CN106447242B - Electricity consumption service handling time limit management method and device - Google Patents
Electricity consumption service handling time limit management method and device Download PDFInfo
- Publication number
- CN106447242B CN106447242B CN201611069630.XA CN201611069630A CN106447242B CN 106447242 B CN106447242 B CN 106447242B CN 201611069630 A CN201611069630 A CN 201611069630A CN 106447242 B CN106447242 B CN 106447242B
- Authority
- CN
- China
- Prior art keywords
- time limit
- task node
- electricity consumption
- task
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 150
- 238000007726 management method Methods 0.000 title claims abstract description 21
- 238000000034 method Methods 0.000 claims abstract description 32
- 238000012545 processing Methods 0.000 claims abstract description 29
- 230000005540 biological transmission Effects 0.000 claims description 19
- 238000012544 monitoring process Methods 0.000 claims description 16
- 238000004364 calculation method Methods 0.000 claims description 10
- 238000004891 communication Methods 0.000 claims description 10
- 238000012163 sequencing technique Methods 0.000 claims description 8
- 238000013461 design Methods 0.000 abstract description 3
- 230000007423 decrease Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 17
- 230000006870 function Effects 0.000 description 9
- 230000008569 process Effects 0.000 description 7
- 230000003993 interaction Effects 0.000 description 4
- 238000004590 computer program Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of electricity consumption service handling time limit management method and device, is related to electricity consumption service management technical field.The method is applied to the server communicated with user terminal and multiple service terminals.The described method includes: acquisition electricity consumption business handles plan;The Task Progress of service terminal periodicity sending corresponding to task node in reception processing;When the Task Progress is to complete, starting notice is sent to the service terminal of next task node;According to sending time of starting notice, general assignment time limit and completing the duration that next task node of the task node at least needs, the completion time limit of next task node of the task node is determined;And the completion time limit is sent to the service terminal for the next task node for handling the task node.By above-mentioned design, the completion time limit that can intelligently distribute links in electricity consumption business according to the actual situation decreases the generation of business handling time-out while saving accepts the business used time.
Description
Technical field
The present invention relates to electricity consumption service management technical fields, manage in particular to a kind of electricity consumption service handling time limit
Method and device.
Background technique
Existing electricity consumption business management system, it is not smart enough to the time limit distribution of each link in electricity consumption business, be usually
The time limit what a fixation links preset is monitored, rather than divides according to the actual situation the time limit of each link
Match.However, some link business are simple, short implementation cycle in an electricity consumption business, it is therefore desirable to time it is also few, usually can
It for a long time completes in advance.Some link business is complicated, and the implementation cycle is long, it is therefore desirable to time it is long, usually beyond complete the time limit or
Person needs to work extra shifts or extra hours and could complete within the time limit.The method of salary distribution of this machinery is easy to cause electricity consumption business overtime, directly
Affect electricity consumption business service time limit compliance rate.
Summary of the invention
In view of this, the present invention provides a kind of electricity consumption service handling time limit management method and device, to solve the above problems.
In order to achieve the above object, the embodiment of the present invention adopts the following technical scheme that
A kind of electricity consumption service handling time limit management method, applied to the service communicated with user terminal and multiple service terminals
Device, which comprises
Obtain electricity consumption business handles plan, general assignment time limit for handling plan including the electricity consumption business and described
Multiple tasks node included by electricity consumption business, each task node include completing duration, the place that the task node at least needs
Manage the mailing address of the service terminal of the task node and the default starting time of the task node and default completion time limit;
The Task Progress that service terminal corresponding to task node in reception processing is sent at interval of the first preset duration;
The Task Progress of task node in the processing is when completing, to the next task section for handling the task node
The service terminal of point sends starting notice;
It is true according to the practical used time of completed each task node and the default completion time limit of unfinished each task node
The estimated completion time limit of the fixed electricity consumption business, when default completion of each task node, are limited to the default starting of the task node
Time postpones backward completes the time of duration and a reserved duration that the task node at least needs;
Judge whether the estimated completion time limit is more than the general assignment time limit, is more than described in the estimated completion time limit
It prescribes a time limit when general assignment, the estimated completion time limit can be made to be less than the pre- of the general assignment time limit by calculating to judge whether there is
Stay duration;
It, will be described reserved when in the presence of the estimated reserved duration for completing the time limit less than the general assignment time limit can be made
Duration is adjusted to the reserved duration that the estimated completion time limit can be made to be less than the general assignment time limit, being not present
When making the estimated reserved duration for completing the time limit less than the general assignment time limit, the reserved duration is adjusted to default minimum
Value;
According to sending the time of the starting notice, complete the duration that next task node of the task node at least needs
And reserved duration adjusted determines the completion time limit of next task node of the task node;And
The completion time limit is sent to the service terminal for the next task node for handling the task node.
Preferably, described to handle the time sequencing pass that plan further includes each task node included by the electricity consumption business
After the step of being, the reserved duration be adjusted to predetermined minimum, the method also includes:
All adjustable task nodes in the unfinished task node of the electricity consumption business are found out, it is described adjustable
Other task nodes in task node and the electricity consumption business do not have time sequencing relationship;And
Starting notice is sent to the service terminal for handling each adjustable task node.
