CN106934208B - A kind of dam thundering observed data automatic identifying method - Google Patents

A kind of dam thundering observed data automatic identifying method Download PDF

Info

Publication number
CN106934208B
CN106934208B CN201710006186.5A CN201710006186A CN106934208B CN 106934208 B CN106934208 B CN 106934208B CN 201710006186 A CN201710006186 A CN 201710006186A CN 106934208 B CN106934208 B CN 106934208B
Authority
CN
China
Prior art keywords
sequence
dam
feature group
matrix
identifying method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710006186.5A
Other languages
Chinese (zh)
Other versions
CN106934208A (en
Inventor
杨鸽
沈海尧
王玉洁
崔何亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China
PowerChina Huadong Engineering Corp Ltd
Original Assignee
Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China, PowerChina Huadong Engineering Corp Ltd filed Critical Large Dam Safety Supervision Center National Energy Administration Of People's Republic Of China
Priority to CN201710006186.5A priority Critical patent/CN106934208B/en
Publication of CN106934208A publication Critical patent/CN106934208A/en
Application granted granted Critical
Publication of CN106934208B publication Critical patent/CN106934208B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Complex Calculations (AREA)

Abstract

The present invention discloses a kind of dam thundering observed data automatic identifying method, comprising: the track matrix of building primary monitoring data sequence carries out singular value decomposition to track matrix and obtains feature group;Feature group is arranged from big to small according to characteristic value, selecting several the preceding feature groups of accumulation contribution rate more than or equal to 85% is main feature group;The corresponding fundamental matrix of main feature group is calculated, diagonal equalization is carried out to fundamental matrix and obtains the main component of data sequence;Main component is added up and obtains reconstruct data sequence;Subtract each other to obtain residual sequence with reproducing sequence and former data sequence, finds out the standard deviation of residual sequence;Judge whether measured value is exceptional value by Pauta criterion according to the residual error of measured value.This method can automatically extract the main feature of monitoring data sequence, avoid artificial founding mathematical models, not only can guarantee the consistency and accuracy of judgement, also reduce human resources investment;It still is able to differentiate monitoring data when the environment parameters such as water level, temperature missing.

