CN105844378A - Schedule management device and schedule management method - Google Patents
Schedule management device and schedule management method Download PDFInfo
- Publication number
- CN105844378A CN105844378A CN201510024076.2A CN201510024076A CN105844378A CN 105844378 A CN105844378 A CN 105844378A CN 201510024076 A CN201510024076 A CN 201510024076A CN 105844378 A CN105844378 A CN 105844378A
- Authority
- CN
- China
- Prior art keywords
- schedule
- pending
- management
- management point
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a schedule management device and a schedule management method. The schedule management device is used for managing the schedule plans of multiple management points, and comprises a screening part used for screening out to-be-executed schedules meeting a set time condition from pre-stored multiple schedule plans and determining the start time, execution management point and to-be-executed task of each to-be-executed schedule, and an issuing part connected with the screening part and used for issuing the to-be-executed task of each to-be-executed schedule to the execution management point of the to-be-executed schedule according to the start time of the to-be-executed schedule, wherein the execution management points are management points executing the to-be-executed tasks in the multiple management points. According to the invention, the screened to-be-executed schedules can be monitored, and the to-be-executed task of each to-be-executed schedule can be issued to the execution management point of the to-be-executed schedule according to the start time of the to-be-executed schedule, so the number of schedule plans needing to be monitored is reduced effectively, and the efficiency of schedule management is improved.
Description
Technical field
The present invention relates to schedule management, particularly relate to a kind of calendar managing device that can be applicable to intelligent building
And method.
Background technology
Open Regional Management System (Unified Area Management System, UAMS) is one
Plant based on intelligent building electromechanical equipment open communication agreement (Intelligent Integrated Interactive
Open Network, IopeNet) intelligent building management system, it is provided that towards building and the equipment in region
The total solution of management, energy conservation, operational control, data management and safety emergency management etc.,
By central server, multiple management points are carried out unified management and control.
In UAMS, if using the agenda managing method of current popular, monitor each bottom in real time
The schedule of management point, and control management point set by schedule time perform defined operation, then by
Management point enormous amount in intelligent building management system, the workload that can make central server is numerous
Weight, the efficiency of management is the lowest, even cannot realize.
Summary of the invention
Technical problem
In view of this, the technical problem to be solved in the present invention is, how to improve schedule management efficiency.
Solution
In order to solve above-mentioned technical problem, the invention provides a kind of calendar managing device, for multiple
The schedule planning of management point is managed, including:
Screening unit, for filtering out the time conditions meeting setting from the multiple schedule plannings prestored
Pending schedule, and determine the time started of each described pending schedule, perform management point and wait to hold
Row task, wherein said execution management point refers to perform described pending task in the plurality of management point
Management point;And
Issue portion, be connected with described screening unit, be used for described by the time started of described pending schedule
The pending task of pending schedule is handed down to the execution management point of described pending schedule.
For above-mentioned calendar managing device, in a kind of possible implementation, described screening unit includes:
Indexing unit, for the executive mode of each described schedule planning of labelling, wherein said executive mode bag
Include and disposably perform, monthly repeat, repeat by week and per diem repeat;And
Many sub-screening units, for respectively from the class schedule planning being marked as particular implementation
Filter out the pending schedule of the time conditions meeting described setting.
For above-mentioned calendar managing device, in a kind of possible implementation, in the time of described setting
In the case of condition comprises appointed day, the plurality of sub-screening unit is each configured to:
Described appointment day is comprised by being marked as in a class schedule planning of particular implementation the repetition date
Phase and exception date do not comprise the schedule planning of described appointed day and are defined as described pending schedule,
Wherein, the described repetition date is to perform described schedule determined by described particular implementation
On the date of plan, the described exception date is the date not performing described schedule planning of special provision.
For above-mentioned calendar managing device, in a kind of possible implementation, described in the portion of issuing include:
Sequencing unit, for being ranked up described pending schedule by the priority of time started;And
Issue unit, for by the sequencing of time started successively pending by described pending schedule
Task is handed down to the execution management point of described pending schedule.
For above-mentioned calendar managing device, in a kind of possible implementation, described in issue unit and joined
It is set to: in the case of the time started of multiple described pending schedules is identical, uses multiple thread respectively
The pending tasks in parallel of multiple described pending schedules is sent to corresponding execution management point.
For above-mentioned calendar managing device, in a kind of possible implementation, described management point be based on
Management point in the intelligent building management system of intelligent building electromechanical equipment open communication agreement,
Described calendar managing device is arranged in described intelligent building management system for the plurality of pipe
Reason point carries out on the central server of unified control and management, or is arranged on for genuinely convinced in described
Communicate between business device and described management point on the home server of relaying.
For above-mentioned calendar managing device, in a kind of possible implementation, also include:
Time synchronized module, for Tong Bu with the described central server retention time.
In order to solve above-mentioned technical problem, present invention also offers a kind of agenda managing method, for many
The schedule planning of individual management point is managed, it is characterised in that including:
The pending day of the time conditions meeting setting is filtered out from the multiple schedule plannings prestored
Journey, and determine the time started of each described pending schedule, perform management point and pending task, its
Described in perform management point refer to the plurality of management point to perform the management point of described pending task;
And
By the time started of described pending schedule, the pending task of described pending schedule is handed down to
The execution management point of described pending schedule.
For above-mentioned agenda managing method, in a kind of possible implementation, multiple from prestore
Schedule planning filters out the pending schedule of the time conditions meeting setting, including:
The executive mode of each described schedule planning of labelling, wherein said executive mode includes disposably performing,
Monthly repeat, repeat by week and per diem repeat;And
Filter out from the class schedule planning being marked as particular implementation respectively and meet described setting
The pending schedule of time conditions.
For above-mentioned agenda managing method, in a kind of possible implementation, in the time of described setting
In the case of condition comprises appointed day, respectively from the class schedule planning being marked as particular implementation
In filter out the time conditions meeting described setting pending schedule after, including:
Described appointment day is comprised by being marked as in a class schedule planning of particular implementation the repetition date
Phase and exception date do not comprise the schedule planning of described appointed day and are defined as described pending schedule,
Wherein, the described repetition date is to perform described schedule determined by described particular implementation
On the date of plan, the described exception date is the date not performing described schedule planning of special provision.
For above-mentioned agenda managing method, in a kind of possible implementation, by described pending schedule
Time started the pending task of described pending schedule is handed down to the execution of described pending schedule
Management point, including:
By the priority of time started, described pending schedule is ranked up;And
Successively the pending task of described pending schedule is handed down to institute by the sequencing of time started
State the execution management point of pending schedule.
For above-mentioned agenda managing method, in a kind of possible implementation, by the priority of time started
The pending task of described pending schedule is handed down to the execution pipe of described pending schedule by order successively
Reason point, including: in the case of the time started of multiple described pending schedules is identical, use multiple line
The pending tasks in parallel of multiple described pending schedules is sent to corresponding execution management point by journey respectively.
For above-mentioned agenda managing method, in a kind of possible implementation, described management point be based on
Management point in the intelligent building management system of intelligent building electromechanical equipment open communication agreement,
Described agenda managing method is used for the plurality of management point by described intelligent building management system
Carry out unified control and management central server perform, or by for described central server with
The home server communicating relaying between described management point performs.
For above-mentioned agenda managing method, in a kind of possible implementation, also include: make described
Ground server is Tong Bu with the described central server retention time.
Beneficial effect
The embodiment of the present invention, filters out the time bar meeting setting from the multiple schedule plannings prestored
The pending schedule of part, can only be monitored the pending schedule filtered out, then by pending day
The pending task of pending schedule is handed down to the execution management point of pending schedule by the time started of journey,
Effectively reduce the amount of the schedule planning needing monitoring, improve the efficiency of schedule management.
According to below with reference to the accompanying drawings to detailed description of illustrative embodiments, the further feature of the present invention and side
Face will be clear from.
Accompanying drawing explanation
The accompanying drawing of the part comprising in the description and constituting description together illustrates with description
The exemplary embodiment of the present invention, feature and aspect, and for explaining the principle of the present invention.
Fig. 1 illustrate according to embodiments of the present invention in the schematic diagram of intelligent building management system;
Fig. 2 illustrates the structural representation of calendar managing device according to an embodiment of the invention;
Fig. 3 illustrates the structural representation of calendar managing device according to another embodiment of the present invention;
Fig. 4 illustrates the database model schematic diagram of calendar managing device according to another embodiment of the present invention;
Fig. 5 illustrates the schematic diagram of the screening process of calendar managing device according to another embodiment of the present invention;
Fig. 6 illustrates the schematic flow sheet of agenda managing method according to an embodiment of the invention;
Fig. 7 illustrates the schematic flow sheet of agenda managing method according to another embodiment of the present invention.
Detailed description of the invention
Various exemplary embodiments, feature and the aspect of the present invention is described in detail below with reference to accompanying drawing.Attached
Reference identical in figure represents the same or analogous element of function.Although enforcement shown in the drawings
The various aspects of example, but unless otherwise indicated, it is not necessary to accompanying drawing drawn to scale.
The most special word " exemplary " means " as example, embodiment or illustrative ".Here as
Any embodiment illustrated by " exemplary " should not necessarily be construed as preferred or advantageous over other embodiments.
It addition, in order to better illustrate the present invention, detailed description of the invention below gives numerous
Detail.It will be appreciated by those skilled in the art that do not have some detail, the present invention is equally
Implement.In some instances, for method well known to those skilled in the art, means, element and circuit
It is not described in detail, in order to highlight the purport of the present invention.
The inventive concept of the present invention is: for needing to carry out substantial amounts of management point the system of schedule management,
Conditional filtering goes out pending schedule according to set time, only treats execution schedule and is monitored, thus efficiently
Carry out schedule management.The present invention the most former to calendar managing device as a example by intelligent building management system
Reason illustrates, as it is shown in figure 1, intelligent building management system can be based on intelligent building electromechanical equipment
Intelligent building management system UAMS of open communication agreement (IopeNet), specifically can include center
Server 25, home server 27, calendar managing device 21 and management point 23.
Wherein, central server 25 may be used for multiple management points 23 are carried out unified control and management,
For example, central server 25 can be the UAMS high in the clouds (Cloud) supporting IopeNet, it is possible to real
The functions such as existing device management application, energy conservation application, operational control application.
During home server 27 may be used for communicating between central server 25 and each management point 23
Continue.Specifically, home server 27 can include proxy module, visualization model, mould able to programme
Block, input and output (Input/Output, I/O) module, metering module, various energy monitoring device with
And the calendar managing device 21 etc. in the embodiment of the present invention, the concrete merit of each module in home server 27
Energy, quantity, position etc. can select according to application scenarios and arrange.Home server 27 can pass through
The Internet (Internet) connects equal to central server 25.
Calendar managing device 21 can be arranged on described intelligent building management system central server 25 or
On home server 27, it is also possible to for independent equipment.
Management point 23 can have polytype, and same type of multiple management points can be as a subsystem
System, thus the multiple management points 23 in intelligent building management system are divided into multiple subsystem, such as: empty
Adjusting system, safety-protection system, supply and drain water system, elevator device, broadcast system, illuminator, change distribution
System, fire alarm system etc..One intrasystem management point of son can be unified by same control equipment
Control, it is also possible to controlled by multiple control equipment in batches, or independently control each management point.Such as,
The air conditioning system of a certain building has master controller, can be controlled the air-conditioning system of these building by master controller
Air-conditioned switch and the temperature etc. of system.
Although it should be noted that describing the center in intelligent building management system using Fig. 1 as example
Server, home server, management point subsystem as above, it is understood by one of ordinary skill in the art that this
Invention should be not limited to this.It is true that can set flexibly according to personal like and/or actual application scenarios completely
Central server, home server, the concrete function of management point subsystem and structure.Additionally, this area
It will be appreciated by the skilled person that intelligent building management system is only the application scenarios of calendar managing device of the present invention
A kind of example, the not restriction to the application scenarios of calendar managing device, calendar managing device can also
It is applied to other the scene needing multiple management points are carried out schedule management, such as: to intelligence such as mobile phones
In equipment, schedule is managed.
Concrete structure and the function of the calendar managing device of the present invention is introduced below by specific embodiment.
Embodiment 1
Fig. 2 illustrates the structural representation of calendar managing device according to an embodiment of the invention.Such as Fig. 2 institute
Showing, this calendar managing device 21 is mainly used in being managed the schedule planning of multiple management points 23, this day
Thread management device 21 may include that
Screening unit 11, for filtering out the time bar meeting setting from the multiple schedule plannings prestored
The pending schedule of part, and determine the time started of each described pending schedule, perform management point and treat
Execution task, wherein said execution management point refers to perform in the plurality of management point 23 described pending
The management point of task;And
Issuing portion 13, be connected with described screening unit 11, being used for will by the time started of described pending schedule
The pending task of described pending schedule is handed down to the execution management point of described pending schedule.
Specifically, see Fig. 1 and Fig. 2, in intelligent building management system, calendar managing device 21
Screening unit 11 can obtain, from central server 25, the time conditions set, it is also possible to by the way of agreement
Obtain the time conditions set.Such as: agreement screens the schedule needing performed the same day one hour in advance every day
Plan.Then, screening unit 11 filters out the time bar meeting setting from each schedule planning prestored
After the pending schedule of part, it may be determined that time started of each pending schedule, perform management point and treat
Execution task.Such as, certain pending schedule is recorded as all elevators that every morning 8 opens in building
Equipment, wherein, the time started is 8 a.m., and execution management point is lift facility, and pending task is
All lift facilities are opened.Then, the portion that issues 13 of calendar managing device 21 can be by pending schedule
Time started, send pending of this pending schedule to the management point that performs of this pending schedule
Business.Such as, home server sends at 8 all lift facilities in building and opens order.
Embodiment 2
Fig. 3 illustrates the structural representation of calendar managing device according to another embodiment of the present invention.Fig. 3 gets the bid
Number assembly identical with Fig. 1, Fig. 2 has identical function, for simplicity's sake, omits these assemblies
Describe in detail.
As it is shown on figure 3, with the differring primarily in that of above-described embodiment, described screening unit 11 may include that
Indexing unit 113, for the executive mode of each described schedule planning of labelling, wherein said executive mode bag
Include and disposably perform, monthly repeat, repeat by week and per diem repeat, the most monthly
Repeating can be according to monthly repeating, it is also possible to repeat according to every some months, by Zhou Chongfu
Perform with per diem repeat similar;And many sub-screening units 115, for respectively from labeled
For a class schedule planning of particular implementation filters out the time conditions that meets described setting wait hold
Row schedule.
In a kind of possible implementation, the time conditions in described setting comprises the situation of appointed day
Under, the plurality of sub-screening unit 115 is each configured to: will be marked as the one of particular implementation
In class schedule planning, the repetition date comprises described appointed day and the exception date does not comprise described appointed day
Schedule planning be defined as described pending schedule, wherein, the described repetition date is specific to hold according to described
To perform the date of described schedule planning determined by line mode, the described exception date be special provision not
Perform the date of described schedule planning.
Specifically, multiple schedule plannings of indexing unit 113 labelling can be preserved by the way of data base
Executive mode.Such as, by schedule database 30 is set inside calendar managing device can be according to not
Same executive mode preserves multiple schedule.Certainly, schedule database 30 can also be arranged in high in the clouds
On central server software platform.Schedule database 30 can store multiple schedule, the most monthly repeat
The schedule planning performed can leave in the schedule monthly repeated, by the schedule planning repeated in week
Can leave in by the schedule repeated in week, it is also possible to storage is disposable similarly performs and per diem
The schedule of the schedule planning repeated.Schedule database 30 can externally provide the interface of data base,
Realize the contents such as the schedule planning to data base to be read out, update and various schedules are calculated
Deng operation.And owing to using data base to classify preservation schedule planning, the calculating that can simplify schedule is multiple
Miscellaneous degree, such as, uses many sub-screening units 115 from data base and row filter schedule planning, can
To be calculated by the schedule execution task list to be performed for every day easily, calculating speed is greatly improved,
Calendar managing device can be become with the outside schedule such as central server or home server of real-time response
More ask, the mode preserved compared to ordinary file, calendar managing device entirety can be improved greatly
Ease for use, stability and other performances.
As shown in Figure 4, the modelling of data base can only have major key, table scheindex and table
The association (such as field href) of monthly and table weekly can be regarded as external key.Specifically, data
In storehouse, each schedule and the implication example represented by relevant field are as follows:
Scheindex is schedule concordance list 41, can deposit (in addition to the hrefs) of such as 128 schedules
Information, then this table can fix 128 information, it is possible to is set as to perform insertion (insert), deleting
Except (delete) operates, only carry out renewal (update) operation etc..
Schemain is that schedule performs task list 42, can deposit the hrefs of such as 128 pending schedules
Information, this table can dynamically add and delete, and such as maximum data bar number could be arranged to 128x32.
Monthly is schedule monthly repetition time table 43, and can record executive mode is repeat by the moon
The repetition date (some days of such as No. 1 to No. 31 or the end of month etc.) of schedule.
Weekly is schedule repetition time table 44 weekly, and can record executive mode is the day repeated in week
The repetition date (some day of such as Monday to Sunday) of journey.
Exception is schedule exception timetable 45, can need not the time of execution, this table with recording schedule
Can dynamically add and delete, such as maximum data bar number could be arranged to 128x32.
Machine4 is for connecting machine set table 46, and storage address style is that the management point of IPv4 is at schedule meter
The corresponding relation between mark and the address (machine Id) of actual machine in Huaing.
Machine6 is for connecting machine set table 47, and storage address style is that the management point of IPv6 is at schedule meter
The corresponding relation between mark and the address of actual machine in Huaing.
Additionally, repeat is meant that schedule repeats kind in Fig. 4, i.e. executive mode 48.Wherein " 0 "
Represent disposable task;" 1 " represents that monthly fixing some day performs;" 2 " represent that the set time holds weekly
OK;" 3 " represent that every day performs.MachineId represents connection machine number.
For example, in scheindex, according to the repeat value of a certain schedule planning, determine the side of execution
At monthly, formula, such as repeat=1, then can determine that the concrete repetition date of this schedule planning is the most every
No. 28 execution of the moon, if being No. 28 today, then can this schedule planning filter out also from scheindex
Put into schemain medium pending, if today is not No. 28, then can ignore this schedule planning and continue
Continue and the next schedule planning in scheindex is screened.
The implication of the relevant parameter of above schedule, type, size etc. are merely illustrative and unrestricted, specifically
Can be according to actual application scenarios and equipment disposal ability flexible configuration.
In a kind of possible implementation, issue portion 13 and include: sequencing unit 131, for by starting
The priority of time is treated execution schedule and is ranked up;And issue unit 133, for by the time started
The pending task of pending schedule is handed down to the execution management point of pending schedule by sequencing successively.
In a kind of possible implementation, calendar managing device 21 can also include that receiving and transmitting part 35 is as quickly
CGI(Common gateway interface) (Fast Common Gateway Interface, FCGI) etc. can receive outside
IopeNet asks, and as received schedule management based on IopeNet request from central server 25, it is right to process
The reading of schedule planning (Schedule Object), setting etc. operate, and after processing is completed to center
Server 25 returns letter.Additionally, receiving and transmitting part 35 can also would indicate that schedule performs the log information transmission of result
Record is carried out to log management portion 37.Log management portion 37 can receive log record request, and by content
Recorded in log database, the interface that log database content reads externally is provided.Wherein, daily record note
The content of record mainly can include that management point 23 performs time of origin, the mistake that during Schedule task, appearance is abnormal
Type etc., in order to follow-up abnormity prompt or the Abnormality remove etc. of carrying out operates.
Further, after receiving and transmitting part 35 receives schedule management request, in can asking according to schedule management
Particular content determines the action of other modules of calendar managing device.If during schedule management request includes
On the time conditions the most a certain date that central server 25 sets, the most sub-screening units 115 can be in schedule
In data base 30, screen according to time conditions.Screening content concrete in screening process and screening bar
Part may refer to the example of Fig. 5 and following table:
Ginseng sees the above table, and 1.~4. the screening action in Fig. 5 can sequentially perform, it is also possible to parallel;It is similar to
5.~8. screening action can sequentially perform, it is also possible to parallel.Specifically: perform (only from disposable
Once), repeat (daily) every day, repeat weekly (weekly), monthly repeat
(monthly) after needing, when schedule filters out some day 0~24 respectively, the schedule planning performed,
The most pending for the schedule planning filtered out schedule can be saved in schedule perform in task list, and also can
With by sequencing unit 131 treat execution schedule be ranked up, then monitoring sequence after each pending day
The time started of journey, according to the sequencing of time started by the pending task of each pending schedule
(task) the execution management point of correspondence it is handed down to.
In a kind of possible implementation, described in issue unit 133 and be configured to: multiple pending
In the case of time started of schedule is identical, use multiple thread respectively by multiple pending schedules wait hold
Row tasks in parallel sends to corresponding execution management point.
Continuing as a example by intelligent building management system based on IopeNet, calendar managing device can use
Batch processing service (Batch Service) in IopeNe comes the connection the most each pipe of machine based on IopeNet
Reason point 23 carries out schedule management.For example, it is assumed that there are 32 connection machines, each connection machine can connect
One or more management points, total can include such as less than 128 management points.Calendar managing device
21 modes using thread pool, management that every connection one single thread of machine startup is delivered letters.
So, after calculating schedule, the pending schedule on the same day can be saved in schedule management dress
Put in the internal memory of 21, when arriving the time started of pending schedule, if there is multiple pending schedules
Pending task need issue (time started of the most multiple pending schedules is identical) in the case of, under
Bill unit 133 can perform management point to difference parallel and issue pending of respective pending schedule
Business.Preferably, calendar managing device 21 needs to avoid same management point 23 in identical beginning as far as possible
Time issues multiple pending task, such as: when carrying out schedule and arranging, if there is to same pipe
Reason point 23 had been carried out arranging in the identical time started, then can remind operator, same to prevent
The task duplication of one management point 23 or conflict.
In a kind of possible implementation, if calendar managing device connects multiple connection machine, and
And each connection machine is respectively connecting to a few management point, then can be by all pipes of each connection machine
The information package such as the pending task of reason point and address information, are then sent in parallel to each connection machine, logical
Cross each connection machine and control the schedule of each management point equipment again.If additionally, calendar managing device only connects
Having a connection machine, this connection machine connects multiple management points, then the thread that this connection machine is corresponding can
With can also the information package such as the pending task of all management points and address information, and be assigned to such as two
In individual batch processing (Batch) bag, these two Batch bags can use serial to send, if such as every
Individual Batch bag can include the information needed for 64 management points, then calendar managing device is every by Batch bag
Secondary can to connect 128 management points of machine Batch sending information.Where it is assumed that first Batch bag is sent out
Send time-out, follow-up Batch bag can not be sent.
Certainly, issue unit 133 to be issued to multiple execution management points batch by thread pool, Batch bag etc.
The pending task of multiple pending schedules is only a kind of example.In this case, generally can will belong to
Pending task in multiple execution management points of same control equipment is placed in same Batch bag, control
Control equipment, after receiving Batch bag, can be distinguished according to the address information that each pending schedule is corresponding
Pending task is sent to respective execution management point.Such as: by Batch bag appointing of turning on light simultaneously
Business is sent to illuminate master controller, has the lamp of the illumination master controller all meeting rooms to a certain floor respectively
Task is opened in transmission.
In a kind of possible implementation, as it is shown on figure 3, so that calendar managing device 21 with in
Central server 25 retention time synchronizes, thus ensures to control more accurately, can arrange time synchronized module
33.Time synchronized module 33 can have such as based on NTP (Network Time
Protocol, NTP) clock automatic synchronizing function, can be according to being set in special time even when opening
Connect time server, if calendar managing device 21 is different from the time of central server 25, then to schedule
Managing device 21 carries out time adjustment.Wherein, time server can be independent equipment, it is also possible to set
Put on other equipment such as central server 25 or home server 27, time server can also in
Central server 25 or calendar managing device 21 actively send prover time, so that central server 25 or journey
Managing device 21 can be corrected keeping synchronizing according to prover time.
Additionally, calendar managing device 21 can also include human-computer interaction module etc..Wherein, man-machine interaction mould
Block can coordinate CGI(Common gateway interface) (Common Gateway Interface, CGI) by Web picture
The functions such as schedule planning is set by realization, display, and may be provided for calendar managing device
The functions such as network settings, time setting, time synchronized setting, journal displaying.
In Fig. 3, the function of each module can be supported by the hardware of bottom or middleware, such as:
Pyhton (schedule calculating), api interface program, sqlite3 (Database Systems), NMAST (illumination control
The communication protocol of system processed), RS458 (interface), RS232 (interface), SDRAM (synchronous dynamic
Random access memory, Synchronous Dynamic Random Access Memory), FROM (ferroelectricity
Read only memory, Ferro-electric Read-Only Memory), SRAM (SRAM,
Static Random Access Memory) etc..
The calendar managing device of the present invention, filters out from the multiple schedule plannings prestored and meets setting
The pending schedule of time conditions, only the pending schedule filtered out can be monitored, then press
The pending task of pending schedule is handed down to holding of pending schedule by the time started of pending schedule
Row management point, effectively reduces the amount of the schedule planning needing monitoring, improves the efficiency of schedule management.
Additionally, after the schedule planning of different executive modes is marked, data base can be used schedule
Plan is divided into multiple schedule to store, and can facilitate many sub-screening units row filter schedule meter
Draw, be not only easier to calculate pending schedule, additionally it is possible to calculating speed is greatly improved, improves day further
The efficiency of thread management.
Embodiment 3
Fig. 6 illustrates the schematic flow sheet of agenda managing method according to an embodiment of the invention.Such as Fig. 6 institute
Showing, this agenda managing method may be used for being managed the schedule planning of multiple management points, and the method can
To include:
Step 601, from the multiple schedule plannings prestored, filter out the time conditions meeting setting
Pending schedule, and determine the time started of each described pending schedule, perform management point and pending
Task, wherein said execution management point refers to perform described pending task in the plurality of management point
Management point;And
Step 602, by the time started of described pending schedule by pending of described pending schedule
Business is handed down to the execution management point of described pending schedule.
Specifically, the agenda managing method of the present embodiment can be by any one structure in above-described embodiment
Calendar managing device perform.See Fig. 1 and Fig. 6, in intelligent building management system, schedule management
Device can obtain, from central server 25, the time conditions set, it is also possible to obtains by the way of agreement
The time conditions set.Then from each schedule planning prestored, filter out the time bar meeting setting
After the pending schedule of part, it may be determined that time started of each pending schedule, perform management point and treat
Execution task.Then, calendar managing device can be pending to this by the time started of pending schedule
The management point that performs of schedule sends the pending task of this pending schedule.
The present embodiment, filters out the time conditions of satisfied setting from the multiple schedule plannings prestored
Pending schedule, can only be monitored the pending schedule filtered out, then by pending schedule
The pending task of pending schedule is handed down to the execution management point of pending schedule by the time started, effectively
Decrease the amount of the schedule planning needing monitoring, improve the efficiency of schedule management.
Embodiment 4
Fig. 7 illustrates the schematic flow sheet of agenda managing method according to another embodiment of the present invention.Fig. 7 gets the bid
Number step identical with Fig. 6 has an identical function, and for simplicity's sake, that omits these assemblies is detailed
Explanation.
Setting is met as it is shown in fig. 7, step 601 filters out from the multiple schedule plannings prestored
The pending schedule of time conditions, specifically may include that
The executive mode of each schedule planning of step 701, labelling, wherein said executive mode includes disposably
Perform, monthly repeat, repeated by week and per diem repeated at least one.Concrete and
Speech, the executive mode of schedule planning may refer to Fig. 4 of above-mentioned calendar managing device embodiment and is correlated with
Describe.
Step 702, respectively filter out from the class schedule planning being marked as particular implementation satisfied
The pending schedule of the time conditions of described setting.Specifically, the detailed process of screening schedule planning can
To see Fig. 5 and the associated description thereof of above-mentioned calendar managing device embodiment.
In a kind of possible implementation, the time conditions in described setting comprises the situation of appointed day
Under, after step 702, the method can also include:
Step 703, by be marked as in a class schedule planning of particular implementation repeat the date comprise institute
State appointed day and the exception date does not comprise the schedule planning of described appointed day and is defined as described pending
Schedule, wherein, the described repetition date is to perform described day determined by described particular implementation
On the date of journey plan, the described exception date is the date not performing described schedule planning of special provision.
In a kind of possible implementation, step 602 specifically may include that
Step 704, by the priority of time started, described pending schedule is ranked up;And
Step 705, by the sequencing of time started successively by the pending task of described pending schedule
It is handed down to the execution management point of described pending schedule.
In a kind of possible implementation, step 705 specifically may include that multiple described pending
In the case of time started of schedule is identical, use multiple thread respectively by multiple described pending schedules
Pending tasks in parallel sends to corresponding execution management point.
In a kind of possible implementation, the agenda managing method of the embodiment of the present invention may be used for intelligence
In building management system, therefore, seeing Fig. 1, the management point of the embodiment of the present invention can be based on intelligence
Management point 23 in the intelligent building management system of building electromechanical equipment open communication agreement, additionally, should
Agenda managing method can by intelligent building management system for the plurality of management point 23 is united
The control of one and the central server 25 of management perform, or by being arranged on at described central server
The home server 27 communicating relaying between 25 and described management point 23 performs.
In a kind of possible implementation, this agenda managing method can also include: makes described local clothes
Business device 27 is Tong Bu with described central server 25 retention time.Such as: can clock based on NTP automatic
Synchronizing function, according to being set in special time such as: each hour or several hours connect a time
Server, if placed at calendar managing device 21 and the time of central server 25 of home server 27
Difference, then can carry out time adjustment to the calendar managing device 21 of home server 27.
The agenda managing method of the present embodiment, filters out satisfied setting from the multiple schedule plannings prestored
The pending schedule of fixed time conditions, can only be monitored, then the pending schedule filtered out
By the time started of pending schedule, the pending task of pending schedule is handed down to pending schedule
Perform management point, effectively reduce the amount of the schedule planning needing monitoring, improve the efficiency of schedule management.
Additionally, after the schedule planning of different executive modes is marked, data base can be used schedule
Plan is divided into multiple schedule to store, and can facilitate many sub-screening units row filter schedule meter
Draw, be not only easier to calculate pending schedule, additionally it is possible to calculating speed is greatly improved, improves day further
The efficiency of thread management.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited to
In this, any those familiar with the art, can be easily in the technical scope that the invention discloses
Expect change or replace, all should contain within protection scope of the present invention.Therefore, the protection of the present invention
Scope should be as the criterion with described scope of the claims.
Claims (14)
1. a calendar managing device, for being managed the schedule planning of multiple management points, it is special
Levy and be, including:
Screening unit, for filtering out the time conditions meeting setting from the multiple schedule plannings prestored
Pending schedule, and determine the time started of each described pending schedule, perform management point and wait to hold
Row task, wherein said execution management point refers to perform described pending task in the plurality of management point
Management point;And
Issue portion, be connected with described screening unit, be used for described by the time started of described pending schedule
The pending task of pending schedule is handed down to the execution management point of described pending schedule.
Calendar managing device the most according to claim 1, it is characterised in that described screening unit includes:
Indexing unit, for the executive mode of each described schedule planning of labelling, wherein said executive mode bag
Include and disposably perform, monthly repeat, repeat by week and per diem repeat;And
Many sub-screening units, for respectively from the class schedule planning being marked as particular implementation
Filter out the pending schedule of the time conditions meeting described setting.
Calendar managing device the most according to claim 2, it is characterised in that described setting time
Between in the case of condition comprises appointed day, the plurality of sub-screening unit is each configured to:
Described appointment day is comprised by being marked as in a class schedule planning of particular implementation the repetition date
Phase and exception date do not comprise the schedule planning of described appointed day and are defined as described pending schedule,
Wherein, the described repetition date is to perform described schedule determined by described particular implementation
On the date of plan, the described exception date is the date not performing described schedule planning of special provision.
Calendar managing device the most according to any one of claim 1 to 3, it is characterised in that institute
State the portion of issuing to include:
Sequencing unit, for being ranked up described pending schedule by the priority of time started;And
Issue unit, for by the sequencing of time started successively pending by described pending schedule
Task is handed down to the execution management point of described pending schedule.
Calendar managing device the most according to claim 4, it is characterised in that described in issue unit quilt
It is configured that in the case of the time started of multiple described pending schedules is identical, uses multiple thread to divide
The pending tasks in parallel of multiple described pending schedules is not sent to corresponding execution management point.
Calendar managing device the most according to any one of claim 1 to 5, it is characterised in that
Described management point is intelligent building management based on intelligent building electromechanical equipment open communication agreement
Management point in system,
Described calendar managing device is arranged in described intelligent building management system for the plurality of pipe
Reason point carries out on the central server of unified control and management, or is arranged on for genuinely convinced in described
Communicate between business device and described management point on the home server of relaying.
Calendar managing device the most according to claim 6, it is characterised in that also include:
Time synchronized module, for Tong Bu with the described central server retention time.
8. an agenda managing method, for being managed the schedule planning of multiple management points, it is special
Levy and be, including:
The pending day of the time conditions meeting setting is filtered out from the multiple schedule plannings prestored
Journey, and determine the time started of each described pending schedule, perform management point and pending task, its
Described in perform management point refer to the plurality of management point to perform the management point of described pending task;
And
By the time started of described pending schedule, the pending task of described pending schedule is handed down to
The execution management point of described pending schedule.
Agenda managing method the most according to claim 8, it is characterised in that many from prestoring
Individual schedule planning filters out the pending schedule of the time conditions meeting setting, including:
The executive mode of each described schedule planning of labelling, wherein said executive mode includes disposably performing,
Monthly repeat, repeat by week and per diem repeat;And
Filter out from the class schedule planning being marked as particular implementation respectively and meet described setting
The pending schedule of time conditions.
Agenda managing method the most according to claim 9, it is characterised in that in described setting
In the case of time conditions comprises appointed day, respectively from the class schedule being marked as particular implementation
After filtering out the pending schedule of the time conditions meeting described setting in the works, including:
Described appointment day is comprised by being marked as in a class schedule planning of particular implementation the repetition date
Phase and exception date do not comprise the schedule planning of described appointed day and are defined as described pending schedule,
Wherein, the described repetition date is to perform described schedule determined by described particular implementation
On the date of plan, the described exception date is the date not performing described schedule planning of special provision.
11. according to Claim 8 to the agenda managing method according to any one of 10, it is characterised in that
The pending task of described pending schedule is handed down to described by the time started of described pending schedule
The execution management point of pending schedule, including:
By the priority of time started, described pending schedule is ranked up;And
Successively the pending task of described pending schedule is handed down to institute by the sequencing of time started
State the execution management point of pending schedule.
12. agenda managing methods according to claim 11, it is characterised in that by the time started
The pending task of described pending schedule is handed down to holding of described pending schedule by sequencing successively
Row management point, including: in the case of the time started of multiple described pending schedules is identical, employing is many
The pending tasks in parallel of multiple described pending schedules is sent to corresponding execution pipe by individual thread respectively
Reason point.
13. according to Claim 8 to the agenda managing method according to any one of 12, it is characterised in that
Described management point is intelligent building management based on intelligent building electromechanical equipment open communication agreement
Management point in system,
Described agenda managing method is used for the plurality of management point by described intelligent building management system
Carry out unified control and management central server perform, or by for described central server with
The home server communicating relaying between described management point performs.
14. agenda managing methods according to claim 13, it is characterised in that also include: make institute
State home server Tong Bu with the described central server retention time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510024076.2A CN105844378A (en) | 2015-01-16 | 2015-01-16 | Schedule management device and schedule management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510024076.2A CN105844378A (en) | 2015-01-16 | 2015-01-16 | Schedule management device and schedule management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105844378A true CN105844378A (en) | 2016-08-10 |
Family
ID=56580192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510024076.2A Pending CN105844378A (en) | 2015-01-16 | 2015-01-16 | Schedule management device and schedule management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105844378A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101920711A (en) * | 2009-06-17 | 2010-12-22 | 上海宝信软件股份有限公司 | Method for controlling device through schedule in rail traffic monitoring system |
CN102360472A (en) * | 2011-10-24 | 2012-02-22 | 刘业兴 | Task manager |
CN102679493A (en) * | 2012-04-28 | 2012-09-19 | 华南理工大学 | Method and system for managing central air-conditioning end equipment of teaching building based on schedule |
CN103676705A (en) * | 2012-10-11 | 2014-03-26 | 国网电力科学研究院 | Remote power control method, system thereof and remote control platform |
CN104136352A (en) * | 2012-02-27 | 2014-11-05 | 奥的斯电梯公司 | Elevator control system |
-
2015
- 2015-01-16 CN CN201510024076.2A patent/CN105844378A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101920711A (en) * | 2009-06-17 | 2010-12-22 | 上海宝信软件股份有限公司 | Method for controlling device through schedule in rail traffic monitoring system |
CN102360472A (en) * | 2011-10-24 | 2012-02-22 | 刘业兴 | Task manager |
CN104136352A (en) * | 2012-02-27 | 2014-11-05 | 奥的斯电梯公司 | Elevator control system |
CN102679493A (en) * | 2012-04-28 | 2012-09-19 | 华南理工大学 | Method and system for managing central air-conditioning end equipment of teaching building based on schedule |
CN103676705A (en) * | 2012-10-11 | 2014-03-26 | 国网电力科学研究院 | Remote power control method, system thereof and remote control platform |
Non-Patent Citations (1)
Title |
---|
汤勇: "《智能建筑自控网趋势数据管理及日程管理研究与开发》", 《中国优秀博硕士学位论文全文数据库 (硕士) 工程科技Ⅱ辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106126346B (en) | A kind of large-scale distributed data collection system and method | |
CN101713984B (en) | Event synchronized reporting in Process Control System | |
US7312721B2 (en) | Data collector for an automated meter reading system | |
CN100592745C (en) | Method and system for sending localization and identity dependent information to mobile terminals | |
CN109862048A (en) | Shop equipment processing system, device databases server and method | |
CN104135533B (en) | A kind of system and method for industrial data transmission | |
TW201714122A (en) | Production scheduling method and automatically scheduling system | |
CN109698787A (en) | A method of realizing Edge position control in gateway of internet of things | |
US8195309B2 (en) | System for scheduling using an external calendaring service | |
US8738158B2 (en) | Apparatus and method for remote configuration of common objects across lighting controllers | |
Wang et al. | Fundamental technology for RFID-based supervisory control of shop floor production system | |
CN109992571A (en) | A kind of intelligent substation configuration file line closed loop check system and method for calibration | |
US10951696B2 (en) | Data manager | |
CN107145350B (en) | A kind of software development methodology and system | |
CN108009258A (en) | It is a kind of can Configuration Online data collection and analysis platform | |
CN104637265A (en) | Dispatch-automated multilevel integration intelligent watching alarming system | |
CN107948008A (en) | A kind of modeling method for low-voltage network monitoring system | |
CN111522719A (en) | Method and device for monitoring big data task state | |
CN104456868A (en) | Air conditioner control system | |
CN103744365B (en) | Bridging module for communication between room control terminal and upper computer and method thereof | |
CN110018993A (en) | A kind of data analysis system, method and monitoring analysis system | |
CN105900025A (en) | Control device, development device, and development program | |
CN103760856A (en) | Cold strip steel leveling unit process control method | |
CN105844378A (en) | Schedule management device and schedule management method | |
CN108366061B (en) | Data processing system for social security |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160810 |
|
WD01 | Invention patent application deemed withdrawn after publication |