CN106789365A - A kind of method that application resource controls framework - Google Patents

A kind of method that application resource controls framework Download PDF

Info

Publication number
CN106789365A
CN106789365A CN201710092857.4A CN201710092857A CN106789365A CN 106789365 A CN106789365 A CN 106789365A CN 201710092857 A CN201710092857 A CN 201710092857A CN 106789365 A CN106789365 A CN 106789365A
Authority
CN
China
Prior art keywords
resource
acceptor
group
control center
donor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710092857.4A
Other languages
Chinese (zh)
Inventor
沈玉将
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Codyy Education Technology Co Ltd
Original Assignee
Codyy Education Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Codyy Education Technology Co Ltd filed Critical Codyy Education Technology Co Ltd
Publication of CN106789365A publication Critical patent/CN106789365A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/10Network architectures or network communication protocols for network security for controlling access to devices or network resources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/0807Network architectures or network communication protocols for network security for authentication of entities using tickets, e.g. Kerberos
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L65/00Network arrangements, protocols or services for supporting real-time applications in data packet communication
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/16Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks using machine learning or artificial intelligence
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L65/00Network arrangements, protocols or services for supporting real-time applications in data packet communication
    • H04L65/10Architectures or entities
    • H04L65/102Gateways
    • H04L65/1043Gateway controllers, e.g. media gateway control protocol [MGCP] controllers

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The present invention provides a kind of method that application resource controls framework, including:Resource management center transmits to Resource Control Center the fraction assessment value of each resource acceptor for gathering;Matched between the corresponding resource acceptor group of high score number interval grade resource acceptor group corresponding with low fraction interval grade, obtained mutual assistance group;The resource acceptor disengaging rate in the corresponding resource acceptor group of low fraction interval grade in Resource Control Center statistics preset period of time in mutual assistance group, if the resource acceptor disengaging rate in mutual assistance group is more than preset value, Resource Control Center is that the resource acceptor in the corresponding resource acceptor group of high score number interval grade sets highest resource access rights and priority assignation result is pushed into resource management center;Resource acceptor in the corresponding resource acceptor group of resource management center control high score number interval grade conducts interviews to the resource in resource management center.The method that application resource controls framework, realizes the fine-grained management of resource.

Description

A kind of method that application resource controls framework
Technical field
The invention belongs to resources control field, more particularly to a kind of method that application resource controls framework.
Background technology
Applicant Huawei Tech Co., Ltd applied for one on 06 02nd, 2007:Application number: 200710111735.1, patent name is business and resource control method and equipment under bearing separation structure, in such scheme, Bearing control equipment first obtains the resource management rule that load bearing equipment is supported, further according to resource management rule down distributing resource operation Order.The attribute of description resource management rule can be increased in auditability command request, in auditability command response The resource management rule that load bearing equipment is supported is represented with the value of correspondence attribute.The resource pipe that load bearing equipment can also be supported Reason rule is pre-configured to be in the bearing control equipment, and the bearing control equipment obtains resource management rule from this device interior.Such as The resource management rule that fruit load bearing equipment is supported has various, then can therefrom select one kind by bearing control equipment, indicates this to hold Load equipment subsequently uses resource management rule.
Applicant ZTE Co., Ltd applied for one on 06 24th, 2009:Application number is 200910146754.7, patent name is the method for policy control architecture and the implementation strategy control of UNE, including is applied Functional entity AF, fixed network policy decision entity and mobile network's policy decision entity, wherein:The AF, for described Fixed network policy decision entity decision-making is provided needed for business information, the business information include fixed user service information or Mobile subscriber business information;
The fixed network policy decision entity, for receiving the business information that the AF sends, and believes the business Breath is judged, if fixed user service information, then formulates fixed network resource control according to the fixed user service information System strategy;If mobile subscriber business information, then mobile network's policy decision entity is transmitted to;
Mobile network's policy decision entity, the mobile subscriber's industry for receiving the forwarding of fixed network policy decision entity Business information, and mobile network resource control strategy is formulated according to the mobile subscriber business information.
Such scheme does not disclose the pass between resource provider, resource recipient, Resource Manager, resources control person System, is not carried out resource fine-grained management.
The content of the invention
The present invention provides a kind of resource control architecture and the method using the framework, to solve the above problems.
The present invention provides a kind of resource control architecture.Above-mentioned framework is included in resource donor, resource acceptor, resource management The heart, Resource Control Center;Wherein, it is two two interconnected between resource donor, resource acceptor, resource management center;Resources control Center is connected with resource donor, resource acceptor, resource management center respectively.
The method that a kind of application resource of the present invention controls framework, resource control architecture includes resource donor, resource acceptor, money Source control center, Resource Control Center;Wherein, it is two two interconnected between resource donor, resource acceptor, resource management center; Resource Control Center is connected with resource donor, resource acceptor, resource management center respectively, and method is comprised the following steps:Resource control Center processed obtains resource control scheme;Resource Control Center is received according to the resource control scheme for obtaining, control resource donor, resource The interaction of resource between body, resource management center;The fraction assessment of each resource acceptor that the resource management center will be gathered Value is transmitted to the Resource Control Center;The Resource Control Center according to default different fractions interval grades will described in each Resource acceptor is divided into multiple resource acceptor groups, the corresponding resource acceptor group of high score number interval grade and low fraction interval grade pair Matched between the resource acceptor group for answering, obtained mutual assistance group;The mutual assistance in the Resource Control Center statistics preset period of time The resource acceptor disengaging rate in the corresponding resource acceptor group of low fraction interval grade in group, if the resource in mutual assistance group is received Body disengaging rate is more than preset value, then the Resource Control Center is the resource in the corresponding resource acceptor group of high score number interval grade Acceptor sets highest resource access rights and priority assignation result is pushed into the resource management center;The resource management According to the priority assignation result, the resource acceptor in the corresponding resource acceptor group of control high score number interval grade is to described at center Resource in resource management center conducts interviews.
Compared to prior art, according to the resource control architecture and the method using the framework of present invention offer, realize The fine-grained management of resource.
In addition, can mutually be converted between resource donor, resource acceptor in scheme so that the scope of application of scheme is more Extensively, the experience of user is enhanced.
In addition, by the granting and resources centralized management of resource management center control authorized certificate or by resource control in scheme The granting of control authorized certificate in center processed and resources control, manage authorized certificate, significantly rather than by single third party entity The interaction between system signaling is reduced, system resource has been saved, the communication efficiency of system is improve, greatly strengthen user's Experience.
In addition, the resource acceptor pays certain expense by the resource management center, obtain it is described authorize with The mode of card, has increased the income of system operator.
In addition, by the setting of resource acceptor manager, realize has carried out certain monitoring to the behavior of resource acceptor, keeps away The loss that the behavior of resource acceptor brings to resource acceptor manager is exempted from.
In addition, by certain strategy so that non-targeted resource acceptor obtains new resources, greatly strengthen the body of user Test.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 show the resource control architecture schematic diagram of the offer of the embodiment of the present invention 1;
The method and flow that Fig. 2 show the resource control architecture shown in the application drawing 1 of the offer of the embodiment of the present invention 2 are illustrated Figure;
Fig. 3 show the resource interaction diagrams of the offer of the embodiment of the present invention 3;
Fig. 4 show the resource interaction diagrams of the offer of the embodiment of the present invention 4;
Fig. 5 show the resource interaction diagrams of the offer of the embodiment of the present invention 5;
Fig. 6 show the resource interaction diagrams of the offer of the embodiment of the present invention 6;
Fig. 7 show the resource interaction diagrams of the offer of the embodiment of the present invention 7;
Fig. 8 show the resource interaction diagrams of the offer of the embodiment of the present invention 8;
Fig. 9 show the resource interaction diagrams of the offer of the embodiment of the present invention 9;
Figure 10 show the resource interaction diagrams of the offer of the embodiment of the present invention 10;
Figure 11 show the resource interaction diagrams of the offer of the embodiment of the present invention 11;
Figure 12 show the resource interaction diagrams of the offer of the embodiment of the present invention 12;
Figure 13 show the resource interaction diagrams of the offer of the embodiment of the present invention 13;
Figure 14 show the resource interaction diagrams of the offer of the embodiment of the present invention 14;
Figure 15 show the resource interaction diagrams of the offer of the embodiment of the present invention 15;
Figure 16 show the resource interaction diagrams of the offer of the embodiment of the present invention 16;
Figure 17 show the resource interaction diagrams of the offer of the embodiment of the present invention 17;
Figure 18 show the resource interaction diagrams of the offer of the embodiment of the present invention 18;
Figure 19 show the resource interaction diagrams of the offer of the embodiment of the present invention 19;
Figure 20 show the resource interaction diagrams of the offer of the embodiment of the present invention 20;
Figure 21 show the resource interaction diagrams of the offer of the embodiment of the present invention 21;
Figure 22 show the resource interaction diagrams of the offer of the embodiment of the present invention 22.
Specific embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that not conflicting In the case of, the feature in embodiment and embodiment in the application can be mutually combined.
Fig. 1 show the resource control architecture schematic diagram of the offer of the embodiment of the present invention 1, including:Resource donor, resource are received Body, resource management center, Resource Control Center;Wherein, it is mutual two-by-two between resource donor, resource acceptor, resource management center Connection;Resource Control Center is connected with resource donor, resource acceptor, resource management center respectively.
Wherein, resource donor is one or more;Resource acceptor is one or more.
Wherein, resource donor refers to:Resource provider;Resource acceptor is resource recipient;Resource management center is management The entity of resource;Resource Control Center is the entity for controlling resource interaction.
Wherein, resource donor under certain condition, can turn into resource acceptor;Resource acceptor under certain condition, can be with As resource donor.
The method and flow that Fig. 2 show the resource control architecture shown in the application drawing 1 of the offer of the embodiment of the present invention 2 are illustrated Figure, comprises the following steps:
Step 201:Resource Control Center obtains resource control scheme;
Wherein, the mode of Resource Control Center acquisition resource control scheme is:Resource Control Center itself configures resource control System strategy or Resource Control Center from third party entity (for example:Strategy controller) middle acquisition resource control scheme.
Step 202:Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, resource The interaction of resource between administrative center.
With reference to Fig. 3, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, touches Hair Resource Control Center sends resource credential and asks to resource acceptor;
After the resource acceptor receives resource credential's request, obtain authorized certificate from resource management center and notify institute State Resource Control Center;
After the Resource Control Center receives the notice, the resource management center is indicated to be provided to the resource acceptor The updated resource of resource donor.
Wherein, the resource acceptor is from the approach of resource management center acquisition authorized certificate:By in resource management The heart pays certain expense, obtains the authorized certificate.
Wherein, resource donor renewal has been provided to the resource of resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering Resource Control Center is to the process that resource acceptor sends resource credential's request:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, to The Resource Control Center sends resource credential's request;
The Resource Control Center sends the resource credential and asks to the resource acceptor.
Wherein, resource donor renewal has been provided to the resource of resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering Resource Control Center is to the process that resource acceptor sends resource credential's request:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, institute State resource management center and send resource credential's request to the Resource Control Center;
The Resource Control Center sends the resource credential and asks to the resource acceptor.
Wherein, with reference to Fig. 4, Resource Control Center is received according to the resource control scheme for obtaining, control resource donor, resource The process of the interaction of resource is between body, resource management center:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, touches Hair Resource Control Center sends resource credential and asks to resource acceptor;
After the resource acceptor receives resource credential's request, sending the resource credential to resource acceptor manager please Ask;
After the resource acceptor manager receives resource credential's request, authorized certificate is obtained simultaneously from resource management center Notify the Resource Control Center;
After the Resource Control Center receives the notice, the resource management center is indicated to be provided to the resource acceptor The updated resource of resource donor.
Wherein, resource donor renewal has been provided to the resource of resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering Resource Control Center is to the process that resource acceptor sends resource credential's request:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, institute State resource management center and send resource credential's request to the Resource Control Center;
The Resource Control Center sends the resource credential and asks to the resource acceptor.
With reference to Fig. 5, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
Resource donor is updated after having been provided to the resource of resource acceptor, is directly triggered Resource Control Center and is sent out to resource acceptor Resource credential is sent to ask;
After the resource acceptor receives resource credential's request, obtain authorized certificate from resource management center and notify institute State Resource Control Center;
After the Resource Control Center receives the notice, the resource donor is indicated to provide described to the resource acceptor The updated resource of resource donor.
Resource donor is updated after having been provided to the resource of resource acceptor, is sent to Resource Control Center and is updated completion notice, Triggering Resource Control Center sends resource credential and asks to resource acceptor.
Wherein, after the resource donor provides the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
With reference to Fig. 6, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
Resource donor is updated after having been provided to the resource of resource acceptor, is directly triggered Resource Control Center and is sent out to resource acceptor Resource credential is sent to ask;
After the resource acceptor receives resource credential's request, sending the resource credential to resource acceptor manager please Ask;
After the resource acceptor manager receives resource credential's request, authorized certificate is obtained simultaneously from resource management center Notify the Resource Control Center;
After the Resource Control Center receives the notice, the resource donor is indicated to provide described to the resource acceptor The updated resource of resource donor.
Resource donor is updated after having been provided to the resource of resource acceptor, is sent to Resource Control Center and is updated completion notice, Triggering Resource Control Center sends resource credential and asks to resource acceptor.
Wherein, after the resource donor provides the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
With reference to Fig. 7, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
After the resource donor provides new resources to the resource management center, the resource management center is triggered according to obtaining The resource donor for taking and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
If not target resource acceptor sends new resources and asks to the Resource Control Center;Then the Resource Control Center refers to Show that the non-targeted resource acceptor sends resource credential and asks to the resource management center;
After the resource management center receives resource credential's request, to the non-targeted resource acceptor feedback resources with Card response message;Wherein, authorized certificate information is carried in the message.
After the non-targeted resource acceptor obtains authorized certificate, the Resource Control Center is notified;
The Resource Control Center indicates the resource management center to provide the new money to the non-targeted resource acceptor Source.
Wherein, the resource donor of the resource management center acquisition is with the mode of the resource acceptor table of comparisons:The resource Administrative center itself configuration resource donor is obtained with the resource acceptor table of comparisons or by third party entity (mapping relations server) Take resource donor and the resource acceptor table of comparisons.
Wherein, in the backward resources control of resource donor and the resource acceptor table of comparisons that the resource management center is obtained The heart sends, and carries out real-time or Timing Synchronization.
With reference to Fig. 8, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
After the resource donor obtains new resources and resource donor and the resource acceptor table of comparisons, target resource acceptor is determined simultaneously The new resources are sent to the target resource acceptor;
If not target resource acceptor sends new resources and asks to the Resource Control Center;Then the Resource Control Center refers to Show that the non-targeted resource acceptor sends resource credential and asks to the resource management center;
After the resource management center receives resource credential's request, to the non-targeted resource acceptor feedback resources with Card response message;Wherein, authorized certificate information is carried in the message.
After the non-targeted resource acceptor obtains authorized certificate, the Resource Control Center is notified;
The Resource Control Center indicates the resource donor to provide the new resources to the non-targeted resource acceptor.
Wherein, after the resource donor provides the new resources to the non-targeted resource acceptor, by new resources hair Deliver to the resource management center and stored by the resource management center.
Wherein, the resource donor acquisition resource donor is with the mode of the resource acceptor table of comparisons:The resource donor from It is described with the resource acceptor table of comparisons or the resource donor itself storage that the resource management center obtains the resource donor Resource donor and the resource acceptor table of comparisons.
Wherein, resource donor and the resource acceptor table of comparisons, as shown in table 1:
Resource donor Target resource acceptor
Resource donor 1 Resource acceptor A
Resource donor 2 Resource acceptor B
Resource donor 3 Resource acceptor C
Resource donor n Resource acceptor Z
With reference to Fig. 9, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
After the resource donor provides new resources to the resource management center, the resource management center is triggered according to obtaining The resource donor for taking and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
If not target resource acceptor obtains the new resources, then send new resources to resource acceptor manager and ask;Institute After stating the resource acceptor manager reception new resources request, send the new resources to the Resource Control Center and ask;
The Resource Control Center indicates the resource acceptor manager to send resource credential to the resource management center Request;
After the resource management center receives resource credential's request, to the resource acceptor manager feedback resources with Card response message;Wherein, authorized certificate information is carried in the message;
After the resource acceptor manager obtains authorized certificate, the Resource Control Center is notified;
The Resource Control Center indicates the resource management center to provide the new money to the non-targeted resource acceptor Source.
With reference to Figure 10, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
After the resource donor obtains new resources and resource donor and the resource acceptor table of comparisons, target resource acceptor is determined simultaneously The new resources are sent to the target resource acceptor;
If not target resource acceptor obtains the new resources, then send new resources to resource acceptor manager and ask;Institute After stating the resource acceptor manager reception new resources request, send the new resources to the Resource Control Center and ask;
The Resource Control Center indicates the resource acceptor manager to send resource credential to the resource management center Request;
After the resource management center receives resource credential's request, to the resource acceptor manager feedback resources with Card response message;Wherein, authorized certificate information is carried in the message;
After the resource acceptor manager obtains authorized certificate, the Resource Control Center is notified;
The Resource Control Center indicates the resource donor to provide the new resources to the non-targeted resource acceptor.
Wherein, after the resource donor provides the new resources to the non-targeted resource acceptor, by new resources hair Deliver to the resource management center storage.
With reference to Figure 11, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, touches Hair resource acceptor sends resource credential and asks to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor and indicates the resource simultaneously Administrative center provides updated resource to the resource acceptor.
Wherein, the Resource Control Center feedback resources voucher response message also includes to before the resource acceptor:Institute State resource acceptor and pay certain expense to the Resource Control Center.
Wherein, authorized certificate information is carried in resource credential's response message.
Wherein, resource donor renewal has been provided to the resource of resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering resource acceptor is to the process that Resource Control Center sends resource credential's request:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, money Source control center sends resource credential and asks to the resource acceptor;
The resource acceptor sends the resource credential and asks to the Resource Control Center.
With reference to Figure 12, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, touches Hair resource acceptor sends resource credential and asks to resource acceptor manager;
The resource acceptor manager sends resource credential and asks to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source control center provides updated resource to the resource acceptor;Wherein, carried in resource credential's response message and authorized Credential information.
Wherein, resource donor renewal has been provided to the resource of resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering resource acceptor is to the process that resource acceptor manager sends resource credential's request:
Resource donor updates the resource that has been provided to resource acceptor and after the resource of renewal is put into resource management center, money Source control center sends to resource acceptor and updates completion notice, and triggering resource acceptor sends resource credential to resource acceptor manager Request.
With reference to Figure 13, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor is updated after having been provided to the resource of resource acceptor, and triggering resource acceptor sends to Resource Control Center and provides Source request for credentials;
The Resource Control Center feedback resources voucher response message is to the resource acceptor and indicates the resource simultaneously Donor provides updated resource to the resource acceptor.
Wherein, after the resource donor provides the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
Resource donor is updated after having been provided to the resource of resource acceptor, is sent to resource acceptor and is updated completion notice, triggering Resource acceptor sends resource credential and asks to Resource Control Center.
With reference to Figure 14, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor is updated after having been provided to the resource of resource acceptor, and triggering resource acceptor sends to resource acceptor manager Resource credential asks;
The resource acceptor manager sends resource credential and asks to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source donor provides updated resource to the resource acceptor;Wherein, authorized certificate is carried in resource credential's response message Information.
Wherein, after the resource donor provides the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
Resource donor is updated after having been provided to the resource of resource acceptor, is sent to resource acceptor and is updated completion notice, triggering Resource acceptor sends resource credential and asks to Resource Control Center.
With reference to Figure 15, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
After the resource donor provides new resources to the resource management center, the resource management center is triggered according to obtaining The resource donor for taking and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
Before if not target resource acceptor obtains the new resources, send resource credential to Resource Control Center and ask;
The Resource Control Center feedback resources voucher response message is to the non-targeted resource acceptor and indicates the money Source control center provides the new resources to the non-targeted resource acceptor.
Wherein, authorized certificate information is carried in resource credential's response message.
With reference to Figure 16, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
After the resource donor obtains new resources and resource donor and the resource acceptor table of comparisons, target resource acceptor is determined simultaneously The new resources are sent to the target resource acceptor;
Before if not target resource acceptor obtains the new resources, send resource credential to Resource Control Center and ask;
The Resource Control Center feedback resources voucher response message is to the non-targeted resource acceptor and indicates the money Source donor provides the new resources to the non-targeted resource acceptor.
Wherein, authorized certificate information is carried in resource credential's response message.
Wherein, after the resource donor provides the new resources to the non-targeted resource acceptor, by new resources hair Deliver to the resource management center storage.
With reference to Figure 17, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
After the resource donor provides new resources to the resource management center, the resource management center is triggered according to obtaining The resource donor for taking and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
Before if not target resource acceptor obtains the new resources, send resource credential to resource acceptor manager and ask;
The resource acceptor manager sends resource credential and asks to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source control center provides the new resources to the non-targeted resource acceptor;Wherein, carried in resource credential's response message Authorized certificate information.
With reference to Figure 18, Resource Control Center is according to the resource control scheme for obtaining, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
After the resource donor obtains new resources and resource donor and the resource acceptor table of comparisons, target resource acceptor is determined simultaneously The new resources are sent to the target resource acceptor;
Before if not target resource acceptor obtains the new resources, send resource credential to resource acceptor manager and ask;
The resource acceptor manager sends resource credential and asks to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source donor provides the new resources to the non-targeted resource acceptor;Wherein, carried in resource credential's response message and authorized Credential information.
Citing is carried out below to be described in detail:
For example:Resource donor is teacher, resource acceptor is student, resource management center is learning resource manager platform, money Source control centre is educational resource controller.Certainly, resource donor can also be main subject hall, and resource acceptor can also be subsidiary course Hall, does not limit here, can be according to actual situation depending on.
Teacher is updated by teacher side and has been provided to the increment test question answer of student and put it into learning resource manager Platform, triggering educational resource controller sends resource credential and asks to student;After student pays certain expense, from educational resource Management platform obtains authorized certificate and notifies educational resource controller;After educational resource controller is notified, education money is indicated Source capsule platform provides the increment test question answer to student.The program can also teacher by teacher side update have been provided to After the increment test question answer of student, directly trigger educational resource controller and send resource credential's request to student;Student pays After certain expense, obtain authorized certificate from learning resource manager platform and notify educational resource controller;Educational resource is controlled After device is notified, teacher is indicated to provide the increment test question answer to student.
In addition, teacher is updated by teacher side and being had been provided to the increment test question answer of student and being put it into educational resource Management platform, triggering educational resource controller sends resource credential to parent's client (resource acceptor manager) of student please Ask, obtaining in the case that parent agrees to, parent by resource acceptor manager, obtained from learning resource manager platform authorize with Demonstrate,prove and notify educational resource controller;After educational resource controller receives the notice, learning resource manager platform is indicated to It is raw that the increment test question answer is provided.The program can also teacher by teacher side update have been provided to student increment test After topic answer, triggering educational resource controller sends resource credential to parent's client (resource acceptor manager) of student please Ask, obtaining in the case that parent agrees to, parent by resource acceptor manager, obtained from learning resource manager platform authorize with Demonstrate,prove and notify educational resource controller;After educational resource controller receives the notice, teacher is indicated to provide the increasing to student Value test question answer.
In addition, after if teacher provides a set of brand-new quiz and answer to learning resource manager platform, educational resource , according to the teacher and student table of comparisons for obtaining, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student for management platform Quiz and answer.If not this class of student sends the brand-new quiz of the set to educational resource controller and answer is asked, then Educational resource controller indicates Fei Benban student to send resource credential's request to learning resource manager platform;Fei Benban student pays After certain expense, obtain authorized certificate from learning resource manager platform and notify educational resource controller;Educational resource is controlled Device indicates learning resource manager platform to provide the brand-new quiz of the set and answer to Fei Benban student.The program can also teacher After there is provided a set of brand-new quiz and answer, directly according to the teacher and student table of comparisons, it is determined that belong to this class of student, then to This class of student sends the brand-new quiz of the set and answer.It is brand-new that if not this class of student sends the set to educational resource controller Quiz and answer are asked, then educational resource controller indicates Fei Benban student to send resource credential to learning resource manager platform Request;After Fei Benban student pays certain expense, obtain authorized certificate from learning resource manager platform and notify educational resource Controller;Educational resource controller indicates teacher to provide the brand-new quiz of the set and answer to Fei Benban student.
In addition, after if teacher provides a set of brand-new quiz and answer to learning resource manager platform, educational resource , according to the teacher and student table of comparisons for obtaining, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student for management platform Quiz and answer.If not this class of student obtains the brand-new quiz of the set and answer, by parent's client elder generation parent New resources request is sent, if parent agrees to and pays certain expense from learning resource manager platform acquisition authorized certificate Afterwards, educational resource controller is notified;Educational resource controller indicates learning resource manager platform to provide the set to Fei Benban student Brand-new quiz and answer.The program can also be after teacher provides a set of brand-new quiz and answer, directly according to religion Teacher and student's table of comparisons, it is determined that belonging to this class of student, then send the brand-new quiz of the set and answer to this class of student.If not this When class student obtains the brand-new quiz of the set and answer, new resources are sent by parent's client elder generation parent and is asked, if parent Certain expense is agreed to and paid from after learning resource manager platform acquisition authorized certificate, notify educational resource controller; Educational resource controller indicates teacher to provide the brand-new quiz of the set and answer to Fei Benban student.
If in addition, teacher has updated the increment test question answer that is supplied to student and has been uploaded to learning resource manager platform Afterwards, triggering student to educational resource controller send resource credential ask, student by paying certain expense, from educational resource After obtaining authorized certificate in controller, educational resource controller indicates learning resource manager platform to provide more added value to student Test question answer.If the program can also be teacher and having updated the increment test question answer that is supplied to student and being uploaded to education money After source capsule platform, triggering student by parent's client to parent send resource credential ask, obtain parent agree to and On the premise of parent pays certain expense, authorized certificate is obtained from educational resource controller;Educational resource controller indicates religion Educate resource management platform and provide more added value test question answer to student.
In addition, if teacher has been updated after being supplied to the increment test question answer of student, student is to educational resource control for triggering Device sends resource credential's request, and student after obtaining authorized certificate from educational resource controller, is taught by paying certain expense Educating resouce controller indicates teacher to provide more added value test question answer to student.If the program can also be teacher having updated After being supplied to the increment test question answer of student, triggering student sends resource credential and asks by parent's client to parent, Obtain parent to agree to and on the premise of parent pays certain expense, authorized certificate is obtained from educational resource controller;Education Resouce controller indicates teacher to provide more added value test question answer to student.
In addition, after if teacher provides a set of brand-new quiz and answer to learning resource manager platform, educational resource , according to the teacher and student table of comparisons for obtaining, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student for management platform Quiz and answer.If not this class of student obtains the brand-new quiz of the set and answer, sent to educational resource controller Resource credential asks;The Fei Benban student obtains authorized certificate after certain expense is paid from educational resource controller;Religion Educating resouce controller indicates learning resource manager platform to provide the brand-new quiz of the set and answer to student.The program can be with For:If teacher provides a set of brand-new quiz and answer and obtains the teacher and student table of comparisons, it is determined that belong to this class of student, Then the brand-new quiz of the set and answer are sent to this class of student.If not this class of student obtains the brand-new quiz of the set and answer When, send resource credential to educational resource controller and ask;The Fei Benban student provides after certain expense is paid from education Source controller obtains authorized certificate;Educational resource controller indicates teacher to provide the brand-new quiz of the set and answer to student.
In addition, after if teacher provides a set of brand-new quiz and answer to learning resource manager platform, educational resource , according to the teacher and student table of comparisons for obtaining, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student for management platform Quiz and answer.If not this class of student obtains the brand-new quiz of the set and answer, then by parent's client to family It is long to send resource credential's request, agree to and on the premise of parent pays certain expense parent is obtained, from educational resource control Device processed obtains authorized certificate;Educational resource controller indicates learning resource manager platform to provide the set brand-new quiz to student And answer.If in addition, teacher provides a set of brand-new quiz and answer and obtains the teacher and student table of comparisons, it is determined that belonging to This class of student, then send the brand-new quiz of the set and answer to this class of student.If not this class of student obtains the brand-new survey of the set Test topic and during answer, then sending resource credential to parent by parent's client asks, parent agrees to and family draws money on credit obtaining On the premise of having paid certain expense, authorized certificate is obtained from educational resource controller;Educational resource controller indicates teacher Xiang Xue It is raw that the brand-new quiz of the set and answer are provided.
In another embodiment, with reference to Figure 19, resource management center of the invention can be counted in preset period of time respectively (for example monthly once being counted) each resource acceptor upload resource citation times and by modification number of times;The resource Control centre obtains each money according to the citation times that the resource is obtained from the resource management center and by modification number of times Source acceptor distinguishes the corresponding superior factor of resource;Resource Control Center is according to residing for the superior factor of the resource of each resource acceptor The superior factor of resource is interval, each resource acceptor is divided and division result is notified into resource management center;Resource management Center is to be used in the different information of the interval resource acceptor push of the superior factor of different resource or the different resources of setting Authority.
It is secondary that being cited for the resource that each resource acceptor is uploaded in preset period of time is counted respectively in the resource management center Number and by modification number of times before, further comprising the steps of (referring to Figure 19):
If the resource acceptor changes the updated resource of resource donor or changes what the resource donor was provided New resources, then send resource upload request to the Resource Control Center;
The Resource Control Center forwards the resource upload request to the resource donor;
After the resource donor receives the resource upload request, if agreeing to upload, feedback resources upload response message To the Resource Control Center;
The Resource Control Center forwards the resource to upload response message to the resource acceptor;
After the resource acceptor receives the resource upload response message, in resource to the resource management of upload modification The heart.
Additionally, after the resource donor receives the resource upload request, if refusal is uploaded, feedback refusal respond disappears Cease to the Resource Control Center.
In a concrete scene, the courseware after student A modification teacher B renewals, and send resource to Resource Control Center Upload request, the resource upload request is forwarded to the teacher B by Resource Control Center (can after teacher B login Online class accounts The resource upload request is obtained, or by client proactive notification teacher B), if teacher B agrees to upload, will have agreed to message feedback To Resource Control Center.The acceptance message is fed back to student A by Resource Control Center, student A receive the acceptance message it Afterwards, the courseware upload that will be changed completes the upload to changing courseware to resource management center.If teacher B refusals are uploaded, instead Feedback refusal respond message is sent to student A to Resource Control Center, Resource Control Center and then by the refusal respond message.
The citation times of resource can be understood as resource and be downloaded or reprinted or be incorporated by reference data Number of times, resource can be modified mistake or be added the number of times of content by modification number of times, in the case of necessary, Resource needs to obtain author or third-party accreditation when being changed, and resource management center can just receive modification content.Resource is received The superior factor of resource of body embodies the participation enthusiasm and its quality for providing resource of resource acceptor.Received according to resource Each resource acceptor of the superior factor pair of resource of body is divided, and is to be pushed away in the interval resource acceptor of the superior factor of different resource Different information or the different resources use rights limit of setting are sent, as shown in table 1 and shown in table 2.
Table 1
Wherein, the content of information pushing can flexibly be set in table 1, protection scope of the present invention not limited herein, for example: During for X >=a, to the resource that resource acceptor M, resource acceptor N real time propelling movements update;During for b≤X < a, to resource acceptor P Push the resource for once updating within one week;During for X < b, the resource for once updating is pushed within mono- month to resource acceptor W.
Table 2
Wherein, the content of resources use right limit can flexibly be set in table 2, and protection scope of the present invention is not limited herein, For example:During for X >=a, resource acceptor M, the access right of resource acceptor N are that may have access to charge interval in the money more than 100 yuan Source;During for b≤X < a, the access right of resource acceptor P is interval more than 10 yuan and less than or equal to 100 to may have access to charge The resource of unit, during for X < b, resource acceptor W access rights are that may have access to charge interval in the resource less than or equal to 10 yuan.
Wherein, according to resource citation times and the superior factor of above-mentioned resource is calculated by modification number of times, for example, is provided The superior factor in source is citation times of resource and by the ratio between modification number of times.Specifically, the resource of resource acceptor is obtained The mode of the superior factor can be:
Wherein, miIt is the citation times of resource, niIt is resource by modification number of times, piBe resource it is superior because Son.
Assuming that the superior factor of resource interval boundary value a=3, b=1, the money that resource acceptor P is provided in upper Tables 1 and 2 The citation times of source W are 100, are 50 by modification number of times, and the superior factor for being calculated the resource is 100/50=2, with reference to Table 1 understands that 2 in b≤X < a intervals, and resource acceptor P can be obtained and be pushed senior teacher, the resource that common teachers are uploaded Qualification.Understood with reference to table 2, the resources use right limit of resource acceptor P is the resource before can only accessing 2 months.
In another embodiment, with reference to Figure 20, Resource Control Center of the invention is secondary according to being cited for each resource Number and the stock assessment factor by modification number of times each resource of acquisition;The resource residing for the stock assessment factor according to each resource Evaluation factor is interval, and each resource is divided;The resource management center is interval in different resource evaluation factor Resource different service ratings are set, the different service ratings different grades of resource acceptors of correspondence, as shown in table 3:
Table 3
The division of the resource acceptor in table 3 can be configured according to actual conditions, not limit protection of the invention herein Scope, for example:During X >=c, for resource O, resource P, the resource acceptor that can set the national contest first prize of acquisition has Power is used;During d≤X < c, for resource Z, can set obtain the resource acceptor of the provincial contest first prize with access to;X During < d, for resource K, can set obtain the city-level contest first prize resource acceptor with access to.
In addition, Resource Control Center can obtain the stock assessment factor of each resource according to below equation:
Wherein,xiIt is that being cited for any resource is secondary Number, yiIt is any resource by modification number of times, piIt is the stock assessment factor of any resource, n is total resources number.
Assuming that one has three resources, respectively A, B and C, its modification number of times, citation times and stock assessment factor feelings Condition is as shown in table 4 below.
Resource Citation times (x) By modification number of times (y) The stock assessment factor (m)
A 120 10 1.2
B 100 8 1.25
C 60 10 0.6
Table 4
The calculating process of the stock assessment factor of resource A:
Similarly, the calculating process of the stock assessment factor of resource B:
The calculating process of the stock assessment factor of resource C:
Assuming that border c=1, the d=0.5 in the stock assessment factor interval in table 3, then resource A and the corresponding moneys of resource B Source service rating is one-level, and only resource acceptor of the year examination average mark more than 90 points could use resource A and resource B.And The corresponding resource service ratings of resource C are two grades, and only year examination average mark is more than 80 points and the resource less than or equal to 90 points Acceptor could use resource C.
Additionally, with reference to Figure 21, resource management center transmits to resource the fraction assessment value of each resource acceptor for gathering Control centre;Each resource acceptor is divided into multiple resources and received by Resource Control Center according to default different fraction intervals grade Body group, is carried out between high score number interval grade corresponding resource acceptor group resource acceptor group corresponding with low fraction interval grade Match somebody with somebody, obtain mutual assistance group, and mutual assistance group's information is notified into each resource acceptor;In Resource Control Center statistics preset period of time in mutual assistance group Low fraction interval grade corresponding resource acceptor group in resource acceptor disengaging rate;If the resource acceptor disengaging rate in mutual assistance group More than preset value, then trigger resource management center and pushed to the resource acceptor in the corresponding resource acceptor group of high score number interval grade Corresponding information.
Wherein, high score number interval grade corresponding resource acceptor group resource acceptor group corresponding with low fraction interval grade Between matched, obtain mutual assistance group process be:
If being the first fraction interval grade, the second fraction interval grade, the 3rd fraction interval by fraction interval grade classification Grade, the 4th fraction interval grade;Wherein, fraction intervals of the second fractions of the first fraction interval grade > interval grade > the 3rd etc. Level > the 4th fractions interval grade;
The corresponding resource acceptor group of first fraction interval grade resource acceptor group knot corresponding with the 4th fraction interval grade Close, form mutual assistance group, the corresponding resource acceptor group of the second fraction interval grade resource corresponding with the 3rd fraction interval grade is received Body group combine, and forms mutual assistance group;Or second fraction interval grade corresponding resource acceptor group and the 4th fraction interval grade pair The resource acceptor group for answering combines, and forms mutual assistance group, and corresponding resource acceptor group is interval with the 3rd fraction for the first fraction interval grade Grade corresponding resource acceptor group combine, and forms mutual assistance group;Or first fraction interval grade corresponding resource acceptor group with the Two fractions interval grade corresponding resource acceptor group combine, and forms mutual assistance group, the corresponding resource acceptor of the 3rd fraction interval grade Group resource acceptor group corresponding with the 4th fraction interval grade combines, and forms mutual assistance group.
Assuming that the corresponding resource acceptor group of the first fraction interval grade resource acceptor corresponding with the 4th fraction interval grade Group combines, and forms mutual assistance group, the corresponding resource acceptor group of the second fraction interval grade money corresponding with the 3rd fraction interval grade Source acceptor group combines, and forms mutual assistance group, as shown in table 5 below:
Table 5
As shown in table 5:Corresponding information is pushed to the resource acceptor in high score number interval in mutual assistance group can also be it Its information, does not limit protection scope of the present invention, for example herein:During X > a, the resource that teacher of a special classification uploads is pushed;0≤X < During a, the resource that senior teacher uploads is pushed.
Assuming that in a preferred embodiment, the fraction assessment value of resource acceptor is, for example, the exam score of student, according to pre- If exam score interval grade student is divided into multiple students group, such as shown in table 6:
Table 6
By student group A and student group D be combined into mutual assistance group W1, by student group B and student group C be combined into mutual assistance group W2 ( Student group A and student group B can be combined into mutual assistance group W3, student group C and be combined into mutual assistance group W4 with student group D).So, learn With student's group's D-shaped into mutually helping right, student group B into mutually helps right to raw group A with student's group's C-shaped.
After having new exam score input, counted again, the student in student group D was likely to enter originally Raw group B or C, the student in student group C are likely to enter student group A.For example for mutual assistance group:Student group A and student group D.Learn There are 8 students in raw group D, wherein in there are 2 students to be put under student group C in next sub-distribution, mutual assistance thus can be calculated Resource acceptor disengaging rate in group W1 middle school student group D is 2/8=0.25.
If the a=0.2 in table 5, then student group A is more than a with the disengaging rate 0.25 of student group D mutual assistance groups, according to Table 5 understands that resource management center pushes the stock assessment factor to the student in student group A, and (value of R can be according to reality more than R Situation set) resource.Or, it is also possible to the resource acceptor in the corresponding resource acceptor group of high score number interval grade is obtained most Resources use right limit high, or when having new resources or updating optimal resource, new resources or the optimal resource supplying of renewal are given The corresponding resource acceptor group of the high score number interval grade.
In another embodiment, with reference to Figure 22, the fraction assessment value of each resource acceptor that resource management center will be gathered Transmit to Resource Control Center;Be divided into for each resource acceptor according to default different fraction intervals grade by Resource Control Center Multiple resource acceptor groups, the corresponding resource acceptor group of high score number interval grade resource acceptor group corresponding with low fraction interval grade Between matched, obtain mutual assistance group;Low fraction interval in Resource Control Center statistics preset period of time in the mutual assistance group etc. Resource acceptor disengaging rate in the corresponding resource acceptor group of level;If the resource acceptor disengaging rate in mutual assistance group is more than preset value, Resource Control Center is that the resource acceptor in the corresponding resource acceptor group of high score number interval grade sets highest resource access right Limit and priority assignation result is pushed to resource management center;Resource management center controls balloon score according to priority assignation result Resource acceptor in the corresponding resource acceptor group of interval grade conducts interviews to the resource in resource management center.
Understood with reference to reference table 6:If student group A and student group D are combined into mutual assistance group W1, by student group B and student group C It is combined into mutual assistance group W2.
Table 7
Assuming that a=1 in table 7, for mutual assistance group:Student group A and student group D, calculate with the mutual assistance group middle school student group D pairs The disengaging rate answered is 2/8 (has 8 students, wherein there is 2 students to be put under student group C in next sub-distribution in student group D In, the resource acceptor disengaging rate that thus can be calculated in mutual assistance group W1 middle school student group D is 2/8=0.25), the disengaging rate is less than 1, Then combine table 7 to understand, the resource in the corresponding resource acceptor group of the high score number interval grade in mutual assistance group (i.e. student group A) is received The resource access rights of body are to look at and reprint.That is the student in student group A is enjoyed to the checking of resource, the power of reprinting Limit.
Compared to prior art, according to the resource control architecture and the method using the framework of present invention offer, realize The fine-grained management of resource.
In addition, can mutually be converted between resource donor, resource acceptor in scheme so that the scope of application of scheme is more Extensively, the experience of user is enhanced.
In addition, by the granting and resources centralized management of resource management center control authorized certificate or by resource control in scheme The granting of control authorized certificate in center processed and resources control, manage authorized certificate, significantly rather than by single third party entity The interaction between system signaling is reduced, system resource has been saved, the communication efficiency of system is improve, greatly strengthen user's Experience.
In addition, the resource acceptor pays certain expense by the resource management center, obtain it is described authorize with The mode of card, has increased the income of system operator.
In addition, by the setting of resource acceptor manager, realize has carried out certain monitoring to the behavior of resource acceptor, keeps away The loss that the behavior of resource acceptor brings to resource acceptor manager is exempted from.
In addition, by certain strategy so that non-targeted resource acceptor obtains new resources, greatly strengthen the body of user Test.
In addition, the service condition according to resource obtains high-quality resource and high-quality resource donor (or resource acceptor), so that High-quality resource donor can be made to use high-quality resource, improve the utilization rate of resource.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (1)

1. a kind of method that application resource controls framework, it is characterised in that resource control architecture includes that resource donor, resource are received Body, resource management center, Resource Control Center;Wherein, it is mutual two-by-two between resource donor, resource acceptor, resource management center Connection;Resource Control Center is connected with resource donor, resource acceptor, resource management center respectively, and method is comprised the following steps:
Resource Control Center obtains resource control scheme;
Resource Control Center according to the resource control scheme for obtaining, control resource donor, between resource acceptor, resource management center The interaction of resource;
The resource management center transmits to the Resource Control Center fraction assessment value of each resource acceptor for gathering;
Described each resource acceptor is divided into multiple moneys by the Resource Control Center according to default different fraction intervals grade Source acceptor group, enters between the corresponding resource acceptor group of high score number interval grade resource acceptor group corresponding with low fraction interval grade Row matching, obtains mutual assistance group;
The corresponding resource acceptor of low fraction interval grade in the Resource Control Center statistics preset period of time in the mutual assistance group Resource acceptor disengaging rate in group,
If the resource acceptor disengaging rate in the mutual assistance group is more than preset value, the Resource Control Center is high score number interval etc. Resource acceptor in the corresponding resource acceptor group of level sets highest resource access rights and priority assignation result is pushed into institute State resource management center;
The resource management center according to the priority assignation result, in the corresponding resource acceptor group of control high score number interval grade Resource acceptor the resource in the resource management center is conducted interviews.
CN201710092857.4A 2014-08-01 2014-10-08 A kind of method that application resource controls framework Pending CN106789365A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201410377750 2014-08-01
CN2014103777500 2014-08-01
CN201410524320.7A CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410524320.7A Division CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture

Publications (1)

Publication Number Publication Date
CN106789365A true CN106789365A (en) 2017-05-31

Family

ID=52375551

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201710092857.4A Pending CN106789365A (en) 2014-08-01 2014-10-08 A kind of method that application resource controls framework
CN201710092668.7A Expired - Fee Related CN106941417B (en) 2014-08-01 2014-10-08 Application method of resource control architecture
CN201710092669.1A Expired - Fee Related CN106789364B (en) 2014-08-01 2014-10-08 Method for applying resource control architecture
CN201410524320.7A Expired - Fee Related CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture

Family Applications After (3)

Application Number Title Priority Date Filing Date
CN201710092668.7A Expired - Fee Related CN106941417B (en) 2014-08-01 2014-10-08 Application method of resource control architecture
CN201710092669.1A Expired - Fee Related CN106789364B (en) 2014-08-01 2014-10-08 Method for applying resource control architecture
CN201410524320.7A Expired - Fee Related CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture

Country Status (2)

Country Link
CN (4) CN106789365A (en)
WO (2) WO2016015363A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016015366A1 (en) * 2014-08-01 2016-02-04 苏州阔地网络科技有限公司 Resource control architecture based on identity service identifier, and method using said architecture
WO2016015363A1 (en) * 2014-08-01 2016-02-04 苏州阔地网络科技有限公司 Resource control architecture, and method using said architecture
CN108717314A (en) * 2018-05-08 2018-10-30 南京思达捷信息科技有限公司 A kind of control framework under cosmetics and its method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101083582A (en) * 2007-06-22 2007-12-05 华中科技大学 Heterogeneous medical information integrated system based on HL7 agent server
US20090113253A1 (en) * 2007-04-03 2009-04-30 Huawei Technologies Co., Ltd. System and apparatus for delivering media and method for playing streaming media
CN101854387A (en) * 2010-05-14 2010-10-06 中国科学院计算技术研究所 P2P flow optimization method and system based on distributed index server architecture
CN101951375A (en) * 2010-09-21 2011-01-19 北京信息科技大学 Trust assessment-based adaptive trust negotiation system and method
CN102130949A (en) * 2011-03-10 2011-07-20 肖智刚 User contribution-based method and system for sharing personalized digital resources
CN102789494A (en) * 2012-07-11 2012-11-21 深圳市宜搜科技发展有限公司 Processing method and system for carrying out reduplication removal on Internet resources

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001001372A1 (en) * 1999-06-30 2001-01-04 Blackboard, Inc. Internet-based education support system and methods
US6957261B2 (en) * 2001-07-17 2005-10-18 Intel Corporation Resource policy management using a centralized policy data structure
US7188364B2 (en) * 2001-12-20 2007-03-06 Cranite Systems, Inc. Personal virtual bridged local area networks
US8091088B2 (en) * 2005-02-22 2012-01-03 Microsoft Corporation Method and system for hierarchical resource management involving hard and soft resource limits
JP5340173B2 (en) * 2007-01-26 2013-11-13 インターデイジタル テクノロジー コーポレーション Location information and method and apparatus for ensuring access control using location information
CN101276269B (en) * 2007-03-30 2010-05-19 上海众恒信息产业股份有限公司 Expandable resource management platform
CN101174326A (en) * 2007-11-16 2008-05-07 广东工业大学 Project training management system
CN101478398B (en) * 2009-01-07 2010-12-22 中国人民解放军信息工程大学 Authorization management system oriented to resource management and establishing method
CN101699819B (en) * 2009-11-13 2012-07-25 中国电信股份有限公司 Method and system for managing digital rights
CN101931534A (en) * 2010-08-30 2010-12-29 中兴通讯股份有限公司 Management method and device of operator resource usage license
CN102104501A (en) * 2011-03-30 2011-06-22 天津大学 Campus network service system
CN102708464A (en) * 2012-05-18 2012-10-03 苏州慧飞信息科技有限公司 Teaching resource management system
CN103078859B (en) * 2012-12-31 2016-03-02 普天新能源有限责任公司 Operation system right management method, equipment and system
WO2016015363A1 (en) * 2014-08-01 2016-02-04 苏州阔地网络科技有限公司 Resource control architecture, and method using said architecture

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090113253A1 (en) * 2007-04-03 2009-04-30 Huawei Technologies Co., Ltd. System and apparatus for delivering media and method for playing streaming media
CN101083582A (en) * 2007-06-22 2007-12-05 华中科技大学 Heterogeneous medical information integrated system based on HL7 agent server
CN101854387A (en) * 2010-05-14 2010-10-06 中国科学院计算技术研究所 P2P flow optimization method and system based on distributed index server architecture
CN101951375A (en) * 2010-09-21 2011-01-19 北京信息科技大学 Trust assessment-based adaptive trust negotiation system and method
CN102130949A (en) * 2011-03-10 2011-07-20 肖智刚 User contribution-based method and system for sharing personalized digital resources
CN102789494A (en) * 2012-07-11 2012-11-21 深圳市宜搜科技发展有限公司 Processing method and system for carrying out reduplication removal on Internet resources

Also Published As

Publication number Publication date
CN106941417A (en) 2017-07-11
CN104320380B (en) 2017-05-17
CN106789364B (en) 2020-05-08
CN106789364A (en) 2017-05-31
CN104320380A (en) 2015-01-28
WO2016015363A1 (en) 2016-02-04
WO2016015498A1 (en) 2016-02-04
CN106941417B (en) 2020-07-17

Similar Documents

Publication Publication Date Title
CN104766255A (en) Course matching and supporting interactive management system and method for supporting terminals
CN109785200A (en) It answers questions method, equipment and storage medium
CN104320380B (en) Resource control architecture and application method of architecture
CN104243219B (en) A kind of resources control framework of identity-based service identification and apply this framework method
CN108156068A (en) A kind of user identity between instant messaging account hides and information forwarding method and device
CN108170285A (en) The interaction control method and device of a kind of electronic equipment
Rule et al. Technology-mediated consultation to assist rural students: A case study
Symeou Family-school liaisons in Cyprus: An investigation of families’ perspectives and needs
Chandra et al. Closing the Digital Divide in US Education—for Good
CN100359849C (en) Net aid system and implementing method therefor
CN105719207A (en) Finely intelligent homework score data generating method and system in SPOC platform
CN103473963B (en) Synchronous classroom processing method and system
Farrell ICT in Education in Rwanda
CN106204370B (en) Interaction management method, interaction management platform and interaction management system
CN105050127B (en) The standby starting control method of calamity and system
Wei et al. The Open University of China and Chinese approach to a sustainable and learning society
Kubica et al. Role-Based Group Formations and Interactions to Foster Collaboration in Different Classrooms
CN113572642B (en) Networking method, device and system
CN113935665B (en) Voting management method and system for alliance chain
Das et al. Mixed-methods study to validate and refine the'Strategic Healthcare Implementation Framework for Task Shifting, Sharing and Resource Enhancement'(SHIFT-SHARE)
Koo et al. Graduate-undergraduate interaction in wireless applications research and development
Walker Collaboration and alliances: a workforce development agenda for primary care
Cóndor-Herrera et al. Analysis of Video Conferencing Platforms for Online Teaching During the Covid-19 Pandemic
Shinde International Planners Network off to a flying start
Battaglini et al. The power of collaboration: the case of the Renewable Grid Initiative

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20201013

AD01 Patent right deemed abandoned