Description

A kind of dam thundering observed data automatic identifying method
Technical field
The present invention relates to Dam Monitoring field more particularly to a kind of dam thundering observed data automatic identifying methods.
Background technique
China builds together into 100 meters or more more than 200 seats of dam, wherein 150 meters or more of more than 40 seat of high dam.To these dams into Row monitoring, monitoring are to guarantee the important means of its safe operation." the Dam operational safety prison that Bureau of Energy in 2015 promulgates Superintend and direct administrative provisions " " for 100 meters of height of dam or more of dam, electric power enterprise should establish dam safety and supervise online further requirement Control system ", " dam center should carry out remote online technical supervision to the dam operational safety that registration (putting on record) registers ".Due to Operating condition is complicated, and the monitoring point that high dam is laid is usually far more than common engineering;And when being managed to group dam, the survey that is related to Point number is even more huge.
The vital task of on-line monitoring is identification abnormal operating condition, and basis is identification thundering observed data.Currently, The visible outlier identification method in Dam Monitoring field is divided into method of identification based on envelope domain according to its principle, based on item The method of identification of part similitude and method of identification three classes based on mathematical model.Wherein, the exception based on statistical regression mathematical model Value recognition methods can be normally reached higher susceptibility, while also be not easy for normal value to be mistaken for exception, therefore application is most It is extensive.But the people that the foundation of regression model is typically required for abundant data analysis experience operates completion.When to monitoring point pole When more high dams or group dam is monitored, human cost is huge;Meanwhile different operators be likely to occur standard it is inconsistent, The even situation of inaccuracy.In addition, also typically including the environment parameters such as water level, temperature in statistical model, and pass through in practical projects Often there is the case where reporting and submitting when environment parameter and effect quantity difference, at this moment will be unable to obtain effect quantity predicted value using statistical model, Thus also can not just judge whether measured value is abnormal.
Summary of the invention
Manual operation and environment parameter are relied in the dam thundering observed data identification technology based on statistical model The excessively high problem of degree, the present invention provide a kind of method of automatic identification thundering observed data, it is intended to promote dam safety monitor Precision, efficiency and the robustness that abnormal value identifies in work, and reduce human resources investment.
To achieve the goals above, the present invention discloses a kind of dam thundering observed data automatic identifying method, the method The following steps are included:
1) by primary monitoring data sequence construct track matrix, singular value decomposition then is carried out to track matrix and obtains a system Column feature group;
2) feature group is arranged from big to small according to characteristic value, selection accumulation contribution rate more than or equal to 85% it is preceding several Feature group is main feature group;
3) the corresponding fundamental matrix of main feature group is calculated, diagonal equalization then is carried out to fundamental matrix and obtains data sequence Several preceding main components of column;
4) main component obtained is added up and obtains reconstruct data sequence;
5) subtract each other to obtain residual sequence with reproducing sequence and former data sequence, find out the standard deviation of residual sequence;
6) judge whether measured value is exceptional value by Pauta criterion according to the standard deviation of residual sequence.
Further, in above-mentioned steps disclosed by the invention, the track matrix X is by monitoring data sequence f0,f1, f2,...,fN-1Lag arrangement in time obtains, and indicates are as follows:
Wherein, N is monitoring data sequent data count, and L is length of window, and 1 < L < N, K includes by the track every row of matrix X Measured value quantity, K=N-L+1;I, j are used to indicate element xijIt is to be arranged in the i-th row jth the location of in the matrix X of track.
Further, described that track matrix X progress singular value decomposition is referred to: to seek S=XXTNon-negative eigenvalue λ12, λ3,...,λlAnd the feature vector U of corresponding orthonormalization1,U2,U3,...,UlAndThe spy Sign group refers to (λi,Ui,Vi), referred to as ith feature group.
Further, the contribution rate CR of the ith feature groupiIt is calculated by following formula:
Further, the main feature group is the preceding m feature group accumulated contribution rate and be more than or equal to 85%, it may be assumed that
It is that i, j are used to indicate for which characteristic value, and m indicates that the sum of main feature group, l indicate the total of non-negative feature group Number.
Further, the fundamental matrix XiIt is calculated by feature group:
Further, described to fundamental matrix XiThe process diagonally equalized are as follows: for the matrix X of L × Ki, enable it Element is xij, L*=min (L, K), K*=max (L, K), N=L+K-1;If L < K, xij *=xij, otherwise xij *=xji.It is described I-th of main componentIt is calculated as follows:
The reconstruct data sequence is obtained by preceding m main component is cumulative, it may be assumed that
The residual sequence ΔkSubtract each other to obtain by reproducing sequence and former data sequence, it may be assumed that
When the Pauta criterion is that take confidence level be 99%, the standard deviation of residual sequence is σ, when following formula is set up Measured value is normal value, is otherwise exceptional value:
k|≤2.58σ (14)
The invention has the benefit that monitoring data can be automatically extracted using the outlier identification method that the present invention announces The main feature of sequence, avoids artificial founding mathematical models, not only can guarantee the consistency and accuracy of judgement, also substantially reduces Human resources investments.Meanwhile it still being able to differentiate monitoring data when the environment parameters such as water level, temperature missing.
Detailed description of the invention
Fig. 1 is the flow chart of one embodiment of method of the invention.
Fig. 2 is measured data to be analyzed in one embodiment, is a top of arch dam displacement monitoring data.
Fig. 3 is the contribution rate distribution map of preceding 20 feature groups in one embodiment.
Fig. 4 is the corresponding main component curve graph of CR1=67.1% in one embodiment.
Fig. 5 is the corresponding main component curve graph of CR2=12% in one embodiment.
Fig. 6 is the corresponding main component curve graph of CR3=11.98% in one embodiment.
Fig. 7 is the reconstruct data sequence obtained in one embodiment by first three main component.
Fig. 8 is the residual sequence acquired in one embodiment by reconstruct data sequence and measured data sequence and reasonable residual error Range.
Specific embodiment
Below in conjunction with attached drawing and one embodiment to the reality of Dam Monitoring Data outlier identification method of the present invention It applies mode and beneficial effect is described further.Fig. 1 is the flow chart for the outlier identification method announced according to the present invention, is used This method carries out analysis identification to top of arch dam displacement monitoring data shown in Fig. 2.The following steps are included:
Step 1: reading monitoring data sequence f0,f1,f2,...,fN-1, data sequence is lagged to arrangement in time and is obtained Track matrix X:
Wherein, N is monitoring data sequent data count, and L is known as length of window, 1 < L < N;For there is periodic monitoring data Sequence, it is desirable that the value of L is greater than the length of a cycle.L=400 days, N=6800 days in the present embodiment.
Step 2: singular value decomposition being carried out to track matrix X: seeking matrix S=XXT, seek the non-negative eigenvalue λ of S12, λ3,...,λlAnd the feature vector U of corresponding orthonormalization1,U2,U3,...,UlAndObtain l Feature group (λi,Ui,Vi), i=1,2 ... .l.
Step 3: seeking the contribution rate CR of ith feature groupi, its calculation formula is:
Wherein, the non-negative characteristic value sum that l is matrix S.
Step 4: feature group being arranged from big to small according to characteristic value, the accumulation contribution rate SCR of i feature group before askingi:
The accumulation contribution rate SCR of i feature group before judgingiWhether it is more than or equal to 85%, if set up, enables main feature Group number m=i, and choosing this m feature group is main feature group;Otherwise, the cumulative tribute for seeking next feature group is continued through Offer rate.
Fig. 3 is the contribution rate distribution map of preceding 20 feature groups of embodiment illustrated in fig. 2, it is seen that the contribution of first three feature group Rate be noticeably greater than after feature group, accumulation contribution rate be 91%;Therefore, select first three feature group for the master of the present embodiment Want feature group.
Step 5: calculating the corresponding fundamental matrix of main feature group: the corresponding fundamental matrix X of i-th of main feature groupiAre as follows:
Wherein, i=1,2 ..., m.
Step 6: diagonal equalization being carried out to the corresponding fundamental matrix of main feature group and seeks main component: for the square of L × K Battle array Xi, enabling its element is xij, L*=min (L, K), K*=max (L, K), N=L+K-1;If L < K, xij *=xij, otherwise xij * =xji.I-th of main componentIt is calculated as follows:
Fig. 4 show first three corresponding main component of main feature group of embodiment illustrated in fig. 2.
Step 7: preceding m main component being added up and obtains reconstruct data sequence, it may be assumed that
Wherein, k=0,1,2 ..., N-1.Heavy line show the reconstruct data sequence of corresponding embodiment illustrated in fig. 2 in Fig. 5 Column are obtained by first three corresponding main component of main feature group is cumulative.
Step 8: subtracting each other to obtain residual sequence Δ by reproducing sequence and former data sequencek, it may be assumed that
Wherein, k=0,1,2 ..., N-1.Fig. 6 show the residual sequence of corresponding embodiment illustrated in fig. 2.
Step 9: find out the standard deviation sigma of residual sequence:
The standard deviation of the residual error of embodiment illustrated in fig. 2 is 0.9090.
Step 10: for each measured value, judge whether measured value is exceptional value according to Pauta criterion:
k|≤2.58σ (9)
When above formula is set up, measured value corresponding to residual error is normal value;Otherwise the probability that the residual error corresponds to measured value appearance is less than 1%, thus be exceptional value.
The grey area Fig. 6 is residual error range ± 2.3452 of normal measured value in the embodiment determined according to above-mentioned criterion, Measured value corresponding to residual error except the region is abnormal value.

Claims (9)

1. a kind of dam thundering observed data automatic identifying method, which is characterized in that the described method comprises the following steps:
1) by primary monitoring data sequence construct track matrix, singular value decomposition then is carried out to track matrix and obtains a series of spies Sign group;
2) feature group is arranged from big to small according to characteristic value, selection accumulation contribution rate is more than or equal to 85% several preceding features Group is main feature group;
3) the corresponding fundamental matrix of main feature group is calculated, diagonal equalization then is carried out to fundamental matrix and obtains data sequence Several preceding main components;
4) main component is added up and obtains reconstruct data sequence;
5) subtract each other to obtain residual sequence with reconstruct data sequence and former data sequence, find out the standard deviation of residual sequence;
6) judge whether measured value is exceptional value by Pauta criterion according to the standard deviation of residual sequence.
2. dam thundering observed data automatic identifying method according to claim 1, which is characterized in that the track matrix X is by monitoring data sequence f0,f1,f2,...,fN-1Lag arrangement in time obtains, and indicates are as follows:
Wherein, N is monitoring data sequent data count, and L is length of window, the measured value that 1 < L < N, K includes by the track every row of matrix X Quantity, K=N-L+1;I, j are used to indicate element xijIt is to be arranged in the i-th row jth the location of in the matrix X of track.
3. dam thundering observed data automatic identifying method according to claim 1, which is characterized in that described to track square Battle array X carries out singular value decomposition and refers to: seeking S=XXTNon-negative eigenvalue λ123,...,λlAnd corresponding orthonormalization Feature vector U1,U2,U3,...,UlAndThe feature group refers to (λi,Ui,Vi), referred to as ith feature Group.
4. dam thundering observed data automatic identifying method according to claim 3, which is characterized in that described i-th special The contribution rate CR of sign groupiIt is calculated by following formula:
The main feature group is the preceding m feature group accumulated contribution rate and be more than or equal to 85%, it may be assumed that
It is that i, j are used to indicate for which characteristic value, and m indicates that the sum of main feature group, l indicate the sum of non-negative feature group.
5. dam thundering observed data automatic identifying method according to claim 1, which is characterized in that the fundamental matrix XiIt is calculated by following formula:
6. dam thundering observed data automatic identifying method according to claim 1, which is characterized in that described to basic square Battle array XiCarry out the process that diagonal equalization seeks main component are as follows: for the matrix X of L × Ki, enabling its element is xij, L*=min (L, K), K*=max (L, K), N=L+K-1;If L < K, xij*=xij, otherwise xij*=xji, i-th of main componentIt is calculated as follows:
7. dam thundering observed data automatic identifying method according to claim 1, which is characterized in that the reconstruct data Sequence is obtained by preceding m main component is cumulative, it may be assumed that
8. dam thundering observed data automatic identifying method according to claim 1, which is characterized in that the residual sequence ΔkSubtract each other to obtain by reproducing sequence and former data sequence, it may be assumed that
9. dam thundering observed data automatic identifying method according to claim 1, which is characterized in that the La Yida is quasi- When being then that take confidence level be 99%, the standard deviation of residual sequence is σ, otherwise it is different that when following formula is set up, measured value, which is normal value, Constant value:
k|≤2.58σ (8)。
CN201710006186.5A 2017-01-05 2017-01-05 A kind of dam thundering observed data automatic identifying method Active CN106934208B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710006186.5A CN106934208B (en) 2017-01-05 2017-01-05 A kind of dam thundering observed data automatic identifying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710006186.5A CN106934208B (en) 2017-01-05 2017-01-05 A kind of dam thundering observed data automatic identifying method

Publications (2)

Publication Number Publication Date
CN106934208A CN106934208A (en) 2017-07-07
CN106934208B true CN106934208B (en) 2019-07-23

Family

ID=59444700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710006186.5A Active CN106934208B (en) 2017-01-05 2017-01-05 A kind of dam thundering observed data automatic identifying method

Country Status (1)

Country Link
CN (1) CN106934208B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111177218B (en) * 2019-12-25 2022-08-30 深圳市东深电子股份有限公司 Dam safety analysis method based on big data analysis
CN111080982A (en) * 2019-12-31 2020-04-28 三峡大学 Dam safety intelligent monitoring and early warning system and method based on multiple sensors
CN111680267B (en) * 2020-06-01 2022-04-01 四川大学 Three-step online identification method for abnormal dam safety monitoring data
CN112487356B (en) * 2020-11-30 2022-10-14 北京航空航天大学 Structural health monitoring data enhancement method
CN112541538B (en) * 2020-12-11 2023-01-31 中国电建集团华东勘测设计研究院有限公司 Dam abnormity monitoring data automatic identification method under poor information condition
CN112507591B (en) * 2020-12-11 2022-11-18 四川大学 Gravity dam crest displacement monitoring method based on separation type hybrid modeling technology
CN116128312B (en) * 2023-04-17 2023-07-14 南昌工程学院 Dam safety early warning method and system based on monitoring data analysis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8380435B2 (en) * 2010-05-06 2013-02-19 Exxonmobil Upstream Research Company Windowed statistical analysis for anomaly detection in geophysical datasets
CN103699874A (en) * 2013-10-28 2014-04-02 中国计量学院 Crowd abnormal behavior identification method based on SURF (Speed-Up Robust Feature) stream and LLE (Locally Linear Embedding) sparse representation
CN104181883A (en) * 2014-08-08 2014-12-03 青岛高校信息产业有限公司 Method for processing abnormal data of real-time data acquisition system in real time
CN104750861A (en) * 2015-04-16 2015-07-01 中国电力科学研究院 Method and system for cleaning mass data of energy storage power station
CN105205112A (en) * 2015-09-01 2015-12-30 西安交通大学 System and method for excavating abnormal features of time series data
CN105894014A (en) * 2016-03-29 2016-08-24 中国人民解放军海军航空工程学院 Abnormal behavior sequential detection method based on multi-factor inconsistency

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8380435B2 (en) * 2010-05-06 2013-02-19 Exxonmobil Upstream Research Company Windowed statistical analysis for anomaly detection in geophysical datasets
CN103699874A (en) * 2013-10-28 2014-04-02 中国计量学院 Crowd abnormal behavior identification method based on SURF (Speed-Up Robust Feature) stream and LLE (Locally Linear Embedding) sparse representation
CN104181883A (en) * 2014-08-08 2014-12-03 青岛高校信息产业有限公司 Method for processing abnormal data of real-time data acquisition system in real time
CN104750861A (en) * 2015-04-16 2015-07-01 中国电力科学研究院 Method and system for cleaning mass data of energy storage power station
CN105205112A (en) * 2015-09-01 2015-12-30 西安交通大学 System and method for excavating abnormal features of time series data
CN105894014A (en) * 2016-03-29 2016-08-24 中国人民解放军海军航空工程学院 Abnormal behavior sequential detection method based on multi-factor inconsistency

Also Published As

Publication number Publication date
CN106934208A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN106934208B (en) A kind of dam thundering observed data automatic identifying method
Vazirizade et al. Seismic reliability assessment of structures using artificial neural network
CN116451879B (en) Drought risk prediction method and system and electronic equipment
CN108375715B (en) Power distribution network line fault risk day prediction method and system
CN110472846A (en) Nuclear power plant&#39;s thermal-hydraulic safety analysis the best-estimated adds uncertain method
CN109470946B (en) Power generation equipment fault detection method and system
CN104156615A (en) Sensor test data point anomaly detection method based on LS-SVM
Li et al. Hydrostatic seasonal state model for monitoring data analysis of concrete dams
CN104537211A (en) Enterprise safety risk early warning method based on analytic hierarchy process and grey theory
Hwang et al. Long-term damping characteristics of twin cable-stayed bridge under environmental and operational variations
CN108960329A (en) A kind of chemical process fault detection method comprising missing data
CN115507822A (en) Flood risk prediction method under hydrographic cyclic variation drive
CN105320987A (en) Satellite telemetry data intelligent interpretation method based on BP neural network
Burr et al. Revisiting statistical aspects of nuclear material accounting
Aliberti et al. Indoor air-temperature forecast for energy-efficient management in smart buildings
CN105046089B (en) A kind of method for predicting heavy showers and flood
CN112700050B (en) Method and system for predicting ultra-short-term 1 st point power of photovoltaic power station
CN109961160B (en) Power grid future operation trend estimation method and system based on tide parameters
CN103197564B (en) Digitizing man-machine interface monitor unit quantity optimization method and system
Hou et al. An artificial neural network based anomaly detection algorithm for nuclear power plants
Khoroshilov Mathematical Modelling of Sayano-Shushenskaya Dam Displacement Process after 2009 Accident
CN108599147B (en) Combined interval prediction method based on normal exponential smoothing method and kernel density estimation
CN109033564A (en) A kind of aircraft airborne equipment testability demonstration index evaluating method
Feng et al. An integrated reliability model of hardware-software system
CN112260211A (en) Method and device for determining operating state of relay protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190528

Address after: No. 22 Chaowang Road, Hangzhou, Zhejiang Province, Zhejiang

Applicant after: LARGE DAM SAFETY SUPERVISION CENTER, NATIONAL ENERGY ADMINISTRATION OF THE PEOPLE'S REPUBLIC OF CHINA

Applicant after: Co., Ltd of East China Investigation and Design Institute of electricity Jian group of China

Address before: No. 22 Chaowang Road, Hangzhou, Zhejiang Province, Zhejiang

Applicant before: Co., Ltd of East China Investigation and Design Institute of electricity Jian group of China

GR01 Patent grant
GR01 Patent grant