CN105845007A - Intelligent electric energy meter simulation application test stand and use method thereof - Google Patents

Intelligent electric energy meter simulation application test stand and use method thereof Download PDF

Info

Publication number
CN105845007A
CN105845007A CN201610420502.9A CN201610420502A CN105845007A CN 105845007 A CN105845007 A CN 105845007A CN 201610420502 A CN201610420502 A CN 201610420502A CN 105845007 A CN105845007 A CN 105845007A
Authority
CN
China
Prior art keywords
electric energy
energy meter
intelligent electric
module
demonstration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610420502.9A
Other languages
Chinese (zh)
Inventor
孙斌
滕国清
傅国胜
刘俊宇
梅雪东
孙慧
赵向东
刘凤珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610420502.9A priority Critical patent/CN105845007A/en
Publication of CN105845007A publication Critical patent/CN105845007A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/06Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
    • G09B23/18Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism
    • G09B23/187Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism for measuring instruments
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Mathematical Physics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Algebra (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to an intelligent electric energy meter simulation application test stand and a use method thereof. The intelligent electric energy meter simulation application test stand comprises a movable rack, detection equipment and demonstration equipment. A display board is erected on the movable rack. The detection equipment and the demonstration equipment are respectively fixed on the display board. The detection equipment comprises a tablet computer, an electric energy meter calibrator, a hand writing device, a writing control module, a monitoring module, a carrier communication module and a power supply module. The demonstration equipment comprises multiple single-phase/three-phase electric energy meters and current transformers and acquisition equipment which are matched with the multiple single-phase/three-phase electric energy meters. The field use environment can be simulated to demonstrate the relevant operation steps and methods of the intelligent electric energy meters, and a movable structure is adopted so that teaching is enabled to be more convenient; and students can skillfully master operation and maintenance skills through repeated simulation training so that the qualified standard of operation and maintenance personnel can be rapidly achieved, the working skills and the working efficiency of the existing operation and maintenance personnel can be enhanced and standardized operation can be realized.

Description

Intelligent electric energy meter simulation application testing stand and using method thereof
Technical field
The present invention relates to intelligent electric energy meter teaching demonstration device, particularly relate to a kind of intelligent electric energy meter simulation application testing stand and Using method.
Background technology
Intelligent electric energy meter is the terminal of intelligent grid, it achieves basic electricity gauge amount and is no longer necessary to the person of checking meter and manually carries out, Also there is power information storage, two-way multiple rate function of measuring, user side control function, plurality of data transmission modes double To data communication function, anti-stealing electricity function etc..It is just as a miniature computer, it is achieved that remotely control, automatization, intelligence Energyization, facilitation.User need only to Utilities Electric Co. business hall or in artificial POS electricity payment, it is possible to Continue electricity consumption.At present, intelligent electric energy meter has become as the main flow equipment of Electro-metering device, and metering device O&M also becomes electricity Force system provides the most important thing of customer service work, and it is the tie of contact huge numbers of families, is again that embodiment national grid is excellent The key node of matter service.
One endemic electric company, customer table sum typically all can exceed up to a million, and the most daily maintenance work amount is non- Chang great, needs to cultivate the most qualified operation maintenance personnel;But up to now, also do not have to carry out intelligent electric energy meter and be correlated with The specialized simulation apparatus for demonstrating of the equipment such as module, concentrator operation demonstration, is unfavorable for the result of training of personnel and the most on duty.
Summary of the invention
The invention provides a kind of intelligent electric energy meter simulation application testing stand and using method thereof, ring can be used with simulated field Border, demonstration intelligent electric energy meter associated operating steps and method, use moveable structure, make teaching convenient;Student can Grasp O&M skill by the instruction of simulation training repeatedly is skilled, be rapidly achieved operation maintenance personnel criterion of acceptability, and existing O&M can be improved The workmanship of personnel and work efficiency, it is achieved standardized work.
In order to achieve the above object, the present invention realizes by the following technical solutions:
Intelligent electric energy meter simulation application testing stand, including removable stand, detection equipment and demonstration equipment, described translational table Erection has Graphic Panel, detection equipment and demonstration equipment to be separately fixed on Graphic Panel;Detection equipment includes panel computer, electric energy Table tester, write by hand device, copy control module, monitoring module, carrier communication module and power module;Described powermeter verification instrumeter, Write by hand device, copy control module, carrier communication module and power module connect panel computer respectively, wherein write by hand device, copy control module, Carrier communication module constitutes the intelligence actively sending in equipment, with demonstration equipment of remote auto meter reading system together with panel computer Can be connected by carrier communication by electric energy meter, the instant data of intelligent electric energy meter are uploaded to panel computer;Power module is flat board Computer and other electricity consumption instrument provide power supply;Copying control module and additionally connect monitoring module, monitoring module is used for monitoring intelligent electric energy The running status of table end collecting device;The another Peripheral Interface of panel computer is connected with circuit tester, vibrating sensor, wherein circuit tester For detecting intelligent electric energy meter Circuits System, vibrating sensor is for detecting vibration ginseng when intelligent electric energy meter runs Amount;Described demonstration equipment includes multiple single-phase/three-phase electric energy meter and the current transformer supporting with it and collecting device.
The main body frame of described removable stand is aluminum alloy material, and Graphic Panel is lucite material.
Described Graphic Panel surface sets the fixing epi-position of multiple indent, respectively corresponding fixed flat planar computer, copy control module and monitoring mould Block, carrier communication module and power module are arranged on inside removable stand, powermeter verification instrumeter, write by hand device, circuit tester, Vibrating sensor is connected with panel computer temporarily
It is additionally provided with control switch and air switch on described Graphic Panel, wherein controls switch and be used for controlling the relevant power supply of detection equipment Connecting and disconnecting of the circuit, air switch is used for controlling presentation device and is correlated with power supply circuits break-make.
Using method based on intelligent electric energy meter simulation application testing stand, comprises the steps:
1) intelligent electric energy meter is checked meter demonstration;Check powermeter verification instrumeter, write by hand device, copy control module, monitoring module and flat board Whether computer is reliably connected, communication with detection equipment and control switch corresponding to demonstration equipment and air switch;Write by hand device is carried out Communication setting makes it be connected with panel computer communication, gathers intelligent electric energy meter data by write by hand device after connection;
2) intelligent electric energy meter check meter malfunction elimination demonstration;According to step 1) operation, find data to return failed Intelligent electric Energy table, below point, three kinds of situations are investigated one by one: a) connection of intelligent electric energy meter circuit is broken down;B) intelligent electric energy meter is preset Address is not inconsistent with actual address;C) intelligent electric energy meter or the carrier module of intelligent electric energy meter end, collecting device break down; Investigate respectively according to failure cause;Break down if investigation result is the connection of intelligent electric energy meter circuit, use circuit tester Interlock circuit is detected, including circuit voltage, resistance, electric current, diode, audion, metal-oxide-semiconductor field effect transistor detection;
3) intelligent electric energy meter calibration demonstration;By powermeter verification instrumeter, single-phase/three-phase electric energy meter is calibrated, electric energy meter school Test instrument and the load of 0.5A, 2.5A, 5A third gear virtual current is provided, on-line checking intelligence electric energy in the case of real load is zero Watch Error, electrical quantity such as voltage, electric current, frequency, power, the power factor of check intelligent electric energy meter;And electric current can be measured Mutual inductor ratio, judges the synthetic error of intelligent electric energy meter and current transformer with this;More than detection is not all having a power failure, is not changing Carry out in the case of becoming measurement loop wiring;
4)) intelligent electric energy meter running stability detection demonstration;The test side of vibrating sensor is fixed on Graphic Panel, signal Outfan is connected with panel computer interface, the Vibration Parameter at detection intelligent electric energy meter, and employing numeral vibrating sensor can be direct Read data and transfer data to panel computer;
5) carrier communication module condition monitoring demonstration;Under determining intelligent electric energy meter normal operating condition, pass through write by hand Device communicates to connect with intelligent electric energy meter, realizes data by carrier communication module and uploads;Check panel computer, if flat board is electric Brain receives the data of detected intelligent electric energy meter, then prove carrier communication module normal operation;As panel computer does not receive To data, then by the way of powering up at each stitch of carrier communication module, detect its electric property, can directly judge that carrier wave leads to Letter module whether fault.
Compared with prior art, the invention has the beneficial effects as follows:
1) environment, demonstration intelligent electric energy meter associated operating steps and method can be used with simulated field, use packaged type knot Structure, makes teaching convenient;
2) student can grasp O&M skill by the instruction of simulation training repeatedly is skilled, is rapidly achieved operation maintenance personnel criterion of acceptability;
3) be conducive to improving workmanship and the work efficiency of existing operation maintenance personnel, it is achieved standardized work.
Accompanying drawing explanation
Fig. 1 is the front view of intelligent electric energy meter simulation application testing stand of the present invention.
Fig. 2 is the annexation block diagram of intelligent electric energy meter simulation application testing stand ingredient of the present invention.
Fig. 3 is translational table frame body framework of the present invention and the structural representation of Graphic Panel.
In figure: 1. may move stand 2. Graphic Panel 3. panel computer 4. single-phase electric energy meter 5. three-phase electric energy meter 6. Copy control module 7. monitoring module 8. collecting device 9. current transformer 10. and control switch 11. air switches
Detailed description of the invention
Below in conjunction with the accompanying drawings the detailed description of the invention of the present invention is described further:
As shown in Figures 1 and 2, intelligent electric energy meter simulation application testing stand of the present invention, including removable stand 1, inspection Measurement equipment and demonstration equipment, described removable 6 stands 1 are provided with Graphic Panel 2 (as shown in Figure 3), detection equipment and demonstration Equipment is separately fixed on Graphic Panel 2;Detection equipment includes panel computer 3, powermeter verification instrumeter, write by hand device, copies control mould Block 6, monitoring module 7, carrier communication module and power module;Described powermeter verification instrumeter, write by hand device, copy control module 6, Carrier communication module and power module connect panel computer 3 respectively, wherein write by hand device, copy control module 6, carrier communication module The intelligent electric energy meter actively sending in equipment, with demonstration equipment of remote auto meter reading system is constituted together with panel computer 3 4/5 is connected by carrier communication, and the instant data of intelligent electric energy meter 4/5 are uploaded to panel computer 3;Power module is flat Plate computer 3 and other electricity consumption instrument provide power supply;Copying control module 6 and additionally connect monitoring module 7, monitoring module 7 is used for supervising The running status of control intelligent electric energy meter 4/5 end collecting device 8;The another Peripheral Interface of panel computer 3 and circuit tester, vibrating sensing Device connects, and wherein circuit tester is for detecting intelligent electric energy meter Circuits System, and vibrating sensor is used for detecting intelligence electric energy Vibration Parameter when table runs;Described demonstration equipment includes that multiple single-phase/three-phase electric energy meter 4/5 and the electric current supporting with it are mutual Sensor 9 and collecting device 8.
The main body frame of described removable stand 1 is aluminum alloy material, and Graphic Panel 2 is lucite material.
Described Graphic Panel 2 surface sets the fixing epi-position of multiple indent, respectively corresponding fixed flat planar computer 3, copy control module 6 and It is internal that monitoring module 7, carrier communication module and power module are arranged on removable stand 1, powermeter verification instrumeter, write by hand device, Circuit tester, vibrating sensor are connected with panel computer 3 temporarily
It is additionally provided with control switch 10 and air switch 11 on described Graphic Panel 2, wherein controls switch 10 and be used for controlling detection Equipment is correlated with power supply circuits break-make, and air switch 11 is used for controlling presentation device and is correlated with power supply circuits break-make.
Using method based on intelligent electric energy meter simulation application testing stand, comprises the steps:
1) intelligent electric energy meter is checked meter demonstration;Check powermeter verification instrumeter, write by hand device, copy control module 6, monitoring module 7 with Whether panel computer 3 is reliably connected, communication with detection equipment and control switch 10 and air switch 11 corresponding to demonstration equipment; Write by hand device carries out communication setting makes it be connected with panel computer 3 communication, gathers intelligent electric energy meter by write by hand device after connection 4/5 data;
2) intelligent electric energy meter check meter malfunction elimination demonstration;According to step 1) operation, find data to return failed Intelligent electric Energy table, below point, three kinds of situations are investigated one by one: a) connection of intelligent electric energy meter circuit is broken down;B) intelligent electric energy meter is preset Address is not inconsistent with actual address;C) intelligent electric energy meter or the carrier module of intelligent electric energy meter end, collecting device 8 break down; Investigate respectively according to failure cause;Break down if investigation result is the connection of intelligent electric energy meter circuit, use circuit tester Interlock circuit is detected, including circuit voltage, resistance, electric current, diode, audion, metal-oxide-semiconductor field effect transistor detection;
3) intelligent electric energy meter calibration demonstration;By powermeter verification instrumeter, single-phase/three-phase electric energy meter 4/5 is calibrated, electric energy Table tester provides the load of 0.5A, 2.5A, 5A third gear virtual current, on-line checking intelligence in the case of real load is zero Electric energy meter error, electrical quantity such as voltage, electric current, frequency, power, the power factor of check intelligent electric energy meter 4/5;And can Measurement current transform er 9 no-load voltage ratio, judges the synthetic error of intelligent electric energy meter 4,5 and current transformer 9 with this;More than examine Survey and all carry out in the case of not having a power failure, not changing measurement loop wiring;
4)) intelligent electric energy meter running stability detection demonstration;The test side of vibrating sensor is fixed on Graphic Panel 2, letter Number outfan is connected with panel computer 3 interface, the Vibration Parameter at detection intelligent electric energy meter, uses the numeral vibrating sensor can Directly read data and transfer data to panel computer 3;
5) carrier communication module condition monitoring demonstration;Under determining intelligent electric energy meter 4/5 normal operating condition, pass through Write by hand device communicates to connect with intelligent electric energy meter 4/5, realizes data by carrier communication module and uploads;Check panel computer 3, If panel computer 3 receives the data of detected intelligent electric energy meter 4/5, then prove carrier communication module normal operation;As Panel computer 3 is not received by data, then detect its electric property by the way of powering up at each stitch of carrier communication module, Directly judge carrier communication module whether fault.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto, and appoints What those familiar with the art is in the technical scope that the invention discloses, according to technical scheme and send out Bright design equivalent or change in addition, all should contain within protection scope of the present invention.

Claims (5)

1. intelligent electric energy meter simulation application testing stand, it is characterised in that include that removable stand, detection equipment and demonstration set Standby, described translational table sets up has Graphic Panel, detection equipment and demonstration equipment to be separately fixed on Graphic Panel;Detection equipment bag Include panel computer, powermeter verification instrumeter, write by hand device, copy control module, monitoring module, carrier communication module and power module; Described powermeter verification instrumeter, write by hand device, copy control module, carrier communication module and power module connect panel computer respectively, its Middle write by hand device, copy control module, carrier communication module constitute together with panel computer remote auto meter reading system active send set Standby, it is connected by carrier communication with the intelligent electric energy meter in demonstration equipment, the instant data of intelligent electric energy meter are uploaded to flat board Computer;Power module provides power supply for panel computer and other electricity consumption instrument;Copy control module and additionally connect monitoring module, monitoring Module is for the running status of monitoring intelligent electric power meter end collecting device;The another Peripheral Interface of panel computer passes with circuit tester, vibration Sensor connects, and wherein circuit tester is for detecting intelligent electric energy meter Circuits System, and vibrating sensor is used for detecting Intelligent electric Vibration Parameter when energy table runs;Described demonstration equipment includes multiple single-phase/three-phase electric energy meter and the Current Mutual Inductance supporting with it Device and collecting device.
Intelligent electric energy meter simulation application testing stand the most according to claim 1, it is characterised in that described translational table The main body frame of frame is aluminum alloy material, and Graphic Panel is lucite material.
Intelligent electric energy meter simulation application testing stand the most according to claim 1, it is characterised in that described Graphic Panel table Face sets the fixing epi-position of multiple indent, respectively corresponding fixed flat planar computer, copy control module and monitoring module, carrier communication module It is arranged on inside removable stand with power module, powermeter verification instrumeter, write by hand device, circuit tester, vibrating sensor and flat board Computer connects temporarily.
Intelligent electric energy meter simulation application testing stand the most according to claim 1, it is characterised in that on described Graphic Panel Being additionally provided with control switch and air switch, wherein control switch and be used for controlling detection equipment and be correlated with power supply circuits break-make, air is opened Pass is used for controlling presentation device and is correlated with power supply circuits break-make.
5. using method based on the intelligent electric energy meter simulation application testing stand described in claim 1, it is characterised in that bag Include following steps:
1) intelligent electric energy meter is checked meter demonstration;Check powermeter verification instrumeter, write by hand device, copy control module, monitoring module and flat board Whether computer is reliably connected, communication with detection equipment and control switch corresponding to demonstration equipment and air switch;Write by hand device is carried out Communication setting makes it be connected with panel computer communication, gathers intelligent electric energy meter data by write by hand device after connection;
2) intelligent electric energy meter check meter malfunction elimination demonstration;According to step 1) operation, find data to return failed Intelligent electric Energy table, below point, three kinds of situations are investigated one by one: a) connection of intelligent electric energy meter circuit is broken down;B) intelligent electric energy meter is preset Address is not inconsistent with actual address;C) intelligent electric energy meter or the carrier module of intelligent electric energy meter end, collecting device break down; Investigate respectively according to failure cause;Break down if investigation result is the connection of intelligent electric energy meter circuit, use circuit tester Interlock circuit is detected, including circuit voltage, resistance, electric current, diode, audion, metal-oxide-semiconductor field effect transistor detection;
3) intelligent electric energy meter calibration demonstration;By powermeter verification instrumeter, single-phase/three-phase electric energy meter is calibrated, electric energy meter school Test instrument and the load of 0.5A, 2.5A, 5A third gear virtual current is provided, on-line checking intelligence electric energy in the case of real load is zero Watch Error, electrical quantity such as voltage, electric current, frequency, power, the power factor of check intelligent electric energy meter;And electric current can be measured Mutual inductor ratio, judges the synthetic error of intelligent electric energy meter and current transformer with this;More than detection is not all having a power failure, is not changing Carry out in the case of becoming measurement loop wiring;
4)) intelligent electric energy meter running stability detection demonstration;The test side of vibrating sensor is fixed on Graphic Panel, signal Outfan is connected with panel computer interface, the Vibration Parameter at detection intelligent electric energy meter, and employing numeral vibrating sensor can be direct Read data and transfer data to panel computer;
5) carrier communication module condition monitoring demonstration;Under determining intelligent electric energy meter normal operating condition, pass through write by hand Device communicates to connect with intelligent electric energy meter, realizes data by carrier communication module and uploads;Check panel computer, if flat board is electric Brain receives the data of detected intelligent electric energy meter, then prove carrier communication module normal operation;As panel computer does not receive To data, then by the way of powering up at each stitch of carrier communication module, detect its electric property, can directly judge that carrier wave leads to Letter module whether fault.
CN201610420502.9A 2016-06-13 2016-06-13 Intelligent electric energy meter simulation application test stand and use method thereof Pending CN105845007A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610420502.9A CN105845007A (en) 2016-06-13 2016-06-13 Intelligent electric energy meter simulation application test stand and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610420502.9A CN105845007A (en) 2016-06-13 2016-06-13 Intelligent electric energy meter simulation application test stand and use method thereof

Publications (1)

Publication Number Publication Date
CN105845007A true CN105845007A (en) 2016-08-10

Family

ID=56576075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610420502.9A Pending CN105845007A (en) 2016-06-13 2016-06-13 Intelligent electric energy meter simulation application test stand and use method thereof

Country Status (1)

Country Link
CN (1) CN105845007A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106208101A (en) * 2016-08-17 2016-12-07 上海格蒂能源科技有限公司 Intelligent follow-up electric energy apparatus for correcting and show merit analyze method
CN106355979A (en) * 2016-10-14 2017-01-25 深圳供电局有限公司 Electric energy metering error display apparatus and electric energy metering error display method
CN106501761A (en) * 2016-12-26 2017-03-15 烟台东方威思顿电气股份有限公司 Three-phase intelligent electric-energy meter simulation detection system
CN111796234A (en) * 2020-06-28 2020-10-20 国家电网有限公司 Non-power-off inspection simulation operation method and system for electric energy metering device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201364350Y (en) * 2008-07-31 2009-12-16 方建军 Remote centralization meter checking system
US20100145642A1 (en) * 2004-10-18 2010-06-10 Electro Industries/Gauge Tech System and Method for Compensating for Potential and Current Transformers in Energy Meters
CN101900801A (en) * 2010-07-15 2010-12-01 田卫华 Intelligent electric energy meter field test device and test method thereof
CN102819004A (en) * 2012-08-31 2012-12-12 江苏省电力公司电力科学研究院 Comprehensive detecting and analyzing platform for performance of digital electric energy metering systems of intelligent transformer substations
CN202649456U (en) * 2012-04-20 2013-01-02 山西省电力公司大同供电分公司 Electric energy meter vibration monitoring system
CN102928811A (en) * 2012-11-21 2013-02-13 湖南省电力公司科学研究院 Electric energy meter on-site detecting system based on optical fiber communication
CN203552356U (en) * 2013-10-20 2014-04-16 湖南龙之翔智能科技有限公司 Three-phase wide-range prepayment intelligent electric energy meter
CN104076319A (en) * 2014-05-04 2014-10-01 贵州电力试验研究院 Online error analysis system of digitized electric energy metering device
CN104851343A (en) * 2015-06-09 2015-08-19 国网山东济南市历城区供电公司 Demonstration and training device for electric equipment
CN104992548A (en) * 2015-07-16 2015-10-21 国网河南省电力公司漯河供电公司 Remote meter reading system
CN105548948A (en) * 2016-01-28 2016-05-04 云南电网有限责任公司电力科学研究院 Device and method for testing digitalization electric energy metering system
CN206003413U (en) * 2016-06-13 2017-03-08 国网辽宁省电力有限公司朝阳供电公司 Intelligent electric energy meter simulation application testing stand

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100145642A1 (en) * 2004-10-18 2010-06-10 Electro Industries/Gauge Tech System and Method for Compensating for Potential and Current Transformers in Energy Meters
CN201364350Y (en) * 2008-07-31 2009-12-16 方建军 Remote centralization meter checking system
CN101900801A (en) * 2010-07-15 2010-12-01 田卫华 Intelligent electric energy meter field test device and test method thereof
CN202649456U (en) * 2012-04-20 2013-01-02 山西省电力公司大同供电分公司 Electric energy meter vibration monitoring system
CN102819004A (en) * 2012-08-31 2012-12-12 江苏省电力公司电力科学研究院 Comprehensive detecting and analyzing platform for performance of digital electric energy metering systems of intelligent transformer substations
CN102928811A (en) * 2012-11-21 2013-02-13 湖南省电力公司科学研究院 Electric energy meter on-site detecting system based on optical fiber communication
CN203552356U (en) * 2013-10-20 2014-04-16 湖南龙之翔智能科技有限公司 Three-phase wide-range prepayment intelligent electric energy meter
CN104076319A (en) * 2014-05-04 2014-10-01 贵州电力试验研究院 Online error analysis system of digitized electric energy metering device
CN104851343A (en) * 2015-06-09 2015-08-19 国网山东济南市历城区供电公司 Demonstration and training device for electric equipment
CN104992548A (en) * 2015-07-16 2015-10-21 国网河南省电力公司漯河供电公司 Remote meter reading system
CN105548948A (en) * 2016-01-28 2016-05-04 云南电网有限责任公司电力科学研究院 Device and method for testing digitalization electric energy metering system
CN206003413U (en) * 2016-06-13 2017-03-08 国网辽宁省电力有限公司朝阳供电公司 Intelligent electric energy meter simulation application testing stand

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵彩霞,赵祖伟: "用电信息采集系统集中抄表终端常见故障及处理方法", 《科技创新导报》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106208101A (en) * 2016-08-17 2016-12-07 上海格蒂能源科技有限公司 Intelligent follow-up electric energy apparatus for correcting and show merit analyze method
CN106355979A (en) * 2016-10-14 2017-01-25 深圳供电局有限公司 Electric energy metering error display apparatus and electric energy metering error display method
CN106501761A (en) * 2016-12-26 2017-03-15 烟台东方威思顿电气股份有限公司 Three-phase intelligent electric-energy meter simulation detection system
CN106501761B (en) * 2016-12-26 2023-07-21 烟台东方威思顿电气有限公司 Three-phase intelligent ammeter simulation detection system
CN111796234A (en) * 2020-06-28 2020-10-20 国家电网有限公司 Non-power-off inspection simulation operation method and system for electric energy metering device

Similar Documents

Publication Publication Date Title
CN206003413U (en) Intelligent electric energy meter simulation application testing stand
CN105845007A (en) Intelligent electric energy meter simulation application test stand and use method thereof
CN201796529U (en) Installation and calibration simulation device for electric energy meters
CN205068942U (en) Experimental hybrid simulation system of high -voltage electrical
CN210200112U (en) Electric energy measurement training device
CN209764962U (en) Test device for excitation system control and rectification loop function verification
CN107909901A (en) Power supply station's Training Room marketing training cabinet and its application process
CN108469569A (en) A kind of Intelligentized test system for electric coupler
CN110223581A (en) The Fundamentals of Electronic Circuits Experimental Teaching Method and system of function are corrected with data
CN105974355A (en) Electric energy metering device comprehensive operation detector and use method thereof
CN204720060U (en) A kind of low voltage electric energy measure device is installed and test training device
CN110058188A (en) The active detector of electric energy metering device
CN102610132B (en) Instrument/meter mounting and maintaining integrated practical training device
CN201584076U (en) Simulator for mutual inductor
CN104794968A (en) Low-voltage electric energy measuring, mounting and connection analyzing comprehensive practical training device
CN206097639U (en) Low -pressure measurement trains equipment
CN205067670U (en) A anti -interference medium simulator for high -voltage electrical is experimental
CN101719324B (en) Simulation training system of voltage drop load test in electric power system measurement loop
CN207780112U (en) A kind of artificial intelligence electric energy meter for simulating field failure
CN106023748A (en) Low-voltage metering training device
CN102707117A (en) Relaying multifunctional tester
CN2781384Y (en) Test control platform for start voltage of electroscope
CN202512745U (en) Comprehensive practical training device for instrument installation and maintenance
CN206557369U (en) High-voltage electric-energy meter on-line monitoring system based on carrier communication
CN201965485U (en) Automatic verifying device for adjustor parameters

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160810