CN106703763A - Intelligent layered mining system applicable to offshore oilfield sand control well completion - Google Patents

Intelligent layered mining system applicable to offshore oilfield sand control well completion Download PDF

Info

Publication number
CN106703763A
CN106703763A CN201710005793.XA CN201710005793A CN106703763A CN 106703763 A CN106703763 A CN 106703763A CN 201710005793 A CN201710005793 A CN 201710005793A CN 106703763 A CN106703763 A CN 106703763A
Authority
CN
China
Prior art keywords
intelligent
cable
production
submersible pump
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710005793.XA
Other languages
Chinese (zh)
Inventor
张志熊
刘义刚
邹剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Tianjin Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201710005793.XA priority Critical patent/CN106703763A/en
Publication of CN106703763A publication Critical patent/CN106703763A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/001Survey of boreholes or wells for underwater installation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Remote Sensing (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses an intelligent layered mining system applicable to offshore oilfield sand control well completion. The intelligent layered mining system comprises a well mouth Christmas tree, an underground safety valve, a cable-passing packer, a Y connector, a holed pipe, a cable-passing positioning seal, a first intelligent bottom-hole regulator, a first cable-passing insertion seal, a second intelligent bottom-hole regulator, a second able-passing insertion seal, a third intelligent bottom-hole regulator and a round plug which are connected through oil pipes, wherein the cable-passing packer is provided with an air vent valve and a cable passing device, the Y connector is connected with an electric submersible pump unit, the electric submersible pump unit is connected with an electric submersible pump control system, and the first intelligent bottom-hole regulator, the second intelligent bottom-hole regulator and the third intelligent bottom-hole regulator are all connected to a ground controller. The intelligent layered mining system can achieve oil well water finding, layered testing, water plugging, layered mining and other purposes through one-time operation, can conduct real-time monitoring and real-time control on single-layer flow, water content, pressure, temperature and other underground parameters, achieves low-cost and efficiency oilfield development and is applicable to offshore oilfield sand control well completion.

Description

A kind of intelligent separate zone production system suitable for offshore oilfield sand control completion
Technical field
It is to be related to one kind to be applied to sea in particular the invention belongs to offshore oilfield intelligence hierarchical-development technical field The intelligent separate zone production system of upper oil field sand control completion.
Background technology
As Bohai Bay Oil exploitation enters high water cut stage, some low aqueous, low permeability pays can not be exploited normally, in order to These problems are solved, it is necessary to implement the measures such as water detection, zonal testing, water blockoff, separate zone production to oil well.Bohai Bay Oil is with High angle Based on well, horizontal well development, oil well uses selective sand control completion, the mode of production to be mainly using electric submersible pump lifting, separate zone production Oil well be usually that using Y-piece post, pay interval looks for water blockoff, zonal testing, to adjust layer to be needed when producing logical using sliding sleeve control Cross steel wire or wireline operation, construct it is cumbersome, account for that the well cycle is long, operating cost is high, and cannot realize individual layer flow, moisture content, Continuously adjusting for the isoparametric real-time monitoring of pressure, temperature and individual layer flow, limits the effect of oil well delamination exploitation.It is existing Oil well delamination production technique be present, and not be suitable for the hole condition condition of Bohai Bay Oil.
The content of the invention
The invention aims to overcome deficiency of the prior art, there is provided one kind is applied to offshore oilfield sand control completion Intelligent separate zone production system, by water detection, zonal testing, water blockoff, separate zone production integrated pipe column and ground survey adjust control system Composition, one-stop operation is to be capable of achieving the purposes such as oil well water detection, zonal testing, water blockoff, separate zone production, is made without steel wire or cable The downhole parameters such as individual layer flow, moisture content, pressure, temperature can be carried out real-time monitoring and real-time control by industry, overcome original work Skill construction is cumbersome, account for that the well cycle is long, operating cost is high, operating efficiency is low, cannot the defect such as real-time monitoring and control downhole parameters, So as to realize oil field low cost, Efficient Development.
The purpose of the present invention is achieved through the following technical solutions.
A kind of intelligent separate zone production system suitable for offshore oilfield sand control completion of the invention, including sleeve pipe and be arranged at Packer in sleeve pipe, is provided with screen casing between the two neighboring packer, one is formed between the two neighboring packer Individual production layer, is provided with downhole integrated tubing string in described sleeve pipe, the downhole integrated tubing string is included from top to bottom by oil Wellhead tree tree that pipe is sequentially connected, storm valve, cable-passing packer, Y-shaped connector, pipe with holes, cross cable location sealing, the One intelligent production mandrel, first cross cable insertion sealing, the second intelligent production mandrel, second cross cable insertion sealing, the 3rd intelligence and match somebody with somebody Produce device and circle is stifled, the cable-passing packer is provided with vent valve and cable penetration device, and the Y-shaped connector is connected with electric submersible pump machine Group, the electric submersible pump unit is connected by power cable with electric submersible pump control system, the described first intelligent production mandrel, the second intelligence The ground controller of production mandrel and the 3rd intelligent production mandrel by controlling cable connection to be connected with PC.
It is described to cross cable location sealing, first cross cable insertion sealing and second and cross cable insertion sealing and may be contained within packing Inside device.
Described first intelligent production mandrel, the second intelligent production mandrel and the 3rd intelligent production mandrel correspond to a production layer and set respectively Put.
The storm valve and vent valve are respectively connected with liquid controling pipe line, and use same liquid controling pipe line.
Compared with prior art, the beneficial effect that technical scheme is brought is:
(1) present invention is designed for the hole condition condition of Bohai Bay Oil selective sand control completion, is adopted using electric submersible pump Y types point Tubing string, is capable of achieving the separate zone production that electric submersible pump group lifts well, and technological adaptability is strong;
(2) present invention is powered and signal transmitted in both directions using control cable to downhole tool, transmitting procedure security reliability It is high;
(3) present invention carries out one-stop operation and is capable of achieving the purpose such as water detection, zonal testing, water blockoff, separate zone production, and Control can carry out real-time monitoring and real-time control to each interval production status in platform, process is simple, make without steel wire or cable Industry, operating cost are low, later maintenance convenient management, for platform other measures provide more operation windows, so as to realize sea Oil field low cost, Efficient Development;
