CN106091249B - Cooler compressor electric heating controlling method and device - Google Patents

Cooler compressor electric heating controlling method and device Download PDF

Info

Publication number
CN106091249B
CN106091249B CN201610415143.8A CN201610415143A CN106091249B CN 106091249 B CN106091249 B CN 106091249B CN 201610415143 A CN201610415143 A CN 201610415143A CN 106091249 B CN106091249 B CN 106091249B
Authority
CN
China
Prior art keywords
data
weather forecast
air conditioner
preset time
time threshold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610415143.8A
Other languages
Chinese (zh)
Other versions
CN106091249A (en
Inventor
董明珠
李耀东
刘群波
张辉
余凯
薛寒冬
傅英胜
许克
王芳
倪毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201610415143.8A priority Critical patent/CN106091249B/en
Publication of CN106091249A publication Critical patent/CN106091249A/en
Application granted granted Critical
Publication of CN106091249B publication Critical patent/CN106091249B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Thermal Sciences (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a kind of cooler compressor electric heating controlling method and devices, wherein, know that the cooler compressor time out of service is more than the first preset time threshold this method comprises: monitoring, the first solicited message is sent to database server, to obtain the data of weather forecast of air conditioner region in following second preset time threshold;The data of weather forecast that database server returns is received, control strategy is generated to control the electrically heated start and stop of cooler compressor according to data of weather forecast.The present invention, which solves the problems, such as that air conditioner is in the standby state compressor and still needs to a large amount of electric heating in the prior art, causes compressor of air conditioner stand-by power consumption big, reduces the electric heating opening time under air-conditioner standby state, decreases energy consumption.

Description

Cooler compressor electric heating controlling method and device
Technical field
The present invention relates to air-conditioning technical field, in particular to a kind of cooler compressor electric heating controlling method and Device.
Background technique
In the prior art, air conditioner is under shutdown status, and outdoor environment rising will lead to compressor into refrigerant, and unit Outdoor environment variation tendency can not be prejudged, in advance in order to guarantee machine set compressor reliability, standby compressor heat tape Be substantially it is always on, and compressor heat tape consumption power account for 70% or more of complete machine standby power, to cause Multi-connected machine standby energy consumption is high.And according to the whole year from the point of view of, home multi-line stand-by time is far longer than runing time, therefore drops The stand-by power consumption of the electromechanical heating tape of low pressure contracting is the key that promote entirety to use efficiency.
Being in the standby state compressor for air conditioner in the related technology and still needing to a large amount of electric heating leads to compressor of air conditioner The big problem of stand-by power consumption not yet proposes to efficiently solve scheme at present.
Summary of the invention
The present invention provides a kind of cooler compressor electric heating controlling method and devices, at least to solve in the prior art Air conditioner is in the standby state compressor and still needs to the problem that a large amount of electric heating cause compressor of air conditioner stand-by power consumption big.
In order to solve the above technical problems, the present invention provides a kind of air conditioners according to the one aspect of the embodiment of the present disclosure Compressor electric heating controlling method knows that the cooler compressor time out of service is more than first default this method comprises: monitoring Time threshold sends the first solicited message to database server, to obtain air conditioner institute in following second preset time threshold Data of weather forecast in region;The data of weather forecast that database server returns is received, is generated according to data of weather forecast Control strategy is to control the electrically heated start and stop of cooler compressor.
Further, the first solicited message is sent to database server, to obtain in following second preset time threshold The data of weather forecast of air conditioner region, comprising: air conditioner region is positioned by the communication module of air conditioner built-in To determine the location information of air conditioner;Obtain preset second preset time threshold;Generation includes the location information of air conditioner With the first solicited message of the second preset time threshold, and database server is sent to obtain the following second preset time threshold The data of weather forecast of air conditioner region in being worth, wherein database server parses the first solicited message, passes through itself net Network interface accesses weather platform and obtains the corresponding data of weather forecast of the first solicited message, and is back to the communication mould of air conditioner Block.
Further, the data of weather forecast that database server returns is received, is generated and is controlled according to data of weather forecast Strategy is to control the electrically heated start and stop of cooler compressor, comprising: in the data of weather forecast that database server returns, sieve Select the data of weather forecast after current time in third preset time threshold;It analyzes and determines in third preset time threshold Temperature value changes over time trend in data of weather forecast, is that control cooler compressor is opened in the time increased in variation tendency Electric heating is opened, is that control cooler compressor closes electric heating in the non-time increased in variation tendency.
Further, temperature value in the data of weather forecast determined in third preset time threshold is analyzed to change over time Gesture, comprising: third preset time threshold is divided into preset n unit interval, is denoted as F respectively1…Fk…Fn, wherein n, K is natural number, k ∈ [2, n];Calculate n unit interval F1…Fk…FnIn in each period temperature average value, respectively It is denoted as t1…tk…tn;The average value of temperature is averaged with temperature in the previous time period of the period in more each period Value, determines that temperature value changes over time trend in the data of weather forecast in third preset time threshold.
Further, in more each period in the average value of temperature and the previous time period of the period temperature it is flat Mean value determines that temperature value changes over time trend in the data of weather forecast in third preset time threshold, comprising: by following Formula calculates and judges: working as tk-t(k-1)When > 0, determine in FkIn period temperature value change over time trend be increase when Between;Work as tk-t(k-1)When≤0, F is determinedkIt is the non-time increased that temperature value, which changes over time trend, in period.
Further, it as k=n, characterizes data of weather forecast in third preset time threshold and is disposed, continue to send First solicited message is pre- with the weather for obtaining air conditioner region in following second preset time threshold to database server Count off evidence.
Further, the first preset time is 1 hour.
According to the another aspect of the embodiment of the present disclosure, a kind of cooler compressor electric heater unit is provided, the device packet Include: transmission unit knows that the cooler compressor time out of service is more than the first preset time threshold for monitoring, sends first Solicited message is to database server, to obtain the weather forecast number of air conditioner region in following second preset time threshold According to;Control unit, the data of weather forecast that library server returns for receiving data generate control plan according to data of weather forecast Slightly to control the electrically heated start and stop of cooler compressor.
Further, transmission unit includes: locating module, for positioning air conditioner by the communication module of air conditioner built-in Region is to determine the location information of air conditioner;Module is obtained, for obtaining preset second preset time threshold;Send mould Block includes the location information of air conditioner and the first solicited message of the second preset time threshold for generating, and is sent to number The data of weather forecast of air conditioner region in following second preset time threshold is obtained according to library server, wherein data Library server parses the first solicited message, accesses weather platform by own network interface and obtains the corresponding day of the first solicited message Gas forecast data, and it is back to the communication module of air conditioner.
Further, control unit includes: screening module, the data of weather forecast for returning in database server In, filter out the data of weather forecast after current time in third preset time threshold;Determining module is analyzed, for analyzing really Determine temperature value in the data of weather forecast in third preset time threshold and change over time trend, when variation tendency is to increase Interior control cooler compressor opens electric heating, is that control cooler compressor is closed in the non-time increased in variation tendency Electric heating.
Further, analysis determining module comprises determining that submodule, default for third preset time threshold to be divided into N unit interval, be denoted as F respectively1…Fk…Fn, wherein n, k are natural number, k ∈ [2, n];Computational submodule, based on Calculate n unit interval F1…Fk…FnIn in each period temperature average value, be denoted as t respectively1…tk…tn;Compare submodule Block is determined for the average value of temperature in the average value of temperature in more each period and the previous time period of the period Temperature value changes over time trend in data of weather forecast in third preset time threshold.
Further, Comparative sub-module is in tk-t(k-1)When > 0, determine in FkTemperature value changes over time in period Gesture is the time increased;In tk-t(k-1)When≤0, F is determinedkIn period temperature value change over time trend be it is non-increase when Between.
Further, Comparative sub-module determines that data of weather forecast has been handled in third preset time threshold in k=n Finish, notice transmission unit continues to send the first solicited message to database server, to obtain following second preset time threshold The data of weather forecast of interior air conditioner region.
In the present invention, portion is provided with the communication module for network communication in the air conditioner, can with include weather data Database server connection communication, also, the time threshold of default compressor of air conditioner time out of service.When air conditioner compresses When the machine time out of service is more than the first preset time threshold, connection is established by the communication module and database server, and It sends comprising solicited message to the database server, time request information and air-conditioning region is carried in solicited message Position request information, after establishing connection with data server and receiving the required data of weather forecast of return, by the weather Forecast data is in the standby state whether compressor needs electrically heated foundation as air conditioner.This control program is effectively Solving air conditioner in the prior art and being in the standby state compressor and still need to a large amount of electric heating leads to the standby function of compressor of air conditioner Big problem is consumed, the electric heating opening time under air-conditioner standby state is reduced, decreases energy consumption.
Detailed description of the invention
Fig. 1 is a kind of optional flow chart of cooler compressor electric heating controlling method according to an embodiment of the present invention;
Fig. 2 is the optional process of another kind of cooler compressor electric heating controlling method according to an embodiment of the present invention Figure;
Fig. 3 is a kind of optional structural frames of cooler compressor electric heating control device according to an embodiment of the present invention Figure;
Fig. 4 is the optional structural frames of another kind of cooler compressor electric heating control device according to an embodiment of the present invention Figure;And
Fig. 5 is another optional structural frames of cooler compressor electric heating control device according to an embodiment of the present invention Figure.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistented with the present invention.On the contrary, they be only with it is such as appended The example of device and method being described in detail in claims, some aspects of the invention are consistent.
Embodiment 1
Cooler compressor electric heating controlling method provided by the invention is illustrated with reference to the accompanying drawing.
Cooler compressor electric heating controlling method provided by the invention can be applied on domestic air conditioner, can be in quotient It is realized in the commercial use air conditioners such as field or marine air conditioner equipment.Fig. 1 shows a kind of optional flow chart of this method, such as Fig. 1 institute Show, which may comprise steps of:
S102, monitoring know that the cooler compressor time out of service is more than the first preset time threshold, send first and ask Ask information to database server, to obtain the weather forecast number of air conditioner region in following second preset time threshold According to;
Specifically, for example, when cooler compressor dwell time T >=1h is known in monitoring, the first solicited message is sent To database server.Preferably, air conditioner region is positioned to determine air conditioner by the communication module of air conditioner built-in Location information;Obtain preset second preset time threshold;Generation include air conditioner location information and second it is default when Between threshold value the first solicited message, and be sent to database server to obtain air conditioner institute in following second preset time threshold Data of weather forecast in region, wherein database server parses the first solicited message, accesses day by own network interface Gas platform obtains the corresponding data of weather forecast of the first solicited message, and is back to the communication module of air conditioner.
S104, receives the data of weather forecast that database server returns, and generates control strategy according to data of weather forecast To control the electrically heated start and stop of cooler compressor.
When specific implementation, in the data of weather forecast that database server returns, third after current time is filtered out Data of weather forecast in preset time threshold;Analyze temperature value in the data of weather forecast determined in third preset time threshold Trend is changed over time, is that control cooler compressor opens electric heating in the time increased in variation tendency, in variation tendency Electric heating is closed to control cooler compressor in the non-time increased.
In of the invention one optional embodiment, a kind of simply and effectively analyze when determining that third is default is provided Between in data of weather forecast in threshold value temperature value change over time the scheme of trend, specifically, by third preset time threshold Value is divided into preset n unit interval, is denoted as F respectively1…Fk…Fn, wherein n, k are natural number, k ∈ [2, n];Calculate n A unit interval F1…Fk…FnIn in each period temperature average value, be denoted as t respectively1…tk…tn;Compare per a period of time Between in section in the average value of temperature and the previous time period of the period temperature average value, determine in third preset time threshold Data of weather forecast in temperature value change over time trend.
When carrying out above-mentioned compare, it can be realized using following scheme, be calculated by the following formula and judge:
Work as tk-t(k-1)When > 0, determine in FkIt is the time increased that temperature value, which changes over time trend, in period;Work as tk- t(k-1)When≤0, F is determinedkIt is the non-time increased that temperature value, which changes over time trend, in period.
In addition, characterizing data of weather forecast in third preset time threshold as k=n and being disposed, continue transmission first Solicited message is to database server, to obtain the weather forecast number of air conditioner region in following second preset time threshold According to circulation carries out according to this.
2 pairs of cooler compressor electric heating controlling methods of the invention are further detailed with reference to the accompanying drawing, with Just the present invention is better understood.
Cooler compressor dwell time T >=1h is known in S201, monitoring, triggers step S202;
S202, communication module obtain its location information by cellular network location self-position;And communication module root The request for using data of weather forecast is sent according to demand;
Two information in S202 are sent to specified server (database clothes by cellular network by S203, communication module Business device);
S204, the information that server receives communication module transmission obtain the local following weather forecast number by internet channel According to;
S205, server send the data of weather forecast of acquisition in communication module;
S206, communication module return to the information received into the controller of air conditioner;
S207, controller start T0 backward at the time of interception corresponding to compressor dwell time T according to data of weather forecast All data of the weather forecast that=6h is included;
The data (data in the following T0) of interception are divided into n points, define every equal part and be recorded as F1 ... Fk ... by S208 Fn.Every part of data processing is obtained into its average value, i.e., the average of every equal part are as follows: t1 ... tk ... tn;It defines k to take [2, n], n is extremely It is less 2;
S209 judges to detect tk-t (k-1) > 0, if so, executing step S210, otherwise, executes step S211;
S210, reservation electric heating unlatching at the time of waiting subregions Fk to correspond to;
S211, reservation electric heating closing at the time of waiting subregions Fk to correspond to;
S212 judges whether k=n, if so, the S202 that gos to step, otherwise, go to step S209.
It can be seen that from the above description, in the present invention, portion is provided with the communication mould for network communication in the air conditioner Block, can with the database server connection communication comprising weather data, also, the default compressor of air conditioner time out of service when Between threshold value.When the cooler compressor time out of service being more than the first preset time threshold, pass through the communication module and data Library server establishes connection, and transmission includes solicited message to the database server, and having time request is carried in solicited message The position request information of information and air-conditioning region is establishing connection with data server and is receiving the required weather of return After forecast data, using the data of weather forecast as air conditioner be in the standby state compressor whether need it is electrically heated according to According to.This control program, which efficiently solves air conditioner in the prior art and is in the standby state compressor, still needs to a large amount of electric heating The problem for causing compressor of air conditioner stand-by power consumption big reduces the electric heating opening time under air-conditioner standby state, decreases energy consumption.
Embodiment 2
The cooler compressor electric heating controlling method provided in 1 based on the above embodiment, optional embodiment 2 of the present invention A kind of cooler compressor electric heating control device is additionally provided, specifically, Fig. 3 shows a kind of optional structure of the device Block diagram knows that the cooler compressor time out of service is more than for monitoring as shown in figure 3, the device includes: transmission unit 32 First preset time threshold sends the first solicited message to database server, to obtain in following second preset time threshold The data of weather forecast of air conditioner region;Control unit 34, the weather forecast number that library server returns for receiving data According to according to data of weather forecast generation control strategy to control the electrically heated start and stop of cooler compressor.
Further, as shown in figure 4, transmission unit 32 includes: locating module 322, for passing through the logical of air conditioner built-in News module positions air conditioner region to determine the location information of air conditioner;Module 324 is obtained, for obtaining preset second Preset time threshold;Sending module 326, for generate include air conditioner location information and the second preset time threshold One solicited message, and database server is sent to obtain the day of air conditioner region in following second preset time threshold Gas forecast data, wherein database server parses the first solicited message, accesses weather platform by own network interface and obtains The corresponding data of weather forecast of first solicited message, and it is back to the communication module of air conditioner.
Further, as shown in figure 5, control unit 34 includes: screening module 342, for being returned in database server Data of weather forecast in, filter out the data of weather forecast after current time in third preset time threshold;Analysis determines Module 344 changes over time trend for analyzing temperature value in the data of weather forecast in determining third preset time threshold, Variation tendency is that control cooler compressor opens electric heating in the time increased, and is the non-time internal control increased in variation tendency Cooler compressor processed closes electric heating.
Further, analysis determining module comprises determining that submodule, default for third preset time threshold to be divided into N unit interval, be denoted as F respectively1…Fk…Fn, wherein n, k are natural number, k ∈ [2, n];Computational submodule, based on Calculate n unit interval F1…Fk…FnIn in each period temperature average value, be denoted as t respectively1…tk…tn;Compare submodule Block is determined for the average value of temperature in the average value of temperature in more each period and the previous time period of the period Temperature value changes over time trend in data of weather forecast in third preset time threshold.
Further, Comparative sub-module is in tk-t(k-1)When > 0, determine in FkTemperature value changes over time in period Gesture is the time increased;In tk-t(k-1)When≤0, F is determinedkIn period temperature value change over time trend be it is non-increase when Between.
Further, Comparative sub-module determines that data of weather forecast has been handled in third preset time threshold in k=n Finish, notice transmission unit continues to send the first solicited message to database server, to obtain following second preset time threshold The data of weather forecast of interior air conditioner region.
In the present invention, portion is provided with the communication module for network communication in the air conditioner, can with include weather data Database server connection communication, also, the time threshold of default compressor of air conditioner time out of service.When air conditioner compresses When the machine time out of service is more than the first preset time threshold, connection is established by the communication module and database server, and It sends comprising solicited message to the database server, time request information and air-conditioning region is carried in solicited message Position request information, after establishing connection with data server and receiving the required data of weather forecast of return, by the weather Forecast data is in the standby state whether compressor needs electrically heated foundation as air conditioner.This control program is effectively Solving air conditioner in the prior art and being in the standby state compressor and still need to a large amount of electric heating leads to the standby function of compressor of air conditioner Big problem is consumed, the electric heating opening time under air-conditioner standby state is reduced, decreases energy consumption.
About the device in above-described embodiment, wherein each unit, module execute the concrete mode of operation related It is described in detail in the embodiment of this method, no detailed explanation will be given here.
Those skilled in the art after considering the specification and implementing the invention disclosed here, will readily occur to of the invention its Its embodiment.This application is intended to cover any variations, uses, or adaptations of the invention, these modifications, purposes or The common knowledge in the art that person's adaptive change follows general principle of the invention and do not invent including the present invention Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are by following Claim is pointed out.
It should be understood that the present invention is not limited to the precise structure already described above and shown in the accompanying drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is limited only by the attached claims.

Claims (11)

1. a kind of cooler compressor electric heating controlling method characterized by comprising
Monitoring knows that the cooler compressor time out of service is more than the first preset time threshold, sends the first solicited message to number According to library server, to obtain the data of weather forecast of air conditioner region in following second preset time threshold;
Receive the data of weather forecast that the database server returns, according to the data of weather forecast generate control strategy with Control the electrically heated start and stop of the cooler compressor;
Wherein, the data of weather forecast for receiving the database server and returning, generates according to the data of weather forecast Control strategy is to control the electrically heated start and stop of the cooler compressor, comprising:
In the data of weather forecast that the database server returns, third preset time threshold after current time is filtered out Interior data of weather forecast;
Analysis determines that temperature value changes over time trend in the data of weather forecast in the third preset time threshold, described Variation tendency is that the control cooler compressor opens electric heating in time for increasing, is increased the variation tendency is non- The control cooler compressor closes electric heating in time.
2. the method according to claim 1, wherein the first solicited message of the transmission is to database server, To obtain the data of weather forecast of air conditioner region in following second preset time threshold, comprising:
Air conditioner region is positioned by the communication module of air conditioner built-in to determine the location information of air conditioner;
Obtain preset second preset time threshold;
Generation includes the location information of the air conditioner and the first solicited message of second preset time threshold, and is sent The data of weather forecast of air conditioner region in following second preset time threshold is obtained to the database server, In, the database server parses first solicited message, is accessed described in the acquisition of weather platform by own network interface The corresponding data of weather forecast of first solicited message, and it is back to the communication module of the air conditioner.
3. the method according to claim 1, wherein the analysis determines in the third preset time threshold Temperature value changes over time trend in data of weather forecast, comprising:
The third preset time threshold is divided into preset n unit interval, is denoted as F respectively1…Fk…Fn, wherein n, K is natural number, k ∈ [2, n];
Calculate n unit interval F1…Fk…FnIn in each period temperature average value, be denoted as t respectively1…tk…tn
In more each period in the average value of temperature and the previous time period of the period temperature average value, determine described in Temperature value changes over time trend in data of weather forecast in third preset time threshold.
4. according to the method described in claim 3, it is characterized in that, in more each period the average value of temperature with should The average value of temperature in the previous time period of period determines the data of weather forecast medium temperature in the third preset time threshold Angle value changes over time trend, comprising:
It is calculated by the following formula and judges:
Work as tk-t(k-1)When > 0, determine in FkIt is the time increased that temperature value, which changes over time trend, in period;
Work as tk-t(k-1)When≤0, F is determinedkIt is the non-time increased that temperature value, which changes over time trend, in period.
5. according to the method described in claim 4, it is characterized in that, characterizing weather in third preset time threshold as k=n Forecast data is disposed, and continues to send the first solicited message to database server, to obtain the following second preset time threshold The data of weather forecast of air conditioner region in being worth.
6. method according to claim 1-5, which is characterized in that first preset time is 1 hour.
7. a kind of cooler compressor electric heating control device characterized by comprising
Transmission unit knows that the cooler compressor time out of service is more than the first preset time threshold for monitoring, transmission the One solicited message is to database server, to obtain the weather forecast of air conditioner region in following second preset time threshold Data;
Control unit, the data of weather forecast returned for receiving the database server, according to the data of weather forecast Control strategy is generated to control the electrically heated start and stop of the cooler compressor;
Wherein, described control unit includes:
Screening module, in the data of weather forecast that the database server returns, filtering out after current time Data of weather forecast in three preset time thresholds;
Determining module is analyzed, for analyzing in the data of weather forecast determined in the third preset time threshold temperature value at any time Between variation tendency, be to control the cooler compressor in the time increased to open electric heating in the variation tendency, described Variation tendency is that the control cooler compressor closes electric heating in the non-time increased.
8. device according to claim 7, which is characterized in that the transmission unit includes:
Locating module positions air conditioner region for the communication module by air conditioner built-in to determine the position of air conditioner Information;
Module is obtained, for obtaining preset second preset time threshold;
Sending module includes that the location information of the air conditioner and the first of second preset time threshold are asked for generating Information is sought, and is sent to the database server to obtain the day of air conditioner region in following second preset time threshold Gas forecast data, wherein the database server parses first solicited message, accesses weather by own network interface Platform obtains the corresponding data of weather forecast of first solicited message, and is back to the communication module of the air conditioner.
9. device according to claim 7, which is characterized in that the analysis determining module includes:
It determines submodule, for the third preset time threshold to be divided into preset n unit interval, is denoted as respectively F1…Fk…Fn, wherein n, k are natural number, k ∈ [2, n];
Computational submodule, for calculating n unit interval F1…Fk…FnIn in each period temperature average value, respectively It is denoted as t1…tk…tn
Comparative sub-module, for temperature in the average value of temperature in more each period and the previous time period of the period Average value determines that temperature value changes over time trend in the data of weather forecast in the third preset time threshold.
10. device according to claim 9, which is characterized in that the Comparative sub-module is in tk-t(k-1)When > 0, determine FkIt is the time increased that temperature value, which changes over time trend, in period;In tk-t(k-1)When≤0, F is determinedkTemperature value in period Changing over time trend is the non-time increased.
11. device according to claim 10, which is characterized in that the Comparative sub-module determines that third is pre- in k=n If data of weather forecast is disposed in time threshold, the transmission unit is notified to continue to send the first solicited message to database Server, to obtain the data of weather forecast of air conditioner region in following second preset time threshold.
CN201610415143.8A 2016-06-13 2016-06-13 Cooler compressor electric heating controlling method and device Active CN106091249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610415143.8A CN106091249B (en) 2016-06-13 2016-06-13 Cooler compressor electric heating controlling method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610415143.8A CN106091249B (en) 2016-06-13 2016-06-13 Cooler compressor electric heating controlling method and device

Publications (2)

Publication Number Publication Date
CN106091249A CN106091249A (en) 2016-11-09
CN106091249B true CN106091249B (en) 2019-07-09

Family

ID=57845758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610415143.8A Active CN106091249B (en) 2016-06-13 2016-06-13 Cooler compressor electric heating controlling method and device

Country Status (1)

Country Link
CN (1) CN106091249B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110360713B (en) * 2018-04-09 2020-06-16 珠海格力电器股份有限公司 Air conditioner control method and device based on weather and air conditioner
CN112188549A (en) * 2020-09-25 2021-01-05 珠海格力电器股份有限公司 Communication method, communication module and communication system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000193325A (en) * 1998-12-25 2000-07-14 Matsushita Electric Ind Co Ltd Air conditioner equipment
JP2012241916A (en) * 2011-05-16 2012-12-10 Fujitsu General Ltd Air conditioner
JP2015064120A (en) * 2013-09-24 2015-04-09 株式会社日立製作所 Air conditioning control system and air conditioning control method
CN104864569A (en) * 2015-05-28 2015-08-26 特灵空调系统(中国)有限公司 Air conditioner and accumulated water or snow recognition method thereof
CN105473357A (en) * 2013-08-23 2016-04-06 三电控股株式会社 Vehicle air conditioner
CN105509245A (en) * 2015-12-23 2016-04-20 珠海格力电器股份有限公司 Air conditioning system and air conditioner outdoor unit standby control method and device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8606374B2 (en) * 2010-09-14 2013-12-10 Nest Labs, Inc. Thermodynamic modeling for enclosures

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000193325A (en) * 1998-12-25 2000-07-14 Matsushita Electric Ind Co Ltd Air conditioner equipment
JP2012241916A (en) * 2011-05-16 2012-12-10 Fujitsu General Ltd Air conditioner
CN105473357A (en) * 2013-08-23 2016-04-06 三电控股株式会社 Vehicle air conditioner
JP2015064120A (en) * 2013-09-24 2015-04-09 株式会社日立製作所 Air conditioning control system and air conditioning control method
CN104864569A (en) * 2015-05-28 2015-08-26 特灵空调系统(中国)有限公司 Air conditioner and accumulated water or snow recognition method thereof
CN105509245A (en) * 2015-12-23 2016-04-20 珠海格力电器股份有限公司 Air conditioning system and air conditioner outdoor unit standby control method and device

Also Published As

Publication number Publication date
CN106091249A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106091248B (en) Cooler compressor electric heating controlling method and device
CN110131838B (en) Air conditioning unit control method and device, computer equipment and storage medium
CN109373635A (en) A kind of air conditioner oil returning control method, device and air conditioner
WO2015106038A1 (en) A data center infrastructure management (dcim) system comprising predictive analytics
CN106091249B (en) Cooler compressor electric heating controlling method and device
CN109099553A (en) A kind of compressor frequency control method, device and air conditioner
CN109539512A (en) A kind of air-conditioning frequency reducing control method, device and air conditioner
CN110081554A (en) The control method and device of multi-online air-conditioning system
CN106230674A (en) Prevent the method and apparatus that intelligent appliance is maliciously controlled
CN113834184B (en) Control method and device for air conditioner and server
CN115017006A (en) Auxiliary energy-saving control method and system for data center
AU2017435881B2 (en) Decoupled modeling methods and systems
CN108131806A (en) Temprature control method and line control machine
CN116221956A (en) Method and device for controlling air conditioner and air conditioner
CN104596044A (en) Method, device and system for controlling air conditioner
CN109827303A (en) A kind of temperature control method, device and server
CN115933421A (en) Energy-saving control method and device for electrical equipment and electrical equipment
Sorrentino et al. A model for simulation and optimal energy management of Telecom switching plants
CN108844183B (en) A kind of energy-saving control method, device and household appliance
CN111880419A (en) Control method and system of household appliance, household appliance and computing device
CN113834183B (en) Control method and device for air conditioner and server
JP2020139705A (en) Operation control method, operation control program and operation control device
CN113432252B (en) Air conditioner control method and device, cloud server, air conditioner and storage medium
CN113641162B (en) Identity identification method and system of environment control equipment and computer storage medium
CN116294141A (en) Method and device for controlling air conditioner and air conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant