CN106655172A CN201611230189.9A CN201611230189A CN106655172A CN 106655172 A CN106655172 A CN 106655172A CN 201611230189 A CN201611230189 A CN 201611230189A CN 106655172 A CN106655172 A CN 106655172A
Authority
CN
China
Prior art keywords
power plant
cascading failure
failure
target power
monitored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611230189.9A
Other languages
Chinese (zh)
Other versions
CN106655172B (en
Inventor
徐涛
陈雪峰
李雅文
崔璨
张春莉
于晓飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611230189.9A priority Critical patent/CN106655172B/en
Publication of CN106655172A publication Critical patent/CN106655172A/en
Application granted granted Critical
Publication of CN106655172B publication Critical patent/CN106655172B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a cascading failure analysis method and apparatus based on a safety control strategy, and relates to the technical field of electric power. The cascading failure analysis method comprises the steps of determining a failure type of a cascading failure when a monitored region suffers from the cascading failure; determining a target power plant for assisting to handle the cascading failure according to the failure type of the cascading failure and the geographic location of the monitored region; generating a to-be-executed operating instruction corresponding to the target power plant according to the failure type of the cascading failure and the power plant information of the target power plant; transmitting the corresponding operating instruction to a safety control apparatus of the target power plant; receiving operation feedback information and confirmation information sent from the safety control apparatus of the target power plant; and after the confirmation information from the target power plant is received, determining an overhaul way corresponding to the cascading failure through an overhaul way strategy table according to the operation feedback information and the failure type of the cascading failure. By adoption of the cascading failure analysis method and apparatus, the cascading failure solving efficiency can be improved.

Description

Grid cascading failure analysis method and device based on peace control strategy
Technical field
The present invention relates to technical field of electric power, more particularly, to a kind of grid cascading failure analysis method based on peace control strategy and Device.
Background technology
With the continuous development of global economy, electrical network interconnects on a large scale the inexorable trend for becoming power system development, electric power Network has become one of most complicated in the world network, increased the uncertainty of system operation, and simultaneity factor disturbance involves Scope is wider, and the consequence of systematic failures is more serious.In large-scale interconnected power system, work as grid collapses, system load flow will again Distribution, if untreated, overload circuit or transformer will be removed, it is possible to cause a series of chain reactions, or even be System collapse.
However, in prior art when running into region cascading failure occurring, because electric network composition is complicated, need to be related to numerous Staff first determines the solution that failure cause and needs are taken after failure generation, and is directed to solution and holds Market condition is circulated a notice of layer by layer, inefficiency, can not only delay emergency repair time, and due to not yet there is preferable counter-measure, it is difficult to It is prevented effectively from the serious consequences such as the large-area power-cuts that causes because of cascading failure.
The content of the invention
In view of this, it is an object of the invention to provide a kind of grid cascading failure analysis method and dress based on peace control strategy Put, the efficiency for solving cascading failure can be lifted, can take measures within a short period of time to tackle cascading failure, so as to effectively keep away Exempt from the serious consequence caused because of cascading failure.
To achieve these goals, the technical scheme that the embodiment of the present invention is adopted is as follows:
In a first aspect, a kind of cascading failure countermeasure based on peace control strategy is embodiments provided, including:When When area to be monitored occurs cascading failure, the fault type of cascading failure is determined;Wherein, the fault type include it is following in one Plant or various:Fault-free trip, three-phase shortcircuit, single-phase earthing, two-phase short circuit, two-phase ground connection, AC line locking, commutation failure, Phase-to phase fault, single-phase permanent fault, single-phase transient fault, with famous prime minister's permanent fault, with famous prime minister's transient fault, different name it is mutually permanent therefore It is barrier, different name phase transient fault, three-phase permanent fault, three-phase transient fault, bus-bar fault, main transformer failure, direct current single-stage failure, straight Stream twin-stage failure;Fault type and the geographical position of area to be monitored according to cascading failure, it is determined that assisting reply cascading failure Target power plant;According to the fault type and the plant information of target power plant of cascading failure, generate corresponding with target power plant On-unit is instructed;Wherein, plant information sets including power plant's type, power plant geographical position, Power Plant specification and power plant Standby capacity;Operational order include it is following in one or more:Excision generate electricity it is active, excision generator, excision load it is active, cut Always plus control, combination switch, close disconnecting link, switch except load, route of stopping transport, the circuit that puts into operation, the active total plus control that generates electricity, load are active Cyclization, drag switch, broaching tool lock, element enter string, element go out string, equipment turn maintenance, equipment transhipment row, equipment turn stand-by heat, equipment Turn cold standby, load tap changer to change gear, throw AGC control models, input single-pole reclosing, input three_phase reclosing;To mesh The security control device of mark power plant sends corresponding operational order;Receive operational feedback information that the security control device of target power plant sends with And confirmation;Operational feedback information includes operation implementing result;Confirmation includes validating that unlatching trouble shooting region;When connecing After receiving the confirmation of target power plant, according to operational feedback information and the fault type of cascading failure, by maintenance mode plan Sketch form determines the maintenance mode of reply cascading failure.
With reference in a first aspect, embodiments provide the first possible embodiment of first aspect, wherein, on Stating method also includes:It is determined that after the maintenance mode of reply cascading failure, generating the peace control policy report of reply cascading failure; Peace control policy report includes that area to be monitored, the fault type of cascading failure, target power plant, the operation to the transmission of target power plant refer to Make, the operational feedback information of target power plant and confirmation, and the maintenance mode of reply cascading failure.
With reference in a first aspect, embodiments provide second possible embodiment of first aspect, wherein, on Stating method also includes:Area to be monitored is monitored;Obtain the currently monitored result of area to be monitored;According to the currently monitored knot Really, judge whether area to be monitored occurs cascading failure.
With reference to second possible embodiment of first aspect, the third of first aspect is embodiments provided Possible embodiment, wherein, it is above-mentioned to judge whether area to be monitored occurs cascading failure and include:According to the electricity of area to be monitored Net topology structure, by Load flow calculation the flow data of area to be monitored is obtained;Wherein, flow data includes topological structure of electric In the voltage magnitude of each node, voltage phase angle, active power and reactive power;By the operation of power networks control with area to be monitored The corresponding limit of system is calculated, and obtains the corresponding dynamic quota data of flow data;Compare flow data and dynamic quota data, Judge whether target area occurs heavily loaded and out-of-limit;If it is, determining that area to be monitored has occurred cascading failure.
With reference in a first aspect, embodiments provide the 4th kind of possible embodiment of first aspect, wherein, on Stating method also includes:When it is determined that the target power plant for assisting reply cascading failure is many, according to the fault type of cascading failure With the plant information of Duo Jia targets power plant, operator precedence level and the corresponding behaviour of Ge Jia targets power plant of Duo Jia targets power plant are determined Instruct;According to the corresponding operator precedence level of target power plant, to Ge Jia targets power plant corresponding operational order is sent.
Second aspect, the embodiment of the present invention also provides a kind of cascading failure reply device based on peace control strategy, including:Therefore Barrier determining module, for when area to be monitored occurs cascading failure, determining the fault type of cascading failure;Wherein, failure classes Type include it is following in one or more:Fault-free trip, three-phase shortcircuit, single-phase earthing, two-phase short circuit, two-phase ground connection, direct current Line locking, commutation failure, phase-to phase fault, single-phase permanent fault, single-phase transient fault, with famous prime minister's permanent fault, instantaneous with famous prime minister Failure, different name phase permanent fault, different name phase transient fault, three-phase permanent fault, three-phase transient fault, bus-bar fault, main transformer event Barrier, direct current single-stage failure, direct current twin-stage failure;Power plant's determining module, for according to the fault type of cascading failure and monitored The geographical position in region, it is determined that assisting the target power plant of reply cascading failure;Directive generation module, for according to cascading failure Fault type and the plant information of target power plant, generate on-unit instruction corresponding with target power plant;Wherein, power plant Information includes power plant's type, power plant geographical position, Power Plant specification and electric power factory equipment capacity;Operational order include it is following in One or more:Excision generate electricity it is active, excision generator, excision load it is active, cut off load, route of stopping transport, the circuit that puts into operation, send out Electricity is active total plus control, load are active always plus control, combination switch, closes disconnecting link, switchs cyclization, drag switch, broaching tool lock, element and enter String, element go out string, equipment and turn maintenance, equipment transhipment row, equipment to turn stand-by heat, equipment and turn cold standby, load tap changer to change shelves Position, throwing AGC control models, input single-pole reclosing, input three_phase reclosing;Instruction sending module, for target power plant Security control device sends corresponding operational order;Information receiving module, the operation that the security control device for receiving target power plant sends Feedback information and confirmation;Operational feedback information includes operation implementing result;Confirmation includes validating that unlatching maintenance event Barrier region;Maintenance determining module, for after the confirmation of target power plant is received, according to operational feedback information and chain event The fault type of barrier, by maintenance mode Policy Table the maintenance mode of reply cascading failure is determined.
With reference to second aspect, the first possible embodiment of second aspect is embodiments provided, wherein, on Stating device also includes:Report generation module, for it is determined that after the maintenance mode of reply cascading failure, generating the chain event of reply The peace control policy report of barrier;Peace control policy report include area to be monitored, the fault type of cascading failure, target power plant, to mesh Operational order, the operational feedback information of target power plant and confirmation that mark power plant sends, and the maintenance of reply cascading failure Mode.
With reference to second aspect, second possible embodiment of second aspect is embodiments provided, wherein, on Stating device also includes:Monitoring modular, for being monitored to area to be monitored;As a result acquisition module, for obtaining monitored district The currently monitored result in domain;Breakdown judge module, it is chain for according to the currently monitored result, judging whether area to be monitored occurs Failure.
With reference to second possible embodiment of second aspect, the third of second aspect is embodiments provided Possible embodiment, wherein, above-mentioned breakdown judge module includes:First computing unit, for according to the electricity of area to be monitored Net topology structure, by Load flow calculation the flow data of area to be monitored is obtained;Wherein, flow data includes topological structure of electric In the voltage magnitude of each node, voltage phase angle, active power and reactive power;Second computing unit, for by with supervised The operation of power networks for surveying region controls corresponding limit calculating, obtains the corresponding dynamic quota data of flow data;Judging unit, For comparing flow data and dynamic quota data, judge whether target area occurs heavily loaded and out-of-limit;Determining unit, for When being judged as YES, determine that area to be monitored has occurred cascading failure.
With reference to second aspect, the 4th kind of possible embodiment of first aspect is embodiments provided, wherein, on Stating device also includes:Many determining modules, for when it is determined that the target power plant for assisting reply cascading failure is many, according to even The fault type of lock failure and the plant information of Duo Jia targets power plant, determine the operator precedence level of Duo Jia targets power plant and each family The corresponding operational order of target power plant;Corresponding instruction sending module, for according to the corresponding operator precedence level of target power plant, to each Target power plant of family sends corresponding operational order.
A kind of grid cascading failure analysis method based on peace control strategy and device are embodiments provided, can be according to even The fault type of lock failure determines the target power plant and operational order corresponding with the target power plant for assisting reply cascading failure, Receive after the operational feedback information and confirmation of target power plant, according to maintenance mode, Policy Table determines cascading failure Maintenance mode.This mode can in time notify that corresponding target power plant takes execution operational order to assist after failure occurs Failure is solved, and is guaranteeing target power plant after taking measures, finally determine the maintenance mode of cascading failure;This continuity is held Row step can effectively lift the efficiency for solving cascading failure, take measures to tackle cascading failure, Jin Eryou within a short period of time Effect avoids the serious consequence caused because of cascading failure.
Other features and advantages of the present invention will be illustrated in the following description, also, the partly change from specification Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims And in accompanying drawing specifically noted structure realizing and obtain.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Description of the drawings
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to concrete The accompanying drawing to be used needed for embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 shows a kind of flow process of cascading failure countermeasure based on peace control strategy that the embodiment of the present invention is provided Figure;
Fig. 2 shows that the another kind that the embodiment of the present invention is provided controls the stream of the cascading failure countermeasure of strategy based on peace Cheng Tu;
Fig. 3 shows that a kind of cascading failure based on peace control strategy that the embodiment of the present invention is provided tackles the structure of device Block diagram;
Fig. 4 shows that the another kind that the embodiment of the present invention is provided tackles the knot of device based on the cascading failure of peace control strategy Structure block diagram;
Fig. 5 shows a kind of the concrete of cascading failure reply device based on peace control strategy that the embodiment of the present invention is provided Structured flowchart.
Specific embodiment
To make purpose, technical scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention Technical scheme be clearly and completely described, it is clear that described embodiment is a part of embodiment of the invention, rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
The reasonable, safety defense system of perfect performance is adopted to be the important of guarantee system safe and stable operation in power system Measure.Because power system direct relation daily life, therefore the safety and reliability of Operation of Electric Systems is got over It is subject to people's attention to get over.But at present power department not yet has preferably reply to arrange when region generation cascading failure is run into Apply, inefficiency, can not only delay emergency repair time, and because reply causes not in time cascading failure to cause serious consequence; Based on this, a kind of grid cascading failure analysis method and device based on peace control strategy provided in an embodiment of the present invention can lift solution Certainly the efficiency of cascading failure, can take measures within a short period of time to tackle cascading failure, so as to be prevented effectively from because of cascading failure And the serious consequence for causing.The embodiment of the present invention is described in detail below.
Embodiment one:
A kind of flow chart of cascading failure countermeasure based on peace control strategy shown in Figure 1, comprises the following steps:
Step S102, when area to be monitored occurs cascading failure, determines the fault type of cascading failure;Wherein, failure Type include it is following in one or more:It is fault-free trip, three-phase shortcircuit, single-phase earthing, two-phase short circuit, two-phase ground connection, straight Streamline locking, commutation failure, phase-to phase fault, single-phase permanent fault, single-phase transient fault, with famous prime minister's permanent fault, with famous prime minister's wink When failure, different name phase permanent fault, different name phase transient fault, three-phase permanent fault, three-phase transient fault, bus-bar fault, main transformer Failure, direct current single-stage failure, direct current twin-stage failure;
Specifically, can be performed by the security control device that the terminals such as the server of the method are connected carries out reality to region When monitor, so as to find cascading failure;Cascading failure can also be known by directly receiving malfunction notification information, wherein, should Malfunction notification information can be known by outside input.State or the area to be monitored of cascading failure are occurred according to area to be monitored The current state value of network topology structure, each bar circuit and each node, searches and the shape from the bug list for pre-building The corresponding fault type of state, so that it is determined that the fault type of cascading failure.
Step S104, the fault type and the geographical position of area to be monitored according to cascading failure, it is determined that assisting reply to connect The target power plant of lock failure;
Such as, when area to be monitored (i.e.:Fault zone) occur cascading failure when, for the failure classes of different cascading failures Type, needs to take different measures, different measures to need corresponding power plant to be assisted;For example, set in the X of area to be monitored There are power plant X1, X2 and X3, power plant Y1, Y2 and Y3 are provided with the region Y of area to be monitored X interconnections, while mutual with area to be monitored X The region Z of connection is provided with power plant Z1, Z2 and Z3, when cascading failure be bus-bar fault when, may by X1, X2, X3, Y1, Y2, Y3, Z1, Z2 and Z3 are set to target power plant;And when cascading failure is single-phase transient fault, may be according to the geographical position in the region, only Using X1 as target power plant.
Step S106, according to the fault type and the plant information of target power plant of cascading failure, generates and target power plant Corresponding on-unit instruction;Wherein, plant information include power plant's type, power plant geographical position, Power Plant specification and Electric power factory equipment capacity;Operational order include it is following in one or more:Excision generating is active, excision generator, excision load It is active, to cut off load, route of stopping transport, the circuit that puts into operation, the active total plus control that generates electricity, load active always plus control, combination switch, conjunction knife Lock, switch cyclization, drag switch, broaching tool lock, element enter string, element go out string, equipment turn maintenance, equipment transhipment row, equipment turn it is hot standby Turn cold standby, load tap changer with, equipment to change gear, throw AGC control models, input single-pole reclosing, input three and coincide Lock;Specifically, can first look in the failure counte-rplan table for pre-setting corresponding with the fault type of the cascading failure Solution, the corresponding operational order of target power plant is determined according to the plant information of the solution and target power plant.Solution Action executing scheme is certainly included in scheme, the unit of switching M capacity is such as needed altogether;Further according to the machine of each target power plant Organize specification, place capacity and geographical position to carry out corresponding switching capacity distribution.
Again such as, when cascading failure causes area to be monitored (i.e. fault zone) that electrical network concussion occurs, notify and failure Specified unit is thrown/cut in the related target power plant in region.For example, when area to be monitored X sends single converter locking or many transverters During locking failure, it is determined that the target power plant related to the failure is X1, X2 and Y1, according to the information of each power plant, to power plant X1, X2 sends the instruction that unit is specified in excision, and to power plant Y1 the instruction that connection cuts interconnection unit is sent.Wherein, power plant's letter of target power plant Breath can be pre-stored within plant information database, in order to transfer at any time.
Step S108, to the security control device of target power plant corresponding operational order is sent;The operational order specifically can pass through Communication sends;Security control device has the ability that corresponding power equipment is controlled according to operational order.
Step S110, receives operational feedback information and confirmation that the security control device of target power plant sends;Operation is anti- Feedforward information includes operation implementing result;Confirmation includes validating that unlatching trouble shooting region;When security control device has been controlled accordingly Power equipment perform after operational order, operational feedback information can be generated, include whether according to operational order successful execution, whether Perform failure, perform current state of target power plant after operation etc.;The purpose of confirmation is to inform that issuing the operation refers to Higher level (for example, total supervision department) target power plant of order corresponding operational order of successful execution so that higher level confirm can be with Next execution step is taken, for example, confirms that maintenance can be opened.
Step S112, after the confirmation of target power plant is received, according to the event of operational feedback information and cascading failure Barrier type, by maintenance mode Policy Table the maintenance mode of reply cascading failure is determined.Maintenance mode includes follow-up detailed Maintenance step, can be safe and reliable under the current electric grid running statu after assisting to perform operational order based on target power plant Fault zone is overhauled, to recover normal operation as early as possible.
Additionally, only just ensuring that the power plant of correlation has carried out corresponding assistance work in the confirmation for receiving target power plant Make, so as to formally start maintenance in the case of completed based on assistance work.This mode is safe and reliable, can also be further Prevent unexpected generation.
In the said method of the present embodiment, the thought of peace control strategy is based primarily upon, can be according to the failure classes of cascading failure Type determines the target power plant and operational order corresponding with the target power plant for assisting reply cascading failure, is receiving from target electricity After the operational feedback information of factory and confirmation, the maintenance mode of cascading failure is determined according to maintenance mode Policy Table.It is this Mode can failure occur after notify in time corresponding target power plant take execution operational order with assist solve failure, and Guarantee target power plant after taking measures, finally determine the maintenance mode of cascading failure;The execution step of this continuity can have Effect lifts the efficiency for solving cascading failure, takes measures to tackle cascading failure within a short period of time, and then is prevented effectively from because chain Failure and the serious consequence that causes.
Wherein, peace control strategy includes current strategies identification, control command parsing, issues control command and perform control command Deng overall process can be realized by equipment continuity, without the need for completing that numerous staff take time and effort, therefore based on the peace control plan The mode for slightly process being analyzed to cascading failure can largely lift troubleshooting efficiency, be prevented effectively from failure because Process not in time and cause serious consequence.
The equipment for performing said method can be server, intelligent terminal or the host computer for being arranged at electric power overhaul department Deng it can be communicated with the security control device for being arranged at target power plant, with interactive information.
The flow chart of another kind shown in Figure 2 based on the cascading failure countermeasure of peace control strategy, including following step Suddenly:
Step S202, is monitored to area to be monitored;
Step S204, obtains the currently monitored result of area to be monitored;
Step S206, according to the currently monitored result, judges whether area to be monitored occurs cascading failure;If it is, performing Step S208, if not, execution step S202;
Step S208, determines the fault type of the cascading failure;
Step S210, the fault type and the geographical position of the area to be monitored according to the cascading failure, it is determined that association Help the target power plant for tackling the cascading failure;
Step S212, according to the fault type and the plant information of the target power plant of the cascading failure, generate with The corresponding on-unit instruction of the target power plant;
Step S214, to the security control device of the target power plant the corresponding operational order is sent;
Step S216, receives operational feedback information and confirmation that the security control device of the target power plant sends;
Step S218, according to the operational feedback information and the fault type of the cascading failure, by maintenance mode plan Sketch form determines the maintenance mode of the reply cascading failure;
Step S220, generates the peace control policy report of reply cascading failure;Wherein, peace control policy report includes monitored district Domain, the fault type of cascading failure, target power plant, to target power plant send operational order, target power plant operational feedback letter Breath and confirmation, and the maintenance mode of reply cascading failure.
Fig. 2 increases step S202 to S206, and step S220 newly on the basis of Fig. 1;The advantage for possessing is as follows:
1st, by being monitored to area to be monitored in real time, failure can be found within the very first time, consequently facilitating being directed to The cascading failure is rushed to repair in time, can avoid causing cascading failure to cause serious consequence because fault discovery is delayed;
2nd, according to reply cascading failure measure automatically generate peace control policy report, be easy to relevant staff clearly Hold the current preparedness plan taken.
Further, the concrete deterministic process of above-mentioned steps S206 can be found in as described below:
(1) according to the topological structure of electric of area to be monitored, the flow data of area to be monitored is obtained by Load flow calculation; Wherein, flow data includes the voltage magnitude of each node, voltage phase angle, active power and idle work(in topological structure of electric Rate;
(2) calculated by the limit corresponding with the operation of power networks of area to be monitored control, obtain flow data corresponding Dynamic quota data;
(3) compare flow data and dynamic quota data, judge whether target area occurs heavily loaded and out-of-limit;
(4) if it is, determining that area to be monitored has occurred cascading failure.
Aforesaid way preferably make use of the application of operation control and peace control Policy Core analytic technique in cascading failure, By the section and equipment limit of adaptive mode change in core analytic technique, can effectively determine whether target area occurs Cascading failure, additionally it is possible to find out the equipment for breaking down, finds out circuit and transformer of the heavy duty of failure probability highest etc. Equipment.
When occurring in view of cascading failure, the power plant for needing to assist reply cascading failure may be many families, therefore above-mentioned side Method also includes:
When it is determined that the target power plant for assisting reply cascading failure is many, the fault type and many families according to cascading failure The plant information of target power plant, determines that the corresponding operation of the operator precedence level of Duo Jia targets power plant and Ge Jia targets power plant refers to Order;
According to the corresponding operator precedence level of target power plant, to Ge Jia targets power plant corresponding operational order is sent.Wherein, root There are two kinds to the mode that target power plant sends operational order according to operator precedence level, referring to as follows:
Mode one:According to the rank of operator precedence level, corresponding operation is sent to Ge Jia targets power plant sequentially in time Instruction, preferentially sends instruction to the high target power plant of priority level;For example, it is desired to assist cascading failure target power plant have A, B, C tri-, corresponding priority level is respectively one-level, two grades and three-level;Therefore it is preferential to send operational order to target power plant A, Determine target power plant A after successful execution operational order, then operational order sent to target power plant B, it is determined that target power plant B After successful execution operational order, finally again to target power plant C transmission operational orders;
Mode two:The order and execute instruction of target power plant corresponding operator precedence level are carried in operational order Time point;As sent each self-corresponding operational order respectively to tri- target power plant of A, B, C simultaneously, not only carry in operational order The operation of execution in need, but also carry the time point for performing operation;The time point can be Preset Time (on presetting Level target power plant executed instructions finish after time point);Priority is the time of the pending operation of the target power plant A of one-level Point is first time point, in the same manner, when the time point of the corresponding pending operations of target power plant B and target power plant C is respectively second Between point and the 3rd time point.
By the way, without the need for manually allocating the execution task of each target power plant, save midway and appoint with regard to distribution The time that business and implementation status are reported, the assistance task situation of Duo Jia targets power plant can be allocated with having very much continuity.
Embodiment two:
Present embodiments provide the cascading failure countermeasure based on peace control strategy that a kind of application previous embodiment is provided Instantiation.
When knowing that region X occurs cascading failure, the fault type of cascading failure is determined according to peace control equipment;The present embodiment It is determined that fault type be that region X occurs single converter locking or many converter blockings, and the DC-flow work(of failure rear region X When rate is more than setting valve, it is determined that the target power plant related to the fault type is A, B, C and D;
According to the fault type and the actual set capacity of each target power plant of single converter locking or many converter blockings With specification conditions, the operational order that each target power plant needs to perform is generated;
Excision is sent to the security control device in target power plant A, B and C and specify the order of unit, and send to target power plant D Connection cuts the order of M regions unit capacity.Order above is operational order, and the concrete letter of specified unit can be carried in order Breath;
According to target plant information, the priority of target power plant is determined, target power plant A, B, C, D's is preferential in the present embodiment Rank is reduced successively;Therefore, the principle for cutting machine is preferential excision target power plant A and target power plant B, if according to target power plant A Determine that it cuts machine amount deficiency with the feedback of B, then continue to cut off target power plant C, finally notify that target power plant D connection cut M regions unit Capacity;By the actual output calculation of unit when each direct current cuts machine.Further, since each power plant may may require that the multiple machines of excision Group, thus can also arrange in advance the unit of assistance in need excision order priority, each power plant carry out it is interspersed carry out, For example, target power plant A has unit A1, A2 and A3, and target power plant B has unit B1, B2 and B3, it is also possible to divide according to unit excellent First level, and do not affected by target power plant priority (target power plant priority can only with the time sequencing for receiving operational order It is related), that is, the priority orders for cutting off unit are followed successively by from high to low A1, B1, A2, B3, A3, B2;Certainly, target power plant is connecing When receiving the instruction of excision unit, it is also possible to voluntarily judge specific implementation, the minimum principle self adaptation such as according to the amount of cutting is crossed Optimal unit combination is found on ground in it can cut unit, and cuts off corresponding unit;
The operational feedback information and confirmation of the target power plant of operational order has been assigned in reception, for example, receives target What power plant A was returned cuts off the feedback information of unit A1, A2, A3 and determines that electric power overhaul department can start modulation areas X Direct current instructs (i.e. confirmation), after target power plant A, B, C, D return operational feedback information and confirmation, according to mesh Machine capacity situation is cut by mark power plant, and by maintenance mode, Policy Table determines maintenance mode, determines how and is modulated appropriately the straight of region X Stream, further to solve the cascading failure of region X.
It is determined that after maintenance mode, generating peace control policy report, record from cascading failure after occurring to maintenance mode really All processes between fixed, so that staff can clearly hold concrete counter-measure.
Above-mentioned overall process can have the server of electric power overhaul department, the security control device of target power plant and power equipment etc. Between interaction realization, determine after cascading failure generation without the need for numerous staff and failure cause and take solution, And circulate a notice of layer by layer for solution and implementation status;Thus the interactive measure of continuity can be carried effectively between this equipment The efficiency for solving cascading failure is risen, takes measures to tackle cascading failure within a short period of time, and then be prevented effectively from because of cascading failure And the serious consequence for causing.
Embodiment three:
For a kind of cascading failure countermeasure based on peace control strategy that embodiment one is provided, the embodiment of the present invention is carried A kind of cascading failure reply device based on peace control strategy is supplied, shown in Figure 3, the device is included with lower module:
Fault determination module 302, for when area to be monitored occurs cascading failure, determining the failure classes of cascading failure Type;Wherein, fault type include it is following in one or more:Fault-free trip, three-phase shortcircuit, single-phase earthing, two-phase short circuit, Two-phase ground connection, AC line locking, commutation failure, phase-to phase fault, single-phase permanent fault, single-phase transient fault, with famous prime minister forever therefore Barrier, with famous prime minister's transient fault, different name phase permanent fault, different name phase transient fault, three-phase permanent fault, three-phase transient fault, mother Line failure, main transformer failure, direct current single-stage failure, direct current twin-stage failure;
Power plant's determining module 304, for according to the geographical position of the fault type of cascading failure and area to be monitored, it is determined that Assist the target power plant of reply cascading failure;
Directive generation module 306, for according to the plant information of the fault type of cascading failure and target power plant, generating On-unit instruction corresponding with target power plant;Wherein, plant information includes power plant's type, power plant geographical position, power plant Unit specification and electric power factory equipment capacity;Operational order include it is following in one or more:Excision generating is active, excision generates electricity Machine, excision load is active, cut off load, route of stopping transport, the circuit that puts into operation, the active total plus control that generates electricity, active total load plus control, Combination switch, close disconnecting link, switch cyclization, drag switch, broaching tool lock, element enter string, element go out string, equipment turn maintenance, equipment transhipment row, Equipment turn stand-by heat, equipment turn cold standby, load tap changer change gear, throw AGC control models, input single-pole reclosing, throw Enter three_phase reclosing;
Instruction sending module 308, for sending corresponding operational order to the security control device of target power plant;
Information receiving module 310, for receiving operational feedback information and the confirmation that the security control device of target power plant sends Information;Operational feedback information includes operation implementing result;Confirmation includes validating that unlatching trouble shooting region;
Maintenance determining module 312, for after the confirmation of target power plant is received, according to operational feedback information and company The fault type of lock failure, by maintenance mode Policy Table the maintenance mode of reply cascading failure is determined.
The said apparatus of the present embodiment, determine fault type, in conjunction with power plant's determining module by fault determination module 302 304 and directive generation module 406 determine assist reply cascading failure target power plant and it is corresponding with the target power plant operation refer to Order, and operational order is sent to corresponding target power plant by instruction sending module 308, receive to come in information receiving module 310 From after the operational feedback information and confirmation of target power plant, the maintenance side of cascading failure is determined according to maintenance mode Policy Table Formula.The present embodiment provide device can failure occur after notify in time corresponding target power plant take execution operational order with Assist to solve failure, and guaranteeing target power plant after taking measures, finally determine the maintenance mode of cascading failure;This continuity Execution step can effectively be lifted solve cascading failure efficiency, take measures within a short period of time tackle cascading failure, enter And it is prevented effectively from the serious consequence caused because of cascading failure.
Another kind shown in Figure 4 tackles the structured flowchart of device based on the cascading failure of peace control strategy, and the device exists On the basis of Fig. 3, also include:Monitoring modular 402, for being monitored to area to be monitored;As a result acquisition module 404, are used for Obtain the currently monitored result of area to be monitored;Breakdown judge module 406, for according to the currently monitored result, judging monitored Whether region there is cascading failure;Further, also including report generation module 408, for it is determined that the inspection of reply cascading failure After repairing mode, the peace control policy report of reply cascading failure is generated;Peace control policy report includes area to be monitored, cascading failure Fault type, target power plant, the operational order, the operational feedback information of target power plant and the confirmation letter that send to target power plant Breath, and the maintenance mode of reply cascading failure.
A kind of cascading failure based on peace control strategy shown in Figure 5 tackles the concrete structure block diagram of device, Fig. 4's On the basis of, breakdown judge module 406 is specifically included such as lower unit:
First computing unit 4061, for according to the topological structure of electric of area to be monitored, by Load flow calculation obtain by The flow data of monitored area;Wherein, flow data includes voltage magnitude, the voltage phase of each node in topological structure of electric Angle, active power and reactive power;
Second computing unit 4062, for being calculated by the limit corresponding with the operation of power networks of area to be monitored control, Obtain the corresponding dynamic quota data of flow data;
Judging unit 4063, for comparing flow data and dynamic quota data, judges whether target area occurs heavy duty With it is out-of-limit;
Determining unit 4064, for when being judged as YES, determining that area to be monitored has occurred cascading failure.
When occurring in view of cascading failure, the power plant for needing to assist reply cascading failure may be many families, therefore above-mentioned dress Putting also includes:Many determining modules, for when it is determined that the target power plant for assisting reply cascading failure is many, according to chain event The fault type of barrier and the plant information of Duo Jia targets power plant, determine the operator precedence level and each target of Duo Jia targets power plant The corresponding operational order of power plant;Corresponding instruction sending module, for according to the corresponding operator precedence level of target power plant, to each mesh Mark power plant sends corresponding operational order.
The device that the present embodiment is provided, it realizes that the technique effect of principle and generation is identical with previous embodiment, is letter Describe, device embodiment part does not refer to part, refers to corresponding contents in preceding method embodiment.
In sum, the present invention is provided the grid cascading failure analysis method based on peace control strategy and device, can be according to even The fault type of lock failure determines the target power plant and operational order corresponding with the target power plant for assisting reply cascading failure, Receive after the operational feedback information and confirmation of target power plant, according to maintenance mode, Policy Table determines cascading failure Maintenance mode.This mode can in time notify that corresponding target power plant takes execution operational order to assist after failure occurs Failure is solved, and is guaranteeing target power plant after taking measures, finally determine the maintenance mode of cascading failure;This continuity is held Row step can effectively lift the efficiency for solving cascading failure, take measures to tackle cascading failure, Jin Eryou within a short period of time Effect avoids the serious consequence caused because of cascading failure.
A kind of computer of grid cascading failure analysis method and device based on peace control strategy that the embodiment of the present invention is provided Program product, including the computer-readable recording medium for storing program code, the instruction that described program code includes can be used for The method described in previous methods embodiment is performed, is implemented and be can be found in embodiment of the method, be will not be described here.
In addition, in the description of the embodiment of the present invention, unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
If the function is realized and as independent production marketing or when using using in the form of SFU software functional unit, can be with In being stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words The part contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be individual People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the invention. And aforesaid storage medium includes:USB flash disk, portable hard drive, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
In describing the invention, it should be noted that term " " center ", " on ", D score, "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, merely to Be easy to description the present invention and simplify description, rather than indicate or imply indication device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.Additionally, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
Finally it should be noted that:Embodiment described above, specific embodiment only of the invention, to illustrate the present invention Technical scheme, rather than a limitation, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this It is bright to be described in detail, it will be understood by those within the art that:Any those familiar with the art The invention discloses technical scope in, it still can modify to the technical scheme described in previous embodiment or can be light Change is readily conceivable that, or equivalent is carried out to which part technical characteristic;And these modifications, change or replacement, do not make The essence of appropriate technical solution departs from the spirit and scope of embodiment of the present invention technical scheme, should all cover the protection in the present invention Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (10)

1. it is a kind of that tactful cascading failure countermeasure is controlled based on peace, it is characterised in that to include:
When area to be monitored occurs cascading failure, the fault type of the cascading failure is determined;Wherein, the fault type bag Include it is following in one or more:Fault-free trip, three-phase shortcircuit, single-phase earthing, two-phase short circuit, two-phase ground connection, AC line are closed Lock, commutation failure, phase-to phase fault, single-phase permanent fault, single-phase transient fault, with famous prime minister's permanent fault, with famous prime minister's transient fault, It is different name phase permanent fault, different name phase transient fault, three-phase permanent fault, three-phase transient fault, bus-bar fault, main transformer failure, straight Stream single-stage failure, direct current twin-stage failure;
Fault type and the geographical position of the area to be monitored according to the cascading failure, it is determined that assisting reply described chain The target power plant of failure;
According to the fault type and the plant information of the target power plant of the cascading failure, generate and the target power plant pair The on-unit instruction answered;Wherein, the plant information includes power plant's type, power plant geographical position, Power Plant specification With electric power factory equipment capacity;The operational order include it is following in one or more:Cut off active, the excision generator that generates electricity, cut Except load is active, cuts off load, route of stopping transport, the circuit that puts into operation, the active total plus control that generates electricity, active total load plus control, run jointly Close, close disconnecting link, switch cyclization, drag switch, broaching tool lock, element enter string, element go out string, equipment turn maintenance, equipment transhipment row, equipment Turn stand-by heat, equipment turn cold standby, load tap changer change gear, throw AGC control models, input single-pole reclosing, input three Coincide lock;
The corresponding operational order is sent to the security control device of the target power plant;
Receive operational feedback information and confirmation that the security control device of the target power plant sends;The operational feedback information Including operation implementing result;The confirmation includes validating that the unlatching maintenance fault zone;
After the confirmation of the target power plant is received, according to the operational feedback information and the failure of the cascading failure Type, by maintenance mode Policy Table the maintenance mode of the reply cascading failure is determined.
2. method according to claim 1, it is characterised in that methods described also includes:
After it is determined that tackling the maintenance mode of the cascading failure, the peace control policy report of the reply cascading failure is generated; It is described peace control policy report include area to be monitored, the fault type of cascading failure, target power plant, to the target power plant send Operational order, the operational feedback information of the target power plant and confirmation, and the maintenance side for tackling the cascading failure Formula.
3. method according to claim 1, it is characterised in that methods described also includes:
The area to be monitored is monitored;
Obtain the currently monitored result of the area to be monitored;
According to the currently monitored result, judge whether the area to be monitored occurs cascading failure.
4. method according to claim 3, it is characterised in that judge whether the area to be monitored occurs cascading failure bag Include:
According to the topological structure of electric of area to be monitored, the flow data of the area to be monitored is obtained by Load flow calculation;Its In, the flow data includes the voltage magnitude of each node, voltage phase angle, active power and nothing in the topological structure of electric Work(power;
Calculated by the corresponding limit of the operation of power networks control with the area to be monitored, obtain the flow data corresponding Dynamic quota data;
Relatively the flow data and the dynamic quota data, judge whether the target area occurs heavily loaded and out-of-limit;
If it is, determining that the area to be monitored has occurred cascading failure.
5. method according to claim 1, it is characterised in that methods described also includes:
When it is determined that the target power plant for assisting the reply cascading failure is many, according to the fault type of the cascading failure and The plant information of target power plant described in many families, determines operator precedence level and the Ge Jia targets power plant pair of target power plant described in many families The operational order answered;
According to the corresponding operator precedence level of the target power plant, to target power plant described in each family corresponding operational order is sent.
6. a kind of cascading failure based on peace control strategy tackles device, it is characterised in that include:
Fault determination module, for when area to be monitored occurs cascading failure, determining the fault type of the cascading failure;Its In, the fault type include it is following in one or more:Fault-free trip, three-phase shortcircuit, single-phase earthing, two-phase short circuit, Two-phase ground connection, AC line locking, commutation failure, phase-to phase fault, single-phase permanent fault, single-phase transient fault, with famous prime minister forever therefore Barrier, with famous prime minister's transient fault, different name phase permanent fault, different name phase transient fault, three-phase permanent fault, three-phase transient fault, mother Line failure, main transformer failure, direct current single-stage failure, direct current twin-stage failure;
Power plant's determining module, for according to the geographical position of the fault type of the cascading failure and the area to be monitored, really The fixed target power plant for assisting to tackle the cascading failure;
Directive generation module, it is raw for according to the plant information of the fault type of the cascading failure and the target power plant Into on-unit corresponding with target power plant instruction;Wherein, the plant information includes that power plant's type, power plant are geographical Position, Power Plant specification and electric power factory equipment capacity;The operational order include it is following in one or more:Excision generating has Work(, excision generator, excision load is active, cut off load, route of stopping transport, the circuit that puts into operation, generate electricity active total plus control, load have Work(always add control, combination switch, close disconnecting link, switch cyclization, drag switch, broaching tool lock, element enter string, element go out string, equipment turn maintenance, Equipment transhipment row, equipment turn stand-by heat, equipment and turn that cold standby, load tap changer change gear, to throw AGC control models, input single Coincide lock, input three_phase reclosing;
Instruction sending module, for sending the corresponding operational order to the security control device of the target power plant;
Information receiving module, for receiving operational feedback information and the confirmation letter that the security control device of the target power plant sends Breath;The operational feedback information includes operation implementing result;The confirmation includes validating that the unlatching maintenance fault zone;
Maintenance determining module, for when the confirmation of the target power plant is received after, according to the operational feedback information with The fault type of the cascading failure, by maintenance mode Policy Table the maintenance mode of the reply cascading failure is determined.
7. device according to claim 6, it is characterised in that described device also includes:
Report generation module, for after it is determined that tackling the maintenance mode of the cascading failure, generate reply it is described chain therefore The peace control policy report of barrier;It is described peace control policy report include area to be monitored, the fault type of cascading failure, target power plant, Operational order, the operational feedback information of the target power plant and the confirmation sent to the target power plant, and reply institute State the maintenance mode of cascading failure.
8. device according to claim 6, it is characterised in that described device also includes:
Monitoring modular, for being monitored to the area to be monitored;
As a result acquisition module, for obtaining the currently monitored result of the area to be monitored;
Breakdown judge module, for according to the currently monitored result, judging whether the area to be monitored occurs cascading failure.
9. device according to claim 8, it is characterised in that the breakdown judge module includes:
First computing unit, for according to the topological structure of electric of area to be monitored, obtaining described monitored by Load flow calculation The flow data in region;Wherein, the flow data includes voltage magnitude, the voltage of each node in the topological structure of electric Phase angle, active power and reactive power;
Second computing unit, for being calculated by the corresponding limit of the operation of power networks control with the area to be monitored, is obtained The corresponding dynamic quota data of the flow data;
Judging unit, for the relatively flow data and the dynamic quota data, judges whether the target area occurs It is heavily loaded and out-of-limit;
Determining unit, for when being judged as YES, determining that the area to be monitored has occurred cascading failure.
10. device according to claim 6, it is characterised in that described device also includes:
Many determining modules, for when it is determined that the target power plant for assisting the reply cascading failure is many, according to the company The fault type of lock failure and the plant information of target power plant described in many families, determine the operator precedence level of target power plant described in many families And the corresponding operational order of Ge Jia targets power plant;
Corresponding instruction sending module, for according to the corresponding operator precedence level of the target power plant, to target power plant described in each family Send corresponding operational order.
CN201611230189.9A 2016-12-26 2016-12-26 Grid cascading failure analysis method and device based on peace control strategy Active CN106655172B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611230189.9A CN106655172B (en) 2016-12-26 2016-12-26 Grid cascading failure analysis method and device based on peace control strategy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611230189.9A CN106655172B (en) 2016-12-26 2016-12-26 Grid cascading failure analysis method and device based on peace control strategy

Publications (2)

Publication Number Publication Date
CN106655172A true CN106655172A (en) 2017-05-10
CN106655172B CN106655172B (en) 2019-04-02

Family

ID=58832951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611230189.9A Active CN106655172B (en) 2016-12-26 2016-12-26 Grid cascading failure analysis method and device based on peace control strategy

Country Status (1)

Country Link
CN (1) CN106655172B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109412135A (en) * 2018-10-11 2019-03-01 许昌许继软件技术有限公司 A kind of acquisition methods and system of DC grid peace control strategy
CN110543658A (en) * 2019-07-15 2019-12-06 乌江渡发电厂 Power plant equipment diagnosis method based on big data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012029550A (en) * 2010-06-18 2012-02-09 General Electric Co <Ge> Self-healing power grid and method thereof
CN103529709A (en) * 2013-10-15 2014-01-22 广东电网公司电力调度控制中心 Method and system for realizing fault joint switching device model of power system
CA2844486A1 (en) * 2013-03-15 2014-09-15 Accenture Global Services Limited Enhanced grid reliability through predictive analysis and dynamic action for stable power distribution
CN105930350A (en) * 2016-04-07 2016-09-07 国电南瑞科技股份有限公司 Power grid accident associated information extraction method based on customized template

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012029550A (en) * 2010-06-18 2012-02-09 General Electric Co <Ge> Self-healing power grid and method thereof
CA2844486A1 (en) * 2013-03-15 2014-09-15 Accenture Global Services Limited Enhanced grid reliability through predictive analysis and dynamic action for stable power distribution
CN103529709A (en) * 2013-10-15 2014-01-22 广东电网公司电力调度控制中心 Method and system for realizing fault joint switching device model of power system
CN105930350A (en) * 2016-04-07 2016-09-07 国电南瑞科技股份有限公司 Power grid accident associated information extraction method based on customized template

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109412135A (en) * 2018-10-11 2019-03-01 许昌许继软件技术有限公司 A kind of acquisition methods and system of DC grid peace control strategy
CN109412135B (en) * 2018-10-11 2020-11-17 许昌许继软件技术有限公司 Method and system for acquiring security control strategy of direct current power grid
CN110543658A (en) * 2019-07-15 2019-12-06 乌江渡发电厂 Power plant equipment diagnosis method based on big data

Also Published As

Publication number Publication date
CN106655172B (en) 2019-04-02

Similar Documents

Publication Publication Date Title
Li et al. Strategic power infrastructure defense
CN103812131B (en) A kind of urban distribution network isolated island black starting-up system and method based on multiple agent
CN101997340B (en) Intelligent feeder line automation method in autonomous self-healing distribution network
EP1976177B1 (en) Substation automation system with increased availability
KR101047728B1 (en) Method for controlling electric power system in response to circuit abnormality and system
CN103779861B (en) Power distribution network actively reconstruction strategy and prevention and control method thereof
CN106655158A (en) Smart grid based distribution network self-healing control system and method
CN103368197A (en) Valve base control device and method of modularization multi-level converter
CN102664457A (en) Energy management system for ship
CN108418236A (en) A kind of flexibility multimode switch AC fault ride-through method
CN102290798A (en) Quick power supply restoring rule based on distribution network wire connecting way
CN202586500U (en) Ship energy management system
CN103605867A (en) Ship electric system failure recovery method based on multi-agent technology
CN105337314B (en) A kind of multi-source based on distributed power source black starting-up technology coordinates control fault handling method
CN110148937A (en) A kind of large-area power-cuts event intelligence deduction method based on Bayesian network
CN106655172A (en) Cascading failure analysis method and apparatus based on safety control strategy
Dehghanian et al. Security-based circuit breaker maintenance management
CN106655173A (en) Power system fault repairing method and device
CN108695889A (en) A kind of high-efficiency photovoltaic inverter for sharing O&amp;M
CN105391030B (en) The plan isolated island division methods of polymerization are gradually loaded based on network topology structure load
US20230420937A1 (en) Power system operation plan creation assistance device and method
CN104795897A (en) Intelligent substation configurable relay protecting method and system
CN114583749A (en) Operation control method and system for microgrid, electronic device and storage medium
Monti et al. Integrated simulation of communication, protection, and power in MVDC systems
CN102545378A (en) Controller, load protection method, automatic transfer switching equipment and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant