CN106569166B - A kind of test method in twin-core electric energy meter legality measurement portion - Google Patents
A kind of test method in twin-core electric energy meter legality measurement portion Download PDFInfo
- Publication number
- CN106569166B CN106569166B CN201610902022.6A CN201610902022A CN106569166B CN 106569166 B CN106569166 B CN 106569166B CN 201610902022 A CN201610902022 A CN 201610902022A CN 106569166 B CN106569166 B CN 106569166B
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- tested
- measurement portion
- stage body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005259 measurement Methods 0.000 title claims abstract description 51
- 238000010998 test method Methods 0.000 title claims abstract description 31
- 238000012360 testing method Methods 0.000 claims abstract description 24
- 238000012795 verification Methods 0.000 claims abstract description 6
- 230000005611 electricity Effects 0.000 claims description 13
- 238000007689 inspection Methods 0.000 claims description 9
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000004088 simulation Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to technical field, in particular to a kind of test method in twin-core electric energy meter legality measurement portion.This method comprises: examining the instruction of stage body reception PC machine to tested electric energy meter output signal;Stage body is examined to obtain the continuous data for being tested the legality measurement portion of electric energy meter under several test condition, the error information for examining stage body to calculate according to continuous data in real time;PC machine stored error data and error curve is compared according to error information fit error curve PC machine with standard verification, obtains comparison result.The error information for examining stage body to be calculated according to continuous data due to the present invention;PC machine stored error data and error curve is compared according to error information fit error curve PC machine with standard verification, obtains comparison result.Tested electric energy meter can be measured and be tested the accuracy that electric energy meter legality measurement portion works independently under the interference of different test conditions.
Description
Technical field
The present invention relates to technical field, in particular to a kind of test method in twin-core electric energy meter legality measurement portion.
Background technique
Currently, China's electric energy meter designs for integral type, i.e., metering section and non-metering part do not do autonomous working and require.This
Kind electric energy meter requires software and hardware to compare solidification, once there is hardware or software failure, can only take the side for replacing whole table
Everything goes well with your work ensureing electric-power metering carries out for formula.And for the security consideration for preventing from distorting electric energy list procedure, do not allow electric energy meter
On-line software updating.And in the following electricity market full of competition, different sale of electricity main bodys are examined for pursuit benefit's
Consider, more rate electricity price day Time segments division strategies of formulation have more specific aim, diversity and real-time.But this to the prior art one
The electric energy meter of body formula design proposes stern challenge.How to ensure that metering accuracy and reliability while be able to achieve meter again
The update or optimization for measuring charging mode, are current urgent problems.It is right simultaneously with the gradually infiltration of user experience idea
The functional requirement of electric energy meter is also more and more, and if at present want extend upgrade function, can only take install new table mode come reality
It is existing, the waste of resource is not only caused, but also also add manpower and material resources cost.
However IR46 standard requirements electric energy meter electronic equipment and component separate measurement function and other function are mutually indepedent, pipe
Reason partial software online upgrading does not influence the Stability and veracity of metering section.Twin-core electric energy meter based on IR46 standard will
Developing direction as Science in Future in China electric energy meter.Twin-core electric energy meter requires legality measurement part and administrative section to separate, that is, measures
Core and management core, and legality measurement part can work independently.In this way, will not influence metering core when electric energy meter online upgrading
It works normally, without installing new table.
In order to guarantee the quality of twin-core electric energy meter, electric energy meter needs the independence to its legality measurement part before factory
It is tested, therefore, is badly in need of a kind of test method that twin-core electric energy meter legality measurement part works independently occur.
Summary of the invention
In order to overcome the above problem, the present invention provides a kind of test method in twin-core electric energy meter legality measurement portion, this method
It can test whether twin-core electric energy meter legality measurement portion can work independently.
In order to achieve the above-mentioned advantages, the test method that the present invention provides a kind of twin-core electric energy meter legality measurement portion includes: check-out console
Body obtains the continuous data that the legality measurement portion of electric energy meter is tested under several test condition in real time, examines stage body according to stoichiometric number
According to the error information of calculating, includes: PC machine stored error data and error curve is obtained according to error information;PC machine is by error
Curve is compared with standard verification, obtains comparison result.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the test condition packet
It includes: being tested electric energy meter multichannel while communicating, tested electric energy meter software upgrading, parameter setting carried out to tested electric energy meter, is tested
Electric energy meter zeros data;To one or more of management department's frequent recovery of tested electric energy meter, external disturbance.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the external disturbance packet
Include: simulation working power failure, peripheral circuit pin is shorted or open-circuit fault, tested electric energy meter normal course of operation in pair quilt
It surveys electric energy meter and carries out one or more of module replacing.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the inspection stage body
The continuous data for being tested the legality measurement portion of electric energy meter under several test condition is obtained in real time, examines stage body according to continuous data
The error information of calculating includes: to obtain output data a to the electric quantity metering for examining stage body to be sent to tested electric energy meter;Examine stage body
Receive the electricity data b of tested electric energy meter;Stage body is examined to calculate the error information that the difference of a and b is used as.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the inspection stage body
The continuous data for being tested the legality measurement portion of electric energy meter under several test condition is obtained in real time, examines stage body according to continuous data
The error information of calculating includes: to obtain output data a to the electric quantity metering for examining stage body to be sent to tested electric energy meter;Examine stage body
Receive the electricity data b of tested electric energy meter;Stage body is examined to calculate the error information that the ratio of a and b is used as.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the legality measurement portion
Including metering chip, metering MCU, RS485 interface, battery, clock chip and memory.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the tested electric energy meter
It is electrically connected by RS485 line with the PC machine.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the metering chip is logical
SPI line is crossed to be electrically connected with the metering MCU.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, stage body is being examined to receive
The instruction of PC machine is tested electric energy meter zeros data to the tested electric energy meter output signal foregoing description.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the PC machine and institute
It states control test stage body while multiple tested electric energy meters is tested.
Since present invention inspection stage body obtains the meter in the legality measurement portion of tested electric energy meter under several test condition in real time
Data are measured, according to the error information for calculating legal system measurement unit;PC machine stored error data and according to error information obtain error
Curve;Error curve is compared by PC machine with standard verification, obtains comparison result.Tested electric energy meter can be measured in different surveys
The accuracy that tested electric energy meter legality measurement portion works independently under the interference of strip part.
Detailed description of the invention
Fig. 1 is the schematic diagram of tested electric energy meter of the invention.
Fig. 2 is the schematic diagram of synchronous testing device of the invention.
Fig. 3 is the flow chart of the test method in first embodiment of the invention twin-core electric energy meter legality measurement portion.
Specific embodiment
It is of the invention to reach the technical means and efficacy that predetermined goal of the invention is taken further to illustrate, below in conjunction with
Attached drawing and preferred embodiment, to specific embodiment, structure, feature and its effect is proposed according to the present invention, detailed description is as follows.
The tested electric energy meter for please referring to the test method in the twin-core electric energy meter legality measurement portion of the invention Fig. 1 includes legal system meter
Amount portion and management department.
Legality measurement portion includes metering chip, metering MCU, RS485 interface, battery, clock chip and memory.Metering core
Piece is electrically connected by SPI line with metering MCU.Tested electric energy meter is electrically connected by RS485 interface and battery with metering MCU.Clock
Chip and memory are electrically connected with metering MCU.Management department includes management MCU, and metering MCU passes through standard interface and management MCU electricity
Connection.Tested electric energy meter is electrically connected by RS485 line with the PC machine.
PC machine obtains legal system electricity data by legal system portion RS485 serial ports, by managing core RS485 serial ports, infrared, carrier wave
Etc. modes obtain management department's electricity data.
Fig. 3 is the flow chart of the test method in first embodiment of the invention twin-core electric energy meter legality measurement portion.Refer to figure
3, the test method in the twin-core electric energy meter legality measurement portion of the present embodiment includes:
S1, examine the instruction of stage body reception PC machine to tested electric energy meter output signal;
S2, stage body is examined to obtain the continuous data for being tested the legality measurement portion of electric energy meter under several test condition in real time,
The error information for examining stage body to be calculated according to continuous data;
S3, PC machine stored error data and according to error information fit error curve;
Error curve is compared by S4, PC machine with standard verification, obtains comparison result.
Test condition includes: tested electric energy meter multichannel while communicating, tested electric energy meter software upgrades, to tested electric energy meter
Carry out parameter setting, tested electric energy meter zeros data;To one of management department's frequent recovery of tested electric energy meter, external disturbance
Or it is several.External disturbance includes: simulation working power failure, peripheral circuit pin short circuit or open-circuit fault, is being tested electric energy meter just
Tested electric energy meter in normal operational process pair carries out one or more of module replacing.
It examines stage body to obtain the continuous data for being tested electric energy meter under several test condition in real time, calculates tested electric energy meter
Error information includes: to obtain output data a to the electric quantity metering for examining stage body to be sent to tested electric energy meter;Stage body is examined to receive tested
The electricity data b of electric energy meter;Stage body is examined to calculate the error information that the difference of a and b is used as.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, stage body is examined to obtain in real time
The continuous data that electric energy meter is tested under several test condition is taken, the error information for calculating tested electric energy meter includes: to check-out console
The electric quantity metering that body is sent to tested electric energy meter obtains output data a;Stage body is examined to receive the electricity data b of tested electric energy meter;Inspection
It tests stage body and calculates the error information that the ratio of a and b is used as.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, stage body is being examined to receive
The instruction of PC machine is tested electric energy meter zeros data to the tested electric energy meter output signal foregoing description.
In one embodiment of the test method in twin-core electric energy meter legality measurement portion of the invention, the PC machine and institute
It states control test stage body while multiple tested electric energy meters is tested.Every ammeter is all that independent test is independent of each other, can be with
How much arrange multiple ammeters simultaneously according to stage body epitope while testing.
To sum up, the present invention at least has the advantage that
Since the inspection stage body in the test method in twin-core electric energy meter legality measurement portion of the invention calculates tested electricity in real time
The error information of energy table;The error information and record for the inspection stage body that PC machine is read in real time, are fitted to error curve;PC machine and inspection
Test stage body to tested electric energy meter export different test conditions;In this way, tested electric energy meter can be measured in different test conditions
Interference under tested electric energy meter legality measurement portion work independently accuracy.In this way, can guarantee that the electric energy meter of factory is to close
Lattice product.
More than, it is only presently preferred embodiments of the present invention, is not intended to limit the present invention in any form, although this
Invention has been disclosed in a preferred embodiment above, and however, it is not intended to limit the invention, any person skilled in the art,
It does not depart within the scope of technical solution of the present invention, when the technology contents using the disclosure above make a little change or are modified to equivalent
The equivalent embodiment of variation, but without departing from the technical solutions of the present invention, according to the technical essence of the invention to the above reality
Any simple modification, equivalent variations and modification made by example are applied, all of which are still within the scope of the technical scheme of the invention.
Claims (7)
1. a kind of test method in twin-core electric energy meter legality measurement portion characterized by comprising
Examine the instruction of stage body reception PC machine to tested electric energy meter output signal;
It examines stage body to obtain the continuous data for being tested the legality measurement portion of electric energy meter under several test condition in real time, examines stage body
Error information is calculated according to continuous data;
PC machine stored error data and according to error information fit error curve;
Error curve is compared by PC machine with standard verification, obtains comparison result;
The test condition includes one or more of following conditions: being tested electric energy meter multichannel while communicating, tested electric energy
Table software upgrading carries out parameter setting, tested electric energy meter zeros data to tested electric energy meter;To management department's frequency of tested electric energy meter
Complicated position, external disturbance;
The external disturbance includes following one or more: simulation working power failure, peripheral circuit pin are shorted or open circuit
Module replacing is carried out to tested electric energy meter in failure, tested electric energy meter normal course of operation.
2. the test method in twin-core electric energy meter legality measurement portion according to claim 1 is it is characterized in that, the inspection
Stage body obtains the continuous data that the legality measurement portion of electric energy meter is tested under several test condition in real time, examines stage body according to metering
Data calculate error information, include:
Output data a is obtained to the electric quantity metering for examining stage body to be sent to tested electric energy meter;
Stage body is examined to receive the electricity data b of tested electric energy meter;
Stage body is examined to calculate the difference of a and b as error information.
3. the test method in twin-core electric energy meter legality measurement portion according to claim 1 to 2 is it is characterized in that, described
Legality measurement portion includes metering chip, metering MCU, RS485 interface, battery, clock chip and memory.
4. the test method in twin-core electric energy meter legality measurement portion according to claim 3 is it is characterized in that, the tested electricity
Energy table is electrically connected by RS485 line with the PC machine.
5. the test method in twin-core electric energy meter legality measurement portion according to claim 3 is it is characterized in that, the metering core
Piece is electrically connected by SPI line with the metering MCU.
6. the test method in twin-core electric energy meter legality measurement portion according to claim 1 is it is characterized in that, examining stage body
The instruction for receiving PC machine is tested electric energy meter zeros data to the tested electric energy meter output signal foregoing description.
7. the test method in twin-core electric energy meter legality measurement portion according to claim 1 is it is characterized in that, the PC machine
Multiple tested electric energy meters are tested simultaneously with the inspection stage body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610902022.6A CN106569166B (en) | 2016-10-17 | 2016-10-17 | A kind of test method in twin-core electric energy meter legality measurement portion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610902022.6A CN106569166B (en) | 2016-10-17 | 2016-10-17 | A kind of test method in twin-core electric energy meter legality measurement portion |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106569166A CN106569166A (en) | 2017-04-19 |
CN106569166B true CN106569166B (en) | 2019-08-13 |
Family
ID=58532996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610902022.6A Active CN106569166B (en) | 2016-10-17 | 2016-10-17 | A kind of test method in twin-core electric energy meter legality measurement portion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106569166B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107505588A (en) * | 2017-08-08 | 2017-12-22 | 国网重庆市电力公司电力科学研究院 | A kind of electric energy meter combines error testing method and system |
CN108445436B (en) * | 2018-03-01 | 2020-04-10 | 宁波迦南智能电气股份有限公司 | Electric energy meter with double cores for mutual detection of running states |
CN112994964B (en) * | 2019-12-16 | 2023-11-14 | 浙江正泰仪器仪表有限责任公司 | Communication simulation system between two cores of intelligent ammeter |
CN112098924B (en) * | 2020-11-04 | 2021-02-23 | 南方电网数字电网研究院有限公司 | Interactive function testing method and device based on double-core intelligent electric meter |
CN112858993B (en) * | 2021-02-20 | 2023-06-13 | 南方电网数字电网科技(广东)有限公司 | Double-core electric energy meter test system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101900801A (en) * | 2010-07-15 | 2010-12-01 | 田卫华 | Intelligent electric energy meter field test device and test method thereof |
CN103698735A (en) * | 2013-10-30 | 2014-04-02 | 国家电网公司 | Electric energy meter harmonic test device and method thereof |
CN104020437A (en) * | 2014-06-21 | 2014-09-03 | 宁波三星电气股份有限公司 | Electric energy meter correction method |
CN105116369A (en) * | 2015-09-09 | 2015-12-02 | 国网冀北电力有限公司电力科学研究院 | Radio frequency radiation disturbance rejection degree test apparatus and system |
-
2016
- 2016-10-17 CN CN201610902022.6A patent/CN106569166B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101900801A (en) * | 2010-07-15 | 2010-12-01 | 田卫华 | Intelligent electric energy meter field test device and test method thereof |
CN103698735A (en) * | 2013-10-30 | 2014-04-02 | 国家电网公司 | Electric energy meter harmonic test device and method thereof |
CN104020437A (en) * | 2014-06-21 | 2014-09-03 | 宁波三星电气股份有限公司 | Electric energy meter correction method |
CN105116369A (en) * | 2015-09-09 | 2015-12-02 | 国网冀北电力有限公司电力科学研究院 | Radio frequency radiation disturbance rejection degree test apparatus and system |
Also Published As
Publication number | Publication date |
---|---|
CN106569166A (en) | 2017-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106569166B (en) | A kind of test method in twin-core electric energy meter legality measurement portion | |
CN106569164B (en) | A kind of synchronous detecting method and system of twin-core electric energy meter electricity | |
CN104569891B (en) | A kind of system and its method of testing for testing equipment for monitoring power quality | |
CN106338706B (en) | A kind of methods, devices and systems of electric energy metering device global error detection | |
CN106569850B (en) | Electric energy meter with independent metering part and management part and calibration method thereof | |
CN102967800B (en) | Method and device for positioning single-phase ground fault section of power distribution network based on transient signal prony algorithm | |
CN107678960B (en) | Intelligent ammeter software black box testing system and method | |
CN105425201B (en) | metering chip simulation test method for software reliability detection of intelligent electric energy meter | |
CN201072597Y (en) | Automatic detection instrument for aviation electronic flight instrument | |
CN208188313U (en) | A kind of electric energy meter calibrating apparatus with built-in monitoring base table | |
CN105676843A (en) | New energy automobile benchmarking and evaluation system and method | |
CN101858966A (en) | Simulation detection system of electric energy meter data acquisition device | |
CN102967846A (en) | Fault self-checking method for intelligent ammeter | |
CN105116369A (en) | Radio frequency radiation disturbance rejection degree test apparatus and system | |
CN105606937A (en) | DC charging pile calibration device | |
US20130285834A1 (en) | Instantaneous Telemetry from the Utility Revenue Meter by use of the Pulse Outputs or Optical Reader | |
CN102662152A (en) | Electronic type mutual inductor as well as system and method for verifying merging unit | |
CN104375024A (en) | In-situ self-inspection and metering device and method of automatic test system | |
CN105467355A (en) | Automatic testing method of electric energy meter and automatic testing device of same | |
CN104215279B (en) | Online environment monitoring system and environment monitoring method | |
CN108776319A (en) | A kind of optical fiber current mutual inductor data accuracy self-diagnosing method and system | |
CN103558571A (en) | Calibration system of electronic transformer and merging unit | |
CN105610520B (en) | A kind of intelligent electric meter sale of electricity communication check terminal | |
CN208077394U (en) | A kind of the communication test plate and communication test system of concentrator communication module | |
CN201780364U (en) | Simulation detecting system of electric energy meter data acquisition device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |