CN106447242B - Electricity consumption service handling time limit management method and device - Google Patents

Electricity consumption service handling time limit management method and device Download PDF

Info

Publication number
CN106447242B
CN106447242B CN201611069630.XA CN201611069630A CN106447242B CN 106447242 B CN106447242 B CN 106447242B CN 201611069630 A CN201611069630 A CN 201611069630A CN 106447242 B CN106447242 B CN 106447242B
Authority
CN
China
Prior art keywords
time limit
task node
electricity consumption
task
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611069630.XA
Other languages
Chinese (zh)
Other versions
CN106447242A (en
Inventor
邵晨
程兆亮
王宝如
李媛
范先慎
王思征
张光耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611069630.XA priority Critical patent/CN106447242B/en
Publication of CN106447242A publication Critical patent/CN106447242A/en
Application granted granted Critical
Publication of CN106447242B publication Critical patent/CN106447242B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of electricity consumption service handling time limit management method and device, is related to electricity consumption service management technical field.The method is applied to the server communicated with user terminal and multiple service terminals.The described method includes: acquisition electricity consumption business handles plan;The Task Progress of service terminal periodicity sending corresponding to task node in reception processing;When the Task Progress is to complete, starting notice is sent to the service terminal of next task node;According to sending time of starting notice, general assignment time limit and completing the duration that next task node of the task node at least needs, the completion time limit of next task node of the task node is determined;And the completion time limit is sent to the service terminal for the next task node for handling the task node.By above-mentioned design, the completion time limit that can intelligently distribute links in electricity consumption business according to the actual situation decreases the generation of business handling time-out while saving accepts the business used time.

Description

Electricity consumption service handling time limit management method and device
Technical field
The present invention relates to electricity consumption service management technical fields, manage in particular to a kind of electricity consumption service handling time limit Method and device.
Background technique
Existing electricity consumption business management system, it is not smart enough to the time limit distribution of each link in electricity consumption business, be usually The time limit what a fixation links preset is monitored, rather than divides according to the actual situation the time limit of each link Match.However, some link business are simple, short implementation cycle in an electricity consumption business, it is therefore desirable to time it is also few, usually can It for a long time completes in advance.Some link business is complicated, and the implementation cycle is long, it is therefore desirable to time it is long, usually beyond complete the time limit or Person needs to work extra shifts or extra hours and could complete within the time limit.The method of salary distribution of this machinery is easy to cause electricity consumption business overtime, directly Affect electricity consumption business service time limit compliance rate.
Summary of the invention
In view of this, the present invention provides a kind of electricity consumption service handling time limit management method and device, to solve the above problems.
In order to achieve the above object, the embodiment of the present invention adopts the following technical scheme that
A kind of electricity consumption service handling time limit management method, applied to the service communicated with user terminal and multiple service terminals Device, which comprises
Obtain electricity consumption business handles plan, general assignment time limit for handling plan including the electricity consumption business and described Multiple tasks node included by electricity consumption business, each task node include completing duration, the place that the task node at least needs Manage the mailing address of the service terminal of the task node and the default starting time of the task node and default completion time limit;
The Task Progress that service terminal corresponding to task node in reception processing is sent at interval of the first preset duration;
The Task Progress of task node in the processing is when completing, to the next task section for handling the task node The service terminal of point sends starting notice;
It is true according to the practical used time of completed each task node and the default completion time limit of unfinished each task node The estimated completion time limit of the fixed electricity consumption business, when default completion of each task node, are limited to the default starting of the task node Time postpones backward completes the time of duration and a reserved duration that the task node at least needs;
Judge whether the estimated completion time limit is more than the general assignment time limit, is more than described in the estimated completion time limit It prescribes a time limit when general assignment, the estimated completion time limit can be made to be less than the pre- of the general assignment time limit by calculating to judge whether there is Stay duration;
It, will be described reserved when in the presence of the estimated reserved duration for completing the time limit less than the general assignment time limit can be made Duration is adjusted to the reserved duration that the estimated completion time limit can be made to be less than the general assignment time limit, being not present When making the estimated reserved duration for completing the time limit less than the general assignment time limit, the reserved duration is adjusted to default minimum Value;
According to sending the time of the starting notice, complete the duration that next task node of the task node at least needs And reserved duration adjusted determines the completion time limit of next task node of the task node;And
The completion time limit is sent to the service terminal for the next task node for handling the task node.
Preferably, described to handle the time sequencing pass that plan further includes each task node included by the electricity consumption business After the step of being, the reserved duration be adjusted to predetermined minimum, the method also includes:
All adjustable task nodes in the unfinished task node of the electricity consumption business are found out, it is described adjustable Other task nodes in task node and the electricity consumption business do not have time sequencing relationship;And
Starting notice is sent to the service terminal for handling each adjustable task node.
Preferably, service terminal corresponding to the task node in the reception processing is sent at interval of the first preset duration Task Progress the step of after, the method also includes:
Judge whether the task node is completed according to the Task Progress;And
When the task node does not complete, the practical used time of the task node is monitored, and arrive in the practical used time The second preset duration sends to service terminal corresponding to the task node and alarms before up to the completion time limit of the task node Information.
Preferably, the method also includes:
Judge whether the estimated completion time limit is more than the general assignment time limit;And
It prescribes a time limit when being less than the general assignment in the estimated completion time limit, the transmission of Xiang Suoshu user terminal is described to use electric industry The progress of business and it is expected that complete the time limit, it is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit, Xiang Suoshu user terminal Send progress, estimated completion time limit and the overtime reason of the electricity consumption business.
Preferably, the method also includes:
The practical used time for monitoring each electricity consumption business records the number that the practical used time is more than the general assignment time limit;And
Alarm signal is issued when the number reaches preset quantity, and generates overtime statistical report form, the time-out statistics Report includes the overtime reason of the task node of task node and the time-out overtime in the electricity consumption business of time-out.
Another embodiment of the present invention also provides a kind of electricity consumption service handling time limit managing device, be applied to user terminal and The server of multiple service terminal communications, the electricity consumption service handling time limit managing device include:
Electricity consumption business acquiring unit, for obtaining the plan of handling of electricity consumption business, described handle plans to include the electricity consumption Multiple tasks node included by the general assignment time limit of business and the electricity consumption business, each task node include completing the task Duration that node at least needs, handle the task node service terminal mailing address and the task node default starting Time and default completion time limit;
Task Progress receiving unit, it is pre- at interval of first for service terminal corresponding to the task node in reception processing If the Task Progress that duration is sent;
Starting notice transmission unit, the Task Progress for the task node in the processing are when completing, to processing The service terminal of next task node of the task node sends starting notice;
It is expected that complete calculation of time unit, for according to practical used time of completed each task node with it is unfinished each The default completion time limit of task node determines the estimated completion time limit of the electricity consumption business, when the default completion of each task node The default starting time for being limited to the task node postpone backward complete duration that the task node at least needs and one it is reserved when The long time;
Reserved duration solves unit, for judging whether the estimated completion time limit is more than the general assignment time limit described It prescribes a time limit when it is expected that completing the time limit more than the general assignment, the estimated completion time limit can be made small by calculating to judge whether there is In the reserved duration in the general assignment time limit;
Reserved duration adjustment unit, for that the estimated completion time limit can be made to be less than the general assignment time limit in presence When reserved duration, the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the general assignment time limit Reserved duration will be described when there is no that can make the estimated reserved duration for completing the time limit less than the general assignment time limit Reserved duration is adjusted to predetermined minimum;
Time limit determination unit is completed, the time, the general assignment time limit, completion for notifying according to the transmission starting should Duration and reserved duration adjusted that next task node of task node at least needs determine next of the task node The completion time limit of business node;And
Time limit transmission unit, for sending the completion to the service terminal for the next task node for handling the task node Time limit.
Preferably, the electricity consumption service handling time limit managing device further include:
Adjustable node searching unit, it is all adjustable in the unfinished task node of the electricity consumption business for finding out Task node, other task nodes in the adjustable task node and the electricity consumption business do not have time sequencing pass System;And
Adjustable node start unit is logical for sending starting to the service terminal for handling each adjustable task node Know.
Preferably, the electricity consumption service handling time limit managing device further include:
Task node progress judging unit, for judging whether the task node is completed;And
Alarm unit, for monitoring the practical used time of the task node, and in institute when the task node does not complete The second preset duration was stated before the completion time limit that the practical used time reaches the task node to business corresponding to the task node Terminal sends warning message.
Preferably, the electricity consumption service handling time limit managing device further include:
Overtime judging unit, for judging whether the estimated completion time limit is more than the general assignment time limit;And
User's notification unit, for prescribing a time limit when being less than the general assignment in the estimated completion time limit, Xiang Suoshu user Terminal sends the progress of the electricity consumption business and it is expected that the time limit is completed, in the estimated completion time limit more than the general assignment time limit When, Xiang Suoshu user terminal sends progress, estimated completion time limit and the overtime reason of the electricity consumption business.
Preferably, the electricity consumption service handling time limit managing device further include:
Electricity consumption business used time monitoring unit records the practical used time for monitoring the practical used time of each electricity consumption business More than the number in general assignment time limit;And
General assignment time limit adjustment unit for issuing alarm signal when the number reaches preset quantity, and generates super When statistical report form, the time-out statistical report form includes the task of overtime task node and the time-out in the electricity consumption business of time-out The overtime reason of node.
Electricity consumption service handling time limit management method provided by the invention and device are according to a task section upper in electricity consumption business The deadline of point determines the starting time of next task node, according to the starting time of each task node, completes this Duration and reserved duration that business node at least needs determine the completion time limit of the task node, to realize to each in electricity consumption business Task node completes the smart allocation in time limit, and achieve the effect that raising electricity consumption business handles time limit and monitoring efficiency, Jin Erti High electricity consumption business service time limit compliance rate.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the interaction schematic diagram of server provided in an embodiment of the present invention, user terminal and multiple service terminals.
Fig. 2 is a kind of block diagram of server provided in an embodiment of the present invention.
Fig. 3 is a kind of a kind of flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 4 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 5 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 6 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 7 is another flow diagram of electricity consumption service handling time limit management method provided in an embodiment of the present invention.
Fig. 8 is a kind of a kind of functional module frame of electricity consumption service handling time limit managing device provided in an embodiment of the present invention Figure.
Fig. 9 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Figure 10 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Figure 11 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Figure 12 is another functional block diagram of electricity consumption service handling time limit managing device provided in an embodiment of the present invention.
Icon: 100- server;110- electricity consumption service handling time limit managing device;111- electricity consumption business acquiring unit; 112- Task Progress receiving unit;113- starting notice transmission unit;114- is estimated to complete calculation of time unit;When 115- is reserved It is long to solve unit;116- reserves duration adjustment unit;117- completes time limit determination unit;118- time limit transmission unit;119- can Deploy node searching unit;The adjustable node start unit of 1020-;1021- task node progress judging unit;1022- alarm Unit;1023- time-out judging unit;1024- user's notification unit;1025- electricity consumption business time-out monitoring unit;1026- report Generation unit;120- memory;130- processor;140- communication unit;200- user terminal;300- service terminal;400- net Network.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
As shown in Figure 1, being the server 100 and user terminal 200 and multiple business end that present pre-ferred embodiments provide The interaction schematic diagram at end 300.The server 100 can pass through network 400 and user terminal 200 and multiple service terminals 300 It is communicated, to realize data communication or interaction.
In the present embodiment, the server 100 be may be, but not limited to, web (website) server, ftp (file Transfer protocol, File Transfer Protocol) server etc..The user terminal 200 and service terminal 300 can be, but It is not limited to, smart phone, PC (personal computer, PC), tablet computer, personal digital assistant (personal Digital assistant, PDA), mobile internet surfing equipment (mobile Internet device, MID) etc..The user is whole End 200 can be the terminal device for handling user of electricity consumption business.In the present embodiment, each electricity consumption business includes multiple tasks section Point, the service terminal 300 is for handling the task node.That is, a service terminal 300 is for handling a task section Point.
The network 400 may be, but not limited to, cable network or wireless network.
As shown in Fig. 2, being the block diagram of server 100 shown in FIG. 1.The server 100 includes electricity consumption business Accept time limit managing device 110, memory 120, processor 130 and communication unit 140.
The memory 120, processor 130 and each element of communication unit 140 directly or indirectly electrically connect between each other It connects, to realize the transmission or interaction of data.For example, these elements pass through one or more communication bus or signal between each other Line, which is realized, to be electrically connected.The electricity consumption service handling time limit managing device 110 includes at least one can be with software or firmware (firmware) form is stored in the memory 120 or is solidificated in the operating system of the server 100 Software function module in (operating system, OS).
The processor 130 be used for handle stored in the memory 120 can processing module, for example, described use electric industry Business accepts software function module included by time limit managing device 110 and computer program.
Wherein, the memory 120 may be, but not limited to, random access memory (Random Access Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..Wherein, memory 120 is for storing program, the processor 130 after receiving process instruction, Handle described program.The communication unit 140 is used to establish the server 100 and user terminal 200 by the network 400 And the communication connection between multiple service terminals 300, and pass through 400 sending and receiving data of network.
It should be appreciated that structure shown in Fig. 2 is only to illustrate, server 100 can also include it is more than shown in Fig. 2 or Less component, or with the configuration different from shown in Fig. 2.Each component shown in Fig. 2 can use hardware, software or its group It closes and realizes.
As shown in figure 3, being a kind of process signal of electricity consumption service handling time limit management method provided in an embodiment of the present invention Figure, this method are applied to server 100 shown in Fig. 1.Detailed process shown in Fig. 3 and step will be carried out below detailed It illustrates.
Step S110: obtain electricity consumption business handles plan.
Wherein, it is described handle plan include the electricity consumption business the general assignment time limit and the electricity consumption business included by it is more A task node.Each task node includes completing duration that the task node at least needs, handling the business of the task node The mailing address of terminal 300 and the default starting time of the task node and default completion time limit.
In the present embodiment, in multiple tasks node included by the electricity consumption business, the default completion of previous task node Time limit is before the default starting time of latter task node namely described to handle plan further include included by the electricity consumption business Multiple tasks node processing sequence.Optionally, according to actual needs, there may be parts in the multiple task node can That is, there is the task node that part may not necessarily be handled according to preset processing sequence in the task node of allotment.Also, it is described to do Record has whether each task node is adjustable task node to reason in the works.It is limited to when the default completion of each task node The default starting time of the task node postpones backward complete the duration and a reserved duration that the task node at least needs after Time.
The server 100 can be before the starting of all task nodes of the electricity consumption business, to each task section of processing The service terminal 300 of point sends request notice, the request notice include the content of each task node, the default starting time and It is default to complete the time limit, so that corresponding staff is able to carry out preparation.
When implementing, the starting time of first task node is to handle the service terminal 300 of the first task node to connect The default starting time received, when completion of first task node, are limited to handle the service terminal 300 of the first task node The default completion time limit received.
Step S120: service terminal 300 corresponding to the task node in reception processing is sent out at interval of the first preset duration The Task Progress sent.
In the present embodiment, after electricity consumption business starts to accept, the service terminal 300 of present is default at interval of first Duration can send the Task Progress of the task node oneself handled to the server 100.The server 100 receives institute Task Progress is stated, and checks whether the Task Progress is completion.The first pre- duration can for 1 minute, 10 minutes or Half an hour, the present embodiment are without limitation.
Step S130: the Task Progress of the task node in the processing is when completing, to handling the task node The service terminal 300 of next task node sends starting notice.
In the present embodiment, after the completion of server 100 detects the task node being presently processing, immediately described in starting The next task node for the task node being presently processing, and started in a manner of sending starting notice to service terminal 300 Task node starting.That is, the starting time of next task node of the task node being presently processing is service Device 100 sends the time of starting notice.
Step S140: according to having preset for the practical used time of completed each task node and unfinished each task node At the estimated completion time limit of electricity consumption business described in calculation of time.
Wherein, the default starting time that the task node is limited to when the default completion of each task node has postponed backward The time of the reserved duration of duration and one at least needed at the task node.The estimated completion time limit is equal to completed each The sum of the practical used time of task node and the unfinished default completion time limit of each task node.
Step S150: judge whether the estimated completion time limit is more than the general assignment time limit, in the estimated completion It limits and prescribes a time limit when being more than the general assignment, solving judgement presence by calculating can make the estimated completion time limit be less than described total The reserved duration in business time limit.If it exists, S160 is thened follow the steps, it is no to then follow the steps S170.
Step S160: the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the general assignment The reserved duration in time limit.
Step S170: the reserved duration is adjusted to predetermined minimum.
Step S180: according to the time of the transmission starting notice, next task node of the task node is completed at least The duration and reserved duration adjusted that need determine the completion time limit of next task node of the task node.
In the present embodiment, the time for sending the starting notice is regarded as the starting of next task node by server 100 Time, and the completion time limit of next task node is determined as the starting time and postpones backward and completes next task Time after duration and reserved duration adjusted that node at least needs.
Step S190: the completion time limit is sent to the next task node for handling the task node.
After the completion time limit for determining next task node, server 100, which is informed, handles next task street shop Service terminal 300 so that the service terminal 300 is according to the completion time limit transacting business.
Optionally, as shown in figure 4, completing the time limit more than the general assignment time limit when estimated, and there is no can make pre- count When being less than the reserved duration in general assignment time limit at the time limit, after the step S170, the method can also include step S210 With step S220.
Step S210: all adjustable task nodes in the unfinished task node of the electricity consumption business are found out.
Wherein, other task nodes in the adjustable task node and the electricity consumption business do not have time sequencing pass System.
Step S220: starting notice is sent to the service terminal 300 for handling each adjustable task node.
It by above-mentioned design, can be by task node and other task nodes adjustable in unfinished task node simultaneously Row processing, to save the processing time.
Optionally, as shown in figure 5, after step S120, the method can also include step S310 and step S320.
Step S310: judge whether the task node is completed according to the Task Progress.
Step S320: when the task node does not complete, the practical used time of the task node is monitored, and in the reality The second preset duration is to service terminal corresponding to the task node before the completion time limit that the border used time reaches the task node 300 send warning message.Second preset duration can be, but be not limited to, 24 hours.
By above-mentioned design, corresponding responsible person can be allowed to be adjusted processing progress, so that the task node can be It completes to complete in the time limit.
Optionally, as shown in fig. 6, the method can also include step S410, step S420 and step S430.
Step S410: judge whether the estimated completion time limit is more than the general assignment time limit.If so, executing step S420, it is no to then follow the steps S430.
S420: Xiang Suoshu user terminal 200 of step sends progress, estimated completion time limit and the time-out of the electricity consumption business Reason.
S430: Xiang Suoshu user terminal 200 of step sends the progress of the electricity consumption business and it is expected that completes the time limit.
Optionally, as shown in fig. 7, the method can also include step S510 and step S520.
Step S510: monitoring the practical used time of each electricity consumption business, records the practical used time more than the general assignment time limit Number.
Step S520: issuing alarm signal when the number reaches preset quantity, and generates overtime statistical report form.
Wherein, the overtime statistical report form includes appointing for task node and the time-out overtime in the electricity consumption business of time-out The overtime reason of business node.Electricity consumption business processing personnel can be according to the overtime statistical report form to the treatment process of electricity consumption business Make improvement or adjustment general assignment time limit.
Optionally, the server 100 can also receive the progress prompting message that the user terminal 200 is sent, and connect The progress of electricity consumption business corresponding with the progress prompting message is inquired after receiving the progress prompting message, and electric industry is used according to this Service terminal 300 corresponding to task node of the progress of business to present sends warning message.
Referring to Fig. 8, being a kind of electricity consumption service handling time limit managing device 110 provided in an embodiment of the present invention, it is applied to The server 100.The electricity consumption service handling time limit managing device 110 includes electricity consumption business acquiring unit 111, Task Progress Receiving unit 112, starting notice transmission unit 113, it is estimated complete calculation of time unit 114, reserved duration solves unit 115, Reserved duration adjustment unit 116 completes time limit determination unit 117 and time limit transmission unit 118.
Wherein, what the electricity consumption business acquiring unit 111 was used to obtain electricity consumption business handles plan.It is described to handle plan packet Include the electricity consumption business the general assignment time limit and the electricity consumption business included by multiple tasks node, each task node includes Complete the duration that the task node at least needs, the mailing address and the task of the service terminal 300 for handling the task node The default starting time of node and default completion time limit.
The description as described in the electricity consumption business acquiring unit 111 specifically refers to the description to the step S110 in Fig. 3. That is, step S110 can be executed by electricity consumption business acquiring unit 111.
The Task Progress receiving unit 112 is every for service terminal 300 corresponding to the task node in reception processing It is spaced the Task Progress of the first preset duration transmission.The description as described in the Task Progress receiving unit 112 specifically refers to pair The detailed description of step S120 in Fig. 3.That is, step S120 can be executed by the Task Progress receiving unit 112.
When Task Progress of the starting notice transmission unit 113 for the task node in the processing is completion, Starting notice is sent to the service terminal 300 for the next task node for handling the task node.It notifies to send about the starting The description of unit 113 specifically refers to the detailed description to the step S130 in Fig. 3, that is, step S130 can be opened by described It is dynamic that transmission unit 113 is notified to execute.
It is described it is estimated complete calculation of time unit 114, for according to practical used time of completed each task node with not The default completion time limit for each task node completed determines estimated completion time limit of the electricity consumption business, each task node it is pre- The default starting time that the task node is limited to when if completing postpone backward complete duration that the task node at least needs and The time of one reserved duration.
The description as described in the estimated completion calculation of time unit 114 is specifically referred to the detailed of the step S140 in Fig. 3 Thin description.That is, step S140 can be executed by the estimated calculation of time unit 114 of completing.
Whether it is more than the general assignment time limit that the reserved duration solves unit 115 for judging the estimated completion time limit It is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit, solved by calculating with the presence or absence of described estimated complete can be made Time limit is less than the reserved duration in the general assignment time limit.
The description as described in reserved duration solves unit 115 specifically refers to the detailed description to the step S150 in Fig. 3. That is, step S150 can solve unit 115 by reserved duration to execute.
The reserved duration adjustment unit 116 is used to the estimated completion time limit can be made to be less than the general assignment in presence When the reserved duration in time limit, the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the general assignment The reserved duration in time limit, when there is no the estimated reserved duration for completing the time limit less than the general assignment time limit can be made, The reserved duration is adjusted to predetermined minimum.
The description as described in the reserved duration adjustment unit 116 is specifically referred to the step S160 and step in Fig. 3 The detailed description of S170.That is, step S160 and step S170 can be executed by reserved duration adjustment unit 116.
It is described complete time limit determination unit 117 be used for according to send it is described starting notice time, the general assignment time limit, It completes duration that next task node of the task node at least needs and reserved duration adjusted determines the task node The completion time limit of next task node.The description as described in completing time limit determination unit 117 is specifically referred to the step in Fig. 3 The detailed description of S180, that is, step S180 can be executed by completing time limit determination unit 117.
The time limit transmission unit 118 is used to send out to the service terminal 300 for the next task node for handling the task node Send the completion time limit.The description as described in the time limit transmission unit 118 is specifically referred to the detailed of the step S190 in Fig. 3 Description, that is, step S190 can be executed by the time limit transmission unit 118.
Referring to Fig. 9, optionally, the electricity consumption service handling time limit managing device 110 can also include adjustable node Searching unit 119 and adjustable node start unit 1020.
The adjustable node searching unit 119 is used to find out to be owned in the unfinished task node of the electricity consumption business Adjustable task node.Wherein, the adjustable task node does not have with other task nodes in the electricity consumption business Time sequencing relationship.The description as described in the adjustable node searching unit 119 is specifically referred to the step S210 in Fig. 4 Detailed description, that is, step S210 can be executed by adjustable node searching unit 119.
The adjustable node start unit 1020, for the service terminal to each adjustable task node of processing 300 send starting notice.The description as described in the adjustable node start unit 1020 specifically refers to the step S220 in 4 Detailed description, that is, step S220 can be executed by adjustable node start unit 1020.
Referring to Fig. 10, optionally, the electricity consumption service handling time limit managing device 110 can also include task node into Spend judging unit 1021 and alarm unit 1022.
The task node progress judging unit 1021 is for judging whether the task node is completed.About the task The description of node progress judging unit 1021 specifically refers to detailed description namely step to step S310 shown in Fig. 5 S310 can be executed by task node progress judging unit 1021.
The alarm unit 1022 is used to monitor the practical use of the task node when the task node does not complete When, and the second preset duration is right to the task node institute before the completion time limit that the practical used time reaches the task node The service terminal 300 answered sends warning message.The description as described in alarm unit 1022 is specifically referred to step shown in fig. 5 The detailed description of S320, that is, step S320 can be executed by the alarm unit 1022.
Figure 11 is please referred to, optionally, the electricity consumption service handling time limit managing device 110 can also include that time-out judgement is single Member 1023 and user's notification unit 1024.
Whether the time-out judging unit 1023 is more than the general assignment time limit for judging the estimated completion time limit.It closes Detailed description namely step to the step S410 in Fig. 6 are specifically referred in the description of the overtime judging unit 1023 S410 can be executed by the overtime judging unit 1023.
User's notification unit 1024 is used to prescribe a time limit when being less than the general assignment in the estimated completion time limit, to institute User terminal 200 is stated to send the progress of the electricity consumption business and it is expected that the time limit is completed, in the estimated completion time limit more than described It prescribes a time limit when general assignment, progress, estimated completion time limit and the time-out that Xiang Suoshu user terminal 200 sends the electricity consumption business are former Cause.
The description as described in user's notification unit 1024 is specifically referred to the step S420 and step S430 in Fig. 6 Detailed description, that is, step S420 and step S430 can be notified by the user if only to execute.
Figure 12 is please referred to, optionally, the electricity consumption service handling time limit managing device 110 can also include that electricity consumption business is super When monitoring unit 1025 and report generation unit 1026.
The electricity consumption business monitoring unit is used to monitor the practical used time of each electricity consumption business, and it is super to record the practical used time Cross the number in general assignment time limit.The description as described in the electricity consumption business monitoring unit is specifically referred to step shown in fig. 7 The detailed description of S510, that is, step S510 can be executed by the electricity consumption business monitoring unit.
The report generation unit 1026 generates super for issuing alarm signal when the number reaches preset quantity When statistical report form.Wherein, the overtime statistical report form includes task node and the time-out overtime in the electricity consumption business of time-out Task node overtime reason.The description as described in the report generation unit 1026 is specifically referred to step shown in fig. 7 The detailed description of rapid S520, that is, step S520 can be executed by the report generation unit 1026.
In conclusion electricity consumption service handling time limit management method provided by the invention and device are according in electricity consumption business upper one The deadline of a task node determines the starting time of next task node, according to the starting time of each task node, It completes duration that the task node at least needs and reserved duration determines the completion time limit of the task node, to realize to electricity consumption Each task node completes the smart allocation in time limit in business, reaches the effect for handling time limit and monitoring efficiency for improving electricity consumption business Fruit, and then improve electricity consumption business service time limit compliance rate.
In several embodiments provided by the embodiment of the present invention, it should be understood that disclosed device and method, it can also To realize by another way.Device and method embodiment described above is only schematical, for example, in attached drawing Flow chart and block diagram show that the devices of multiple embodiments according to the present invention, method and computer program product are able to achieve Architecture, function and operation.In this regard, each box in flowchart or block diagram can represent module, a program A part of section or code, a part of the module, section or code include that one or more is patrolled for realizing defined Collect the executable instruction of function.It should also be noted that in some implementations as replacement, function marked in the box It can occur in a different order than that indicated in the drawings.For example, two continuous boxes can actually be held substantially in parallel Row, they can also be executed in the opposite order sometimes, and this depends on the function involved.It is also noted that block diagram and/or The combination of each box in flow chart and the box in block diagram and or flow chart, can the function as defined in executing or dynamic The dedicated hardware based device made is realized, or can be realized using a combination of dedicated hardware and computer instructions.
In addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation together Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, electronic equipment or network equipment etc.) execute all or part of step of each embodiment the method for the present invention Suddenly.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), deposits at random The various media that can store program code such as access to memory (RAM, Random Access Memory), magnetic or disk. It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to the packet of nonexcludability Contain, so that the process, method, article or equipment for including a series of elements not only includes those elements, but also including Other elements that are not explicitly listed, or further include for elements inherent to such a process, method, article, or device. In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including the element Process, method, article or equipment in there is also other identical elements.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of electricity consumption service handling time limit management method, which is characterized in that be applied to and user terminal and multiple service terminals The server of communication, which comprises
The plan of handling of electricity consumption business is obtained, it is described to handle the general assignment time limit and the electricity consumption that plan includes the electricity consumption business Multiple tasks node included by business, each task node include complete the task node at least need duration, processing should The mailing address of the service terminal of task node and the default starting time of the task node and default completion time limit;
The Task Progress that service terminal corresponding to task node in reception processing is sent at interval of the first preset duration;
The Task Progress of task node in the processing is when completing, to the next task node for handling the task node Service terminal sends starting notice;
According to the default completion calculation of time institute of the practical used time of completed each task node and unfinished each task node State the estimated completion time limit of electricity consumption business, when default completion of each task node is limited to the default starting time of the task node It postpones backward and completes the time of duration and a reserved duration that the task node at least needs;
Judge whether the estimated completion time limit is more than the general assignment time limit, is more than described total in the estimated completion time limit Prescribe a time limit when business, by calculate judge whether there is can make it is described it is estimated complete the time limit be less than the general assignment time limit it is reserved when It is long;
When in the presence of the estimated reserved duration for completing the time limit less than the general assignment time limit can be made, by the reserved duration It is adjusted to the reserved duration that the estimated completion time limit can be made to be less than the general assignment time limit, institute can be made being not present When stating the estimated reserved duration for completing the time limit less than the general assignment time limit, the reserved duration is adjusted to predetermined minimum;
According to the time of the transmission starting notice, complete duration and tune that next task node of the task node at least needs Reserved duration after whole determines the completion time limit of next task node of the task node;And
The completion time limit is sent to the service terminal for the next task node for handling the task node.
2. electricity consumption service handling time limit management method according to claim 1, which is characterized in that described handle plans also to wrap The reserved duration is adjusted to predetermined minimum by the time sequencing relationship for including each task node included by the electricity consumption business The step of after, the method also includes:
Find out all adjustable task nodes in the unfinished task node of the electricity consumption business, the adjustable task Other task nodes in node and the electricity consumption business do not have time sequencing relationship;And
Starting notice is sent to the service terminal for handling each adjustable task node.
3. electricity consumption service handling time limit management method according to claim 1, which is characterized in that in the reception processing After the step of Task Progress that service terminal corresponding to task node is sent at interval of the first preset duration, the method is also Include:
Judge whether the task node is completed according to the Task Progress;And
When the task node does not complete, the practical used time of the task node is monitored, and reach institute in the practical used time The second preset duration sends warning message to service terminal corresponding to the task node before the completion time limit for stating task node, Second preset duration is 24 hours.
4. electricity consumption service handling time limit management method according to claim 1, which is characterized in that the method also includes:
Judge whether the estimated completion time limit is more than the general assignment time limit;And
It prescribes a time limit when being less than the general assignment in the estimated completion time limit, Xiang Suoshu user terminal sends the electricity consumption business Progress and it is expected that complete the time limit, it is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit, Xiang Suoshu user terminal is sent The progress of the electricity consumption business, estimated completion time limit and overtime reason.
5. electricity consumption service handling time limit management method according to claim 1, which is characterized in that the method also includes:
The practical used time for monitoring each electricity consumption business records the number that the practical used time is more than the general assignment time limit;And
Alarm signal is issued when the number reaches preset quantity, and generates overtime statistical report form, the time-out statistical report form The overtime reason of the task node of overtime task node and the time-out in electricity consumption business including time-out.
6. a kind of electricity consumption service handling time limit managing device, which is characterized in that be applied to and user terminal and multiple service terminals The server of communication, the electricity consumption service handling time limit managing device include:
Electricity consumption business acquiring unit, for obtaining the plan of handling of electricity consumption business, described handle plans to include the electricity consumption business The general assignment time limit and the electricity consumption business included by multiple tasks node, each task node include complete the task node The duration that at least needs, handle the task node service terminal mailing address and the task node the default starting time With the default completion time limit;
Task Progress receiving unit, for reception processing in task node corresponding to service terminal at interval of first it is default when The long Task Progress sent;
Starting notice transmission unit, for the task node in the processing Task Progress be complete when, to handle this The service terminal of next task node of business node sends starting notice;
It is expected that calculation of time unit is completed, for according to practical used time of completed each task node and unfinished each task The default completion time limit of node determines the estimated completion time limit of the electricity consumption business, and when default completion of each task node is limited to The default starting time of the task node postpones backward completes duration that the task node at least needs and a reserved duration Time;
Reserved duration solves unit, for judging whether the estimated completion time limit is more than the general assignment time limit, described pre- It prescribes a time limit when counting into the time limit more than the general assignment, the estimated completion time limit can be made to be less than by calculating to judge whether there is The reserved duration in the general assignment time limit;
Reserved duration adjustment unit, for that the estimated completion time limit can be made to be less than the reserved of the general assignment time limit in presence When duration, the reserved duration, which is adjusted to described, can make the estimated completion time limit be less than the reserved of the general assignment time limit Duration will be described reserved when there is no that can make the estimated reserved duration for completing the time limit less than the general assignment time limit Duration is adjusted to predetermined minimum;
Complete time limit determination unit, for according to send it is described starting notice time, the general assignment time limit, complete the task Duration and reserved duration adjusted that next task node of node at least needs determine next task section of the task node The completion time limit of point;And
Time limit transmission unit, when for sending the completion to the service terminal for the next task node for handling the task node Limit.
7. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption service handling Time limit managing device includes:
Adjustable node searching unit, for finding out all adjustable in the unfinished task node of the electricity consumption business appoint Business node, the adjustable task node do not have time sequencing relationship with other task nodes in the electricity consumption business;With And
Adjustable node start unit, for sending starting notice to the service terminal for handling each adjustable task node.
8. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption service handling Time limit managing device further include:
Task node progress judging unit, for judging whether the task node is completed;And
Alarm unit, for monitoring the practical used time of the task node, and in the reality when the task node does not complete The second preset duration is to service terminal corresponding to the task node before the completion time limit that the border used time reaches the task node Warning message is sent, second preset duration is 24 hours.
9. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption service handling Time limit managing device further include:
Overtime judging unit, for judging whether the estimated completion time limit is more than the general assignment time limit;And
User's notification unit, for prescribing a time limit when being less than the general assignment in the estimated completion time limit, Xiang Suoshu user terminal Send the progress of the electricity consumption business and it is expected that complete the time limit, it is described it is estimated complete the time limit be more than the general assignment when prescribe a time limit, Progress, estimated completion time limit and the overtime reason of the electricity consumption business are sent to the user terminal.
10. electricity consumption service handling time limit managing device according to claim 6, which is characterized in that the electricity consumption business by Manage time limit managing device further include:
Electricity consumption business time-out monitoring unit, for monitoring the practical used time of each electricity consumption business, recording the practical used time is more than The number in general assignment time limit;And
Report generation unit for issuing alarm signal when the number reaches preset quantity, and generates overtime statistical report form, The time-out statistical report form includes the time-out of the task node of task node and the time-out overtime in the electricity consumption business of time-out Reason.
CN201611069630.XA 2016-11-28 2016-11-28 Electricity consumption service handling time limit management method and device Active CN106447242B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611069630.XA CN106447242B (en) 2016-11-28 2016-11-28 Electricity consumption service handling time limit management method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611069630.XA CN106447242B (en) 2016-11-28 2016-11-28 Electricity consumption service handling time limit management method and device