(4) present invention can carry out continuous monitoring to Reservoir behavior, realize oil well intelligent separate zone production, be that oil reservoir is opened Start state to adjust and sufficient reliable big data support is provided.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the schematic diagram of ground controller in the present invention.
Reference:1st, storm valve;2nd, vent valve;3rd, cable penetration device;4th, cable-passing packer;5th, Y-shaped connector;6、 Electric submersible pump unit;7th, pipe with holes;8th, cable location sealing is crossed;9th, the first intelligent production mandrel;10th, first cable insertion sealing is crossed; 11st, the second intelligent production mandrel;12nd, second cable insertion sealing is crossed;13rd, the 3rd intelligent production mandrel;14th, circle is stifled;15th, hydraulic control pipe Line;16th, power cable;17th, cable is controlled;18th, wellhead tree tree;19th, electric submersible pump control system;20th, ground controller;21、 PC;22nd, sleeve pipe;23rd, oil pipe;24th, packer;25th, screen casing.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
A kind of intelligent separate zone production system suitable for offshore oilfield sand control completion of the invention, including sleeve pipe 22, it is described Multiple packers 24 are provided with sleeve pipe 22, screen casing 25 is provided between the two neighboring packer 24, it is two neighboring described A production layer is formed between packer 24, packer 24 is provided with four in Fig. 1, form three production layers.
Downhole integrated tubing string is provided with described sleeve pipe 22, the downhole integrated tubing string is anti-for Bohai Bay Oil layering The characteristics of sand completion, is designed, overall to adopt integrated pipe column using electric submersible pump Y types intelligence point.The downhole integrated tubing string bag Include from top to bottom be sequentially connected by oil pipe 23 wellhead tree tree 18, storm valve 1, cable-passing packer 4, Y-shaped connector 5, Pipe with holes 7, cross the intelligent production mandrel 9, first of cable location sealing 8, first and cross the intelligent production mandrel of cable insertion sealing 10, second 11st, second the intelligent production mandrel 13 of cable insertion sealing the 12, the 3rd and circle stifled 14 are crossed.The storm valve 1 is oil pipe passage peace Full control instrument, is connected with underground hydraulic-control pipeline 15, controls it to open and close by ground hydraulic, is in during normal production Open mode, closing well or can close oil pipe passage when having overflow blowout, play a part of production safety control.
The cable-passing packer 4 is oil jacket annular space security control instrument, hydraulic setting, above proposes deblocking, described to cross cable Packer 4 is provided with vent valve 2 and cable penetration device 3, and the cable penetration device 3 realizes well dynamic cable 16 and control cable 17 pass through, and the vent valve 2 is equally connected with underground hydraulic-control pipeline 15, control it to open and close by ground hydraulic, just Open mode is often in during production, oil jacket annular space is connected with well head, releasable cable-passing packer is below 4 in oil jacket annular space Gas, to ensure that electric submersible pump unit 6 runs well, when being in an emergency, ground release can close it, play control oil The effect of set annular space safety, the vent valve 2 and storm valve 1 are controlled using same liquid controling pipe line 15, and both are same with opening Close.
The Y-shaped connector 5 is that Bohai Bay Oil realizes that electric submersible pump unit 6 lifts the important kit of separate zone production, and the Y connects First 5 top is connected with oil pipe 23, and two joints are arranged at bottom, and a joint is used for connecting electric submersible pump unit 6, and another joint is used for Connection bottom separate-layer string.The electric submersible pump unit 6 is connected by power cable 16 with ground electric submersible pump control system 19, described Power cable 16 be after for underground electric submersible pump unit 6 is powered and data transfer, passing through wellhead tree tree 18 with electric submersible pump control System processed 19 is connected, and the electric submersible pump control system 19 can power for underground electric submersible pump unit 6, and to the work of electric submersible pump unit 6 It is monitored as state, it is ensured that the normal work of electric submersible pump unit 6.
The pipe with holes 7 is crossing the top of cable location sealing 8, connection oil pipe and oil jacket annular space, for downhole fluid provides stream Dynamic passage.It is described cross cable location sealing 8, first and cross cable insertion sealing 10 and second and cross cable insertion sealing 12 may be contained within Inside packer 24, the cable location sealing 8, first of crossing crosses cable insertion sealing 10 and second to cross cable insertion sealing 12 real Existing zonal isolation, is designed with cable penetration passage, so that underground control cable 17 passes through.
The described first intelligent intelligent production mandrel 11 of production mandrel 9, second is identical with the 3rd intelligent structure of production mandrel 13, is well The core of lower integrated pipe column, mainly by multiphase flow flowmeter, pressure gauge, moisture content meter, measurement control module, data The parts such as reason module, electric machine actuating mechanism constitute, and are integrated with the isoparametric test function of flow, moisture content, pressure, temperature.Institute Corresponding production layer is set respectively to state the first intelligent production mandrel 13 of the intelligent intelligent production mandrel 11 and the 3rd of production mandrel 9, second.Institute State the first intelligent production mandrel 13 of the intelligent intelligent production mandrel 11 and the 3rd of production mandrel 9, second and connect ground by controlling cable 17 Controller 20, the ground controller 20 and the grade of PC 21 part constitute ground and survey tune control system.The control cable 17 is used To power and realize that signal is two-way for the intelligent production mandrel 9, second in the underground first intelligent production mandrel 13 of intelligent production mandrel 11 and the 3rd Transmission, is connected after passing through wellhead tree tree 18 with ground controller 20.The ground controller 20 is main by Switching Power Supply, master control The part such as plate, communication board, driving plate, display board and annex constitutes, and its one end and underground control cable 17 to be connected, the other end and PC Machine 21 be connected, can by PC 21 earthward controller 20 send instruction, and by under the received well of ground controller 20 first intelligence The signal that the intelligent production mandrel 13 of the intelligent production mandrel the 11, the 3rd of production mandrel 9, second is transmitted, completion collection signal and control signal Modulation /demodulation and the transmission of signal, realize and the intelligent intelligence of production mandrel the 11, the 3rd of the intelligent production mandrel 9, second in underground first is with product Communication between device 13, so as to realize the real-time monitoring and real-time control of individual layer manufacturing parameter, reaches water detection, zonal testing, blocks up The purposes such as water, separate zone production, according to the concrete condition of downhole parameters, formulate the optimal production system of producing well, and Fig. 2 is controlled for ground The principle schematic of device processed 20.
Assemble downhole integrated tubing string according to design, and under lower going-into-well integrated pipe column in place, well head suppresses completion Cable-passing packer 4 is setting, carries out cable penetration and protection in construction as requested, after tubing string tests sealing lattice, recovers well head, opens Well is produced.After oil well operation terminates, by PC 21 from ground controller 20 to the intelligent intelligence of production mandrel 9, second in underground first The intelligent production mandrel 13 of production mandrel the 11, the 3rd sends instruction, has been in the corresponding intelligent production mandrel oil nozzle of each pay interval Full open mode, several days of steady production, can before and after flow, moisture content, the oil nozzle of direct access each interval pressure, temperature etc. it is raw Produce parameter, by analysis determine high aquifer formation, realize water detection and zonal testing purpose, for production parameter adjustment provides reliably according to According to.Strata pressure recovery curve is obtained if desired, can be from ground to first the 9, second intelligent production mandrel 11 of intelligent production mandrel, the Three intelligent production mandrels 13 send instruction, close the intelligent production mandrel oil nozzle of correspondence interval, recover so as to measure corresponding strata pressure Curve.According to the manufacturing parameter for measuring, judge with reference to the analysis of oil reservoir development personnel, determine rational production system, can root According to the intelligent production mandrel oil nozzle aperture size for needing any regulation correspondence interval, individual layer water content and Liquid output are controlled, to reach Optimal production status.In addition it is also possible in ground PC 21 to the intelligent production mandrel 11 of the intelligent production mandrel 9, second in underground first, The working condition of the 3rd intelligent production mandrel 13 is configured, and it is operated according to the state for setting, if actual production State deviates setting state, and the first intelligent production mandrel 13 of the intelligent intelligent production mandrel the 11, the 3rd of production mandrel 9, second can be carried out automatically Regulation, recovers to working condition is set, and whole system realizes oil well intelligent hierarchical-development.
Although being described to function of the invention and the course of work above in conjunction with accompanying drawing, the invention is not limited in Above-mentioned concrete function and the course of work, above-mentioned specific embodiment are only schematical, rather than restricted, ability The those of ordinary skill in domain is not departing from present inventive concept and scope of the claimed protection situation under enlightenment of the invention Under, many forms can also be made, these are belonged within protection of the invention.

Claims (4)

1. a kind of intelligent separate zone production system suitable for offshore oilfield sand control completion, including sleeve pipe and the envelope being arranged in sleeve pipe Every device, screen casing is provided between the two neighboring packer, a production layer is formed between the two neighboring packer, its It is characterised by, downhole integrated tubing string is provided with described sleeve pipe, and the downhole integrated tubing string is included from top to bottom by oil Wellhead tree tree that pipe is sequentially connected, storm valve, cable-passing packer, Y-shaped connector, pipe with holes, cross cable location sealing, the One intelligent production mandrel, first cross cable insertion sealing, the second intelligent production mandrel, second cross cable insertion sealing, the 3rd intelligence and match somebody with somebody Produce device and circle is stifled, the cable-passing packer is provided with vent valve and cable penetration device, and the Y-shaped connector is connected with electric submersible pump machine Group, the electric submersible pump unit is connected by power cable with electric submersible pump control system, the described first intelligent production mandrel, the second intelligence The ground controller of production mandrel and the 3rd intelligent production mandrel by controlling cable connection to be connected with PC.
2. a kind of intelligent separate zone production system suitable for offshore oilfield sand control completion according to claim 1, its feature It is, it is described to cross cable location sealing, first cross cable insertion sealing and second and cross cable insertion sealing and may be contained within packer It is internal.
3. a kind of intelligent separate zone production system suitable for offshore oilfield sand control completion according to claim 1, its feature It is that the described first intelligent production mandrel, the second intelligent production mandrel and the 3rd intelligent production mandrel correspond to a production layer and set respectively.
4. a kind of intelligent separate zone production system suitable for offshore oilfield sand control completion according to claim 1, its feature It is that the storm valve and vent valve are respectively connected with liquid controling pipe line, and use same liquid controling pipe line.
CN201710005793.XA 2017-01-04 2017-01-04 Intelligent layered mining system applicable to offshore oilfield sand control well completion Pending CN106703763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710005793.XA CN106703763A (en) 2017-01-04 2017-01-04 Intelligent layered mining system applicable to offshore oilfield sand control well completion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710005793.XA CN106703763A (en) 2017-01-04 2017-01-04 Intelligent layered mining system applicable to offshore oilfield sand control well completion

Publications (1)

Publication Number Publication Date
CN106703763A true CN106703763A (en) 2017-05-24

Family

ID=58905882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710005793.XA Pending CN106703763A (en) 2017-01-04 2017-01-04 Intelligent layered mining system applicable to offshore oilfield sand control well completion

Country Status (1)

Country Link
CN (1) CN106703763A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894761A (en) * 2018-08-06 2018-11-27 中国海洋石油集团有限公司 A kind of one-trip string seperated layer water injection sand control back washing device and method
CN109057755A (en) * 2018-08-19 2018-12-21 中国海洋石油集团有限公司 A kind of downhole rotational-flow gas-liquid point adopts tubing string and systematic analytic method
CN110242281A (en) * 2019-07-19 2019-09-17 西安思坦仪器股份有限公司 A kind of oil well intelligent calibration self checking method and device
CN112031683A (en) * 2020-08-19 2020-12-04 中国海洋石油集团有限公司 Sand washing and sand carrying lifting production integrated process pipe column and method thereof
CN112252999A (en) * 2020-10-20 2021-01-22 中国石油大学(华东) Self-injection machine mining working condition integrated intelligent sand prevention pipe column and well completion method
CN112682032A (en) * 2021-01-04 2021-04-20 中海石油(中国)有限公司 Offshore intelligent well downhole data transmission method and device
CN113236199A (en) * 2020-11-09 2021-08-10 中国海洋石油集团有限公司 Oil well cable control layered monitoring and intelligent production allocation system and use method thereof
CN113605864A (en) * 2019-06-28 2021-11-05 周静 Be applicable to offshore oil field intelligence layering mining devices
CN113669036A (en) * 2020-05-13 2021-11-19 中国海洋石油集团有限公司 Hydraulic control layered oil production system
CN113738318A (en) * 2021-08-10 2021-12-03 中海油田服务股份有限公司 Electric control intelligent layered water control oil production device
CN113969783A (en) * 2020-07-23 2022-01-25 中国石油天然气股份有限公司 Underground fluid stratified sampling system and stratified sampling method
CN114198065A (en) * 2021-08-24 2022-03-18 中国石油天然气集团有限公司 Leak preventer for sea natural gas hydrate reservoir and method for determining using amount of leak preventer material in leak preventer
CN114482921A (en) * 2020-10-27 2022-05-13 中国石油化工股份有限公司 Electro-hydraulic integrated switch and application thereof
CN114776262A (en) * 2022-04-02 2022-07-22 中国海洋石油集团有限公司 Underground heat generation device for offshore heavy oil thermal recovery and application thereof
CN114856494A (en) * 2021-02-04 2022-08-05 中国石油天然气股份有限公司 Gas-water output profile testing method for coal bed gas combined production well
CN114198065B (en) * 2021-08-24 2024-05-24 中国石油天然气集团有限公司 Leakage-proof agent for sea area natural gas hydrate reservoir and method for determining leakage-proof material dosage in leakage-proof agent

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2900906A1 (en) * 2012-09-26 2015-08-05 Halliburton Energy Services, Inc. Single trip multi-zone completion systems and methods
CN205445558U (en) * 2016-03-08 2016-08-10 中国海洋石油总公司 Novel double pump technology tubular column in pit
CN106121598A (en) * 2016-06-30 2016-11-16 中国石油化工股份有限公司 Oil well delamination production fluid measure and control test device
CN106121600A (en) * 2016-08-21 2016-11-16 中国石油化工股份有限公司 A kind of layering section exploitation observing and controlling flow string
CN106150433A (en) * 2016-08-21 2016-11-23 中国石油化工股份有限公司 A kind of downhole intelligent balanced production control valve

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2900906A1 (en) * 2012-09-26 2015-08-05 Halliburton Energy Services, Inc. Single trip multi-zone completion systems and methods
CN205445558U (en) * 2016-03-08 2016-08-10 中国海洋石油总公司 Novel double pump technology tubular column in pit
CN106121598A (en) * 2016-06-30 2016-11-16 中国石油化工股份有限公司 Oil well delamination production fluid measure and control test device
CN106121600A (en) * 2016-08-21 2016-11-16 中国石油化工股份有限公司 A kind of layering section exploitation observing and controlling flow string
CN106150433A (en) * 2016-08-21 2016-11-23 中国石油化工股份有限公司 A kind of downhole intelligent balanced production control valve

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894761B (en) * 2018-08-06 2020-08-18 中国海洋石油集团有限公司 One-trip pipe column separate-layer water injection sand prevention backwashing device and method
CN108894761A (en) * 2018-08-06 2018-11-27 中国海洋石油集团有限公司 A kind of one-trip string seperated layer water injection sand control back washing device and method
CN109057755B (en) * 2018-08-19 2021-02-19 中国海洋石油集团有限公司 Underground rotational flow gas-liquid separate production pipe column and system analysis method
CN109057755A (en) * 2018-08-19 2018-12-21 中国海洋石油集团有限公司 A kind of downhole rotational-flow gas-liquid point adopts tubing string and systematic analytic method
CN113605864B (en) * 2019-06-28 2023-09-12 周静 Intelligent layered mining device suitable for offshore oil field
CN113605864A (en) * 2019-06-28 2021-11-05 周静 Be applicable to offshore oil field intelligence layering mining devices
CN110242281B (en) * 2019-07-19 2023-08-18 西安思坦仪器股份有限公司 Intelligent calibration self-checking method and device for oil well
CN110242281A (en) * 2019-07-19 2019-09-17 西安思坦仪器股份有限公司 A kind of oil well intelligent calibration self checking method and device
CN113669036A (en) * 2020-05-13 2021-11-19 中国海洋石油集团有限公司 Hydraulic control layered oil production system
CN113969783B (en) * 2020-07-23 2024-03-26 中国石油天然气股份有限公司 Downhole fluid stratified sampling system and stratified sampling method
CN113969783A (en) * 2020-07-23 2022-01-25 中国石油天然气股份有限公司 Underground fluid stratified sampling system and stratified sampling method
CN112031683A (en) * 2020-08-19 2020-12-04 中国海洋石油集团有限公司 Sand washing and sand carrying lifting production integrated process pipe column and method thereof
CN112252999A (en) * 2020-10-20 2021-01-22 中国石油大学(华东) Self-injection machine mining working condition integrated intelligent sand prevention pipe column and well completion method
CN112252999B (en) * 2020-10-20 2021-09-24 中国石油大学(华东) Well completion method of self-injection machine mining working condition integrated intelligent sand prevention pipe column
CN114482921A (en) * 2020-10-27 2022-05-13 中国石油化工股份有限公司 Electro-hydraulic integrated switch and application thereof
CN113236199A (en) * 2020-11-09 2021-08-10 中国海洋石油集团有限公司 Oil well cable control layered monitoring and intelligent production allocation system and use method thereof
CN112682032A (en) * 2021-01-04 2021-04-20 中海石油(中国)有限公司 Offshore intelligent well downhole data transmission method and device
CN112682032B (en) * 2021-01-04 2023-11-24 中海石油(中国)有限公司 Offshore intelligent downhole data transmission method and device
CN114856494B (en) * 2021-02-04 2024-03-26 中国石油天然气股份有限公司 Method for testing gas and water production profile of coal bed gas combined well
CN114856494A (en) * 2021-02-04 2022-08-05 中国石油天然气股份有限公司 Gas-water output profile testing method for coal bed gas combined production well
CN113738318A (en) * 2021-08-10 2021-12-03 中海油田服务股份有限公司 Electric control intelligent layered water control oil production device
CN114198065A (en) * 2021-08-24 2022-03-18 中国石油天然气集团有限公司 Leak preventer for sea natural gas hydrate reservoir and method for determining using amount of leak preventer material in leak preventer
CN114198065B (en) * 2021-08-24 2024-05-24 中国石油天然气集团有限公司 Leakage-proof agent for sea area natural gas hydrate reservoir and method for determining leakage-proof material dosage in leakage-proof agent
CN114776262A (en) * 2022-04-02 2022-07-22 中国海洋石油集团有限公司 Underground heat generation device for offshore heavy oil thermal recovery and application thereof

Similar Documents

Publication Publication Date Title
CN106703763A (en) Intelligent layered mining system applicable to offshore oilfield sand control well completion
CN103277079B (en) A kind of tubing string of horizontal well fracturing completion and pressing crack construction method thereof
CN103277078B (en) A kind of hydraulic sliding sleeve
CN103485747B (en) A kind of automatic compensation borehole sealing device and method
CN104100219B (en) A kind of single-unit circulation road controlled pressure drilling method and apparatus adapting to big changes in flow rate
RU2562641C2 (en) Method of simultaneous-separate operation of dually-completed well and well pump unit for its implementation
WO2018000470A1 (en) Intelligent switch valve for reservoir transformation, production monitoring and control and construction method therefor
CN104153753B (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN203285370U (en) Single-section throttling channel pressure control drilling device adapted to large flow variation
He et al. Development and prospect of separated zone oil production technology
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN107939376A (en) A kind of gas well gas testing operation integrated synthesis completion method
CN110118069A (en) A kind of ultra-deep well drilling pressure control equipment and operating method
CN205400702U (en) Hard strata shallow layer geothermal well fracturing unit
CN101403293B (en) Column type down-hole shut-in well delamination pressure test technique suitable for oil well
CN110608005B (en) Gas lift reverse circulation drilling system and automatic control method
CN101769129B (en) Integral layering gas recovery technology tubular column and application method thereof
CN105715220B (en) A kind of drilling well control pressure system
CN202900175U (en) Gas storage suspending pressure meter manometry completion pipe string
CN107956430B (en) Intelligent well completion pipe string suitable for land test well and well logging test method thereof
CN207004498U (en) Infinite stages switching sliding sleeve fracturing tool
CN203939477U (en) A kind of formation testing and completion practice integrated pipe column
CN210087252U (en) Underground continuous pipe cable separation sealing adapter
CN204098872U (en) Electric immersible pump well tubing string and electric immersible pump well
CN112081535A (en) Ultra-deep high-sulfur-content gas well completion pipe string and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170524

WD01 Invention patent application deemed withdrawn after publication