CN106682743A - Operation and maintenance work order scheduling management method and system in electric power telecommunication field - Google Patents

Operation and maintenance work order scheduling management method and system in electric power telecommunication field Download PDF

Info

Publication number
CN106682743A
CN106682743A CN201611158421.2A CN201611158421A CN106682743A CN 106682743 A CN106682743 A CN 106682743A CN 201611158421 A CN201611158421 A CN 201611158421A CN 106682743 A CN106682743 A CN 106682743A
Authority
CN
China
Prior art keywords
task
personnel
operation maintenance
work order
matching degree
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611158421.2A
Other languages
Chinese (zh)
Inventor
邵波
刘嘉华
阮冬玲
王升杰
巢玉坚
胡游君
杨华飞
康睿
吴德胜
王琪
严晴
邱玉祥
蔡新忠
施健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Information and Communication Technology Co
Original Assignee
Nari Information and Communication Technology Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Information and Communication Technology Co filed Critical Nari Information and Communication Technology Co
Priority to CN201611158421.2A priority Critical patent/CN106682743A/en
Publication of CN106682743A publication Critical patent/CN106682743A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an operation and maintenance work order scheduling management method and system in an electric power telecommunication field. The method comprises steps of 1, work order and worker information acquisition: acquiring all types of operation and maintenance work orders and operation and maintenance worker information, wherein the operation and maintenance work orders comprise task identifiers, task categories, task work procedures, continuous time of accomplishing of each work procedure and task grade information, and the operation and maintenance worker information comprise operation and maintenance worker identifiers, operation and maintenance skills, skill coefficients of each operation and maintenance skill and worker available state information; 2, task and worker matching analysis: based on the work orders and worker information, calculating a task difficulty coefficient of each project, operation ability coefficient of each operation and maintenance worker and a corresponding single worker task matching degree; and 3, work order scheduling: based on the single worker task matching degree relative to each operation and maintenance worker, distributing each task to the corresponding operation and maintenance worker. According to the invention, based on the task matching degree, the operation and maintenance tasks are distributed to corresponding operation and maintenance workers, so the method is vivid and easy to use, operation and maintenance efficiency can be effectively improved and operation and maintenance cost can be reduced.

Description

A kind of power communication scene work order schedule management method and system
Technical field
The present invention relates to the job scheduling technical field of power communication scene O&M, and in particular to a kind of power communication scene Work order schedule management method, further relates to a kind of power communication scene work order dispatching management information system.
Background technology
Power telecom network building-up work during " 12 " has been completed, and the construction of electric power enterprise power telecom network also will meet Carry out new construction period, in the face of the power telecom network for having existed He will build, existing operation management pattern lack it is real-time, The job scheduling management method of intelligence, will face and increasingly weigh operating pressure;This not only causes management and running person works' efficiency Reduce, also resulting in live operation maintenance personnel during O&M cannot require to carry out standardized operation fully according to system, and O&M is made Into hidden danger, the safe and stable operation of power telecom network is constrained.
There is problems with existing power communication scene O&M management and running pattern:(1) at this stage work order adopts people's work point The pattern matched somebody with somebody, for field operation work order lacks reasonable efficient scheduling management, to electric power enterprise safety in production hidden danger is caused; (2) under existing O&M pattern, lack real-time work order schedule transmission and support, it is impossible to realize that real time implementation, intelligent work order scheduling are passed Defeated, efficiency is carried out at the scene for constraining maintenance work.
Therefore, the present invention takes into full account problem above, in line with lifting powerline network scene operation management efficiency and pipe The principle of reason level, proposes a kind of power communication scene work order schedule management method and system.
The content of the invention
It is an object of the invention to overcome deficiency of the prior art, there is provided a kind of power communication scene work order is adjusted O&M task is distributed to corresponding operation maintenance personnel by degree management method and system, task based access control matching degree, directly perceived easy-to-use, can be effective O&M efficiency is improved, O&M cost is saved.
To solve above-mentioned technical problem, the invention provides a kind of power communication scene work order schedule management method, It is characterized in that, comprise the following steps:
Step S1, work order and personnel information acquisition:The all types of work orders of collection power telecom network, operation maintenance personnel information;Wherein Work order includes task identification, and task category, task operation, each operation completes persistent period and task class information;Fortune Dimension personal information includes operation maintenance personnel mark, O&M technical ability, each O&M skill and ability coefficient and personnel's upstate information;
Step S2, task and personnel's the matching analysis:The task difficulty coefficient, fortune of projects are calculated based on work order and personal information The performance capacity coefficient of dimension personnel and corresponding single task matching degree;
Step S3, work order schedule:Each task is distributed to by phase based on single task matching degree of the operation maintenance personnel relative to each task The operation maintenance personnel answered.
Further, define:
The task difficulty coefficient of project Xj=(Q1+Q2 ... .+Qk)/k*Z
The performance capacity coefficient of personnel Yi=((L1*B1)+(L2*B2)…..+(Lf*Bf))* personnel's upstate K
Single task matching degree=task difficulty coefficient/personnel's performance capacity coefficient of Yi personnel's matching entries Xj
Wherein, Q1, Q2 ..., Qk are every procedure deadline;Z is task equivalent coefficient;L1, L2 ..., Lf is work skill Energy;B1, B2 ..., Bf is respective capabilities coefficient;K is personnel's upstate.
Further, work order schedule specifically includes procedure below:
S301, for any one task Xj in all items, first calculate all operation maintenance personnel matching entries Xj one appoint Business matching degree;
S302, prioritizing selection is distributed to the corresponding operation maintenance personnel that single task matching degree is constant C by this task;Secondly select Select and this task is distributed to into corresponding operation maintenance personnel of the single task matching degree in the W of C is interval;
S303, for single task matching degree is less than C and outside W is interval, then distributes to multiple operation maintenance personnels by this task, The single task matching degree of single task matching degree, operation maintenance personnel Y2 from operation maintenance personnel Y1 .... operation maintenance personnel Ym one Arbitrarily select in task matching degree and be added less than 3 task matching angle value, if being added numerical value in the W of C is interval, by this The corresponding one group operation maintenance personnel that business is distributed to;
S304, updates personnel's upstate of the operation maintenance personnel for being allocated task, and circulation performs S301 to S303 steps, until Project is respectively matched somebody with somebody and is completed in all work orders.
Further, W is interval interval for positive and negative 10%.
Accordingly, present invention also offers a kind of power communication scene work order dispatching management information system, is characterized in that, wrap Include work order and personnel information acquisition module, task and personnel's matching analysis module and work order schedule module;
Work order and personnel information acquisition module, for gathering all types of work orders of power telecom network, operation maintenance personnel information;Wherein Work order includes task identification, and task category, task operation, each operation completes persistent period and task class information;Fortune Dimension personal information includes operation maintenance personnel mark, O&M technical ability, each O&M skill and ability coefficient and personnel's upstate information;
Task and personnel's matching analysis module, for calculated based on work order and personal information projects task difficulty coefficient, The performance capacity coefficient of operation maintenance personnel and corresponding single task matching degree;
Work order schedule module, is distributed to each task accordingly based on single task matching degree of the operation maintenance personnel relative to each task Operation maintenance personnel;
The outfan connection task input corresponding with personnel's matching analysis module of work order and personnel information acquisition module;Task Input corresponding with the outfan of personnel's matching analysis module connection work order schedule module.
Further, the task difficulty coefficient of project Xj=(Q1+Q2 ... .+Qk)/k*Z
The performance capacity coefficient of personnel Yi=((L1*B1)+(L2*B2)…..+(Lf*Bf))* personnel's upstate K
Single task matching degree=task difficulty coefficient/personnel's performance capacity coefficient of Yi personnel's matching entries Xj
Wherein, Q1, Q2 ..., Qk are every procedure deadline;Z is task equivalent coefficient;L1, L2 ..., Lf is work skill Energy;B1, B2 ..., Bf is respective capabilities coefficient;K is personnel's upstate.
Further, the concrete calculating process of work order schedule module is for any one task Xj in all items, elder generation Calculate the single task matching degree of all operation maintenance personnel matching entries Xj;
Prioritizing selection is distributed to the corresponding operation maintenance personnel that single task matching degree is constant C by this task;Secondly selecting will This task distributes to corresponding operation maintenance personnel of the single task matching degree in the W of C is interval;
For single task matching degree is less than C and outside W is interval, then this task is distributed to into multiple operation maintenance personnels, from fortune The single task matching degree of dimension personnel Y1, the single task matching degree of operation maintenance personnel Y2 .... the single task of operation maintenance personnel Ym Arbitrarily select in matching degree and be added less than 3 task matching angle value, if being added numerical value in the W of C is interval, by this task point The corresponding one group operation maintenance personnel of dispensing;
Personnel's upstate of the operation maintenance personnel for being allocated task is updated, circulation performs above procedure, until all O&M works Project is respectively matched somebody with somebody and is completed in list.
Compared with prior art, the beneficial effect that reached of the present invention is:Task based access control matching degree distributes O&M task It is directly perceived easy-to-use to corresponding operation maintenance personnel, O&M efficiency can be effectively improved, save O&M cost.
Description of the drawings
Fig. 1 is the schematic flow sheet of the inventive method.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described.Following examples are only used for clearly illustrating the present invention Technical scheme, and can not be limited the scope of the invention with this.
Utilities Electric Co.s at different levels have defined communication and the huge electric power deposited with the continuous propulsion of business Communications network architecture.Data volume is big, scene maintenance work is various, hierarchical structure due to existing for existing operation management pattern Unintelligible the problems such as, will face and increasingly weigh operating pressure;This is not only caused during O&M, and live operation maintenance personnel cannot be complete Require to carry out standardized operation according to system, also reduce the work efficiency of O&M, hidden danger is caused to O&M, constrain electric power The safe and stable operation of communication network.
In order to solve the practical problem of presence now, while preferably realizing that the strong wisdom of Utilities Electric Co.'s communication network is built If having built live work order intelligent scheduling platform.
As shown in figure 1, a kind of power communication scene work order schedule management method of the present invention, is characterized in that, including Following steps:
Step S1, work order and personnel information acquisition:The all types of work orders of collection power telecom network, operation maintenance personnel information;
Dispatching management information system is deployed in consolidated network region with existing communication net operation management system, using the data-interface of standard Carry out data interaction, it is ensured that the existing communication net operation management system inside work order data management system that can be scheduled is collected.
Dispatching management information system is in different type work order(Such as maintenance, tour work order)Each data are acquired, and realize work Forms data classification collection, to ensure the reasonable reliability of data results.
Work order includes task identification, and task category, task operation, each operation completes persistent period and task grade Information.
Operation maintenance personnel information is identified including operation maintenance personnel, O&M technical ability, and each O&M skill and ability coefficient and personnel can use shape State information.
Step S2, task and personnel's the matching analysis:Work order assignment problem is modeled, based on work order and personal information meter Calculate the task difficulty coefficient of projects, the performance capacity coefficient of operation maintenance personnel and corresponding single task matching degree.
To solve the problems, such as each work order to distribute to each operation maintenance personnel, work order scheduling model is first set up.
1)Set up work order scheduling model
Work order schedule problem is described as follows:Now require that project team completes X1, the common n disparity items of X2 ..., Xn.Project Xj(j = 1,2 ..., n)Comprising one by H1, the operation set of the common k procedures composition of H2 ..., Hk.Project process sequence is previously given, often The procedure deadline gives:Q1, Q2 ..., Qk.Represented with desired workmanship type and man-hour per procedure.Each A maintenance content in mesh may may require that the different operating technical ability of employee.
There are Y1, a Y2 ..., Ym staff in certain O&M project team, and each staff has variety classes and not etc. ripe Practice the technical ability of degree.Employee Yi(I=1,2 ..., m)Possess workmanship L1, L2 ..., Lf(Wherein f is technical ability number), accordingly Capacity factor is B1, B2 ..., Bf.The numerical value of capacity factor is 0,1,2.Wherein 0 expression completely will not the technical ability;1 represents average Level, can substantially grasp the technical ability;2 represent that the skill master is quite skilled.Capacity factor is given by project team director and is evaluated. The numerical value of personnel upstate K, K is 0,1, -1;Three different numeric factors are represented respectively cannot dispatch, idle schedulable on duty With three kinds of states in operation.When idle can simultaneously there are the mapping relations of multi-to-multi in the employee:One employee is available for multiple tasks Allotment, a task is selected also to need multiple employees to complete.Once allocating successfully, the employee can not be again before current task is completed It is assigned the task.But when occur burst the state of emergency when, it is necessary to this task as first need to complete task when, in task difficulty Increase task equivalent coefficient Z in coefficient, Z is identified with numerical value 1 and 2,1 represents that this task is common task, 2 be expressed as must be first complete Into task.
2)The matching degree of operation maintenance personnel and work order project
The final goal of task scheduling is to find a kind of rational schedule engineering solution so that complete task natural law be less than or Equal to the deadline that project specifies, and it is higher to complete the quality of task(The employee for being dispatched to the task possesses accordingly Ability can be competent at this task).
To ensure that task better quality is completed, should ensure that to be in idle condition and possess current allotment during personnel assignment and appoint Ability value highest employee needed for business distributes to current task.The operation of defined item purpose task difficulty coefficient and operation maintenance personnel Capacity factor, the Target Transformation of allocation schedule selects its performance capacity coefficient O&M people suitable with task difficulty coefficient for task Member.
The task difficulty coefficient of project Xj=(Q1+Q2 ... .+Qk)/k*Z
The performance capacity coefficient of personnel Yi=((L1*B1)+(L2*B2)…..+(Lf*Bf))* personnel's upstate K(This formula people Member's upstate K is directly abandoned when being 0 or -1, that is, is represented, this personnel can not again receive other tasks)
Single task matching degree=task difficulty coefficient/personnel's performance capacity coefficient of Yi personnel's matching entries Xj
The single task matching degree of Yi personnel's matching entries Xj, if result is constant C(With reference to practical application, adopt in the present embodiment Constant value is 1), then it is assumed that this task and this personnel's optimal matching degree, this task can be distributed to this personnel;If at result It is interval in the W of C(For example, positive and negative 10% is interval), then it is assumed that this personnel can also complete this task, this task can be distributed to into this person Member;If result is less than C and outside 10% interval, illustrate that this personnel mismatches with task, many people's matching degree superpositions need to be carried out (Will in actual applications, it is 3 people to participate in the number upper limit).
Step S3, work order schedule:Each task is distributed based on single task matching degree of the operation maintenance personnel relative to each task To corresponding operation maintenance personnel.
By all items X1, when the common n project of X2 ..., Xn is allocated, using the scheme of allocation of items one by one.Tool Body includes procedure below:
S301, for so any one task Xj in project, first calculate all operation maintenance personnel matching entries Xj one appoint Business matching degree;
S302, prioritizing selection is distributed to the corresponding operation maintenance personnel that single task matching degree is constant C by this task;Secondly select Select and this task is distributed to into corresponding operation maintenance personnel of the single task matching degree in the W of C is interval;
S303, for single task matching degree is less than C and outside W is interval, then distributes to multiple operation maintenance personnels by this task, The single task matching degree of single task matching degree, operation maintenance personnel Y2 from operation maintenance personnel Y1 .... operation maintenance personnel Ym one Arbitrarily select in task matching degree and be added less than 3 task matching angle value, if being added numerical value in the W of C is interval, by this The corresponding one group operation maintenance personnel that business is distributed to;
S304, updates personnel's upstate of the operation maintenance personnel for being allocated task, and circulation performs S301 to S303 steps, until Project is respectively matched somebody with somebody and is completed in all work orders.
O&M task is distributed to corresponding operation maintenance personnel by the inventive method task based access control matching degree, and the method is logical in electric power Apply in the live operational system of letter, it is directly perceived easy-to-use, O&M efficiency can be effectively improved, save O&M cost.
Accordingly, present invention also offers a kind of power communication scene work order dispatching management information system, is characterized in that, wrap Include work order and personnel information acquisition module, task and personnel's matching analysis module and work order schedule module;
Work order and personnel information acquisition module, for gathering all types of work orders of power telecom network, operation maintenance personnel information;Wherein Work order includes task identification, and task category, task operation, each operation completes persistent period and task class information;Fortune Dimension personal information includes operation maintenance personnel mark, O&M technical ability, each O&M skill and ability coefficient and personnel's upstate information;
Task and personnel's matching analysis module, for calculated based on work order and personal information projects task difficulty coefficient, The performance capacity coefficient of operation maintenance personnel and corresponding single task matching degree;
The outfan connection task input corresponding with personnel's matching analysis module of work order and personnel information acquisition module;Task Input corresponding with the outfan of personnel's matching analysis module connection work order schedule module.
The wherein task difficulty coefficient of project Xj=(Q1+Q2 ... .+Qk)/k*Z
The performance capacity coefficient of personnel Yi=((L1*B1)+(L2*B2)…..+(Lf*Bf))* personnel's upstate K
Single task matching degree=task difficulty coefficient/personnel's performance capacity coefficient of Yi personnel's matching entries Xj
Wherein, Q1, Q2 ..., Qk are every procedure deadline;Z is task equivalent coefficient;L1, L2 ..., Lf is work skill Energy;B1, B2 ..., Bf is respective capabilities coefficient;K is personnel's upstate.
Work order schedule module, phase is distributed to based on single task matching degree of the operation maintenance personnel relative to each task by each task The operation maintenance personnel answered.Detailed process is:
For any one task Xj in all items, the single task matching of all operation maintenance personnel matching entries Xj is first calculated Degree;
Prioritizing selection is distributed to the corresponding operation maintenance personnel that single task matching degree is constant C by this task;Secondly selecting will This task distributes to corresponding operation maintenance personnel of the single task matching degree in the W of C is interval;
For single task matching degree is less than C and outside W is interval, then this task is distributed to into multiple operation maintenance personnels, from fortune The single task matching degree of dimension personnel Y1, the single task matching degree of operation maintenance personnel Y2 .... the single task of operation maintenance personnel Ym Arbitrarily select in matching degree and be added less than 3 task matching angle value, if being added numerical value in the W of C is interval, by this task point The corresponding one group operation maintenance personnel of dispensing;
Personnel's upstate of the operation maintenance personnel for being allocated task is updated, circulation performs above procedure, until all O&M works Project is respectively matched somebody with somebody and is completed in list.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, on the premise of without departing from the technology of the present invention principle, some improvement and modification can also be made, these are improved and modification Also should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of power communication scene work order schedule management method, is characterized in that, comprise the following steps:
Step S1, work order and personnel information acquisition:The all types of work orders of collection power telecom network, operation maintenance personnel information;Wherein Work order includes task identification, and task category, task operation, each operation completes persistent period and task class information;Fortune Dimension personal information includes operation maintenance personnel mark, O&M technical ability, each O&M skill and ability coefficient and personnel's upstate information;
Step S2, task and personnel's the matching analysis:The task difficulty coefficient, fortune of projects are calculated based on work order and personal information The performance capacity coefficient of dimension personnel and corresponding single task matching degree;
Step S3, work order schedule:Each task is distributed to by phase based on single task matching degree of the operation maintenance personnel relative to each task The operation maintenance personnel answered.
2. a kind of power communication scene work order schedule management method according to claim 1, is characterized in that, in step In rapid S2, definition:
The task difficulty coefficient of project Xj=(Q1+Q2 ... .+Qk)/k*Z
The performance capacity coefficient of personnel Yi=((L1*B1)+(L2*B2)…..+(Lf*Bf))* personnel's upstate K
Single task matching degree=task difficulty coefficient/personnel's performance capacity coefficient of Yi personnel's matching entries Xj
Wherein, Q1, Q2 ..., Qk are every procedure deadline;Z is task equivalent coefficient;L1, L2 ..., Lf is work skill Energy;B1, B2 ..., Bf is respective capabilities coefficient;K is personnel's upstate.
3. a kind of power communication scene work order schedule management method according to claim 2, is characterized in that, in step In S3, work order schedule specifically includes procedure below:
S301, for any one task Xj in all items, first calculate all operation maintenance personnel matching entries Xj one appoint Business matching degree;
S302, prioritizing selection is distributed to the corresponding operation maintenance personnel that single task matching degree is constant C by this task;Secondly select Select and this task is distributed to into corresponding operation maintenance personnel of the single task matching degree in the W of C is interval;
S303, for single task matching degree is less than C and outside W is interval, then distributes to multiple operation maintenance personnels by this task, The single task matching degree of single task matching degree, operation maintenance personnel Y2 from operation maintenance personnel Y1 .... operation maintenance personnel Ym one Arbitrarily select in task matching degree and be added less than 3 task matching angle value, if being added numerical value in the W of C is interval, by this The corresponding one group operation maintenance personnel that business is distributed to;
S304, updates personnel's upstate of the operation maintenance personnel for being allocated task, and circulation performs S301 to S303 steps, until Project is respectively matched somebody with somebody and is completed in all work orders.
4. a kind of power communication scene work order schedule management method according to claim 3, is characterized in that, W areas Between be positive and negative 10% interval.
5. a kind of power communication scene work order dispatching management information system, is characterized in that, including work order and personnel information acquisition mould Block, task and personnel's matching analysis module and work order schedule module;
Work order and personnel information acquisition module, for gathering all types of work orders of power telecom network, operation maintenance personnel information;Wherein Work order includes task identification, and task category, task operation, each operation completes persistent period and task class information;Fortune Dimension personal information includes operation maintenance personnel mark, O&M technical ability, each O&M skill and ability coefficient and personnel's upstate information;
Task and personnel's matching analysis module, for calculated based on work order and personal information projects task difficulty coefficient, The performance capacity coefficient of operation maintenance personnel and corresponding single task matching degree;
Work order schedule module, is distributed to each task accordingly based on single task matching degree of the operation maintenance personnel relative to each task Operation maintenance personnel;
The outfan connection task input corresponding with personnel's matching analysis module of work order and personnel information acquisition module;Task Input corresponding with the outfan of personnel's matching analysis module connection work order schedule module.
6. a kind of power communication scene work order dispatching management information system according to claim 5, is characterized in that, project The task difficulty coefficient of Xj=(Q1+Q2 ... .+Qk)/k*Z
The performance capacity coefficient of personnel Yi=((L1*B1)+(L2*B2)…..+(Lf*Bf))* personnel's upstate K
Single task matching degree=task difficulty coefficient/personnel's performance capacity coefficient of Yi personnel's matching entries Xj
Wherein, Q1, Q2 ..., Qk are every procedure deadline;Z is task equivalent coefficient;L1, L2 ..., Lf is work skill Energy;B1, B2 ..., Bf is respective capabilities coefficient;K is personnel's upstate.
7. a kind of power communication scene work order dispatching management information system according to claim 5, is characterized in that, work order is adjusted The concrete calculating process of degree module is, for any one task Xj in all items, first to calculate all operation maintenance personnel occurrences The single task matching degree of mesh Xj;
Prioritizing selection is distributed to the corresponding operation maintenance personnel that single task matching degree is constant C by this task;Secondly selecting will This task distributes to corresponding operation maintenance personnel of the single task matching degree in the W of C is interval;
For single task matching degree is less than C and outside W is interval, then this task is distributed to into multiple operation maintenance personnels, from fortune The single task matching degree of dimension personnel Y1, the single task matching degree of operation maintenance personnel Y2 .... the single task of operation maintenance personnel Ym Arbitrarily select in matching degree and be added less than 3 task matching angle value, if being added numerical value in the W of C is interval, by this task point The corresponding one group operation maintenance personnel of dispensing;
Personnel's upstate of the operation maintenance personnel for being allocated task is updated, circulation performs above procedure, until all O&M works Project is respectively matched somebody with somebody and is completed in list.
CN201611158421.2A 2016-12-15 2016-12-15 Operation and maintenance work order scheduling management method and system in electric power telecommunication field Pending CN106682743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611158421.2A CN106682743A (en) 2016-12-15 2016-12-15 Operation and maintenance work order scheduling management method and system in electric power telecommunication field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611158421.2A CN106682743A (en) 2016-12-15 2016-12-15 Operation and maintenance work order scheduling management method and system in electric power telecommunication field

Publications (1)

Publication Number Publication Date
CN106682743A true CN106682743A (en) 2017-05-17

Family

ID=58869368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611158421.2A Pending CN106682743A (en) 2016-12-15 2016-12-15 Operation and maintenance work order scheduling management method and system in electric power telecommunication field

Country Status (1)

Country Link
CN (1) CN106682743A (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107657372A (en) * 2017-09-22 2018-02-02 谭涵升 A kind of Information Maritime monitoring and dispatching system
CN107657371A (en) * 2017-09-22 2018-02-02 谭涵升 A kind of Information Maritime monitoring and scheduling method
CN107665604A (en) * 2017-09-30 2018-02-06 宁波优泊停车服务有限公司 Berth task auto-allocation method, system, computer installation and computer-readable recording medium
CN107944715A (en) * 2017-11-23 2018-04-20 海南电网有限责任公司 A kind of grid maintenance work order optimizing distribution method
CN108108907A (en) * 2017-12-31 2018-06-01 广州用能互联网有限公司 The maintenance program system and method for multifactor consideration
CN108171417A (en) * 2017-12-27 2018-06-15 深圳春沐源控股有限公司 Planting task adjusting method, electronic device and storage medium
CN108181503A (en) * 2017-12-30 2018-06-19 广州供电局有限公司 Electric power metering device O&M plan acquisition methods, device, storage medium and equipment
CN108205709A (en) * 2017-12-31 2018-06-26 广州用能互联网有限公司 Maintenance task distribution system and method
CN109002964A (en) * 2018-06-21 2018-12-14 岭东核电有限公司 A kind of million kilowatt nuclear power station occupational health emergency management method and device
CN109034561A (en) * 2018-07-09 2018-12-18 武汉瑞莱保能源技术有限公司 A method of the work order intelligent association knowledge base knowledge suitable for IT operational system
CN109255513A (en) * 2018-07-18 2019-01-22 南瑞集团有限公司 A kind of power telecom network scene work order dispatching method
WO2019041439A1 (en) * 2017-08-28 2019-03-07 平安科技(深圳)有限公司 Underwriting difficulty prediction method and device, computer equipment and storage medium
CN109523178A (en) * 2018-11-22 2019-03-26 国网冀北电力有限公司信息通信分公司 A kind of O&M method and device towards power communication scene
CN109784625A (en) * 2018-12-10 2019-05-21 南京南瑞信息通信科技有限公司 A kind of work order intelligence distributing method based on personnel ability's analysis
CN109840705A (en) * 2019-01-29 2019-06-04 国家电网有限公司 A kind of electric power field work personnel smart allocation application method
CN110751376A (en) * 2019-09-27 2020-02-04 奇安信科技集团股份有限公司 Work order distribution scheduling method and device, computer equipment and storage medium
CN111144692A (en) * 2019-11-27 2020-05-12 中建科技有限公司 Smart city operation and maintenance management method and device and computer readable storage medium
CN111191845A (en) * 2019-12-31 2020-05-22 广东电网有限责任公司 Power communication network work monotony scheduling method based on DBSCAN algorithm and KMP mode matching method
CN111260252A (en) * 2020-02-18 2020-06-09 广东电网有限责任公司 Power communication network field operation and maintenance work order scheduling method
CN111369016A (en) * 2020-02-05 2020-07-03 许昌北邮万联网络技术有限公司 Image recognition-based on-site operation and maintenance method and system
CN111738566A (en) * 2020-06-02 2020-10-02 国网河北省电力有限公司邯郸供电分公司 Power equipment remote scheduling management system based on cloud computing
CN112149932A (en) * 2019-06-28 2020-12-29 北京天诚同创电气有限公司 Operation and maintenance scheduling method and device for photovoltaic power station group
CN113169888A (en) * 2018-12-05 2021-07-23 瑞典爱立信有限公司 Method for distributing field technicians and technician distribution system
CN114070748A (en) * 2022-01-12 2022-02-18 广东电网有限责任公司广州供电局 Multi-objective optimization-based operation and maintenance service scheduling method and related equipment
CN115796563A (en) * 2023-02-10 2023-03-14 中建安装集团有限公司 Steel structure list checking and verifying management system based on big data
CN115983591A (en) * 2023-01-05 2023-04-18 上海数瞳信息科技有限公司 Service decision management platform based on digitization
CN116502881A (en) * 2023-06-29 2023-07-28 深圳市昊昱精密机电有限公司 Personnel scheduling management method and system for equipment maintenance

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955770A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Dispatching command system
CN103955771A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Cost optimizing calculation method for on-site operation
CN104820901A (en) * 2015-05-18 2015-08-05 中原工学院 Method for evaluating skill of clothing employees at production line based on production on-site data
CN105069555A (en) * 2015-07-22 2015-11-18 广东电网有限责任公司中山供电局 Resource scheduling method and resource scheduling system for first-aid repair of power grid
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955770A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Dispatching command system
CN103955771A (en) * 2014-05-04 2014-07-30 广东怡创科技股份有限公司 Cost optimizing calculation method for on-site operation
CN104820901A (en) * 2015-05-18 2015-08-05 中原工学院 Method for evaluating skill of clothing employees at production line based on production on-site data
CN105069555A (en) * 2015-07-22 2015-11-18 广东电网有限责任公司中山供电局 Resource scheduling method and resource scheduling system for first-aid repair of power grid
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019041439A1 (en) * 2017-08-28 2019-03-07 平安科技(深圳)有限公司 Underwriting difficulty prediction method and device, computer equipment and storage medium
CN107657371A (en) * 2017-09-22 2018-02-02 谭涵升 A kind of Information Maritime monitoring and scheduling method
CN107657372A (en) * 2017-09-22 2018-02-02 谭涵升 A kind of Information Maritime monitoring and dispatching system
CN107665604A (en) * 2017-09-30 2018-02-06 宁波优泊停车服务有限公司 Berth task auto-allocation method, system, computer installation and computer-readable recording medium
CN107944715A (en) * 2017-11-23 2018-04-20 海南电网有限责任公司 A kind of grid maintenance work order optimizing distribution method
CN108171417B (en) * 2017-12-27 2021-07-27 深圳春沐源控股有限公司 Planting task adjusting method, electronic device and storage medium
CN108171417A (en) * 2017-12-27 2018-06-15 深圳春沐源控股有限公司 Planting task adjusting method, electronic device and storage medium
CN108181503B (en) * 2017-12-30 2020-02-18 广州供电局有限公司 Power metering device operation and maintenance plan obtaining method and device, storage medium and equipment
CN108181503A (en) * 2017-12-30 2018-06-19 广州供电局有限公司 Electric power metering device O&M plan acquisition methods, device, storage medium and equipment
CN108205709A (en) * 2017-12-31 2018-06-26 广州用能互联网有限公司 Maintenance task distribution system and method
CN108108907A (en) * 2017-12-31 2018-06-01 广州用能互联网有限公司 The maintenance program system and method for multifactor consideration
CN109002964A (en) * 2018-06-21 2018-12-14 岭东核电有限公司 A kind of million kilowatt nuclear power station occupational health emergency management method and device
CN109034561A (en) * 2018-07-09 2018-12-18 武汉瑞莱保能源技术有限公司 A method of the work order intelligent association knowledge base knowledge suitable for IT operational system
CN109255513A (en) * 2018-07-18 2019-01-22 南瑞集团有限公司 A kind of power telecom network scene work order dispatching method
CN109523178A (en) * 2018-11-22 2019-03-26 国网冀北电力有限公司信息通信分公司 A kind of O&M method and device towards power communication scene
CN113169888A (en) * 2018-12-05 2021-07-23 瑞典爱立信有限公司 Method for distributing field technicians and technician distribution system
CN109784625A (en) * 2018-12-10 2019-05-21 南京南瑞信息通信科技有限公司 A kind of work order intelligence distributing method based on personnel ability's analysis
CN109840705A (en) * 2019-01-29 2019-06-04 国家电网有限公司 A kind of electric power field work personnel smart allocation application method
CN112149932A (en) * 2019-06-28 2020-12-29 北京天诚同创电气有限公司 Operation and maintenance scheduling method and device for photovoltaic power station group
CN110751376B (en) * 2019-09-27 2022-07-19 奇安信科技集团股份有限公司 Work order distribution scheduling method and device, computer equipment and storage medium
CN110751376A (en) * 2019-09-27 2020-02-04 奇安信科技集团股份有限公司 Work order distribution scheduling method and device, computer equipment and storage medium
CN111144692A (en) * 2019-11-27 2020-05-12 中建科技有限公司 Smart city operation and maintenance management method and device and computer readable storage medium
CN111191845A (en) * 2019-12-31 2020-05-22 广东电网有限责任公司 Power communication network work monotony scheduling method based on DBSCAN algorithm and KMP mode matching method
CN111369016A (en) * 2020-02-05 2020-07-03 许昌北邮万联网络技术有限公司 Image recognition-based on-site operation and maintenance method and system
CN111369016B (en) * 2020-02-05 2022-09-02 许昌北邮万联网络技术有限公司 Image recognition-based on-site operation and maintenance method and system
CN111260252A (en) * 2020-02-18 2020-06-09 广东电网有限责任公司 Power communication network field operation and maintenance work order scheduling method
CN111738566A (en) * 2020-06-02 2020-10-02 国网河北省电力有限公司邯郸供电分公司 Power equipment remote scheduling management system based on cloud computing
CN114070748A (en) * 2022-01-12 2022-02-18 广东电网有限责任公司广州供电局 Multi-objective optimization-based operation and maintenance service scheduling method and related equipment
CN115983591A (en) * 2023-01-05 2023-04-18 上海数瞳信息科技有限公司 Service decision management platform based on digitization
CN115796563A (en) * 2023-02-10 2023-03-14 中建安装集团有限公司 Steel structure list checking and verifying management system based on big data
CN115796563B (en) * 2023-02-10 2023-04-11 中建安装集团有限公司 Steel structure list checking and verifying management system based on big data
CN116502881A (en) * 2023-06-29 2023-07-28 深圳市昊昱精密机电有限公司 Personnel scheduling management method and system for equipment maintenance
CN116502881B (en) * 2023-06-29 2023-12-22 深圳市昊昱精密机电有限公司 Personnel scheduling management method and system for equipment maintenance

Similar Documents

Publication Publication Date Title
CN106682743A (en) Operation and maintenance work order scheduling management method and system in electric power telecommunication field
CN100495272C (en) Integrative data source based automatic optimization scheduling system and method for energy source of steel and iron
CN104468778B (en) A kind of cloud manufacturing execution system and its manufacture execution method based on cloud service
CN111163238B (en) Intelligent scheduling method of online customer service system
CN107092991B (en) Self-adaptive economic dispatching distribution method for smart power grid
WO2020239057A1 (en) Distributed mobile energy storage power distribution network control method and system
CN108196494B (en) Building management and control platform
CN104504483B (en) Method for realizing province and local integration of anti-misoperation tickets
CN102227122A (en) Platform-independent protocol modularized system
CN110020967A (en) The information processing method and device of a kind of dispatching of power netwoks end substation intelligent alarm
CN112053135B (en) Service flow control system and control method based on air freight
CN102324788A (en) Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN107492040A (en) A kind of multidimensional analysis display systems and method based on power grid regulation operation monitoring
CN101867226A (en) Wide-area distribution type data collection method for dispatching automation system
CN104578422B (en) Remote maintenance method for transformer substation telecontrol forwarding table
CN102522783B (en) Multi-user automatic-negotiation non-synchronization micro-grid scheduling system and method
CN104036373A (en) Power dispatching equipment main data management method based on data center
CN115511397B (en) Intelligent work order data dispatching method and system
CN207320950U (en) The integrated anti-error system of regulation and control
CN110705808A (en) Power transmission network planning scheme generation system and method considering maintenance under new energy access
CN109657830A (en) A kind of meeting room reserving method and device
CN113178947A (en) Offshore oil field group integrated intelligent control system based on shore-based power supply
CN106027536A (en) Intelligent building remote operation and maintenance method based on cloud computing
CN113673903B (en) Task management system for off-site nuclear emergency and control method thereof
CN109245307A (en) A kind of remote dispatching Programmed control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517

RJ01 Rejection of invention patent application after publication