CN106339828A - WeChat platform based on-site security risk management and control method - Google Patents
WeChat platform based on-site security risk management and control method Download PDFInfo
- Publication number
- CN106339828A CN106339828A CN201610935714.0A CN201610935714A CN106339828A CN 106339828 A CN106339828 A CN 106339828A CN 201610935714 A CN201610935714 A CN 201610935714A CN 106339828 A CN106339828 A CN 106339828A
- Authority
- CN
- China
- Prior art keywords
- management
- work
- control system
- risk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000012544 monitoring process Methods 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 description 5
- 238000007689 inspection Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a WeChat platform based on-site security risk management and control method, wherein an onsite security risk management and control system is established on the WeChat platform. On-site staffs register information on the work content, work place, and work team members into the system before they start high-risk work. The onsite security risk management and control system delivers such work through the Wechat platform to the Wechat accounts of the management staffs at all levels of an enterprise so that the management staffs at all levels could receive the work progress at the onsite risky work and conduct real time monitoring as well as instant interventions through smart phone installed Wechat. With the invention, every management staff in an enterprise can have first hand information about onsite security. At any time or any place, the management staffs can receive first hand information about various types of onsite risky work and conduct monitoring so that real time management over the security risk work can be performed and the management efficiency and level are greatly improved.
Description
Technical field
The present invention relates to a kind of risk management and control method, specifically a kind of site safety risk management and control side based on wechat platform
Method.
Background technology
Under existing enterprise security manager pattern, for the technology of each manufacturing enterprise of live all kinds of excessive risk operation, peace
Full management personnel can only carry out live risk management and control by way of site inspection, selective examination.The traditional input of this dependence is suitable
The safety manager of quantity deeply scene blanket type test mode in the case that supervisor is limited it is impossible to constantly Fang Fang
Face face is deep into live every nook and cranny, be thus easily caused live key device, critical position security control not in place;
Additionally, situation cross-operation more than big for field operation face.Traditional deep scene carries out security control, inefficiency,
Increasingly can not meet the requirement to safety management under the new situation.This management mode by spot check determines construction
During demand of human resources amount big, the problems such as full-time safety manager's shortage, cause corporate security monitoring capacity layer by layer
Decay, there is certain blind area in the risk management and control that also result in whole scene.
In recent years, with the continuous development of information technology, network technology, and the height to healthy ring management work for the country
Pay attention to, increasing enterprises pay attention management of safe operation, and effect in management of safe operation for the security information management system
Also it is more and more notable.The safety management situation that tradition grasps job site relies primarily on telephonic communication, mail transmission, comes to personally now
Three kinds of modes, first two mode easy existence information falseness, distortion, grasp not in time, the phenomenon such as imperfect, the latter's needs
Sufficient amount of human and material resources and financial resources, and put into more times, energy and be in the action inspection.
Simultaneously as lacking real-time security monitoring and management, company manager cannot be to live all of material risk
Accomplish to know what's what, thus rational Support Resource cannot be allocated and carries out on-site support and inspection with a definite target in view, more no
Method risk work all types of to scene in real time is effectively instructed and is intervened.
Content of the invention
It is an object of the invention to provide a kind of site safety risk management and control method based on wechat platform, above-mentioned to solve
The problem proposing in background technology.
For achieving the above object, the following technical scheme of present invention offer:
A kind of site safety risk management and control method based on wechat platform, builds site safety risk management and control system in wechat platform
System, by field personnel excessive risk work before by job content, job site, the work information such as crewmember existing
Registered in the security risk managing and control system of field, this work is pushed to by site safety risk management and control system by wechat platform
In all levels of management personnel's wechat in wechat enterprise number, all levels of management personnel receives the dynamic of live risk work in the very first time
And progress.
As the present invention further scheme: live monitor in real time can also be drawn by site safety risk management and control system
Face carries out live, and all levels of management personnel sees the real-time condition at scene conveniently by handset Wechat, when finding to have deviation, also
Can be intervened by site safety risk management and control system direct line work on the spot director.
Compared with prior art, the invention has the beneficial effects as follows: the present invention can allow each manager in enterprise exist
It is dynamic that the very first time grasps site safety.All can receive in the very first time with any place at any time and monitor scene respectively
The development condition of type risk work, carries out real-time management to the work of live risk, is greatly enhanced enterprise security manager efficiency
And level.
Specific embodiment
Below the technical scheme in the embodiment of the present invention is clearly and completely described.
In the embodiment of the present invention, a kind of site safety risk management and control method based on wechat platform, build in wechat platform
Site safety risk management and control system, by field personnel excessive risk work before by job content, job site, work
The information such as crewmember are registered in security risk managing and control system at the scene, and site safety risk management and control system is passed through wechat and put down
This work is pushed in all levels of management personnel's wechat in wechat enterprise number platform, and all levels of management personnel received in the very first time
The dynamic and progress of live risk work.Live monitor in real time picture can also be entered by site safety risk management and control system
Row live, all levels of management personnel conveniently by handset Wechat see scene real-time condition, find have deviation when additionally it is possible to
By site safety risk management and control system, direct line work on the spot director is intervened.
The present invention be achieved in that by wechat enterprise platform building business risk managing and control system so that scene every
Content, field personnel's situation and scene that one excessive risk work, can work the place of work in the very first time
Real-time pictures are pushed directly in the wechat of enterprise all levels of management personnel.All levels of management personnel can obtain scene in the very first time
The situation of risk work progress is it is possible to carry out live monitor in real time conveniently by handset Wechat, when finding deviation, permissible
Directly line scene is intervened, and prevents the expansion further of risk, and effective Accident prevention occurs.
By building of site safety risk management and control system, allow enterprise all levels of management personnel can at any time, any
The place very first time grasps site safety dynamically, can also easily directly field condition be entered by handset Wechat simultaneously
Row monitor in real time.When finding deviation, directly can be intervened at line scene, be prevented the expansion further of risk, effectively
Accident prevention occurs.
By building of site safety risk management and control system, conventional enterprise security checking mode, each higher level can be changed
Authorities can to subordinate, each enterprise, the site safety truth of all departments be carried out in real time at any time and any place
Selective examination, effectively improves subordinate enterprise, the safe production awareness of department employee and safety supervision management dynamics.
By building of site safety risk management and control system, each enterprise can convene expert remotely each company, portion to subordinate
The site safety work of door carries out expert diagnosis, find in time each subordinate enterprise produce at the scene present in risk hidden danger, carry
Go out reform advice and suggestion, improve the safety management level of enterprise.
Live all types of risks can be worked micro- by mobile phone by the site safety risk management and control system in wechat enterprise number
Letter is registered in systems, and all levels of management personnel in subsequent wechat enterprise just can receive wechat and push in the very first time and disappear
Breath.Thus accomplishing to control in real time to the risk work in enterprise.
In the risk monitoring and control function of system, all levels of management personnel can need to carry out now according to oneself by handset Wechat
Checking of field all types of risks work, such that it is able to reasonable disposition resource and personnel with a definite target in view, carries out live risk management and control
Work.
In the risk monitoring and control function of system, all levels of management personnel can need to carry out now according to oneself by handset Wechat
Checking of field all types of risks work, such that it is able to reasonable disposition resource and personnel with a definite target in view, carries out live risk management and control
Work.
Job content, job site, shift are made up of before excessive risk work starts by the present invention field personnel
The information such as member are registered in security risk managing and control system at the scene.Site safety risk management and control system can be incited somebody to action by wechat platform
This work is pushed in all levels of management personnel's wechat in wechat enterprise number that (concrete personnel can be by each enterprise in wechat platform
Voluntarily configure as needed), all levels of management personnel can receive, in the very first time, the dynamic and progress that live risk works.With
This simultaneously, live monitor in real time picture can also be carried out live by site safety risk management and control system, and all levels of management personnel can
To see the real-time condition at scene conveniently by handset Wechat, when finding to have deviation, site safety risk can also be passed through
Managing and control system direct line work on the spot director intervened, it is to avoid the generation expanding further with accident of risk.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of the spirit or essential attributes of the present invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each
Embodiment only comprises an independent technical scheme, this narrating mode of description only for clarity, this area
Technical staff should be using description as an entirety, and the technical scheme in each embodiment can also form this through appropriately combined
Skilled person may be appreciated other embodiment.
Claims (2)
1. a kind of site safety risk management and control method based on wechat platform is it is characterised in that build scene peace in wechat platform
Job content, job site, shift are made up of before excessive risk work starts by full blast danger managing and control system field personnel
Member's information is registered in security risk managing and control system at the scene, site safety risk management and control system pass through wechat platform by this
Work is pushed in all levels of management personnel's wechat in wechat enterprise number, and all levels of management personnel receives live risk in the very first time
The dynamic and progress of work.
2. the site safety risk management and control method based on wechat platform according to claim 1 is it is characterised in that scene is pacified
Live monitor in real time picture can also be carried out live by full blast danger managing and control system by wechat, and all levels of management personnel is easily led to
Cross handset Wechat see scene real-time condition, find have deviation when additionally it is possible to by site safety risk management and control system straight
Line work on the spot director is intervened in succession.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610935714.0A CN106339828A (en) | 2016-11-01 | 2016-11-01 | WeChat platform based on-site security risk management and control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610935714.0A CN106339828A (en) | 2016-11-01 | 2016-11-01 | WeChat platform based on-site security risk management and control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106339828A true CN106339828A (en) | 2017-01-18 |
Family
ID=57840780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610935714.0A Pending CN106339828A (en) | 2016-11-01 | 2016-11-01 | WeChat platform based on-site security risk management and control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106339828A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107798489A (en) * | 2017-12-01 | 2018-03-13 | 国网河南省电力公司鹤壁供电公司 | A kind of electric network operation site safety management method based on wechat platform |
CN110689284A (en) * | 2019-10-15 | 2020-01-14 | 中国电力企业联合会电力建设技术经济咨询中心 | Project security risk management and control method and system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463481A (en) * | 2014-12-18 | 2015-03-25 | 国家电网公司 | Electric power construction site safety control method |
CN104820907A (en) * | 2015-05-22 | 2015-08-05 | 中国石油化工股份有限公司 | Working site safety check improvement method and system based on data mining |
CN105488658A (en) * | 2015-11-27 | 2016-04-13 | 中国长江三峡集团公司 | Wechat based method and system for quickly instructing field potential safety hazard by management leader |
CN105809355A (en) * | 2016-03-14 | 2016-07-27 | 国网福建省电力有限公司 | Personnel information identification method based on working field remote monitoring system |
CN105825329A (en) * | 2016-03-14 | 2016-08-03 | 国网福建省电力有限公司 | Safety and quality inspection method based on remote working site monitoring system |
-
2016
- 2016-11-01 CN CN201610935714.0A patent/CN106339828A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104463481A (en) * | 2014-12-18 | 2015-03-25 | 国家电网公司 | Electric power construction site safety control method |
CN104820907A (en) * | 2015-05-22 | 2015-08-05 | 中国石油化工股份有限公司 | Working site safety check improvement method and system based on data mining |
CN105488658A (en) * | 2015-11-27 | 2016-04-13 | 中国长江三峡集团公司 | Wechat based method and system for quickly instructing field potential safety hazard by management leader |
CN105809355A (en) * | 2016-03-14 | 2016-07-27 | 国网福建省电力有限公司 | Personnel information identification method based on working field remote monitoring system |
CN105825329A (en) * | 2016-03-14 | 2016-08-03 | 国网福建省电力有限公司 | Safety and quality inspection method based on remote working site monitoring system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107798489A (en) * | 2017-12-01 | 2018-03-13 | 国网河南省电力公司鹤壁供电公司 | A kind of electric network operation site safety management method based on wechat platform |
CN110689284A (en) * | 2019-10-15 | 2020-01-14 | 中国电力企业联合会电力建设技术经济咨询中心 | Project security risk management and control method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106652633B (en) | A kind of polygonal color fire-fighting drill system and method based on virtual reality | |
CN103942635B (en) | A kind of coal mine gas safe and intelligent cruising inspection system | |
CN114548656B (en) | Safe emergency management commanding and dispatching system | |
CN106339828A (en) | WeChat platform based on-site security risk management and control method | |
CN108108388A (en) | City function Facilities Construction operation security produces active monitoring system and method | |
CN115641070A (en) | Multi-level multi-department linkage handling method and deduction device for power grid emergency | |
CN105321009A (en) | Fire control integrated information management platform for building | |
CN114519490A (en) | Multi-department gridding cooperative system and method for community risk prevention | |
CN110782378A (en) | Community operation service platform, community management method, community management equipment and storage medium | |
CN108153621A (en) | A kind of standby emergent handover management system of cloud calamity | |
CN105897796A (en) | Information sharing and service platform | |
AU2019101668A4 (en) | System and method for acquiring and processing social risk information | |
CN102609821A (en) | Portable safety management system for fire scene interior, and implementation method thereof | |
CN202524422U (en) | Disaster prevention and mitigation service platform for urban public buildings | |
Hou et al. | An Emergency Drill Command System Facing the Power Grid Emergency Operation Site | |
Ma | Responding in crises: a comparative analysis of disaster responses between mainland China and Taiwan | |
Wu et al. | Research on Public Safety Management under the Application of Big Data and Internet of Things | |
Li | Design and Development of a Fire Fighting and Rescue Planning System | |
Yin et al. | Discussion on Operation Risk Analysis and Emergency Management Construction of Urban Large-scale Horticultural Exposition | |
Zhai | Design and Optimization of Smart Fire IoT Cloud Platform Based on Big Data Technology | |
Wang et al. | Design and analysis on emergency rescue workflow of metro construction based on Petri nets | |
Wu et al. | Risk Factors for Unsafe Behaviour of Construction Workers and Intervention Countermeasures | |
Yao et al. | Analysis on emergency management of significant security problems from the perspective of limited rational decision-making | |
Liang et al. | Notice of Retraction: How to strengthen safety management in construction and installation project | |
CN110503392A (en) | A kind of construction risk type level safety management system based on BIM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170118 |