Preferably, service terminal corresponding to the task node in the reception processing is sent at interval of the first preset duration
Task Progress the step of after, the method also includes:
Judge whether the task node is completed according to the Task Progress;And
When the task node does not complete, the practical used time of the task node is monitored, and arrive in the practical used time
The second preset duration sends to service terminal corresponding to the task node and alarms before up to the completion time limit of the task node
Information.
Preferably, the method also includes:
Judge whether the estimated completion time limit is more than the general assignment time limit;And
It prescribes a time limit when being less than the general assignment in the estimated completion time limit, the transmission of Xiang Suoshu user terminal is described to use electric industry
The progress of business and it is expected that complete the time limit, it is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit, Xiang Suoshu user terminal
Send progress, estimated completion time limit and the overtime reason of the electricity consumption business.
Preferably, the method also includes:
The practical used time for monitoring each electricity consumption business records the number that the practical used time is more than the general assignment time limit;And
Alarm signal is issued when the number reaches preset quantity, and generates overtime statistical report form, the time-out statistics
Report includes the overtime reason of the task node of task node and the time-out overtime in the electricity consumption business of time-out.
Another embodiment of the present invention also provides a kind of electricity consumption service handling time limit managing device, be applied to user terminal and
The server of multiple service terminal communications, the electricity consumption service handling time limit managing device include:
Electricity consumption business acquiring unit, for obtaining the plan of handling of electricity consumption business, described handle plans to include the electricity consumption
Multiple tasks node included by the general assignment time limit of business and the electricity consumption business, each task node include completing the task
Duration that node at least needs, handle the task node service terminal mailing address and the task node default starting
Time and default completion time limit;
Task Progress receiving unit, it is pre- at interval of first for service terminal corresponding to the task node in reception processing
If the Task Progress that duration is sent;
Starting notice transmission unit, the Task Progress for the task node in the processing are when completing, to processing
The service terminal of next task node of the task node sends starting notice;
It is expected that complete calculation of time unit, for according to practical used time of completed each task node with it is unfinished each
The default completion time limit of task node determines the estimated completion time limit of the electricity consumption business, when the default completion of each task node
The default starting time for being limited to the task node postpone backward complete duration that the task node at least needs and one it is reserved when
The long time;
Reserved duration solves unit, for judging whether the estimated completion time limit is more than the general assignment time limit described
It prescribes a time limit when it is expected that completing the time limit more than the general assignment, the estimated completion time limit can be made small by calculating to judge whether there is
In the reserved duration in the general assignment time limit;
Reserved duration adjustment unit, for that the estimated completion time limit can be made to be less than the general assignment time limit in presence
When reserved duration, the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the general assignment time limit
Reserved duration will be described when there is no that can make the estimated reserved duration for completing the time limit less than the general assignment time limit
Reserved duration is adjusted to predetermined minimum;
Time limit determination unit is completed, the time, the general assignment time limit, completion for notifying according to the transmission starting should
Duration and reserved duration adjusted that next task node of task node at least needs determine next of the task node
The completion time limit of business node;And
Time limit transmission unit, for sending the completion to the service terminal for the next task node for handling the task node
Time limit.
Preferably, the electricity consumption service handling time limit managing device further include:
Adjustable node searching unit, it is all adjustable in the unfinished task node of the electricity consumption business for finding out
Task node, other task nodes in the adjustable task node and the electricity consumption business do not have time sequencing pass
System;And
Adjustable node start unit is logical for sending starting to the service terminal for handling each adjustable task node
Know.
Preferably, the electricity consumption service handling time limit managing device further include:
Task node progress judging unit, for judging whether the task node is completed;And
Alarm unit, for monitoring the practical used time of the task node, and in institute when the task node does not complete
The second preset duration was stated before the completion time limit that the practical used time reaches the task node to business corresponding to the task node
Terminal sends warning message.
Preferably, the electricity consumption service handling time limit managing device further include:
Overtime judging unit, for judging whether the estimated completion time limit is more than the general assignment time limit;And
User's notification unit, for prescribing a time limit when being less than the general assignment in the estimated completion time limit, Xiang Suoshu user
Terminal sends the progress of the electricity consumption business and it is expected that the time limit is completed, in the estimated completion time limit more than the general assignment time limit
When, Xiang Suoshu user terminal sends progress, estimated completion time limit and the overtime reason of the electricity consumption business.
Preferably, the electricity consumption service handling time limit managing device further include:
Electricity consumption business used time monitoring unit records the practical used time for monitoring the practical used time of each electricity consumption business
More than the number in general assignment time limit;And
General assignment time limit adjustment unit for issuing alarm signal when the number reaches preset quantity, and generates super
When statistical report form, the time-out statistical report form includes the task of overtime task node and the time-out in the electricity consumption business of time-out
The overtime reason of node.
Electricity consumption service handling time limit management method provided by the invention and device are according to a task section upper in electricity consumption business
The deadline of point determines the starting time of next task node, according to the starting time of each task node, completes this
Duration and reserved duration that business node at least needs determine the completion time limit of the task node, to realize to each in electricity consumption business
Task node completes the smart allocation in time limit, and achieve the effect that raising electricity consumption business handles time limit and monitoring efficiency, Jin Erti
High electricity consumption business service time limit compliance rate.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the interaction schematic diagram of server provided in an embodiment of the present invention, user terminal and multiple service terminals.
Fig. 2 is a kind of block diagram of server provided in an embodiment of the present invention.
Fig. 3 is a kind of a kind of flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 4 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 5 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 6 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 7 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 8 is a kind of a kind of functional module frame of electricity consumption service handling time limit managing device provided in an embodiment of the present invention
Figure.
Fig. 9 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Figure 10 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Figure 11 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Figure 12 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Icon: 100- server;110- electricity consumption service handling time limit managing device;111- electricity consumption business acquiring unit;
112- Task Progress receiving unit;113- starting notice transmission unit;114- is estimated to complete calculation of time unit;When 115- is reserved
It is long to solve unit;116- reserves duration adjustment unit;117- completes time limit determination unit;118- time limit transmission unit;119- can
Deploy node searching unit;The adjustable node start unit of 1020-;1021- task node progress judging unit;1022- alarm
Unit;1023- time-out judging unit;1024- user's notification unit;1025- electricity consumption business time-out monitoring unit;1026- report
Generation unit;120- memory;130- processor;140- communication unit;200- user terminal;300- service terminal;400- net
Network.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed
The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common
Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects
It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
As shown in Figure 1, being the server 100 and user terminal 200 and multiple business end that present pre-ferred embodiments provide
The interaction schematic diagram at end 300.The server 100 can pass through network 400 and user terminal 200 and multiple service terminals 300
It is communicated, to realize data communication or interaction.
In the present embodiment, the server 100 be may be, but not limited to, web (website) server, ftp (file
Transfer protocol, File Transfer Protocol) server etc..The user terminal 200 and service terminal 300 can be, but
It is not limited to, smart phone, PC (personal computer, PC), tablet computer, personal digital assistant (personal
Digital assistant, PDA), mobile internet surfing equipment (mobile Internet device, MID) etc..The user is whole
End 200 can be the terminal device for handling user of electricity consumption business.In the present embodiment, each electricity consumption business includes multiple tasks section
Point, the service terminal 300 is for handling the task node.That is, a service terminal 300 is for handling a task section
Point.
The network 400 may be, but not limited to, cable network or wireless network.
As shown in Fig. 2, being the block diagram of server 100 shown in FIG. 1.The server 100 includes electricity consumption business
Accept time limit managing device 110, memory 120, processor 130 and communication unit 140.
The memory 120, processor 130 and each element of communication unit 140 directly or indirectly electrically connect between each other
It connects, to realize the transmission or interaction of data.For example, these elements pass through one or more communication bus or signal between each other
Line, which is realized, to be electrically connected.The electricity consumption service handling time limit managing device 110 includes at least one can be with software or firmware
(firmware) form is stored in the memory 120 or is solidificated in the operating system of the server 100
Software function module in (operating system, OS).
The processor 130 be used for handle stored in the memory 120 can processing module, for example, described use electric industry
Business accepts software function module included by time limit managing device 110 and computer program.
Wherein, the memory 120 may be, but not limited to, random access memory (Random Access
Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable
Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only
Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only
Memory, EEPROM) etc..Wherein, memory 120 is for storing program, the processor 130 after receiving process instruction,
Handle described program.The communication unit 140 is used to establish the server 100 and user terminal 200 by the network 400
And the communication connection between multiple service terminals 300, and pass through 400 sending and receiving data of network.
It should be appreciated that structure shown in Fig. 2 is only to illustrate, server 100 can also include it is more than shown in Fig. 2 or
Less component, or with the configuration different from shown in Fig. 2.Each component shown in Fig. 2 can use hardware, software or its group
It closes and realizes.
As shown in figure 3, being a kind of process signal of electricity consumption service handling time limit management method provided in an embodiment of the present invention
Figure, this method are applied to server 100 shown in Fig. 1.Detailed process shown in Fig. 3 and step will be carried out below detailed
It illustrates.
Step S110: obtain electricity consumption business handles plan.
Wherein, it is described handle plan include the electricity consumption business the general assignment time limit and the electricity consumption business included by it is more
A task node.Each task node includes completing duration that the task node at least needs, handling the business of the task node
The mailing address of terminal 300 and the default starting time of the task node and default completion time limit.
In the present embodiment, in multiple tasks node included by the electricity consumption business, the default completion of previous task node
Time limit is before the default starting time of latter task node namely described to handle plan further include included by the electricity consumption business
Multiple tasks node processing sequence.Optionally, according to actual needs, there may be parts in the multiple task node can
That is, there is the task node that part may not necessarily be handled according to preset processing sequence in the task node of allotment.Also, it is described to do
Record has whether each task node is adjustable task node to reason in the works.It is limited to when the default completion of each task node
The default starting time of the task node postpones backward complete the duration and a reserved duration that the task node at least needs after
Time.
The server 100 can be before the starting of all task nodes of the electricity consumption business, to each task section of processing
The service terminal 300 of point sends request notice, the request notice include the content of each task node, the default starting time and
It is default to complete the time limit, so that corresponding staff is able to carry out preparation.
When implementing, the starting time of first task node is to handle the service terminal 300 of the first task node to connect
The default starting time received, when completion of first task node, are limited to handle the service terminal 300 of the first task node
The default completion time limit received.
Step S120: service terminal 300 corresponding to the task node in reception processing is sent out at interval of the first preset duration
The Task Progress sent.
In the present embodiment, after electricity consumption business starts to accept, the service terminal 300 of present is default at interval of first
Duration can send the Task Progress of the task node oneself handled to the server 100.The server 100 receives institute
Task Progress is stated, and checks whether the Task Progress is completion.The first pre- duration can for 1 minute, 10 minutes or
Half an hour, the present embodiment are without limitation.
Step S130: the Task Progress of the task node in the processing is when completing, to handling the task node
The service terminal 300 of next task node sends starting notice.
In the present embodiment, after the completion of server 100 detects the task node being presently processing, immediately described in starting
The next task node for the task node being presently processing, and started in a manner of sending starting notice to service terminal 300
Task node starting.That is, the starting time of next task node of the task node being presently processing is service
Device 100 sends the time of starting notice.
Step S140: according to having preset for the practical used time of completed each task node and unfinished each task node
At the estimated completion time limit of electricity consumption business described in calculation of time.
Wherein, the default starting time that the task node is limited to when the default completion of each task node has postponed backward
The time of the reserved duration of duration and one at least needed at the task node.The estimated completion time limit is equal to completed each
The sum of the practical used time of task node and the unfinished default completion time limit of each task node.
Step S150: judge whether the estimated completion time limit is more than the general assignment time limit, in the estimated completion
It limits and prescribes a time limit when being more than the general assignment, solving judgement presence by calculating can make the estimated completion time limit be less than described total
The reserved duration in business time limit.If it exists, S160 is thened follow the steps, it is no to then follow the steps S170.
Step S160: the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the general assignment
The reserved duration in time limit.
Step S170: the reserved duration is adjusted to predetermined minimum.
Step S180: according to the time of the transmission starting notice, next task node of the task node is completed at least
The duration and reserved duration adjusted that need determine the completion time limit of next task node of the task node.
In the present embodiment, the time for sending the starting notice is regarded as the starting of next task node by server 100
Time, and the completion time limit of next task node is determined as the starting time and postpones backward and completes next task
Time after duration and reserved duration adjusted that node at least needs.
Step S190: the completion time limit is sent to the next task node for handling the task node.
After the completion time limit for determining next task node, server 100, which is informed, handles next task street shop
Service terminal 300 so that the service terminal 300 is according to the completion time limit transacting business.
Optionally, as shown in figure 4, completing the time limit more than the general assignment time limit when estimated, and there is no can make pre- count
When being less than the reserved duration in general assignment time limit at the time limit, after the step S170, the method can also include step S210
With step S220.
Step S210: all adjustable task nodes in the unfinished task node of the electricity consumption business are found out.
Wherein, other task nodes in the adjustable task node and the electricity consumption business do not have time sequencing pass
System.
Step S220: starting notice is sent to the service terminal 300 for handling each adjustable task node.
It by above-mentioned design, can be by task node and other task nodes adjustable in unfinished task node simultaneously
Row processing, to save the processing time.
Optionally, as shown in figure 5, after step S120, the method can also include step S310 and step S320.
Step S310: judge whether the task node is completed according to the Task Progress.
Step S320: when the task node does not complete, the practical used time of the task node is monitored, and in the reality
The second preset duration is to service terminal corresponding to the task node before the completion time limit that the border used time reaches the task node
300 send warning message.Second preset duration can be, but be not limited to, 24 hours.
By above-mentioned design, corresponding responsible person can be allowed to be adjusted processing progress, so that the task node can be
It completes to complete in the time limit.
Optionally, as shown in fig. 6, the method can also include step S410, step S420 and step S430.
Step S410: judge whether the estimated completion time limit is more than the general assignment time limit.If so, executing step
S420, it is no to then follow the steps S430.
S420: Xiang Suoshu user terminal 200 of step sends progress, estimated completion time limit and the time-out of the electricity consumption business
Reason.
S430: Xiang Suoshu user terminal 200 of step sends the progress of the electricity consumption business and it is expected that completes the time limit.
Optionally, as shown in fig. 7, the method can also include step S510 and step S520.
Step S510: monitoring the practical used time of each electricity consumption business, records the practical used time more than the general assignment time limit
Number.
Step S520: issuing alarm signal when the number reaches preset quantity, and generates overtime statistical report form.
Wherein, the overtime statistical report form includes appointing for task node and the time-out overtime in the electricity consumption business of time-out
The overtime reason of business node.Electricity consumption business processing personnel can be according to the overtime statistical report form to the treatment process of electricity consumption business
Make improvement or adjustment general assignment time limit.
Optionally, the server 100 can also receive the progress prompting message that the user terminal 200 is sent, and connect
The progress of electricity consumption business corresponding with the progress prompting message is inquired after receiving the progress prompting message, and electric industry is used according to this
Service terminal 300 corresponding to task node of the progress of business to present sends warning message.
Referring to Fig. 8, being a kind of electricity consumption service handling time limit managing device 110 provided in an embodiment of the present invention, it is applied to
The server 100.The electricity consumption service handling time limit managing device 110 includes electricity consumption business acquiring unit 111, Task Progress
Receiving unit 112, starting notice transmission unit 113, it is estimated complete calculation of time unit 114, reserved duration solves unit 115,
Reserved duration adjustment unit 116 completes time limit determination unit 117 and time limit transmission unit 118.
Wherein, what the electricity consumption business acquiring unit 111 was used to obtain electricity consumption business handles plan.It is described to handle plan packet
Include the electricity consumption business the general assignment time limit and the electricity consumption business included by multiple tasks node, each task node includes
Complete the duration that the task node at least needs, the mailing address and the task of the service terminal 300 for handling the task node
The default starting time of node and default completion time limit.
The description as described in the electricity consumption business acquiring unit 111 specifically refers to the description to the step S110 in Fig. 3.
That is, step S110 can be executed by electricity consumption business acquiring unit 111.
The Task Progress receiving unit 112 is every for service terminal 300 corresponding to the task node in reception processing
It is spaced the Task Progress of the first preset duration transmission.The description as described in the Task Progress receiving unit 112 specifically refers to pair
The detailed description of step S120 in Fig. 3.That is, step S120 can be executed by the Task Progress receiving unit 112.
When Task Progress of the starting notice transmission unit 113 for the task node in the processing is completion,
Starting notice is sent to the service terminal 300 for the next task node for handling the task node.It notifies to send about the starting
The description of unit 113 specifically refers to the detailed description to the step S130 in Fig. 3, that is, step S130 can be opened by described
It is dynamic that transmission unit 113 is notified to execute.
It is described it is estimated complete calculation of time unit 114, for according to practical used time of completed each task node with not
The default completion time limit for each task node completed determines estimated completion time limit of the electricity consumption business, each task node it is pre-
The default starting time that the task node is limited to when if completing postpone backward complete duration that the task node at least needs and
The time of one reserved duration.
The description as described in the estimated completion calculation of time unit 114 is specifically referred to the detailed of the step S140 in Fig. 3
Thin description.That is, step S140 can be executed by the estimated calculation of time unit 114 of completing.
Whether it is more than the general assignment time limit that the reserved duration solves unit 115 for judging the estimated completion time limit
It is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit, solved by calculating with the presence or absence of described estimated complete can be made
Time limit is less than the reserved duration in the general assignment time limit.
The description as described in reserved duration solves unit 115 specifically refers to the detailed description to the step S150 in Fig. 3.
That is, step S150 can solve unit 115 by reserved duration to execute.
The reserved duration adjustment unit 116 is used to the estimated completion time limit can be made to be less than the general assignment in presence
When the reserved duration in time limit, the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the general assignment
The reserved duration in time limit, when there is no the estimated reserved duration for completing the time limit less than the general assignment time limit can be made,
The reserved duration is adjusted to predetermined minimum.
The description as described in the reserved duration adjustment unit 116 is specifically referred to the step S160 and step in Fig. 3
The detailed description of S170.That is, step S160 and step S170 can be executed by reserved duration adjustment unit 116.
It is described complete time limit determination unit 117 be used for according to send it is described starting notice time, the general assignment time limit,
It completes duration that next task node of the task node at least needs and reserved duration adjusted determines the task node
The completion time limit of next task node.The description as described in completing time limit determination unit 117 is specifically referred to the step in Fig. 3
The detailed description of S180, that is, step S180 can be executed by completing time limit determination unit 117.
The time limit transmission unit 118 is used to send out to the service terminal 300 for the next task node for handling the task node
Send the completion time limit.The description as described in the time limit transmission unit 118 is specifically referred to the detailed of the step S190 in Fig. 3
Description, that is, step S190 can be executed by the time limit transmission unit 118.
Referring to Fig. 9, optionally, the electricity consumption service handling time limit managing device 110 can also include adjustable node
Searching unit 119 and adjustable node start unit 1020.
The adjustable node searching unit 119 is used to find out to be owned in the unfinished task node of the electricity consumption business
Adjustable task node.Wherein, the adjustable task node does not have with other task nodes in the electricity consumption business
Time sequencing relationship.The description as described in the adjustable node searching unit 119 is specifically referred to the step S210 in Fig. 4
Detailed description, that is, step S210 can be executed by adjustable node searching unit 119.
The adjustable node start unit 1020, for the service terminal to each adjustable task node of processing
300 send starting notice.The description as described in the adjustable node start unit 1020 specifically refers to the step S220 in 4
Detailed description, that is, step S220 can be executed by adjustable node start unit 1020.
Referring to Fig. 10, optionally, the electricity consumption service handling time limit managing device 110 can also include task node into
Spend judging unit 1021 and alarm unit 1022.
The task node progress judging unit 1021 is for judging whether the task node is completed.About the task
The description of node progress judging unit 1021 specifically refers to detailed description namely step to step S310 shown in Fig. 5
S310 can be executed by task node progress judging unit 1021.
The alarm unit 1022 is used to monitor the practical use of the task node when the task node does not complete
When, and the second preset duration is right to the task node institute before the completion time limit that the practical used time reaches the task node
The service terminal 300 answered sends warning message.The description as described in alarm unit 1022 is specifically referred to step shown in fig. 5
The detailed description of S320, that is, step S320 can be executed by the alarm unit 1022.
Figure 11 is please referred to, optionally, the electricity consumption service handling time limit managing device 110 can also include that time-out judgement is single
Member 1023 and user's notification unit 1024.
Whether the time-out judging unit 1023 is more than the general assignment time limit for judging the estimated completion time limit.It closes
Detailed description namely step to the step S410 in Fig. 6 are specifically referred in the description of the overtime judging unit 1023
S410 can be executed by the overtime judging unit 1023.
User's notification unit 1024 is used to prescribe a time limit when being less than the general assignment in the estimated completion time limit, to institute
User terminal 200 is stated to send the progress of the electricity consumption business and it is expected that the time limit is completed, in the estimated completion time limit more than described
It prescribes a time limit when general assignment, progress, estimated completion time limit and the time-out that Xiang Suoshu user terminal 200 sends the electricity consumption business are former
Cause.
The description as described in user's notification unit 1024 is specifically referred to the step S420 and step S430 in Fig. 6
Detailed description, that is, step S420 and step S430 can be notified by the user if only to execute.
Figure 12 is please referred to, optionally, the electricity consumption service handling time limit managing device 110 can also include that electricity consumption business is super
When monitoring unit 1025 and report generation unit 1026.
The electricity consumption business monitoring unit is used to monitor the practical used time of each electricity consumption business, and it is super to record the practical used time
Cross the number in general assignment time limit.The description as described in the electricity consumption business monitoring unit is specifically referred to step shown in fig. 7
The detailed description of S510, that is, step S510 can be executed by the electricity consumption business monitoring unit.
The report generation unit 1026 generates super for issuing alarm signal when the number reaches preset quantity
When statistical report form.Wherein, the overtime statistical report form includes task node and the time-out overtime in the electricity consumption business of time-out
Task node overtime reason.The description as described in the report generation unit 1026 is specifically referred to step shown in fig. 7
The detailed description of rapid S520, that is, step S520 can be executed by the report generation unit 1026.
In conclusion electricity consumption service handling time limit management method provided by the invention and device are according in electricity consumption business upper one
The deadline of a task node determines the starting time of next task node, according to the starting time of each task node,
It completes duration that the task node at least needs and reserved duration determines the completion time limit of the task node, to realize to electricity consumption
Each task node completes the smart allocation in time limit in business, reaches the effect for handling time limit and monitoring efficiency for improving electricity consumption business
Fruit, and then improve electricity consumption business service time limit compliance rate.
In several embodiments provided by the embodiment of the present invention, it should be understood that disclosed device and method, it can also
To realize by another way.Device and method embodiment described above is only schematical, for example, in attached drawing
Flow chart and block diagram show that the devices of multiple embodiments according to the present invention, method and computer program product are able to achieve
Architecture, function and operation.In this regard, each box in flowchart or block diagram can represent module, a program
A part of section or code, a part of the module, section or code include that one or more is patrolled for realizing defined
Collect the executable instruction of function.It should also be noted that in some implementations as replacement, function marked in the box
It can occur in a different order than that indicated in the drawings.For example, two continuous boxes can actually be held substantially in parallel
Row, they can also be executed in the opposite order sometimes, and this depends on the function involved.It is also noted that block diagram and/or
The combination of each box in flow chart and the box in block diagram and or flow chart, can the function as defined in executing or dynamic
The dedicated hardware based device made is realized, or can be realized using a combination of dedicated hardware and computer instructions.
In addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation together
Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module
It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words
The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a
People's computer, electronic equipment or network equipment etc.) execute all or part of step of each embodiment the method for the present invention
Suddenly.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), deposits at random
The various media that can store program code such as access to memory (RAM, Random Access Memory), magnetic or disk.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to the packet of nonexcludability
Contain, so that the process, method, article or equipment for including a series of elements not only includes those elements, but also including
Other elements that are not explicitly listed, or further include for elements inherent to such a process, method, article, or device.
In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including the element
Process, method, article or equipment in there is also other identical elements.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of electricity consumption service handling time limit management method, which is characterized in that be applied to and user terminal and multiple service terminals
The server of communication, which comprises
The plan of handling of electricity consumption business is obtained, it is described to handle the general assignment time limit and the electricity consumption that plan includes the electricity consumption business
Multiple tasks node included by business, each task node include complete the task node at least need duration, processing should
The mailing address of the service terminal of task node and the default starting time of the task node and default completion time limit;
The Task Progress that service terminal corresponding to task node in reception processing is sent at interval of the first preset duration;
The Task Progress of task node in the processing is when completing, to the next task node for handling the task node
Service terminal sends starting notice;
According to the default completion calculation of time institute of the practical used time of completed each task node and unfinished each task node
State the estimated completion time limit of electricity consumption business, when default completion of each task node is limited to the default starting time of the task node
It postpones backward and completes the time of duration and a reserved duration that the task node at least needs;
Judge whether the estimated completion time limit is more than the general assignment time limit, is more than described total in the estimated completion time limit
Prescribe a time limit when business, by calculate judge whether there is can make it is described it is estimated complete the time limit be less than the general assignment time limit it is reserved when
It is long;
When in the presence of the estimated reserved duration for completing the time limit less than the general assignment time limit can be made, by the reserved duration
It is adjusted to the reserved duration that the estimated completion time limit can be made to be less than the general assignment time limit, institute can be made being not present
When stating the estimated reserved duration for completing the time limit less than the general assignment time limit, the reserved duration is adjusted to predetermined minimum;
According to the time of the transmission starting notice, complete duration and tune that next task node of the task node at least needs
Reserved duration after whole determines the completion time limit of next task node of the task node;And
The completion time limit is sent to the service terminal for the next task node for handling the task node.
