Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.With reference to what is be described with reference to the accompanying drawings
Embodiment will be apparent from advantages of the present invention, feature and realize method used in these.However, the invention is not limited to
Lower disclosed embodiment and can be realized by variform different from each other, embodiment is intended merely to completely to disclose the present invention simultaneously
The scope of the present invention is completely illustrated to provide to the personnel with general knowledge in technical field belonging to the present invention, this
Invention is only defined by the range of claims.Through the whole instruction, identical appended drawing reference refers to identical constituent element.
If without other definition, all term (term including technology and science aspect) used in this specification
The meaning that can be commonly understood by for the personnel in technical field belonging to the present invention with general knowledge can be used.Also, it is right
For the usually used term being defined in dictionary, as long as no clearly especially definition, then it will not idealize or excessively
It explains on ground.
Fig. 2 is the figure for indicating the data management system of embodiment according to the present invention, and data management system 200 is configured to
Including job file generating means 210, management server 220, job file distributor 230 and SMT (Surface
Mounting Technology) equipment 241,242,243,244.
Job file generating means 210 execute to generate to be made used in the SMT equipment 241,242,243,244 of SMT line
The effect of industry file.
SMT technique including the use of attachment machine equipment by various surface mounting devices (Surface Mounting Device:
SMD the operation) being installed on printed circuit board (Printed Circuit Board:PCB), the present invention in job file can quilt
Be interpreted as include such as CAD data or bill of materials needed for the installation of surface mounting devices (Bill Of Material:
BOM) the installation sequence data of data.
For example, job file may include such as component index (reference), X value, Y value, Z value, R value, name of parts, confession
Material machine (feeder), letter head (header) number, omits the work such as (skip) information and priority (level) at ozzle (nozzle)
Industry data.
By job file generating means 210 generate job file when can using off-line procedure (Off-Line Program:
OLP), however, the present invention is not limited thereto.
Management server 220 executes the effect for storing and distributing the job file generated by job file generating means 210.
Although Fig. 2 shows a job file generating means 210 and a job file distributor 230, management clothes
Business device 220 can manage the job file generated by multiple job file generating means 210, and can mention the job file of storage
Supply multiple job file distributors.
Alternatively, job file can also be managed by multiple management servers, and job file appropriate is supplied to work
Industry file distribution means 230.
The execution of job file distributor 230 sends each SMT for the job file provided by management server 220 and sets
Standby 241,242,243,244 effect.
When distributing job file, identical job file can be distributed to all SMT by job file distributor 230
Equipment 241,242,243,244, can also categorizedly distribute job file.For example, the operation provided by management server 220
1 (not shown) of file is assigned to SMT equipment 1 and SMT equipment 3 243, the job file provided by management server 220
2 (not shown) are assigned to SMT equipment 2 242, and can not distribute job file to SMT equipment 4 244.
SMT equipment 241,242,243,244 can utilize the job file received from job file distributor 230 to hold
Row SMT process operation.In the present invention, SMT equipment 241,242,243,244 can be put at the same time receives identical operation
Thus file executes unified SMT process operation, and can also receive operation text different from each other at time point different from each other
Part, thus executing respectively has other SMT process operation.
In addition, job file can be modified by each device.For example, user can using job file generating means 210 come
The job file generated is modified, job file can be perhaps modified using management server 220 or using job file point
Job file is modified with device 230, or can modify job file using SMT equipment 241,242,243,244.
In addition, various devices 210,220,230,241~244 may include the more than one journey that can modify job file
Sequence is known as each device for being used to modify job file or each program to modify main body below.
As described above, by multiple modification main bodys to modify job file, it is understood that there may be correspond to most nascent
At job file copy different from each other, such chaotic in order to prevent, data pipe of embodiment according to the present invention
Reason system 200 may include the special data administrator 300 for managing modified job file.
In the case where sending modification file by predetermined subject, which is passed to data administrator 300,
Job file can be modified according to the modification file received to this data administrator 300, and can be according to the recovery of user
Modified job file is restored to as former state by order.To which job file that is modified or restoring is passed to management clothes
It is engaged in device 220, then can only allow the modification thing reflected for the job file accumulation generated by job file generating means 210
One standard operation file of item exists.
In the present invention, data administrator 300 may be included in job file generating means 210, management server 220, make
One in industry file distribution means 230 and SMT equipment 241,242,243,244 and constitute, be alternatively arranged as independent device
It realizes.
Fig. 3 is the block diagram for indicating the data administrator of embodiment according to the present invention, and data administrator 300 is configured
Being includes receiving unit 310, storage unit 320, control unit 330, Data Management Department 340 and interface generating unit 350.
Receiving unit 310 executes the effect that the modification file for standard operation file is received from SMT line.In the present invention, repair
Change file to refer to comprising for modifying the file for constituting the information of work data of standard operation file.
As a modification file is received, a corresponding work data can both modified, can also made pair
The multiple work datas answered are modified.Hereinafter, will be to be the case where a work data to modify by a modification file
Master is illustrated.
In addition, receiving unit 310 executes the effect for receiving the recovery order of standard operation file.In the present invention, standard operation
File recovery order refer to constitute standard operation file work data in by the work data of modification be restored to as former state or
Person is restored to the order for the predetermined value modified in the past.
It is received based on a recovery order, a corresponding work data can be reconditioned, corresponding multiple work datas
It can also be reconditioned.Hereinafter, to be illustrated based on the case where modifying a work data by recovery order.
Modification file or recovery order for standard operation file can be input directly by data administrator 300
Or received from other devices, in this regard, the receiving unit 310 of embodiment according to the present invention can be configured to include being input directly into
It modifies file or restores the input unit 311 of order and receive modification file from other devices or restore the communication unit of order
312。
Input unit 311 can have button, handwheel (wheel), shuttle wheel (jog shuttle) etc. and receive and order from user.
In addition, data administrator 300 has display unit (not shown), and in the case where display unit provides touch screen function, display unit
It can also carry out the effect of input unit 311.
Here, input unit 311 is only with inherently can be a device, for example, input unit 311 can be performed in Digiplex
Effect.That is, user can input order using button and handwheel for being set to Digiplex etc., have in Digiplex
In the case where inertial sensor, user can also be corresponding with relative motion track to input by applying movement to Digiplex
Order.
Communication unit 312 can be communicated by wired or communication with other devices.Communication unit 312 can pass through ether
Net (Ethernet), public switched telephone network (PSTN:Public Switched Telephone Network), mobile communication
Net, WLAN (Wireless LAN), bluetooth (Bluetooth), Wireless Fidelity (Wi-Fi;Wireless
Fidelity), Universal Mobile Telecommunications System (UMTS;Universal Mobile Telecommunications System),
High-speed downlink packet access (HSDPA:High Speed Downlink Packet Access) or WiMAX
(WiBro;Wireless Broadband) etc. communication modes communicated with other devices.
Data Management Department 340 executes modification file or recovery order according to receiving by receiving unit 310 to modify
Or the effect of backout criterion job file.For this purpose, Data Management Department 340 can be configured to include data modification portion 341 and number
According to recovery portion 342, these are shown in Fig. 4.
Data modification portion 341 executes following effect: modifying at least one work data for constituting standard operation file
Relevant work data is modified standard operation file at the same time and is modified with marking to send to correspond to the modification file received
The source of file.
For example, the Y value that predetermined component indexes can be revised as 63.970 from 64.000 using SMT equipment 1 by user,
When receiving the modification file of this content, data modification portion 341 is included in the phase in the work data of standard operation file
The Y value for closing component index is revised as 63.970 from 64.000, and modifies standard operation file and send above-mentioned modification to reflect
The device of file is SMT equipment 1.
The device that modification file is sent in the present invention may include at least one of following device: job file generating means
210, the SMT equipment 241,242,243,244 of surface mount operation is executed in SMT line and come to visit by network (not shown)
Ask the special device of standard operation file.
In order to mark send modification file modification main body, data modification portion 341 can by send modification file device or
Person modify the source of file and respectively by mutually different colors or in the form of modification with modify the corresponding work data of file.
For example, data modification portion 341 is repaired in the case where job file generating means 210 send modification file with blue
It corrects students' papers data, modifies work data with red in the case where SMT equipment 241,242,243,244 sends modification file,
It can be modified for respectively with different colors by each SMT equipment in the case where SMT equipment 241,242,243,244 is multiple
Industry data.
In addition, standard operation file can be implemented as the form for the table being made of multiple cells (cell), data are repaired
The list expressed and have modified data can be marked with color corresponding with the device or source that send modification file by changing portion 341
First lattice.
Data recovery portion 342 executes the effect for restoring modified work data.Recovery can be received by receiving unit 310
Order, data recovery portion 342, which can correspond to restore to order, carrys out comeback job data.
In the present invention, work data can it is primary by modification or by modification repeatedly, can will be through to this data recovery portion 342
The work data of modification is restored to as former state, or is restored to the predetermined value modified in the past.Here, it is restored to refer to as former state and be restored to
The work data on time point generated by job file generating means 210.
Referring again to Fig. 3, interface generating unit 350, which is executed, reflects the information of modification for generating according to file is modified
The effect at modification information interface.
Modification information interface includes: the first modification information interface, includes repairing for each project for predetermined component index
Change data;Second modification information interface, the modification history comprising the predetermined item for predetermined component index.
The interface generating unit 350 of embodiment according to the present invention can be respectively by expressing in modified standard operation file
Component indexes to generate the first modification information interface, or can be respectively by the project expressed in the component index of standard operation file
To generate the second modification information interface.
First modification information interface may include have the work data before sending the modification modification main body of file, project, modification,
Current work data and recovery order input icon.Here, project may include X value, Y value, Z value, R value, name of parts, feeding machine
(feeder), ozzle (nozzle), letter head (header) number, omission (skip) information and priority (level) etc..
In addition, the second modification information interface may include having the modification main body for sending modification file, modified work data
And restore command icon.
It, will be later by Fig. 7 extremely for the detailed description at the first modification information interface and the second modification information interface
Fig. 9 and Figure 11 is carried out.
In addition, interface generating unit 350 is produced for allowing user to confirm work data and modifying the operation interfaces of the data,
The detailed description for operation interface will be carried out later by Fig. 5.
Storage unit 320 executes the effect of storage standard operation file or modified standard operation file.In addition, storage
Portion 320 can store the modification history according to the modification file received or each work data for restoring order, data recovery
Portion 342, which can refer to, to be stored in the modification history of storage unit 320 and is restored to as former state or is restored to predetermined value for work data.
Control unit 330 is executed for the whole of receiving unit 310, storage unit 320, Data Management Department 340 and interface generating unit 350
The control of body.
Although the data administrator 300 of embodiment according to the present invention may include being used in addition, not shown in FIG. 3
The display unit (not shown) for showing a variety of interfaces generated by interface generating unit 350 does not include display in data administrator 300
It, can be by the display unit of such as monitor come display interface in the case where portion.
Fig. 5 is the figure for showing the operation interface of embodiment according to the present invention, and operation interface 500 can allow use in the present invention
Family is able to confirm that work data, and refers to the graphic user interface that can be used for modifying or restoring predetermined operation data
(Graphic User Interface:GUI).
Operation interface 500 is configured to include component configuration diagram 510 and schedule work 520.Component configuration diagram 510 is indicated with structure
At the various parts arranged based on the work data of job file.Since component configuration diagram 510 is by the size with physical unit
And the corresponding ratio in interval between component shows component, therefore it is used can be confirmed by this oneself want modification or multiple
Former component.
The work data of the expression fabrication process file of schedule work 520.Component configuration diagram 510 can be interconnected mutually with schedule work 520
It moves and operates, such as in the case where the predetermined component of alternative pack configuration diagram 510, schedule work 520 corresponding with associated components
Relevant range can high-brightness, select schedule work 520 predetermined operation data in the case where, corresponding component can match in component
Set high-brightness on Figure 51 0.
As described above, can be in the work data that schedule work 520 indicates about the component indicated in component configuration diagram 510
Work data, but operation interface 500 of the invention is without being limited thereto.
Fig. 6 is the figure for showing the schedule work of embodiment according to the present invention, show by user modification work data with
Other work datas are compared and are expressed as different schedule works 600.
As shown, the Y of the R project of component index CN501_UBA, the R project of component index CN405, component index IC8
Project, X, Y project of component index IC601 are represented by more slightly compared with other work datas, and user can be confirmed by this
Which work data is modified.
In particular, the color of the work data of modification can be different according to the modification main body of modification work data, such as by
The work data that job file generating means 210 are modified is represented by blue, is modified by SMT equipment 241,242,243,244
Work data is represented by red.
Fig. 7 to Fig. 9 is the figure for showing the first modification information interface of embodiment according to the present invention.
First modification information interface 700,800,900 is the interface for showing the modification status of predetermined operation data, such as
In the case that modified work data is selected in the work data of schedule work, express the modification status of related work data
First modification information interface 700,800,900 is displayed at picture.
It first modification information interface 700,800,900 can be and being realized with the independent window of schedule work (for example, pop-out)
It has been shown that, but not limited to this.
As described above, the first modification information interface 700,800,900 is comprising each project for predetermined component index
Modification data interface, and be configured to include modification body field 710,810,910, item field 720,820,920, with
Preceding data field 730,830,930, current data field 740,840,940 and restore field 750,850,950.
Modification body field 710,810,910 in show send modify file modification main body, item field 720,
820, the project as modification object is shown in 920, shown in former data field 730,830,930 relevant item before
Work data, the work data that display is modified for relevant item in current data field 740,840,940, are restoring
Recovery order input icon 751,851,951,952,953,954 is shown in field 750,850,950.
In addition, can show associated components index 760,860,960 at the first modification information interface 700,800,900.
As a result, user can be confirmed by the first modification information interface 700 shown in Fig. 7: the Y project of component index IC8
Work data modified by the MMI of the program as SMT equipment 241,242,243,244, value is revised as from 64.000
63.970。
In addition, user can be confirmed by the first modification information interface 800 shown in Fig. 8: the R item of component index CN405
Purpose work data is modified by the OLP of the program as job file generating means 210, and value is revised as from 90.000
0.000。
Comprising restoring order input icon 751,851,951~954 in the first modification information interface 700,800,900,
User can be by this come comeback job data.
That is, selecting the case where restoring order input icon 751 by the first modification information interface 700 of Fig. 7 in user
Under, the work data of relevant item is restored to 64.000 from 63.970, passes through the first modification information interface 800 of Fig. 8 in user
In the case where selecting to restore order input icon 851, the work data of relevant item is restored to 90.000 from 0.000.
The recovery of work data is executed by data recovery portion 342, restore order input icon 751,851,951~
In the case that 954 are selected by the first modification information interface 700,800,900, data recovery portion 342 is by current operation number
According to the work data being restored to before modifying.
Figure 10, which is shown, is restored the work data of relevant item from 63.970 by the first modification information interface 700 of Fig. 7
For 64.000 situation.If order input icon 751, as shown in Figure 10, work data recovery and first are restored in selection
Modification information interface 700,800,900 disappears from picture therewith.
In the case where work data restores, correlation, which restores information, can be reflected in schedule work and the first modification information interface
700、800、900。
Although Fig. 7 and Fig. 8 show display about the work data of a project the first modification information interface 700,800,
900, but as shown in figure 9, the work data about multiple projects is also displayed at the first modification information interface 900.
Fig. 9 is the figure for showing the first modification information interface of the modification status comprising the work data about multiple projects.
By the first modification information shown in Fig. 9 interface 900, user can confirm repairing for the respective work data of each project
Change status, can also execute respectively recovery by each project.
Figure 11 is the figure for showing the second modification information interface of embodiment according to the present invention.
Second modification information interface 1100 is the interface for showing the modification history of the predetermined item indexed about predetermined component,
Such as in the case that modified work data is selected, express the modification of related work data in the work data of schedule work
Second modification information interface 1100 of history is displayed at picture.
Second modification information interface 1100 can by with the independent window of schedule work (for example, pop-out) realize and show, but
It is without being limited thereto.
As described above, the second modification information interface 1100 is that the modification comprising the predetermined item for predetermined component index is gone through
The interface of history, and be configured to include field 1120 when modifying body field 1110, modification day, data field 1130 and recovery word
Section 1140.
The modification main body for sending modification file is shown in modification body field 1100, is shown in field 1120 when modifying day
Show the date and time that work data is modified, the modification history of work data is shown in data field 1130, is restoring word
Recovery order input icon 1141,1142,1143,1144,1145,1146 is shown in section 1140.
In addition, can show associated components index 1160 and project 1150 at the second modification information interface 1100.
As a result, user can be confirmed by the second modification information interface 1100 shown in Figure 11: the X of component index CN2102
The work data of project is repaired by the program of the program of job file generating means 210 and SMT equipment 241,242,243,244
Change, value is modified by 4.689-> 4.480-> 4.520-> 4.779-> 4.689-> 4.500 time sequencing.
Here, 4.500 positioned at last line are related to current work data, and user can be by selecting from modification history
It selects one and work data is restored to correlation.
The recovery of work data is executed by data recovery portion 342, orders input icon 1141~1146 to pass through restoring
In the case that second modification information interface 1100 is selected, current work data is restored to modified by data recovery portion 342
Work data in order the corresponding work data of input icon 1141~1146 with restoring.
For example, data recovery portion 342 will make in the case where user selects the recovery order of the second row to input icon 1142
Industry data are restored to 4.480 from 4.500.
In the case where work data is reconditioned, correlation, which restores history, can be reflected in schedule work and the second modification information interface
1100。
Although the embodiment of the present invention is illustrated referring to the above content and attached drawing, technology belonging to the present invention
Technical staff in field with usual knowledge is appreciated that in the case where not changing its technical idea or necessary feature
It may be embodied as other specific forms.Therefore, the embodiment of the above record should be understood in all respects all to be exemplary
Rather than it is limited.