CN105637934A - Carrier aggregation method, related equipment and system - Google Patents

Carrier aggregation method, related equipment and system Download PDF

Info

Publication number
CN105637934A
CN105637934A CN201480033899.5A CN201480033899A CN105637934A CN 105637934 A CN105637934 A CN 105637934A CN 201480033899 A CN201480033899 A CN 201480033899A CN 105637934 A CN105637934 A CN 105637934A
Authority
CN
China
Prior art keywords
base station
carrying
message
core network
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201480033899.5A
Other languages
Chinese (zh)
Inventor
戴明增
郭轶
曾清海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN105637934A publication Critical patent/CN105637934A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/24Reselection being triggered by specific parameters

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Provided are a carrier aggregation (CA) method, related equipment and system. The CA method comprises: a first base station receives indication information transmitted by a second base station; and the first base station transmits a radio resource connection (RRC) reconfiguration message to a terminal, the RRC reconfiguration message being used to instruct the terminal to delete at least one configuration borne by the terminal with respect to the second base station. In an embodiment of the present invention, if a general packet radio system tunneling protocol (GTP) error is borne by the second base station, all of the bearers of the first base station and the second base station are not necessarily released, and only a bearer with a GTP error of the second base station is released, or only a bearer of the second base station is released, thus avoiding a link interruption between the base station and the terminal, and reducing the amount of control signaling data in the process of releasing and re-establishing a bearer, thereby improving user data transmission efficiency, and improving user experience.

Description

A kind of carrier polymerizing method, relevant device and system Technical field
The present invention relates to communication technical field, more particularly to a kind of carrier polymerizing method, relevant device and system.
Background technology
With the development of GSM, the service quality more and more higher that system can be provided.To keep 3GPP long term competitive advantage, LTE Release-12 standard formulation work is carried out.One key property of Release-12 versions is to support the carrier aggregation (CA between base station, Carrier Aggregation), that is user equipment (User Equipment, UE) it can be communicated simultaneously using the multiple cells for belonging to multiple base stations, so as to support high speed data transfer, UE hardware circuit solution is improved.Current discussion problem of this feature in standard is dual link (DC, Dual Connectivity for LTE) or cell enhancing (SCE, Small Cell Enhancement).
For a UE, in this multiple serving BS, one of them is master base station (MeNB, Master eNB), and other are prothetic group station (SeNB, Secondary eNB).Master base station and prothetic group station can all carry out data transmission with UE, both main difference is that, master base station undertakes more control functions, such as has S1-MME connections between master base station and MME, all S1-MME signaling terminating is in MeNB, that is, being related to the interaction of signaling between MME has master base station to be responsible for completion;In addition, the control signaling (RRC information) that master base station is responsible for air interface UE between is interacted, if prothetic group station needs the RRC configuration parameters at modification prothetic group station, master base station must be asked, via master base station eat dishes without rice or wine change.
It can be divided into three kinds for bearer types:One kind is:MCG (Master Cell Group, main plot group) is carried, and the data of the carrying are directly transmitted by MeNB between UE and gateway SGW;It is for second:SCG (Secondary Cell Group, secondary cell group) is carried, and the data of the carrying are transmitted by SeNB between UE and SGW;The third is:Split Bearers, shunting carrying, the data of the carrying between MeNB and SeNB and UE simultaneously by transmitting, and transmitted between MeNB and SGW.For example:For downlink data, downlink data first reaches MeNB by S1-U, and MeNB determines shunting partial data and is transferred to SeNB by X2-U, and the partial data is handed down to UE by SeNB.Data on current SGW and eNB S1-U, MeNB and SeNB X2-U interfaces are transmitted by GTP (General Packet Radio System Tunnelling Protocol, General Packet Radio System tunnel protocol).Each The up or downlink data of carrying has single GTP tunnel, is distinguished by TEID (Tunnel Endpoint IDentifier r, Tunnel End Point Identifier).
According to 3GPP TS 23.007 regulation, MeNB and SeNB have S1-U to be connected between SGW, i.e. MCG carryings and SCG carryings.But SGW will not recognize bearer types (MCG or SCG carryings), i.e., carrier aggregation technology is transparent to SGW between base station.When SeNB or MeNB detect the GTP mistakes that a SCG is carried, GTP Error Indication (instruction of GTP mistakes) are sent to SGW, SGW will not only delete involved carrying, but delete and be carried on all TEID of interior all UE comprising MCG, and downlink data notification message (Downlink Data Notification) is sent to MME, style of writing release flow on MME triggerings UE, and attempt to rebuild to UE, that is, beep-page message is sent to UE.Subject matter caused by prior art is, when no matter GTP mistakes occur for any one carrying in MCG carryings or SCG carryings, will all to cause the Connection Release of all carryings and UE, will have a strong impact on Consumer's Experience.
The content of the invention
The invention provides a kind of carrier polymerizing method, relevant device and system.
First aspect of the embodiment of the present invention provides a kind of carrier polymerizing method, including:
First base station receives the configured information that the second base station is sent, and the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
The first base station sends Radio Resource connection reallocation message to terminal, and the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
With reference to the embodiment of the present invention in a first aspect, in the first implementation of the first aspect of the embodiment of the present invention,
The configured information be additionally operable to be released on request second base station at least one because the carrying of the GTP mistakes between second base station and the gateway is switched over.
With reference to the embodiment of the present invention first aspect and the embodiment of the present invention first aspect the first implementation, in second of implementation of the first aspect of the embodiment of the present invention,
The configured information includes carrying cause value, and the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway.
With reference to the embodiment of the present invention first aspect to the embodiment of the present invention second of first aspect realization In any one of mode, the third implementation of the first aspect of the embodiment of the present invention,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data.
With reference to the first implementation of the first aspect of the embodiment of the present invention, in the 4th kind of implementation of the first aspect of the embodiment of the present invention,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement.
With reference to the embodiment of the present invention in a first aspect, in the 5th kind of implementation of the first aspect of the embodiment of the present invention,
The first base station receives the mapping table that second base station is sent, and the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
The first base station receives the carrying mark that second base station is sent;
The configured information is additionally operable to the main plot group carrying for asking the second target being released on second base station carrying to switch in the first base station, and it is corresponding with the carrying mark that second target is carried through the mapping table;
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station.
With reference to the 5th kind of implementation of the first aspect of the embodiment of the present invention, in the 6th kind of implementation of the first aspect of the embodiment of the present invention,
The carrying and signal intensity that the first object is carried as on the carrying of secondary cell group and the 3rd target carrying on the 3rd base station, the 3rd base station meet preset requirement.
With reference to the embodiment of the present invention in a first aspect, in the 7th kind of implementation of the first aspect of the embodiment of the present invention,
The first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
First bearing modification instruction message is sent to equipment of the core network by the first base station, and first bearing modification indicates that message is used to indicate that the equipment of the core network cuts the secondary cell group carrying on second base station The main plot group carrying shifted in the first base station.
With reference to the third implementation of the first aspect of the embodiment of the present invention, in the 8th kind of implementation of the first aspect of the embodiment of the present invention,
The first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
Second bearing modification instruction message is sent to the equipment of the core network by the first base station, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
With reference to the 4th kind of implementation of the first aspect of the embodiment of the present invention, in the 9th kind of implementation of the first aspect of the embodiment of the present invention,
The first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
3rd bearing modification instruction message is sent to the equipment of the core network by the first base station, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
With reference to the 5th kind of implementation of the first aspect of the embodiment of the present invention, in the tenth kind of implementation of the first aspect of the embodiment of the present invention,
The first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
4th bearing modification instruction message is sent to the equipment of the core network by the first base station, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
Or,
5th bearing modification instruction message is sent to the equipment of the core network by the first base station, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
With reference to the 6th kind of implementation of the first aspect of the embodiment of the present invention, in a kind of the tenth implementation of the first aspect of the embodiment of the present invention,
The first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
6th bearing modification instruction message is sent to the equipment of the core network by the first base station, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
Second aspect of the embodiment of the present invention provides a kind of carrier polymerizing method, including:
Detect that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station in the second base station;
If so, then second base station discharges at least one carrying for the GTP mistakes between second base station and the gateway occur;
Configured information is sent to first base station by second base station, and the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
With reference to inventive embodiments second aspect, in the first implementation of the second aspect of the embodiment of the present invention,
The configured information be additionally operable to be released on request second base station at least one because the carrying of the GTP mistakes between second base station and the gateway is switched over, so that the main plot group carrying that the secondary cell group carrying on the second base station is switched in first base station, or, carrying and signal intensity on the secondary cell group carrying that secondary cell group carrying on second base station is switched on the 3rd base station, the 3rd base station meet preset requirement.
With reference to second aspect of the embodiment of the present invention or the first implementation of inventive embodiments second aspect, in second of implementation of the second aspect of the embodiment of the present invention,
The configured information includes carrying cause value, and the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway.
With reference to second aspect of the embodiment of the present invention, in the third implementation of the second aspect of the embodiment of the present invention,
Methods described also includes:
Mapping table is sent to the first base station by second base station, and the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
The carrying mark is sent to first base station by second base station, so that the first base station determines the carrying for the GTP mistakes between second base station and the gateway occur.
The third aspect of the embodiment of the present invention provides a kind of carrier polymerizing method, including:
Terminal receives the Radio Resource connection reallocation message that first base station is sent, and the Radio Resource connection is matched somebody with somebody again Message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion;
The terminal connects reallocation message according to the Radio Resource deletes on second base station at least one and is carried on the configuration in the terminal.
With reference to the third aspect of the embodiment of the present invention, in the first implementation of the third aspect of the embodiment of the present invention,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;Methods described also includes:
The terminal sends data by the main plot group carrying in first base station.
With reference to the third aspect of the embodiment of the present invention, in second of implementation of the third aspect of the embodiment of the present invention,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement;Methods described also includes:
The terminal sends data by the secondary cell group carrying on the 3rd base station.
With reference to the third aspect of the embodiment of the present invention, in the third implementation of the third aspect of the embodiment of the present invention,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;Methods described also includes:
The terminal sends data by the main plot group carrying and the 3rd target carrying in the first base station.
With reference to the third aspect of the embodiment of the present invention, in the 4th kind of implementation of the third aspect of the embodiment of the present invention,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;Methods described also includes:
The terminal sends data by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
Fourth aspect of the embodiment of the present invention provides a kind of carrier polymerizing method, including:
Equipment of the core network receives the carrying instruction message that first base station is sent, and the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
The equipment of the core network indicates that message carries out corresponding carrying and switched according to the carrying.
With reference to fourth aspect of the embodiment of the present invention, in the first implementation of the fourth aspect of the embodiment of the present invention,
The carrying indicates that message is that the first bearing modification indicates message, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;
The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
The equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
With reference to fourth aspect of the embodiment of the present invention, in second of implementation of the fourth aspect of the embodiment of the present invention,
The carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
The secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
With reference to fourth aspect of the embodiment of the present invention, in the third implementation of the fourth aspect of the embodiment of the present invention,
The carrying indicates that message is that the 3rd bearing modification indicates message, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;
The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
The secondary cell group discharged carrying is established as on the 3rd base station by the equipment of the core network Secondary cell group is carried.
With reference to fourth aspect of the embodiment of the present invention, in the 4th kind of implementation of the fourth aspect of the embodiment of the present invention,
The carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
The equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
Or,
The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
Second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
With reference to fourth aspect of the embodiment of the present invention, in the 5th kind of implementation of the fourth aspect of the embodiment of the present invention,
The carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;
The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
The equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
The aspect of the embodiment of the present invention the 5th provides a kind of first base station, including:
First receiving unit, for receiving the configured information that the second base station is sent, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
First transmitting element, for sending Radio Resource connection reallocation message to terminal, the Radio Resource connects Connecing reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
In terms of the embodiment of the present invention the 5th, in the first implementation of the 5th aspect of the embodiment of the present invention,
The first base station also includes:
Second receiving unit, for receiving the mapping table that second base station is sent, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
3rd receiving unit, for receiving the carrying mark that second base station is sent.
In terms of the embodiment of the present invention the 5th, in second of implementation of the 5th aspect of the embodiment of the present invention,
The first base station also includes:
Second transmitting element, for the first bearing modification instruction message to be sent into equipment of the core network, first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
In terms of the embodiment of the present invention the 5th, in the third implementation of the 5th aspect of the embodiment of the present invention,
The first base station also includes:
3rd transmitting element, for the second bearing modification instruction message to be sent into the equipment of the core network, second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
In terms of the embodiment of the present invention the 5th, in the 4th kind of implementation of the 5th aspect of the embodiment of the present invention,
The first base station also includes:
4th transmitting element, for the 3rd bearing modification instruction message to be sent into the equipment of the core network, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
In terms of the embodiment of the present invention the 5th, in the 5th kind of implementation of the 5th aspect of the embodiment of the present invention,
The first base station also includes:
5th transmitting element, for the 4th bearing modification instruction message to be sent into the equipment of the core network, the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
Or,
6th transmitting element, for the 5th bearing modification instruction message to be sent into the equipment of the core network, the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
In terms of the embodiment of the present invention the 5th, in the 6th kind of implementation of the 5th aspect of the embodiment of the present invention,
The first base station also includes:
7th transmitting element, for the 6th bearing modification instruction message to be sent into the equipment of the core network, the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
The aspect of the embodiment of the present invention the 6th provides a kind of second base station, including:
Detection unit, for detecting that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
Releasing unit, if the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs at least one carrying on second base station, at least one carrying for the GTP mistakes between second base station and the gateway occur is discharged;
8th transmitting element, for configured information to be sent into first base station, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
In terms of the embodiment of the present invention the 6th, in the first implementation of the aspect of the embodiment of the present invention the 6th,
Second base station also includes:
9th send unit, and for mapping table to be sent into the first base station, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
Tenth transmitting element, for the carrying mark to be sent into first base station, so that the first base station determines the carrying for the GTP mistakes between second base station and the gateway occur.
The aspect of the embodiment of the present invention the 7th provides a kind of terminal, including:
4th receiving unit, connects reallocation message, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion for receiving the Radio Resource of first base station transmission;
Unit is deleted, deleting on second base station at least one for connecting reallocation message according to the Radio Resource is carried on the configuration in the terminal.
In terms of the embodiment of the present invention the 7th, in the first implementation of the aspect of the embodiment of the present invention the 7th,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;The terminal also includes:
11st transmitting element, for sending data by the main plot group carrying in first base station.
In terms of the embodiment of the present invention the 7th, in second of implementation of the aspect of the embodiment of the present invention the 7th,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement;The terminal also includes:
12nd transmitting element, for sending data by the secondary cell group carrying on the 3rd base station.
In terms of the embodiment of the present invention the 7th, in the third implementation of the aspect of the embodiment of the present invention the 7th,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The terminal also includes:
13rd transmitting element, for sending data by the main plot group carrying and the 3rd target carrying in the first base station.
In terms of the embodiment of the present invention the 7th, in the 4th kind of implementation of the aspect of the embodiment of the present invention the 7th,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The terminal also includes:
14th transmitting element, for sending data by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
Eighth aspect of the embodiment of the present invention provides a kind of equipment of the core network, including:
5th receiving unit, the carrying for receiving first base station transmission indicates message, and the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
Switch unit, for indicating that message carries out corresponding carrying and switched according to the carrying.
With reference to eighth aspect of the embodiment of the present invention, in the first implementation of eighth aspect of the embodiment of the present invention,
The carrying indicates that message is that the first bearing modification indicates message, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;The switch unit is additionally operable to the main plot group carrying for switching to the secondary cell group carrying on second base station in the first base station.
With reference to eighth aspect of the embodiment of the present invention, in second of implementation of eighth aspect of the embodiment of the present invention,
The carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The switch unit is additionally operable to carry the secondary cell group discharged the main plot group carrying being established as in the first base station.
With reference to eighth aspect of the embodiment of the present invention, in the third implementation of eighth aspect of the embodiment of the present invention,
The carrying indicates that message is that the 3rd bearing modification indicates message, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;The switch unit is additionally operable to carry the secondary cell group discharged the secondary cell group carrying being established as on the 3rd base station.
With reference to eighth aspect of the embodiment of the present invention, the 4th kind of implementation of eighth aspect of the embodiment of the present invention In,
The carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;The switch unit is additionally operable to the main plot group carrying for switching to second target carrying on second base station in the first base station;
Or,
The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The switch unit is additionally operable to carry second target discharged the main plot group carrying being established as in the first base station on second base station.
With reference to eighth aspect of the embodiment of the present invention, in the 5th kind of implementation of eighth aspect of the embodiment of the present invention,
The carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;The switch unit is additionally operable to the secondary cell group carrying for switching to second target carrying on second base station on the 3rd base station.
The aspect of the embodiment of the present invention the 9th provides a kind of system,
The second base station being connected including first base station, with the first base station, the terminal being connected with the first base station and second base station and the equipment of the core network being connected respectively with the first base station, second base station and the terminal;
The first base station in terms of the embodiment of the present invention the 5th to as described in the 6th kind of any one of implementation in terms of the 5th of the embodiment of the present invention;
Second base station is as described in the first implementation in terms of the embodiment of the present invention the 6th or in terms of the embodiment of the present invention the 6th;
The terminal as in terms of the embodiment of the present invention the 7th to any one of the 4th kind of implementation in terms of the embodiment of the present invention the 7th;
The equipment of the core network is as described in the 5th kind of any one of implementation of eighth aspect of the embodiment of the present invention to eighth aspect of the embodiment of the present invention;
The aspect of the embodiment of the present invention the tenth provides a kind of first base station,
Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
The central processing unit performs following operation:
The configured information of the second base station transmission is received, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
Radio Resource connection reallocation message is sent to terminal, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
In terms of the embodiment of the present invention the tenth, in the first implementation of the aspect of the embodiment of the present invention the tenth,
The central processing unit performs following operation:
The mapping table that second base station is sent is received, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
Receive the carrying mark that second base station is sent.
With reference to the first implementation of the aspect of the embodiment of the present invention the tenth, in second of implementation of the aspect of the embodiment of the present invention the tenth,
The central processing unit performs following operation:
First bearing modification instruction message is sent to equipment of the core network, first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
With reference to the first implementation of the aspect of the embodiment of the present invention the tenth, in the third implementation of the aspect of the embodiment of the present invention the tenth,
The central processing unit performs following operation:
Second bearing modification instruction message is sent to the equipment of the core network, second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
With reference to the first implementation of the aspect of the embodiment of the present invention the tenth, in the 4th kind of implementation of the aspect of the embodiment of the present invention the tenth,
The central processing unit performs following operation:
3rd bearing modification instruction message is sent to the equipment of the core network, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
With reference to the first implementation of the aspect of the embodiment of the present invention the tenth, in the 5th kind of implementation of the aspect of the embodiment of the present invention the tenth,
The central processing unit performs following operation:
4th bearing modification instruction message is sent to the equipment of the core network, the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
Or,
5th bearing modification instruction message is sent to the equipment of the core network, the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
With reference to the first implementation of the aspect of the embodiment of the present invention the tenth, in the 6th kind of implementation of the aspect of the embodiment of the present invention the tenth,
The central processing unit performs following operation:
6th bearing modification instruction message is sent to the equipment of the core network, the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
The one side of the embodiment of the present invention the tenth provides a kind of second base station, including:
Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
The central processing unit performs following operation:
Detect that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
If the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs at least one carrying on second base station, at least one carrying for the GTP mistakes between second base station and the gateway occur is discharged;
Configured information is sent to first base station, the configured information is used to indicate that at least one carrying to be due to the General Packet Radio System tunnel protocol GTP between second base station and gateway on second base station Mistake and be released.
With reference to the embodiment of the present invention the tenth on the one hand, in the first implementation of the one side of the embodiment of the present invention the tenth,
The central processing unit performs following operation:
Mapping table is sent to the first base station, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
The carrying mark is sent to first base station, so that the first base station determines the carrying for the GTP mistakes between second base station and the gateway occur.
The aspect of the embodiment of the present invention the 12nd provides a kind of terminal, including:
Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
The central processing unit performs following operation:
The Radio Resource connection reallocation message that first base station is sent is received, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion;
Reallocation message is connected according to the Radio Resource delete on second base station at least one and be carried on the configuration in the terminal.
In terms of the embodiment of the present invention the 12nd, in the first implementation of the aspect of the embodiment of the present invention the 12nd,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;The central processing unit performs following operation:
Data are sent by the main plot group carrying in first base station.
In terms of the embodiment of the present invention the 12nd, in second of implementation of the aspect of the embodiment of the present invention the 12nd,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the secondary cell group carrying that the terminal is used to send on the 3rd base station of data;The central processing unit performs following operation:
Data are sent by the secondary cell group carrying on the 3rd base station.
With reference to the aspect of the embodiment of the present invention the 12nd, the third realization side of the aspect of the embodiment of the present invention the 12nd In formula,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The central processing unit performs following operation:
Data are sent by the main plot group carrying and the 3rd target carrying in the first base station.
In terms of the embodiment of the present invention the 12nd, in the 4th kind of implementation of the aspect of the embodiment of the present invention the 12nd,
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The central processing unit performs following operation:
Data are sent by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
The aspect of the embodiment of the present invention the 13rd provides a kind of equipment of the core network, including:
Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
The central processing unit performs following operation:
The carrying instruction message that first base station is sent is received, the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
Indicate that message carries out corresponding carrying switching according to the carrying.
In terms of the embodiment of the present invention the 13rd, in the first implementation of the aspect of the embodiment of the present invention the 13rd,
The carrying indicates that message is that the first bearing modification indicates message, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;The central processing unit performs following operation:
The main plot group carrying that secondary cell group carrying on second base station is switched in the first base station.
In terms of the embodiment of the present invention the 13rd, in second of implementation of the aspect of the embodiment of the present invention the 13rd,
The carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates message Carried for indicating that the equipment of the core network carries the secondary cell group discharged the main plot group being established as in the first base station;The central processing unit performs following operation:
The secondary cell group discharged is carried to the main plot group carrying being established as in the first base station.
In terms of the embodiment of the present invention the 13rd, in the third implementation of the aspect of the embodiment of the present invention the 13rd,
The carrying indicates that message is that the 3rd bearing modification indicates message, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;The central processing unit performs following operation:
The secondary cell group discharged is carried to the secondary cell group carrying being established as on the 3rd base station.
In terms of the embodiment of the present invention the 13rd, in the 4th kind of implementation of the aspect of the embodiment of the present invention the 13rd,
The carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;The central processing unit performs following operation:
The main plot group carrying that second target carrying on second base station is switched in the first base station;
Or,
The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The central processing unit performs following operation:
Second target discharged on second base station is carried to the main plot group carrying being established as in the first base station.
In terms of the embodiment of the present invention the 13rd, in the 5th kind of implementation of the aspect of the embodiment of the present invention the 13rd,
The carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;The central processing unit performs following operation:
The secondary cell group carrying that second target carrying on second base station is switched on the 3rd base station.
The invention provides a kind of carrier polymerizing method, relevant device and system.The carrier polymerizing method includes:First base station receives the configured information that the second base station is sent, and the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;The first base station sends Radio Resource connection reallocation message to terminal, and the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.Pass through the embodiment of the present invention, if during so that there is the carrying of GTP mistakes on second base station, all carryings in the first base station and on second base station need not all be discharged, and simply discharge and occur the carrying of GTP mistakes on second base station or only discharge carrying on the second base station, and all configurations of the first base station and second base station in the terminal need not be deleted, so as to avoid the interruption of link between base station and terminal, reduce releasing bearing and re-establish the data of control signaling in load bearing process, improve the efficiency of user data transmission, improve user experience.
Brief description of the drawings
A kind of preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 1 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 2 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 3 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 4 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 5 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 6 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 7 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 8 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Fig. 9 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Figure 10 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Figure 11 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Figure 12 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Figure 13 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Figure 14 is provided by the embodiment of the present invention;
Another preferred embodiment flow chart of steps for the carrier polymerizing method that Figure 15 is provided by the embodiment of the present invention;
A kind of preferred embodiment structural representation for the first base station that Figure 16 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the first base station that Figure 17 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the first base station that Figure 18 is provided by the embodiment of the present invention;
A kind of preferred embodiment structural representation for the second base station that Figure 19 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the second base station that Figure 20 is provided by the embodiment of the present invention;
A kind of preferred embodiment structural representation for the terminal that Figure 21 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the terminal that Figure 22 is provided by the embodiment of the present invention;
A kind of preferred embodiment structural representation for the equipment of the core network that Figure 23 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the equipment of the core network that Figure 24 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the first base station that Figure 25 is provided by the embodiment of the present invention Figure;
Another preferred embodiment structural representation for the second base station that Figure 26 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the terminal that Figure 27 is provided by the embodiment of the present invention;
Another preferred embodiment structural representation for the equipment of the core network that Figure 28 is provided by the embodiment of the present invention.
Embodiment
Below in conjunction with shown in Fig. 1 to being described in detail the invention provides a kind of carrier polymerizing method:
101st, first base station receives the configured information that the second base station is sent;
The present embodiment is using first base station as master base station (MeNB, Master eNB), it is illustrated supplemented by second base station exemplified by base station (SeNB, Secondary eNB), and the present embodiment is not construed as limiting to the particular number of second base station.
The configured information generates for second base station, even described second base station detects on second base station at least one carrying due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway, GTP mistakes are not sent to gateway to indicate, but correspondence generation is used to indicate the configured information that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station, and second base station is sent to first base station by X2 interface.
The first base station determines that at least one carrying is released on the second base station according to the configured information received.
Wherein, the present embodiment the reason at least one carrying is released on second base station to being not construed as limiting, such as at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on described second base station.
102nd, the first base station sends Radio Resource connection reallocation message to terminal;
The present embodiment is not construed as limiting to the configured information, has at least one carrying to be released on second base station as long as the first base station can determine according to the configured information.
The first base station generates the Radio Resource according to the configured information correspondence having been received by and connects reallocation message, and the Radio Resource connection reallocation message is used to indicate the second base station described in the terminal deletion At least one is carried on the configuration in the terminal.
The Radio Resource generated connection reallocation message is sent to terminal by the first base station, is deleted on second base station at least one so that the terminal connects reallocation message correspondence according to the Radio Resource and is carried on the configuration in the terminal.
In the present embodiment, if the second base station detects on second base station at least one carrying due to the GTP mistakes between second base station and gateway, first base station is then notified by the configured information, so that the first base station is that can determine that at least one carrying is released on the second base station according to the configured information, the first base station is according to the situation correspondence generation Radio Resource connection reallocation message that release is carried on second base station, so that terminal connects the release that reallocation message carries out corresponding configuration according to the Radio Resource, so as to avoid the configuration being carried in terminal for not occurring the GTP mistakes described in terminal deletion in first base station, and avoid re-establishing user's context between first base station and terminal, improve the experience of user.
Even if during to ensure that the carrying on the second base station is released because of the GTP mistakes, the transmission of terminal data is not interfered with, even if then the present invention has effectively ensured that the carrying on the second base station is released by following examples, the normal transmission of user data is not interfered with then yet, need it is clear that, following embodiments illustrate for citing, are not construed as limiting, as long as core net will not be discharged all carryings and UE connections.
The first is shown in Figure 2;
201st, first base station receives the configured information that the second base station is sent;
In the present embodiment, second base station detects the GTP mistakes between at least one described second base station of carrying appearance and gateway on second base station, but the GTP mistakes are indicated to gateway by second base station not by S1-U, but correspondence generates the configured information.
The first base station determines that at least one carrying is released on the second base station according to the configured information received.
Wherein, the present embodiment the reason at least one carrying is released on second base station to being not construed as limiting, such as at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on described second base station.
Wherein, the present embodiment is not construed as limiting to the configured information, for example, the information that the configured information can be newly defined for the second base station, and second base station and the first base station configured information of making an appointment may indicate that described GTP mistakes occurs at least one carrying on second base station;
Further for example, the configured information, which is SeNB modifications, requires that (SeNB Modification Required) disappears Breath, SeNB modifications require that message is used for second base station and indicates the switching that the first base station is carried, in the present embodiment, SeNB modifications require that message can indicate the main plot group carrying that the secondary cell group carrying on second base station is switched in the first base station for second base station.
Preferably, SeNB modifications described in the present embodiment require that message also carries the instruction of GTP mistakes, so that second base station informs that the GTP mistakes occurs at least one carrying on the second base station described in the first base station.
Also for example, the configured information can be X2 mouthfuls of reset (Reset) message, and second base station and the first base station configured information of making an appointment may indicate that on second base station that described GTP mistakes occurs at least one carrying, so that the instruction GTP mistakes that second base station is implied by the reset message occur on second base station.
Further for example, the configured information is SeNB releasing requests message (SeNB Release Required), the SeNB releasing requests message is used to ask to indicate that second base station discharges all secondary cell group carryings.
Preferably, the configured information of the present embodiment may also include carrying cause value, the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway, so that the first base station can determine that the carrying for the GTP mistakes specifically occur.
Specifically, the configured information is sent the configured information by second base station by the X2 interface between the first base station, and second base station is after the configured information is sent, then stop sending data by air interface, and prepare release the second base station at least one carrying, and/or terminal contextual information.
202nd, the first base station sends confirmation message to second base station;
In the present embodiment, the first base station is received after the configured information that the second base station is sent, if agreeing at least one carrying on release second base station, then the first base station generates the confirmation message, to notify at least one carrying described in second base station on the second base station to be agreed release by the confirmation message.
Preferably, data forwarding message can be included in the confirmation message, so that the upstream data and downlink data of second node B cache are forwarded to first base station by second base station by the data forwarding message, to prevent the interruption connected between base station and terminal.
Need it is clear that, the step 202 of the present embodiment be optional, in concrete application scene, second base station also can by the configured information send ask first base station agreement the second base station releasing bearing request.
203rd, the first base station determines that first object is carried according to the configured information;
The first object is carried as the carrying that the terminal is used to send data;
In the present embodiment, first base station first object according to determined by the configured information is carried as the main plot group carrying in first base station.
204th, the first base station determines that (RRC Connection Reconfiguration) message is matched somebody with somebody in Radio Resource connection again according to first object carrying;
In the present embodiment, it is that can determine that the main plot group carrying that the secondary cell group carrying at least one described second base station need to be switched in the first base station that terminal connects reallocation message according to the Radio Resource.
205th, Radio Resource connection reallocation message is sent to terminal by the first base station;
Radio Resource connection reallocation message is sent to after terminal by the first base station, and the terminal connects reallocation message according to the Radio Resource deletes on second base station at least one and be carried on the configuration in the terminal.
Because in the present embodiment, second base station is discharged at least one carrying on second base station, then the terminal, which connects reallocation message according to the Radio Resource and can delete on second base station at least one, is carried on the configuration in the terminal.
206th, the response message that the first base station receiving terminal is sent;
The terminal connects reallocation message according to the Radio Resource and carried out after corresponding configuration deletion, then terminal-pair should generate response message, to inform that terminal deletion configuration is completed described in the first base station by the response message.
207th, the first base station indicates message according to configured information correspondence the first bearing modification of generation;
The first base station is after the response message is received, then the first base station indicates message according to configured information correspondence the first bearing modification of generation, and the first bearing modification described in the present embodiment indicates that message can be E-RAB Modification Indication (bearing modification instruction) message.
208th, first bearing modification generated instruction message is sent to equipment of the core network by the first base station;
Wherein, the equipment of the core network shown in the present embodiment is mobility management entity MME and gateway (serving gateway, SGW), or for realizing the MME and the SGW functions network element.
In the present embodiment, the equipment of the core network is being received after first bearing modification indicates message, you can carried out in corresponding path switching, the present embodiment, and the equipment of the core network is by the secondary cell on the second base station The main plot group carrying that group carrying is switched in the first base station, so that the data occurred in the carrying of GTP mistakes will not disappear in handoff procedure, and the data in the carryings of GTP mistakes occur transmission is proceeded by the main plot group carrying in the first base station, to ensure the normal transmission of user data, the equipment of the core network is avoided to be released all carryings in first base station and the second base station because of the GTP mistakes, also the terminal can be avoided to be deleted all configurations corresponding with carrying in terminal, effectively reduce the equipment of the core network and re-establish the control signaling quantity transmitted by carrying, lift the efficiency and Consumer's Experience of data transfer.
Second shown in Figure 3;
301st, first base station receives the configured information that the second base station is sent;
In the present embodiment, second base station detects the GTP mistakes between at least one described second base station of carrying appearance and gateway on second base station, but the GTP mistakes are indicated to gateway by second base station not by S1-U, but correspondence generates the configured information.
The first base station determines that at least one carrying is released on the second base station according to the configured information received.
Wherein, the present embodiment the reason at least one carrying is released on second base station to being not construed as limiting, such as at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on described second base station.
Wherein, the present embodiment is not construed as limiting to the configured information, for example, the information that the configured information can be newly defined for the second base station, and second base station and the first base station configured information of making an appointment may indicate that described GTP mistakes occurs at least one carrying on second base station;
Also for example, the configured information is that SeNB modifications require (SeNB Modification Required) message, SeNB modifications require the secondary cell group carrying that message is used on second base station requests release, second base station, and set up the secondary cell group carrying on second base station discharged to the main plot group carrying in the first base station, and SeNB modifications described in the present embodiment require that message also carries the instruction of GTP mistakes, so that second base station informs that the GTP mistakes occurs at least one carrying on the second base station described in the first base station.
Also for example, the configured information can be X2 mouthfuls of reset (Reset) message, and second base station and the first base station configured information of making an appointment may indicate that on second base station that described GTP mistakes occurs at least one carrying, so as to pass through the reset message implicit instruction GTP wrong for second base station Occur by mistake on second base station.
Further for example, the configured information is SeNB releasing requests message (SeNB Release Required), the SeNB releasing requests message is used to ask to indicate that second base station discharges all secondary cell group carryings.
Preferably, the configured information of the present embodiment may also include carrying cause value, the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway, so that the first base station can determine that the carrying for the GTP mistakes specifically occur.
Specifically, the configured information is sent the configured information by second base station by the X2 interface between the first base station, and second base station is after the configured information is sent, then stop sending data by air interface, and prepare the contextual information of at least one carrying on the second base station of release and/or terminal.
302nd, the first base station sends confirmation message to second base station;
In the present embodiment, the first base station is received after the configured information that the second base station is sent, if agreeing at least one carrying on release second base station, then the first base station generates the confirmation message, to notify at least one carrying described in second base station on the second base station to be agreed release by the confirmation message.
Preferably, data forwarding message can be included in the confirmation message, so that the upstream data and downlink data of second node B cache are forwarded to first base station by second base station by the data forwarding message, to prevent the interruption connected between base station and terminal.
Need it is clear that, the step 302 of the present embodiment be optional, in concrete application scene, second base station also can by the configured information send ask first base station agreement the second base station releasing bearing request.
303rd, the first base station determines that first object is carried according to the configured information;
The first object is carried as the carrying that the terminal is used to send data;
In the present embodiment, first base station first object according to determined by the configured information is carried as the main plot group carrying in first base station.
304th, the first base station determines that (RRC Connection Reconfiguration) message is matched somebody with somebody in Radio Resource connection again according to first object carrying;
In the present embodiment, it is that can determine that the main plot group carrying that the secondary cell group carrying at least one described second base station need to be switched in the first base station that terminal connects reallocation message according to the Radio Resource.
305th, Radio Resource connection reallocation message is sent to terminal by the first base station;
Radio Resource connection reallocation message is sent to after terminal by the first base station, and the terminal connects reallocation message according to the Radio Resource deletes on second base station at least one and be carried on the configuration in the terminal.
Because in the present embodiment, second base station is discharged at least one carrying on second base station, then the terminal, which connects reallocation message according to the Radio Resource and can delete on second base station at least one, is carried on the configuration in the terminal.
306th, the response message that the first base station receiving terminal is sent;
The terminal connects reallocation message according to the Radio Resource and carried out after corresponding configuration deletion, then terminal-pair should generate response message, to inform that terminal deletion configuration is completed described in the first base station by the response message.
307th, the first base station indicates message according to configured information correspondence the second bearing modification of generation;
The first base station is after the response message is received, then the first base station indicates message according to configured information correspondence the second bearing modification of generation, and the second bearing modification described in the present embodiment indicates that message can be E-RAB Modification Indication (bearing modification instruction) message.
308th, second bearing modification generated instruction message is sent to equipment of the core network by the first base station;
Wherein, the equipment of the core network shown in the present embodiment is mobility management entity MME and gateway (serving gateway, SGW), or for realizing the MME and the SGW functions network element.
In the present embodiment, the equipment of the core network is after the second bearing modification instruction message is received, corresponding path switching can be carried out, in the present embodiment, secondary cell group carrying on second base station discharged is set up to the main plot group in the first base station and carried by the equipment of the core network, to ensure the normal transmission of user data, the equipment of the core network is avoided to be released all carryings in first base station and the second base station because of the GTP mistakes, also the terminal can be avoided to be deleted all configurations corresponding with carrying in terminal, effectively reduce the equipment of the core network and re-establish the control signaling quantity transmitted by carrying, lift the efficiency and Consumer's Experience of data transfer.
The third is shown in Figure 4;
401st, first base station receives the configured information that the second base station is sent;
In the present embodiment, second base station detects on second base station at least one carrying and GTP mistakes between described second base station and gateway occurs, but second base station not by S1-U by institute State GTP mistakes and be indicated to gateway, but correspondence generates the configured information.
The first base station determines that at least one carrying is released on the second base station according to the configured information received.
Wherein, the present embodiment the reason at least one carrying is released on second base station to being not construed as limiting, such as at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on described second base station.
Wherein, the present embodiment is not construed as limiting to the configured information, for example, the information that the configured information can be newly defined for the second base station, and second base station and the first base station configured information of making an appointment may indicate that described GTP mistakes occurs at least one carrying on second base station;
Also for example, the configured information is that SeNB modifications require (SeNB Modification Required) message, SeNB modifications require that message is used for second base station and indicates the switching that the first base station is carried, in the present embodiment, SeNB modifications require that message can indicate that the secondary cell group carrying on second base station switches over for second base station, and SeNB modifications described in the present embodiment require that message also carries the instruction of GTP mistakes, so that second base station informs that the GTP mistakes occurs at least one carrying on the second base station described in the first base station.
Also for example, the configured information can be X2 mouthfuls of reset (Reset) message, and second base station and the first base station configured information of making an appointment may indicate that on second base station that described GTP mistakes occurs at least one carrying, so that the instruction GTP mistakes that second base station is implied by the reset message occur on second base station.
Further for example, the configured information is SeNB releasing requests message (SeNB Release Required), the SeNB releasing requests message is used to ask to indicate that second base station discharges all secondary cell group carryings.
Preferably, the configured information of the present embodiment may also include carrying cause value, the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway, so that the first base station can determine that the carrying for the GTP mistakes specifically occur.
Specifically, the configured information is sent the configured information by second base station by the S1-U between the first base station, and second base station is after the configured information is sent, then stop sending data by air interface, and prepare the contextual information of at least one carrying on the second base station of release and/or terminal.
402nd, the first base station sends confirmation message to second base station;
In the present embodiment, the first base station is received after the configured information that the second base station is sent, if agreeing to release At least one carrying on second base station is put, then the first base station generates the confirmation message, to notify at least one carrying described in second base station on the second base station to be agreed release by the confirmation message.
Preferably, data forwarding message can be included in the confirmation message, so that the upstream data and downlink data of second node B cache are forwarded to first base station by second base station by the data forwarding message, to prevent the interruption connected between base station and terminal.
Need it is clear that, the step 202 of the present embodiment be optional, in concrete application scene, second base station also can by the configured information send ask first base station agreement the second base station releasing bearing request.
403rd, the first base station determines to meet the 3rd base station according to the configured information;
Wherein, on the 3rd base station carrying and signal intensity meets preset requirement, so that the 3rd base station for meeting the preparatory condition ensure that the normal transmission of user data.
404th, the first base station determines that the 3rd base station carries for first object;
The first object is carried as the carrying that the terminal is used to send data;
In the present embodiment, first base station first object according to determined by the configured information is carried as the secondary cell group carrying on the 3rd base station.
405th, the first base station determines that (RRC Connection Reconfiguration) message is matched somebody with somebody in Radio Resource connection again according to first object carrying;
In the present embodiment, it is that can determine that the main plot group carrying that the secondary cell group carrying at least one described second base station need to be switched in the first base station that terminal connects reallocation message according to the Radio Resource.
406th, Radio Resource connection reallocation message is sent to terminal by the first base station;
Radio Resource connection reallocation message is sent to after terminal by the first base station, and the terminal connects reallocation message according to the Radio Resource deletes on second base station at least one and be carried on the configuration in the terminal.
Because in the present embodiment, second base station is discharged at least one carrying on second base station, then the terminal, which connects reallocation message according to the Radio Resource and can delete on second base station at least one, is carried on the configuration in the terminal.
407th, the response message that the first base station receiving terminal is sent;
The terminal connects reallocation message according to the Radio Resource and carried out after corresponding configuration deletes, then terminal-pair should generate response message, be configured with terminal deletion described in informing the first base station by the response message Into.
408th, the first base station indicates message according to configured information correspondence the 3rd bearing modification of generation;
The first base station is after the response message is received, then the first base station indicates message according to configured information correspondence the 3rd bearing modification of generation, and the 3rd bearing modification described in the present embodiment indicates that message can be E-RAB Modification Indication (bearing modification instruction) message.
409th, the 3rd bearing modification generated instruction message is sent to equipment of the core network by the first base station;
In the present embodiment, the equipment of the core network is after the 3rd bearing modification instruction message is received, corresponding path switching can be carried out, in the present embodiment, the equipment of the core network carries the secondary cell group that the secondary cell group carrying on second base station is switched on the 3rd base station, so that the data occurred in the carrying of GTP mistakes will not disappear in handoff procedure, and the data in the carryings of GTP mistakes occur transmission is proceeded by the secondary cell group carrying on the 3rd base station, to ensure the normal transmission of user data, the equipment of the core network is avoided to be released all carryings in first base station and the second base station because of the GTP mistakes, also the terminal can be avoided to be deleted all configurations corresponding with carrying in terminal, effectively reduce the equipment of the core network and re-establish the control signaling quantity transmitted by carrying, lift the efficiency and Consumer's Experience of data transfer.
4th kind shown in Figure 5;
501st, the first base station receives the mapping table that second base station is sent;
In the present embodiment, mapping table is set up in second base station, and the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
Need it is clear that, mapping table described in the present embodiment can also set up each corresponding relation for carrying and identifying on second base station, and the present embodiment is illustrated so that the mapping table includes the corresponding relation that at least one carrying being released due to the GTP mistakes between second base station and the gateway is identified with carrying as an example.
The corresponding carrying mark of carrying that second base station determines the GTP mistakes between second base station and the gateway by the mapping table and is released, and the fixed carrying mark is sent to first base station by second base station.
Need it is clear that, the present embodiment to it is described carrying mark be not construed as limiting, it is described carrying mark can be sequence number, Field etc., also for example described carrying is designated Tunnel End Point Identifier (Tunnel Endpoint IDentifier, Tunnel End Point Identifier).
502nd, the first base station receives the carrying mark that second base station is sent;
The first base station is that can determine that on second base station corresponding with the carrying mark carrying of GTP mistakes occur according to the corresponding relation.
503rd, first base station receives the configured information that the second base station is sent;
In the present embodiment, second base station detects the GTP mistakes between at least one described second base station of carrying appearance and gateway on second base station, but the GTP mistakes are indicated to gateway by second base station not by S1-U, but correspondence generates the configured information.
The first base station determines that at least one carrying is released on the second base station according to the configured information received.
Wherein, the present embodiment the reason at least one carrying is released on second base station to being not construed as limiting, such as at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on described second base station.
Wherein, the present embodiment is not construed as limiting to the configured information, for example, the information that the configured information can be newly defined for the second base station, and second base station and the first base station configured information of making an appointment may indicate that described GTP mistakes occurs at least one carrying on second base station;
Also for example, the configured information is that SeNB modifications require (SeNB Modification Required) message, SeNB modifications require that message is used for the main plot group carrying that the carrying of the second target is switched in the first base station being released described in second base station requests on the second base station, or, SeNB modifications require that second target carrying of the message for being released described in second base station requests on the second base station is set up to the main plot group carrying in the first base station;It is corresponding with the carrying mark that second target is carried through the mapping table;And SeNB modifications described in the present embodiment require that message also carries the instruction of GTP mistakes, so that second base station informs that the GTP mistakes occurs at least one carrying on the second base station described in the first base station.
Also for example, the configured information can be X2 mouthfuls of reset (Reset) message, and second base station and the first base station configured information of making an appointment may indicate that on second base station that described GTP mistakes occurs at least one carrying, so that the instruction GTP mistakes that second base station is implied by the reset message occur on second base station.
Further for example, the configured information is SeNB releasing requests message (SeNB Release Required), the SeNB releasing requests message is used to ask to indicate that second base station discharges all secondary cell group carryings.
Preferably, the configured information of the present embodiment may also include carrying cause value, the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway, so that the first base station can determine that the carrying for the GTP mistakes specifically occur.
Specifically, the configured information is sent the configured information by second base station by the S1-U between the first base station, and second base station is after the configured information is sent, then stop sending data by air interface, and prepare the contextual information of at least one carrying on the second base station of release and/or terminal.
504th, the first base station sends confirmation message to second base station;
In the present embodiment, the first base station is received after the configured information that the second base station is sent, if agreeing at least one carrying on release second base station, then the first base station generates the confirmation message, to notify at least one carrying described in second base station on the second base station to be agreed release by the confirmation message.
Preferably, data forwarding message can be included in the confirmation message, so that the upstream data and downlink data of second node B cache are forwarded to first base station by second base station by the data forwarding message, to prevent the interruption connected between base station and terminal.
Need it is clear that, the step 504 of the present embodiment be optional, in concrete application scene, second base station also can by the configured information send ask first base station agreement the second base station releasing bearing request.
505th, the first base station determines that the 3rd target is carried;
In the present embodiment, the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station.
506th, the first base station determines that first object is carried according to the configured information;
The first object is carried as the carrying that the terminal is used to send data;
In the present embodiment, first base station first object according to determined by the configured information is carried as main plot group carrying and the 3rd target carrying that the terminal is used to send in the first base station of data.
507th, the first base station determines that (RRC Connection Reconfiguration) message is matched somebody with somebody in Radio Resource connection again according to first object carrying;
In the present embodiment, it is that can determine that second target is held that terminal connects reallocation message according to the Radio Resource The main plot group carrying that need to be switched in the first base station is carried, or, second target carrying need to be set up to the main plot group carrying in the first base station.
508th, Radio Resource connection reallocation message is sent to terminal by the first base station;
Radio Resource connection reallocation message is sent to after terminal by the first base station, and the terminal connects reallocation message according to the Radio Resource and deletes the configuration that second target is carried in the terminal.
Because in the present embodiment, second base station is discharged second target carrying, then the terminal can delete second target on second base station according to Radio Resource connection reallocation message and be carried on the configuration in the terminal.
509th, the response message that the first base station receiving terminal is sent;
The terminal connects reallocation message according to the Radio Resource and carried out after corresponding configuration deletion, then terminal-pair should generate response message, to inform that terminal deletion configuration is completed described in the first base station by the response message.
510th, the first base station indicates that message or the 5th bearing modification indicate message according to configured information correspondence the 4th bearing modification of generation;
The first base station is after the response message is received, then the first base station indicates that message or the 5th bearing modification indicate message according to configured information correspondence the 4th bearing modification of generation, and the 4th bearing modification described in the present embodiment indicates that message or the 5th bearing modification indicate that message can be E-RAB Modification Indication (bearing modification instruction) message.
511st, the 4th bearing modification generated is indicated that message or the 5th bearing modification indicate that message is sent to equipment of the core network by the first base station;
In the present embodiment, the equipment of the core network is after the 4th bearing modification instruction message or the 5th bearing modification instruction message is received, corresponding path switching can be carried out, in the present embodiment, the equipment of the core network can indicate that the second target being released on second base station is carried the main plot group switched in the first base station and carried by message according to the 4th bearing modification, or, the equipment of the core network can indicate that message carries the second target being released on second base station to set up to the main plot group in the first base station according to the 5th bearing modification and carry, to ensure the normal transmission of user data, the equipment of the core network is avoided to be released all carryings in first base station and the second base station because of the GTP mistakes, also the terminal can be avoided to be deleted all configurations corresponding with carrying in terminal, effectively reduce the equipment of the core network and re-establish the control signaling quantity transmitted by carrying, lift the efficiency and user's body of data transfer Test.
5th kind shown in Figure 6;
601st, the first base station receives the mapping table that second base station is sent;
In the present embodiment, mapping table is set up in second base station, and the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
Need it is clear that, mapping table described in the present embodiment can also set up each corresponding relation for carrying and identifying on second base station, and the present embodiment is illustrated so that the mapping table includes the corresponding relation that at least one carrying being released due to the GTP mistakes between second base station and the gateway is identified with carrying as an example.
The corresponding carrying mark of carrying that second base station determines the GTP mistakes between second base station and the gateway by the mapping table and is released, and the fixed carrying mark is sent to first base station by second base station.
Need it is clear that, the present embodiment is not construed as limiting to the carrying mark, and the carrying mark can be sequence number, and field etc., also for example described carrying is designated Tunnel End Point Identifier (Tunnel Endpoint IDentifier r, Tunnel End Point Identifier).
602nd, the first base station receives the carrying mark that second base station is sent;
The first base station is that can determine that on second base station corresponding with the carrying mark carrying of GTP mistakes occur according to the corresponding relation.
603rd, first base station receives the configured information that the second base station is sent;
604th, the first base station sends confirmation message to second base station;
Step 601 shown in the present embodiment is identical to step 504 process with the step 501 shown in Fig. 5 to step 604, does not repeat in the present embodiment.
605th, the first base station determines that the 3rd target is carried;
In the present embodiment, the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station.
606th, the first base station determines the 3rd base station;
Carrying and signal intensity described in 3rd base station on the 3rd base station meet preset requirement, so that the 3rd base station for meeting the preset requirement disclosure satisfy that the normal transmission of user data.
607th, the first base station determines that first object is carried according to the configured information;
The first object is carried as the carrying that the terminal is used to send data;
In the present embodiment, the first object is carried as the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
608th, the first base station determines that (RRC Connection Reconfiguration) message is matched somebody with somebody in Radio Resource connection again according to first object carrying;
In the present embodiment, it is that can determine that the secondary cell group carrying that the second target carrying need to be switched on the 3rd base station that terminal connects reallocation message according to the Radio Resource.
609th, Radio Resource connection reallocation message is sent to terminal by the first base station;
Radio Resource connection reallocation message is sent to after terminal by the first base station, and the terminal connects reallocation message according to the Radio Resource and deletes the configuration that second target is carried in the terminal.
Because in the present embodiment, second base station is discharged second target carrying, then the terminal can delete second target on second base station according to Radio Resource connection reallocation message and be carried on the configuration in the terminal.
610th, the response message that the first base station receiving terminal is sent;
The terminal connects reallocation message according to the Radio Resource and carried out after corresponding configuration deletion, then terminal-pair should generate response message, to inform that terminal deletion configuration is completed described in the first base station by the response message.
611st, the first base station indicates message according to configured information correspondence the 6th bearing modification of generation;
The first base station is after the response message is received, then the first base station indicates message according to configured information correspondence the 6th bearing modification of generation, and the 6th bearing modification described in the present embodiment indicates that message or the 5th bearing modification indicate that message can be E-RAB Modification Indication (bearing modification instruction) message.
612nd, the 6th bearing modification generated instruction message is sent to equipment of the core network by the first base station;
In the present embodiment, the equipment of the core network is after the 6th bearing modification instruction message is received, corresponding path switching can be carried out, in the present embodiment, the equipment of the core network can indicate that the second target being released on second base station is carried the secondary cell group switched on the 3rd base station and carried by message according to the 6th bearing modification, to ensure the normal transmission of user data, avoid the equipment of the core network from being released all carryings in first base station and the second base station because of the GTP mistakes, can also avoid the end All configurations corresponding with carrying in terminal are deleted at end, are effectively reduced the equipment of the core network and are re-established the control signaling quantity transmitted by carrying, and lift the efficiency and Consumer's Experience of data transfer.
Embodiment shown in figure 1 above to Fig. 6 is described in detail first base station is how to realize carrier aggregation, and following examples illustrate the second base station is how to realize carrier aggregation;
Below in conjunction with the carrier polymerizing method is described in detail shown in Fig. 7:
701st, the second base station detects that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
The present embodiment is using first base station as master base station (MeNB, Master eNB), it is illustrated supplemented by second base station exemplified by base station (SeNB, Secondary eNB), and the present embodiment is not construed as limiting to the particular number of second base station.
702nd, if so, then second base station discharges at least one carrying for the GTP mistakes between second base station and the gateway occur;
All carryings on releasable second base station in second base station shown in the present embodiment, also can only discharge the carrying for the GTP mistakes occur.
The quantity for the carrying of the GTP mistakes occur can be one or more.
703rd, the second base station generation configured information;
In the present embodiment, second base station detects the GTP mistakes between at least one described second base station of carrying appearance and gateway on second base station, but the GTP mistakes are indicated to gateway by second base station not by S1-U, but correspondence generates the configured information.
The configured information generates for second base station, even described second base station detects on second base station at least one carrying due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway, GTP mistakes are not sent to gateway to indicate, but correspondence generation configured information, and second base station is sent to first base station by X2-U.
704th, the configured information is sent to first base station by second base station;
The configured information generated is sent to the first base station by second base station, so that the first base station generates the Radio Resource according to the configured information correspondence having been received by connects reallocation message, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
In the present embodiment, if the second base station detects on second base station at least one carrying due to described the The GTP mistakes between two base stations and service gateway, first base station is then notified by the configured information, so that the first base station is that can determine that at least one carrying has been released on the second base station according to the configured information, the first base station is according to configured information correspondence generation Radio Resource connection reallocation message, so that the terminal connects the release that reallocation message carries out corresponding configuration according to the Radio Resource, so as to avoid the configuration being carried in terminal for not occurring the GTP mistakes described in terminal deletion in first base station, so as to avoid re-establishing user's context between first base station and terminal, improve the experience of user.
The carrier polymerizing method, which is described in further detail, to be realized to second base station below in conjunction with the embodiment shown in Fig. 8:
801st, the second base station detects that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
802nd, if so, then second base station discharges at least one carrying for the GTP mistakes between second base station and the gateway occur;
Shown in step 801 shown in the present embodiment to the detailed process step 701 to 702 please as shown in Figure 7 of step 802, detailed process is not repeated in the present embodiment.
803rd, the second base station generation configured information;
In the present embodiment, second base station detects the GTP mistakes between at least one described second base station of carrying appearance and gateway on second base station, but the GTP mistakes are indicated to gateway by second base station not by S1-U, but correspondence generates the configured information.
Wherein, the present embodiment is not construed as limiting to the configured information, for example, the information that the configured information can be newly defined for the second base station, and second base station and the first base station configured information of making an appointment may indicate that described GTP mistakes occurs at least one carrying on second base station;
Also for example, the configured information is that SeNB modifications require (SeNB Modification Required) message, SeNB modifications require that message is used for second base station and indicates the switching that the first base station is carried, in the present embodiment, SeNB modifications require the main plot group carrying that message can be switched in first base station for the secondary cell group carrying on the second base station of request, or, SeNB modifications require the secondary cell group carrying that message can be switched on the 3rd base station for the secondary cell group carrying on the second base station of request.
Wherein, the 3rd base station is what the first base station was determined, and load and signal on the 3rd base station can ensure the normal transmission of user data.
SeNB modifications described in the present embodiment require that message also carries the instruction of GTP mistakes, so that described second Inform that the GTP mistakes occurs at least one carrying on the second base station described in the first base station in base station.
Also for example, the configured information can be X2 mouthfuls of reset (Reset) message, and second base station and the first base station configured information of making an appointment may indicate that on second base station that described GTP mistakes occurs at least one carrying, so that the instruction GTP mistakes that second base station is implied by the reset message occur on second base station.
Further for example, the configured information is SeNB releasing requests message (SeNB Release Required), the SeNB releasing requests message is used to ask to indicate that second base station discharges all secondary cell group carryings.
Preferably, the configured information of the present embodiment may also include carrying cause value, the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway, so that the first base station can determine that the carrying for the GTP mistakes specifically occur.
Specifically, the configured information is sent the configured information by second base station by the X2 interface between the first base station, and second base station is after the configured information is sent, then stop sending data by air interface, and prepare the contextual information of at least one carrying on the second base station of release and/or terminal.
804th, second base station receives the confirmation message that the first base station is sent;
In the present embodiment, the first base station is received after the configured information that the second base station is sent, if agreeing at least one carrying on release second base station, then the first base station generates the confirmation message, to notify at least one carrying described in second base station on the second base station to be agreed release by the confirmation message.
Preferably, data forwarding message can be included in the confirmation message, so that the upstream data and downlink data of second node B cache are forwarded to first base station by second base station by the data forwarding message, to prevent the interruption connected between base station and terminal.
Need it is clear that, the step 804 of the present embodiment be optional, in concrete application scene, second base station also can by the configured information send ask first base station agreement the second base station releasing bearing request.
In the present embodiment, first base station first object according to determined by the configured information is carried as the main plot group carrying in first base station.Wherein, secondary cell group on second base station discharged can be carried the main plot group switched in the first base station and carried by the first base station, or, the secondary cell group on second base station discharged can be carried to set up to the main plot group in the first base station and carried by the first base station.
In the present embodiment, second base station is when it is determined that whether at least one carrying the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs on second base station, second base station does not send GTP mistakes to gateway and indicated, but correspondence generation configured information, so that first base station indicates that the equipment of the core network carries out corresponding path switching according to the configured information, so that the equipment of the core network will not be discharged by all carryings and with the connection of terminal, ensure the normal transmission of user data, improve the usage experience of user.
Illustrate second base station is how to realize that the carrying that only will appear from the GTP mistakes is switched over below in conjunction with the embodiment shown in Fig. 9;
901st, the second base station generation mapping table;
The mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway.
Need it is clear that, mapping table described in the present embodiment can also set up each corresponding relation for carrying and identifying on second base station, and the present embodiment is illustrated so that the mapping table includes the corresponding relation that at least one carrying being released due to the GTP mistakes between second base station and the gateway is identified with carrying as an example.
Need it is clear that, the present embodiment is not construed as limiting to the carrying mark, and the carrying mark can be sequence number, and field etc., also for example described carrying is designated Tunnel End Point Identifier (Tunnel Endpoint IDentifier, Tunnel End Point Identifier).
902nd, the mapping table is sent to the first base station by second base station;
903rd, second base station detects that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
904th, if so, then second base station determines that second target that is carried as GTP mistakes occur is carried;
905th, second base station discharges the second target carrying;
906th, second base station determines that carrying corresponding with the carrying of the second target is identified by the mapping table;
907th, the carrying mark is sent to the first base station by second base station;
The first base station is that can determine that on second base station corresponding with the carrying mark carrying of GTP mistakes occur according to the corresponding relation.
908th, the second base station generation configured information;
In the present embodiment, second base station detects the GTP mistakes between at least one described second base station of carrying appearance and gateway on second base station, but the GTP mistakes are indicated to gateway by second base station not by S1-U, but correspondence generates the configured information.
Wherein, the present embodiment is not construed as limiting to the configured information, for example, the information that the configured information can be newly defined for the second base station, and second base station and the first base station configured information of making an appointment may indicate that described GTP mistakes occurs at least one carrying on second base station;
Also for example, the configured information is that SeNB modifications require (SeNB Modification Required) message, SeNB modifications require that message is used for the main plot group carrying that the carrying of the second target is switched in the first base station being released described in second base station requests on the second base station, or, SeNB modifications require that second target carrying of the message for being released described in second base station requests on the second base station is set up to the main plot group carrying in the first base station;It is corresponding with the carrying mark that second target is carried through the mapping table;And SeNB modifications described in the present embodiment require that message also carries the instruction of GTP mistakes, so that second base station informs that the GTP mistakes occurs at least one carrying on the second base station described in the first base station.
Also for example, the configured information can be X2 mouthfuls of reset (Reset) message, and second base station and the first base station configured information of making an appointment may indicate that on second base station that described GTP mistakes occurs at least one carrying, so that the instruction GTP mistakes that second base station is implied by the reset message occur on second base station.
Also for example, the configured information is SeNB releasing requests message (SeNB Release Required), the SeNB releasing requests message is used to indicate that the carrying of the GTP mistakes occurs in the second base station release, that is, is released through mapping table carrying corresponding with the carrying mark.
Preferably, the configured information of the present embodiment may also include carrying cause value, the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway, so that the first base station can determine that the carrying for the GTP mistakes specifically occur.
Specifically, the configured information is sent the configured information by second base station by the S1-U between the first base station, and second base station is after the configured information is sent, then stop sending data by air interface, and prepare the contextual information of at least one carrying on the second base station of release and/or terminal.
909th, second base station receives the confirmation message that the first base station is sent;
In the present embodiment, the first base station is received after the configured information that the second base station is sent, if agreeing to release Second target carrying on second base station is put, then the first base station generates the confirmation message, and release is agreed to notify second target described in second base station on the second base station to carry by the confirmation message.
Preferably, data forwarding message can be included in the confirmation message, so that the upstream data and downlink data of second node B cache are forwarded to first base station by second base station by the data forwarding message, to prevent the interruption connected between base station and terminal.
Need it is clear that, the step 909 of the present embodiment be optional, in concrete application scene, second base station also can by the configured information send ask first base station agreement the second base station releasing bearing request.
In the present embodiment, first base station first object according to determined by the configured information is carried as the main plot group carrying in first base station.Wherein, second target discharged can be carried the main plot group switched in the first base station and carried by the first base station, or, second target discharged can be carried to set up to the main plot group in the first base station and carried by the first base station.
By the present embodiment so that the second base station need not be discharged all carryings on second base station, and need only to the carrying that the GTP mistakes occurs in release, reduce releasing bearing and re-establish the output of the control signaling of carrying, improve the efficiency of data transfer.
Below in conjunction with being how to realize that carrier polymerizing method is described in detail to terminal shown in Figure 10:
1001st, terminal receives the Radio Resource connection reallocation message that first base station is sent;
The Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion;
1002nd, the terminal, which connects reallocation message according to the Radio Resource and deletes on second base station at least one, is carried on the configuration in the terminal.
In the present embodiment, the terminal can connect reallocation message according to the Radio Resource and delete all configurations being carried in the terminal on second base station, can also be, the terminal, which can connect reallocation message according to the Radio Resource and delete on second base station, there is the configuration being carried in the terminal of GTP mistakes, avoid because mistake occurs in the carrying on second base station, and make it that the terminal is deleted the configuration in first base station and the second base station in all carrying terminals, so as to avoid the terminal connected between terminal and base station, the normal transmission of data is ensured, and then improve the experience that user uses.
It is specifically how to be connected according to the Radio Resource to the terminal below in conjunction with the embodiment shown in Figure 11 Connect reallocation message and determine first object carrying;
1101st, terminal receives the Radio Resource connection reallocation message that first base station is sent;
1102nd, the terminal, which connects reallocation message according to the Radio Resource and deletes on second base station at least one, is carried on the configuration in the terminal;
The detailed process of step 1101 to 1102 in the present embodiment please as shown in Figure 10 1001 to 1002 described in, do not repeat in the present embodiment.
1103rd, the terminal connects reallocation message according to the Radio Resource and determines that first object is carried;
The first object is carried as the carrying that the terminal is used to send data;
Wherein, the terminal connects reallocation message according to the Radio Resource and determines that first object carrying may include following situation:
One kind is:The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;
Then the terminal can connect reallocation message according to the Radio Resource and determine the main plot group carrying that the first object is carried as in the first base station;
It is another to be:The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement;
The terminal can connect reallocation message according to the Radio Resource and determine the secondary cell group carrying that the first object is carried as on the 3rd base station;
It is another to be:The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;
The terminal can connect reallocation message according to the Radio Resource and determine main plot group carrying and the 3rd target carrying that the first object is carried as in the first base station;
It is another to be:The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;
The terminal can connect reallocation message according to the Radio Resource and determine the carrying of secondary cell group and the 3rd target carrying that the first object is carried as on the 3rd base station;
1104th, the terminal sends data by the fixed first object carrying;
If specifically, the terminal determines the main plot group carrying that the first object is carried as in the first base station, the terminal sends data by the main plot group carrying in the first base station.
If the terminal determines that first object is carried as the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, terminal sends data by the secondary cell group carrying on the 3rd base station;
If the terminal determines that the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, the terminal sends data by the main plot group carrying and the 3rd target carrying in the first base station;
If the terminal determines the carrying of secondary cell group and the carrying of the 3rd target that the first object is carried as on the 3rd base station, the terminal sends data by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
Specifically how to realize that carrier polymerizing method is described in detail to the equipment of the core network below in conjunction with the embodiment shown in Figure 12:
1201st, equipment of the core network receives the carrying instruction message that first base station is sent;
I.e. described first base station generates the carrying and indicates message, and the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching.
In the present embodiment, the first base station can indicate that the carrying on second base station is switched over or only switches over the carrying for the GTP mistakes occur on second base station by the equipment of the core network by the carrying configured information.
1202nd, the equipment of the core network indicates that message carries out corresponding carrying and switched according to the carrying.
The carrying that the equipment of the core network is sent according to the first base station indicates that message carries out corresponding carrying and switched, to ensure the normal transmission of user data.
Illustrate how the equipment of the core network specifically carries out carrying switching below in conjunction with the embodiment shown in Figure 13;
1301st, equipment of the core network receives the carrying instruction message that first base station is sent;
Specifically, the carrying indicates that message is that the first bearing modification indicates message, first bearing modification indicates that message is used to indicate that the equipment of the core network switches to the secondary cell group carrying on second base station Main plot group carrying in the first base station;
Or, the carrying indicates that message is that the second bearing modification indicates message, second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
Or, the carrying indicates that message is that the 3rd bearing modification indicates message, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;
Or, the carrying indicates that message is that the 4th bearing modification indicates message, the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
Or, the carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
Or, the carrying indicates that message is that the 6th bearing modification indicates message, the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;
1302nd, the equipment of the core network indicates that message carries out corresponding carrying and switched according to the carrying.
Even described carrying indicates that message is that the first bearing modification indicates message, then the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;
If the carrying indicates that message is that the second bearing modification indicates message, the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
If the carrying indicates that message is that the 3rd bearing modification indicates message, the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;
If the carrying indicates that message is that the 4th bearing modification indicates message, the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
If the carrying indicates that message is that the 5th bearing modification indicates message, second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
If the carrying indicates that message is that the 6th bearing modification indicates message, the equipment of the core network will be described The secondary cell group carrying that second target carrying on second base station is switched on the 3rd base station
It can be seen that in the present embodiment, the difference for the carrying configured information that the equipment of the core network can be according to transmitted by first base station and carry out different carryings switchings, and then cause in application scenarios that the present embodiment may be used on different bearer switching.
Another embodiment of carrier polymerizing method provided by the present invention is illustrated below in conjunction with Figure 14, in above-described embodiment, second base station is after it is determined that the GTP mistakes occurs in carrying on second base station, to realize carrier polymerizing method, configured information is not sent then to equipment of the core network, this example demonstrates that how second base station is indicated to realize carrier polymerizing method by sending GTP mistakes to the equipment of the core network;
1401st, mapping table is reported to equipment of the core network by first base station;
The present embodiment is using first base station as master base station (MeNB, Master eNB), it is illustrated supplemented by second base station exemplified by base station (SeNB, Secondary eNB), and the present embodiment is not construed as limiting to the particular number of second base station.
The first base station determines mapping table, and the mapping table includes the corresponding relation of each carrying and carrying mark on each carrying in first base station and the second base station.
Need it is clear that, the present embodiment is not construed as limiting to the carrying mark, and the carrying mark can be sequence number, and field etc., also for example described carrying is designated Tunnel End Point Identifier (Tunnel Endpoint IDentifier, Tunnel End Point Identifier).
Point out to send on the second base station with the data which is carried by the corresponding relation, the data of which carrying are sent in first base station.
Specifically, the equipment of the core network is mobility management entity MME and gateway (serving gateway, SGW), or for realizing the MME and the SGW functions network element.
More specifically, mapping table is reported to MME by the first base station, and the corresponding relation having been received by is transmitted to SGW by MME.
1402nd, second base station detects whether at least one carries the GTP mistakes occurred between described second base station and gateway on second base station;
How second base station is specifically detected see above-described embodiment, does not repeat in the present embodiment.
1403rd, if so, then second base station is generated for indicating that the configured information of the GTP mistakes between second base station and gateway occurs at least one carrying on second base station;
1404th, second base station determines that the first carrying corresponding with there is the carrying of the GTP mistakes is identified according to the mapping table;
1405th, the configured information for carrying the first carrying mark is sent to equipment of the core network by second base station;
Specifically, the configured information for carrying the first carrying mark is sent to the SGW by second base station by S1-U, the SGW parses the configured information, so that carrying identification (RNC-ID) analytic corresponding with there is the carrying of the GTP mistakes entrained by the configured information to be come out, so that the SGW discharges all carryings on second base station according to the described first carrying mark, or, carrying on the second base station corresponding with the described first carrying mark of first carrying mark release described in the SGW, to avoid being discharged the carrying for GTP mistakes do not occur on the second base station.
1406th, the first base station detects whether at least one carries the GTP mistakes occurred between described first base station and gateway in the first base station;
1407th, if so, then the first base station is generated for indicating that the configured information of the GTP mistakes between the first base station and gateway occurs at least one carrying in the first base station;
1408th, the first base station determines that the second carrying corresponding with there is the carrying of the GTP mistakes is identified according to the mapping table;
1409th, the configured information for carrying the second carrying mark is sent to equipment of the core network by the first base station;
Specifically, the configured information for carrying the second carrying mark is sent to the SGW by the first base station by S1-U, the SGW parses the configured information, so that carrying identification (RNC-ID) analytic corresponding with there is the carrying of the GTP mistakes entrained by the configured information to be come out, so that the SGW discharges all carryings in the first base station according to the described second carrying mark, or, second carrying mark release described in the SGW and the carrying in the described second carrying corresponding first base station of mark, to avoid being discharged the carrying for not occurring GTP mistakes in first base station.
Illustrate how at least one carrying in first base station, then realize carrier polymerizing method if GTP mistakes occurs below in conjunction with the embodiment shown in Figure 15;
1501st, first base station detects that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway in the first base station;
1502nd, if so, then the first base station discharges at least one appearance second base station and the service The carrying of the GTP mistakes between gateway;
First base station release occur the carrying of the GTP mistakes implement process and the carrying of the second base station release appearance GTP mistakes shown in Fig. 8 to implement process identical, do not repeat in the present embodiment.
1503rd, the first base station generation configured information;
The first base station is according to GTP mistakes correspondence generation configured information;
1504th, the configured information is sent to equipment of the core network by the first base station;
The equipment of the core network, which is received, carries out corresponding carrying switching after the configured information of first base station transmission, the present embodiment is to being not construed as limiting that how equipment of the core network specifically switches over, for example, the carrying discharged in the first base station can be switched on the second base station by the equipment of the core network, or, the equipment of the core network determines to meet the base station of preparatory condition, so that the need for meeting carrying and the signal intensity satisfaction transmission data on the base station of preparatory condition, then the carrying in first base station can be switched to and met on the base station of preparatory condition by the equipment of the core network.
Even if by the present embodiment so that GTP mistakes occurs in the carrying in first base station, also the transmission of user data can be ensured, the equipment of the core network is avoided to be released all carryings in first base station and the second base station because of the GTP mistakes, also the terminal can be avoided to be deleted all configurations corresponding with carrying in terminal, effectively reduce the equipment of the core network and re-establish the control signaling quantity transmitted by carrying, lift the efficiency and Consumer's Experience of data transfer.
Carrier polymerizing method is described in detail above example, and the concrete structure of first base station is described in detail below in conjunction with the embodiment shown in Figure 16:
The first base station includes:
First receiving unit 1601, for receiving the configured information that the second base station is sent, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
First transmitting element 1602, for sending Radio Resource connection reallocation message to terminal, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
In the present embodiment, if the second base station detects at least one carrying on second base station and, due to the GTP mistakes between second base station and gateway, first base station is notified by the configured information, So that the first base station is that can determine that at least one carrying is released on the second base station according to the configured information, the first base station is according to the situation correspondence generation Radio Resource connection reallocation message that release is carried on second base station, so that terminal connects the release that reallocation message carries out corresponding configuration according to the Radio Resource, so as to avoid the configuration being carried in terminal for not occurring the GTP mistakes described in terminal deletion in first base station, and avoid re-establishing user's context between first base station and terminal, improve the experience of user.
The concrete structure of first base station is further elaborated below in conjunction with the embodiment shown in Figure 17:
The first base station includes:
Second receiving unit 1701, for receiving the mapping table that second base station is sent, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
3rd receiving unit 1702, for receiving the carrying mark that second base station is sent;
First receiving unit 1703, for receiving the configured information that the second base station is sent, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
First transmitting element 1704, for sending Radio Resource connection reallocation message to terminal, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
Radio Resource connection reallocation message is sent to after terminal by the first base station, and the terminal connects reallocation message according to the Radio Resource and deletes the configuration that second target is carried in the terminal.
Because in the present embodiment, second base station is discharged second target carrying, then the terminal can delete second target on second base station according to Radio Resource connection reallocation message and be carried on the configuration in the terminal.
The concrete structure that the first base station of switching can be carried out carrying below in conjunction with the embodiment pair shown in Figure 18 is further elaborated:
The first base station includes:
First receiving unit 1801, for receiving the configured information that the second base station is sent, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
First transmitting element 1802, for sending Radio Resource connection reallocation message to terminal, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion;
Second transmitting element 1803, for the first bearing modification instruction message to be sent into equipment of the core network, first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;
3rd transmitting element 1804, for the second bearing modification instruction message to be sent into the equipment of the core network, second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
4th transmitting element 1805, for the 3rd bearing modification instruction message to be sent into the equipment of the core network, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
5th transmitting element 1806, for the 4th bearing modification instruction message to be sent into the equipment of the core network, the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
6th transmitting element 1807, for the 5th bearing modification instruction message to be sent into the equipment of the core network, the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
7th transmitting element 1808, for the 6th bearing modification instruction message to be sent into the equipment of the core network, the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
In the present embodiment, the equipment of the core network is after the bearing modification instruction message is received, corresponding path switching can be carried out, to ensure the normal transmission of user data, the equipment of the core network is avoided to be released all carryings in first base station and the second base station because of the GTP mistakes, also the terminal can be avoided to be deleted all configurations corresponding with carrying in terminal, effectively reduce the equipment of the core network and re-establish the control signaling quantity transmitted by carrying, lift the efficiency and Consumer's Experience of data transfer.
Below in conjunction with the concrete structure of the second base station is described in detail shown in Figure 19:
Second base station includes:
Detection unit 1901, for detecting on second base station whether at least one carrying occurs described the General Packet Radio System tunnel protocol GTP mistakes between two base stations and service gateway;
Releasing unit 1902, if the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs at least one carrying on second base station, at least one carrying for the GTP mistakes between second base station and the gateway occur is discharged;
8th transmitting element 1903, for configured information to be sent into first base station, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
In the present embodiment, if the second base station detects on second base station at least one carrying due to the GTP mistakes between second base station and gateway, first base station is then notified by the configured information, so that the first base station is that can determine that at least one carrying has been released on the second base station according to the configured information, the first base station is according to configured information correspondence generation Radio Resource connection reallocation message, so that the terminal connects the release that reallocation message carries out corresponding configuration according to the Radio Resource, so as to avoid the configuration being carried in terminal for not occurring the GTP mistakes described in terminal deletion in first base station, so as to avoid re-establishing user's context between first base station and terminal, improve the experience of user.
Below in conjunction with the concrete structure of the second base station is described in detail shown in Figure 20:
Second base station includes:
9th send unit 2001, and for mapping table to be sent into the first base station, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
Tenth transmitting element 2002, for the carrying mark to be sent into first base station, so that the first base station determines the carrying for the GTP mistakes between second base station and the gateway occur.
Detection unit 2003, for detecting that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
Releasing unit 2004, if the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs at least one carrying on second base station, at least one carrying for the GTP mistakes between second base station and the gateway occur is discharged;
8th transmitting element 2005, for configured information to be sent into first base station, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
Below in conjunction with the concrete structure of terminal is described in detail shown in Figure 21:
The terminal includes:
4th receiving unit 2101, connects reallocation message, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion for receiving the Radio Resource of first base station transmission;
Unit 2102 is deleted, deleting on second base station at least one for connecting reallocation message according to the Radio Resource is carried on the configuration in the terminal.
In the present embodiment, the terminal can connect reallocation message according to the Radio Resource and delete all configurations being carried in the terminal on second base station, can also be, the terminal, which can connect reallocation message according to the Radio Resource and delete on second base station, there is the configuration being carried in the terminal of GTP mistakes, avoid because mistake occurs in the carrying on second base station, and make it that the terminal is deleted the configuration in first base station and the second base station in all carrying terminals, so as to avoid the terminal connected between terminal and base station, the normal transmission of data is ensured, and then improve the experience that user uses.
Below in conjunction with the concrete structure of terminal is described in further detail shown in Figure 22:
The terminal includes:
4th receiving unit 2201, connects reallocation message, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion for receiving the Radio Resource of first base station transmission;
Unit 2202 is deleted, deleting on second base station at least one for connecting reallocation message according to the Radio Resource is carried on the configuration in the terminal;
11st transmitting element 2203, for sending data by the main plot group carrying in first base station;
Wherein, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;
12nd transmitting element 2204, for sending data by the secondary cell group carrying on the 3rd base station;
Wherein, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement;
13rd transmitting element 2205, for passing through the main plot group carrying in the first base station and institute State the carrying of the 3rd target and send data;
Wherein, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;
14th transmitting element 2206, for sending data by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station;
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station.
Below in conjunction with the concrete structure of equipment of the core network is described in detail shown in Figure 23:
The equipment of the core network includes:
5th receiving unit 2301, the carrying for receiving first base station transmission indicates message, and the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
Switch unit 2302, for indicating that message carries out corresponding carrying and switched according to the carrying.
In the present embodiment, the equipment of the core network is after the carrying instruction message is received, corresponding path switching can be carried out, to ensure the normal transmission of user data, the terminal can be avoided to be deleted all configurations corresponding with carrying in terminal, effectively reduce the equipment of the core network and re-establish the control signaling quantity transmitted by carrying, lift the efficiency and Consumer's Experience of data transfer.
Below in conjunction with the concrete structure of equipment of the core network is described in detail shown in Figure 24:
The equipment of the core network includes:
5th receiving unit 2401, the carrying for receiving first base station transmission indicates message, and the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
Switch unit 2402, for indicating that message carries out corresponding carrying and switched according to the carrying;
Specifically, the carrying indicates that message is that the first bearing modification indicates message, first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;
The switch unit 2402 is additionally operable to switch to the secondary cell group carrying on second base station described Main plot group carrying in first base station.
The carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
The switch unit 2402 is additionally operable to carry the secondary cell group discharged the main plot group carrying being established as in the first base station.
The carrying indicates that message is that the 3rd bearing modification indicates message, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;
The switch unit 2402 is additionally operable to carry the secondary cell group discharged the secondary cell group carrying being established as on the 3rd base station.
The carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
The switch unit 2402 is additionally operable to the main plot group carrying for switching to second target carrying on second base station in the first base station;
The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
The switch unit 2402 is additionally operable to carry second target discharged the main plot group carrying being established as in the first base station on second base station.
The carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;
The switch unit 2402 is additionally operable to the secondary cell group carrying for switching to second target carrying on second base station on the 3rd base station.
In the present embodiment, the equipment of the core network is after bearing modification instruction message is received, corresponding path switching can be carried out, to ensure the normal transmission of user data, avoid the equipment of the core network from being released all carryings in first base station and the second base station because of the GTP mistakes, can also avoid the terminal will be eventually All configurations corresponding with carrying are deleted on end, are effectively reduced the equipment of the core network and are re-established the control signaling quantity transmitted by carrying, and lift the efficiency and Consumer's Experience of data transfer.
The embodiment of the present invention additionally provides a kind of system for realizing carrier aggregation, and the system includes:
First base station;The first base station is not repeated in the present embodiment as shown in 16 to Figure 18.
The second base station being connected with the first base station;
Second base station is not repeated in the present embodiment as shown in 19 to Figure 20.
The terminal being connected with the first base station and second base station;
The terminal is not repeated in the present embodiment as shown in 21 to Figure 22.
And the equipment of the core network being connected respectively with the first base station, second base station and the terminal;
The equipment of the core network is not repeated in the present embodiment as shown in 23 to Figure 24.
The base station in the embodiment of the present invention is described from the angle of blocking functional entity above, the first base station in the embodiment of the present invention is specifically described from the angle of hardware handles below, another embodiment of first base station 2500 referred in Figure 25, the embodiment of the present invention includes:
It should be understood that diagram first base station 2500 is only an example, and first base station 2500 can have than more or less parts shown in figure, can combine two or more parts, or can have different parts to configure.Various parts shown in figure can be realized in the combination including the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
What deserves to be explained is, the first base station 2500 that the present embodiment is provided is only an example of base station, the present embodiments relate to first base station can have than more or less parts illustrated in fig. 25, two or more parts can be combined, or can have different parts to configure or set up, all parts can be realized in the combination of the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
The first base station provided below with regard to the present embodiment is described in detail.
Memory 2501:The memory 2501 can be accessed by central processing unit 2503, Peripheral Interface 2504 etc., the memory 2501 can include high-speed random access memory, nonvolatile memory, such as one or more disk memories, flush memory device or other volatile solid-state parts can also be included.
The input of equipment and output peripheral hardware can be connected to center by Peripheral Interface 2504, the Peripheral Interface Processor 2503 and memory 2501.
RF circuits 2502, are mainly used in setting up the communication for each terminal device that base station is connected with wireless network i.e. wireless network, realize data receiver and the transmission of base station and wireless network.Such as sending control command.Specifically, RF circuits 2502 receive and send RF signals, RF signals are also referred to as electromagnetic signal, and RF circuits 2502 convert electrical signals to electromagnetic signal or electromagnetic signal is converted into electric signal, and are communicated by the electromagnetic signal with communication network and other equipment.RF circuits 2502 can include the known circuit for being used to perform these functions, it includes but is not limited to antenna system, RF transceivers, one or more amplifiers, tuner, one or more oscillators, digital signal processor, CODEC chipsets, Subscriber Identity Module (Subscriber Identity Module, SIM) etc., the RF circuits can be WIFI circuits, it can also be Bluetooth circuit, it can also be infrared ray circuit, be not construed as limiting herein.
Power management chip 2505, the hardware for being connected by central processing unit 2503 and Peripheral Interface is powered and power management.
Central processing unit 2503 specifically performs following operation:
The configured information of the second base station transmission is received, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
Radio Resource connection reallocation message is sent to terminal, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
Further, the central processing unit performs following operation:
The mapping table that second base station is sent is received, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
Receive the carrying mark that second base station is sent.
Further, the central processing unit performs following operation:
First bearing modification instruction message is sent to equipment of the core network, first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
Further, the central processing unit performs following operation:
Second bearing modification instruction message is sent to the equipment of the core network, second bearing modification is indicated Message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
Further, the central processing unit performs following operation:
3rd bearing modification instruction message is sent to the equipment of the core network, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
Further, the central processing unit performs following operation:
4th bearing modification instruction message is sent to the equipment of the core network, the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
Or,
5th bearing modification instruction message is sent to the equipment of the core network, the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
Further, the central processing unit performs following operation:
6th bearing modification instruction message is sent to the equipment of the core network, the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
The base station in the embodiment of the present invention is described from the angle of blocking functional entity above, the second base station in the embodiment of the present invention is specifically described from the angle of hardware handles below, another embodiment in the second base station 2600 referred in Figure 26, the embodiment of the present invention includes:
It should be understood that the second base station 2600 of diagram is only an example, and the second base station 2600 can have than more or less parts shown in figure, can combine two or more parts, or can have different parts to configure.Various parts shown in figure can be realized in the combination including the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
What deserves to be explained is, the second base station 2600 that the present embodiment is provided is only an example of base station, the present embodiments relate to the second base station can have than more or less parts illustrated in fig. 26, two or more parts can be combined, or can have different parts to configure or set up, all parts It can be realized in the combination of the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
The second base station provided below with regard to the present embodiment is described in detail.
Memory 2601:The memory 2601 can be accessed by central processing unit 2603, Peripheral Interface 2604 etc., the memory 2601 can include high-speed random access memory, nonvolatile memory, such as one or more disk memories, flush memory device or other volatile solid-state parts can also be included.
The input of equipment and output peripheral hardware can be connected to central processing unit 2603 and memory 2601 by Peripheral Interface 2604, the Peripheral Interface.
RF circuits 2602, are mainly used in setting up the communication for each terminal device that base station is connected with wireless network i.e. wireless network, realize data receiver and the transmission of base station and wireless network.Such as sending control command.Specifically, RF circuits 2602 receive and send RF signals, RF signals are also referred to as electromagnetic signal, and RF circuits 2602 convert electrical signals to electromagnetic signal or electromagnetic signal is converted into electric signal, and are communicated by the electromagnetic signal with communication network and other equipment.RF circuits 2602 can include the known circuit for being used to perform these functions, it includes but is not limited to antenna system, RF transceivers, one or more amplifiers, tuner, one or more oscillators, digital signal processor, CODEC chipsets, Subscriber Identity Module (Subscriber Identity Module, SIM) etc., the RF circuits can be WIFI circuits, it can also be Bluetooth circuit, it can also be infrared ray circuit, be not construed as limiting herein.
Power management chip 2605, the hardware for being connected by central processing unit 2603 and Peripheral Interface is powered and power management.
Central processing unit 2603 specifically performs following operation:
Detect that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
If the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs at least one carrying on second base station, at least one carrying for the GTP mistakes between second base station and the gateway occur is discharged;
Configured information is sent to first base station, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
Further, the central processing unit performs following operation:
Mapping table is sent to the first base station, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
The carrying mark is sent to first base station, so that the first base station determines the carrying for the GTP mistakes between second base station and the gateway occur.
The base station in the embodiment of the present invention is described from the angle of blocking functional entity above, the terminal in the embodiment of the present invention is specifically described from the angle of hardware handles below, another embodiment of terminal 2700 referred in Figure 27, the embodiment of the present invention includes:
It should be understood that graphic terminal 2700 is only an example, and terminal 2700 can have than more or less parts shown in figure, can combine two or more parts, or can have different parts to configure.Various parts shown in figure can be realized in the combination including the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
What deserves to be explained is, the terminal 2700 that the present embodiment is provided is only an example of base station, the present embodiments relate to terminal can have than more or less parts illustrated in fig. 27, two or more parts can be combined, or can have different parts to configure or set up, all parts can be realized in the combination of the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
The terminal provided below with regard to the present embodiment is described in detail.
Memory 2701:The memory 2701 can be accessed by central processing unit 2703, Peripheral Interface 2704 etc., the memory 2701 can include high-speed random access memory, nonvolatile memory, such as one or more disk memories, flush memory device or other volatile solid-state parts can also be included.
The input of equipment and output peripheral hardware can be connected to central processing unit 2703 and memory 2701 by Peripheral Interface 2704, the Peripheral Interface.
RF circuits 2702, are mainly used in setting up the communication for each terminal device that base station is connected with wireless network i.e. wireless network, realize data receiver and the transmission of base station and wireless network.Such as sending control command.Specifically, RF circuits 2702 receive and send RF signals, and RF signals are also referred to as electromagnetic signal, and RF circuits 2702 convert electrical signals to electromagnetic signal or electromagnetic signal is converted into electric signal, and pass through the electromagnetism Signal is communicated with communication network and other equipment.RF circuits 2702 can include the known circuit for being used to perform these functions, it includes but is not limited to antenna system, RF transceivers, one or more amplifiers, tuner, one or more oscillators, digital signal processor, CODEC chipsets, Subscriber Identity Module (Subscriber Identity Module, SIM) etc., the RF circuits can be WIFI circuits, it can also be Bluetooth circuit, it can also be infrared ray circuit, be not construed as limiting herein.
Power management chip 2705, the hardware for being connected by central processing unit 2703 and Peripheral Interface is powered and power management.
Central processing unit 2703 specifically performs following operation:
The Radio Resource connection reallocation message that first base station is sent is received, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion;
Reallocation message is connected according to the Radio Resource delete on second base station at least one and be carried on the configuration in the terminal.
Further, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;The central processing unit performs following operation:
Data are sent by the main plot group carrying in first base station.
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the secondary cell group carrying that the terminal is used to send on the 3rd base station of data;The central processing unit performs following operation:
Data are sent by the secondary cell group carrying on the 3rd base station.
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The central processing unit performs following operation:
Data are sent by the main plot group carrying and the 3rd target carrying in the first base station.
The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The central processing unit performs following operation:
Data are sent by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
The base station in the embodiment of the present invention is described from the angle of blocking functional entity above, the equipment of the core network in the embodiment of the present invention is specifically described from the angle of hardware handles below, another embodiment of equipment of the core network 2800 referred in Figure 28, the embodiment of the present invention includes:
It should be understood that diagram equipment of the core network 2800 is only an example, and equipment of the core network 2800 can have than more or less parts shown in figure, can combine two or more parts, or can have different parts to configure.Various parts shown in figure can be realized in the combination including the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
What deserves to be explained is, the equipment of the core network 2800 that the present embodiment is provided is only an example of base station, the present embodiments relate to equipment of the core network can have than more or less parts illustrated in fig. 28, two or more parts can be combined, or can have different parts to configure or set up, all parts can be realized in the combination of the hardware including one or more signal transactings and/or application specific integrated circuit, software or hardware and software.
The equipment of the core network equipment provided below with regard to the present embodiment is described in detail.
Memory 2801:The memory 2801 can be accessed by central processing unit 2803, Peripheral Interface 2804 etc., the memory 2801 can include high-speed random access memory, nonvolatile memory, such as one or more disk memories, flush memory device or other volatile solid-state parts can also be included.
The input of equipment and output peripheral hardware can be connected to central processing unit 2803 and memory 2801 by Peripheral Interface 2804, the Peripheral Interface.
RF circuits 2802, are mainly used in setting up the communication for each equipment of the core network equipment that base station is connected with wireless network i.e. wireless network, realize data receiver and the transmission of base station and wireless network.Such as sending control command.Specifically, RF circuits 2802 receive and send RF signals, RF signals are also referred to as electromagnetic signal, and RF circuits 2802 convert electrical signals to electromagnetic signal or electromagnetic signal is converted into electric signal, and are communicated by the electromagnetic signal with communication network and other equipment.RF circuits 2802 can include the known circuit for being used to perform these functions, it includes but is not limited to antenna system, RF transceivers, one or more amplifiers, tuner, one or more oscillators, digital signal processor, CODEC chipsets, Subscriber Identity Module (Subscriber Identity Module, SIM) etc., the RF circuits can be WIFI electricity Road or Bluetooth circuit or infrared ray circuit, are not construed as limiting herein.
Power management chip 2805, the hardware for being connected by central processing unit 2803 and Peripheral Interface is powered and power management.
Central processing unit 2803 specifically performs following operation:
The carrying instruction message that first base station is sent is received, the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
Indicate that message carries out corresponding carrying switching according to the carrying.
The carrying indicates that message is that the first bearing modification indicates message, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;The central processing unit performs following operation:
The main plot group carrying that secondary cell group carrying on second base station is switched in the first base station.
The carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The central processing unit performs following operation:
The secondary cell group discharged is carried to the main plot group carrying being established as in the first base station.
The carrying indicates that message is that the 3rd bearing modification indicates message, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;The central processing unit performs following operation:
The secondary cell group discharged is carried to the secondary cell group carrying being established as on the 3rd base station.
The carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;The central processing unit performs following operation:
The main plot group carrying that second target carrying on second base station is switched in the first base station;
Or,
The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The central processing unit performs following operation:
Second target discharged on second base station is carried to the main plot group carrying being established as in the first base station.
The carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;The central processing unit performs following operation:
The secondary cell group carrying that second target carrying on second base station is switched on the 3rd base station.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the specific work process of the system, apparatus, and unit of foregoing description may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although the present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It can still modify to the technical scheme described in foregoing embodiments, or carry out equivalent substitution to which part technical characteristic;And these modifications or replacement, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (68)

  1. A kind of carrier polymerizing method, it is characterised in that including:
    First base station receives the configured information that the second base station is sent, and the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
    The first base station sends Radio Resource connection reallocation message to terminal, and the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
  2. Carrier polymerizing method according to claim 1, it is characterised in that the configured information be additionally operable to be released on request second base station at least one because the carrying of the GTP mistakes between second base station and the gateway is switched over.
  3. Carrier polymerizing method according to claim 1 or 2, it is characterized in that, the configured information includes carrying cause value, and the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway.
  4. Carrier polymerizing method according to any one of claims 1 to 3, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data.
  5. Carrier polymerizing method according to claim 2, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement.
  6. Carrier polymerizing method according to claim 1, it is characterised in that methods described also includes:
    The first base station receives the mapping table that second base station is sent, and the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
    The first base station receives the carrying mark that second base station is sent;
    The configured information is additionally operable to the main plot group carrying for asking the second target being released on second base station carrying to switch in the first base station, and it is corresponding with the carrying mark that second target is carried through the mapping table;
    The Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station.
  7. Carrier polymerizing method according to claim 6, it is characterised in that the carrying and signal intensity that the first object is carried as on the carrying of secondary cell group and the 3rd target carrying on the 3rd base station, the 3rd base station meet preset requirement.
  8. Carrier polymerizing method according to claim 4, it is characterised in that the first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
    First bearing modification instruction message is sent to equipment of the core network by the first base station, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
  9. Carrier polymerizing method according to claim 4, it is characterised in that the first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
    Second bearing modification instruction message is sent to the equipment of the core network by the first base station, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
  10. Carrier polymerizing method according to claim 5, it is characterised in that the first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
    3rd bearing modification instruction message is sent to the equipment of the core network by the first base station, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
  11. Carrier polymerizing method according to claim 6, it is characterised in that the first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
    4th bearing modification instruction message is sent to the equipment of the core network by the first base station, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
    Or,
    5th bearing modification instruction message is sent to the equipment of the core network by the first base station, described in the 5th bearing modification indicates that message is used to indicating that the equipment of the core network will to have discharged on second base station The carrying of second target is established as the main plot group carrying in the first base station.
  12. Carrier polymerizing method according to claim 7, it is characterised in that the first base station is sent to terminal after Radio Resource connection reallocation message, and methods described also includes:
    6th bearing modification instruction message is sent to the equipment of the core network by the first base station, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
  13. A kind of carrier polymerizing method, it is characterised in that including:
    Detect that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station in the second base station;
    If so, then second base station discharges at least one carrying for the GTP mistakes between second base station and the gateway occur;
    Configured information is sent to first base station by second base station, and the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
  14. Carrier polymerizing method according to claim 13, it is characterized in that, the configured information be additionally operable to be released on request second base station at least one because the carrying of the GTP mistakes between second base station and the gateway is switched over, so that the main plot group carrying that the secondary cell group carrying on the second base station is switched in first base station, or, carrying and signal intensity on the secondary cell group carrying that secondary cell group carrying on second base station is switched on the 3rd base station, the 3rd base station meet preset requirement.
  15. Carrier polymerizing method according to claim 13 or 14, it is characterized in that, the configured information includes carrying cause value, and the carrying cause value is used to indicate at least one carrying being released due to the GTP mistakes between second base station and the gateway.
  16. Carrier polymerizing method according to claim 13, it is characterised in that methods described also includes:
    Mapping table is sent to the first base station by second base station, and the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
    The carrying mark is sent to first base station by second base station, so that the first base station is determined The carrying of the existing GTP mistakes between second base station and the gateway.
  17. A kind of carrier polymerizing method, it is characterised in that including:
    Terminal receives the Radio Resource connection reallocation message that first base station is sent, and the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion;
    The terminal connects reallocation message according to the Radio Resource deletes on second base station at least one and is carried on the configuration in the terminal.
  18. Carrier polymerizing method according to claim 17, it is characterised in that the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;Methods described also includes:
    The terminal sends data by the main plot group carrying in first base station.
  19. Carrier polymerizing method according to claim 17, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement;Methods described also includes:
    The terminal sends data by the secondary cell group carrying on the 3rd base station.
  20. Carrier polymerizing method according to claim 17, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;Methods described also includes:
    The terminal sends data by the main plot group carrying and the 3rd target carrying in the first base station.
  21. Carrier polymerizing method according to claim 17, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;Methods described also includes:
    The terminal sends data by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
  22. A kind of carrier polymerizing method, it is characterised in that including:
    Equipment of the core network receives the carrying instruction message that first base station is sent, and the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
    The equipment of the core network indicates that message carries out corresponding carrying and switched according to the carrying.
  23. Carrier polymerizing method according to claim 22, it is characterized in that, the carrying indicates that message is that the first bearing modification indicates message, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;
    The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
    The equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
  24. Carrier polymerizing method according to claim 22, it is characterized in that, the carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
    The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
    The secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
  25. Carrier polymerizing method according to claim 22, it is characterized in that, the carrying indicates that message is that the 3rd bearing modification indicates message, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;
    The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
    The secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
  26. Carrier polymerizing method according to claim 22, it is characterized in that, the carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
    The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
    Second target carrying on second base station is switched to described first by the equipment of the core network Main plot group carrying on base station;
    Or,
    The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;
    The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
    Second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
  27. Carrier polymerizing method according to claim 22, it is characterized in that, the carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;
    The equipment of the core network indicates that message carries out corresponding carrying switching and included according to the carrying:
    The equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
  28. A kind of first base station, it is characterised in that including:
    First receiving unit, for receiving the configured information that the second base station is sent, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
    First transmitting element, for sending Radio Resource connection reallocation message to terminal, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
  29. First base station according to claim 28, it is characterised in that the first base station also includes:
    Second receiving unit, for receiving the mapping table that second base station is sent, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
    3rd receiving unit, for receiving the carrying mark that second base station is sent.
  30. First base station according to claim 28, it is characterised in that the first base station is also wrapped Include:
    Second transmitting element, for the first bearing modification instruction message to be sent into equipment of the core network, first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
  31. First base station according to claim 28, it is characterised in that the first base station also includes:
    3rd transmitting element, for the second bearing modification instruction message to be sent into the equipment of the core network, second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
  32. First base station according to claim 28, it is characterised in that the first base station also includes:
    4th transmitting element, for the 3rd bearing modification instruction message to be sent into the equipment of the core network, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
  33. First base station according to claim 28, it is characterised in that the first base station also includes:
    5th transmitting element, for the 4th bearing modification instruction message to be sent into the equipment of the core network, the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
    Or,
    6th transmitting element, for the 5th bearing modification instruction message to be sent into the equipment of the core network, the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
  34. First base station according to claim 28, it is characterised in that the first base station also includes:
    7th transmitting element, for the 6th bearing modification instruction message to be sent into the equipment of the core network, the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
  35. A kind of second base station, it is characterised in that including:
    Detection unit, for detecting that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
    Releasing unit, if the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs at least one carrying on second base station, at least one carrying for the GTP mistakes between second base station and the gateway occur is discharged;
    8th transmitting element, for configured information to be sent into first base station, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
  36. Second base station according to claim 35, it is characterised in that second base station also includes:
    9th send unit, and for mapping table to be sent into the first base station, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
    Tenth transmitting element, for the carrying mark to be sent into first base station, so that the first base station determines the carrying for the GTP mistakes between second base station and the gateway occur.
  37. A kind of terminal, it is characterised in that including:
    4th receiving unit, connects reallocation message, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion for receiving the Radio Resource of first base station transmission;
    Unit is deleted, deleting on second base station at least one for connecting reallocation message according to the Radio Resource is carried on the configuration in the terminal.
  38. Terminal according to claim 37, it is characterised in that the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;The terminal also includes:
    11st transmitting element, for sending data by the main plot group carrying in first base station.
  39. Terminal according to claim 37, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the carrying and signal intensity that the first object is carried as on the secondary cell group carrying that the terminal is used to send on the 3rd base station of data, the 3rd base station meet preset requirement;The terminal also includes:
    12nd transmitting element, for sending data by the secondary cell group carrying on the 3rd base station.
  40. Terminal according to claim 37, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The terminal also includes:
    13rd transmitting element, for sending data by the main plot group carrying and the 3rd target carrying in the first base station.
  41. Terminal according to claim 37, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The terminal also includes:
    14th transmitting element, for sending data by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
  42. A kind of equipment of the core network, it is characterised in that including:
    5th receiving unit, the carrying for receiving first base station transmission indicates message, and the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
    Switch unit, for indicating that message carries out corresponding carrying and switched according to the carrying.
  43. Equipment of the core network according to claim 42, it is characterized in that, the carrying indicates that message is that the first bearing modification indicates message, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;The switch unit is additionally operable to the main plot group carrying for switching to the secondary cell group carrying on second base station in the first base station.
  44. Equipment of the core network according to claim 42, it is characterized in that, the carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The switch unit is additionally operable to carry the secondary cell group discharged the main plot group carrying being established as in the first base station.
  45. Equipment of the core network according to claim 42, it is characterised in that the carrying indicates to disappear Cease and indicate message for the 3rd bearing modification, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;The switch unit is additionally operable to carry the secondary cell group discharged the secondary cell group carrying being established as on the 3rd base station.
  46. Equipment of the core network according to claim 42, it is characterized in that, the carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;The switch unit is additionally operable to the main plot group carrying for switching to second target carrying on second base station in the first base station;
    Or,
    The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The switch unit is additionally operable to carry second target discharged the main plot group carrying being established as in the first base station on second base station.
  47. Equipment of the core network according to claim 42, it is characterized in that, the carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;The switch unit is additionally operable to the secondary cell group carrying for switching to second target carrying on second base station on the 3rd base station.
  48. A kind of system, it is characterised in that it includes first base station, the second base station being connected with the first base station, the terminal being connected with the first base station and second base station and the equipment of the core network being connected respectively with the first base station, second base station and the terminal;
    The first base station is as described in claim 28 to any one of claim 34;
    Second base station is as described in claim 35 or claim 36;
    The terminal is as described in claim 37 to any one of claim 41;
    The equipment of the core network is as described in claim 42 to any one of claim 47;
  49. A kind of first base station, it is characterised in that including:
    Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
    The central processing unit performs following operation:
    The configured information of the second base station transmission is received, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station;
    Radio Resource connection reallocation message is sent to terminal, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion.
  50. First base station according to claim 49, it is characterised in that the central processing unit performs following operation:
    The mapping table that second base station is sent is received, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
    Receive the carrying mark that second base station is sent.
  51. First base station according to claim 49, it is characterised in that the central processing unit performs following operation:
    First bearing modification instruction message is sent to equipment of the core network, first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station.
  52. First base station according to claim 49, it is characterised in that the central processing unit performs following operation:
    Second bearing modification instruction message is sent to the equipment of the core network, second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
  53. First base station according to claim 49, it is characterised in that the central processing unit performs following operation:
    3rd bearing modification instruction message is sent to the equipment of the core network, the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network.
  54. First base station according to claim 49, it is characterised in that the central processing unit performs following operation:
    4th bearing modification instruction message is sent to the equipment of the core network, the 4th bearing modification is indicated Message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;
    Or,
    5th bearing modification instruction message is sent to the equipment of the core network, the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network.
  55. First base station according to claim 49, it is characterised in that the central processing unit performs following operation:
    6th bearing modification instruction message is sent to the equipment of the core network, the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station.
  56. A kind of second base station, it is characterised in that including:
    Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
    The central processing unit performs following operation:
    Detect that at least one carries the General Packet Radio System tunnel protocol GTP mistakes whether occurred between second base station and gateway on second base station;
    If the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway occurs at least one carrying on second base station, at least one carrying for the GTP mistakes between second base station and the gateway occur is discharged;
    Configured information is sent to first base station, the configured information is used to indicate that at least one carrying is released due to the General Packet Radio System tunnel protocol GTP mistakes between second base station and gateway on second base station.
  57. Second base station according to claim 56, it is characterised in that the central processing unit performs following operation:
    Mapping table is sent to the first base station, the mapping table includes carrying and the corresponding relation of carrying mark that at least one is released due to the GTP mistakes between second base station and the gateway;
    The carrying mark is sent to first base station, so that the first base station determines the carrying for the GTP mistakes between second base station and the gateway occur.
  58. A kind of terminal, it is characterised in that including:
    Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
    The central processing unit performs following operation:
    The Radio Resource connection reallocation message that first base station is sent is received, the Radio Resource connection reallocation message is used to indicate that at least one is carried on the configuration in the terminal on the second base station described in the terminal deletion;
    Reallocation message is connected according to the Radio Resource delete on second base station at least one and be carried on the configuration in the terminal.
  59. Terminal according to claim 58, it is characterised in that the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the main plot group carrying that the terminal is used to send in the first base station of data;The central processing unit performs following operation:
    Data are sent by the main plot group carrying in first base station.
  60. Terminal according to claim 58, it is characterised in that the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, and the first object is carried as the secondary cell group carrying that the terminal is used to send on the 3rd base station of data;The central processing unit performs following operation:
    Data are sent by the secondary cell group carrying on the 3rd base station.
  61. Terminal according to claim 58, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as main plot group carrying and the carrying of the 3rd target that the terminal is used to send in the first base station of data, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The central processing unit performs following operation:
    Data are sent by the main plot group carrying and the 3rd target carrying in the first base station.
  62. Terminal according to claim 58, it is characterized in that, the Radio Resource connection reallocation message is additionally operable to indicate first object carrying, the first object is carried as the carrying of secondary cell group and the carrying of the 3rd target on the 3rd base station, carrying and signal intensity on 3rd base station meet preset requirement, and the 3rd target is carried as the carrying for not occurring the GTP mistakes on second base station;The central processing unit performs following operation:
    Data are sent by the carrying of secondary cell group and the 3rd target carrying on the 3rd base station.
  63. A kind of equipment of the core network, it is characterised in that including:
    Memory, central processing unit, Peripheral Interface, RF circuits, power management chip, and communication bus;
    The central processing unit performs following operation:
    The carrying instruction message that first base station is sent is received, the carrying indicates that message is used for the first base station and indicates that the equipment of the core network carries out carrying switching;
    Indicate that message carries out corresponding carrying switching according to the carrying.
  64. Equipment of the core network according to claim 63, it is characterized in that, the carrying indicates that message is that the first bearing modification indicates message, and first bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that the secondary cell group carrying on second base station is switched in the first base station;The central processing unit performs following operation:
    The main plot group carrying that secondary cell group carrying on second base station is switched in the first base station.
  65. Equipment of the core network according to claim 63, it is characterized in that, the carrying indicates that message is that the second bearing modification indicates message, and second bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The central processing unit performs following operation:
    The secondary cell group discharged is carried to the main plot group carrying being established as in the first base station.
  66. Equipment of the core network according to claim 63, it is characterized in that, the carrying indicates that message is that the 3rd bearing modification indicates message, and the 3rd bearing modification indicates that message is used to indicate that the secondary cell group discharged is carried the secondary cell group being established as on the 3rd base station and carried by the equipment of the core network;The central processing unit performs following operation:
    The secondary cell group discharged is carried to the secondary cell group carrying being established as on the 3rd base station.
  67. Equipment of the core network according to claim 63, it is characterized in that, the carrying indicates that message is that the 4th bearing modification indicates message, and the 4th bearing modification indicates that message is used to indicate that the equipment of the core network carries the main plot group that second target carrying on second base station is switched in the first base station;The central processing unit performs following operation:
    The main plot group carrying that second target carrying on second base station is switched in the first base station;
    Or,
    The carrying indicates that message is that the 5th bearing modification indicates message, and the 5th bearing modification indicates that message is used to indicate that second target discharged on second base station is carried the main plot group being established as in the first base station and carried by the equipment of the core network;The central processing unit performs following operation:
    Second target discharged on second base station is carried to the main plot group carrying being established as in the first base station.
  68. Equipment of the core network according to claim 63, it is characterized in that, the carrying indicates that message is that the 6th bearing modification indicates message, and the 6th bearing modification indicates that message is used to indicate that the equipment of the core network carries the secondary cell group that second target carrying on second base station is switched on the 3rd base station;The central processing unit performs following operation:
    The secondary cell group carrying that second target carrying on second base station is switched on the 3rd base station.
CN201480033899.5A 2014-09-25 2014-09-25 Carrier aggregation method, related equipment and system Pending CN105637934A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/087408 WO2016045038A1 (en) 2014-09-25 2014-09-25 Carrier aggregation method, related equipment and system

Publications (1)

Publication Number Publication Date
CN105637934A true CN105637934A (en) 2016-06-01

Family

ID=55580086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201480033899.5A Pending CN105637934A (en) 2014-09-25 2014-09-25 Carrier aggregation method, related equipment and system

Country Status (2)

Country Link
CN (1) CN105637934A (en)
WO (1) WO2016045038A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110024477A (en) * 2016-12-06 2019-07-16 金雅拓M2M有限责任公司 Method for reliable data transmission

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103428788A (en) * 2012-05-18 2013-12-04 华为技术有限公司 Method and device for forwarding data and communication system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102006655A (en) * 2009-08-31 2011-04-06 中兴通讯股份有限公司 RRC (Radio Resource Control) connection reestablishment method and device in carrier aggregation
CN102215600B (en) * 2010-04-06 2015-12-16 中兴通讯股份有限公司 The processing method of Radio Link Failure and subscriber equipment in carrier aggregation system
CN103139911B (en) * 2011-11-25 2016-10-05 华为技术有限公司 Realize the method for carrier aggregation, base station and subscriber equipment
US9125197B2 (en) * 2012-03-23 2015-09-01 Mediatek Inc. Methods for physical layer multi-point carrier aggregation and multi-point feedback configuration

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103428788A (en) * 2012-05-18 2013-12-04 华为技术有限公司 Method and device for forwarding data and communication system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110024477A (en) * 2016-12-06 2019-07-16 金雅拓M2M有限责任公司 Method for reliable data transmission
CN110024477B (en) * 2016-12-06 2023-07-04 泰利特辛特里恩德国有限公司 Method for reliable data transmission

Also Published As

Publication number Publication date
WO2016045038A1 (en) 2016-03-31

Similar Documents

Publication Publication Date Title
US11323920B2 (en) Handover method, base station, and communications system
US11146995B2 (en) Management method, device, equipment and storage medium for mobile handover
CN107027153B (en) Service switching method, context migration method and related equipment
US11432351B2 (en) Service continuity ensuring method, control plane gateway, and mobility management network element
US10512009B2 (en) Method for user equipment to switch base station, base station and user equipment
US11115880B2 (en) Path switch method between LTE and 5G node
CN102123460B (en) Method for realizing group calling service handover in trunked mobile communication system
WO2018165996A1 (en) Switching method and apparatus
US10064115B2 (en) Method and apparatus for handover in dual connectivity user equipment and base station
CN104796954A (en) System and method for seamless mobility in a network environment
JP2015122735A (en) Method for coping with radio link failure
CN105992292A (en) ENB handover method in heterogeneous network and eNB
WO2021027932A1 (en) Information processing method and apparatus, device and computer-readable storage medium
CN105992293B (en) Method and equipment for switching between networks
CN104838693A (en) Method and apparatus for managing handovers
CN114600508A (en) Method for establishing IAB node double connection and communication device
US10757610B2 (en) Call preservation on handover
KR20150065874A (en) Method for switching device-to-device communication, base station, and communication system
CN104350809B (en) Wireless communication system, wireless base station and communication means
CN103841657A (en) Local IP access connection release method and MRN
CN105637934A (en) Carrier aggregation method, related equipment and system
CN105578563A (en) Working method with terminal as wireless small station, and devices thereof
WO2017214921A1 (en) Wireless communication method, apparatus, terminal and base station
WO2020088177A1 (en) Communication method, mobility management entity, user equipment, and serving gateway
WO2024067015A1 (en) Communication method, communication apparatus, and communication system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160601