2. electricity consumption service handling time limit management method according to claim 1, which is characterized in that described handle plans also to wrap
The reserved duration is adjusted to predetermined minimum by the time sequencing relationship for including each task node included by the electricity consumption business
The step of after, the method also includes:
Find out all adjustable task nodes in the unfinished task node of the electricity consumption business, the adjustable task
Other task nodes in node and the electricity consumption business do not have time sequencing relationship;And
Starting notice is sent to the service terminal for handling each adjustable task node.
3. electricity consumption service handling time limit management method according to claim 1, which is characterized in that in the reception processing
After the step of Task Progress that service terminal corresponding to task node is sent at interval of the first preset duration, the method is also
Include:
Judge whether the task node is completed according to the Task Progress;And
When the task node does not complete, the practical used time of the task node is monitored, and reach institute in the practical used time
The second preset duration sends warning message to service terminal corresponding to the task node before the completion time limit for stating task node,
Second preset duration is 24 hours.
4. electricity consumption service handling time limit management method according to claim 1, which is characterized in that the method also includes:
Judge whether the estimated completion time limit is more than the general assignment time limit;And
It prescribes a time limit when being less than the general assignment in the estimated completion time limit, Xiang Suoshu user terminal sends the electricity consumption business
Progress and it is expected that complete the time limit, it is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit, Xiang Suoshu user terminal is sent
The progress of the electricity consumption business, estimated completion time limit and overtime reason.
5. electricity consumption service handling time limit management method according to claim 1, which is characterized in that the method also includes:
The practical used time for monitoring each electricity consumption business records the number that the practical used time is more than the general assignment time limit;And
Alarm signal is issued when the number reaches preset quantity, and generates overtime statistical report form, the time-out statistical report form
The overtime reason of the task node of overtime task node and the time-out in electricity consumption business including time-out.
6. a kind of electricity consumption service handling time limit managing device, which is characterized in that be applied to and user terminal and multiple service terminals
The server of communication, the electricity consumption service handling time limit managing device include:
Electricity consumption business acquiring unit, for obtaining the plan of handling of electricity consumption business, described handle plans to include the electricity consumption business
The general assignment time limit and the electricity consumption business included by multiple tasks node, each task node include complete the task node
The duration that at least needs, handle the task node service terminal mailing address and the task node the default starting time
With the default completion time limit;
Task Progress receiving unit, for reception processing in task node corresponding to service terminal at interval of first it is default when
The long Task Progress sent;
Starting notice transmission unit, for the task node in the processing Task Progress be complete when, to handle this
The service terminal of next task node of business node sends starting notice;
It is expected that calculation of time unit is completed, for according to practical used time of completed each task node and unfinished each task
The default completion time limit of node determines the estimated completion time limit of the electricity consumption business, and when default completion of each task node is limited to
The default starting time of the task node postpones backward completes duration that the task node at least needs and a reserved duration
Time;
Reserved duration solves unit, for judging whether the estimated completion time limit is more than the general assignment time limit, described pre-
It prescribes a time limit when counting into the time limit more than the general assignment, the estimated completion time limit can be made to be less than by calculating to judge whether there is
The reserved duration in the general assignment time limit;
Reserved duration adjustment unit, for that the estimated completion time limit can be made to be less than the reserved of the general assignment time limit in presence
When duration, the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the reserved of the general assignment time limit
Duration will be described reserved when there is no that can make the estimated reserved duration for completing the time limit less than the general assignment time limit
Duration is adjusted to predetermined minimum;
Complete time limit determination unit, for according to send it is described starting notice time, the general assignment time limit, complete the task
Duration and reserved duration adjusted that next task node of node at least needs determine next task section of the task node
The completion time limit of point;And
Time limit transmission unit, when for sending the completion to the service terminal for the next task node for handling the task node
Limit.
7. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption service handling
Time limit managing device includes:
Adjustable node searching unit, for finding out all adjustable in the unfinished task node of the electricity consumption business appoint
Business node, the adjustable task node do not have time sequencing relationship with other task nodes in the electricity consumption business;With
And
Adjustable node start unit, for sending starting notice to the service terminal for handling each adjustable task node.
8. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption service handling
Time limit managing device further include:
Task node progress judging unit, for judging whether the task node is completed;And
Alarm unit, for monitoring the practical used time of the task node, and in the reality when the task node does not complete
The second preset duration is to service terminal corresponding to the task node before the completion time limit that the border used time reaches the task node
Warning message is sent, second preset duration is 24 hours.
9. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption service handling
Time limit managing device further include:
Overtime judging unit, for judging whether the estimated completion time limit is more than the general assignment time limit;And
User's notification unit, for prescribing a time limit when being less than the general assignment in the estimated completion time limit, Xiang Suoshu user terminal
Send the progress of the electricity consumption business and it is expected that complete the time limit, it is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit,
Progress, estimated completion time limit and the overtime reason of the electricity consumption business are sent to the user terminal.
10. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption business by
Manage time limit managing device further include:
Electricity consumption business time-out monitoring unit, for monitoring the practical used time of each electricity consumption business, recording the practical used time is more than
The number in general assignment time limit;And
Report generation unit for issuing alarm signal when the number reaches preset quantity, and generates overtime statistical report form,
The time-out statistical report form includes the time-out of the task node of task node and the time-out overtime in the electricity consumption business of time-out
Reason.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611069630.XA CN106447242B (en) | 2016-11-28 | 2016-11-28 | Electricity consumption service handling time limit management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611069630.XA CN106447242B (en) | 2016-11-28 | 2016-11-28 | Electricity consumption service handling time limit management method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106447242A CN106447242A (en) | 2017-02-22 |
CN106447242B true CN106447242B (en) | 2019-11-12 |
Family
ID=58219507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611069630.XA Active CN106447242B (en) | 2016-11-28 | 2016-11-28 | Electricity consumption service handling time limit management method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106447242B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109784831A (en) * | 2018-12-12 | 2019-05-21 | 福建亿榕信息技术有限公司 | The pending sharing method of task, storage medium and equipment |
CN109995787A (en) * | 2019-04-10 | 2019-07-09 | 北京奇艺世纪科技有限公司 | A kind of data processing method and relevant device |
CN111178665A (en) * | 2019-11-19 | 2020-05-19 | 腾讯科技(深圳)有限公司 | Data analysis method, device and equipment |
CN113762906A (en) * | 2020-08-12 | 2021-12-07 | 北京沃东天骏信息技术有限公司 | Method, device and equipment for alarming task period delay and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103488691A (en) * | 2013-09-02 | 2014-01-01 | 用友软件股份有限公司 | Task scheduling device and task scheduling method |
CN103617472A (en) * | 2013-07-09 | 2014-03-05 | 成都希盟泰克科技发展有限公司 | Resource balancing self-adaption scheduling method of multi-project and multi-task management |
CN105824639A (en) * | 2016-03-17 | 2016-08-03 | 百度在线网络技术(北京)有限公司 | Progress estimating method and progress estimating device |
-
2016
- 2016-11-28 CN CN201611069630.XA patent/CN106447242B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103617472A (en) * | 2013-07-09 | 2014-03-05 | 成都希盟泰克科技发展有限公司 | Resource balancing self-adaption scheduling method of multi-project and multi-task management |
CN103488691A (en) * | 2013-09-02 | 2014-01-01 | 用友软件股份有限公司 | Task scheduling device and task scheduling method |
CN105824639A (en) * | 2016-03-17 | 2016-08-03 | 百度在线网络技术(北京)有限公司 | Progress estimating method and progress estimating device |
Also Published As
Publication number | Publication date |
---|---|
CN106447242A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106447242B (en) | Electricity consumption service handling time limit management method and device | |
CN107169744B (en) | Time limit monitoring method and system for electronic work order | |
CN106357811B (en) | A kind of delet method of Backup Data, apparatus and system | |
CN107509178A (en) | Express delivery information sharing Notification Method and device | |
CN108874640A (en) | A kind of appraisal procedure and device of clustering performance | |
CN105912703A (en) | Data storage method and data query method and device | |
CN104346571B (en) | Security breaches management method, system and equipment | |
CN107995377A (en) | Customer service management method, electronic device and computer-readable recording medium | |
WO2018223672A1 (en) | Data processing method and device | |
CN108880943A (en) | A kind of monitoring system of isomery cloud platform | |
CN110399533A (en) | Funds flow querying method and device | |
CN108460601A (en) | Client's list acquisition methods, device, terminal device and storage medium | |
CN109636304B (en) | Business system publishing method and device, storage medium and electronic device | |
KR101994454B1 (en) | Method for task distribution and asssessment | |
CN107092641A (en) | Determination methods and device, the method and apparatus of shop search of shop business status | |
CN110446273A (en) | A kind of method and apparatus based on electronics price tag networking | |
CN103326951A (en) | Bandwidth control method and device for electric power communication network | |
CN108459944A (en) | System operation monitoring method, device and server | |
CN109325702A (en) | Method for scheduling task and device | |
CN109582531A (en) | Monitoring method, device and the electronic equipment of power distribution unit | |
CN107276859B (en) | Keep the method and device of long connection | |
CN110909129B (en) | Abnormal complaint event identification method and device | |
CN105847169B (en) | A kind of method and device for flow control | |
CN104883705B (en) | A kind of the problem of data service is complained localization method and device | |
CN113360321B (en) | Micro-service retry calling method and device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Shao Chen Inventor after: Cheng Zhaoliang Inventor after: Wang Baoru Inventor after: Li Yuan Inventor after: Fan Xianshen Inventor after: Wang Sizheng Inventor after: Zhang Guangyao Inventor before: Shao Chen |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |