CN106155790A - The management method of application program, managing device and terminal - Google Patents

The management method of application program, managing device and terminal Download PDF

Info

Publication number
CN106155790A
CN106155790A CN201610506396.6A CN201610506396A CN106155790A CN 106155790 A CN106155790 A CN 106155790A CN 201610506396 A CN201610506396 A CN 201610506396A CN 106155790 A CN106155790 A CN 106155790A
Authority
CN
China
Prior art keywords
application program
run entity
object run
chained list
entity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610506396.6A
Other languages
Chinese (zh)
Other versions
CN106155790B (en
Inventor
蔡志富
王书军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yulong Computer Telecommunication Scientific Shenzhen Co Ltd
Original Assignee
Yulong Computer Telecommunication Scientific Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yulong Computer Telecommunication Scientific Shenzhen Co Ltd filed Critical Yulong Computer Telecommunication Scientific Shenzhen Co Ltd
Priority to CN201610506396.6A priority Critical patent/CN106155790B/en
Publication of CN106155790A publication Critical patent/CN106155790A/en
Application granted granted Critical
Publication of CN106155790B publication Critical patent/CN106155790B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Stored Programmes (AREA)

Abstract

The present invention proposes the management method of a kind of application program, managing device and terminal, wherein, the management of described application program includes: when arbitrary application program is at front stage operation, obtains and described arbitrary application program incoherent object run entity in running chained list;Described object run entity is controlled, to reduce the frequency of interaction between described object run entity and CPU.By technical scheme, the operational efficiency of application program at front stage operation can be improved, and then be effectively prevented the application program at front stage operation the phenomenon of card occurs.

Description

The management method of application program, managing device and terminal
Technical field
The present invention relates to field of terminal technology, in particular to management method, a kind of application journey of a kind of application program The managing device of sequence and a kind of terminal.
Background technology
At present, the always on substantial amounts of application program on the backstage of terminal, application program can produce while running background Raw a lot of processes or service, often these processes or service occupy CPU (the Central Processing of many Unit, CPU) resource or internal memory, thus cause the application program of front stage operation the phenomenons such as card to occur, seriously Have impact on the experience of user.
Therefore, the operational efficiency of application program at front stage operation how is improved, it is to avoid at the application program of front stage operation Occur that the phenomenon that card pauses becomes technical problem urgently to be resolved hurrily.
Summary of the invention
The present invention is based on the problems referred to above, it is proposed that a kind of new technical scheme, can improve answering at front stage operation By the operational efficiency of program, and then it is effectively prevented the application program at front stage operation the phenomenon of card occurs.
In view of this, a first aspect of the present invention proposes the management method of a kind of application program, including: when arbitrary application Program, when front stage operation, obtains and described arbitrary application program incoherent object run entity in running chained list;To institute State object run entity to be controlled, to reduce the frequency of interaction between described object run entity and CPU.
In this technical scheme, when arbitrary application program is at front stage operation, determine uncorrelated with this arbitrary application program Object run entity, wherein, object run entity includes process and service, then object run entity is limited with Reducing the frequency of interaction between object run entity and CPU, so, it is same that the application program at guarantee front stage operation normally uses Time, more internal memory or cpu resource can be saved, thus ensure the operational efficiency of the application program at front stage operation, enter And be effectively prevented the application program at front stage operation and the phenomenon that card pauses occurs.
In technique scheme, it is preferable that the step that described object run entity is controlled, specifically include: will Described object run entity is hung up;Or forbid in the given time handing between described object run entity and described CPU Mutually.
In this technical scheme, by object run entity is hung up, the most not performance objective run entity, or predetermined Forbid in time interacting between object run entity and CPU, it is achieved thereby that the restriction to object run entity, Jin Erke To discharge more internal memory or cpu resource.
In any of the above-described technical scheme, it is preferable that in described operation chained list, storage has the application program of all startups Run entity, described acquisition and the step of described arbitrary application program incoherent object run entity in running chained list, have Body includes: search described object run entity in described operation chained list.
In this technical scheme, by being stored in the run entity of the application program of all startups running in chained list, Such as, when often starting an application program, just deposit corresponding with the title of this application program for the run entity of this application program Store up to and run in chained list, more fully find out and the incoherent fortune of application program at front stage operation with ratio in running chained list Row entity.
In any of the above-described technical scheme, it is preferable that described search described object run entity in described operation chained list Step before, also include: determine whether that application program is at running background;If having application program at running background, then in institute State in operation chained list and search described object run entity;If there is no application program at running background, it is determined that at described operation chain Table does not exist described object run entity.
In this technical scheme, if having application program at running background, illustrate that the operation of the application program of running background is real Know from experience committed memory or cpu resource, then the run entity of the application program of running background is limited, if there is no application program At running background, run entity committed memory or the cpu resource not having the application program of running background is described, in running chained list Only have the run entity of application program at front stage operation, there is not run entity incoherent with arbitrary application program, be not required to Search operation chained list to obtain object run entity, thus ensure that the operational reliability of the application program at front stage operation.
In any of the above-described technical scheme, it is preferable that also include: when the application program having been turned on is out of service, by institute State the run entity deletion running the application program having been turned on described in chained list.
In this technical scheme, when the application program having been turned on exits, illustrate that the run entity of this application program will not Committed memory or cpu resource, it is not necessary to limit the run entity of this application program, then by the fortune of this application program again Row entity is deleted, it is to avoid running storage in chained list has too much redundancy to cause acquisition object run in running chained list real Efficiency comparison during body is low.
A second aspect of the present invention proposes the managing device of a kind of application program, including: acquiring unit, for when arbitrary Application program, when front stage operation, obtains and described arbitrary application program incoherent object run entity in running chained list; Control unit, for described object run entity is controlled, mutual with reduce between described object run entity and CPU Frequency.
In this technical scheme, when arbitrary application program is at front stage operation, determine uncorrelated with this arbitrary application program Object run entity, wherein, object run entity includes process and service, then object run entity is limited with Reducing the frequency of interaction between object run entity and CPU, so, it is same that the application program at guarantee front stage operation normally uses Time, more internal memory or cpu resource can be saved, thus ensure the operational efficiency of the application program at front stage operation, enter And be effectively prevented the application program at front stage operation and the phenomenon that card pauses occurs.
In technique scheme, it is preferable that described control unit specifically for, by described object run entity hang up, Or forbid in the given time interacting between described object run entity and described CPU.
In this technical scheme, by object run entity is hung up, the most not performance objective run entity, or predetermined Forbid in time interacting between object run entity and CPU, it is achieved thereby that the restriction to object run entity, Jin Erke To discharge more internal memory or cpu resource.
In any of the above-described technical scheme, it is preferable that in described operation chained list, storage has the application program of all startups Run entity, described acquiring unit includes: search subelement, real for searching described object run in described operation chained list Body.
In this technical scheme, by being stored in the run entity of the application program of all startups running in chained list, Such as, when often starting an application program, just deposit corresponding with the title of this application program for the run entity of this application program Store up to and run in chained list, more fully find out and the incoherent fortune of application program at front stage operation with ratio in running chained list Row entity.
In any of the above-described technical scheme, it is preferable that also include: judging unit, it is used for determining whether that application program exists Running background;If described judging unit is determined with application program at running background, the most described lookup subelement is at described operation chain Table is searched described object run entity;If described judging unit judges do not have application program at running background, the most described lookup Subelement determines and there is not described object run entity in described operation chained list.
In this technical scheme, if having application program at running background, illustrate that the operation of the application program of running background is real Know from experience committed memory or cpu resource, then the run entity of the application program of running background is limited, if there is no application program At running background, run entity committed memory or the cpu resource not having the application program of running background is described, in running chained list Only have the run entity of application program at front stage operation, there is not run entity incoherent with arbitrary application program, be not required to Search operation chained list to obtain object run entity, thus ensure that the operational reliability of the application program at front stage operation.
In any of the above-described technical scheme, it is preferable that also include: delete unit, for moving back when the application program having been turned on When going out to run, the run entity of the application program having been turned on described in described operation chained list is deleted.
In this technical scheme, when the application program having been turned on exits, illustrate that the run entity of this application program will not Committed memory or cpu resource, it is not necessary to limit the run entity of this application program, then by the fortune of this application program again Row entity is deleted, it is to avoid running storage in chained list has too much redundancy to cause acquisition object run in running chained list real Efficiency comparison during body is low.
A third aspect of the present invention proposes a kind of terminal, including the application program according to any one of technique scheme Managing device, therefore, this terminal has identical with the managing device of the application program according to any one of technique scheme Technique effect, do not repeat them here.
By technical scheme, the operational efficiency of application program at front stage operation can be improved, and then effectively Prevent front stage operation application program occur card phenomenon.
Accompanying drawing explanation
Fig. 1 shows the schematic flow sheet of the management method of application program according to an embodiment of the invention;
Fig. 2 shows the schematic flow sheet of the management method of application program according to another embodiment of the invention;
Fig. 3 shows the structural representation of the managing device of application program according to an embodiment of the invention;
Fig. 4 shows the structural representation of terminal according to an embodiment of the invention.
Detailed description of the invention
In order to the above-mentioned purpose of the present invention, feature and advantage can be more clearly understood that, real with concrete below in conjunction with the accompanying drawings The present invention is further described in detail by mode of executing.It should be noted that in the case of not conflicting, the enforcement of the application Feature in example and embodiment can be mutually combined.
Elaborate a lot of detail in the following description so that fully understanding the present invention, but, the present invention also may be used Implementing to use other to be different from other modes described here, therefore, protection scope of the present invention is not by described below The restriction of specific embodiment.
Fig. 1 shows the schematic flow sheet of the management method of application program according to an embodiment of the invention.
As it is shown in figure 1, the management method of application program according to an embodiment of the invention, including:
Step 102, when arbitrary application program is at front stage operation, obtains and described arbitrary application program in running chained list Incoherent object run entity.
Preferably, in described operation chained list, storage has the run entity of the application program of all startups.
It is stored in the run entity of the application program of all startups running in chained list, such as, should when often starting one When using program, just store corresponding with the title of this application program for the run entity of this application program in operation chained list.
Certainly, run chained list and can also be previously stored with the run entity of all application programs, will not be along with application program Startup and exit and change.
Preferably, described acquisition and the step of described arbitrary application program incoherent object run entity in running chained list Suddenly, specifically include: in described operation chained list, search described object run entity.
Preferably, before the described step searching described object run entity in described operation chained list, also include: judge Whether there is application program at running background;If having application program at running background, then in described operation chained list, search described mesh Mark run entity;If there is no application program at running background, it is determined that there is not described object run in described operation chained list Entity.
If having application program at running background, illustrate running background application program run entity can committed memory or Cpu resource, then limit the run entity of the application program of running background, if not having application program at running background, says The run entity committed memory of the bright application program not having running background or cpu resource, only have in running chained list and transport on foreground , there is not run entity incoherent with arbitrary application program in the run entity of the application program of row, it is not necessary to searches and run chain Table obtains object run entity, thus ensure that the operational reliability of the application program at front stage operation.
Step 104, is controlled described object run entity, to reduce between described object run entity and CPU Frequency of interaction.
Preferably, the step that described object run entity is controlled, specifically include: described object run entity is hung Rise;Or forbid in the given time interacting between described object run entity and described CPU.
By object run entity is hung up, the most not performance objective run entity, or forbid target in the given time Interact between run entity and CPU, it is achieved thereby that the restriction to object run entity, and then can discharge more Internal memory or cpu resource.
Preferably, when the application program having been turned on is out of service, should by have been turned on described in described operation chained list Delete with the run entity of program.
When the application program having been turned on exits, illustrate that the run entity of this application program will not committed memory or CPU Resource, it is not necessary to limit the run entity of this application program again, then delete the run entity of this application program, it is to avoid Run efficiency comparison when storage in chained list has a too much redundancy and causes obtaining object run entity in running chained list Low.
In technique scheme, when arbitrary application program is at front stage operation, determine and this arbitrary application program not phase The object run entity closed, wherein, object run entity includes process and service, then limits object run entity To reduce the frequency of interaction between object run entity and CPU, so, normally use at the application program ensureing front stage operation Meanwhile, more internal memory or cpu resource can be saved, thus ensure the operational efficiency of the application program at front stage operation, And then be effectively prevented front stage operation application program occur card phenomenon.
Technique scheme is described in detail below by two embodiments:
Embodiment one: when wechat is switched to front stage operation, the process produced when wechat is run and service and operation chain In table, process and the service of storage compare, and to get process incoherent with wechat and service, such as, are running chained list In get process A, process B, service C, then hang up process A, process B, service C, with avoid process A, process B, service C divide Not and mutual between CPU.It addition, when wechat is switched to running background, when microblogging is switched to front stage operation, will again travel through operation Chained list, needs that limit and front stage operation the incoherent service of microblogging and process to find out.
Embodiment two: when starting an application program first, by a newly-built chained list, obtains this application program and is running Time produce process and service, the process of this application program, service, Apply Names correspondence are stored in newly-built chained list.After If the phase starts other application program, directly the process of other application program, service, Apply Names correspondence are stored above-mentioned In chained list in.When there being arbitrary application program (such as Taobao) at front stage operation, get in chained list and arbitrary application journey The process of sequence and the incoherent target process of service and destination service, forbid between target process and CPU mutual, and forbid mesh Between mark service and CPU alternately.When arbitrary application program is out of service, by the process kimonos of the arbitrary application program in chained list Business is deleted.
Fig. 2 shows the schematic flow sheet of the management method of application program according to another embodiment of the invention.
As in figure 2 it is shown, the management method of application program according to another embodiment of the invention, including:
Step 202, opens application A.
Step 204, adds chained list APP_MESG_ to by corresponding to the service of application A, process and application name In LIST.
Step 206, it is judged that whether application A is at front stage operation, if application A is at front stage operation, then enters step 214, otherwise, enter step 208.
Step 208, it is judged that whether application A exits, if application A exits, then enters step 210, otherwise, enters Step 212.
Step 210, deletes the process of the application A in chained list and service.
Step 212, does not processes.
Step 214, it is judged that whether backstage has application program running, if backstage has application program running, then enters step Rapid 216, otherwise, enter step 212.
Step 216, compares the service of application A, process with the service in chained list, process.
Step 218, it is judged that whether have service incoherent with application A, process in chained list, if having in chained list with The incoherent service of application A, process, then enter step 220, if not clothes incoherent with application A in chained list Business, process, then enter step 212.
Step 220, obtains and the incoherent service of application A, process in chained list.
Step 222, limits the service got, process.Such as, forbid carrying out between this service, process and CPU Alternately, or service, process are hung up, to avoid service, to interact between process and CPU.
Fig. 3 shows the structural representation of the managing device of application program according to an embodiment of the invention.
As it is shown on figure 3, the managing device 300 of application program according to an embodiment of the invention, including: acquiring unit 302 and control unit 304.
Acquiring unit 302, for when arbitrary application program is at front stage operation, obtains arbitrary with described in running chained list Application program incoherent object run entity.
Preferably, in described operation chained list, storage has the run entity of the application program of all startups.
It is stored in the run entity of the application program of all startups running in chained list, such as, should when often starting one When using program, just store corresponding with the title of this application program for the run entity of this application program in operation chained list.
Certainly, run chained list and can also be previously stored with the run entity of all application programs, will not be along with application program Startup and exit and change.
Preferably, acquiring unit 302 includes: search subelement 3022, for searching described mesh in described operation chained list Mark run entity.
Preferably, the managing device 300 of application program also includes: judging unit 308, is used for determining whether application program At running background;If described judging unit 308 is determined with application program at running background, the most described lookup subelement 3022 is in institute State in operation chained list and search described object run entity;If described judging unit 308 judges do not have application program at running background, The most described lookup subelement 3022 determines and there is not described object run entity in described operation chained list.
If having application program at running background, illustrate running background application program run entity can committed memory or Cpu resource, then limit the run entity of the application program of running background, if not having application program at running background, says The run entity committed memory of the bright application program not having running background or cpu resource, only have in running chained list and transport on foreground , there is not run entity incoherent with arbitrary application program in the run entity of the application program of row, it is not necessary to searches and run chain Table obtains object run entity, thus ensure that the operational reliability of the application program at front stage operation.
Control unit 304, for described object run entity is controlled, with reduce described object run entity with Frequency of interaction between CPU.
Preferably, control unit 304 specifically for, described object run entity is hung up, or prohibits in the given time Only interact between described object run entity and described CPU.
By object run entity is hung up, the most not performance objective run entity, or forbid target in the given time Interact between run entity, it is achieved thereby that the restriction to object run entity, and then more internal memory can be discharged Or cpu resource.
Preferably, the managing device 300 of application program also includes: delete unit 310, for when the application program having been turned on Time out of service, the run entity of the application program having been turned on described in described operation chained list is deleted.
When the application program having been turned on exits, illustrate that the run entity of this application program will not committed memory or CPU Resource, it is not necessary to limit the run entity of this application program again, then delete the run entity of this application program, it is to avoid Run efficiency comparison when storage in chained list has a too much redundancy and causes obtaining object run entity in running chained list Low.
In technique scheme, when arbitrary application program is at front stage operation, determine and this arbitrary application program not phase The object run entity closed, wherein, object run entity includes process and service, then limits object run entity To reduce the frequency of interaction between object run entity and CPU, so, normally use at the application program ensureing front stage operation Meanwhile, more internal memory or cpu resource can be saved, thus ensure the operational efficiency of the application program at front stage operation, And then be effectively prevented front stage operation application program occur card phenomenon.
Technique scheme is described in detail below by two embodiments:
Embodiment one: when wechat is switched to front stage operation, the process produced when wechat is run and service and operation chain In table, process and the service of storage compare, and to get process incoherent with wechat and service, such as, are running chained list In get process A, process B, service C, then hang up process A, process B, service C, with avoid process A, process B, service C divide Not and mutual between CPU.It addition, when wechat is switched to running background, when microblogging is switched to front stage operation, will again travel through operation Chained list, needs that limit and front stage operation the incoherent service of microblogging and process to find out.
Embodiment two: when starting an application program first, by a newly-built chained list, obtains this application program and is running Time produce process and service, the process of this application program, service, Apply Names correspondence are stored in newly-built chained list.After If the phase starts other application program, directly the process of other application program, service, Apply Names correspondence are stored above-mentioned In chained list in.When there being arbitrary application program (such as Taobao) at front stage operation, get in chained list and arbitrary application journey The process of sequence and the incoherent target process of service and destination service, forbid between target process and CPU mutual, and forbid mesh Between mark service and CPU alternately.When arbitrary application program is out of service, by the process kimonos of the arbitrary application program in chained list Business is deleted.
Fig. 4 shows the structural representation of terminal according to an embodiment of the invention.
As shown in Figure 4, terminal 400 according to an embodiment of the invention, including institute any one of technique scheme The managing device 300 of the application program stated, therefore, this terminal 400 has and the application according to any one of technique scheme The technique effect that the managing device 300 of program is identical, does not repeats them here.
Technical scheme is described in detail above in association with accompanying drawing, by technique scheme, can improve front The operational efficiency of application program that platform runs, and then be effectively prevented the application program at front stage operation the phenomenon of card occurs.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (11)

1. the management method of an application program, it is characterised in that including:
When arbitrary application program is at front stage operation, obtain and the described incoherent target of arbitrary application program in running chained list Run entity;
Described object run entity is controlled, to reduce the frequency of interaction between described object run entity and CPU.
The management method of application program the most according to claim 1, it is characterised in that described object run entity is carried out The step controlled, specifically includes:
Described object run entity is hung up;Or
Forbid in the given time interacting between described object run entity and described CPU.
The management method of application program the most according to claim 1, it is characterised in that store in described operation chained list There are the run entity of the application program of startup, described acquisition and the described incoherent target of arbitrary application program in running chained list The step of run entity, specifically includes:
Described object run entity is searched in described operation chained list.
The management method of application program the most according to claim 3, it is characterised in that described look in described operation chained list Before looking for the step of described object run entity, also include:
Determine whether that application program is at running background;
If having application program at running background, then in described operation chained list, search described object run entity;
If there is no application program at running background, it is determined that there is not described object run entity in described operation chained list.
The management method of application program the most according to any one of claim 1 to 4, it is characterised in that also include:
When the application program having been turned on is out of service, the operation of application program having been turned on described in described operation chained list Entity is deleted.
6. the managing device of an application program, it is characterised in that including:
Acquiring unit, for when arbitrary application program is at front stage operation, obtains and described arbitrary application journey in running chained list Sequence incoherent object run entity;
Control unit, for being controlled described object run entity, to reduce between described object run entity and CPU Frequency of interaction.
The managing device of application program the most according to claim 6, it is characterised in that described control unit specifically for,
Described object run entity is hung up, or
Forbid in the given time interacting between described object run entity and described CPU.
The managing device of application program the most according to claim 6, it is characterised in that store in described operation chained list The run entity of the application program of startup, described acquiring unit is had to include:
Search subelement, for searching described object run entity in described operation chained list.
The managing device of application program the most according to claim 8, it is characterised in that also include:
Judging unit, is used for determining whether that application program is at running background;
If described judging unit is determined with application program at running background, the most described lookup subelement is looked in described operation chained list Look for described object run entity;
If described judging unit judges do not have application program at running background, the most described lookup subelement determines at described operation chain Table does not exist described object run entity.
10. according to the managing device of the application program according to any one of claim 6 to 9, it is characterised in that also include:
Delete unit, for when the application program having been turned on is out of service, by have been turned on described in described operation chained list The run entity of application program is deleted.
11. 1 kinds of terminals, it is characterised in that including: the management dress of the application program as according to any one of claim 6 to 10 Put.
CN201610506396.6A 2016-06-30 2016-06-30 Application program management method and device and terminal Active CN106155790B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610506396.6A CN106155790B (en) 2016-06-30 2016-06-30 Application program management method and device and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610506396.6A CN106155790B (en) 2016-06-30 2016-06-30 Application program management method and device and terminal

Publications (2)

Publication Number Publication Date
CN106155790A true CN106155790A (en) 2016-11-23
CN106155790B CN106155790B (en) 2020-02-18

Family

ID=57350820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610506396.6A Active CN106155790B (en) 2016-06-30 2016-06-30 Application program management method and device and terminal

Country Status (1)

Country Link
CN (1) CN106155790B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107038074A (en) * 2017-04-14 2017-08-11 努比亚技术有限公司 Internal memory optimization device and method based on associating policy
CN107145392A (en) * 2017-04-26 2017-09-08 努比亚技术有限公司 A kind of method and apparatus of memory optimization
CN107450984A (en) * 2017-07-25 2017-12-08 广东欧珀移动通信有限公司 Method for scheduling task, device, storage medium and electronic equipment
CN108614697A (en) * 2016-12-13 2018-10-02 杭州华为数字技术有限公司 Backstage Dex compiles the method and device of management and control

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101996072A (en) * 2009-08-21 2011-03-30 联想(北京)有限公司 Window management method and computer of operating system
CN103853610A (en) * 2012-12-07 2014-06-11 腾讯科技(深圳)有限公司 Resource optimization method and resource optimization device
CN103914342A (en) * 2013-01-06 2014-07-09 联想(北京)有限公司 Electronic equipment process control method, system and electronic equipment
CN104461725A (en) * 2014-12-30 2015-03-25 小米科技有限责任公司 Application process starting control method and device
CN105676987A (en) * 2014-11-19 2016-06-15 中兴通讯股份有限公司 Method for shutting down background application of mobile terminal, device and mobile terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101996072A (en) * 2009-08-21 2011-03-30 联想(北京)有限公司 Window management method and computer of operating system
CN103853610A (en) * 2012-12-07 2014-06-11 腾讯科技(深圳)有限公司 Resource optimization method and resource optimization device
CN103914342A (en) * 2013-01-06 2014-07-09 联想(北京)有限公司 Electronic equipment process control method, system and electronic equipment
CN105676987A (en) * 2014-11-19 2016-06-15 中兴通讯股份有限公司 Method for shutting down background application of mobile terminal, device and mobile terminal
CN104461725A (en) * 2014-12-30 2015-03-25 小米科技有限责任公司 Application process starting control method and device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108614697A (en) * 2016-12-13 2018-10-02 杭州华为数字技术有限公司 Backstage Dex compiles the method and device of management and control
CN107038074A (en) * 2017-04-14 2017-08-11 努比亚技术有限公司 Internal memory optimization device and method based on associating policy
CN107038074B (en) * 2017-04-14 2021-04-23 努比亚技术有限公司 Memory optimization device and method based on association strategy
CN107145392A (en) * 2017-04-26 2017-09-08 努比亚技术有限公司 A kind of method and apparatus of memory optimization
CN107450984A (en) * 2017-07-25 2017-12-08 广东欧珀移动通信有限公司 Method for scheduling task, device, storage medium and electronic equipment

Also Published As

Publication number Publication date
CN106155790B (en) 2020-02-18

Similar Documents

Publication Publication Date Title
CN106155790A (en) The management method of application program, managing device and terminal
CN107104824B (en) Network topology determination method and device
CN106302632B (en) Downloading method of basic mirror image and management node
CN103500191B (en) Flow table configuration, query and table item deleting method and device
CN104657380A (en) Picture loading method and device
CN103714013B (en) A kind of collocation method and device of the memory space of file system
CN112073438B (en) Access control rule configuration method and device, switch and storage medium
CN112104572B (en) Data processing method and device, electronic equipment and storage medium
JP2018530270A5 (en)
CN109756382B (en) Fault positioning method and device
CN113328944B (en) Flow table management method and device
CN110532774A (en) Hook inspection method, device, server and readable storage medium storing program for executing
CN107577423A (en) A kind of method and system for optimizing memory space
CN108846121A (en) A kind of data search method and device
CN101986672A (en) Message processing method and device
CN105307238B (en) A kind of mobile terminal and its network selection method and device
CN110652728B (en) Game resource management method and device, electronic equipment and storage medium
CN109688126B (en) Data processing method, network equipment and computer readable storage medium
CN109429302A (en) Restoration methods and device after a kind of multi-card terminal off-grid
WO2022247477A1 (en) Access method and apparatus, electronic device and computer-readable storage medium
CN113572747B (en) IP address processing method, device, storage medium and processor
CN114585035A (en) Voice call method, device and computer readable storage medium
CN104808985B (en) The management method and device of object in application program
CN111353018A (en) Data processing method and device based on deep packet inspection and network equipment
CN110795220B (en) Task merging method and device and computer readable storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant