CN105809411A - Plan controlling method and apparatus - Google Patents

Plan controlling method and apparatus Download PDF

Info

Publication number
CN105809411A
CN105809411A CN201610118941.4A CN201610118941A CN105809411A CN 105809411 A CN105809411 A CN 105809411A CN 201610118941 A CN201610118941 A CN 201610118941A CN 105809411 A CN105809411 A CN 105809411A
Authority
CN
China
Prior art keywords
plan
information
sub
instruction
general
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610118941.4A
Other languages
Chinese (zh)
Inventor
苗青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Zhidian Network Technology Co Ltd
Original Assignee
Guangzhou Zhidian Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Zhidian Network Technology Co Ltd filed Critical Guangzhou Zhidian Network Technology Co Ltd
Priority to CN201610118941.4A priority Critical patent/CN105809411A/en
Publication of CN105809411A publication Critical patent/CN105809411A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1093Calendar-based scheduling for persons or groups
    • G06Q10/1097Task assignment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a plan controlling method and an apparatus. The method comprises the creating of an order of creating sub-plans and the creating of sub-plans corresponding to the order. Based on the node connecting information, the sub-plans are connected to an overall plan. The information of sub-plans are obtained and transmitted to their corresponding overall plan. All the information that the overall plan receives is displayed in the form of images where each sub-plan corresponds to one region and the information of each sub-plan is filled into its corresponding region. According to the invention, all sub-plan information can be automatically summed up in an overall plan, therefore allowing managers of the overall plan know about the sub-plan information and how this information is executed. In this way, the managers will be able to have a full picture of the overall plan, accordingly.

Description

Planned management protocol and device
Technical field
The present invention relates to a kind of planned management protocol being applied in project management system and device.
Background technology
The Internet, the developing rapidly of development of Mobile Internet technology, bring new intension for much traditional application, and the problem existing for a lot of tradition application brings new, more efficient solution route.The plan of each participant that traditional project management system causes can not be planned manager in time and understand, and causes a lot of program administrator by social networks SNS correlation technique, seeks more efficient more transparent method for the planning management in planning management.
Summary of the invention
In order to overcome the deficiencies in the prior art, it is an object of the invention to provide a kind of planned management protocol and device, realize automatically collecting to general plan sub calculated plan information, general plan manager is enable to know sub calculated plan information and implementation of the plan in time, it is simple to general plan is grasped comprehensively.
For solving the problems referred to above, the technical solution adopted in the present invention is as follows:
Scheme one:
Planned management protocol, comprises the following steps:
S1, reception son plan create instruction, according to the sub-plan that the information creating of this sub-plan establishment instruction is corresponding;
S2, according to sub calculated node-associated information, this sub-plan is set up incidence relation with corresponding general plan;
S3, the sub plan information formulated in the works of acquisition also send to corresponding general plan;
S4, plan information received in general plan is presented by view, in the view, the corresponding region of every height plan, successively calculated for every height plan information is positioned in corresponding region and presents.
Preferably, described sub-plan creates instruction by planning participant or general plan manager initiation.
Preferably, also including in step s3, obtain sub calculated plan implementation progress information and send to corresponding general plan, plan information is one-to-one relationship with plan implementation progress information.
Preferably, also include in step s 4, successively calculated for every height plan implementation progress information is positioned in the region of correspondence, and plan implementation progress information position in the zone is corresponding with the position of corresponding plan information.
Preferably, also include after step s4:
S5: receive general plan manager and instruction is set for general plan, operate accordingly according to arranging instruction antithetical phrase plan;Wherein, arrange instruction to include: instruction is deleted in the setting of sub-plan visible range, sub-plan modification instruction and son plan.
Scheme two:
Plan controls device, including with lower module:
Son plan creation module, is used for receiving sub-plan and creates instruction, according to the son plan that the information creating of this sub-plan establishment instruction is corresponding;
Relating module, for setting up incidence relation by this sub-plan with corresponding general plan according to sub calculated node-associated information;
Information sending module, for obtaining the sub plan information formulated in the works and sending to corresponding general plan;
Information presents module, for plan information received in general plan is presented by view, in the view, the corresponding region of every height plan, successively calculated for every height plan information is positioned in the region of correspondence and presents.
Preferably, described sub-plan creates instruction by planning participant or general plan manager initiation.
Preferably, also including in information sending module, obtain sub calculated plan implementation progress information and send to corresponding general plan, plan information is one-to-one relationship with plan implementation progress information.
Preferably, present in module in information and also include, successively calculated for every height plan implementation progress information is positioned in the region of correspondence, and plan implementation progress information position in the zone is corresponding with the position of corresponding plan information.
Preferably, also include after information presents module:
General plan arranges module, arranges instruction for receiving general plan manager for general plan, operates accordingly according to arranging instruction antithetical phrase plan;Wherein, arrange instruction to include: instruction is deleted in the setting of sub-plan visible range, sub-plan modification instruction and son plan.
Compared to existing technology, the beneficial effects of the present invention is: support plan participant sets up son plan according to the task of oneself under general plan, and formulate the setting of specific plans, son plan can be aggregated into the sub-plan specific plans of participant in general plan after submitting to and display with intuitive way, general plan manager is enable to know sub calculated plan information and implementation of the plan in time, it is simple to general plan is grasped comprehensively.It addition, general plan manager's antithetical phrase plan has comprehensively arranges authority.
Accompanying drawing explanation
Fig. 1 is the planned management protocol flow chart of the present invention.
Detailed description of the invention
Below, in conjunction with accompanying drawing and detailed description of the invention, the present invention is described further:
With reference to Fig. 1, a kind of planned management protocol, comprise the following steps:
S1, reception son plan create instruction, according to the sub-plan that the information creating of this sub-plan establishment instruction is corresponding.
S2, according to sub calculated node-associated information, this sub-plan is set up incidence relation with corresponding general plan.
S3, the sub plan information formulated in the works of acquisition and plan implementation progress information also send to the general plan of correspondence.
S4, plan information received in general plan and plan implementation progress information are presented by view, in the view, the corresponding region of every height plan, successively calculated for every height plan information and plan implementation progress information are positioned in the region of correspondence and present, and plan implementation progress information position in the zone is corresponding with the position of corresponding plan information.
Wherein, in step sl, a general plan is generally made up of some height plans, then have the different son plans that multiple participant is each responsible in general plan, general plan manager or general plan participant all can create sub-plan, concrete program content is configured by founder, namely creates, by son plan, the son plan that the information creating in instruction is corresponding.
In step s 2, the son plan created have to have incidence relation with corresponding general plan, therefore node-associated information is had in the works at the son created, node-associated information specifically refers to the child node at this sub-plan place and the incidence relation of father node, just with corresponding general plan, this sub-plan can be set up incidence relation by node-associated information.
In step s3, after establishing incidence relation, just can obtain plan information therein and plan implementation progress information in the works from son and send to corresponding general plan.Wherein, one or more plan can be included in the works at one, each plan has its plan information and plan implementation progress information, namely plan information is one-to-one relationship with plan implementation progress information, plan information can be the description information to this plan, and planning implementation progress information can be percent data, specifically can be presented by the form of progress bar.
In step s 4, general plan can receive the calculated plan information of each height and plan implementation progress information, then the information received is collected and presents in the view, the corresponding region of every height plan, namely the calculated information of different sons can distinguish display in different regions, successively calculated for every height plan information and plan implementation progress information are positioned in the region of correspondence and present, and on plan information and the corresponding in the zone position of plan implementation progress information, such as plan information is on the left side, plan implementation progress information is on corresponding the right.Program administrator is enable intuitively to arrive the implementation progress of certain plan, thus being conducive to plan is controlled.
Further, also include step S5 after step s4: receive general plan manager and instruction is set for general plan, operate accordingly according to arranging instruction antithetical phrase plan;Wherein, arrange instruction to include: instruction is deleted in the setting of sub-plan visible range, sub-plan modification instruction and son plan.Wherein, general plan manager has and arranges authority, it is possible to each height plan belonged under this general plan is operated.Son plan visible range is set to: arrange this sub-plan visible range for other plan participants, such as, the son plan that certain can plan participant is visible to another plan participant, then this another plan participant can check plan therein and plan implementation progress.Sub-plan modification instruction is: the calculated plan of certain height or the information relevant to this sub-plan are modified.Instruction is deleted in son plan: delete certain height plan.
It is an advantage of the current invention that: support plan participant sets up son plan according to the task of oneself under general plan, and formulate the setting of specific plans, son plan can be aggregated into the sub-plan specific plans of participant in general plan after submitting to and display with intuitive way, general plan manager is enable to know sub calculated plan information and implementation of the plan in time, it is simple to general plan is grasped comprehensively.It addition, general plan manager's antithetical phrase plan has comprehensively arranges authority.
Corresponding to above-mentioned planned management protocol, the invention also discloses a kind of plan and control device, including with lower module:
Son plan creation module, is used for receiving sub-plan and creates instruction, according to the son plan that the information creating of this sub-plan establishment instruction is corresponding;
Relating module, for setting up incidence relation by this sub-plan with corresponding general plan according to sub calculated node-associated information;
Information sending module, for obtaining the sub plan information formulated in the works and sending to corresponding general plan;
Information presents module, for plan information received in general plan is presented by view, in the view, the corresponding region of every height plan, successively calculated for every height plan information is positioned in the region of correspondence and presents.
Preferably, described sub-plan creates instruction by planning participant or general plan manager initiation.
Preferably, also including in information sending module, obtain sub calculated plan implementation progress information and send to corresponding general plan, plan information is one-to-one relationship with plan implementation progress information.
Preferably, present in module in information and also include, successively calculated for every height plan implementation progress information is positioned in the region of correspondence, and plan implementation progress information position in the zone is corresponding with the position of corresponding plan information.
Preferably, also include after information presents module:
General plan arranges module, arranges instruction for receiving general plan manager for general plan, operates accordingly according to arranging instruction antithetical phrase plan;Wherein, arrange instruction to include: instruction is deleted in the setting of sub-plan visible range, sub-plan modification instruction and son plan.
It will be apparent to those skilled in the art that can technical scheme as described above and design, make other various corresponding changes and deformation, and all these change and deformation all should belong within the protection domain of the claims in the present invention.

Claims (10)

1. planned management protocol, it is characterised in that comprise the following steps:
S1, reception son plan create instruction, according to the sub-plan that the information creating of this sub-plan establishment instruction is corresponding;
S2, according to sub calculated node-associated information, this sub-plan is set up incidence relation with corresponding general plan;
S3, the sub plan information formulated in the works of acquisition also send to corresponding general plan;
S4, plan information received in general plan is presented by view, in the view, the corresponding region of every height plan, successively calculated for every height plan information is positioned in corresponding region and presents.
2. planned management protocol according to claim 1, it is characterised in that described sub-plan creates instruction by planning participant or general plan manager initiation.
3. planned management protocol according to claim 1, it is characterised in that also include in step s3, obtains sub calculated plan implementation progress information and sends to corresponding general plan, and plan information is one-to-one relationship with plan implementation progress information.
4. planned management protocol according to claim 3, it is characterized in that, also include in step s 4, successively calculated for every height plan implementation progress information is positioned in the region of correspondence, and plan implementation progress information position in the zone is corresponding with the position of corresponding plan information.
5. planned management protocol according to claim 1, it is characterised in that also include after step s4:
S5: receive general plan manager and instruction is set for general plan, operate accordingly according to arranging instruction antithetical phrase plan;Wherein, arrange instruction to include: instruction is deleted in the setting of sub-plan visible range, sub-plan modification instruction and son plan.
6. plan controls device, it is characterised in that include with lower module:
Son plan creation module, is used for receiving sub-plan and creates instruction, according to the son plan that the information creating of this sub-plan establishment instruction is corresponding;
Relating module, for setting up incidence relation by this sub-plan with corresponding general plan according to sub calculated node-associated information;
Information sending module, for obtaining the sub plan information formulated in the works and sending to corresponding general plan;
Information presents module, for plan information received in general plan is presented by view, in the view, the corresponding region of every height plan, successively calculated for every height plan information is positioned in the region of correspondence and presents.
7. plan according to claim 6 controls device, it is characterised in that described sub-plan creates instruction by planning participant or general plan manager initiation.
8. plan according to claim 6 controls device, it is characterised in that also include in information sending module, obtains sub calculated plan implementation progress information and sends to corresponding general plan, and plan information is one-to-one relationship with plan implementation progress information.
9. plan according to claim 8 controls device, it is characterized in that, present in module in information and also include, successively calculated for every height plan implementation progress information is positioned in the region of correspondence, and plan implementation progress information position in the zone is corresponding with the position of corresponding plan information.
10. plan according to claim 6 controls device, it is characterised in that also include after information presents module:
General plan arranges module, arranges instruction for receiving general plan manager for general plan, operates accordingly according to arranging instruction antithetical phrase plan;Wherein, arrange instruction to include: instruction is deleted in the setting of sub-plan visible range, sub-plan modification instruction and son plan.
CN201610118941.4A 2016-03-02 2016-03-02 Plan controlling method and apparatus Pending CN105809411A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610118941.4A CN105809411A (en) 2016-03-02 2016-03-02 Plan controlling method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610118941.4A CN105809411A (en) 2016-03-02 2016-03-02 Plan controlling method and apparatus

Publications (1)

Publication Number Publication Date
CN105809411A true CN105809411A (en) 2016-07-27

Family

ID=56466611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610118941.4A Pending CN105809411A (en) 2016-03-02 2016-03-02 Plan controlling method and apparatus

Country Status (1)

Country Link
CN (1) CN105809411A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1700652A (en) * 2005-06-01 2005-11-23 合肥工业大学 Collaborative design method based on collaborative template
CN102246191A (en) * 2008-12-15 2011-11-16 Itt制造企业公司 Project timeline visualization methods and systems
CN102497442A (en) * 2011-12-22 2012-06-13 陈晓亮 Online user task distribution system and method thereof
CN103995771A (en) * 2014-05-30 2014-08-20 北京安兔兔科技有限公司 Task progress display method and system
CN104616098A (en) * 2014-12-31 2015-05-13 国网山东省电力公司青岛供电公司 Task management method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1700652A (en) * 2005-06-01 2005-11-23 合肥工业大学 Collaborative design method based on collaborative template
CN102246191A (en) * 2008-12-15 2011-11-16 Itt制造企业公司 Project timeline visualization methods and systems
CN102497442A (en) * 2011-12-22 2012-06-13 陈晓亮 Online user task distribution system and method thereof
CN103995771A (en) * 2014-05-30 2014-08-20 北京安兔兔科技有限公司 Task progress display method and system
CN104616098A (en) * 2014-12-31 2015-05-13 国网山东省电力公司青岛供电公司 Task management method and system

Similar Documents

Publication Publication Date Title
CN104125087B (en) A kind of alarm information processing method and device
CN107368967A (en) Engineering safety quality inspection intelligent management based on internet
CN105227364B (en) A kind of method and device of ERP system resource-sharing
CN102724138A (en) Information sharing method and device for instant messaging
CN101763842A (en) Spliced wall body allocation system and position mapping method for establishing display units
CN105204798B (en) Combination windowing method and device
DE102005008745A1 (en) Audio / video component networking system and method
CN102693651A (en) Self-service network teaching system
CN104601367A (en) AD domain based virtual desktop management method
CN105490842B (en) A kind of method based on the dialogue of MVVM model management in online service system
CN105761058A (en) Multi-type task control method and device in plan management
CN109063576A (en) Management method and device for flight movement node
CN105488658A (en) Wechat based method and system for quickly instructing field potential safety hazard by management leader
CN104933495A (en) Work task assessment system on Android-based mobile terminal
CN106448779A (en) Method and device for gang controlling screen of master control room of nuclear electrical power plant
CN109144562B (en) A kind of smart code publication alarm method based on zookeeper
CN106790347A (en) A kind of large-scale concurrent data forwarding method based on netty
CN106897071A (en) A kind of API extracting methods and system
CN105809411A (en) Plan controlling method and apparatus
CN104363305B (en) A kind of community management and service system based on mobile terminal
CN111030843A (en) M equipment online configuration method and device
CN104468788A (en) Multi-net and multi-terminal data synchronization method
CN103825769A (en) Network operation and maintenance management method and device
CN105740180B (en) The virtual machine cut-in method and device of USB device
CN102263930A (en) Method and device for broadcasting multiple pictures in video conference

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160727

RJ01 Rejection of invention patent application after publication