CN106194105A - Profile control method is thrown in blocking agent deep - Google Patents

Profile control method is thrown in blocking agent deep Download PDF

Info

Publication number
CN106194105A
CN106194105A CN201610832339.7A CN201610832339A CN106194105A CN 106194105 A CN106194105 A CN 106194105A CN 201610832339 A CN201610832339 A CN 201610832339A CN 106194105 A CN106194105 A CN 106194105A
Authority
CN
China
Prior art keywords
blocking agent
control method
profile control
liquid
deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610832339.7A
Other languages
Chinese (zh)
Other versions
CN106194105B (en
Inventor
王增林
靳彦欣
隋春艳
史树彬
王涛
唐培忠
衣哲
刘丛玮
陈伟
尹相文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering Shengli Co filed Critical China Petroleum and Chemical Corp
Priority to CN201610832339.7A priority Critical patent/CN106194105B/en
Publication of CN106194105A publication Critical patent/CN106194105A/en
Application granted granted Critical
Publication of CN106194105B publication Critical patent/CN106194105B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/138Plastering the borehole wall; Injecting into the formation

Abstract

The present invention relates to a kind of blocking agent deep and throw in profile control method, it is characterised in that said method comprising the steps of: step 1, at well end, preposition for low leak-off liquid for plugging is injected in stratum, form the man-made fracture of plug at end part;Step 2, uses the man-made fracture formed in liquid-solid mixture filling step 1;Step 3, injects blocking agent, Hou Ning in well, so that blocking agent system solidifies or plastic.The inventive method achieves follow-up blocking agent and is efficiently entering earth formation deep and carries out the purpose that fixed point is thrown in, barometric gradient is effectively protracted, seepage flow mode changes around crack, effectively improves water flooding effectiveness.

Description

Profile control method is thrown in blocking agent deep
Technical field
The present invention relates to a kind of blocking agent deep and throw in profile control method.
Background technology
China started to explore water plugging and profiling technology and study from the fifties in 19th century, developed this skill through decades The most each elephant of art is applied on a large scale, becomes the effective means of oilfield stimulation stable yields.At present, well profile modification be to High permeability zone injects blocking agent, adjusts the intake profile of water filling interval, reaches to be subsequently implanted into water and streams the purpose expanding swept volume, But the major defect of this technology is blocking agent be deposited in 30 meters, near wellbore zone within, follow-up water is easy to breakthrough and streams, and has caused The effect phase is short, oil increasing precipitation weak effect.Particularly within ultra-high water-containing stage, near wellbore zone 30m remaining oil saturation at 20%- 30%, it is limited that follow-up water streams displacement efficiency.
In order to improve ultra-high water cut stage well profile modification effect, it is necessary for a kind of simple, effective, success rate of constructing Higher blocking agent deep put-on method, the method allows for effectively blocking agent being placed into beyond 30 meters of well, effectively employs remote Well area remaining oil, reaches barometric gradient and effectively protracts, improving ecology development effectiveness purpose.Blocking agent deep put-on method master at present Utilize well of passing by one's way between oil-water well to inject blocking agent and blocking agent slug optimization two kinds of methods of combination, wherein utilize well of passing by one's way to throw in stifled The method of agent is to inject blocking agent by well of passing by one's way between oil-water well to realize fixed point placement, and implementation process is simple, but real at mining site Well of passing by one's way when executing is less, it is impossible to realize large-scale application;Blocking agent slug optimization combination depth profile control method is according to waiting pressure drop ladder Degree method preferred profile control system, high to multistage cock body system performance requirement, and also plug agent amount is big, it is impossible to meet economic requirement, ore deposit It is big that difficulty is implemented in field.
Therefore, it is still necessary to develop the profile control method thrown in for blocking agent deep.
Summary of the invention
The present invention provides a kind of blocking agent deep to throw in profile control method, it is characterised in that said method comprising the steps of:
Step 1, at well end, injects preposition for low leak-off liquid for plugging in stratum, forms the man-made fracture of plug at end part;
Step 2, uses the man-made fracture formed in liquid-solid mixture filling step 1;
Step 3, injects blocking agent, Hou Ning in well, so that blocking agent system solidifies or plastic.
The method of the present invention includes that expanded support makes seam part and blocking agent input part, and wherein expanded support makes seam part and common pressure break Difference is that the prepad fluid pumped into is low leak-off liquid for plugging, and its important function is closure crack front, prevents from follow-up taking sand Liquid and blocking agent are advanced by leaps and bounds along high permeability zone position;Blocking agent input part can utilize the man-made fracture that expanded support goes out, and makes follow-up blocking agent effective Enter earth formation deep and carry out fixed point input, reach the purpose that barometric gradient is effectively protracted, be effectively improved water flooding effectiveness.
When being embodied as, determine construction target well according to oil reservoir and Developing status, determine according to expanded support length and width and prop up The consumption of support agent quartz sand;Plug agent amount is determined according to fracture length, core intersection, formation porosity and blocking agent process range, Utilize profile control device that blocking agent solution is injected stratum after expanded support, reach the purpose of deep profile controlling.
Profile control method applied range is thrown in blocking agent deep of the present invention, and process matched therewith is ripe, and utilize that expanded support produces is artificial Crack, can make follow-up blocking agent be efficiently entering earth formation deep high permeability zone, has before making blocking agent system effectively before defeated, barometric gradient Stretch, three big advantages that near wellbore zone seepage flow mode changes, be conducive to improving deep profile controlling quality, be effectively improved waterflooding development effect Really.
Accompanying drawing explanation
Fig. 1 is the block diagram of the inventive method step;
Fig. 2 is that the expanded support of the present invention makes seam vertical profile schematic diagram;
Fig. 3 is that expanded support of the present invention makes crack vertical profile schematic diagram after seam interpolation proppant;
Fig. 4 is injection blocking agent vertical profile schematic diagram after expanded support;
Fig. 5 is injection blocking agent plane streamline distribution schematic diagram after expanded support;
Fig. 6 is that expanded support makes pressure drop funnel change schematic diagram before and after seam profile control.
In figure, 1 is well;2 is oil well;3 is man-made fracture;4 is the preposition sealing agent of low leak-off;5 proppants;6 is blocking agent.
Detailed description of the invention
The present invention provides a kind of blocking agent deep to throw in profile control method, it is characterised in that said method comprising the steps of:
Step 1, at well end, injects preposition for low leak-off liquid for plugging in stratum, forms the man-made fracture of plug at end part;
Step 2, uses the man-made fracture formed in liquid-solid mixture filling step 1;
Step 3, injects blocking agent, Hou Ning in well, so that blocking agent system solidifies or plastic.
In one embodiment of the invention, profile control method is thrown in described blocking agent deep, it is characterised in that also include step Rapid 4, after the solidification of blocking agent system or plastic, drive a well the normal water filling of recovery.
In the step 1 of the present invention, a length of more than 30 meters of the man-made fracture formed, preferably 30 to 100 meters, more preferably 35 to 75 meters, particularly preferred 40 to 60 meters;Width is 0.3 to 1 centimetre, preferably 0.3 to 0.8 centimetre;Highly it is 1 to 20 meter, excellent Select 1 to 15 meter.Described man-made fracture passes through methods known in the art, such as, determined by personal monitoring's method of microseism Its length, highly, width, and then calculate its volume.
In the step 1 of the present invention, the preposition liquid for plugging of low leak-off is the mixture of high viscous base fluid and inorganic particle, the highest viscous Base fluid is 2000mg/L-5000mg/L polyacrylamide solution or Xanthan gun solution, and inorganic particle is 40 μm-80 μm cement;Institute The content stating inorganic particle is 10% to 40 weight %, gross weight meter based on the preposition liquid for plugging of low leak-off.
In the step 1 of the present invention, using fracturing unit truck group, such as rated operating pressure is 70-120MPa, preferably 70MPa Fracturing unit truck group, injects preposition for low leak-off liquid for plugging in stratum.
In the step 1 of the present invention, the discharge capacity injecting the described preposition liquid for plugging of low leak-off is 3m3/min-6m3/ min, it makes Man-made fracture front end is closed.Described front end refer to the man-made fracture of the formation along low leak-off preposition liquid for plugging injection direction before End face.
In the step 2 of the present invention, described liquid-solid mixture is the mixture of highly viscous sand-laden fluid and proppant, and the highest gluing is taken Sand liquid be concentration be 2000mg/L-5000mg/L polyacrylamide solution or Xanthan gun solution;Proppant be particle diameter be 0.4mm- The inorganic particle of 0.8mm, the preferred quartz sand of described inorganic particle;The content of described proppant is 10% to 40 weight %, based on The gross weight meter of liquid-solid mixture.
In the step 3 of the present invention, blocking agent is discontinuous phase particulate species blocking agent or continuous phase gelled plugging agent;Discontinuous phase Grain class blocking agent such as concentration is the superfine cement of 10%-15%, continuous phase gelled plugging agent for example, 3000-5000mg/L poly-third Acrylamide and the mixture of 3000-5000mg/L phenolic crosslinkers equal proportion.
In the step 3 of the present invention, the injection mode of blocking agent is general injection.The injection of blocking agent uses side well known in the art Method is carried out.
In the step 3 of the present invention, the plug agent amount of injection is calculated by formula (1):
Q=4/3 π abL Φ (1)
In formula, Q is plug agent amount, m3;A is the vertical degree of depth of ellipsoid radial section, m;B is the level of ellipsoid radial section Radius, m;L is the length that blocking agent is distributed in both sides, man-made fracture end, m;Φ is formation porosity, %.
In one embodiment of the invention, the method for the present invention is carried out as follows:
Step 1, at well end, utilizes fracturing unit truck group that preposition for low leak-off liquid for plugging high pump pressure huge discharge is just being clamp-oned stratum In, form the man-made fracture of 30 meters of-100 meters of plug at end part in the earth formation, prevent follow-up load fluid and blocking agent along Thief zone position Advance by leaps and bounds;
Step 2, then use concentration be 2000mg/L-5000mg/L polyacrylamide solution or Xanthan gun solution contour viscous Liquid, as load fluid, suspends and carries the quartz sand of 0.4mm-0.8mm as proppant, filling man-made fracture;
Step 3, in well, general implantation concentration is the discontinuous phase particulate species blocking agents such as the superfine cement of 10%~15% Or the continuous phase gelled plugging agent such as 3000-5000mg/L polyacrylamide and 3000-5000mg/L phenolic crosslinkers, blocking agent is being split Seam both sides are efficiently entering Thief zone position, and after having noted blocking agent, in well, the blocking agent in pit shaft and crack is replaced ground by injected clear water In Ceng, the consumption of injected clear water is hole volume and crevice volume sum, has replaced rear closing well 3-5 days, it is ensured that blocking agent system is solid Change or plastic;
Step 4, after the solidification of blocking agent system or plastic, drive a well the normal water filling of recovery, injects water in crack to both sides, crack Stratum filtration, forms linear flow, produces at profile control closure position and streams, thus reaches expand injection ripples and and change ground layer depth The effect of portion's barometric gradient, plays the effect of oil increasing precipitation.
In the present invention, unless otherwise indicated, the most all numbers or percent are weight portion or percetage by weight.
In the present invention, material used is known substance, commercially available or synthesized by known method.
In the present invention, equipment therefor or equipment are conventional equipment or equipment known to described field, commercially available.
Illustrate the present invention below in conjunction with embodiment, but the present invention is not limited to following example.
Embodiment
Advance by leaps and bounds along high permeability zone position cause oil well 2 ultra-high water-containing as in figure 2 it is shown, well 1 injects water, and pass through around well The oil saturation that washes away for many years is less than 30%, and waterflood efficiency is extremely low, as being not for Thief zone position indepth plugging, then affects oil The development effectiveness of well and economic life time.Well 1 design parameter: perforated interval 1248m-1263m, perforation layer thickness 15m, infiltration Rate 2300 × 10-3μm2, porosity 31.6%, water injection pressure 8.0MPa, daily water-injection rate 150m3/ d, corresponding oil well 2 comprehensive water cut 96.4%.
As shown in Figures 2 to 6, Specific construction step is as follows:
In step 1, utilize fracturing unit truck group that the polyacrylamide solution that concentration is 3000mg/L carries particle diameter 50 μm cement As the preposition liquid for plugging of low leak-off, arranging fracturing unit truck group discharge capacity in injection process is 4m3/ min, injection mode, for just to note, is formed The artificial expanded support crack of plug at end part, then determines a length of of man-made fracture by microseism personal monitoring's method in the earth formation 45m, highly 15m, width 0.8cm, determine that the amount filling load fluid is 5.4m3
In step 2, then using 4000mg/L polyacrylamide solution load fluid, suspension is carried the quartz sand of 0.6mm and is filled Fill out man-made fracture, make crack have high flow conductivity.
In step 3,400 type profile control pumps are utilized to inject 4000mg/L polyacrylamide and 4000mg/L phenol in man-made fracture The mixed solution 3600m of aldehyde cross-linking agent3, blocking agent is efficiently entering high permeability zone in both sides, crack, reaches the mesh that location, deep envelope is altered , after injecting blocking agent, the blocking agent in pit shaft and crack is replaced to stratum, closing well Hou Ning 3 days, it is ensured that blocking agent system plastic.Blocking agent Consumption is according to formula (1) approximate calculation:
Q=4/3 π abL Φ (1)
In formula, a is the vertical degree of depth of ellipsoid radial section, and i.e. the height of man-made fracture, takes 15m;B is ellipsoid radial section Horizontal radius, increase for making to be subsequently implanted into water swept volume, take 20m;L is the length that blocking agent is distributed in both sides, man-made fracture end Degree, in the range of proving that blocking agent is distributed in the 1/5 of fracture tip by indoor logistics organizations, takes 9m;Φ is formation porosity, takes 31.6%.
In step 4, after blocking agent Hou Ning terminates, drive a well the normal water filling of recovery, injects water in crack and near both sides, crack Form linear flow in stratum, produce at profile control closure position and stream, thus reach to expand the effect involving and changing barometric gradient.
After measure is implemented, oil well 2 is aqueous minimum is down to 89.6%, accumulative increases oil more than 5000 tons, and effect duration reaches 18 months, rises Effect to decreasing water cut and increasing oil..

Claims (10)

1. profile control method is thrown in a blocking agent deep, it is characterised in that said method comprising the steps of:
Step 1, at well end, injects preposition for low leak-off liquid for plugging in stratum, forms the man-made fracture of plug at end part;
Step 2, uses the man-made fracture formed in liquid-solid mixture filling step 1;
Step 3, injects blocking agent, Hou Ning in well, so that blocking agent system solidifies or plastic.
2. claim 1 blocking agent deep throw in profile control method, it is characterised in that also include step 4, blocking agent system solidification or After plastic, drive a well the normal water filling of recovery.
3. profile control method is thrown in the blocking agent deep of claim 1 or 2, it is characterised in that in step 1, the man-made fracture formed A length of more than 30 meters, preferably 30 to 100 meters, more preferably 35 to 75 meters, particularly preferred 40 to 60 meters;Width is 0.3 to 1 li Rice, preferably 0.3 to 0.8 centimetre;Highly it is 1 to 20 meter, preferably 1 to 15 meter.
4. profile control method is thrown in the blocking agent deep of claim 1 or 2, it is characterised in that the liquid-solid mixture in step 2 is high viscous Load fluid and the mixture of proppant, wherein highly viscous sand-laden fluid be concentration be 2000mg/L-5000mg/L polyacrylamide solution Or Xanthan gun solution;Proppant be particle diameter be the inorganic particle of 0.4mm-0.8mm, the preferred quartz sand of described inorganic particle;Described The content of proppant is 10% to 40 weight %, gross weight meter based on liquid-solid mixture.
5. profile control method is thrown in the blocking agent deep of claim 1 or 2, it is characterised in that the blocking agent in step 3 is discontinuous phase Grain class blocking agent or continuous phase gelled plugging agent;Discontinuous phase particulate species blocking agent for example, concentration is the superfine cement of 10%-15%, Continuous phase gelled plugging agent for example, 3000-5000mg/L polyacrylamide and 3000-5000mg/L phenolic crosslinkers equal proportion Mixture.
6. profile control method is thrown in the blocking agent deep of claim 1 or 2, it is characterised in that in step 1, the preposition liquid for plugging of low leak-off is High viscous base fluid and the mixture of inorganic particle, the highest viscous base fluid is 2000mg/L-5000mg/L polyacrylamide solution or Huang Born of the same parents' sol solution, inorganic particle is 40 μm-80 μm cement;The content of described inorganic particle is 10% to 40 weight %, based on low filter Lose the gross weight meter of preposition liquid for plugging.
7. profile control method is thrown in the blocking agent deep of claim 1 or 2, it is characterised in that in step 1, uses fracturing unit truck group, such as Rated operating pressure is the fracturing unit truck group of 70-120MPa, is injected in stratum by preposition for low leak-off liquid for plugging.
8. profile control method is thrown in the blocking agent deep of claim 1 or 2, it is characterised in that in step 1, inject described low leak-off preposition The discharge capacity of liquid for plugging is 3m3/min-6m3/ min, and man-made fracture front end is closed.
9. throw in profile control method according to the blocking agent deep of claim 1 or 2, it is characterised in that in step 3, the injection of blocking agent Mode is general injection.
10. throw in profile control method according to the blocking agent deep of claim 1 or 2, it is characterised in that in step 3, the blocking agent of injection Consumption is calculated by formula (1):
Q=4/3 π abL Φ (1)
In formula, Q is plug agent amount, m3;A is the vertical degree of depth of ellipsoid radial section, m;B is the horizontal radius of ellipsoid radial section, m;L is the length that blocking agent is distributed in both sides, man-made fracture end, m;Φ is formation porosity, %.
CN201610832339.7A 2016-09-19 2016-09-19 Launch profile control method in blocking agent deep Active CN106194105B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610832339.7A CN106194105B (en) 2016-09-19 2016-09-19 Launch profile control method in blocking agent deep

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610832339.7A CN106194105B (en) 2016-09-19 2016-09-19 Launch profile control method in blocking agent deep

Publications (2)

Publication Number Publication Date
CN106194105A true CN106194105A (en) 2016-12-07
CN106194105B CN106194105B (en) 2019-08-27

Family

ID=58067983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610832339.7A Active CN106194105B (en) 2016-09-19 2016-09-19 Launch profile control method in blocking agent deep

Country Status (1)

Country Link
CN (1) CN106194105B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725038A (en) * 2017-09-12 2018-02-23 中国石油天然气股份有限公司 It is a kind of to test seal-off effect chemical profile control agent and migrated in oil reservoir the method for depth
CN108643856A (en) * 2018-03-15 2018-10-12 中国石油大学(华东) A kind of radial well guiding blocking agent injection oilwell water shutoff method
CN109826590A (en) * 2019-02-27 2019-05-31 杨凌单色生物科技有限公司 A kind of old well water blockoff fracturing process of hypotonic oil gas field High water cut
CN112360393A (en) * 2020-10-29 2021-02-12 中国石油化工股份有限公司 Profile control process for improving profile control effectiveness of waste drilling mud
CN114961631A (en) * 2021-02-24 2022-08-30 中国石油化工股份有限公司 Composite water plugging method for jelly
CN115434659A (en) * 2021-06-02 2022-12-06 中国石油天然气集团有限公司 Process method for deep fixed-point feeding of blocking agent for high-permeability reservoir

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4928766A (en) * 1989-02-16 1990-05-29 Mobil Oil Corporation Stabilizing agent for profile control gels and polymeric gels of improved stability
CN1445433A (en) * 2002-03-15 2003-10-01 赵普春 Method for regulating section of oil wells
CN1523202A (en) * 2003-08-23 2004-08-25 辽河石油勘探局 Integrated water blocking, profile control and sand prevention construction method for high-viscosity oil wells
CN102373914A (en) * 2010-08-25 2012-03-14 中国石油天然气股份有限公司 Deep profile control method for fractured oil reservoir
CN103244097A (en) * 2013-05-16 2013-08-14 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Multi-crack fracturing control method for medium-depth coal beds
CN103790560A (en) * 2012-11-02 2014-05-14 西安交大京盛科技发展有限公司 Fractured reservoir profile control process
CN104989347A (en) * 2015-06-24 2015-10-21 延安宇涵石油工程技术服务有限公司 Inorganic gel profile control technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4928766A (en) * 1989-02-16 1990-05-29 Mobil Oil Corporation Stabilizing agent for profile control gels and polymeric gels of improved stability
CN1445433A (en) * 2002-03-15 2003-10-01 赵普春 Method for regulating section of oil wells
CN1523202A (en) * 2003-08-23 2004-08-25 辽河石油勘探局 Integrated water blocking, profile control and sand prevention construction method for high-viscosity oil wells
CN102373914A (en) * 2010-08-25 2012-03-14 中国石油天然气股份有限公司 Deep profile control method for fractured oil reservoir
CN103790560A (en) * 2012-11-02 2014-05-14 西安交大京盛科技发展有限公司 Fractured reservoir profile control process
CN103244097A (en) * 2013-05-16 2013-08-14 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Multi-crack fracturing control method for medium-depth coal beds
CN104989347A (en) * 2015-06-24 2015-10-21 延安宇涵石油工程技术服务有限公司 Inorganic gel profile control technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭亮 等: "特低渗油藏中高含水期油井增产技术应用探索", 《特低渗油藏中高含水期油井增产技术应用探索 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725038A (en) * 2017-09-12 2018-02-23 中国石油天然气股份有限公司 It is a kind of to test seal-off effect chemical profile control agent and migrated in oil reservoir the method for depth
CN108643856A (en) * 2018-03-15 2018-10-12 中国石油大学(华东) A kind of radial well guiding blocking agent injection oilwell water shutoff method
CN108643856B (en) * 2018-03-15 2020-06-02 中国石油大学(华东) Water plugging method for oil well by injecting plugging agent into radial well
CN109826590A (en) * 2019-02-27 2019-05-31 杨凌单色生物科技有限公司 A kind of old well water blockoff fracturing process of hypotonic oil gas field High water cut
CN109826590B (en) * 2019-02-27 2021-05-14 杨凌单色生物科技有限公司 Water plugging and fracturing method for high-water-content old well in low-permeability oil and gas field
CN112360393A (en) * 2020-10-29 2021-02-12 中国石油化工股份有限公司 Profile control process for improving profile control effectiveness of waste drilling mud
CN114961631A (en) * 2021-02-24 2022-08-30 中国石油化工股份有限公司 Composite water plugging method for jelly
CN115434659A (en) * 2021-06-02 2022-12-06 中国石油天然气集团有限公司 Process method for deep fixed-point feeding of blocking agent for high-permeability reservoir
CN115434659B (en) * 2021-06-02 2024-03-01 中国石油天然气集团有限公司 Technological method for deep fixed-point delivery of hypertonic reservoir plugging agent

Also Published As

Publication number Publication date
CN106194105B (en) 2019-08-27

Similar Documents

Publication Publication Date Title
CN106194105B (en) Launch profile control method in blocking agent deep
CN107255027B (en) Compound modification method for carbonate rock reservoir
CN107387053B (en) Method for collaborative fracturing of main cracks and complex crack network of large channel
CN101952544B (en) Method of hydraulic fracturing of horizontal wells, resulting in increased production
CN105298438B (en) More fine profile control methods in round polymer gel deep
CN103541705B (en) The stifled tune equipment of high temperature and high temperature that super-heavy oil deposit steam drives block up tune method
CN105089596B (en) A kind of hydraulic fracturing remodeling method of unconventional reservoir oil/gas well
CN106246150B (en) A kind of oil field compression fracture remodeling method
CN109577909A (en) A kind of extra permeability oilfield selectivity frothy gel water plugging and profile controlling method
CN104675371B (en) It is a kind of it is poly- drive plus subsequent waterflooding after alternately inject gel and polymer solution complex oil displacing experimental method
CN107575207A (en) A kind of method predicted oilfield water flooding and involve radius
CN103087699B (en) Sand-carrying profile control agent composition of fracture-cave type oil deposit and profile control method of profile control agent
CN110552656B (en) Method for fixed-point crack initiation of low-permeability layer of water flooded well
CN102051161B (en) Thick oil huff and puff deep channel blocking system and injection method thereof
CN105317417A (en) Fracturing method of medium-to-high-rank coal bed gas reservoir
CN103437737A (en) Method for water plugging for petroleum well with oil phase microparticle plugging agent
CN109751033A (en) A kind of fracturing process for tight sandstone reservoir
CN109233768A (en) A kind of shutoff method of untraditional reservoir oil well
CN109826590A (en) A kind of old well water blockoff fracturing process of hypotonic oil gas field High water cut
CN103225495B (en) One from the close-by examples to those far off displacement method piecemeal
CN105625981A (en) Composite profile control method for middle-high permeability oil reservoirs
CN112324412A (en) Method for forming complex seam net through volume fracturing
CN113464087A (en) Selective water plugging method for bottom water reservoir high-water-cut oil well
CN105178910A (en) Water-plugging process tubing string and method of horizontal wells
CN104213885A (en) Acidification and profile control integrated method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant