CN106154127A - The wire harness pressure method for rapidly testing of insulation - Google Patents

The wire harness pressure method for rapidly testing of insulation Download PDF

Info

Publication number
CN106154127A
CN106154127A CN201610490486.0A CN201610490486A CN106154127A CN 106154127 A CN106154127 A CN 106154127A CN 201610490486 A CN201610490486 A CN 201610490486A CN 106154127 A CN106154127 A CN 106154127A
Authority
CN
China
Prior art keywords
heart yearn
test
group
insulation
wire harness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610490486.0A
Other languages
Chinese (zh)
Other versions
CN106154127B (en
Inventor
朱挺
刘炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU RONGSHENGDA SYSTEMS ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
CHENGDU RONGSHENGDA SYSTEMS ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU RONGSHENGDA SYSTEMS ENGINEERING TECHNOLOGY Co Ltd filed Critical CHENGDU RONGSHENGDA SYSTEMS ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201610490486.0A priority Critical patent/CN106154127B/en
Publication of CN106154127A publication Critical patent/CN106154127A/en
Application granted granted Critical
Publication of CN106154127B publication Critical patent/CN106154127B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • G01R31/1263Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of solid or fluid materials, e.g. insulation films, bulk material; of semiconductors or LV electronic components or parts; of cable, line or wire insulation
    • G01R31/1272Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of solid or fluid materials, e.g. insulation films, bulk material; of semiconductors or LV electronic components or parts; of cable, line or wire insulation of cable, line or wire insulation, e.g. using partial discharge measurements
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/025Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses a kind of wire harness pressure method for rapidly testing of insulation, use combined test, and add process when judging defective.By the combined test of heart yearn; ensure all to carry out between heart yearn two-by-two the voltage-withstand test that insulate; effectively shorten the testing time; reduce cost of labor; high testing efficiency; passage switching times, effective protective relay and the service life of excitation power supply is reduced so that the insulation voltage-withstand test of wire harness can be carried out as normality test while reducing testing time.

Description

The wire harness pressure method for rapidly testing of insulation
Technical field
The present invention relates to a kind of wire harness pressure method for rapidly testing of insulation
Background technology
Traditional wire harness insulation voltage-withstand test is test between heart yearn two-by-two, and wherein a heart yearn is to high pressure, other one Root heart yearn, as return terminal, measures the insulation resistance value between line or pressure leakage current.The test philosophy of insulation resistance value as it is shown in figure 1, The test philosophy of pressure leakage current is as shown in Figure 2.
In fact be equivalent to the resistance to big resistance measure and current measurement.As a example by a wire harness with 100 heart yearns, as Really the retention time is 1s, test use time be: C100 2* 1=4950s, needs to take a long time.And it is the most large-scale The wire harness of equipment there may be thousands of heart yearn the most up to ten thousand, and the retention time is also likely to be the most a few min of a few s (generally Insulation test is 5s, and voltage-withstand test is 1min), the time spent is the most unacceptable.In commercially available tester, also Having the method for testing that some are improved, such as give a wherein heart yearn high pressure, remaining all accesses return terminal and tests, so Wire harness for 100 cores is tested, and just has only to the time of 100*1=100s, but for the wire harness of more split conductor and holding The test that time is longer, the required time remains and is difficult to accept.In actual test process, wire harness is in most cases Up to standard, underproof wire harness is little, and in underproof wire harness, underproof heart yearn is the most little.Accordingly it is contemplated that pass through group Close the mode measured and first carry out quick qualitative test, it is judged that the heart yearn in wire harness or wire harness is the most qualified, the most again to not Qualified heart yearn is measured accurately, it is achieved pressure quick test of insulating.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that a kind of wire harness pressure method for rapidly testing of insulation, By the combined test of heart yearn, it is ensured that all carry out the voltage-withstand test that insulate two-by-two between heart yearn, effectively shorten the testing time, improve and survey Examination efficiency, reduces passage switching times, effective protective relay and the service life of excitation power supply while reducing testing time.
It is an object of the invention to be achieved through the following technical solutions: wire harness insulate pressure method for rapidly testing, its bag Include following steps:
S1: using measurement in a closed series algorithm to carry out heart yearn packet, group number is M, M=ROUNDUP (Log2N, 0);
S2: the combination of n-th group heart yearn is insulated or voltage-withstand test, if test passes, then jump procedure S6, if test is not Qualified, then jump procedure S3;
S3: keeping the combination of n-th group heart yearn constant, high-pressure section keeps, and return terminal part scans in turn, measures insulation or resistance to Pressure value, records defective heart yearn and measured value, and high-pressure and low-pressure inverts, and again tests, records defective heart yearn and measured value;
S4: if there is defective heart yearn, then reject defective heart yearn, jump procedure S2, proceeds insulation or pressure survey Examination;
If there is not defective heart yearn, then jump procedure S5;
S5: judge whether that heart yearn is rejected, rejects if there is heart yearn, then n-th group heart yearn combined test is defective, if not There is heart yearn to reject, then n-th group heart yearn combined test is qualified, and takes worst-case value as measured value;
S6: circulation step S2-S5, the combination of remaining M-1 core assembly line is insulated or voltage-withstand test;
Described measurement in a closed series algorithm is: assuming that wire harness has N root heart yearn, first halved by N, first group is N/2 and N- N/2, halves the most respectively by N/2 and N-N/2 after decile the most again, and wherein half carries out high-low-position intersects and switch to the Two groups, second group is N/2/2+ (N-N/2)/2 and N/2-N/2/2+ (N-N/2)-(N-N/2)/2, and the rest may be inferred, to the last one Group is 1+1+ ...+1 and 1+1+ ...+1, and wherein N is positive integer.
The invention has the beneficial effects as follows: the invention provides a kind of wire harness pressure method for rapidly testing of insulation, pass through heart yearn Combined test, it is ensured that all carry out the voltage-withstand test that insulate two-by-two between heart yearn, effectively shorten the testing time, reduce artificial one-tenth This, high testing efficiency, reduces making of passage switching times, effective protective relay and excitation power supply while reducing testing time With the life-span so that the insulation voltage-withstand test of wire harness can be carried out as normality test.
Accompanying drawing explanation
Fig. 1 is insulation resistance value test philosophy figure;
Fig. 2 is the test philosophy figure of pressure leakage current;
Fig. 3 is that heart yearn combines distribution principle figure;
Fig. 4 is 8 heart yearn wire harness combination distribution schematic diagrams;
Fig. 5 is the combined test parallel resistance schematic diagram of 4 heart yearns;
Fig. 6 is the wire harness pressure method for rapidly testing flow chart of insulation.
Detailed description of the invention
Technical scheme is described in further detail below in conjunction with the accompanying drawings, but protection scope of the present invention is not limited to The following stated.
As it is shown on figure 3, the present invention is in the insulation voltage-withstand test of wire harness, invent a kind of combinational algorithm, by heart yearn Combined test, it is ensured that all carry out the voltage-withstand test that insulate two-by-two between heart yearn.
Assuming that wire harness has N root heart yearn, first halved by N, first group is N/2 and N-N/2, the most again by the N/ after decile 2 and N-N/2 halve the most respectively, and wherein half is carried out high-low-position intersect switch to second group, second group is N/2/2+ (N- N/2)/2 and N/2-N/2/2+ (N-N/2)-(N-N/2)/2, the rest may be inferred, and to the last one group is 1+1+ ...+1 and 1+1+ ...+ 1, wherein N is positive integer.
In order to vividly describe this assigning process, as a example by the wire harness of 8 heart yearns, it is allocated demonstration, such as Fig. 4 institute Show.Concrete steps:
Heart yearn is defined as 1~8, and two points, by 1~4 short circuits and access high pressure, 5~8 short circuits also access return terminal, measure Insulation pressure voltage;
By 1~4 two point, 5~8 two points, then latter half intersects, and forms 1278 and 5634, and 1278 short circuits also access height Pressure, 5634 short circuits also access return terminal, measure insulation pressure voltage;
By 12 2 points, 78 2 points, 56 2 points, 34 2 points, then the latter half of intersection of every part, forms 1674 Hes 5238,1674 short circuits also access high pressure, and 5238 short circuits also access return terminal, measure insulation pressure voltage;
The most all heart yearns insulation pressure voltage between any two is all measured.
The combination distribution of whole wire harness has only to ROUNDUP (Log2N, 0) secondary measurement can complete, during wherein N is wire harness Heart yearn quantity.With 100 heart yearn wire harness, as a example by retention time 1s, it is only necessary to ROUNDUP (Log2100,0) * 1=7s, greatly Shorten the testing time.
But, measurement in a closed series there is also the problem of parallel resistance, cause measured value be not actual heart yearn two-by-two it Between insulation pressure voltage, as Fig. 5 illustrates as a example by the combined test of 4 heart yearns:
If it practice, R13 to be measured, by combined test, often recording the parallel resistance of R13, R14, R23 and R24 Value, measurement result is inaccurate.But the measured value of insulation resistance is certainly less than actual value (RT< R), the measured value of leakage current is agree Surely more than actual value (IT>I).And generally judge that the insulation of single line bundle or voltage-withstand test are the most qualified, judge it often Whether insulation resistance value is more than the threshold value (R > R specified0), or whether leakage current value is less than the threshold value (I < I specified0)。
Wherein, RT, IT are measured value;R, I are actual value;R0, I0 are threshold value.
Therefore, the mode of employing combined test:
If RT>R0, then R > R0
If IT<I0, then I < I0
According to the actual test to wire harness, the qualified insulation resistance value between heart yearn often close to infinity, leakage current Often close to zero, even if consider parallel resistance, also will not exceeded threshold and cause defective;And between underproof heart yearn its Insulation resistance value can be well below threshold value, and leakage current can substantially exceed threshold value.In the case of the most most, adopt and in this way may be used Judge that wire harness is the most qualified qualitatively.
When using combined test, if judging test passes, then result is accurately;If judging defective, then result The most accurate.The most in testing, need to add process when judging defective.As shown in Figure 6, wire harness insulation is pressure soon Speed method of testing, comprises the steps:
S1: using measurement in a closed series algorithm to carry out heart yearn packet, group number is M, M=ROUNDUP (Log2N, 0);
S2: the combination of n-th group heart yearn is insulated or voltage-withstand test, if test passes, then jump procedure S6, if test is not Qualified, then jump procedure S3;
S3: keeping the combination of n-th group heart yearn constant, high-pressure section keeps, and return terminal part scans in turn, measures insulation or resistance to Pressure value, records defective heart yearn and measured value, and high-pressure and low-pressure inverts, and again tests, records defective heart yearn and measured value;
S4: if there is defective heart yearn, then reject defective heart yearn, jump procedure S2, proceeds insulation or pressure survey Examination;
If there is not defective heart yearn, then jump procedure S5;
S5: judge whether that heart yearn is rejected, rejects if there is heart yearn, then n-th group heart yearn combined test is defective, if not There is heart yearn to reject, then n-th group heart yearn combined test is qualified, and takes worst-case value as measured value;
S6: circulation step S2-S5, the combination of remaining M-1 core assembly line is insulated or voltage-withstand test.
Testing by above flow process, if wire harness is qualified, then the testing time is only ROUNDUP (Log2N, 0) * T, wherein N For heart yearn quantity, T is the retention time.If there is underproof heart yearn, then individual cord can be tested, can obtain accurate Measurement data, but the time can be elongated, and also defective heart yearn is the most, and the time is the longest.In actual test, the overwhelming majority is acceptance line Bundle, even if defective work, underproof heart yearn also tends to only several.Therefore, this method of testing is greatly improved wire harness and exists Carry out work efficiency when Insulation test and voltage-withstand test, greatly saved cost, and defective heart yearn can have been carried out accurately Location and test, it is simple to the maintenance of wire harness.
The present invention is as follows with traditional method of testing correction data when testing acceptance line Shu Jinhang:
Table 1 Insulation test Data Comparison (retention time: 5s, unit: s)
Table 2 voltage-withstand test Data Comparison (retention time: 1min, unit: min)

Claims (1)

1. the pressure method for rapidly testing of wire harness insulation, it is characterised in that: it comprises the steps:
S1: using measurement in a closed series algorithm to carry out heart yearn packet, group number is M, M=ROUNDUP(Log2N, 0);
S2: the combination of n-th group heart yearn is insulated or voltage-withstand test, if test passes, then jump procedure S6, if test does not conforms to Lattice, then jump procedure S3;
S3: keeping the combination of n-th group heart yearn constant, high-pressure section keeps, and return terminal part scans in turn, measures insulation or pressure Value, records defective heart yearn and measured value, and high-pressure and low-pressure inverts, and again tests, records defective heart yearn and measured value;
S4: if there is defective heart yearn, then reject defective heart yearn, jump procedure S2, proceeds insulation or voltage-withstand test;
If there is not defective heart yearn, then jump procedure S5;
S5: judge whether that heart yearn is rejected, rejects if there is heart yearn, then n-th group heart yearn combined test is defective, if not existing Heart yearn is rejected, then n-th group heart yearn combined test is qualified, and takes worst-case value as measured value;
S6: circulation step S2-S5, the combination of remaining M-1 core assembly line is insulated or voltage-withstand test;
Described measurement in a closed series algorithm is: assuming that wire harness has N root heart yearn, first halved by N, first group is N/2 and N-N/2, The most again N/2 and N-N/2 after decile is halved the most respectively, and wherein half is carried out high-low-position intersect switch to second Group, second group is N/2/2+ (N-N/2)/2 and N/2-N/2/2+ (N-N/2)-(N-N/2)/2, and the rest may be inferred, to the last one group For 1+1+ ...+1 and 1+1+ ...+1, wherein N is positive integer.
CN201610490486.0A 2016-06-27 2016-06-27 Harness insulation pressure resistance method for rapidly testing Active CN106154127B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610490486.0A CN106154127B (en) 2016-06-27 2016-06-27 Harness insulation pressure resistance method for rapidly testing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610490486.0A CN106154127B (en) 2016-06-27 2016-06-27 Harness insulation pressure resistance method for rapidly testing

Publications (2)

Publication Number Publication Date
CN106154127A true CN106154127A (en) 2016-11-23
CN106154127B CN106154127B (en) 2019-04-19

Family

ID=57350122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610490486.0A Active CN106154127B (en) 2016-06-27 2016-06-27 Harness insulation pressure resistance method for rapidly testing

Country Status (1)

Country Link
CN (1) CN106154127B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109031065A (en) * 2018-07-24 2018-12-18 常州同惠电子股份有限公司 Other a pair of test methods of high pressure for wire test instrument
CN111624509A (en) * 2020-05-07 2020-09-04 博硕科技(江西)有限公司 Power line testing method and device
CN112363002A (en) * 2020-11-25 2021-02-12 常州同惠电子股份有限公司 Multi-element parallel test method for safety voltage-resistant instrument
CN116930823A (en) * 2023-09-18 2023-10-24 常州同惠电子股份有限公司 High-voltage adjacent test method and system for wire tester

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040046570A1 (en) * 2002-09-06 2004-03-11 Stanley Teich Aircraft multi-function wire and insulation tester
CN101718835A (en) * 2009-11-23 2010-06-02 泰兴市航联电连接器有限公司 Comprehensive insulation and voltage resistance testing device of electric connector
CN103389445A (en) * 2013-07-26 2013-11-13 南车南京浦镇车辆有限公司 Insulation and voltage resistance test method for multicore connector wirings
CN104090216A (en) * 2014-07-10 2014-10-08 苏州福瑞互感器有限公司 Device and method for detecting wiring harness high-voltage insulation
CN104459480A (en) * 2013-09-22 2015-03-25 珠海格力电器股份有限公司 Voltage-withstand performance testing method and system for multi-core power line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040046570A1 (en) * 2002-09-06 2004-03-11 Stanley Teich Aircraft multi-function wire and insulation tester
CN101718835A (en) * 2009-11-23 2010-06-02 泰兴市航联电连接器有限公司 Comprehensive insulation and voltage resistance testing device of electric connector
CN103389445A (en) * 2013-07-26 2013-11-13 南车南京浦镇车辆有限公司 Insulation and voltage resistance test method for multicore connector wirings
CN104459480A (en) * 2013-09-22 2015-03-25 珠海格力电器股份有限公司 Voltage-withstand performance testing method and system for multi-core power line
CN104090216A (en) * 2014-07-10 2014-10-08 苏州福瑞互感器有限公司 Device and method for detecting wiring harness high-voltage insulation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109031065A (en) * 2018-07-24 2018-12-18 常州同惠电子股份有限公司 Other a pair of test methods of high pressure for wire test instrument
CN111624509A (en) * 2020-05-07 2020-09-04 博硕科技(江西)有限公司 Power line testing method and device
CN112363002A (en) * 2020-11-25 2021-02-12 常州同惠电子股份有限公司 Multi-element parallel test method for safety voltage-resistant instrument
CN116930823A (en) * 2023-09-18 2023-10-24 常州同惠电子股份有限公司 High-voltage adjacent test method and system for wire tester

Also Published As

Publication number Publication date
CN106154127B (en) 2019-04-19

Similar Documents

Publication Publication Date Title
CN106154127A (en) The wire harness pressure method for rapidly testing of insulation
CN107797036B (en) Method for evaluating composite insulator interface performance based on high voltage and salt solution
CN104246521A (en) Method and device for automatic test of relay protection function of intelligent susbstation
CN108196204A (en) A kind of method and test device of quick detection lithium ion battery self discharge consistency
CN111220851A (en) Magnetic inductance performance detection method
CN111077420A (en) System and method for automatically testing voltage sag tolerance capability of sensitive equipment
CN207301253U (en) A kind of interface performance test system of composite insulator
CN114624526A (en) Stepping stress accelerated life test method for evaluating reliability of electric meter
CN113109637A (en) Direct current integral charge measuring device and method for high-voltage cable
CN103558516A (en) Method of testing alternating current voltage resistance performance of multi-core cable
CN106324452A (en) Transformer insulation model system
CN105589015B (en) A kind of method for building up of cable oscillatory wave partial discharge detection failure criterion
CN113760772B (en) Use case execution method of semi-automatic/automatic execution system for testability test
CN107688141B (en) Interface of composite insulator Performance test system and method
CN101581766A (en) Method for detecting invalid detecting point of cell detecting cabinet
CN113985226A (en) Cable processing method and system
CN113391129A (en) Method for testing medium loss factor of valve side sleeve and winding of converter transformer
CN110658463B (en) Method for predicting cycle life of lithium ion battery
CN109975625B (en) Test method and device for researching key factors of short-circuit radial instability of power transformer
CN106154121A (en) A kind of cable system insulating fault diagnosis method
CN111190079A (en) Fault indicator collects unit with withstand voltage automatic test system
CN117148091B (en) Semiconductor test method, system, terminal and storage medium
CN207937575U (en) A kind of test device of quick detection lithium ion battery self discharge consistency
CN204168240U (en) Hi-pot Tester spot check fixture
CN103995190A (en) Current carrying capacity test method for overhead conductor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant