CN106533827B - Network apparatus test method and device - Google Patents

Network apparatus test method and device Download PDF

Info

Publication number
CN106533827B
CN106533827B CN201610951226.9A CN201610951226A CN106533827B CN 106533827 B CN106533827 B CN 106533827B CN 201610951226 A CN201610951226 A CN 201610951226A CN 106533827 B CN106533827 B CN 106533827B
Authority
CN
China
Prior art keywords
network
module
functional module
start completion
network equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610951226.9A
Other languages
Chinese (zh)
Other versions
CN106533827A (en
Inventor
林剑亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongtong Electronics Co Ltd
Original Assignee
Shenzhen Gongtong Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongtong Electronics Co Ltd filed Critical Shenzhen Gongtong Electronics Co Ltd
Priority to CN201610951226.9A priority Critical patent/CN106533827B/en
Publication of CN106533827A publication Critical patent/CN106533827A/en
Application granted granted Critical
Publication of CN106533827B publication Critical patent/CN106533827B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/10Active monitoring, e.g. heartbeat, ping or trace-route
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0805Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
    • H04L43/0811Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking connectivity
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0805Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
    • H04L43/0817Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements

Abstract

The present invention relates to a kind of network apparatus test method, the network equipment includes network module and multiple functional modules;The described method includes: detect the network module whether start completion;The network module is tested after detecting the network module start completion;Successively detect each functional module whether start completion;And the functional module of start completion is tested.Reliability and testing efficiency in test process has can be improved in above-mentioned network apparatus test method.The present invention also provides a kind of network equipment detection devices.

Description

Network apparatus test method and device
Technical field
The present invention relates to network communication technology fields, more particularly to a kind of network apparatus test method and device.
Background technique
Before carrying out network equipment detection, need whether detection network equipment starts completely.Traditional detection network is set It is standby whether to complete to start, the method for generalling use PING (Packet Internet Groper).The obstructed network equipment of PING, then Think the inactive completion of the network equipment;PING open network equipment, then it is assumed that equipment start completion.However, energy PING open network is set It is standby, it can only illustrate the network module start completion in the network equipment, not for all module start completions of the network equipment.Work as net When other modules in network equipment are inactive, the test crash to this module will lead to, reduce the reliability of test process.
Summary of the invention
Based on this, it is necessary to provide a kind of higher network apparatus test method of testing reliability and device.
A kind of network apparatus test method, the network equipment include network module and multiple functional modules;The method Include: the detection network module whether start completion;To the network mould after detecting the network module start completion Block is tested;Successively detect each functional module whether start completion;And the functional module of start completion is tested.
In one of the embodiments, the detection network module whether start completion the step of include: with default Time interval sends solicited message until receiving the response message that the network equipment is replied, and connecing to the network equipment The network module start completion is confirmed when receiving the response message.
In one of the embodiments, it is described successively detect each functional module whether start completion the step of in, to each function The sequence that energy module is detected is identical as the boot sequence of each functional module in the network equipment.
In one of the embodiments, it is described successively detect each functional module whether start completion the step of include: with pre- If time interval sends solicited message to the network equipment;Receive the response message that the network equipment is replied;The response It include the functional module information that initialization is completed and the functional module information for not completing initialization in information;According to the response Validation of information functional module whether start completion.
In one of the embodiments, it is described successively detect each functional module whether start completion the step of in, only visiting Measure that current functional module has been turned on completion and complete just can be according to preset order after the test to the current functional module To next functional module, whether start completion is detected.
A kind of network equipment detection device, the network equipment include network module and multiple functional modules, the network Equipment testing device includes: detecting devices, for detect the network module whether start completion;Equipment is controlled, with the spy Measurement equipment connection, for controlling the network equipment to institute after the detecting devices detects the network module start completion Network module is stated to be tested;The detecting devices be also used to successively detect each functional module whether start completion;The control Equipment is also used to control the network equipment and tests the functional module of start completion.
The detecting devices is used to ask with prefixed time interval to network equipment transmission in one of the embodiments, Information is sought until receiving the response message that the network equipment is replied, and confirm the net when receiving the response message Network module start completion.
The sequence that the detecting devices detects each functional module in one of the embodiments, is set with the network The boot sequence of each functional module is identical in standby.
The detecting devices is used to ask with prefixed time interval to network equipment transmission in one of the embodiments, Information is sought, and receives the response message that the network equipment is replied, the response message includes the function mould that initialization is completed Block and the functional module for not completing initialization;The detecting devices is also used to whether confirm functional module according to the response message Start completion.
The detecting devices only has been turned on completion and completion detecting current functional module in one of the embodiments, To just can according to preset order to next functional module, whether start completion be visited after the test of the current functional module It surveys.
Above-mentioned network apparatus test method and device, network module in first detection network equipment whether start completion and The network module is tested after start completion, so that it is guaranteed that network module will not influence subsequent test process, is improved Reliability in test process.Meanwhile before testing each functional module, it can first detect whether the functional module has started At so that the problem of only testing to it after the functional module start completion, avoid the occurrence of test crash, further increases Reliability and testing efficiency in test process.
Detailed description of the invention
Fig. 1 is the flow chart of the network apparatus test method in an embodiment;
Fig. 2 is the internal module figure of the IAD in an embodiment;
Fig. 3 is the flow chart tested IAD;
Fig. 4 is the structural block diagram of the network equipment detection device in an embodiment.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Fig. 1 is the flow chart of the network apparatus test method in an embodiment.The network apparatus test method is used for net Network equipment is tested, and can be applied in network equipment automated production testing field.The network equipment includes network module With multiple functional modules.Network module is for realizing the communication connection between the network equipment and test device, and each functional module is then For realizing the various functions of the network equipment.Test device is for realizing the test method.The test method the following steps are included:
S110, detection network module whether start completion.
Solicited message is sent to the network equipment with prefixed time interval.Prefixed time interval, which can according to need, to be set It is fixed.In the present embodiment, prefixed time interval 2s.The network equipment responds the solicited message after network module start completion, And reply response message.When receiving the response message, network module start completion can be confirmed.
S120 tests network module after detecting network module start completion.
After confirming network module start completion, just control the network equipment network module is tested, thus avoid by The case where test crash, occurs when network module inactive completion.Network module is tested, it can be ensured that network module It can work normally, will not influence the test process of follow-up function module.
S130, successively detect each functional module whether start completion.
The sequence detected to each functional module is identical as the boot sequence of functional module each in the network equipment, thus nothing It is tested again after needing to wait for the equal start completion of all modules in the network equipment, the testing time can be saved, improve test effect Rate.To each functional module whether the detection method of start completion whether the detection method of start completion is identical with network module.Tool Body, the network equipment is sent to the network equipment with prefixed time interval and sends request message.When the current detection in the network equipment Functional module start completion after, reply response message.It include the functional module and not that initialization is completed in the response message Complete the functional module of initialization.The functional module of initialization namely the functional module of start completion is completed.Therefore, according to sound Answer message can confirm the functional module currently detected whether start completion, thus to it after the functional module start completion S140 is executed, and continues whether start completion detects to next functional module.In one embodiment, detection process can connect It is continuous to carry out, namely after detecting current functional module start completion, that is, start to detect next functional module, until institute Functional module detection is completed.It in the present embodiment, can't be at once under after detecting current functional module start completion One functional module is detected, and only can just be visited to next functional module after completing the test to current functional module It surveys.Therefore, in current functional module detection process, next functional module can be completed to start, so that it is guaranteed that next function The functional module has been started up completion when module is detected, and improves testing efficiency.
S140 tests the functional module of start completion.
Only the control network equipment tests the functional module of start completion, can be improved and is successfully tested probability, in turn Improve whole testing efficiency.
Whether above-mentioned network apparatus test method, network module in first detection network equipment start completion and are starting The network module is tested at rear, so that it is guaranteed that network module will not influence subsequent test process, improves and tested Reliability in journey.Meanwhile before testing each functional module, can first detect the functional module whether start completion, from And the problem of only it is tested after the functional module start completion, avoids the occurrence of test crash, further improve survey Reliability and testing efficiency during examination.
Below with the network equipment to be carried out for IAD (Integrated Access Device, i.e. integrated access equipment) Explanation.The equipment that IAD is to provide Internet data and voice communication access function, internal module figure are as shown in Figure 2.The IAD packet Include network module 210, led module 220, usb module 230, wireless mode 240, voice module 250 and dect module 260.Wherein, network module 210 is the network module of IAD;Led module 220 is the indicating lamp module of IAD;Usb module 230 It is the usb interface module of IAD;Wireless mode 240 is the wireless module of IAD;Voice module 250 is the voice mould of IAD Block;Dect module 260 is the cordless telephone module of IAD.Fig. 3 is the flow chart tested IAD, illustrates it to be clearer Working principle also shows the Booting sequence of IAD in figure.The test method the following steps are included:
S302, to IAD electrifying startup.
S304 sends OPTIONS request message to IAD with predetermined period.
Execution predetermined period is 2s.OPTIONS request message is for realizing logical between test device and detected IAD Letter.In the present embodiment, OPTIONS request message is defined as:
Test device continues to send OPTIONS request message to IAD with predetermined period.
S306 receives the 200OK response message that IAD is replied.
IAD after the power-up, starts network module 210, and ring after start completion to OPTIONS request message It answers.200OK response message is defined as follows:
Message line Message format Explanation
Response message mark row RESPONSE 200OK 200OK response message
It has been turned on and completes module Initialized:Module_1 ..., Module_N It has been turned on and completes module,
Module to be launched Uninitialized:Module_1 ..., Module_N Module to be launched
Network module 210 has been started up completion at this time, therefore the 200OK response message that the network equipment is replied is as follows:
RESPONSE 200OK
Initialized:network
Uninitialized:led,usb,wireless,voice,dect
Network module 210 can be confirmed according to the 200OK response message, thereby executing subsequent step.
S308, control IAD carry out production test to netwrok module.
S310 continues to send OPTIONS request message to IAD with predetermined period.
S312 receives the 200OK response message that IAD is replied.
Netwrok module 210 is carried out in production test procedure in control IAD, the led module 220 in IAD has started At.Therefore the content of the OPTIONS request message of IAD reply is as follows:
RESPONSE 200OK
Initialized:network,led
Uninitialized:usb,wireless,voice,dect
Therefore, 220 start completion of led module can be confirmed according to the message.
S314, control IAD carry out production test to led module.
S316 continues to send OPTIONS request message to IAD with predetermined period.
S318 receives the 200OK response message that IAD is replied.
Led module 220 is carried out in production test procedure in control IAD, 230 start completion of usb module in IAD.Therefore The content for the OPTIONS request message that IAD is replied is as follows:
RESPONSE 200OK
Initialized:network,led,usb
Uninitialized:wireless,voice,dect
Therefore, 230 start completion of usb module can be confirmed according to the response message.
S320, control IAD carry out production test to usb module.
S322 continues to send OPTIONS request message to IAD with predetermined period.
S324 receives the 200OK response message that IAD is replied.
Usb module 230 is carried out in production test procedure in control IAD, the wireless module 240 in IAD has started At.Therefore the content of the OPTIONS request message of IAD reply is as follows:
RESPONSE 200OK
Initialized:network,led,usb,wireless
Uninitialized:voice,dect
Therefore, 240 start completion of wireless module can be confirmed according to the message.
S326, control IAD carry out production test to wireless module.
S328 continues to send OPTIONS request message to IAD with predetermined period.
S330 receives the 200OK response message that IAD is replied.
Wireless module 240 is carried out in production test procedure in control IAD, the voice module 250 in IAD starts It completes.Therefore the content of the OPTIONS request message of IAD reply is as follows:
RESPONSE 200OK
Initialized:network,led,usb,wireless,voice
Uninitialized:dect
Therefore, 250 start completion of voice module can be confirmed according to the message.
S332, control IAD carry out production test to voice module.
S334 continues predetermined period to IAD and sends OPTIONS request message.
S336 receives the 200OK response message that IAD is replied.
Voice module 250 is carried out in production test procedure in control IAD, 260 start completion of dect module in IAD. Therefore the content of the OPTIONS request message of IAD reply is as follows:
RESPONSE 200OK
Initialized:network,led,usb,wireless,voice,dect
Uninitialized:
Therefore, 260 start completion of dect module can be confirmed according to the message.
S338, control IAD carry out production test to dect module.
S340 powers off IAD, stops sending OPTIONS request message to IAD.
In above-mentioned test process, test process is only just carried out after respective modules start completion, so as to effectively avoid The test crash problem as caused by module inactive completion, improves the reliability in testing efficiency and test process.
The present invention also provides a kind of network equipment detection devices, for realizing above-mentioned test method.The network equipment detection Device includes detecting devices 410 and controls equipment 420, as shown in Figure 4.Wherein, detecting devices 410 is for detection network module No start completion.Specifically, detecting devices 410 is used to send solicited message to the network equipment until receiving with prefixed time interval The response message replied to the network equipment, and network module start completion is confirmed when receiving the response message.Control is set Standby 420 connect with detecting devices 410, for controlling the network equipment after detecting devices 410 detects network module start completion Network module is tested.Detecting devices 410 be also used to successively detect each functional module whether start completion.Detecting devices The sequence that 410 pairs of each functional modules are detected is identical as the boot sequence of functional module each in the network equipment.Specifically, it detects Equipment 410 is used to send solicited message to the network equipment with prefixed time interval, and receives the response message of network equipment reply. Response message includes the functional module that initialization is completed and the functional module for not completing initialization.Detecting devices 410 is also used to According to the response message confirm functional module whether start completion.Control equipment 410 is also used to control the network equipment to having started At functional module tested.
Whether above-mentioned network equipment detection device, network module in first detection network equipment start completion and are starting The network module is tested at rear, so that it is guaranteed that network module will not influence subsequent test process, improves and tested Reliability in journey.Meanwhile before testing each functional module, can first detect the functional module whether start completion, from And the problem of only it is tested after the functional module start completion, avoids the occurrence of test crash, further improve survey Reliability and testing efficiency during examination.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (8)

1. a kind of network apparatus test method, the network equipment includes network module and multiple functional modules;It is characterized in that, The described method includes:
Detect the network module whether start completion;
The network module is tested after detecting the network module start completion;
Successively detect each functional module whether start completion;And
The functional module of start completion is tested;
It is described successively detect each functional module whether start completion the step of include:
Solicited message is sent to the network equipment with prefixed time interval;
Receive the response message that the network equipment is replied;It include the functional module letter that initialization is completed in the response message Breath and the functional module information for not completing initialization;
According to the response message confirm functional module whether start completion.
2. the method according to claim 1, wherein the detection network module whether the step of start completion Suddenly include:
Solicited message is sent until receiving the response that the network equipment is replied to the network equipment with prefixed time interval Information, and the network module start completion is confirmed when receiving the response message.
3. the method according to claim 1, wherein it is described successively detect each functional module whether start completion In step, the sequence detected to each functional module is identical as the boot sequence of each functional module in the network equipment.
4. the method according to claim 1, wherein it is described successively detect each functional module whether start completion In step, only has been turned on completion and just can after completing the test to the current functional module detecting current functional module According to preset order, to next functional module, whether start completion is detected.
5. a kind of network equipment detection device, the network equipment includes network module and multiple functional modules, which is characterized in that The network equipment detection device includes:
Detecting devices, for detect the network module whether start completion;
Equipment is controlled, is connect with the detecting devices, for detecting the network module start completion in the detecting devices After control the network equipment network module tested;
The detecting devices be also used to successively detect each functional module whether start completion;
The control equipment is also used to control the network equipment and tests the functional module of start completion;
The detecting devices is used to send solicited message to the network equipment with prefixed time interval, and receives the network and set The standby response message replied, the response message include the functional module that initialization is completed and the function mould for not completing initialization Block;The detecting devices be also used to according to the response message confirm functional module whether start completion.
6. network equipment detection device according to claim 5, which is characterized in that when the detecting devices is used for preset Between be spaced and send solicited message to the network equipment until receiving the response message that the network equipment is replied, and receiving The network module start completion is confirmed when to the response message.
7. network equipment detection device according to claim 5, which is characterized in that the detecting devices is to each functional module The sequence detected is identical as the boot sequence of each functional module in the network equipment.
8. network equipment detection device according to claim 5, which is characterized in that the detecting devices is only worked as detecting Preceding functional module has been turned on completion and complete just can be according to preset order to next after the test to the current functional module Whether start completion is detected functional module.
CN201610951226.9A 2016-10-26 2016-10-26 Network apparatus test method and device Active CN106533827B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610951226.9A CN106533827B (en) 2016-10-26 2016-10-26 Network apparatus test method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610951226.9A CN106533827B (en) 2016-10-26 2016-10-26 Network apparatus test method and device

Publications (2)

Publication Number Publication Date
CN106533827A CN106533827A (en) 2017-03-22
CN106533827B true CN106533827B (en) 2019-12-03

Family

ID=58326806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610951226.9A Active CN106533827B (en) 2016-10-26 2016-10-26 Network apparatus test method and device

Country Status (1)

Country Link
CN (1) CN106533827B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102238042A (en) * 2010-04-29 2011-11-09 鸿富锦精密工业(深圳)有限公司 Network equipment testing system and method
CN103631702A (en) * 2012-08-20 2014-03-12 腾讯科技(深圳)有限公司 Automatic random key test method and device
CN104850499A (en) * 2015-06-10 2015-08-19 北京华力创通科技股份有限公司 Automatic test method and device for base band software

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI497968B (en) * 2012-12-25 2015-08-21 Wistron Neweb Corp Network transmission inspection device and network transmission inspection method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102238042A (en) * 2010-04-29 2011-11-09 鸿富锦精密工业(深圳)有限公司 Network equipment testing system and method
CN103631702A (en) * 2012-08-20 2014-03-12 腾讯科技(深圳)有限公司 Automatic random key test method and device
CN104850499A (en) * 2015-06-10 2015-08-19 北京华力创通科技股份有限公司 Automatic test method and device for base band software

Also Published As

Publication number Publication date
CN106533827A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN113675636B (en) Electronic device and method for electronic device to identify connection terminal of external device
CN112020048B (en) Bluetooth device pairing method, device and storage medium
CN110035556B (en) Method and terminal for processing conflict of communication service process
CN108476247A (en) Media access control(MAC)Address identifies
CN106028264B (en) Electronic equipment Bluetooth pairing methods and system
CN112492442A (en) Connection switching method, device, equipment and storage medium of Bluetooth headset
CN111107528A (en) Bluetooth test method and test machine
CN106598358B (en) Proximity detection method and device and terminal
JP2017005304A5 (en)
CN105354118B (en) Automatic test approach, the apparatus and system of intelligent terminal
WO2020156428A1 (en) Information sending method, information detection method, terminal device and network device
WO2019062509A1 (en) Paging method, terminal and network side device
US20220022187A1 (en) Transmission method, terminal device, and network-side device
US20220225352A1 (en) System and method for physical downlink control channel monitoring
CN105549995B (en) A kind of audio frequency apparatus upgrade method and device
CN106533827B (en) Network apparatus test method and device
TW202215889A (en) Method and system for implementing beam failure recovery
US8391162B2 (en) Apparatus and method for testing SMNP cards
CN104850203A (en) Electronic apparatus reset method and electronic apparatus
CN105743879B (en) Smart television personal identification method and system
CN108538041A (en) Electronic equipment matching method and apply its electronic equipment
US11352997B2 (en) Remote starter adapter for use with a communication device
CN105243015B (en) Method and system for automatically testing software
TW202203611A (en) Network device and method for cross carrier scheduling
CN113691024A (en) Wireless charging method and wireless charging device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant