CN106815695A - Information processing method and device in object transfer - Google Patents
Information processing method and device in object transfer Download PDFInfo
- Publication number
- CN106815695A CN106815695A CN201510846448.XA CN201510846448A CN106815695A CN 106815695 A CN106815695 A CN 106815695A CN 201510846448 A CN201510846448 A CN 201510846448A CN 106815695 A CN106815695 A CN 106815695A
- Authority
- CN
- China
- Prior art keywords
- server
- user equipment
- node
- message
- logistics
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/01—Customer relationship services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0601—Electronic shopping [e-shopping]
Abstract
This application provides information processing method and device in a kind of object transfer.The method includes:First server receives the certification request that second user equipment sends in response to receiving first payment message and the second payment message afterwards of first user equipment;Certification message is sent to second user equipment, the certification message sends object transfer request for triggering second user equipment;In the case where the object transfer for receiving second user equipment is asked, notify that second server pays request and second and pays request designated destination connection object to first.Subscribed under scene present application addresses in the futures of distribution, the Network Security Issues of the transaction between retail trader and supplier.
Description
Technical field
The application be related to a kind of information processing method in computer realm, more particularly to object transfer and
Device.
Background technology
It is a kind of innovation supplying mode for improving supply chain circulation efficiency that futures subscribe pattern, i.e., right
As having not been entered into warehouse, even without reservation pattern when producing with regard to being supplied in advance.
Its feature is to generally require user's hair payment message twice.It is for the first time that deposit pays successfully, hair
One deposit payment message;It is for the second time that remaining fund pays successfully, sends out a remaining fund payment message.It is logical
Cross and allow a certain proportion of deposit of user's payment (after usual 10% or so) determines purchase intention, to supply
Business's reproduction, storage, by logistics network be issued to from user designated destination closer to logistics
Node.After paying remaining fund Deng user, it is possible to from the logistics node of closer to the destination by object very
User is transferred to soon.Futures subscribe this pattern for supplier, because being it is determined that user
Need to be put in storage again after purchase, therefore object can be reduced in the storehouse time, improve inventory turnover ratio,
And then improve the efficiency of whole supply chain;For a user, paying remaining fund can receive quickly
Object, the time of receiving greatly shortens, and realizes both sides' win-win.
Distribution refers to supplier acts on behalf of the power of sale increases Sales Channel, retail trader's earning to retail trader
The price difference of the purchasing price between supplier and user.This pattern is because can help supplier to expand
Big Sales Channel and be widely used.If to realize dividing in the prior art under futures reservation pattern
Pin, the problem arises.When realizing distribution under futures reservation pattern, e-commerce platform monitoring
After the deposit sent to user, notify logistics platform by object transfer to the purpose specified from user
Ground closer to logistics node.Then, after monitoring the remaining fund that user sends, it is impossible to notify logistics
Object is sent to user by platform from the logistics node of closer to the destination, because retail trader does not give also
Supplier pays the bill.If e-commerce platform notes that logistics after monitoring the remaining fund that user sends
Platform is delivered, if retail trader does not pay supplier, will cause the loss of supplier.But if
The remaining fund for allowing retail trader to receive user is just paid the bill to supplier, and supplier can feel dangerous, because
For if supplier has paid money, supplier does not recognize that the loss of retail trader will be caused.Therefore, dividing
The futures of pin are subscribed under scene, the Network Security Issues of the transaction between retail trader and supplier,
Into problem demanding prompt solution.
The content of the invention
One of technical problem that the application is solved is to solve to be subscribed under scene in the futures of distribution, distribution
The Network Security Issues of the transaction between business and supplier.
According to one embodiment of the application, there is provided the information processing method in a kind of object transfer,
Including:First server receives second user equipment in response to receiving the first of first user equipment
Payment message and the second payment message afterwards and the certification request that sends;Sent out to second user equipment
Certification message, the certification message is sent to send object transfer request for triggering second user equipment;
In the case where the object transfer for receiving second user equipment is asked, notify second server to the
One pays request and second pays request designated destination connection object.
According to one embodiment of the application, there is provided the information processing method in a kind of object transfer,
Including:Second server receive it is from first server, monitor first user equipment
In the case of the notice of the first payment message, by object transfer to transit node;Come from receiving
In the case of first server, the request of the object transfer that has been received by second user equipment notice,
Object is transferred to the first payment message and the second payment message designated destination from transit node,
The object transfer request of wherein second user equipment is set in response to second user according to first server
Standby certification request and the certification message that sends produces, the certification request is second user equipment
In response to receiving the generation of the second payment message.
According to one embodiment of the application, there is provided the information processing method in a kind of object transfer,
Including:Second user equipment is in response to receiving first payment message and afterwards of first user equipment
The second payment message, to first server send certification request;Certification is received from first server
Message;According to the certification message, send object transfer to first server and ask, so as to first
Server notifies that second server pays request to first and the second payment request designated destination passes
Defeated object.
According to one embodiment of the application, there is provided the information processing method in a kind of object transfer,
Including:First user equipment sends the first payment message to second user equipment;Set to second user
Preparation send the second payment message, second payment message to trigger second user equipment to first service
Device sends certification request, certification message is received from first server, according to the certification message to first
Server sends object transfer request, so that first server notifies that second server pays to first
Request and second pays request designated destination connection object.
According to one embodiment of the application, there is provided the information processor in a kind of object transfer,
Including:Certification request receiving unit, for receiving second user equipment in response to receiving the first use
First payment message of family equipment and the second payment message afterwards and the certification request that sends;Certification
Message sending unit, certification message is sent to second user equipment, and the certification message is used to trigger
Second user equipment sends object transfer request;Destination transmission notice unit, for receiving
In the case that the object transfer of second user equipment is asked, notify that second server pays to first and ask
Summation second pays request designated destination connection object.
According to one embodiment of the application, there is provided the information processor in a kind of object transfer,
Including:Object to transit node transmission unit, for receiving from first server, prison
In the case of depending on the notice to the first payment message of first user equipment, by object transfer to transfer
Node;Object to destination transmission unit, for receive it is from first server, connect
In the case of receiving the notice of object transfer request of second user equipment, by object from transit node
It is transferred to the first payment message and the second payment message designated destination, wherein second user equipment
Object transfer request be to be sent out in response to the certification request of second user equipment according to first server
What the certification message for going out was produced, the certification request is second user equipment in response to receiving second
What payment message was produced.
According to one embodiment of the application, there is provided the information processor in a kind of object transfer,
Including:Certification request transmitting element, for the first payment in response to receiving first user equipment
Message and the second payment message afterwards, certification request is sent to first server;Certification message connects
Unit is received, for receiving certification message from first server;Object transfer asks issue unit, uses
According to the certification message, send object transfer to first server and ask, so as to first service
Device notifies that second server pays request to first and the second payment request designated destination transmission is right
As.
According to one embodiment of the application, there is provided the information processor in a kind of object transfer,
Including:First payment message transmitting element, for sending the first payment message to second user equipment;
Second payment message transmitting element, it is described for sending the second payment message to second user equipment
Second payment message triggers second user equipment and sends certification request to first server, from the first clothes
Business device receives certification message, and sending object transfer to first server according to the certification message asks,
So that first server notifies that second server pays request and second and pays what request was specified to first
Destination connection object.
In embodiments herein, when realizing distribution under futures reservation pattern, work as second user
Equipment (retail trader's terminal) receives the second payment that first user equipment (user terminal) is sent
It is not hastily to be paid the bill to the 3rd user equipment (vendor terminal) after message (remaining fund), but
A certification request first is sent out to first server, if the certification message of first server is indicated to point
Pin business's payment is safe, can just be paid the bill, and only can just give user after retail trader's payment
Connection object, so as to the futures solved in distribution are subscribed under scene, between retail trader and supplier
Trade network safety issue.
Although those of ordinary skill in the art will be appreciated that referenced in schematic is implemented in following detailed description
Example, accompanying drawing are carried out, but the application is not limited in these embodiments.But, scope of the present application
It is extensive, and is intended to be bound only by appended claims restriction scope of the present application.
Brief description of the drawings
The detailed description made to non-limiting example made with reference to the following drawings by reading,
Other features, objects and advantages will become more apparent upon:
Fig. 1 is the general frame of the object transfer system that the application one embodiment is applied.
Fig. 2 is the letter in the object transfer of first server side according to one embodiment of the application
Cease the flow chart of processing method.
Fig. 3 is another embodiment according to the application in the object transfer of first server side
The flow chart of information processing method.
Fig. 4 is the letter in the object transfer of second server side according to one embodiment of the application
Cease the flow chart of processing method.
Fig. 5 is the one embodiment according to the application in the object transfer of second user equipment side
The flow chart of information processing method.
Fig. 6 is the one embodiment according to the application in the object transfer of first user equipment side
The flow chart of information processing method.
Fig. 7 is the letter in the object transfer of first server side according to one embodiment of the application
Cease the block diagram of processing unit.
Fig. 8 is another embodiment according to the application in the object transfer of first server side
The block diagram of information processor.
Fig. 9 is the letter in the object transfer of second server side according to one embodiment of the application
Cease the block diagram of processing unit.
Figure 10 is the one embodiment according to the application in the object transfer of second user equipment side
The block diagram of information processor.
Figure 11 is the one embodiment according to the application in the object transfer of first user equipment side
The block diagram of information processor.
Although those of ordinary skill in the art will be appreciated that referenced in schematic is implemented in following detailed description
Example, accompanying drawing are carried out, but the application is not limited in these embodiments.But, scope of the present application
It is extensive, and is intended to be bound only by appended claims restriction scope of the present application.
Specific embodiment
It should be mentioned that some exemplary realities before exemplary embodiment is discussed in greater detail
Apply treatment or method that example is described as describing as flow chart.Although flow chart retouches operations
The treatment of order is stated into, but many of which operation can be by concurrently, concomitantly or simultaneously
Implement.Additionally, the order of operations can be rearranged.The place when its operations are completed
Reason can be terminated, it is also possible to have the additional step being not included in accompanying drawing.The treatment
Can correspond to method, function, code, subroutine, subprogram etc..
The computer equipment includes user equipment and the network equipment.Wherein, the user equipment bag
Include but be not limited to computer, smart mobile phone, PDA etc.;The network equipment is including but not limited to single
The webserver, the server group of multiple webserver composition or based on cloud computing (Cloud
Computing the cloud being made up of a large amount of computers or the webserver), wherein, cloud computing is point
One kind that cloth is calculated, a super virtual computing being made up of the computer collection of a group loose couplings
Machine.Wherein, the computer equipment can isolated operation realize the application, also can access network simultaneously
The application is realized by with the interactive operation of other computer equipments in network.Wherein, it is described
Network residing for computer equipment include but is not limited to internet, wide area network, Metropolitan Area Network (MAN), LAN,
VPN etc..
It should be noted that the user equipment, the network equipment and network etc. are only for example, other
The existing or computer equipment that will be likely to occur from now on or network are such as applicable to the application, should also wrap
It is contained within the application protection domain, and is incorporated herein by reference.
Method (some of them are illustrated by flow) discussed hereafter can be by hardware, soft
Part, firmware, middleware, microcode, hardware description language or its any combination are implemented.When
During with software, firmware, middleware or microcode to implement, it is used to implement the program generation of necessary task
Code or code segment can be stored in machine or computer-readable medium (such as storage medium).(one
Individual or multiple) processor can implement necessary task.
Concrete structure disclosed herein and function detail are only representational, and are for retouching
State the purpose of the exemplary embodiment of the application.But the application can by many alternative forms come
Implement, and be not interpreted as being limited only by the embodiments set forth herein.
Although it should be appreciated that may have been used term " first ", " second " etc. herein
To describe unit, but these units should not be limited by these terms.Use these terms
Just for the sake of a unit and another unit are made a distinction.For example, without departing substantially from showing
In the case of the scope of example property embodiment, first module can be referred to as second unit, and be similar to
Ground second unit can be referred to as first module.Term "and/or" used herein above is included wherein
Any and all combination of one or more listed associated items.
It should be appreciated that when a unit is referred to as " connection " or " coupled " to another unit
When, it can be connected or coupled to another unit, or there may be temporary location.
On the other hand, when a unit is referred to as " being directly connected " or " directly coupled " to another unit
When, then in the absence of temporary location.Should explain in a comparable manner be used for description unit it
Between relation other words (such as compared to " between being directly in ... " " between being in ... ", " with ...
It is neighbouring " compared to " with ... it is directly adjacent to " etc.).
Term used herein above is not intended to limit exemplary just for the sake of description specific embodiment
Embodiment.Unless the context clearly dictates otherwise, singulative " otherwise used herein above
It is individual ", " one " also attempt to include plural number.It is to be further understood that term " bag used herein above
Include " and/or "comprising" specify stated feature, integer, step, operation, unit and/or group
The presence of part, and do not preclude the presence or addition of one or more other features, integer, step, behaviour
Work, unit, component and/or its combination.
It should further be mentioned that in some replaces realization modes, the function/action being previously mentioned can be with
Occur according to the order different from being indicated in accompanying drawing.For example, depending on involved function/dynamic
Make, the two width figures for showing in succession can essentially substantially simultaneously perform or sometimes can be according to phase
Anti- order is performed.
Fig. 1 is the general frame of the object transfer system that the application one embodiment is applied.The confession
Answering system includes first user equipment 60, second user equipment 20, the 3rd user equipment 30, first
Server 10, second server 40, transit node 50.
In one embodiment, first user equipment 60 is the terminal of user, second user equipment 20
It is the terminal of retail trader, the 3rd user equipment 30 is the terminal of supplier, and first server 10 is
E-business network site server (hereinafter referred to as " electric business server "), second server 40 is logistics
Service provider server (hereinafter referred to as " logistics service device "), node is that logistics service device is provided
A logistics warehouse in the logistics system of business, transit node is wanted for temporary in logistics system
Transfer to the logistics warehouse of the object of user.Object can be the article during futures are subscribed, it is also possible to
It is a message, because being likely to situation about being subscribed in advance for message occur.That is, the phase
" goods " during goods is subscribed can refer to tangible entity, such as one article, it is also possible to refer to intangibles
Product, such as one e-magazine or an enterprise data analysis result bag.
Fig. 2 shows a kind of first server of one embodiment (electric business server) according to the application
Information processing method in the object transfer of 10 sides.The method includes:S110, first server connect
Receive second user equipment in response to receive first user equipment the first payment message and afterwards the
Two payment messages and the certification request that sends;S120, to second user equipment send certification message,
The certification message sends object transfer request for triggering second user equipment;S130, receive
To second user equipment object transfer ask in the case of, notify second server to first pay
Request and second pays request designated destination connection object.These steps are carried out in detail below
Description.
In step s 110, first server receives second user equipment in response to receiving the first use
First payment message of family equipment and the second payment message afterwards and the certification request that sends.
In one embodiment, the first payment message is deposit payment message, and the second payment message is
Remaining fund payment message.Retail trader is that supplier acts as the agent of object.First server is (for example, electricity
Business's server) e-commerce platform be each retail trader show respectively its agency and sales supplier
Object.That is, detail information (the example of the object of the supplier that retail trader is acted as the agent of
Such as picture, specification, operation instruction, price, the place of origin) can be from supplier synchronized update to electricity
The space of corresponding retail trader in sub- business platform.User logs in e-commerce platform, just can be appreciated that point
The detail information of the object of the supplier that pin business is acted as the agent of.When user sees the details letter of object
Breath, it is desirable to when carrying out futures reservation, first pass through first user equipment (terminal of user) and determined
Gold is paid, and the first payment message is sent to second user equipment (terminal of retail trader).Work as user
When wanting to receive the object of futures reservation, remaining fund payment is carried out by first user equipment, to second
User equipment (terminal of retail trader) sends the second payment message.Second user equipment (retail trader
Terminal) be connected to the first payment message and the second payment message after, to first server (electric business take
Business device) send certification request.The certification request is used for asking first server to retail trader to supply
Whether safety is authenticated business's payment.
In the step s 120, certification message is sent to second user equipment, the certification message is used for
Triggering second user equipment sends object transfer request.
In one embodiment, it is first after first server is connected to the certification request of second user equipment
First the supplier according to pointed by certification request, verifies supplier in first server in other words in electricity
Business's platform lawful registration, and verify the supplier with the dispersing agent relation of retail trader in first service
Device is put on record on electric business platform in other words.If supplier is in first server lawful registration, and should
Supplier has put on record with the dispersing agent relation of retail trader in first server, then send and represent certification
Successful certification message, it is safe to represent retail trader to supplier's payment.If supplier does not exist
First server lawful registration, or the supplier and retail trader dispersing agent relation in first service
Device is not put on record, then send the certification message for representing authentification failure, represents retail trader and is paid the bill to supplier
It is risky.Only the expression successful certification of certification is received in second user equipment from first server
During message, second user equipment is just paid the bill to the 3rd user equipment (terminal of supplier), is sent
Object transfer is asked, you can arrive user to deliver.
Another meaning of the certification message is that it serves as buying and sells list on a commission basis, it comprises second
The price that user equipment is paid the bill to the 3rd user equipment, because the meaning of distribution is that retail trader can earn
Price differential between the payment for goods that the payment for goods and supplier for getting user's payment are received.The number that user pays
(deposit+remaining fund) is greater than the number that retail trader pays to supplier, and distribution is just meaningful.First
The supplier and the dispersing agent contract of retail trader that whois lookup is put on record in first server, really
The number that retail trader pays to supplier is determined, so as to allow retail trader to be paid the bill to supplier according to the number.
In step s 130, in the case where the object transfer for receiving second user equipment is asked,
Notify that second server pays request to first and the second payment request designated destination transmission is right
As.
That is, when retail trader pays the bill to supplier, object is have issued by second user equipment
In the case of transmission request, first server (electric business server) receives object transfer request,
Notify that second server (logistics service device) pays request and second and pays what request was specified to first
Destination connection object.Because supplier is by the matters thing such as the storage of object, transport, delivery
Logistics platform is first entrusted to, therefore can directly pass through second server to destination connection object,
It is transmitted without through supplier.
In the case where user is oneself subscription object, first pays request and the second payment request refers to
Fixed destination is the address of user, and the address can be that user sends on the first user device
Filled in first user equipment when one payment message and the second payment message.In user for other people are pre-
In the case of ordering object, the first payment request and the second payment request designated destination are other people
Address, the address can be that user sends the first payment message and second on the first user device
Pay what is filled in first user equipment during message.
In addition, in another embodiment of the application, as shown in figure 3, before step S110,
Methods described also includes step S108, that is, monitoring the first payment message of first user equipment
In the case of, notify second server by object transfer to transit node.In addition, step S130 is also wrapped
Include:Notify second server from the transit node to the destination connection object.
First payment message is that first user equipment is sent to second user equipment, but it be user with
Electric business platform to the selection of the electric business page and is filled in and generated during interacting in response to user,
It must be supervised by first server.The first payment message is monitored in first server
In the case of, notify second server, i.e. logistics service device by object transfer to transit node.So
The benefit done is, after user has paid remaining fund, and retail trader also pays the bill to supplier, Ke Yizhi
Connect in step s 130 from transit node by object transfer to destination, reduce period of reservation of number,
Improve Dispatching efficiency.
In one embodiment, the transit node is the logistics node nearest from the destination.
Advantage of this is that, the wait that maximization reduction user has been paid after remaining fund is received the time, because in
Trochanterion from destination more close to, receive faster, efficiency is higher.
In one embodiment of the application, also to stock's exhibition of futures subscription object on electric business platform
It is shown with improvement.Stockpile number of the user often according to the object shown on electric business platform is ordered certainly
Plan.The object stockpile number shown on electric business platform, is generally into logistics platform (such as green hand's net
Network) warehouses at different levels object number.Because in logistics platform, user just has these stocks
One kind is expected, i.e., user can quickly be connected to goods after ordering, because the turnover of goods is in logistics network
Quickly.According to the stockpile number on electric business platform, user can just decide whether to order right
As.However, for futures reservation pattern, only displaying has been enter into logistics net on electric business platform
The object in the warehouse of network, i.e., only show that real warehouse is deposited, may vicious guidance to user.User
May can be appreciated that the real warehouse of the object is deposited less and abandons subscribing.But it is in fact, pre- for futures
For ordering, can after user has paid deposit again from suppliers adjust goods, wait user paid remaining fund it
The object of the quantity that user subscribes is suffered in the warehouse of logistics network afterwards.Therefore, for futures
Subscription object, shows that real warehouse deposits nonsensical in electric business platform.The application one embodiment is proposed
Show the empty storehouse stockpile number of futures subscription object in electric business platform.Its benefit is make displaying right
Really reflect can be the quantity of object that user provides quickly as stockpile number, provided for user subscribes
True foundation, and super dispatching will not occur.Super dispatching under futures reservation pattern refers to user's payment
Because the shortage of stock cannot in time dispense object after deposit and remaining fund.Due to user branch pay earnest money after,
Object sinks to transit node from suppliers, and user would not be because of stock after remaining fund is paid
Deficiency cannot in time receive object, i.e., super dispatching will not occur.
In this embodiment, before step S108, the method also includes:S102, identification are described
Whether object is futures subscription object;If S104, described pair as if futures subscription object, displaying
The empty storehouse stockpile number of object, the empty storehouse stockpile number be at the 3rd user equipment be expected still can be
Futures subscribe the number of objects for providing.
In step s 102, recognize whether the object is futures subscription object.
In one embodiment, recognize whether the object is that futures subscription object is by recognizing
Whether object there are futures to subscribe what mark was realized in object detail information database.In first service
Device safeguards an object detail information database.The detail information of object from supplier's synchronized update to
Object detail information database.If this pair as if futures subscription object, there is provided side is in the object
Just mark, synchronized update to object detail information database are subscribed in detail information plus a futures.
Therefore, by recognizing whether object there are futures to subscribe mark in the database, it is possible to recognize
Whether the object is futures subscription object.
In step S104, if described pair as if futures subscription object, show the empty warehouse of object
Poke amount.
The empty storehouse stockpile number be at the 3rd user equipment be expected still can be futures reservation provide it is right
Still the number of objects for providing can be subscribed as quantity, i.e. suppliers are estimated for futures.It can be supplied
Answer the number of objects that business has produced.It may be stored in the warehouse of supplier itself, not have also
Have and enter logistics network.It is to first server in the 3rd user equipment that the initial empty warehouse of object is deposited
Updated as a part for detail information during the detail information of synchronized update object and arrive first server
Object detail information database.It is as described below, once the first payment message is monitored, with regard to basis
Referent quantity in first payment message, reduces the empty storehouse stockpile number.
In one embodiment, step S108 includes:According to referent in the first payment message
Quantity, reduces the empty storehouse stockpile number of displaying;Notify second server from logistics nodes at different levels
The object of referent quantity described in real storehouse stock allotment is to transit node;Notify second server
The actual object for receiving referent quantity from the 3rd user equipment, to make up logistics sections at different levels
Deposit in real warehouse in point.
According to referent quantity in the first payment message, the empty storehouse stockpile number of displaying is reduced
Benefit is to prevent super dispatching.Because, once receive deposit, it is meant that what deposit was related to
The object of part quantity has had user have subscribed to, it is impossible to receive futures reservation again.If do not supported
Subtract the empty storehouse stockpile number of displaying, it is possible to which super dispatching occurs.
The warehouses at different levels of logistics network (such as green hand's network) are called logistics nodes at different levels.In general,
One two-stage logistics node is the big warehouse such as provincial, city-level, and Huo Yige cities of a general province just have one
It is individual or several, belong to senior logistics node.Three level Four logistics nodes be area level, street-level it is small
Warehouse, area, an one or several streets have one, belong to rudimentary logistics node.
Futures are subscribed needs that object first is transferred into transit node from supplier after deposit is received, etc.
To user paid remaining fund and retail trader also to supplier pay the bill after, by object from transit node send out
It is sent to destination.But it sometimes appear that user has been paid after remaining fund, retail trader also pay the bill to supplier supply
Answer the situation that business is still non-shipment, cause transit node short supply.Therefore, in order to prevent transit node to lack
Goods causes dispatching efficiency to decline, and one embodiment of the application proposes the conversion of actual situation storehouse, that is, change storehouse
Way.I.e. when the object of the actual offer of supplier is not connected to, storehouse treatment is changed in execution, from different levels
There is the object of the quantity that reservation is first alloted at the logistics node of the object to middle trochanter in logistics node
Point, then receives object from supplier is actual again.That is, first server (electric business service
Device) notify second server (logistics service device) from the real storehouse stock allotment in logistics nodes at different levels
The object of the number of objects involved by the first payment message reinforms second server to transit node
The actual object for receiving referent quantity from the 3rd user equipment, to make up logistics sections at different levels
Deposit in real warehouse in point.By so treatment, it is therefore prevented that transit node is in short supply, dispatching effect is improve
Rate.
In one embodiment, notify that second server deposits tune from the real warehouse in logistics nodes at different levels
Dial the object of the referent quantity is to a kind of actual practice of transit node:From low member
The object of referent quantity described in the real storehouse stock allotment of node is flowed to transit node;Rudimentary
The real warehouse of logistics node is deposited in the case of cannot meeting the referent quantity, from higher member
The object of real storehouse stock allotment insufficient section of node is flowed to transit node.Advantage of this is that,
First being filled with foot with the real warehouse of rudimentary logistics node needs to be sent to the object of transit node, is conducive to
The stock's stabilization for keeping senior logistics node, is conducive to the overall arrangement of logistics.Senior logistics node
Often a province or city's only one of which or several, if senior logistics node repository deposits deficit can influence whole
The logistic efficiency of individual logistics system.
For example, the deposit of user is related to subscribe 100 B objects of A suppliers.Where user
Ground three, level Four logistics storehouse only find 40 B objects of A suppliers, in user location one,
Find 80 B objects of A suppliers in two-stage logistics storehouse.Therefore, first by the three of user location,
The B objects of 40 A suppliers in level Four logistics storehouse are sent to transit node, then from user location
I and II logistics storehouse take out 60 A suppliers B objects be sent to transit node.But logistics
Network is typically all stored in I and II from after A suppliers 100 B objects of actual reception
Logistics storehouse.
In one embodiment, referent described in the real storehouse stock allotment from rudimentary logistics node
The object of quantity is that timing is completed to transit node.That is, it is not to receive one first payment to disappear
Breath, just adjusts goods since three, level Four logistics storehouse at once, but is spaced at predetermined time intervals, for
All first payment messages received in the predetermined time interval, from the real storehouse of rudimentary logistics node
The object of stock's Unified transfers these the first payment message referent quantity is to transit node.This
Sample is favorably improved the logistic efficiency of logistics network.
In one embodiment, from the object of the real storehouse stock allotment insufficient section of senior logistics node
To transit node nor the real warehouse that a discovery has rudimentary logistics node is deposited and cannot meet the first payment
The situation of message referent quantity is just carried out immediately, but is being received during futures subscribe
After end, deposit to meet and relate to for the real warehouse for receiving rudimentary logistics node during futures are subscribed
And number of objects all first payment messages, unification deposit tune from the real warehouse of senior logistics node
The object of insufficient section is dialled to transit node.The benefit of do so is also to be favorably improved logistics network
Logistic efficiency.
For futures subscription object, can set one receive futures subscribe during.User only has
During this it is interior descend deposit can carry out futures reservation.Once under terminating user not during this period
Deposit, cannot carry out futures reservation.After receiving to terminate during futures are subscribed, just from senior
The object of the real storehouse stock allotment insufficient section of logistics node is helped avoid frequently to transit node
Being alloted from a two-stage logistics storehouse causes logistic efficiency to decline.
In addition, as shown in figure 3, in one embodiment of the application, after step s 102,
Methods described also includes:
If S105, the object are not futures subscription objects, recognize whether the object is anti-super
Dispatching object;
S106, in response to identifying described pair as if anti-super dispatching object, the stockpile number that will show
It is defined as 0;
S107, in response to identifying that the object is not anti-super dispatching object, the inventory that will show
Deposit in the total real warehouse that amount is defined as object described in each logistics website.
Specifically, in step S105, if the object is not futures subscription object, identification
Whether the object is anti-super dispatching object.
Super dispatching under non-subscribing pattern refer to user-pay after because of the shortage of stock in logistics network
Causing consignee cannot timely receive object.
In one embodiment, recognize whether the object is anti-super dispatching pair as if is existed by identification
Whether object has what anti-super dispatching mark was realized in object detail information database.In first service
Device safeguards an object detail information database, from the object details letter that supplier's synchronized update comes
Breath storage is in the database.If this pair likes can not surpass dispatching, supplier is in the object
Just just stored after synchronized update to first server plus an anti-super dispatching mark in detail information
In object detail information database.Therefore, by recognizing whether object has in the database
Anti- super dispatching mark, it is possible to recognize whether the object is anti-super dispatching object.
In step s 106, in response to identifying described pair as if anti-super dispatching object, by what is shown
Stockpile number is defined as 0.
If it is assumed that electric business platform shows that the stock of certain object is 6, i.e., being not 0, show logistics net
Each storehouse is stored with 6 objects in network.Now, if 10 users order the object simultaneously, though
So there are 6 objects in display logistics network, still at least 4 users cannot in time obtain this pair
As causing super dispatching.Accordingly, in response to described pair as if anti-super dispatching object is identified, by exhibition
The stockpile number for showing is defined as 0, and just having reached prevents the purpose of the super dispatching for usual articles.
In step s 107, it is not anti-super dispatching object in response to identifying the object, will shows
Stockpile number be defined as the total real warehouse of object described in each logistics website and deposit.
If object is not anti-super dispatching object, only need to be by the total real warehouse of object in each logistics website
Deposit and show because at this moment users more more than the stock simultaneously order also it doesn't matter because
This pair likes and does not prevent super dispatching.
In figure 3, including step S102, S104, S108, S105, S106, S107, but this
Art personnel should be appreciated that they need not be while be present in an embodiment.For example,
In a certain embodiment, may there was only step S108, without step S102, S104, S105,
S106、S107。
Fig. 4 shows according to an embodiment of the invention in the object transfer of second server side
Information processing method.The method includes:
S210, second server receive it is from first server, monitor first user and set
In the case of the notice of the first standby payment message, by object transfer to transit node;
S220, receiving object from first server, having been received by second user equipment
In the case of transmitting the notice of request, object is transferred to the first payment message and the from transit node
The object transfer request of two payment message designated destinations, wherein second user equipment is according to the
What the certification message that one server sends in response to the certification request of second user equipment was produced, institute
It is that second user equipment is produced in response to receiving the second payment message to state certification request.
Alternatively, step S210 includes:From the real storehouse stock allotment first in logistics nodes at different levels
The object of referent quantity in message is paid to transit node;Actually connect from the 3rd user equipment
The object of referent quantity is received, is deposited with the real warehouse made up in logistics nodes at different levels (in figure not
Show).
Alternatively, related in the real payment message of storehouse stock allotment first from logistics nodes at different levels
And number of objects object to transit node the step of include:From the real warehouse of rudimentary logistics node
Deposit and allot the object of the referent quantity to transit node;In the real storehouse of rudimentary logistics node
In the case that stock cannot meet the referent quantity, from the real warehouse of senior logistics node
Deposit and allot the object of insufficient section to transit node.
The embodiment of Fig. 4 is only the difference for describing angle with Fig. 2,3 embodiment.Fig. 2,3
Embodiment is described from the angle of first server, and the embodiment of Fig. 4 is from second server
Angle be described, therefore do not repeat.
Fig. 5 shows the object transfer in second user equipment side according to one embodiment of the application
In information processing method.The method includes:
S310, second user equipment in response to receive first user equipment the first payment message and
The second payment message afterwards, certification request is sent to first server;
S320, from first server receive certification message;
S330, according to the certification message, send object transfer to first server and ask, so as to
First server notifies that second server pays request and second and pays the purpose that request is specified to first
Ground connection object.
The embodiment of Fig. 5 is only the difference for describing angle with Fig. 2,3 embodiment.Fig. 2,3
Embodiment is described from the angle of first server, and the embodiment of Fig. 5 is set from second user
Standby angle is described, therefore does not repeat.
Fig. 6 shows the object transfer in first user equipment side according to one embodiment of the application
In information processing method.The method includes:
S410, first user equipment send the first payment message to second user equipment;
S420, the second payment message is sent to second user equipment, second payment message triggering
Second user equipment sends certification request to first server, and certification message is received from first server,
Object transfer is sent according to the certification message to first server to ask, so that first server is notified
Second server pays request and second and pays request designated destination connection object to first.
The embodiment of Fig. 6 is only the difference for describing angle with Fig. 2,3 embodiment.Fig. 2,3
Embodiment is described from the angle of first server, and the embodiment of Fig. 6 is set from first user
Standby angle is described, therefore does not repeat.
As shown in fig. 7, according to one embodiment of the application, there is provided one kind is in first server
Information processor 100 in the object transfer of side.The device 100 includes:
Certification request receiving unit 110, for receiving second user equipment in response to receiving the first use
First payment message of family equipment and the second payment message afterwards and the certification request that sends;
Certification message sending unit 120, certification message is sent to second user equipment, and the certification disappears
Cease and send object transfer request for triggering second user equipment;
Destination transmission notice unit 130, for please in the object transfer for receiving second user equipment
In the case of asking, notify that second server pays request and second and pays the mesh that request is specified to first
Ground connection object.
Alternatively, as shown in figure 8, described device 100 also includes:
Transit node transmission notice unit 108, for monitoring the first payment of first user equipment
In the case of message, notify second server by object transfer to transit node.
The destination transmission notice unit 130 is further included:Destination transmission notice subelement
1301, for notifying second server from the transit node to the destination connection object.
Alternatively, the transit node is the logistics node nearest from the destination.
Alternatively, described device 100 also includes:Futures subscription object recognition unit 102, for knowing
Whether not described object is futures subscription object;Display unit 104, if for described pair as if phase
Goods subscription object, shows the empty storehouse stockpile number of object, and the empty storehouse stockpile number is the 3rd user
Being expected at equipment still can be for futures subscribes the number of objects for providing.
Alternatively, the destination transmission notice subelement 1301 includes:Subelement 13011 is reduced,
For according to referent quantity in the first payment message, reducing the empty storehouse stockpile number of displaying;
Notice subelement 13012 is alloted, for notifying second server from the real warehouse in logistics nodes at different levels
Deposit and allot the object of the referent quantity to transit node;Actual reception notifies subelement
13013, receive referent quantity for notifying that second server is actual from the 3rd user equipment
Object, deposited with the real warehouse made up in logistics nodes at different levels.
Alternatively, the notice subelement 13012 of alloting is used to notify that second server is performed:From
The object of referent quantity described in the real storehouse stock allotment of rudimentary logistics node is to transit node;
In the case where the real warehouse of rudimentary logistics node is deposited and cannot meet the referent quantity, from
The object of the real storehouse stock allotment insufficient section of senior logistics node is to transit node.
Alternatively, referent quantity described in the real storehouse stock allotment from rudimentary logistics node
Object be achieved by the following way to transit node:It is spaced at predetermined time intervals, for the scheduled time
All first payment messages for receiving in interval, from the real storehouse stock allotment of rudimentary logistics node this
The object of a little first payment message referent quantity is to transit node.
Alternatively, the object of the real storehouse stock allotment insufficient section from senior logistics node is in
Trochanterion is achieved by the following way:It is pre- for futures are received after receiving to terminate during futures are subscribed
The first payment that cannot meet referent quantity is deposited in the real warehouse of rudimentary logistics node during ordering
Message, from the object of the real storehouse stock allotment insufficient section of senior logistics node to transit node.
Alternatively, as shown in figure 8, described device 100 also includes:Anti- super dispatching Object identifying list
Unit 105, if not being futures subscription object for the object, recognizes whether the object is anti-
Super dispatching object;Anti- super dispatching object displaying stockpile number determining unit 106, in response to identification
Go out described pair as if anti-super dispatching object, the stockpile number of displaying is defined as 0;Non- anti-super dispatching is right
As displaying stockpile number determining unit 107, in response to identifying that the object is not anti-super dispatching
Object, the total real warehouse that the stockpile number of displaying is defined as object described in each logistics website is deposited.
Fig. 9 is shown in the object transfer according to the second server side of the application one embodiment
Information processor 400.The device 400 includes:Object is used to transit node transmission unit 210
In receiving the first payment message from first server, monitoring first user equipment
In the case of notice, by object transfer to transit node;Object is used to destination transmission unit 220
In receiving it is from first server, have been received by second user equipment object transfer request
Notice in the case of, by object from transit node be transferred to the first payment message and second pay disappear
The object transfer request of breath designated destination, wherein second user equipment is according to first server
What the certification message sent in response to the certification request of second user equipment was produced, the certification please
Seeking Truth second user equipment is in response to receiving the generation of the second payment message.
Alternatively, the object includes to transit node transmission unit 210:Subelement is alloted, is used
In the referent quantity from the real payment message of storehouse stock allotment first in logistics nodes at different levels
Object is to transit node;Actual receiving subelement, relates to for actual reception the from the 3rd user equipment
And number of objects object, (not shown) is deposited with the real warehouse made up in logistics nodes at different levels.
Alternatively, the subelement of alloting is used for:From the real storehouse stock allotment institute of rudimentary logistics node
State the object of referent quantity to transit node;Being deposited in the real warehouse of rudimentary logistics node cannot
In the case of meeting the referent quantity, from the real storehouse stock allotment of senior logistics node not
The object of foot point is to transit node.
Figure 10 shows the object transfer in second user equipment side according to the application one embodiment
In information processor 200.The device 200 includes:Certification request transmitting element 310, is used for
The first payment message and the second payment message afterwards in response to receiving first user equipment, to
First server sends certification request;Certification message reception units 320, for being connect from first server
Receive certification message;Object transfer asks issue unit 330, for according to the certification message, to the
One server sends object transfer request, so that first server notifies second server to first
Pay request and second and pay request designated destination connection object.
Figure 11 shows the object transfer in first user equipment side according to the application one embodiment
In information processor 600.The device 600 includes:First payment message transmitting element 410,
For sending the first payment message to second user equipment;Second payment message transmitting element 420, uses
In the second payment message is sent to second user equipment, second payment message triggers second user
Equipment sends certification request to first server, certification message is received from first server, according to this
Certification message sends object transfer and asks to first server, so that first server notifies the second clothes
Business device pays request and second and pays request designated destination connection object to first.
It should be noted that the application can be carried out in the assembly of software and/or software with hardware,
For example, can be using application specific integrated circuit (ASIC), general purpose computer or any other is similar hard
Part equipment is realized.In one embodiment, the software program of the application can be held by processor
Go to realize steps described above or function.Similarly, software program (including the correlation of the application
Data structure) can be stored in computer readable recording medium storing program for performing, for example, RAM memory,
Magnetically or optically driver or floppy disc and similar devices.In addition, some steps or function of the application can
Employ hardware to realize, for example, coordinating so as to perform each step or function as with processor
Circuit.
In addition, the part of the application can be applied to computer program product, such as computer journey
Sequence is instructed, and when it is computer-executed, by the operation of the computer, can be called or be provided
According to the present processes and/or technical scheme.And the programmed instruction of the present processes is called, can
Can be stored in fixed or moveable recording medium, and/or be held by broadcast or other signals
Carry the data flow in media and be transmitted, and/or be stored in the meter according to described program instruction operation
In the working storage of calculation machine equipment.Here, the one embodiment according to the application includes a dress
Put, the device is included for storing the memory of computer program instructions and for execute program instructions
Processor, wherein, when the computer program instructions are by the computing device, trigger the device
Methods and/or techniques scheme of the operation based on foregoing multiple embodiments according to the application.
It is obvious to a person skilled in the art that the application is not limited to above-mentioned one exemplary embodiment
Details, and in the case of without departing substantially from spirit herein or essential characteristic, can be with others
Concrete form realizes the application.Which point therefore, no matter from the point of view of, embodiment all should be regarded as
It is exemplary, and be nonrestrictive, scope of the present application is by appended claims rather than upper
Bright restriction is stated, it is intended that by the institute in the implication and scope of the equivalency of claim that falls
Change and be included in the application.Any reference in claim should not be considered as limitation institute
The claim being related to.Furthermore, it is to be understood that " including " word is not excluded for other units or step, odd number is not
Exclude plural number.The multiple units or device stated in system claims can also by a unit or
Device is realized by software or hardware.The first, the second grade word is used for representing title, and simultaneously
Any specific order is not indicated that.
Claims (28)
1. the information processing method in a kind of object transfer, it is characterised in that including:
First server receives second user equipment in response to receiving first of first user equipment
The certification request paid message and the second payment message afterwards and send;
Certification message is sent to second user equipment, the certification message sets for triggering second user
Preparation goes out object transfer request;
In the case where the object transfer for receiving second user equipment is asked, second server is notified
Request and second is paid to first pay request designated destination connection object.
2. method according to claim 1, it is characterised in that receive second in first server and use
Family equipment in response to receive first user equipment the first payment message and afterwards second payment disappear
Before the step of certification request for ceasing and sending, methods described also includes:
In the case of the first payment message for monitoring first user equipment, second server is notified
By object transfer to transit node,
And the purpose for notifying second server to be specified to the first payment request and the second payment request
The step of ground connection object, includes:Notify second server from the transit node to the destination
Connection object.
3. method according to claim 2, it is characterised in that the transit node is from the mesh
The nearest logistics node in ground.
4. method according to claim 2, it is characterised in that notifying second server by object
Before the step of being transferred to transit node, methods described also includes:
Recognize whether the object is futures subscription object;
If described pair as if futures subscription object, show the empty storehouse stockpile number of object, the void
Storehouse stockpile number is to be expected still to be the futures number of objects that provides of reservation at the 3rd user equipment.
5. method according to claim 4, it is characterised in that the notice second server will be right
The step of as being transferred to transit node, includes:
According to referent quantity in the first payment message, the empty storehouse stockpile number of displaying is reduced;
Notify second server from referent described in the real storehouse stock allotment in logistics nodes at different levels
The object of quantity is to transit node;
Notify that second server is actual from the 3rd user equipment and receive the right of referent quantity
As being deposited with the real warehouse made up in logistics nodes at different levels.
6. method according to claim 5, it is characterised in that the notice second server is from each
The object of referent quantity is to transit node described in real storehouse stock allotment in level logistics node
Step includes notifying that second server is performed:
The object of referent quantity described in real storehouse stock allotment from rudimentary logistics node is to transfer
Node;
The situation that cannot meet the referent quantity is deposited in the real warehouse of rudimentary logistics node
Under, from the object of the real storehouse stock allotment insufficient section of senior logistics node to transit node.
7. method according to claim 6, it is characterised in that the reality from rudimentary logistics node
The step of object of referent quantity described in the stock allotment of storehouse is to transit node includes:Every pre-
Fix time interval, for all first payment messages received in the predetermined time interval, from low
The object of real storehouse stock allotment these the first payment message referent quantity of level logistics node is arrived
Transit node.
8. method according to claim 6, it is characterised in that the reality from senior logistics node
The step of object of storehouse stock allotment insufficient section is to transit node includes:Receiving futures reservation
After period terminates, deposit and cannot expire for the real warehouse for receiving rudimentary logistics node during futures are subscribed
First payment message of sufficient referent quantity, from the real storehouse stock allotment of senior logistics node not
The object of foot point is to transit node.
9. method according to claim 4, it is characterised in that recognizing whether the object is the phase
After the step of goods subscription object, methods described also includes:
If the object is not futures subscription object, recognize whether the object is that anti-super dispatching is right
As;
In response to identifying described pair as if anti-super dispatching object, the stockpile number of displaying is defined as
0;
In response to identifying that the object is not anti-super dispatching object, the stockpile number that will show determines
The total real warehouse of object is deposited described in each logistics website.
10. the information processing method in a kind of object transfer, it is characterised in that including:
Second server is receiving from first server, monitoring first user equipment
In the case of the notice of one payment message, by object transfer to transit node;
Please object transfer from first server, having been received by second user equipment is received
In the case of the notice asked, object is transferred to the first payment message and second from transit node and is paid
The object transfer request of message designated destination, wherein second user equipment is according to first service
What the certification message that device sends in response to the certification request of second user equipment was produced, the certification
Request is that second user equipment is produced in response to receiving the second payment message.
11. methods according to claim 10, it is characterised in that described by object transfer to transfer
The step of node, includes:
The referent quantity from the real payment message of storehouse stock allotment first in logistics nodes at different levels
Object to transit node;
The actual object for receiving referent quantity from the 3rd user equipment, to make up things at different levels
Deposit in real warehouse in stream node.
12. methods according to claim 11, it is characterised in that described from logistics nodes at different levels
The real payment message of storehouse stock allotment first in referent quantity object to transit node step
Suddenly include:
The object of referent quantity described in real storehouse stock allotment from rudimentary logistics node is to transfer
Node;
The situation that cannot meet the referent quantity is deposited in the real warehouse of rudimentary logistics node
Under, from the object of the real storehouse stock allotment insufficient section of senior logistics node to transit node.
Information processing method in a kind of 13. object transfers, it is characterised in that including:
Second user equipment is in response to receiving first payment message and afterwards of first user equipment
Second payment message, certification request is sent to first server;
Certification message is received from first server;
According to the certification message, send object transfer to first server and ask, so as to the first clothes
Business device notifies that second server pays the transmission of request designated destination to the first payment request and second
Object.
Information processing method in a kind of 14. object transfers, it is characterised in that including:
First user equipment sends the first payment message to second user equipment;
The second payment message is sent to second user equipment, the second payment message triggering second is used
Family equipment sends certification request to first server, and certification message is received from first server, according to
The certification message sends object transfer and asks to first server, so that first server notifies second
Server pays request and second and pays request designated destination connection object to first.
Information processor in a kind of 15. object transfers, it is characterised in that including:
Certification request receiving unit, for receiving second user equipment in response to receiving first user
First payment message of equipment and the second payment message afterwards and the certification request that sends;
Certification message sending unit, certification message, the certification message are sent to second user equipment
Object transfer request is sent for triggering second user equipment;
Destination transmission notice unit, for being asked in the object transfer for receiving second user equipment
In the case of, notify that second server pays request and second and pays the purpose that request is specified to first
Ground connection object.
16. devices according to claim 15, it is characterised in that described device also includes:
Transit node transmission notice unit, for disappearing in the first payment for monitoring first user equipment
In the case of breath, second server is notified by object transfer to transit node,
And the destination transmission notice unit is further included:Destination transmission notice subelement,
For notifying second server from the transit node to the destination connection object.
17. devices according to claim 16, it is characterised in that the transit node is from described
The nearest logistics node in destination.
18. devices according to claim 16, it is characterised in that described device also includes:
Futures subscription object recognition unit, for recognizing whether the object is futures subscription object;
Display unit, if for described pair as if futures subscription object, showing the empty warehouse of object
Poke amount, the empty storehouse stockpile number is to be expected still be subscribed for futures at the 3rd user equipment to provide
Number of objects.
19. devices according to claim 18, it is characterised in that destination transmission notice
Unit includes:
Subelement is reduced, for according to referent quantity in the first payment message, reducing displaying
Empty storehouse stockpile number;
Notice subelement is alloted, for notifying second server from the real warehouse in logistics nodes at different levels
Deposit and allot the object of the referent quantity to transit node;
Actual reception notifies subelement, for notifying second server from reality at the 3rd user equipment
The object of referent quantity is received, is deposited with the real warehouse made up in logistics nodes at different levels.
20. devices according to claim 19, it is characterised in that the notice subelement of alloting is used
Performed in second server is notified:
The object of referent quantity described in real storehouse stock allotment from rudimentary logistics node is to transfer
Node;
The situation that cannot meet the referent quantity is deposited in the real warehouse of rudimentary logistics node
Under, from the object of the real storehouse stock allotment insufficient section of senior logistics node to transit node.
21. devices according to claim 20, it is characterised in that described from rudimentary logistics node
The object of referent quantity is achieved by the following way to transit node described in real storehouse stock allotment:Often
Every predetermined time interval, for all first payment messages received in the predetermined time interval,
From the right of the real storehouse stock allotment of rudimentary logistics node these the first payment message referent quantity
As to transit node.
22. devices according to claim 20, it is characterised in that described from senior logistics node
The object of real storehouse stock allotment insufficient section is achieved by the following way to transit node:It is pre- futures are received
After terminating during ordering, nothing is deposited for the real warehouse for receiving rudimentary logistics node during futures are subscribed
Method meets the first payment message of referent quantity, and tune is deposited from the real warehouse of senior logistics node
The object of insufficient section is dialled to transit node.
23. devices according to claim 18, it is characterised in that described device also includes:
Anti- super dispatching object identification unit, if not being futures subscription object for the object, knows
Whether not described object is anti-super dispatching object;
Anti- super dispatching object displaying stockpile number determining unit, in response to identifying the object
It is anti-super dispatching object, the stockpile number of displaying is defined as 0;
Non- anti-super dispatching object displaying stockpile number determining unit, for described right in response to identifying
As not being anti-super dispatching object, the stockpile number of displaying is defined as object described in each logistics website
Total real warehouse deposit.
Information processor in a kind of 24. object transfers, it is characterised in that including:
Object to transit node transmission unit, for receiving from first server, monitoring
To the first payment message of first user equipment notice in the case of, by object transfer to middle trochanter
Point;
Object to destination transmission unit, for receive it is from first server, received
In the case of the notice asked to the object transfer of second user equipment, object is passed from transit node
It is defeated to the first payment message and the second payment message designated destination, wherein second user equipment
Object transfer request is sent in response to the certification request of second user equipment according to first server
Certification message produce, the certification request is second user equipment in response to receiving second
Pay what message was produced.
25. devices according to claim 24, it is characterised in that the object is passed to transit node
Defeated unit includes:
Subelement is alloted, for from the real payment message of storehouse stock allotment first in logistics nodes at different levels
The object of middle referent quantity is to transit node;
Actual receiving subelement, referent quantity is received for actual from the 3rd user equipment
Object, deposited with the real warehouse made up in logistics nodes at different levels.
26. devices according to claim 25, it is characterised in that the subelement of alloting is used for:
The object of referent quantity described in real storehouse stock allotment from rudimentary logistics node is to transfer
Node;
The situation that cannot meet the referent quantity is deposited in the real warehouse of rudimentary logistics node
Under, from the object of the real storehouse stock allotment insufficient section of senior logistics node to transit node.
Information processor in a kind of 27. object transfers, it is characterised in that including:
Certification request transmitting element, disappears for the first payment in response to receiving first user equipment
Breath and the second payment message afterwards, certification request is sent to first server;
Certification message reception units, for receiving certification message from first server;
Object transfer asks issue unit, for according to the certification message, being sent out to first server
Go out object transfer request, so that first server notifies that second server pays request and the to first
Two pay request designated destination connection object.
Information processor in a kind of 28. object transfers, it is characterised in that including:
First payment message transmitting element, for sending the first payment message to second user equipment;
Second payment message transmitting element, for sending the second payment message to second user equipment,
Second payment message triggering second user equipment sends certification request to first server, from the
One server receives certification message, and sending object transfer to first server according to the certification message please
Ask, so that first server notifies that second server pays request to first and the second payment request refers to
Fixed destination connection object.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510846448.XA CN106815695B (en) | 2015-11-27 | 2015-11-27 | Information processing method and device in object transmission |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510846448.XA CN106815695B (en) | 2015-11-27 | 2015-11-27 | Information processing method and device in object transmission |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106815695A true CN106815695A (en) | 2017-06-09 |
CN106815695B CN106815695B (en) | 2021-03-26 |
Family
ID=59102781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510846448.XA Active CN106815695B (en) | 2015-11-27 | 2015-11-27 | Information processing method and device in object transmission |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106815695B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1347537A (en) * | 1999-07-30 | 2002-05-01 | 恩里克·戴维·桑乔 | System and method for secure network purchasing |
CN101751639A (en) * | 2008-12-17 | 2010-06-23 | 上海西本钢铁贸易发展有限公司 | Method and system for electronic transaction platform based on network |
WO2012053780A1 (en) * | 2010-10-20 | 2012-04-26 | 비씨카드 주식회사 | Payment method and payment system using information on the mac address of a customer terminal |
CN102609841A (en) * | 2012-01-13 | 2012-07-25 | 东北大学 | Remote mobile payment system based on digital certificate and payment method |
CN103034933A (en) * | 2012-06-27 | 2013-04-10 | 郭思宇 | Logistics management method based on multi-stage storage |
CN104766196A (en) * | 2015-04-14 | 2015-07-08 | 中国科学院计算技术研究所 | Intelligent logistics method and system based on third party payment online shopping |
CN105069621A (en) * | 2015-07-20 | 2015-11-18 | 中商交在线(北京)科技发展有限公司 | Payment processing server, payment system and payment method |
CN105096015A (en) * | 2014-04-23 | 2015-11-25 | 阿里巴巴集团控股有限公司 | Information processing method and system of commodity object |
-
2015
- 2015-11-27 CN CN201510846448.XA patent/CN106815695B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1347537A (en) * | 1999-07-30 | 2002-05-01 | 恩里克·戴维·桑乔 | System and method for secure network purchasing |
CN101751639A (en) * | 2008-12-17 | 2010-06-23 | 上海西本钢铁贸易发展有限公司 | Method and system for electronic transaction platform based on network |
WO2012053780A1 (en) * | 2010-10-20 | 2012-04-26 | 비씨카드 주식회사 | Payment method and payment system using information on the mac address of a customer terminal |
CN102609841A (en) * | 2012-01-13 | 2012-07-25 | 东北大学 | Remote mobile payment system based on digital certificate and payment method |
CN103034933A (en) * | 2012-06-27 | 2013-04-10 | 郭思宇 | Logistics management method based on multi-stage storage |
CN105096015A (en) * | 2014-04-23 | 2015-11-25 | 阿里巴巴集团控股有限公司 | Information processing method and system of commodity object |
CN104766196A (en) * | 2015-04-14 | 2015-07-08 | 中国科学院计算技术研究所 | Intelligent logistics method and system based on third party payment online shopping |
CN105069621A (en) * | 2015-07-20 | 2015-11-18 | 中商交在线(北京)科技发展有限公司 | Payment processing server, payment system and payment method |
Non-Patent Citations (1)
Title |
---|
用户旁观者说: "双十一为什么要预售,预售对于电商有哪些意义?", 《知乎》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106815695B (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TWI640937B (en) | Online payment method and equipment | |
CN102360480B (en) | A kind of method and system for linking online payment and record link | |
CN104794132B (en) | Inventory information processing method and system | |
CN102663531B (en) | Cloud based master data management | |
CN107038629A (en) | Order processing method, device and server in a kind of commodity transaction | |
CN105096015A (en) | Information processing method and system of commodity object | |
CN109118219A (en) | Transaction data processing method and device | |
CN106251209A (en) | A kind of on-line shopping system based on ecommerce | |
CN107105477A (en) | Share the method and apparatus of feedback or excitation information for providing WAP | |
CN105096129A (en) | Data processing system and method | |
CN108764963A (en) | It is a kind of based on the electric business transaction platform for answering valence agreement | |
CN108600323A (en) | A kind of multicenter data-sharing systems and its application method | |
CN110506263A (en) | Resource provider polymerize and the content based on context notifies system | |
CN103886472A (en) | Permission assignment method and system in online transaction | |
KR101312406B1 (en) | Online donation method and system | |
KR20160043605A (en) | Member sharing and profit distribution system using profitability service and method of the same | |
US20130203443A1 (en) | Providing information about a location to a mobile device based on the location of the mobile device | |
Effah | The rise and fall of a dot-com pioneer in a developing country | |
CN106815695A (en) | Information processing method and device in object transfer | |
CN110633966A (en) | Block chain-based contract securitization method and device | |
KR102072714B1 (en) | System for providing shopping service using head mounted device and method therefor | |
Hodosi et al. | Risk factors in IT outsourcing and the theories decision makers use to resolve them | |
CN106610764A (en) | Methods and devices for providing warehouse value-added service | |
KR20170024175A (en) | Method of service providing realtime mobie coupon | |
JP6212236B1 (en) | Delivery management method, delivery management server, delivery management server program, and delivery management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180411 Address after: Four story 847 mailbox of the capital mansion of Cayman Islands, Cayman Islands, Cayman Applicant after: CAINIAO SMART LOGISTICS HOLDING Ltd. Address before: Cayman Islands Grand Cayman capital building a four storey No. 847 mailbox Applicant before: ALIBABA GROUP HOLDING Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |