CN106681760A - Transaction processing method and device based on client engineering project management system - Google Patents

Transaction processing method and device based on client engineering project management system Download PDF

Info

Publication number
CN106681760A
CN106681760A CN201611142031.6A CN201611142031A CN106681760A CN 106681760 A CN106681760 A CN 106681760A CN 201611142031 A CN201611142031 A CN 201611142031A CN 106681760 A CN106681760 A CN 106681760A
Authority
CN
China
Prior art keywords
data
module
renewal
record
application program
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611142031.6A
Other languages
Chinese (zh)
Inventor
高子琳
杨建伶
邢胜
史永
曹峰
邵阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611142031.6A priority Critical patent/CN106681760A/en
Publication of CN106681760A publication Critical patent/CN106681760A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/18File system types
    • G06F16/1805Append-only file systems, e.g. using logs or journals to store data
    • G06F16/1815Journaling file systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/18File system types
    • G06F16/1865Transactional file systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • Computer Security & Cryptography (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a transaction processing method and device based on a client engineering project management system. The method comprises the steps that if it is monitored that an updating operation is performed on an object of an application program, first data before the updating device object and second data after the updating device object are recorded; if a transaction meeting a preset condition exists in the deice updating operation process, any one or more kinds of processing is executed on the device object, wherein the device object is positioned, the device object is recovered and the device object is rolled back. The technical problem that in the prior art, working efficiency is low due to the fact that complex and tedious object processing processes are related to a data modification operation mechanism is solved.

Description

Transaction methods and device based on customer engineering project management system
Technical field
The present invention relates to software technology field, in particular to a kind of thing based on customer engineering project management system Business treating method and apparatus.
Background technology
In customer engineering project management system, often it is related to change the situation of data manipulation, when user is carried out newly Need to carry out logging operations when increasing, modification, deletion project, scheme, procedure information, to ensure that data are complete, unified.To repair Change as a example by end message, need first to open things when user adjusts when end message is clicked on and preserved in the page, then repaiied Change terminal operation, submit things to after the completion of modification, the rollback things if it there is exception during modification recovers terminal to not State during modification.Prior art is related to many complicated, cumbersome transaction processes for the operation mechanism of change data, So as to influence operating efficiency.
Operation mechanism for above-mentioned prior art for change data is related to many complicated, cumbersome transaction mistakes The ineffective problems of Cheng Zaocheng, not yet propose effective solution at present.
The content of the invention
A kind of transaction methods based on customer engineering project management system and device are the embodiment of the invention provides, with The operation mechanism that prior art is at least solved for change data is related to many complicated, cumbersome transaction processes and causes work Make the low technical problem of efficiency.
A kind of one side according to embodiments of the present invention, there is provided office based on customer engineering project management system Reason method, including:If monitoring to be updated the object in application program operation, before record updating device object the The second data after one data and updating device object;If device exists during updating operation meets predetermined condition Affairs, following any one or more treatment is performed to device object:Positioner object, recovery operation is carried out to device object Rolling back action is carried out with to device object.
Another aspect according to embodiments of the present invention, additionally provides a kind of affairs based on customer engineering project management system Processing unit, including:First processing module, if for monitoring to be updated the object in application program operation, record The second data after the first data and updating device object before updating device object;Second processing module, if for There are the affairs for meeting predetermined condition in device, during updating operation at the execution of device object as follows any one or more Reason:Positioner object, recovery operation is carried out to device object and rolling back action is carried out to device object.
In embodiments of the present invention, if by monitoring to be updated the object in application program operation, record is more The second data after the first data and updating device object before new equipment object;If during device updates operation In the presence of the affairs for meeting predetermined condition, following any one or more treatment is performed to device object:Positioner object, to dress Putting object carries out recovery operation and carries out rolling back action to device object, has reached at core business and transaction or daily record The horizontal business of reason carries out layered shaping, and by service code and the purpose of horizontal logical separation, it is achieved thereby that efficiently, just Technique effect prompt, being accurately uniformly processed, and then solve prior art and be related to very for the operation mechanism of change data More complicated, cumbersome transaction process causes ineffective technical problem.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is a kind of transaction methods flow based on customer engineering project management system according to embodiments of the present invention Figure;
Fig. 2 is a kind of optional issued transaction side based on customer engineering project management system according to embodiments of the present invention Method flow chart;
Fig. 3 is a kind of optional issued transaction side based on customer engineering project management system according to embodiments of the present invention Method flow chart;
Fig. 4 is a kind of preferred AOP process charts according to embodiments of the present invention;
Fig. 5 is a kind of optional issued transaction side based on customer engineering project management system according to embodiments of the present invention Method flow chart;And
Fig. 6 is that a kind of transacter based on customer engineering project management system according to embodiments of the present invention is illustrated Figure.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model of present invention protection Enclose.
It should be noted that term " first ", " in description and claims of this specification and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or other intrinsic steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of method reality of the issued transaction based on customer engineering project management system Example is applied, it is necessary to illustrate, can be in the such as one group meter of computer executable instructions the step of the flow of accompanying drawing is illustrated Performed in calculation machine system, and, although logical order is shown in flow charts, but in some cases, can be with difference Shown or described step is performed in order herein.
Fig. 1 is a kind of transaction methods flow based on customer engineering project management system according to embodiments of the present invention Figure, as shown in figure 1, the method comprises the following steps:
Step S102, if monitoring to be updated the object in application program operation, before record upgating object The second data after first data and upgating object;
Step S104, if there are the affairs for meeting predetermined condition during updating operation, following appointing is performed to object One or more treatment of meaning:Object is positioned, recovery operation is carried out to object and rolling back action is carried out to object.
Specifically, in above-mentioned steps, the object in above-mentioned application program can be the information such as project, scheme, flow;On State the logging operations for updating that needs are carried out when operation can be newly-increased, modification, deletion project, scheme, procedure information;It is above-mentioned First data can be the data before modification;Above-mentioned second data can be amended data;It is above-mentioned to meet predetermined condition Situations such as affairs can be maloperation, system vulnerability.
In a kind of optional embodiment, increased newly as user, changed, deletion project, scheme, procedure information when need into Row logging operations, can be very using the technology (AOP, Aspect Oriented Programming) of Aspect-oriented programming Data and amended data before convenient record modification.Object information when beginning is changed before record modification, record is repaiied Change rear information, and change process then can be with independent.For maloperation, we can be using daily record very situations such as system vulnerability Easily positioned, recovery operation, to ensure that system is normal, stable operation.
Herein it should be noted that SpringAOP be it is a kind of using tangent plane technology come dynamic proxy application program in it is each The method for planting transaction rule, daily record and other associated transverse service logics.SpringAOP mainly includes tangent plane (Aspect), tie point (Join point), notice (Advice), point of penetration (Point cut), introducing (Introduction), the aspect such as destination object (Target Object), AOP agencies (AOP Proxy), weaving (Weaving) Content.Its operation principle is to reflect agency mechanism using Java, is not created directly when application is obtained but is used Reflex mechanism obtains object.Using reflex mechanism, can (Around), execution in (Before), execution before method execution (After) adds the code of oneself afterwards.Therefore, it is possible to the code before and after method is performed gives agency (Proxy) to process, with Reduce the degree of coupling of core business logic and the generic logic of transverse direction.Operation after decoupling can improve the recycling rate of waterused of code, Reduce size of code, it is to avoid code confusion and mistake caused by business is long.
From the foregoing, it will be observed that in embodiment in the application, by monitoring the renewal that user is carried out to the object in application program Operation, in the case where monitoring that user is updated operation to the object in application program, before record upgating object the The second data after one data and upgating object, in a kind of optional example, can using AOP come record modification before first Data and amended second data, and during user is updated operation to the object in application program, if prison Measure in the presence of the affairs for meeting predetermined condition, then using journal file positioning object, to the object carry out recovery operation or rollback Deng operation, reached carries out layered shaping by the horizontal business of core business and transaction or log processing, and by business generation The purpose of code and horizontal logical separation, it is achieved thereby that efficiently, convenient, the accurate technique effect being uniformly processed.
In a kind of optional embodiment, if as shown in Fig. 2 monitoring to be updated the object in log recording Operation, before the first data before record upgating object and the second data after upgating object, the above method can also be wrapped Include following steps:
Step S202, during system service startup, registration AOP monitors module, wherein, AOP monitors whether module is used for monitoring Generation updates operation, and carries out layered shaping to updating operation;
Step S204, configuration is corresponding with AOP monitorings module to intercept control rule, wherein, intercept and control rule for true It is fixed whether to insert default code.
Specifically, in above-mentioned steps, data and amended data that AOP can very easily before record modification, Modification start when record modification before object information, information after record modification, and change process then can be with independent;In AOP In the case that monitoring module listens to generation renewal operation, intercept corresponding with AOP monitorings module of configuration controls rule, to determine Whether allow to insert default code.
In a kind of optional embodiment, above-mentioned interception control rule can include being intercepted before performing, and be intercepted after execution, and It is abnormal to intercept.
By above-described embodiment, the probability of maloperation can be reduced.
In a kind of optional embodiment, as shown in figure 3, recording the first data and upgating object before upgating object Before the second data afterwards, the above method can also comprise the following steps:
Step S302, during the object of application program is updated operation, access is updated the resource of operation;
Step S304, judges whether the access of resource meets interception control rule;
Step S306, if met, inserts preprocessor, wherein, preprocessor is used for execution record and updates right As the first data before, and perform the second data after record upgating object;
Step S308, if do not met, performs and is updated operation to the object in application program.
Used as a kind of preferred embodiment, Fig. 4 is a kind of preferred AOP process charts according to embodiments of the present invention, As shown in figure 4, comprising the following steps:
Step 402, registration AOP monitors module when service starts.
Step 404, configuration intercepts control rule.
Step 406, resource judges whether to meet interception rule when accessing, and meets, and inserts pre-set code.
Specifically, in above-mentioned steps, in a kind of optional embodiment, above-mentioned pre-set code is used for things and opens or daily record The operation such as insertion.
Step 408, performs corresponding method.
Step 410, inserts pre-set code.
Specifically, in above-mentioned steps, in a kind of optional embodiment, above-mentioned pre-set code is used to submit things or daily record to The operation such as insertion.
Step 412, completes AOP operations.
In a kind of optional embodiment, as shown in figure 5, being updated operation to the object in application program performing Afterwards, the above method can also comprise the following steps:
Step 502, judges to perform whether renewal operation succeeds;
Step 504, if run succeeded, terminates to perform preprocessor, and the first data and the second data are write Daily record;
Step 506, if performing failure, terminates the whole flow for updating operation.
Specifically, in the above-described embodiments, after execution is updated operation to the object in application program, judge more Whether new operation runs succeeded, if run succeeded, terminates to perform preprocessor, and the first data and the second data are write Enter journal file;If performing failure, terminate the whole flow for updating operation.
In a kind of optional embodiment, after the first data and upgating object before upgating object are recorded second After data, the above method can also include:By the first data and the second data write-in daily record, and according to daily record to renewal before Object after object and renewal is positioned.
In a kind of optional embodiment, above-mentioned predetermined condition includes at least one following:Maloperation, system vulnerability, behaviour Make abnormal and invasion.
By scheme disclosed in above-described embodiment, using the tangent plane technology of AOP come dynamic proxy application program in it is various Transaction rule, daily record and other associated transverse service logics, it is easy to separate database access things, formulate The submission rollback mechanism of oneself, while adapting to each operation module.Unified things, log management control rule are realized, and really Accomplish unified, efficient purpose, so that operating process is standardized, transaction unitizes, and code is concise, and safety is steady It is fixed, it is easy to transplant.
Embodiment 2
According to embodiments of the present invention, a kind of transacter reality based on customer engineering project management system is additionally provided Apply example.The transaction methods based on customer engineering project management system in the embodiment of the present invention 1 can be implemented in the present invention Performed in the device of example 2.
Fig. 6 is that a kind of transacter based on customer engineering project management system according to embodiments of the present invention is illustrated Figure, as shown in fig. 6, the device includes:First processing module 601 and Second processing module 603.
Wherein, first processing module 601, if for monitoring to be updated the object in application program operation, note The first data before record upgating object and the second data after upgating object;
Second processing module 603, if there are the affairs for meeting predetermined condition during for updating operation, to object Perform following any one or more treatment:Object is positioned, recovery operation is carried out to object and rolling back action is carried out to object.
From the foregoing, it will be observed that in embodiment in the application, first processing module 601 is by monitoring user in application program The renewal operation that object is carried out, and in the case where monitoring that user is updated operation to the object in application program, record The second data after the first data and upgating object before upgating object, in a kind of optional example, can using AOP come The first data and amended second data before record modification, and operation is updated to the object in application program in user During, if Second processing module 603 is used to monitor there are the affairs for meeting predetermined condition, determined using journal file Position object, the operation such as recovery operation or rollback is carried out to the object, reached core business and transaction or log processing Horizontal business carry out layered shaping, and by the purpose of service code and horizontal logical separation, it is achieved thereby that efficiently, it is convenient, The technique effect being accurately uniformly processed.
In a kind of optional embodiment, said apparatus also include:Registering modules, when starting for system service, registration AOP monitors module, wherein, AOP monitors module is used to monitor whether renewal operation to occur, and is carried out at layering to updating operation Reason;Configuration module, monitors corresponding interception of module and controls rule for configuration with AOP, wherein, interception control rule is used to determine Whether default code is inserted.
In a kind of optional embodiment, said apparatus also include:Access modules, are carried out for the object in application program During updating operation, access is updated the resource of operation;Whether the first judge module, the access for judging resource accords with Close and intercept control rule;First performing module, if for meeting, inserting preprocessor, wherein, preprocessor is used for The first data before record upgating object are performed, and performs the second data after record upgating object;Second performs mould Block, if for not meeting, performing and being updated operation to the object in application program.
In a kind of optional embodiment, said apparatus also include:Second judge module, operation is updated for judging to perform Whether succeed;3rd performing module, if for running succeeded, terminate to perform preprocessor, and by the first data and the Two data write daily record;4th performing module, if for performing failure, terminating the whole flow for updating operation.
In a kind of optional embodiment, said apparatus also include:3rd processing module, for by the first data and second Data write daily record, and the object after the object before renewal and renewal is positioned according to daily record.
In a kind of optional embodiment, above-mentioned predetermined condition includes at least one following:Maloperation, system vulnerability, behaviour Make abnormal and invasion.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in certain embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, can be by other Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces Connect, can be electrical or other forms.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be according to the actual needs selected to realize the purpose of this embodiment scheme.
In addition, during each functional unit in each embodiment of the invention can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.Above-mentioned integrated list Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is to realize in the form of SFU software functional unit and as independent production marketing or use When, can store in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part for being contributed to prior art in other words or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are used to so that a computer Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (12)

1. a kind of transaction methods based on customer engineering project management system, it is characterised in that including:
If monitoring to be updated the object in application program operation, record update the first data before the object and Update the second data after the object;
If it is described update operation during exist and meet the affairs of predetermined condition, the object is performed it is following any one Or various treatment:The object is positioned, recovery operation is carried out to the object and rolling back action is carried out to the object.
2. method according to claim 1, it is characterised in that if monitoring to carry out more the object in log recording New operation, before recording the first data updated before the object and the second data updated after the object, the side Method also includes:
When system service starts, registration AOP monitors module, wherein, the AOP monitor module be used to monitor whether occur it is described more New operation, and layered shaping is carried out to the renewal operation;
Configuration is monitored corresponding interception of module and controls rule with the AOP, wherein, the control rule that intercepts is used to determine whether Insert default code.
3. method according to claim 2, it is characterised in that update the first data before the object and more in record Before the second data after the new object, methods described also includes:
During the object of the application program carries out the renewal operation, access carries out the resource for updating operation;
Judge whether the access of the resource meets described interception and control rule;
If met, preprocessor is inserted, wherein, before the preprocessor is used to perform the record renewal object First data, and perform second data after record updates the object;
If do not met, performing carries out the renewal operation to the object in the application program.
4. method according to claim 3, it is characterised in that perform the object in the application program is carried out it is described Update after operation, methods described also includes:
Judge to perform whether the renewal operation succeeds;
If run succeeded, terminate to perform the preprocessor, and first data and second data are write Daily record;
If performing failure, terminate the whole flow for updating operation.
5. method according to claim 1, it is characterised in that update the first data before the object and more in record After the second data after the new object, methods described also includes:
By first data and second data write-in daily record, and according to the daily record to the object before the renewal and more Object after new is positioned.
6. method as claimed in any of claims 1 to 5, it is characterised in that the predetermined condition include it is following extremely It is one of few:Maloperation, system vulnerability, operation exception and invasion.
7. a kind of transacter based on customer engineering project management system, it is characterised in that including:
First processing module, if for monitoring to be updated the object in application program operation, it is described right that record updates As the second data after the first data before and the renewal object;
Second processing module, if there are the affairs for meeting predetermined condition during for the renewal operation, to described right As performing following any one or more treatment:Position the object, recovery operation carried out to the object and to the object Carry out rolling back action.
8. device according to claim 7, it is characterised in that described device also includes:
Registering modules, when starting for system service, registration AOP monitors module, wherein, the AOP monitors module to be used to monitor Whether there is described renewal to operate, and layered shaping is carried out to the renewal operation;
Configuration module, rule is controlled for configuring intercept corresponding with AOP monitorings module, wherein, described interception controls rule Then it is used to determine whether to insert default code.
9. device according to claim 8, it is characterised in that described device also includes:
Access modules, during carrying out the renewal operation in the object of the application program, access described in carrying out more The resource of new operation;
First judge module, whether the access for judging the resource meets described interception controls rule;
First performing module, if for meeting, inserting preprocessor, wherein, the preprocessor is used to perform note Record updates first data before the object, and performs second data after record updates the object;
Second performing module, if for not meeting, performing carries out the renewal operation to the object in the application program.
10. device according to claim 9, it is characterised in that described device also includes:
Second judge module, for judging to perform whether the renewal operation succeeds;
3rd performing module, if for running succeeded, terminate to perform the preprocessor, and by first data and Second data write daily record;
4th performing module, if for performing failure, terminating the whole flow for updating operation.
11. devices according to claim 7, it is characterised in that described device also includes:
3rd processing module, for first data and second data to be write into daily record, and according to the daily record to institute Object after stating the object before updating and updating is positioned.
12. device according to any one in claim 7 to 11, it is characterised in that the predetermined condition includes as follows At least one:Maloperation, system vulnerability, operation exception and invasion.
CN201611142031.6A 2016-12-12 2016-12-12 Transaction processing method and device based on client engineering project management system Pending CN106681760A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611142031.6A CN106681760A (en) 2016-12-12 2016-12-12 Transaction processing method and device based on client engineering project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611142031.6A CN106681760A (en) 2016-12-12 2016-12-12 Transaction processing method and device based on client engineering project management system

Publications (1)

Publication Number Publication Date
CN106681760A true CN106681760A (en) 2017-05-17

Family

ID=58868154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611142031.6A Pending CN106681760A (en) 2016-12-12 2016-12-12 Transaction processing method and device based on client engineering project management system

Country Status (1)

Country Link
CN (1) CN106681760A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109144534A (en) * 2017-06-28 2019-01-04 北京京东尚科信息技术有限公司 Service module dynamic updating method, device and electronic equipment
CN109240816A (en) * 2018-08-30 2019-01-18 世纪龙信息网络有限责任公司 System schema switching method, device, computer equipment and storage medium
CN110389860A (en) * 2019-06-20 2019-10-29 北京奇艺世纪科技有限公司 A kind of data processing method, device, electronic equipment and storage medium
CN110781170A (en) * 2019-10-28 2020-02-11 杭州安恒信息技术股份有限公司 Historical data protection method and device based on AOP

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101038549A (en) * 2007-03-28 2007-09-19 北京启明星辰信息技术有限公司 A software updating method capable of crossing system
CN101699439A (en) * 2009-11-16 2010-04-28 中兴通讯股份有限公司 Database transaction submitting method and device
CN102508702A (en) * 2011-10-20 2012-06-20 北京金和软件股份有限公司 Method for processing common service logic by performing interception based on AOP (aspect-oriented programming) technology
CN102999319A (en) * 2011-09-09 2013-03-27 北京大学 Method and system for caching function execution result based on aspect-oriented programming (AOP) technology
CN105718572A (en) * 2016-01-21 2016-06-29 成都索贝数码科技股份有限公司 Transaction consistency achieving method and system for isomerous data compound object

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101038549A (en) * 2007-03-28 2007-09-19 北京启明星辰信息技术有限公司 A software updating method capable of crossing system
CN101699439A (en) * 2009-11-16 2010-04-28 中兴通讯股份有限公司 Database transaction submitting method and device
CN102999319A (en) * 2011-09-09 2013-03-27 北京大学 Method and system for caching function execution result based on aspect-oriented programming (AOP) technology
CN102508702A (en) * 2011-10-20 2012-06-20 北京金和软件股份有限公司 Method for processing common service logic by performing interception based on AOP (aspect-oriented programming) technology
CN105718572A (en) * 2016-01-21 2016-06-29 成都索贝数码科技股份有限公司 Transaction consistency achieving method and system for isomerous data compound object

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109144534A (en) * 2017-06-28 2019-01-04 北京京东尚科信息技术有限公司 Service module dynamic updating method, device and electronic equipment
CN109240816A (en) * 2018-08-30 2019-01-18 世纪龙信息网络有限责任公司 System schema switching method, device, computer equipment and storage medium
CN109240816B (en) * 2018-08-30 2020-11-10 世纪龙信息网络有限责任公司 System scheme switching method and device, computer equipment and storage medium
CN110389860A (en) * 2019-06-20 2019-10-29 北京奇艺世纪科技有限公司 A kind of data processing method, device, electronic equipment and storage medium
CN110781170A (en) * 2019-10-28 2020-02-11 杭州安恒信息技术股份有限公司 Historical data protection method and device based on AOP
CN110781170B (en) * 2019-10-28 2022-07-08 杭州安恒信息技术股份有限公司 Historical data protection method and device based on AOP

Similar Documents

Publication Publication Date Title
CN106326219B (en) Method, device and system for checking business system data
CN107645562A (en) Data transmission processing method, device, equipment and system
CN106681760A (en) Transaction processing method and device based on client engineering project management system
CN111294217B (en) Alarm analysis method, device, system and storage medium
CN111722043B (en) Power equipment fault detection method, device and system
CN109760041A (en) Cloud management system and its operating method based on chat robots
CN109560996B (en) Automatic testing system and method for terminal of Internet of things
CN111400367B (en) Service report generation method, device, computer equipment and storage medium
CN110932918B (en) Log data acquisition method and device and storage medium
CN107315586A (en) Using the methods, devices and systems of packing
CN106685894B (en) Risk identification method, device and system
CN113242159B (en) Application access relation determining method and device
CN107409134A (en) Method card analysis
CN107168813A (en) Task processing method and system
CN107295031A (en) A kind of method of data synchronization and device
CN106815089A (en) Malfunction elimination method and device based on daily record
CN113867782A (en) Gray scale distribution method and device, computer equipment and storage medium
CN110298007A (en) User behavior statistical method, device, electronic equipment and computer readable storage medium
CN108833541A (en) A kind of method and device of identification terminal information
CN106482299A (en) Machine set system data backup device, method and the air-conditioner set with the device
CN110009347B (en) Block chain transaction information auditing method and device
CN115001967A (en) Data acquisition method and device, electronic equipment and storage medium
CN110580556B (en) Data processing method and system and processor
CN112699136B (en) Cross-link certificate storage method and related device
CN104536926B (en) The control method and device of serial equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517