Publications (2)

Publication Number Publication Date
CN106447242A CN106447242A (en) 2017-02-22
CN106447242B true CN106447242B (en) 2019-11-12

Family

ID=58219507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611069630.XA Active CN106447242B (en) 2016-11-28 2016-11-28 Electricity consumption service handling time limit management method and device

Country Status (1)

Country Link
CN (1) CN106447242B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109784831A (en) * 2018-12-12 2019-05-21 福建亿榕信息技术有限公司 The pending sharing method of task, storage medium and equipment
CN109995787A (en) * 2019-04-10 2019-07-09 北京奇艺世纪科技有限公司 A kind of data processing method and relevant device
CN111178665A (en) * 2019-11-19 2020-05-19 腾讯科技(深圳)有限公司 Data analysis method, device and equipment
CN113762906A (en) * 2020-08-12 2021-12-07 北京沃东天骏信息技术有限公司 Method, device and equipment for alarming task period delay and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103488691A (en) * 2013-09-02 2014-01-01 用友软件股份有限公司 Task scheduling device and task scheduling method
CN103617472A (en) * 2013-07-09 2014-03-05 成都希盟泰克科技发展有限公司 Resource balancing self-adaption scheduling method of multi-project and multi-task management
CN105824639A (en) * 2016-03-17 2016-08-03 百度在线网络技术(北京)有限公司 Progress estimating method and progress estimating device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617472A (en) * 2013-07-09 2014-03-05 成都希盟泰克科技发展有限公司 Resource balancing self-adaption scheduling method of multi-project and multi-task management
CN103488691A (en) * 2013-09-02 2014-01-01 用友软件股份有限公司 Task scheduling device and task scheduling method
CN105824639A (en) * 2016-03-17 2016-08-03 百度在线网络技术(北京)有限公司 Progress estimating method and progress estimating device

Also Published As

Publication number Publication date
CN106447242A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106447242B (en) Electricity consumption service handling time limit management method and device
CN107169744B (en) Time limit monitoring method and system for electronic work order
CN106357811B (en) A kind of delet method of Backup Data, apparatus and system
CN107509178A (en) Express delivery information sharing Notification Method and device
CN108874640A (en) A kind of appraisal procedure and device of clustering performance
CN105912703A (en) Data storage method and data query method and device
CN104346571B (en) Security breaches management method, system and equipment
CN107995377A (en) Customer service management method, electronic device and computer-readable recording medium
WO2018223672A1 (en) Data processing method and device
CN108880943A (en) A kind of monitoring system of isomery cloud platform
CN110399533A (en) Funds flow querying method and device
CN108460601A (en) Client's list acquisition methods, device, terminal device and storage medium
CN109636304B (en) Business system publishing method and device, storage medium and electronic device
KR101994454B1 (en) Method for task distribution and asssessment
CN107092641A (en) Determination methods and device, the method and apparatus of shop search of shop business status
CN110446273A (en) A kind of method and apparatus based on electronics price tag networking
CN103326951A (en) Bandwidth control method and device for electric power communication network
CN108459944A (en) System operation monitoring method, device and server
CN109325702A (en) Method for scheduling task and device
CN109582531A (en) Monitoring method, device and the electronic equipment of power distribution unit
CN107276859B (en) Keep the method and device of long connection
CN110909129B (en) Abnormal complaint event identification method and device
CN105847169B (en) A kind of method and device for flow control
CN104883705B (en) A kind of the problem of data service is complained localization method and device
CN113360321B (en) Micro-service retry calling method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Shao Chen

Inventor after: Cheng Zhaoliang

Inventor after: Wang Baoru

Inventor after: Li Yuan

Inventor after: Fan Xianshen

Inventor after: Wang Sizheng

Inventor after: Zhang Guangyao

Inventor before: Shao Chen

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant