CN106027298A - Data collection method of distributed data system and the distributed data system - Google Patents

Data collection method of distributed data system and the distributed data system Download PDF

Info

Publication number
CN106027298A
CN106027298A CN201610340902.9A CN201610340902A CN106027298A CN 106027298 A CN106027298 A CN 106027298A CN 201610340902 A CN201610340902 A CN 201610340902A CN 106027298 A CN106027298 A CN 106027298A
Authority
CN
China
Prior art keywords
data center
data
center
load
assistance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610340902.9A
Other languages
Chinese (zh)
Other versions
CN106027298B (en
Inventor
张锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Longrise Technology Co Ltd
Original Assignee
Shenzhen Longrise Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Longrise Technology Co Ltd filed Critical Shenzhen Longrise Technology Co Ltd
Priority to CN201610340902.9A priority Critical patent/CN106027298B/en
Publication of CN106027298A publication Critical patent/CN106027298A/en
Application granted granted Critical
Publication of CN106027298B publication Critical patent/CN106027298B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0668Management of faults, events, alarms or notifications using network fault recovery by dynamic selection of recovery network elements, e.g. replacement by the most appropriate element after failure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0659Management of faults, events, alarms or notifications using network fault recovery by isolating or reconfiguring faulty entities
    • H04L41/0661Management of faults, events, alarms or notifications using network fault recovery by isolating or reconfiguring faulty entities by reconfiguring faulty entities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/60Scheduling or organising the servicing of application requests, e.g. requests for application data transmissions using the analysis and optimisation of the required network resources

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Information Transfer Between Computers (AREA)

Abstract

The invention discloses a data collection method and a distributed data system. The distributed data system comprises multiple data centers which are in mutual communication connection and remote terminals subordinate to the data centers. The data centers comprise a management data center and auxiliary data centers. The data collection method comprises the steps that the management data center dynamically allocates data collection tasks for collecting data uploaded by the remote terminals to the auxiliary data centers to execution; when a fault occur in the management data center, replacer information generated in the operation of the current management data center is extracted, the auxiliary data center corresponding to the replacer information is taken as the new management data center; and the new management data center restores the data center in which the fault occurs and outputs event prompting to a preset maintenance terminal. According to the method and the system, the stability of executing the data collection tasks by the data centers is improved, the collection process of the collected target data is ensured to be fluent, and the integrity of the collected target data is ensured.

Description

The collecting method of distributed data system and distributed data system
Technical field
The present invention relates to distributed system technical field, particularly relate to the data of a kind of distributed data system Acquisition method and distributed data system.
Background technology
In reality, the most all producing substantial amounts of data, some needs to analyze, and some needs storage, All these needs data bulk to be processed to be huge, has similarity, so needing these big Data are analyzed processing, and gather the data needed.
In the prior art, the target that usually remote terminal is generated by data center based on data gather computer Data (such as performance data, alarm data, data on flows, business datum etc.) are acquired, data The reliability of harvester is to gather complete target data, reduce the work of hand inspection target data completeness The important prerequisite of amount and guarantee;But, owing to current data gather computer itself is insecure, work as number When breaking down according to harvester, it will cause data acquisition slowly or interrupt, easily causing collection There is serious incomplete technical problem in target data.
Summary of the invention
Present invention is primarily targeted at collecting method and the distribution that a kind of distributed data system is provided Formula data system, it is intended to solve prior art and easily occur that the target data gathered occurs the most incomplete The technical problem of technical problem.
For achieving the above object, the collecting method of a kind of distributed data system that the present invention provides, Described distributed data system includes multiple data center being in communication with each other connection and each data center subordinate Remote terminal, data center includes managing data center and assistance data center,
The collecting method of this distributed data system includes:
The data acquisition session that data uploaded by each remote terminal of collection is dynamically assigned to by management data center Each assistance data center performs, the corresponding data acquisition session of one of them remote terminal;
When managing data center and breaking down, extract during current management data center is run the replacement generated Person's information, and using assistance data center corresponding for replacement person's information as new management data center;
The data center broken down is repaired by new management data center, and safeguards that end is defeated to default Outgoing event is pointed out.
Preferably, the data center broken down is repaired by described new management data center, and to Preset and safeguard that the step that end outgoing event is pointed out includes:
New management data center uses the journey of the correct procedure content the prestored data center to breaking down Sequence content carries out data reparation;
If the response that the data center being not detected by breaking down sends based on the program after carrying out data reparation Message, then reset the data center broken down described in restarting;
If the response message that the data center broken down after restarting that resets sends being detected, then judge institute State the data center broken down and software failure occurs, export the first event prompt;
If being not detected by resets restart after the data center broken down send response message, then judge There is hardware failure, output second event prompting in the described data center broken down.
Preferably, the data acquisition that data uploaded by each remote terminal of collection is appointed by described management data center Business is dynamically assigned to the step of each assistance data center execution and includes:
The data acquisition session that data uploaded by each remote terminal of collection is averagely allocated to by management data center Each assistance data center performs;
Management data center obtains once each assistance data center processing data acquisition at interval of preset duration The hardware load of task, using this hardware load as with reference to hardware load;
Management data center with reference to hardware load according to described, dynamically adjust each assistance data center and performs Data acquisition session.
Preferably, described management data center with reference to hardware load, dynamically adjusts each auxiliary according to described The step of the data acquisition session that data center performs includes:
Management data center with reference to hardware load, selects the very big supplementary number that hardware load is the highest according to described According to the minimum assistance data center that center and hardware load are minimum, wherein hard by very big assistance data center The hardware load at minimum assistance data center, as very big hardware load, is born by part load as minimum hardware Lotus;
Management data center calculates the load difference of described very big hardware load and minimum hardware load;
If described load difference is more than load threshold value, then management data center is from described very big assistance data The heart reclaims one or more data acquisition session, and is reallocated to by the data acquisition session of recovery minimum auxiliary Help data center.
Preferably, management data center adds up the adjustment that each data acquisition session experience reclaims and reallocates Number of times,
Described management data center reclaims one or more data acquisitions and appoints from described very big assistance data center It is engaged in, and the step that the data acquisition session of recovery is reallocated to minimum assistance data center includes:
Management data center reclaims one or more adjustment number of times less than secondary from described very big assistance data center The data acquisition session of number threshold value, using this data acquisition session as task to be allocated;
Described task to be allocated is reallocated to minimum assistance data center by management data center.
The present invention also provides for a kind of distributed data system, described distributed data system include multiple mutually The data center of communication connection and the remote terminal of each data center subordinate, data center includes managing number According to center and assistance data center,
Described management data center includes:
Dynamically distribute module, dynamic for each remote terminal of collection being uploaded the data acquisition session of data Distribute to each assistance data center perform, the corresponding data acquisition session of one of them remote terminal;
Replacement module, for when managing data center and breaking down, extracts current management data center fortune The replacement person's information generated in row, and using assistance data center corresponding for replacement person's information as new management Data center;
Repair module, for when becoming new management data center, enters the data center broken down Row is repaired, and safeguards that end outgoing event is pointed out to default;
Described assistance data center receives and performs to manage the data acquisition session of data center's distribution.
Preferably, described repair module module includes:
Data repair unit, for when becoming new management data center, use the correct procedure prestored The contents of program of the content data center to breaking down carries out data reparation;
Unit repaired by hardware, is used in the data center being not detected by breaking down based on carrying out data reparation After program send response message time, reset the data center that breaks down described in restarting;
First Tip element, for detecting the transmission of the data center broken down after restarting that resets During response message, it is determined that described in the data center that breaks down there is software failure, first event that exports carries Show;
Second Tip element, for being not detected by the transmission of the data center broken down after restarting that resets Response message time, it is determined that described in the data center that breaks down there is hardware failure, export second event Prompting.
Preferably, described dynamic distribution module includes:
Mean allocation unit, average for each remote terminal of collection being uploaded the data acquisition session of data Distribute to each assistance data center perform;
Load obtaining unit, for obtaining once each assistance data center processing number at interval of preset duration According to the hardware load of acquisition tasks, using this hardware load as reference hardware load, wherein in assistance data The heart sends the hardware of currently processed data acquisition session at interval of preset duration to current management data center Load;
Dynamically regulate unit, for according to described reference hardware load, dynamically adjusting in each assistance data The data acquisition session that the heart performs.
Preferably, described dynamic regulation unit includes:
Screening subelement, for according to described with reference to hardware load, select the highest the most auxiliary of hardware load Help data center and the minimum minimum assistance data center of hardware load, wherein by very big assistance data center Hardware load as very big hardware load, using the hardware load at minimum assistance data center as minimum firmly Part load;
Mathematic interpolation subelement, for calculating the load difference of described very big hardware load and minimum hardware load Value;
Reclaim distribution subelement, for described load difference more than load threshold value time, then from described greatly One or more data acquisition session are reclaimed at assistance data center, and are divided by the data acquisition session of recovery again Dispensing minimum assistance data center.
Preferably, management data center adds up the adjustment that each data acquisition session experience reclaims and reallocates Number of times,
The described distribution subelement that reclaims is additionally operable to:
One or more adjustment number of times data less than frequency threshold value are reclaimed from described very big assistance data center Acquisition tasks, using this data acquisition session as task to be allocated;
Described task to be allocated is reallocated to minimum assistance data center.
Data acquisition session is dynamically assigned to each assistance data center by managing data center by the present invention Perform process, when managing data center and breaking down, according to the replacement person's information prestored, by this replacement Assistance data center corresponding to person's information is as new data center, and the newest management data center is to sending out The data center of raw fault repairs, and safeguards that end outgoing event is pointed out to default, thus avoids because of pipe Reason data center breaks down, and two management data centers occurs or without managing the situation of data center and shadow Ring execution and the distribution of data acquisition session, and then data acquisition session can perform smoothly, improves number Perform the stability of data acquisition session according to center, and then ensure that the gatherer process of the target data of collection Smooth and easy, it is ensured that the integrity of the target data of collection.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the collecting method first embodiment of distributed data system of the present invention;
Fig. 2 be distributed data system of the present invention collecting method the second embodiment in when management data Time breaking down in center, extract during current management data center is run the replacement person's information generated, and will replace Assistance data center corresponding to the person's of changing information is as the refinement flow process signal of the step of new management data center Figure;
Fig. 3 be distributed data system of the present invention collecting method the 3rd embodiment in manage in data The data acquisition session that data uploaded by each remote terminal of collection is dynamically assigned in each assistance data by the heart The refinement schematic flow sheet of the step that the heart performs;
Fig. 4 be distributed data system of the present invention collecting method the 4th embodiment in manage in data The heart, according to reference to hardware load, dynamically adjusts the step of the data acquisition session that each assistance data center performs Rapid refinement schematic flow sheet;
If load difference in the collecting method that Fig. 5 is distributed data system of the present invention 5th embodiment More than load threshold value, then management data center reclaims one or more data acquisitions from very big assistance data center Set task, and the data acquisition session of recovery is reallocated to the refinement of the step at minimum assistance data center Schematic flow sheet;
Fig. 6 is the system framework schematic diagram of distributed data system first embodiment of the present invention;
Fig. 7 is to manage data center's repair module module in distributed data system the second embodiment of the present invention Refinement high-level schematic functional block diagram;
Fig. 8 be in distributed data system the 3rd embodiment of the present invention manage data center dynamically distribute mould The refinement high-level schematic functional block diagram of block;
Fig. 9 be in distributed data system the 4th embodiment of the present invention manage data center dynamically regulate list The refinement high-level schematic functional block diagram of unit.
The realization of the object of the invention, functional characteristics and advantage will in conjunction with the embodiments, do referring to the drawings further Explanation.
Detailed description of the invention
Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not used to limit Determine the present invention.
The present invention provides collecting method (the hereinafter referred to as data acquisition side of a kind of distributed data system Method), in the first embodiment of collecting method of the present invention, with reference to Fig. 1 and Fig. 6, distributed data System includes multiple data center being in communication with each other connection and the remote terminal of each data center subordinate, number Include managing data center 100 and assistance data center 100 according to center, can enter starting data acquisition the earliest The data center of journey is as management data center 100, and in distributed data system, other data center is as auxiliary Help data center 110,
This collecting method includes:
Step S10, the data acquisition session that data uploaded by each remote terminal of collection is moved by management data center State is distributed to each assistance data center and is performed, the corresponding data acquisition session of one of them remote terminal;
The communication structure between each data center in distributed data system can be star-like, net type etc., Preferably, each data center is connected with a network interconnection device 200 (such as switch, hub etc.), Each remote terminal 300 of subordinate is also connected with network interconnection device 200, and the present invention introduces data acquisition and enters Journey carries out the process of data acquisition in order to manage data center 100, and each data center runs one Data acquisition process, when the managing process of a certain data center starts, if finding, other data center does not has Data acquisition process is being run, then this data acquisition process is as master data collection process, thus master data Data center corresponding to collection process is as management data center 100, and other data center is then as supplementary number According to center 110, the data acquisition process that assistance data center 110 is run is as from data acquisition process; Management data center 100 and the major-minor relation of assistance data center 110 simply process, each data herein In the data acquisition session that processes in the heart there is no major-minor point.
Corresponding 300 1 data acquisition session of a remote terminal of management data center 100, will gather each Remote terminal 300 is uploaded the data acquisition session of data and is dynamically assigned to each assistance data center 110 and holds OK, dynamically distribution herein is it is to be understood that distribute average number for each assistance data center 110 According to acquisition tasks, wherein average is that data acquisition session sum is divided by data center's sum;Certainly, flat All distribution can also be alternate manner, as long as substantially realizing being data acquisition session each supplementary number According to center 110, the most one by one data acquisition session is assigned randomly to each assistance data center 110.
Step S20, when managing data center and breaking down, extracts during current management data center is run raw The replacement person's information become, and using assistance data center corresponding for replacement person's information as in new management data The heart;
In data center by during as management data center 100, this management data center 100 preserves Replacement person's information (i.e. the information at replacement data center), when managing data center 100 and breaking down, directly Connect the replacement person's information extracted in current management data center 100, and by auxiliary corresponding for replacement person's information Data center 110 is as new management data center 100, it is to avoid because of management, data center 100 breaks down, Two management data centers 100 occur or affects data acquisition appoint without the situation of management data center 100 The execution of business and distribution.Additionally, it should be noted that, the management data center 100 broken down is being taken The data acquisition session oneself processed, new management data can be discharged when disappearing as management data center 100 The data acquisition session that the release of last management data center 100 is reclaimed at center 100 is auxiliary to be again assigned to Help data center 110.
Step S30, the data center broken down is repaired by new management data center, and to presetting Safeguard that end outgoing event is pointed out.
The new data center to breaking down of the management data center 100 is (in the management data of the most previous The heart) to repair, this reparation includes software reparation and/or hardware reparation, and to default maintenance end output Event prompt, to inform system maintenance personnel's failure condition.
In the present embodiment, by management data center 100, data acquisition session is dynamically assigned to each Assistance data center performs process, when managing data center 100 and breaking down, according to the replacement prestored Person's information, using assistance data center 110 corresponding for this replacement person's information as new data center, then The data center broken down is repaired by new management data center 100, and safeguards that end is defeated to default Outgoing event is pointed out, thus avoids, because management data center 100 breaks down, occurring that two manage in data The heart 100 or affect execution and the distribution of data acquisition session without the management situation of data center 100, enters And data acquisition session can perform smoothly, improve data center and perform the stability of data acquisition session, And then ensure that the gatherer process of the target data of collection is smooth and easy, it is ensured that the target data of collection complete Property.
Further, on the basis of collecting method first embodiment of the present invention, data acquisition is proposed Method the second embodiment, with reference to Fig. 2, in a second embodiment, step S30 includes:
Step S31, new management data center uses the correct procedure content the prestored data to breaking down The contents of program at center carries out data reparation;
Step S32, if the data center being not detected by breaking down is sent out based on the program after carrying out data reparation The response message sent, then reset and restart the data center broken down;
Step S33, if the response message that the data center broken down after restarting that resets sends being detected, Then judge that the data center broken down occurs software failure, export the first event prompt;
Step S34, if the response that the data center broken down after restarting that is not detected by resetting sends disappears Breath, then judge that the data center broken down occurs hardware failure, output second event prompting.
The contents of program of data center is the most changeless, is determining that management data center breaks down Afterwards, the contents of program using the correct procedure content the prestored data center to breaking down carries out data Repair, if the data center broken down is after carrying out data reparation based on correct procedure content, it is possible to Current management data center sends response message, i.e. management data center and the data broken down detected The response message that center sends based on the program after carrying out data reparation, then judge in the data broken down Heart generation software failure, exports the first event prompt to maintenance terminal, and this first event prompt is for dimension Protecting the data center that terminal report breaks down is that program software lost efficacy, and prompting maintenance personnel note generation The data center of fault carries out the maintenance of software aspects, thus provides accurate fault for attendant Testing result, and automatically solve the Problem of Failure of the data center's software aspects broken down.
After the data center broken down is carried out software data reparation, if being still not detected by not examining Measure the response message that the data center broken down sends based on the program after carrying out data reparation, now Can speculate that problem on hardware occurs in the data center broken down, then reset and restart fail data node; If the response message that the data center broken down after restarting that resets sends being detected, show to break down Data center's in house software program the most out of joint, then judge that the data center broken down is sent out Raw software failure, exports the first event prompt;If to be still not detected by reset restart after break down The response message that data center sends, i.e. carries out data reparation and the weight that resets to the data center broken down After opening, the data center broken down still can not normally send response message, then judge to break down Data center there is hardware failure, output second event prompting, the prompting of this second event is for maintenance The data center that terminal report breaks down is that hardware of memory device lost efficacy, and prompting maintenance personnel note sending out The data center of raw fault carries out the maintenance of hardware aspect, thus provides accurate event for attendant Barrier testing result, in order to attendant prepares the instrument needed for data center's hardware maintenance and consumptive material in time.
Further, on the basis of collecting method the second embodiment of the present invention, data acquisition is proposed Method the 3rd embodiment, with reference to Fig. 3, in the third embodiment, step S10 includes:
Step S11, the data acquisition session that data uploaded by each remote terminal of collection is put down by management data center All distribute to each assistance data center perform;
Step S12, management data center obtains once each assistance data center processing at interval of preset duration The hardware load of data acquisition session, using this hardware load as with reference to hardware load;
Step S13, management data center, according to reference to hardware load, dynamically adjusts each assistance data center The data acquisition session performed.
Data center, before performing data acquisition session, is to know which data acquisition session ratio Relatively time consuming, which data acquisition session is fairly simple, and the hardware processing capability of each data center is also It is not quite similar, so each data center (including managing data center and Added Management center) is because processing number Can not persistently keep in balance according to hardware load produced by acquisition tasks, so needing the most dynamically to adjust.
Hardware load can include in cpu load, Memory Load etc. one or more, prioritizing selection CPU Load is as hardware load, and data center is the longest to the process time of data acquisition session, then hardware load The highest, management data center obtains in the most each assistance data at interval of preset duration (such as 3 minutes) The hardware load (i.e. with reference to hardware load) of the heart, then management data center is according to each assistance data center Reference hardware load, dynamically adjust the data acquisition session that each assistance data center performs, the most firmly The data acquisition session at the assistance data center that part load is high turns to the assistance data center that hardware load is low Move.
In the present embodiment, it is determined by managing data center, and manages data center first by data acquisition Set task is evenly distributed to assistance data center, and the reference hardware then obtaining each assistance data center is born Lotus, finally according to reference to hardware load, dynamically adjusts the data acquisition session at each assistance data center, To realize the dynamic load balancing at each assistance data center, thus make full use of the hard of multiple data center Part resource and the network bandwidth, process the data acquisition session of multiple remote terminal concurrently, thus accelerate The processing speed of data acquisition session, data center can gather required target data in time, it is to avoid because of The target data that target data collection is caused not in time gathers incomplete problem.
Further, on the basis of collecting method the 3rd embodiment of the present invention, data acquisition is proposed Method the 4th embodiment, with reference to Fig. 4, in the fourth embodiment, step S13 includes:
Step S131, management data center according to reference to hardware load, selects the highest very big of hardware load Assistance data center and the minimum minimum assistance data center of hardware load, wherein by very big assistance data The hardware load of the heart is as very big hardware load, using the hardware load at minimum assistance data center as minimum Hardware load;
Step S132, management data center calculates the load difference of very big hardware load and minimum hardware load;
Step S133, if load difference is more than load threshold value, then management data center is from very big assistance data One or more data acquisition session are reclaimed at center, and are reallocated to minimum by the data acquisition session of recovery Assistance data center.
The hardware load at management each assistance data center of data center's comparison, selects hardware load the highest Greatly assistance data center and the minimum assistance data center of hardware load minimum, management data center is from pole One or more data acquisition session, the data acquisition session number root of recovery are reclaimed in big assistance data center Determine according to the highest hardware load and minimal hardware load.Management data center calculates very big hardware load and pole The load difference of little hardware load, i.e. load difference=very big hardware load-minimum hardware load, presets load Threshold value, compares load difference and load threshold value, if load difference is more than load threshold value, shows greatly to assist The hardware load of data center differs relatively big with the hardware load at minimum assistance data center, and hardware load is not All phenomenons are more serious, so management data center reclaims one or more numbers from very big assistance data center According to acquisition tasks, and it is hard to relax that the data acquisition session of recovery is reallocated to minimum assistance data center The problem that part power load distributing is uneven;If load difference is less than load threshold value, show very big assistance data center Hardware load differ less with the hardware load at minimum assistance data center, hardware load distribution the most equal Weighing apparatus, it is not necessary to carry out hardware load adjustment, thus only when hardware load skewness is more serious, just enter The adjustment of the data acquisition session that row is corresponding, improves accuracy and promptness that data acquisition session adjusts, Avoid very big assistance data central hardware load too high and cause processing speed to be crossed slowly, even crash, simultaneously Avoid minimum assistance data central hardware load too small and cause the waste of hardware resource.
Further, on the basis of collecting method the 3rd embodiment of the present invention, data acquisition is proposed Method the 4th embodiment, with reference to Fig. 5, in the fourth embodiment, management data center adds up each data acquisition Set task experience reclaims and the adjustment number of times of reallocation,
Step S133 includes:
Step S1331, if load difference is more than load threshold value, management data center is from very big assistance data The heart reclaims one or more adjustment number of times data acquisition session less than frequency threshold value, this data acquisition is appointed Business is as task to be allocated;
Step S1332, task to be allocated is reallocated to minimum assistance data center by management data center.
Give each data acquisition session one in management data center and adjust number of times statistical value, at logarithm When once reclaiming according to acquisition tasks and reallocate, the adjustment number of times of this data acquisition session is added one, I.e. one data acquisition session is recovered and reallocates once that it adjusts number of times from adding one.
In the present embodiment, when managing data center's data collection acquisition tasks, only reclaim and adjust number of times Less than the data acquisition session of frequency threshold value (task the most to be allocated), then by task to be allocated sub-distribution again To minimum assistance data center, i.e. when the adjustment number of times of a certain data acquisition session is more than frequency threshold value, Then this data acquisition session will not be recovered reallocation again, until corresponding assistance data center has performed this number According to acquisition tasks, thus avoid a data acquisition session repeatedly between assistance data center reclaim and again Distribution, and cannot be performed in time.
The present invention also provides for a kind of distributed data system, in distributed data system first embodiment, With reference to Fig. 6, distributed data system includes multiple data centers being in communication with each other connection and each data center The remote terminal of subordinate, data center includes managing data center 100 and assistance data center 100, can be by Start the data center of data acquisition process the earliest as managing data center 100, in distributed data system Other data center as assistance data center 110,
Management data center 100 includes:
Dynamically distribution module 10, moves for each remote terminal of collection is uploaded the data acquisition session of data State is distributed to each assistance data center and is performed, the corresponding data acquisition session of one of them remote terminal;
The communication structure between each data center in distributed data system can be star-like, net type etc., Preferably, each data center is connected with a network interconnection device 200 (such as switch, hub etc.), Each remote terminal 300 of subordinate is also connected with network interconnection device 200, and the present invention introduces data acquisition and enters Journey carries out the process of data acquisition in order to manage data center 100, and each data center runs one Data acquisition process, when the managing process of a certain data center starts, if finding, other data center does not has Data acquisition process is being run, then this data acquisition process is as master data collection process, thus master data Data center corresponding to collection process is as management data center 100, and other data center is then as supplementary number According to center 110, the data acquisition process that assistance data center 110 is run is as from data acquisition process; Management data center 100 and the major-minor relation of assistance data center 110 simply process, each data herein In the data acquisition session that processes in the heart there is no major-minor point.
Corresponding 300 1 data acquisition session of a remote terminal of management data center 100, dynamically distribute The data acquisition session that data uploaded by each remote terminal 300 of collection is dynamically assigned to each auxiliary by module 10 Data center 110 performs, and dynamically distribution herein is it is to be understood that be each assistance data center 110 Distribution average data acquisition session, wherein average is that data acquisition session sum is divided by data center Sum;Certainly, mean allocation can also be alternate manner, as long as substantially realizing data acquisition session equal For to each assistance data center 110, the most one by one data acquisition session being assigned randomly to each Assistance data center 110.
Replacement module 20, for breaking down when management data center, extracts current management data center fortune The replacement person's information generated in row, and using assistance data center corresponding for replacement person's information as new management Data center;
In data center by during as management data center 100, this management data center 100 preserves Replacement person's information (i.e. the information at replacement data center), when managing data center 100 and breaking down, replaces Replacement person's information in die change block 20 extracting directly current management data center 100, and by replacement person's information Corresponding assistance data center 110 is as new management data center 100, it is to avoid because of management data center 100 break down, occur two management data centers 100 or without the management situation of data center 100 shadow Ring execution and the distribution of data acquisition session.Additionally, it should be noted that, in the management data broken down The heart 100 can discharge, when being cancelled as management data center 100, the data acquisition session oneself processed, New management data center 100 reclaim the data acquisition session of last management data center 100 release with It is again assigned to assistance data center 110.
Repair module 30, for when becoming new management data center, to the data center broken down Repair, and safeguard that end outgoing event is pointed out to default;
Assistance data center 110 receives and performs to manage the data acquisition session of data center's distribution.
The repair module 30 of new management data center 100 data center (the most previous to breaking down Management data center) repair, this reparation includes software reparation and/or hardware reparation, and to presetting Maintenance end outgoing event prompting, to inform system maintenance personnel's failure condition.
In the present embodiment, by dynamically distribution module 10, data acquisition session is dynamically assigned to each auxiliary Helping data center to perform process, when managing data center 100 and breaking down, replacement module 20 is according in advance The replacement person's information deposited, using assistance data center 110 corresponding for this replacement person's information as in new data The heart, the newest management data center 100 repair module 30 data center to breaking down repairs, And safeguard that end outgoing event is pointed out to default, thus avoid, because management data center 100 breaks down, going out Existing two manage data centers 100 or affect data acquisition session without the situation of management data center 100 Execution and distribution, and then data acquisition session can perform smoothly, improves data center and performs data The stability of acquisition tasks, and then ensure that the gatherer process of the target data of collection is smooth and easy, it is ensured that adopt The integrity of the target data of collection.
Further, on the basis of distributed data system first embodiment of the present invention, propose distributed Data system the second embodiment, with reference to Fig. 7, in a second embodiment, repair module module 30 includes:
Data repair unit 31, for when becoming new management data center, use the correct journey prestored The contents of program of the sequence content data center to breaking down carries out data reparation;
Unit 32 repaired by hardware, for repairing based on carrying out data in the data center being not detected by breaking down During the response message that the program after Fu sends, reset and restart the data center broken down;
First Tip element 33, for detecting that the data center broken down after restarting that resets sends Response message time, it is determined that there is software failure in the data center that breaks down, exports the first event prompt;
Second Tip element 34, for sending out in the data center broken down after restarting that is not detected by resetting During the response message sent, it is determined that the data center broken down occurs hardware failure, output second event to carry Show.
The contents of program of data center is the most changeless, is determining that management data center breaks down Afterwards, data are repaired unit 31 and are used the journey of the correct procedure content the prestored data center to breaking down Sequence content carries out data reparation, if the data center broken down is carrying out data based on correct procedure content After reparation, it is possible to send response message, i.e. management data center to current management data center and detect The response message that the data center broken down sends based on the program after carrying out data reparation, then first carry Show that unit 33 judges that the data center broken down occurs software failure, export the first event to maintenance terminal Prompting, this first event prompt is program software for the data center broken down to maintenance terminal report Losing efficacy, prompting maintenance personnel note carrying out the data center broken down the maintenance of software aspects, thus There is provided accurate failure detection result for attendant, and automatically solve in the data that break down The Problem of Failure of heart software aspects.
After the data center broken down is carried out software data reparation, if being still not detected by not examining Measure the response message that the data center broken down sends based on the program after carrying out data reparation, now Can speculate that problem on hardware occurs in the data center broken down, then hardware reparation unit 32 resets and restarts Fail data node;If the response message that the data center broken down after restarting that resets sends being detected, Show that the data center's in house software program broken down is the most out of joint, then the first Tip element 33 judge that the data center broken down occurs software failure, export the first event prompt;If still not examining Measure the response message that the data center broken down after restarting that resets sends, i.e. to the number broken down Carrying out data reparation according to center and after reset restarts, the data center broken down still can not normally send out Send response message, then the second Tip element 34 judges that the data center broken down occurs hardware failure, defeated Going out second event prompting, the prompting of this second event for reporting the data center broken down to maintenance terminal Being that hardware of memory device lost efficacy, prompting maintenance personnel note the data center broken down is carried out hardware side The maintenance in face, thus provide accurate failure detection result for attendant, in order to attendant and Time prepare the instrument needed for data center hardware maintenance and consumptive material.
Further, on the basis of distributed data system the second embodiment of the present invention, propose distributed Data system the 3rd embodiment, with reference to Fig. 8, in the third embodiment,
Dynamically distribution module 10 includes:
Mean allocation unit 11, puts down for each remote terminal of collection is uploaded the data acquisition session of data All distribute to each assistance data center perform;
Load obtaining unit 12, for obtaining once each assistance data center processing at interval of preset duration The hardware load of data acquisition session, using this hardware load as with reference to hardware load, wherein assistance data Center sends the hard of currently processed data acquisition session at interval of preset duration to current management data center Part load;
Dynamically regulation unit 13, for according to reference to hardware load, dynamically adjusting each assistance data center The data acquisition session performed.
Data center, before performing data acquisition session, is to know which data acquisition session ratio Relatively time consuming, which data acquisition session is fairly simple, and the hardware processing capability of each data center is also It is not quite similar, so each data center (including managing data center and Added Management center) is because processing number Can not persistently keep in balance according to hardware load produced by acquisition tasks, so module 10 need to dynamically be distributed The most dynamically adjust.
Hardware load can include in cpu load, Memory Load etc. one or more, prioritizing selection CPU Load is as hardware load, and data center is the longest to the process time of data acquisition session, then hardware load The highest, Load obtaining unit 12 obtains the most each assistance data at interval of preset duration (such as 3 minutes) The hardware load (i.e. with reference to hardware load) at center, the most dynamically regulation unit 13 is according to each supplementary number According to the reference hardware load at center, dynamically adjust the data acquisition session that each assistance data center performs, Wherein the data acquisition session at the assistance data center that hardware load is high is in the assistance data that hardware load is low The heart shifts.
In the present embodiment, it is determined by managing data center, and mean allocation unit 11 is first by data Acquisition tasks is evenly distributed to assistance data center, and then Load obtaining unit 12 obtains each assistance data The reference hardware load at center, last dynamically regulation unit 13, according to reference to hardware load, dynamically adjusts each The data acquisition session at individual assistance data center, to realize the dynamic load balancing at each assistance data center, Thus make full use of hardware resource and the network bandwidth of multiple data center, process multiple long-range end concurrently The data acquisition session of end, thus accelerates the processing speed of data acquisition session, data center can and Time gather needed for target data, it is to avoid the target data collection caused not in time because of target data collection Incomplete problem.
Further, on the basis of distributed data system the 3rd embodiment of the present invention, propose distributed Data system the 4th embodiment, dynamically regulation unit 13 includes:
Screening subelement 131, for according to reference to hardware load, selecting the very big auxiliary that hardware load is the highest Data center and the minimum minimum assistance data center of hardware load, wherein by very big assistance data center Hardware load is as very big hardware load, using the hardware load at minimum assistance data center as minimum hardware Load;
Mathematic interpolation subelement 132, for calculating the load difference of very big hardware load and minimum hardware load Value;
Reclaim distribution subelement 133, for when load difference is more than load threshold value, then from very big supplementary number Reclaim one or more data acquisition session according to center, and the data acquisition session of recovery is reallocated to pole Little assistance data center.
The hardware load at screening each assistance data center of subelement 131 comparison, selects hardware load the highest Very big assistance data center and the minimum minimum assistance data center of hardware load, management data center from One or more data acquisition session, the data acquisition session number of recovery are reclaimed in greatly assistance data center Determine according to the highest hardware load and minimal hardware load.Mathematic interpolation subelement 132 calculates very big hardware Load and the load difference of minimum hardware load, i.e. load difference=very big hardware load-minimum hardware load, Preset load threshold value, compare load difference and load threshold value, if load difference is more than load threshold value, show The greatly hardware load at assistance data center differs relatively big, firmly with the hardware load at minimum assistance data center Part load uneven phenomenon is more serious, returns so reclaiming distribution subelement 133 from very big assistance data center Receive one or more data acquisition session, and the data acquisition session of recovery is reallocated to minimum supplementary number According to center with the problem relaxing hardware load skewness;If load difference is less than load threshold value, show pole The big hardware load at assistance data center differs less with the hardware load at minimum assistance data center, hardware Power load distributing more equalizes, it is not necessary to carry out hardware load adjustment, thus only at hardware load skewness relatively For time serious, just carry out the adjustment of the data acquisition session of correspondence, improve what data acquisition session adjusted Accuracy and promptness, it is to avoid greatly assistance data central hardware load too high and cause processing speed the slowest, Even crash, avoid minimum assistance data central hardware load too small simultaneously and cause the waste of hardware resource.
Preferably, management data center adds up the adjustment that each data acquisition session experience reclaims and reallocates Number of times,
Reclaim distribution subelement 133 to be additionally operable to:
If load difference is more than load threshold value, reclaim one or more adjustment time from very big assistance data center Number is less than the data acquisition session of frequency threshold value, using this data acquisition session as task to be allocated;
Task to be allocated is reallocated to minimum assistance data center.
Give each data acquisition session one in management data center and adjust number of times statistical value, at logarithm When once reclaiming according to acquisition tasks and reallocate, the adjustment number of times of this data acquisition session is added one, I.e. one data acquisition session is recovered and reallocates once that it adjusts number of times from adding one.
In the present embodiment, when managing data center's data collection acquisition tasks, reclaim distribution subelement 133 only reclaim the data acquisition session (task the most to be allocated) adjusting number of times less than frequency threshold value, then will Task to be allocated is assigned to minimum assistance data center again, i.e. in the adjustment time of a certain data acquisition session When number is more than frequency threshold value, then this data acquisition session will not be recovered reallocation again, until corresponding auxiliary Data center has performed this data acquisition session, thus avoids a data acquisition session repeatedly at supplementary number According to reclaiming between center and reallocating, and cannot be performed in time.
Through the above description of the embodiments, those skilled in the art is it can be understood that arrive above-mentioned Embodiment method can add the mode of required general hardware platform by software and realize, naturally it is also possible to logical Cross hardware, but a lot of in the case of the former is more preferably embodiment.Based on such understanding, the present invention's The part that prior art is contributed by technical scheme the most in other words can be with the form body of software product Revealing to come, this computer software product is stored in a storage medium (such as ROM/RAM, magnetic disc, light Dish) in, including some instructions with so that a station terminal equipment (can be mobile phone, computer, service Device, air-conditioner, or the network equipment etc.) perform each embodiment of the present invention method.
These are only the preferred embodiments of the present invention, not thereby limit the scope of the claims of the present invention, every Utilize equivalent structure or equivalence flow process conversion that description of the invention and accompanying drawing content made, or directly or Connect and be used in other relevant technical fields, be the most in like manner included in the scope of patent protection of the present invention.

Claims (10)

1. the collecting method of a distributed data system, it is characterised in that described distributed data System includes multiple data center being in communication with each other connection and the remote terminal of each data center subordinate, number Include managing data center and assistance data center according to center,
The collecting method of this distributed data system includes:
The data acquisition session that data uploaded by each remote terminal of collection is dynamically assigned to by management data center Each assistance data center performs, the corresponding data acquisition session of one of them remote terminal;
When managing data center and breaking down, extract during current management data center is run the replacement generated Person's information, and using assistance data center corresponding for replacement person's information as new management data center;
The data center broken down is repaired by new management data center, and safeguards that end is defeated to default Outgoing event is pointed out.
2. the collecting method of distributed data system as claimed in claim 1, it is characterised in that The data center broken down is repaired by described new management data center, and safeguards that end is defeated to default The step of outgoing event prompting includes:
New management data center uses the journey of the correct procedure content the prestored data center to breaking down Sequence content carries out data reparation;
If the response that the data center being not detected by breaking down sends based on the program after carrying out data reparation Message, then reset the data center broken down described in restarting;
If the response message that the data center broken down after restarting that resets sends being detected, then judge institute State the data center broken down and software failure occurs, export the first event prompt;
If being not detected by resets restart after the data center broken down send response message, then judge There is hardware failure, output second event prompting in the described data center broken down.
3. the collecting method of distributed data system as claimed in claim 1 or 2, its feature exists In, the data acquisition session that data uploaded by each remote terminal of collection is dynamically divided by described management data center The step that each assistance data center of dispensing performs includes:
The data acquisition session that data uploaded by each remote terminal of collection is averagely allocated to by management data center Each assistance data center performs;
Management data center obtains once each assistance data center processing data acquisition at interval of preset duration The hardware load of task, using this hardware load as with reference to hardware load;
Management data center with reference to hardware load according to described, dynamically adjust each assistance data center and performs Data acquisition session.
4. the collecting method of distributed data system as claimed in claim 1, it is characterised in that Described management data center with reference to hardware load according to described, dynamically adjust each assistance data center and performs The step of data acquisition session include:
Management data center with reference to hardware load, selects the very big supplementary number that hardware load is the highest according to described According to the minimum assistance data center that center and hardware load are minimum, wherein hard by very big assistance data center The hardware load at minimum assistance data center, as very big hardware load, is born by part load as minimum hardware Lotus;
Management data center calculates the load difference of described very big hardware load and minimum hardware load;
If described load difference is more than load threshold value, then management data center is from described very big assistance data The heart reclaims one or more data acquisition session, and is reallocated to by the data acquisition session of recovery minimum auxiliary Help data center.
5. the collecting method of distributed data system as claimed in claim 4, it is characterised in that Management data center adds up each data acquisition session experience and reclaims and the adjustment number of times of reallocation,
Described management data center reclaims one or more data acquisitions and appoints from described very big assistance data center It is engaged in, and the step that the data acquisition session of recovery is reallocated to minimum assistance data center includes:
Management data center reclaims one or more adjustment number of times less than secondary from described very big assistance data center The data acquisition session of number threshold value, using this data acquisition session as task to be allocated;
Described task to be allocated is reallocated to minimum assistance data center by management data center.
6. a distributed data system, it is characterised in that described distributed data system includes multiple phase The data center of intercommunication connection and the remote terminal of each data center subordinate, data center includes management Data center and assistance data center,
Described management data center includes:
Dynamically distribute module, dynamic for each remote terminal of collection being uploaded the data acquisition session of data Distribute to each assistance data center perform, the corresponding data acquisition session of one of them remote terminal;
Replacement module, for when managing data center and breaking down, extracts current management data center fortune The replacement person's information generated in row, and using assistance data center corresponding for replacement person's information as new management Data center;
Repair module, for when becoming new management data center, enters the data center broken down Row is repaired, and safeguards that end outgoing event is pointed out to default;
Described assistance data center receives and performs to manage the data acquisition session of data center's distribution.
7. distributed data system as claimed in claim 6, it is characterised in that described repair module mould Block includes:
Data repair unit, for when becoming new management data center, use the correct procedure prestored The contents of program of the content data center to breaking down carries out data reparation;
Unit repaired by hardware, is used in the data center being not detected by breaking down based on carrying out data reparation After program send response message time, reset the data center that breaks down described in restarting;
First Tip element, for detecting the transmission of the data center broken down after restarting that resets During response message, it is determined that described in the data center that breaks down there is software failure, first event that exports carries Show;
Second Tip element, for being not detected by the transmission of the data center broken down after restarting that resets Response message time, it is determined that described in the data center that breaks down there is hardware failure, export second event Prompting.
Distributed data system the most as claimed in claims 6 or 7, it is characterised in that described dynamic point Join module to include:
Mean allocation unit, average for each remote terminal of collection being uploaded the data acquisition session of data Distribute to each assistance data center perform;
Load obtaining unit, for obtaining once each assistance data center processing number at interval of preset duration According to the hardware load of acquisition tasks, using this hardware load as reference hardware load, wherein in assistance data The heart sends the hardware of currently processed data acquisition session at interval of preset duration to current management data center Load;
Dynamically regulate unit, for according to described reference hardware load, dynamically adjusting in each assistance data The data acquisition session that the heart performs.
9. distributed data system as claimed in claim 8, it is characterised in that described dynamic regulation list Unit includes:
Screening subelement, for according to described with reference to hardware load, select the highest the most auxiliary of hardware load Help data center and the minimum minimum assistance data center of hardware load, wherein by very big assistance data center Hardware load as very big hardware load, using the hardware load at minimum assistance data center as minimum firmly Part load;
Mathematic interpolation subelement, for calculating the load difference of described very big hardware load and minimum hardware load Value;
Reclaim distribution subelement, for described load difference more than load threshold value time, then from described greatly One or more data acquisition session are reclaimed at assistance data center, and are divided by the data acquisition session of recovery again Dispensing minimum assistance data center.
10. distributed data system as claimed in claim 9, it is characterised in that management data center Add up each data acquisition session experience to reclaim and the adjustment number of times of reallocation,
The described distribution subelement that reclaims is additionally operable to:
One or more adjustment number of times data less than frequency threshold value are reclaimed from described very big assistance data center Acquisition tasks, using this data acquisition session as task to be allocated;
Described task to be allocated is reallocated to minimum assistance data center.
CN201610340902.9A 2016-05-20 2016-05-20 The collecting method and distributed data system of distributed data system Active CN106027298B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610340902.9A CN106027298B (en) 2016-05-20 2016-05-20 The collecting method and distributed data system of distributed data system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610340902.9A CN106027298B (en) 2016-05-20 2016-05-20 The collecting method and distributed data system of distributed data system

Publications (2)

Publication Number Publication Date
CN106027298A true CN106027298A (en) 2016-10-12
CN106027298B CN106027298B (en) 2019-07-26

Family

ID=57095781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610340902.9A Active CN106027298B (en) 2016-05-20 2016-05-20 The collecting method and distributed data system of distributed data system

Country Status (1)

Country Link
CN (1) CN106027298B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070021966A1 (en) * 2005-07-20 2007-01-25 Xerox Corporation Systems and methods for facilitating service request processing in a call center
US20070112486A1 (en) * 2005-11-16 2007-05-17 Avery Robert L Centralized management of maintenance and materials for commercial aircraft fleets with information feedback to customer
CN103246592A (en) * 2013-05-13 2013-08-14 北京搜狐新媒体信息技术有限公司 Monitoring acquisition system and method
CN104184819A (en) * 2014-08-29 2014-12-03 城云科技(杭州)有限公司 Multi-hierarchy load balancing cloud resource monitoring method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070021966A1 (en) * 2005-07-20 2007-01-25 Xerox Corporation Systems and methods for facilitating service request processing in a call center
US20070112486A1 (en) * 2005-11-16 2007-05-17 Avery Robert L Centralized management of maintenance and materials for commercial aircraft fleets with information feedback to customer
CN103246592A (en) * 2013-05-13 2013-08-14 北京搜狐新媒体信息技术有限公司 Monitoring acquisition system and method
CN104184819A (en) * 2014-08-29 2014-12-03 城云科技(杭州)有限公司 Multi-hierarchy load balancing cloud resource monitoring method

Also Published As

Publication number Publication date
CN106027298B (en) 2019-07-26

Similar Documents

Publication Publication Date Title
CN110430071A (en) Service node fault self-recovery method, apparatus, computer equipment and storage medium
CN110601900B (en) Network fault early warning method and device
CN101808351B (en) Method and system for business impact analysis
CN109379396B (en) Method, medium, device and block chain system for preventing hard branching phenomenon in block chain system
CN106161090A (en) The monitoring method of a kind of subregion group system and device
CN109347688A (en) A kind of method and apparatus of positioning failure in a wireless local area network
CN103763127A (en) Device state alarm monitoring method and system
CN106060123A (en) Distributed data system data acquisition method and distributed data system
CN106327103A (en) Distribution room operating state evaluation system and evaluation method
CN109525036B (en) Method, device and system for monitoring mains supply state of communication equipment
CN106027649A (en) Data collection method of distributed data system and the distributed data system
CN113807713A (en) Product quality evaluation method and industrial internet identification analysis system
CN105897498A (en) Business monitoring method and device
CN106027298A (en) Data collection method of distributed data system and the distributed data system
CN109218113B (en) Communication network fault positioning method and fault monitoring device
JP2015156578A (en) Network evaluation apparatus, method, and program
CN111008114A (en) Disk partition monitoring method, device, equipment and readable storage medium
CN106027523B (en) The collecting method and distributed data system of distributed data system
CN111125195A (en) Data anomaly detection method and device
CN104639499A (en) Firewall monitoring method, firewall monitoring device and network management platform
CN116684327B (en) Mountain area communication network fault monitoring and evaluating method based on cloud computing
CN107465531B (en) Power generation dispatching method and device
CN104811346A (en) Method and system for detecting operating performance of integrated system
CN114422332B (en) Network slice control method, device, processing equipment and storage medium
CN113032227B (en) Abnormal network element detection method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 518057 Shenzhen Software Park, Nanshan District high tech Industrial Park, Guangdong, China,, 6 401-402

Applicant after: Yongxing Shenzhen Polytron Technologies Inc

Address before: 518057 Shenzhen Software Park, Nanshan District high tech Industrial Park, Guangdong, China,, 6 401-402

Applicant before: Shenzhen Longrise Technology Co., Ltd.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant