CN106201686A - Management method, device and the terminal of application - Google Patents

Management method, device and the terminal of application Download PDF

Info

Publication number
CN106201686A
CN106201686A CN201610509828.9A CN201610509828A CN106201686A CN 106201686 A CN106201686 A CN 106201686A CN 201610509828 A CN201610509828 A CN 201610509828A CN 106201686 A CN106201686 A CN 106201686A
Authority
CN
China
Prior art keywords
application program
time
probability
value
switched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610509828.9A
Other languages
Chinese (zh)
Inventor
陈帅
刘铁俊
张向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xiaomi Mobile Software Co Ltd
Original Assignee
Beijing Xiaomi Mobile Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xiaomi Mobile Software Co Ltd filed Critical Beijing Xiaomi Mobile Software Co Ltd
Priority to CN201610509828.9A priority Critical patent/CN106201686A/en
Publication of CN106201686A publication Critical patent/CN106201686A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/485Task life-cycle, e.g. stopping, restarting, resuming execution
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • User Interface Of Digital Computer (AREA)

Abstract

The disclosure is directed to management method, device and the terminal of application, the method includes: when the first application program is at running background, obtains the use data of the first application program;Based on using data, obtaining described first application program and be switched to the first probability of front stage operation within a predetermined period of time, predetermined amount of time is the time period between current time and following predetermined instant;When the first probability is less than when setting threshold value, remove corresponding process based on the first application program.Application disclosure embodiment, terminal use data based on the application program at running background can determine that this application program is switched to the first probability of front stage operation within a predetermined period of time, if this first probability is less than predetermined threshold value, so illustrating within a period of time, the probability that this application program is switched to front stage operation is the lowest, then terminal can remove the process of correspondence, to save system memory space and electricity, improve running efficiency of system, improve and run fluency, optimize Consumer's Experience.

Description

Management method, device and the terminal of application
Technical field
It relates to network communication technology field, particularly relate to the management method of a kind of application, device and terminal.
Background technology
Terminal, such as mobile phone, after closing App (Application, application program), the most do not kill this application Process, its process can continue executing with on backstage.Thus terminal is after using for a long time, it may appear that substantial amounts of backstage is entered Journey, these processes do not only take up Installed System Memory, cause system to be run slowly, consume the electricity of terminal yet.
In correlation technique, user can be manually operated some security classes software provide for removing background process Instrument, clears up process, but the mode of manual operation more bothers, and user may forget cleaning, thus Bring bad Consumer's Experience.
Summary of the invention
For overcoming problem present in correlation technique, present disclose provides the management method of a kind of application, device and terminal.
First aspect according to disclosure embodiment, it is provided that the management method of a kind of application program, it is characterised in that bag Include:
When the first application program is at running background, obtain the use data of described first application program;
Based on described use data, obtain described first application program and be switched to the of front stage operation within a predetermined period of time One probability, described predetermined amount of time is the time period between current time and following predetermined instant;
When described first probability is less than when setting threshold value, remove corresponding process based on described first application program.
Optionally, described method also includes:
When described first application program is switched to running background from foreground, obtain the first beginning being switched to running background Time;
When described first application program is switched to front stage operation from backstage, obtain the second beginning being switched to front stage operation Time;
The use data of described first application program of described acquisition, including:
Described use data are obtained based on described first time started and corresponding described second time started.
Optionally, described described second time started based on described first time started and correspondence obtains described use number According to, including:
Object time section is obtained, during described target based on described first time started and corresponding described second time started Between section be the time period between described first time started and corresponding described second time started;
Wherein, described use data at least include: described object time section.
Optionally, described described second time started based on described first time started and correspondence obtains described use number According to, including:
One day is divided into multiple unit interval section;
Based on described first time started and corresponding described second time started, obtain described first application program one It is switched in unit time section the second probability of front stage operation;
Wherein, described use data at least include: described second probability.
Optionally, described based on described use data, obtain described first application program and be switched within a predetermined period of time First probability of front stage operation, including:
Obtain the target unit time period that described predetermined amount of time is corresponding;
Threeth probability corresponding with the described target unit time period is obtained in described second probability;
Described first probability is obtained based on described 3rd probability.
Optionally, described based on described use data, obtain described first application program and be switched within a predetermined period of time First probability of front stage operation, including:
When described object time section is more than described predetermined amount of time, determine that described first probability is the first value;
When described object time section is less than or equal to described predetermined amount of time, determine that described first probability is the second value;
Wherein, described second value is more than described first value.
Optionally, described based on described first application program remove corresponding process, including:
Obtain the second application program associated with described first application program;
Remove the process that described first application program is corresponding with described second application program.
Optionally, described second application program includes: alternately switch with described first application program, and alternately switching Frequency is more than the application program of preset frequency.
Optionally, described based on described use data, obtain described first application program and be switched within a predetermined period of time First probability of front stage operation, including:
Based on described use data, determine currently at the foreground application of front stage operation;
When described foreground application is not described second application program, determine that described first probability is the 3rd value;
When described foreground application is described second application program, determine that described first probability is the 4th value;
Wherein, described 4th value is more than described 3rd value.
Optionally, the use data of described first application program of described acquisition, including:
The history reading described first application program uses time data;
Time data is used to determine the use frequency data of described first application program based on described history;
Wherein, described use data at least include: described use frequency data.
Optionally, described based on described use data, obtain described first application program and be switched within a predetermined period of time First probability of front stage operation, including:
When described use frequency data are more than the frequency threshold preset, determine that described first frequency is the 5th value;
When described use frequency data are less than or equal to described frequency threshold, determine that described first frequency is the 6th value;
Wherein, described 5th value is more than described 6th value.
Second aspect according to disclosure embodiment, it is provided that the managing device of a kind of application, including: the management dress of application Put, it is characterised in that including:
First acquisition module, is configured as the first application program when running background, obtains described first application program Use data;
Second acquisition module, is configured to based on described use data, obtains described first application program in the scheduled time Being switched to the first probability of front stage operation in Duan, described predetermined amount of time is the time between current time and following predetermined instant Section;
Remove module, when being configured as described first probability less than setting threshold value, clear based on described first application program Except corresponding process.
Optionally, described device also includes:
3rd acquisition module, is configured as described first application program when being switched to running background from foreground, and acquisition is cut Change to the first time started of running background;
4th acquisition module, is configured as described first application program when being switched to front stage operation from backstage, and acquisition is cut Change to the second time started of front stage operation;
Described first acquisition module includes:
First obtains submodule, is configured to obtain based on described first time started and corresponding described second time started Take described use data.
Optionally, described first acquisition submodule includes:
Second obtains submodule, is configured to obtain based on described first time started and corresponding described second time started Take object time section, described object time section be between described first time started and corresponding described second time started time Between section;
Wherein, described use data at least include: described object time section.
Optionally, described second acquisition submodule includes:
Divide submodule, be configured to be divided into one day multiple unit interval section;
3rd obtains submodule, is configured to based on described first time started and corresponding described second time started, Obtain described first application program in one day, in unit time section, be switched to the second probability of front stage operation;
Wherein, described use data at least include: described second probability.
Optionally, described second acquisition module includes:
4th obtains submodule, is configured to obtain the target unit time period that described predetermined amount of time is corresponding;
5th obtains submodule, is configured in described second probability acquisition corresponding with the described target unit time period 3rd probability;
6th obtains submodule, is configured to obtain described first probability based on described 3rd probability.
Optionally, described second acquisition module includes:
First determines submodule, is configured as described object time section more than described predetermined amount of time, determines described the One probability is the first value;
Second determines submodule, is configured as described object time section and is less than or equal to described predetermined amount of time, determines Described first probability is the second value;
Wherein, described second value is more than described first value.
Optionally, described removing module includes:
7th obtains submodule, is configured to obtain the second application program associated with described first application program;
First removes submodule, is configured to remove described first application program and described corresponding the entering of second application program Journey.
Optionally, described second application program includes: alternately switch with described first application program, and alternately switching Frequency is more than the application program of preset frequency.
Optionally, described second acquisition module includes:
3rd determines submodule, is configured to, based on described use data, determine currently in the foreground application of front stage operation Program;
4th determines submodule, and being configured as described foreground application is not described second application program, determines institute Stating the first probability is the 3rd value;
5th determines submodule, and being configured as described foreground application is described second application program, determines described First probability is the 4th value;
Wherein, described 4th value is more than described 3rd value.
Optionally, described first acquisition module includes:
Reading submodule, the history being configured to read described first application program uses time data;
6th determines submodule, is configured to use time data to determine described first application program based on described history Use frequency data;
Wherein, described use data at least include: described use frequency data.
Optionally, described second acquisition module includes:
6th determines submodule, is configured as described use frequency data and is more than the frequency threshold preset, and determines described First frequency is the 5th value;
7th determines submodule, is configured as described use frequency data and is less than or equal to described frequency threshold, determines Described first frequency is the 6th value;
Wherein, described 5th value is more than described 6th value.
The third aspect according to disclosure embodiment, it is provided that a kind of terminal, including: processor;Can for storing processor Perform the memorizer of instruction;Wherein, described processor is configured to:
When the first application program is at running background, obtain the use data of described first application program;
Based on described use data, obtain described first application program and be switched to the of front stage operation within a predetermined period of time One probability, described predetermined amount of time is the time period between current time and following predetermined instant;
When described first probability is less than when setting threshold value, remove corresponding process based on described first application program.
Embodiment of the disclosure that the technical scheme of offer can include following beneficial effect:
In the disclosure, terminal use data based on the application program at running background can determine that this application program is in advance The first probability of front stage operation it is switched to, if this first probability is less than predetermined threshold value, then illustrate at one section in the section of fixing time Within time, the probability that this application program is switched to front stage operation is the lowest, then terminal can remove the process of correspondence, with joint Save system memory space and electricity, improve running efficiency of system, improve and run fluency, optimize Consumer's Experience.
When in the disclosure, terminal can obtain the first beginning that many groups the first application program is switched to running background from foreground Between and be switched to the second time started of front stage operation from backstage, and during based on the first time started and the corresponding second beginning Between obtain the use data of the first application program such that it is able to the time opening this first application program based on user habit is obtained Take use data, in order to determine that the first application program is switched to the first probability of front stage operation more accurately.
In the disclosure, terminal can be divided into multiple unit interval section by one day, and opens based on the first time started and second Time beginning determines the second probability being switched to front stage operation in unit time such that it is able to the first application journey of reflection accurately The probability that sequence occurs in each unit interval section, consequently facilitating determine that the first application program switches at predetermined amount of time more accurately Probability to front stage operation.
In the disclosure, terminal can be the biggest based on the object time section between the first time started and the second time started In predetermined amount of time, determine that the first application program is switched to the first probability of front stage operation accurately, thus accurately determine and need Process to be removed, in order to effectively save memory headroom, improves operational efficiency.
In the disclosure, terminal can be by the first application program and the second application program being associated with the first application program Process is purged in the lump, the most alternately switches use due to affiliate application, thus before the first application program is switched to When the probability of platform operation is relatively low, the second application program being associated can be removed in the lump, thus effectively clear up memory headroom, improve Running efficiency of system, optimizes Consumer's Experience.
In the disclosure, whether terminal can be the associated application of the first application program based on current foreground application, comes Accurately determining that the first application program is switched to the probability of front stage operation, this mode is simple, it is easy to accomplish, and the accuracy judged Higher.
In the disclosure, terminal history based on the first application program can use time data to determine use frequency data, makes User's interest to application program can be reflected with frequency data.
In the disclosure, terminal can arrange frequency threshold, and whether use frequency based on the first application program is more than frequency threshold Value determines the first probability, thus for determine that the first application program switches in the first probability of front stage operation within a predetermined period of time There is provided more reference frame more accurately, it is possible to realize interest based on user and determine that the first application program is switched to foreground fortune First probability of row.
It should be appreciated that it is only exemplary and explanatory, not that above general description and details hereinafter describe The disclosure can be limited.
Accompanying drawing explanation
Accompanying drawing herein is merged in description and constitutes the part of this specification, it is shown that meet the enforcement of the disclosure Example, and for explaining the principle of the disclosure together with description.
Fig. 1 is the disclosure management method flow chart according to a kind of application shown in an exemplary embodiment.
Fig. 2 is the disclosure management method flow chart according to the another kind of application shown in an exemplary embodiment.
Fig. 3 is the disclosure management method flow chart according to the another kind of application shown in an exemplary embodiment.
Fig. 4 is the disclosure management method flow chart according to the another kind of application shown in an exemplary embodiment.
Fig. 5 is the disclosure management method flow chart according to the another kind of application shown in an exemplary embodiment.
Fig. 6 is that the disclosure is illustrated according to the application scenarios of the management method of a kind of application shown in an exemplary embodiment Figure.
Fig. 7 is the disclosure managing device block diagram according to a kind of application shown in an exemplary embodiment.
Fig. 8 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Fig. 9 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 10 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 11 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 12 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 13 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 14 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 15 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 16 is the disclosure managing device block diagram according to the another kind of application shown in an exemplary embodiment.
Figure 17 is that the disclosure is shown according to a kind of structure for the managing device of application shown in an exemplary embodiment It is intended to.
Detailed description of the invention
Here will illustrate exemplary embodiment in detail, its example represents in the accompanying drawings.Explained below relates to During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represents same or analogous key element.Following exemplary embodiment Described in embodiment do not represent all embodiments consistent with the disclosure.On the contrary, they are only with the most appended The example of the apparatus and method that some aspects that described in detail in claims, the disclosure are consistent.
The term used in the disclosure is only merely for describing the purpose of specific embodiment, and is not intended to be limiting the disclosure. " a kind of ", " described " and " being somebody's turn to do " of singulative used in disclosure and the accompanying claims book is also intended to include majority Form, unless context clearly shows that other implications.It is also understood that term "and/or" used herein refers to and wraps Any or all containing one or more projects of listing being associated may combination.
Although should be appreciated that in the disclosure possible employing term first, second, third, etc. to describe various information, but this A little information should not necessarily be limited by these terms.These terms are only used for same type of information is distinguished from each other out.Such as, without departing from In the case of disclosure scope, the first information can also be referred to as the second information, and similarly, the second information can also be referred to as One information.Depend on linguistic context, word as used in this " if " can be construed to " ... time " or " when ... Time " or " in response to determining ".
As it is shown in figure 1, Fig. 1 is the management method flow chart according to a kind of application shown in an exemplary embodiment, the party Method may be used for, in terminal, comprising the following steps:
Step 101, when the first application program is at running background, obtain the use data of this first application program.
Terminal in the disclosure can be any intelligent terminal with function of surfing the Net, for example, it is possible to specially mobile phone, flat Plate computer, PDA (Personal Digital Assistant, personal digital assistant) etc..Wherein, terminal can pass through wireless office Territory net couple in router, and by the server on router access public network.
Wherein the first application program can be the arbitrary application program installed in terminal.When user uses terminal, can To close application program by shutoff operation, or the first application program is made to exit foreground etc., surface by returning operation From the point of view of on, these operations make application program be closed, and in fact the process of application program is still in running background, the disclosure In embodiment, closing application program and refer to application program not at front stage operation, its process still in the situation of running background, is beaten Open application program to refer to so that application program is in the situation of front stage operation.
Step 102, based on these use data, obtain the first application program and be switched to front stage operation within a predetermined period of time First probability, predetermined amount of time is the time period between current time and following predetermined instant.
Wherein, predetermined amount of time can custom based on user be arranged, such as, in order to save terminal power, can will be somebody's turn to do It is longer that predetermined amount of time is arranged, such as 8 hours.First probability can represent with percentages, it is also possible to high, In, inferior grade do not represents.
Step 103, when the first probability less than predetermined threshold value time, based on first application program remove corresponding process.
In above-described embodiment, terminal use data based on the application program at running background can determine this application program It is switched to the first probability of front stage operation within a predetermined period of time, if this first probability is less than predetermined threshold value, then illustrate Within a period of time, the probability that this application program is switched to front stage operation is the lowest, then terminal can remove the process of correspondence, To save system memory space and electricity, improve running efficiency of system, improve and run fluency, optimize Consumer's Experience.
As in figure 2 it is shown, Fig. 2 is the management method flow chart according to the another kind of application shown in an exemplary embodiment, should Method may be used in terminal, and sets up on the basis of embodiment illustrated in fig. 1, and the method may comprise steps of:
Step 201, when the first application program is switched to running background from foreground, obtain be switched to the first of running background Time started.
In disclosure step, when terminal detects that the first application program is closed, the i.e. first application program is cut from foreground When changing to running background, record this time, as the first time started.
Step 202, when the first application program is switched to front stage operation from backstage, obtain be switched to the second of front stage operation Time started.
In disclosure step, when terminal detects that the first application program is opened, i.e. it is switched to front stage operation from backstage Time, record this time as the second time started.
It should be noted that terminal can gather multiple first time started and multiple second time started, i.e. gather One application program repeatedly time started corresponding to switchover operation between foreground and backstage.
Step 203, for the first application program at running background, based on the first time started and the corresponding second beginning Time obtains object time section.
Wherein, the first application program is switched to the first time started of running background from foreground, is then switched to from backstage Second time started of front stage operation is corresponding, say, that open in each the first corresponding time started and second Between time beginning, it is not carried out other switchings.
Such as, certain first application program is closed, and the first time started i.e. falling back on running background from foreground is the morning 8: 30, then the first application program is switched to the second time started of front stage operation from backstage is 9:10 in the morning, and this period first should By program at running background, then 8:30 with 9:10 is corresponding.And, use data to include object time section, i.e. 8:30-9:10 Between time period.
Step 204, the target unit time period that acquisition predetermined amount of time is corresponding.
In disclosure embodiment, in advance one day is divided into multiple unit interval section;Be then based on the first time started and The second corresponding time started, obtain the first application program in one day, in unit time section, be switched to the second of front stage operation Probability.Such as one day is divided into 3 unit interval sections, when 6 group of first time started gathered and the corresponding second beginning Between data in, have 3 groups of times to fall first unit interval section, have 2 groups of times to fall second unit interval section, have 1 group of time falls in low three unit interval sections, then the first application program is switched to foreground fortune in the first unit interval section Second probability of row is 50%, and the second probability being switched to front stage operation in the second unit interval section is 33.3%, the 3rd The second probability being switched to front stage operation in unit interval section is 16.7%.Obviously, the second probability is the biggest, it is meant that user is more Custom uses this first application program at predetermined amount of time, thus the first probability is the biggest.
Step 205, the 3rd probability that acquisition is corresponding with the target unit time period in the second probability.
In disclosure step, if unit interval section corresponding to predetermined amount of time is the first unit interval section, then the 3rd Probability is 50%.
Step 206, obtain the first probability based on the 3rd probability.
In disclosure step, the 3rd probability is high, and correspondingly the first probability is the highest.
Step 207, based on first application program remove corresponding process.
In a possible implementation, directly remove the process of the first application program.
In the implementation that another is possible, obtain the second application program associated with the first application program.
In disclosure embodiment, the second application program refers to alternately switch with the first application program, and alternately cuts Change the frequency application program more than preset frequency.
Such as, camera application program and image procossing application program the most alternately switch use, in this case can be by Camera application program and image procossing application program regard mutually the application program of association as.Such as, the first of certain camera applications Time started and the second time started are respectively 12:23-12:31,12:50-12:59,13:12-13:25, and certain image procossing should The first time started and the second time started be respectively 12:31-12:49,13:00-13:11,13:26-13:29, from The upper time it can be seen that the time-interleaved switching of the use of the two application program and continuously, and alternately switching frequency more than predetermined Frequency, thus this camera applications and image procossing can be applied and be defined as associated application.
In this case, not only remove the process that the first application program is corresponding, also remove corresponding the entering of the second application program Journey, to avoid backstage extensive application process occur, takies Installed System Memory, the relieving system speed of service.
As it is shown on figure 3, Fig. 3 is the management method flow chart according to the another kind of application shown in an exemplary embodiment, should Method may be used in terminal, and sets up on the basis of embodiment illustrated in fig. 1, and step 102 may comprise steps of:
Step 301, based on using data, determine currently at the foreground application of front stage operation.
In the terminal, currently in the application program only one of which of front stage operation, terminal may determine that current foreground application Program.
Step 302, when foreground application is not the second application program, determine that the first probability is the 3rd value.
Step 303, when foreground application is the second application program, determine that the first probability is the 4th value.
Wherein, the 4th value is more than the 3rd value.
Described in embodiment illustrated in fig. 2, the first application program and the second application program are affiliate application, on backstage Run is the first application program, and foreground application is and the affiliate application of the first application program, owing to association should With generally replacing switchover operation, thus the first application program is switched to the probability of front stage operation, and the i.e. the 4th value is higher, if foreground Application program is not the second application program, then the first application program is switched to the probability of front stage operation, and the i.e. the 3rd value is relatively low.
In above-described embodiment, whether application program based on front stage operation is the association of the first application program of running background Application program, determines that the first application program is switched to the first probability of front stage operation, owing to associated application is for alternately frequently making Application, thus this mode can accurately judge the height of the first probability.
As shown in Figure 4, Fig. 4 is the management method flow chart according to the another kind of application shown in an exemplary embodiment, should Method may be used in terminal, and sets up on the basis of embodiment illustrated in fig. 1, and step 102 may comprise steps of:
Step 401, when object time section is more than predetermined amount of time, determine that the first probability is the first value.
Step 402, when object time section is less than or equal to predetermined amount of time, determine that the first probability is the second value.
Wherein, described second value is more than described first value.
In disclosure embodiment, it is provided with predetermined amount of time, for example, owing to object time section was the first time started And the time period between the second corresponding time started, thus the length of object time section can illustrate making of the first application program By frequency, if object time section is shorter, then can illustrate that the first application program, when running background, is switched to front stage operation Frequency higher, thus disclosure embodiment is provided with predetermined amount of time, such as 2 hours, if object time section is more than pre- The section of fixing time, then the first application program is switched to the probability of front stage operation, and the i.e. first value is less, if object time section is less than Or equal to predetermined amount of time, then the first application program is switched to the probability of front stage operation, and the i.e. second value is bigger.
Such as, for weather application, user is to check once in the period more early every day, and time difference is about It is about 24 hours, for example, 8 hours setting time period of user setup, then due to 24 hours ratio 8 little durations, thus permissible Think this application program within the period of 8 hours from current time again the first probability at front stage operation be 0, or be The first relatively low value.
As it is shown in figure 5, Fig. 5 is the management method flow chart according to the another kind of application shown in an exemplary embodiment, should Method may be used in terminal, and sets up on the basis of embodiment illustrated in fig. 1, and step 101 may comprise steps of:
Step 501, read the first application program history use time data.
In the terminal, the use time of each application program installed can be stored, namely at front stage operation Time.
Step 502, time data is used to determine the use frequency data of the first application program based on history.
Can determine the use frequency of application program based on the use time, some application program front stage operation frequency relatively Height, some application program is less to be opened, say, that less at front stage operation.
Wherein, data are used at least to include: to use frequency data.
Step 503, when use frequency data more than preset frequency threshold, determine that first frequency is the 5th value.
Step 504, when using frequency data less than or equal to frequency threshold, determine that first frequency is the 6th value.
Wherein, the 5th value is more than the 6th value.
In above-described embodiment, use frequency can represent the interest of user, say, that the application program that user is interested Use frequency higher, the use frequency of the application program that user is interested is relatively low, thus can arrange frequency threshold, will Use frequency to be defined as the 5th higher value more than the first frequency of application program of frequency threshold, will use frequency less than or etc. First frequency in the application program of frequency threshold is defined as the 6th relatively low value.It is thus possible to accurately determine that first should The first probability of front stage operation it is switched to by program.
As shown in Figure 6, Fig. 6 is the disclosure application according to the management method of a kind of application shown in an exemplary embodiment Scene schematic diagram.In the scene shown in Fig. 6, including: as the smart mobile phone of terminal.
Smart mobile phone, for each application program installed, all records it and uses data, including: application journey detected When sequence is switched to running background from foreground, obtains and be switched to the first time started of running background, also record this application program from When backstage is switched to front stage operation, it is switched to the second time started of front stage operation.Terminal gathers 8 groups of application programs " news " First time started and the second time started of correspondence, and one day is divided into three time periods, including 6:00-12:00 in the morning, Afternoon 12:00-18:00 and 18:00-23:00 in evening.These 8 groups of time datas there are 5 groups occur in section the unit interval in the morning, There are 2 groups unit interval section in the afternoon occurs, have 1 group the time period at night occurs, then to would correspond to each unit interval section Front stage operation probability is stored as using data.
Smart mobile phone detects that application program " news ", when running background, reads the use number of application program " news " According to, it is assumed that current time is 7:00 in the morning, and predetermined amount of time is 7:00-11:00 in the morning, belongs to the first unit interval section, thus Read " news " in the first unit interval section at the probability of front stage operation, be 62.5%, determine that the first probability is also height accordingly, Thus smart mobile phone removes the process that " news " application program is corresponding.
In application scenarios shown in Fig. 6, it is achieved the detailed process of the management of application may refer to aforementioned to retouching in Fig. 1-2 State, do not repeat them here.
Corresponding with the management method embodiment of aforementioned applications, the disclosure additionally provides the managing device of application and is answered The embodiment of terminal.
As it is shown in fig. 7, Fig. 7 is the disclosure managing device block diagram according to a kind of application shown in an exemplary embodiment, This device can apply in terminal, and for performing the method shown in Fig. 1, this device may include that the first acquisition module 710, the second acquisition module 720 and removing module 730.
First acquisition module 710, is configured as the first application program when running background, obtains described first application journey The use data of sequence;
Second acquisition module 720, is configured to based on described use data, obtains described first application program in pre-timing Between be switched to the first probability of front stage operation in section, described predetermined amount of time be between current time and following predetermined instant time Between section;
Remove module 730, when being configured as described first probability less than setting threshold value, based on described first application program Remove corresponding process.
In above-described embodiment, terminal use data based on the application program at running background can determine this application program It is switched to the first probability of front stage operation within a predetermined period of time, if this first probability is less than predetermined threshold value, then illustrate Within a period of time, the probability that this application program is switched to front stage operation is the lowest, then terminal can remove the process of correspondence, To save system memory space and electricity, improve running efficiency of system, improve and run fluency, optimize Consumer's Experience.
As shown in Figure 8, Fig. 8 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 7, and this device can also include: this device also includes: the 3rd obtains Module 740 and the 4th acquisition module 750.
3rd acquisition module 740, is configured as described first application program when being switched to running background from foreground, obtains It is switched to the first time started of running background;
4th acquisition module 750, is configured as described first application program when being switched to front stage operation from backstage, obtains It is switched to the second time started of front stage operation;
This first acquisition module 710 includes:
First obtains submodule 711, when being configured to start based on described first time started and corresponding described second Between obtain described use data.
In above-described embodiment, terminal can obtain many groups the first application program and be switched to the first of running background from foreground and open Time beginning and be switched to the second time started of front stage operation from backstage, and open based on the first time started and corresponding second Time beginning obtains the use data of the first application program such that it is able to open the time of this first application program based on user habit Obtain use data, in order to determine that the first application program is switched to the first probability of front stage operation more accurately.
As it is shown in figure 9, Fig. 9 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 8, and first obtains submodule 711 may include that the second acquisition submodule Block 712.
Second obtains submodule 712, when being configured to start based on described first time started and corresponding described second Between obtain object time section, described object time section is between described first time started and corresponding described second time started Time period;
Wherein, described use data at least include: described object time section.
As shown in Figure 10, Figure 10 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 8, and second obtains submodule 712 may include that division submodule 713 and the 3rd obtain submodule 714.
Divide submodule 713, be configured to be divided into one day multiple unit interval section;
3rd obtains submodule 714, when being configured to start based on described first time started and corresponding described second Between, obtain described first application program in one day, in unit time section, be switched to the second probability of front stage operation;
Wherein, described use data at least include: described second probability.
In above-described embodiment, terminal can be divided into multiple unit interval section by one day, and based on the first time started and Second time started determined the second probability being switched to front stage operation in unit time such that it is able to reflect first accurately The probability that application program occurs in each unit interval section, consequently facilitating determine that the first application program is in the scheduled time more accurately Section is switched to the probability of front stage operation.
As shown in figure 11, Figure 11 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 10, and the second acquisition module 720 may include that the 4th acquisition submodule Block the 721, the 5th obtains submodule 722 and the 6th and obtains submodule 723.
4th obtains submodule 721, is configured to obtain the target unit time period that described predetermined amount of time is corresponding;
5th obtains submodule 722, is configured in described second probability obtain and the described target unit time period pair The 3rd probability answered;
6th obtains submodule 723, is configured to obtain described first probability based on described 3rd probability.
As shown in figure 12, Figure 12 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 9, and the second acquisition module 720 may include that first determines submodule 724 and second determine submodule 725.
First determines submodule 724, is configured as described object time section and is more than described predetermined amount of time, determines described First probability is the first value;
Second determines submodule 725, is configured as described object time section and is less than or equal to described predetermined amount of time, really Fixed described first probability is the second value;
Wherein, described second value is more than described first value.
In above-described embodiment, terminal can be based on the object time section between the first time started and the second time started No more than predetermined amount of time, determine that the first application program is switched to the first probability of front stage operation accurately, thus the most true The fixed process needing to remove, in order to effectively save memory headroom, improves operational efficiency.
As shown in figure 13, Figure 13 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment, on the basis of aforementioned embodiment illustrated in fig. 7, is removed module 730 and be may include that the 7th acquisition submodule 731 Submodule 732 is removed with first.
7th obtains submodule 731, is configured to obtain the second application program associated with described first application program;
First removes submodule 732, is configured to remove described first application program corresponding with described second application program Process.
Second application program includes: alternately switch with described first application program, and alternately switching frequency is more than pre- Determine the application program of frequency.
In above-described embodiment, terminal can be by the first application program and the second application journey being associated with the first application program The process of sequence is purged in the lump, the most alternately switches use due to affiliate application, thus switches at the first application program When probability to front stage operation is relatively low, the second application program being associated can be removed in the lump, thus effectively clear up memory headroom, Improve running efficiency of system, optimize Consumer's Experience.
As shown in figure 14, Figure 14 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 13, and the second acquisition module 720 may include that the 3rd determines submodule Block the 726, the 4th determines that submodule 727 and the 5th determines submodule 728.
3rd determines submodule 726, is configured to based on described use data, and determining currently should on the foreground of front stage operation Use program;
4th determines submodule 727, and being configured as described foreground application is not described second application program, determines Described first probability is the 3rd value;
5th determines submodule 728, and being configured as described foreground application is described second application program, determines institute Stating the first probability is the 4th value;
Wherein, described 4th value is more than described 3rd value.
In above-described embodiment, whether terminal can be that the association of the first application program should based on current foreground application With, accurately determining that the first application program is switched to the probability of front stage operation, this mode is simple, it is easy to accomplish, and judge Accuracy is higher.
As shown in figure 15, Figure 15 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 7, and the first acquisition module 710 may include that reading submodule 715 Submodule 716 is determined with the 6th.
Reading submodule 715, the history being configured to read described first application program uses time data;
6th determines submodule 716, is configured to use time data to determine described first application journey based on described history The use frequency data of sequence;
Wherein, described use data at least include: described use frequency data.
In above-described embodiment, terminal history based on the first application program can use time data to determine use frequency number According to, use frequency data can reflect user's interest to application program.
As shown in figure 16, Figure 16 is the disclosure managing device frame according to the another kind of application shown in an exemplary embodiment Figure, this embodiment is on the basis of aforementioned embodiment illustrated in fig. 15, and the second acquisition module 720 may include that the 7th determines submodule Block 729 and the 8th determines submodule 7210.
7th determines submodule 729, is configured as described use frequency data and is more than the frequency threshold preset, determines institute Stating first frequency is the 5th value;
8th determines submodule 7210, is configured as described use frequency data and is less than or equal to described frequency threshold, Determine that described first frequency is the 6th value;
Wherein, described 5th value is more than described 6th value.
In above-described embodiment, terminal can arrange frequency threshold, and whether use frequency based on the first application program is more than Frequency threshold determines the first probability, thus for determining that the first application program switches in the of front stage operation within a predetermined period of time One probability provides more reference frames more accurately, it is possible to realizes interest based on user and determines that the first application program is switched to First probability of front stage operation.
The managing device embodiment of the application shown in above-mentioned Fig. 7 to Figure 16 can be applied in the terminal.
In said apparatus, the function of unit and the process that realizes of effect specifically refer to corresponding step in said method Realize process, do not repeat them here.
For device embodiment, owing to it corresponds essentially to embodiment of the method, so relevant part sees method in fact The part executing example illustrates.Device embodiment described above is only schematically, wherein said as separating component The unit illustrated can be or may not be physically separate, and the parts shown as unit can be or can also It not physical location, i.e. may be located at a place, or can also be distributed on multiple NE.Can be according to reality Need to select some or all of module therein to realize the purpose of disclosure scheme.Those of ordinary skill in the art are not paying In the case of going out creative work, i.e. it is appreciated that and implements.
Corresponding with Fig. 7, the disclosure also provides for a kind of terminal, and this terminal includes processor;Can for storing processor Perform the memorizer of instruction;Wherein, described processor is configured to:
When the first application program is at running background, obtain the use data of described first application program;
Based on described use data, obtain described first application program and be switched to the of front stage operation within a predetermined period of time One probability, described predetermined amount of time is the time period between current time and following predetermined instant;
When described first probability is less than when setting threshold value, remove corresponding process based on described first application program.
As shown in figure 17, Figure 17 is that the disclosure is according to a kind of managing device for application shown in an exemplary embodiment One structural representation of 1700 (terminal equipment side).Such as, device 1700 can be the mobile phone with routing function, calculates Machine, digital broadcast terminal, messaging devices, game console, tablet device, armarium, body-building equipment, individual digital helps Reason etc..
With reference to Figure 17, device 1700 can include following one or more assembly: processes assembly 1702, memorizer 1704, Power supply module 1706, multimedia groupware 1708, audio-frequency assembly 1710, the interface 1712 of input/output (I/O), sensor cluster 1714, and communications component 1716.
Process assembly 1702 and generally control the integrated operation of device 1700, such as with display, call, data communication, The operation that camera operation and record operation are associated.Process assembly 1702 and can include that one or more processor 1720 performs Instruction, to complete all or part of step of above-mentioned method.Additionally, process assembly 1702 can include one or more mould Block, it is simple to process between assembly 1702 and other assemblies is mutual.Such as, process assembly 1702 and can include multi-media module, With facilitate multimedia groupware 1708 and process between assembly 1702 mutual.
Memorizer 1704 is configured to store various types of data to support the operation at device 1700.These data Example include on device 1700 operation any application program or the instruction of method, contact data, telephone book data, Message, picture, video etc..Memorizer 1704 can by any kind of volatibility or non-volatile memory device or they Combination realizes, such as static RAM (SRAM), Electrically Erasable Read Only Memory (EEPROM), erasable can Program read-only memory (EPROM), programmable read only memory (PROM), read only memory (ROM), magnetic memory, flash memory Reservoir, disk or CD.
The various assemblies that power supply module 1706 is device 1700 provide electric power.Power supply module 1706 can include power management System, one or more power supplys, and other generate, manage and distribute, with for device 1700, the assembly that electric power is associated.
The screen of one output interface of offer that multimedia groupware 1708 is included between described device 1700 and user.? In some embodiments, screen can include liquid crystal display (LCD) and touch panel (TP).If screen includes touch panel, Screen may be implemented as touch screen, to receive the input signal from user.Touch panel includes that one or more touch passes Sensor is with the gesture on sensing touch, slip and touch panel.Described touch sensor can not only sense touch or slide dynamic The border made, but also detect the persistent period relevant to described touch or slide and pressure.In certain embodiments, many Media component 1708 includes a front-facing camera and/or post-positioned pick-up head.When device 1700 is in operator scheme, such as shooting mould When formula or video mode, front-facing camera and/or post-positioned pick-up head can receive the multi-medium data of outside.Each preposition shooting Head and post-positioned pick-up head can be a fixing optical lens system or have focal length and optical zoom ability.
Audio-frequency assembly 1710 is configured to output and/or input audio signal.Such as, audio-frequency assembly 1710 includes a wheat Gram wind (MIC), when device 1700 is in operator scheme, during such as call model, logging mode and speech recognition mode, mike quilt It is configured to receive external audio signal.The audio signal received can be further stored at memorizer 1704 or via communication Assembly 1716 sends.In certain embodiments, audio-frequency assembly 1710 also includes a speaker, is used for exporting audio signal.
I/O interface 1712 provides interface, above-mentioned peripheral interface module for processing between assembly 1702 and peripheral interface module Can be keyboard, put striking wheel, button etc..These buttons may include but be not limited to: home button, volume button, start button and Locking press button.
Sensor cluster 1714 includes one or more sensor, for providing the state of various aspects to comment for device 1700 Estimate.Such as, what sensor cluster 1714 can detect device 1700 opens/closed mode, the relative localization of assembly, such as institute Stating display and keypad that assembly is device 1700, sensor cluster 1714 can also detect device 1700 or device 1,700 1 The position change of individual assembly, the presence or absence that user contacts with device 1700, device 1700 orientation or acceleration/deceleration and dress Put the variations in temperature of 1700.Sensor cluster 1714 can include proximity transducer, is configured to do not having any physics The existence of object near detection during contact.Sensor cluster 1714 can also include optical sensor, as CMOS or ccd image sense Device, for using in imaging applications.In certain embodiments, this sensor cluster 1714 can also include acceleration sensing Device, gyro sensor, Magnetic Sensor, pressure transducer, microwave remote sensor or temperature sensor.
Communications component 1716 is configured to facilitate the communication of wired or wireless mode between device 1700 and other equipment.Dress Put 1700 and can access wireless network based on communication standard, such as WiFi, 2G or 3G, or combinations thereof.Exemplary at one In embodiment, broadcast singal or broadcast that communications component 1716 receives from external broadcasting management system via broadcast channel are relevant Information.In one exemplary embodiment, described communications component 1716 also includes near-field communication (NFC) module, to promote short distance Communication.Such as, can be based on RF identification (RFID) technology in NFC module, Infrared Data Association (IrDA) technology, ultra broadband (UWB) technology, bluetooth (BT) technology and other technologies realize.
In the exemplary embodiment, device 1700 can be by one or more application specific integrated circuits (ASIC), numeral Signal processor (DSP), digital signal processing appts (DSPD), PLD (PLD), field programmable gate array (FPGA), controller, microcontroller, microprocessor or other electronic components realize, be used for performing said method.
In the exemplary embodiment, a kind of non-transitory computer-readable recording medium including instruction, example are additionally provided As included the memorizer 1704 of instruction, above-mentioned instruction can have been performed said method by the processor 1720 of device 1700.Example If, described non-transitory computer-readable recording medium can be ROM, random access memory (RAM), CD-ROM, tape, soft Dish and optical data storage devices etc..
Disclosure embodiment additionally provides a kind of non-transitory computer-readable recording medium, when in described storage medium When instructing the processor execution by mobile terminal so that mobile terminal is able to carry out the management method of a kind of application, described method Including:
When the first application program is at running background, obtain the use data of described first application program;
Based on described use data, obtain described first application program and be switched to the of front stage operation within a predetermined period of time One probability, described predetermined amount of time is the time period between current time and following predetermined instant;
When described first probability is less than when setting threshold value, remove corresponding process based on described first application program.
Those skilled in the art, after considering description and putting into practice invention disclosed herein, will readily occur to its of the disclosure Its embodiment.The disclosure is intended to any modification, purposes or the adaptations of the disclosure, these modification, purposes or Person's adaptations is followed the general principle of the disclosure and includes the undocumented common knowledge in the art of the disclosure Or conventional techniques means.Description and embodiments is considered only as exemplary, and the true scope of the disclosure and spirit are by following Claim is pointed out.
The foregoing is only the preferred embodiment of the disclosure, not in order to limit the disclosure, all essences in the disclosure Within god and principle, any modification, equivalent substitution and improvement etc. done, should be included within the scope of disclosure protection.

Claims (23)

1. the management method of an application program, it is characterised in that including:
When the first application program is at running background, obtain the use data of described first application program;
Based on described use data, obtain described first application program and be switched to the first general of front stage operation within a predetermined period of time Rate, described predetermined amount of time is the time period between current time and following predetermined instant;
When described first probability is less than when setting threshold value, remove corresponding process based on described first application program.
Method the most according to claim 1, it is characterised in that described method also includes:
When described first application program is switched to running background from foreground, when obtaining the first beginning being switched to running background Between;
When described first application program is switched to front stage operation from backstage, when obtaining the second beginning being switched to front stage operation Between;
The use data of described first application program of described acquisition, including:
Described use data are obtained based on described first time started and corresponding described second time started.
Method the most according to claim 2, it is characterised in that described based on described in described first time started and correspondence Second time started obtained described use data, including:
Object time section, described object time section is obtained based on described first time started and corresponding described second time started For the time period between described first time started and corresponding described second time started;
Wherein, described use data at least include: described object time section.
Method the most according to claim 2, it is characterised in that described based on described in described first time started and correspondence Second time started obtained described use data, including:
One day is divided into multiple unit interval section;
Based on described first time started and corresponding described second time started, obtain described first application program in one day The second probability of front stage operation it is switched in unit time section;
Wherein, described use data at least include: described second probability.
Method the most according to claim 4, it is characterised in that described based on described use data, obtaining described first should The first probability of front stage operation it is switched within a predetermined period of time by program, including:
Obtain the target unit time period that described predetermined amount of time is corresponding;
Threeth probability corresponding with the described target unit time period is obtained in described second probability;
Described first probability is obtained based on described 3rd probability.
Method the most according to claim 3, it is characterised in that described based on described use data, obtaining described first should The first probability of front stage operation it is switched within a predetermined period of time by program, including:
When described object time section is more than described predetermined amount of time, determine that described first probability is the first value;
When described object time section is less than or equal to described predetermined amount of time, determine that described first probability is the second value;
Wherein, described second value is more than described first value.
Method the most according to claim 1, it is characterised in that described based on described first application program remove enter accordingly Journey, including:
Obtain the second application program associated with described first application program;
Remove the process that described first application program is corresponding with described second application program.
Method the most according to claim 7, it is characterised in that described second application program includes: with described first application Program alternately switches, and alternately switching frequency is more than the application program of preset frequency.
Method the most according to claim 7, it is characterised in that described based on described use data, obtaining described first should The first probability of front stage operation it is switched within a predetermined period of time by program, including:
Based on described use data, determine currently at the foreground application of front stage operation;
When described foreground application is not described second application program, determine that described first probability is the 3rd value;
When described foreground application is described second application program, determine that described first probability is the 4th value;
Wherein, described 4th value is more than described 3rd value.
Method the most according to claim 6, it is characterised in that the use data of described first application program of described acquisition, Including:
The history reading described first application program uses time data;
Time data is used to determine the use frequency data of described first application program based on described history;
Wherein, described use data at least include: described use frequency data.
11. methods according to claim 10, it is characterised in that described based on described use data, obtain described first Application program is switched to the first probability of front stage operation within a predetermined period of time, including:
When described use frequency data are more than the frequency threshold preset, determine that described first frequency is the 5th value;
When described use frequency data are less than or equal to described frequency threshold, determine that described first frequency is the 6th value;
Wherein, described 5th value is more than described 6th value.
The managing device of 12. 1 kinds of application, it is characterised in that including:
First acquisition module, is configured as the first application program when running background, obtains making of described first application program Use data;
Second acquisition module, is configured to, based on described use data, obtain described first application program within a predetermined period of time Being switched to the first probability of front stage operation, described predetermined amount of time is the time period between current time and following predetermined instant;
Remove module, when being configured as described first probability less than setting threshold value, remove phase based on described first application program The process answered.
13. devices according to claim 12, it is characterised in that described device also includes:
3rd acquisition module, is configured as described first application program when being switched to running background from foreground, and acquisition is switched to First time started of running background;
4th acquisition module, is configured as described first application program when being switched to front stage operation from backstage, and acquisition is switched to Second time started of front stage operation;
Described first acquisition module includes:
First obtains submodule, is configured to obtain institute based on described first time started and corresponding described second time started State use data.
14. devices according to claim 13, it is characterised in that described first obtains submodule includes:
Second obtains submodule, is configured to obtain mesh based on described first time started and corresponding described second time started The mark time period, described object time section is the time between described first time started and corresponding described second time started Section;
Wherein, described use data at least include: described object time section.
15. devices according to claim 13, it is characterised in that described second obtains submodule includes:
Divide submodule, be configured to be divided into one day multiple unit interval section;
3rd obtains submodule, is configured to, based on described first time started and corresponding described second time started, obtain Described first application program was switched to the second probability of front stage operation in one day in unit time section;
Wherein, described use data at least include: described second probability.
16. devices according to claim 15, it is characterised in that described second acquisition module includes:
4th obtains submodule, is configured to obtain the target unit time period that described predetermined amount of time is corresponding;
5th obtains submodule, is configured in described second probability obtain threeth corresponding with the described target unit time period Probability;
6th obtains submodule, is configured to obtain described first probability based on described 3rd probability.
17. devices according to claim 14, it is characterised in that described second acquisition module includes:
First determines submodule, is configured as described object time section more than described predetermined amount of time, determines described first general Rate is the first value;
Second determines submodule, is configured as described object time section and is less than or equal to described predetermined amount of time, determines described First probability is the second value;
Wherein, described second value is more than described first value.
18. devices according to claim 12, it is characterised in that described removing module includes:
7th obtains submodule, is configured to obtain the second application program associated with described first application program;
First removes submodule, is configured to remove the process that described first application program is corresponding with described second application program.
19. devices according to claim 18, it is characterised in that described second application program includes: should with described first Alternately switch by program, and alternately switching frequency is more than the application program of preset frequency.
20. devices according to claim 18, it is characterised in that described second acquisition module includes:
3rd determines submodule, is configured to, based on described use data, determine currently at the foreground application of front stage operation;
4th determines submodule, and being configured as described foreground application is not described second application program, determines described One probability is the 3rd value;
5th determines submodule, and being configured as described foreground application is described second application program, determines described first Probability is the 4th value;
Wherein, described 4th value is more than described 3rd value.
21. devices according to claim 12, it is characterised in that described first acquisition module includes:
Reading submodule, the history being configured to read described first application program uses time data;
6th determines submodule, is configured to use time data to determine the use of described first application program based on described history Frequency data;
Wherein, described use data at least include: described use frequency data.
22. devices according to claim 21, it is characterised in that described second acquisition module includes:
6th determines submodule, is configured as described use frequency data and is more than the frequency threshold preset, determines described first Frequency is the 5th value;
7th determines submodule, is configured as described use frequency data and is less than or equal to described frequency threshold, determines described First frequency is the 6th value;
Wherein, described 5th value is more than described 6th value.
23. 1 kinds of terminals, it is characterised in that including: processor;For storing the memorizer of processor executable;Wherein, Described processor is configured to:
When the first application program is at running background, obtain the use data of described first application program;
Based on described use data, obtain described first application program and be switched to the first general of front stage operation within a predetermined period of time Rate, described predetermined amount of time is the time period between current time and following predetermined instant;
When described first probability is less than when setting threshold value, remove corresponding process based on described first application program.
CN201610509828.9A 2016-06-30 2016-06-30 Management method, device and the terminal of application Pending CN106201686A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610509828.9A CN106201686A (en) 2016-06-30 2016-06-30 Management method, device and the terminal of application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610509828.9A CN106201686A (en) 2016-06-30 2016-06-30 Management method, device and the terminal of application

Publications (1)

Publication Number Publication Date
CN106201686A true CN106201686A (en) 2016-12-07

Family

ID=57464409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610509828.9A Pending CN106201686A (en) 2016-06-30 2016-06-30 Management method, device and the terminal of application

Country Status (1)

Country Link
CN (1) CN106201686A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959892A (en) * 2017-03-30 2017-07-18 联想(北京)有限公司 Process handling method, device and electronic equipment
CN107133094A (en) * 2017-06-05 2017-09-05 努比亚技术有限公司 Application management method, mobile terminal and computer-readable recording medium
CN107436779A (en) * 2017-05-22 2017-12-05 努比亚技术有限公司 A kind of application management method, equipment and computer-readable recording medium
CN107632697A (en) * 2017-09-30 2018-01-26 广东欧珀移动通信有限公司 Processing method, device, storage medium and the electronic equipment of application program
CN107678928A (en) * 2017-10-31 2018-02-09 聚好看科技股份有限公司 The processing method and server of application program
CN107844333A (en) * 2017-09-06 2018-03-27 努比亚技术有限公司 One kind applies method for cleaning, mobile terminal and computer-readable recording medium
CN107908273A (en) * 2017-11-14 2018-04-13 广东欧珀移动通信有限公司 application management method, device, storage medium and electronic equipment
CN108111427A (en) * 2017-12-20 2018-06-01 歌尔科技有限公司 Data flow control method and device in a kind of terminal device
CN109388947A (en) * 2018-10-30 2019-02-26 努比亚技术有限公司 A kind of back-stage management method, equipment and computer readable storage medium
WO2019062462A1 (en) * 2017-09-30 2019-04-04 Oppo广东移动通信有限公司 Application control method and apparatus, storage medium and electronic device
WO2019061184A1 (en) * 2017-09-28 2019-04-04 深圳传音通讯有限公司 Process clearing method and related device
CN109819503A (en) * 2019-01-08 2019-05-28 平安科技(深圳)有限公司 The management method and device of terminal APP
CN110046031A (en) * 2018-01-12 2019-07-23 广东欧珀移动通信有限公司 Application processing method and device, electronic equipment, computer readable storage medium
CN111709785A (en) * 2020-06-18 2020-09-25 北京字节跳动网络技术有限公司 Method, apparatus, device and medium for determining user retention time
CN112346699A (en) * 2020-10-29 2021-02-09 深圳Tcl新技术有限公司 Volume control method and device for audio application, terminal and readable storage medium
WO2021208626A1 (en) * 2020-04-13 2021-10-21 华为技术有限公司 Method and apparatus for keeping application alive, and electronic device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090113444A1 (en) * 2007-10-31 2009-04-30 Google Inc. Application Management
CN102521041A (en) * 2011-12-14 2012-06-27 华为终端有限公司 Method for processing application program and wireless handheld device
CN104298336A (en) * 2013-07-19 2015-01-21 贝壳网际(北京)安全技术有限公司 Mobile terminal and control method and device of application program of mobile terminal
CN105045637A (en) * 2015-08-14 2015-11-11 深圳市金立通信设备有限公司 Application start method and terminal
CN105718027A (en) * 2016-01-20 2016-06-29 努比亚技术有限公司 Management method of background application programs and mobile terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090113444A1 (en) * 2007-10-31 2009-04-30 Google Inc. Application Management
CN102521041A (en) * 2011-12-14 2012-06-27 华为终端有限公司 Method for processing application program and wireless handheld device
CN104298336A (en) * 2013-07-19 2015-01-21 贝壳网际(北京)安全技术有限公司 Mobile terminal and control method and device of application program of mobile terminal
CN105045637A (en) * 2015-08-14 2015-11-11 深圳市金立通信设备有限公司 Application start method and terminal
CN105718027A (en) * 2016-01-20 2016-06-29 努比亚技术有限公司 Management method of background application programs and mobile terminal

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959892A (en) * 2017-03-30 2017-07-18 联想(北京)有限公司 Process handling method, device and electronic equipment
CN107436779A (en) * 2017-05-22 2017-12-05 努比亚技术有限公司 A kind of application management method, equipment and computer-readable recording medium
CN107133094A (en) * 2017-06-05 2017-09-05 努比亚技术有限公司 Application management method, mobile terminal and computer-readable recording medium
CN107133094B (en) * 2017-06-05 2021-11-02 努比亚技术有限公司 Application management method, mobile terminal and computer readable storage medium
CN107844333A (en) * 2017-09-06 2018-03-27 努比亚技术有限公司 One kind applies method for cleaning, mobile terminal and computer-readable recording medium
WO2019061184A1 (en) * 2017-09-28 2019-04-04 深圳传音通讯有限公司 Process clearing method and related device
CN107632697B (en) * 2017-09-30 2019-10-25 Oppo广东移动通信有限公司 Processing method, device, storage medium and the electronic equipment of application program
WO2019062462A1 (en) * 2017-09-30 2019-04-04 Oppo广东移动通信有限公司 Application control method and apparatus, storage medium and electronic device
CN107632697A (en) * 2017-09-30 2018-01-26 广东欧珀移动通信有限公司 Processing method, device, storage medium and the electronic equipment of application program
CN107678928A (en) * 2017-10-31 2018-02-09 聚好看科技股份有限公司 The processing method and server of application program
CN107908273A (en) * 2017-11-14 2018-04-13 广东欧珀移动通信有限公司 application management method, device, storage medium and electronic equipment
CN108111427A (en) * 2017-12-20 2018-06-01 歌尔科技有限公司 Data flow control method and device in a kind of terminal device
CN110046031B (en) * 2018-01-12 2021-11-09 Oppo广东移动通信有限公司 Application processing method and device, electronic equipment and computer readable storage medium
CN110046031A (en) * 2018-01-12 2019-07-23 广东欧珀移动通信有限公司 Application processing method and device, electronic equipment, computer readable storage medium
CN109388947A (en) * 2018-10-30 2019-02-26 努比亚技术有限公司 A kind of back-stage management method, equipment and computer readable storage medium
CN109388947B (en) * 2018-10-30 2023-06-20 浙江解纷链数字科技有限公司 Background management method, device and computer readable storage medium
CN109819503A (en) * 2019-01-08 2019-05-28 平安科技(深圳)有限公司 The management method and device of terminal APP
CN109819503B (en) * 2019-01-08 2022-11-04 平安科技(深圳)有限公司 Management method and device of terminal APP
WO2021208626A1 (en) * 2020-04-13 2021-10-21 华为技术有限公司 Method and apparatus for keeping application alive, and electronic device
CN111709785A (en) * 2020-06-18 2020-09-25 北京字节跳动网络技术有限公司 Method, apparatus, device and medium for determining user retention time
CN111709785B (en) * 2020-06-18 2023-08-22 抖音视界有限公司 Method, apparatus, device and medium for determining user retention time
CN112346699A (en) * 2020-10-29 2021-02-09 深圳Tcl新技术有限公司 Volume control method and device for audio application, terminal and readable storage medium

Similar Documents

Publication Publication Date Title
CN106201686A (en) Management method, device and the terminal of application
CN104239094B (en) Control method, device and the terminal device of background application
CN104735548B (en) Incidence prompt method and device
CN104601918B (en) video recording method and device
CN106028143A (en) Video live broadcasting method and device
CN104933170A (en) Information exhibition method and device
CN105975301A (en) Memory cleaning method and device, and electronic equipment
CN104281432A (en) Method and device for regulating sound effect
CN106488335A (en) Live-broadcast control method and device
CN104834435A (en) Method and device for playing audio comments
CN105096144A (en) Social relation analysis method and social relation analysis device
CN105404382A (en) Power saving mode setting method and apparatus
CN105897862A (en) Method and apparatus for controlling intelligent device
CN106066770A (en) Memory space management and device
CN104391626A (en) Method and device for dynamically displaying equipment list
CN107438811A (en) One kind breath screen shows method and device
CN106534562A (en) File deletion method and apparatus
CN105827489A (en) Intelligent household electrical appliance control method and device and intelligent household electrical appliance
CN106776068A (en) Display methods, device and equipment that candidate applies
CN103997686B (en) Playing management method and device based on smart television
CN106648730A (en) Processing method and device of abnormal application
CN105677548A (en) Application management method and apparatus, and terminal
CN105282867A (en) Network connection method and device
CN105868624A (en) Application program authority management method and device
CN106921545A (en) The sharing method of appliance information, device and terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication