CN105633970B - Distribution back scheduling control system building method based on major network scheduling system - Google Patents

Distribution back scheduling control system building method based on major network scheduling system Download PDF

Info

Publication number
CN105633970B
CN105633970B CN201610146152.1A CN201610146152A CN105633970B CN 105633970 B CN105633970 B CN 105633970B CN 201610146152 A CN201610146152 A CN 201610146152A CN 105633970 B CN105633970 B CN 105633970B
Authority
CN
China
Prior art keywords
distribution
major network
scheduling
network
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610146152.1A
Other languages
Chinese (zh)
Other versions
CN105633970A (en
Inventor
李晓志
李宗垒
郝臻
江辉
杨凯
单喜斌
麻亚鹏
宋宗勋
钱丽平
丛玉頔
王国杰
连晓华
许晓康
于卫卫
刘帅
张瀚
王志英
于晓飞
车涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610146152.1A priority Critical patent/CN105633970B/en
Publication of CN105633970A publication Critical patent/CN105633970A/en
Application granted granted Critical
Publication of CN105633970B publication Critical patent/CN105633970B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention belongs to distribution network automated control system technical fields, more particularly, to a kind of distribution back scheduling control system building method based on major network scheduling system, system is dispatched by major network to be acquired the data of distribution using data acquisition equipment, it is analyzed using analysis system, in conjunction with the voltage of the actual motion of current power distribution network, the parameter of electric current and load, dispatch deal center carries out judge processing to the operating status of power distribution network, and transmission control is carried out using communication network, the present invention is by establishing Topology connection to major network pictorial statement and distribution pictorial statement, the logical relation of original distribution scheduling control system is substituted using the new spare distribution scheduling control logic relationship of foundation, the ride comfort of distribution operation can be greatly improved, during distribution scheduling, it is less prone to failure, it can effectively ensure that distribution just Often operation, can make system formed main distribution integration, the integrated independent multiple-limb intelligent control in area, county.

Description

Distribution back scheduling control system building method based on major network scheduling system
Technical field
The invention belongs to distribution network automated control system technical fields, dispatch system based on major network more particularly, to one kind Distribution back scheduling control system building method.
Background technique
Distribution system is the power generation of electric system electric energy, power transformation, transmission of electricity, power supply, a weight towards users in distribution Want link.Several years ago, with the deep progress of national grid construction and upgrading, distribution automation work also starts in some areas Carry out different degrees of development.Distribution management work is an important component in electric power enterprise management, to electric power The power supply capacity and power supply level of enterprise have direct influence, are the key factors for improving Management of Electrical Enterprise level.Distribution The core as distribution management is dispatched, determines the management quality of distribution.Currently, division of labor based on specialization is carried out in power scheduling, into one Differentiated control is walked, the difficulty and intensity of distribution sacurity dispatching management highlight.Under the new situation, distribution scheduling mode, job responsibility, Scheduling range etc. all also needs further perfect, this causes certain difficulty for distribution management, while also facing new challenges.
The management mode of distribution scheduling can be divided into according to different features: first, major network scheduling mutually divides with distribution scheduling From mode: structure is complicated for some Utilities Electric Co.s, and equipment compass of competency is big, therefore, scheduling portfolio it is also big, grid dispatching management The mode that mode usually selects main, distribution mutually to separate, can the failure to distribution scheduling be purged in time, to safeguard power grid Safe operation.Auxiliary tone is arranged in this local power-management centre in regional Utilities Electric Co., clearly the permission of reconciliation auxiliary tone, and Foundation emphasis is different with focus and fulfils different management and running functions.In actual operation, according to region, some electric power Company can dispatch the city power grid distribution Hua You, area or county, realize main, distribution scheduling separation.Second, major network and distribution scheduling The mode being combined into one.The power grid big for electric network composition complicated business amount can use the distinct mould of major network distribution scheduling Formula, and it is simple for electric network composition, almost without the minor scale power net of distribution net equipment, in order to save human resources, major network can be used The two-in-one mode with distribution scheduling.
But the distribution scheduling control function of current major network scheduling system is still incomplete, although Chinese patent CN105260810A discloses a kind of building method of distribution back scheduling control system based on major network scheduling system, still, The control regulation reaction of the power distribution automation of the dispatching method is slow, cannot be carried out updating in real time according to the needs of practical distribution with Variation influences the ride comfort of distribution operation, during distribution scheduling, is easy to appear failure, influences the operation of distribution.
Summary of the invention
The technical issues of needle of the present invention, provides a kind of ride comfort that can greatly improve distribution operation, distribution scheduling process In, it is less prone to failure, can effectively ensure that the distribution back scheduling based on major network scheduling system of the normal operation of distribution Control system building method.
The present invention is achieved by the following measures:
A kind of distribution back scheduling control system building method based on major network scheduling system, which is characterized in that specific packet Include following steps:
Step 1: analyzing the real time execution situation of built major network scheduling system, and the real-time of system is dispatched according to built major network Operating condition, the disk array of the business in conjunction with scheduled in built major network scheduling system, database server, SCADA server, Interface server, the voltage of actual motion, electric current and load parameter establish the pictorial statement of major network operation;
Step 2: the real time execution situation of analysis first wife's net Dispatching Control System, and according to the reality of built distribution scheduling system When operating condition, the application to distribution network model of the business in conjunction with scheduled in built distribution scheduling system, preposition correlation table, protection section Point, state quantity data and limit value check data, establish distribution pictorial statement;
Step 3: the distribution pictorial statement in the major network pictorial statement and the step 2 in the step 1 being imported unified In Electric control graphic platform, and Topology connection is established to major network pictorial statement and distribution pictorial statement, wherein topological relation is In conjunction with the relationship of the distribution pictorial statement in the major network pictorial statement and the step 2 in the step 1, controlled from Unified Power Inquiry obtains in standard topology relational database in graphic platform;
Step 4: topological reparation being carried out to first wife's net Dispatching Control System, according to the topological relation in the step 3, to original Distribution scheduling control system carries out topological coefficient reparation, adds the affiliated feeder line of distribution, affiliated switchyard, the ring network cabinet and described The field of on-pole switch obtains new spare distribution scheduling control to realize the affiliated accurate positioning of master network equipment and distribution net equipment Logical relation processed;
Step 5: substituting original match using the new spare distribution scheduling control logic relationship that the step 4 is established The logical relation of net Dispatching Control System, and remove apply in original major network scheduling system and distribution scheduling system all and answer With program module, and update the content of the message channel and server operation process in the application of major network and distribution;
Step 6: adjustment is optimized to the major network and distribution scheduling system that are newly formed in the step 4 and is updated, make be System formed main distribution integration, the integrated independent multiple-limb intelligent control in area, county.
In step 1 of the present invention, when analyzing the real time execution situation of built major network scheduling system, firstly, using data Acquisition module carries out real-time data acquisition, wherein data acquisition module is run on the Front End Server of major network scheduling system, is adopted The data of collection and the following source of processing: real time data and the GPS clock letter of substation, switchyard, ring network cabinet, on-pole switch etc. Number, real time data in frequency, area's tune SCADA system.
In step 6 of the present invention, after major network and distribution scheduling system optimize adjustment and update, major network dispatches system Voltage levels route is controlled by being connect after transformer transformation with the wire-outgoing breaker of low-voltage-grade, graph topology will Two single ended lines regard same route as, may be implemented to jump connection from major network figure by single ended line, are directly entered and match Net figure, accomplishes one-stop through, and distribution low-voltage-grade power transformation is directly accessed according to network topology from major network figure It stands, distribution box or even end user.
During the work time, major network scheduling system is acquired the data of distribution using data acquisition equipment the present invention, And analyzed using analysis system, then in conjunction with the parameter of the voltage of the actual motion of current power distribution network, electric current and load, On the basis of being fully considered to the supply of current power generation and transmission situation, operation of the dispatch deal center to power distribution network State carries out judge processing, and using communication network carry out transmission control, commander field personnel or automated system into The work of row distribution non-firm power scheduling realizes distribution back scheduling control, to ensure that it is safe and reliable that power distribution network operates in always In the state of.
Compared with prior art, the present invention by establishing Topology connection to major network pictorial statement and distribution pictorial statement, benefit The logical relation that original distribution scheduling control system is substituted with the new spare distribution scheduling control logic relationship of foundation, can To greatly improve the ride comfort of distribution operation, during distribution scheduling, it is less prone to failure, can effectively ensure that distribution just Often operation, can make system formed main distribution integration, the integrated independent multiple-limb intelligent control in area, county.
Detailed description of the invention:
Attached drawing 1 is flow chart of the invention.
Specific embodiment:
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description.
Such as attached drawing 1, the present invention provides a kind of distribution back scheduling control system Construction Parties based on major network scheduling system Method, major network scheduling system is acquired the data of distribution using data acquisition equipment, and is analyzed using analysis system, Then in conjunction with the parameter of the voltage of the actual motion of current power distribution network, electric current and load, to the supply of current power generation and On the basis of transmission situation is fully considered, dispatch deal center carries out judge processing, and benefit to the operating status of power distribution network Transmission control is carried out with communication network, commander field personnel or automated system carry out the work of distribution non-firm power scheduling Make, distribution back scheduling control is realized, to ensure that power distribution network is operated in always under safe and reliable state, which is characterized in that should The building method of distribution back scheduling control system specifically includes the following steps:
(1) the real time execution situation of built major network scheduling system is analyzed, and dispatches the real-time fortune of system according to built major network Market condition, the disk array of the business in conjunction with scheduled in built major network scheduling system, SCADA server, connect database server Mouth server, the voltage of actual motion, electric current and load parameter, establish the pictorial statement of major network operation;
(2) the real time execution situation of first wife's net Dispatching Control System is analyzed, and according to the real-time of built distribution scheduling system Operating condition, the application to distribution network model of the business in conjunction with scheduled in built distribution scheduling system, preposition correlation table, protection node, State quantity data and limit value check data, establish distribution pictorial statement;
(3) the distribution pictorial statement in the major network pictorial statement and the step (2) in the step (1) is imported unified In Electric control graphic platform, and Topology connection is established to major network pictorial statement and distribution pictorial statement, wherein topological relation is In conjunction with the relationship of the distribution pictorial statement in the major network pictorial statement and the step (2) in the step (1), from Unified Power Inquiry obtains in standard topology relational database in control graphic platform;
(4) topological reparation is carried out to first wife's net Dispatching Control System, according to the topological relation in the step (3), to original Distribution scheduling control system carries out topological coefficient reparation, adds the affiliated feeder line of distribution, affiliated switchyard, the ring network cabinet and described The field of on-pole switch obtains new spare distribution scheduling control to realize the affiliated accurate positioning of master network equipment and distribution net equipment Logical relation processed;
(5) original match is substituted using the new spare distribution scheduling control logic relationship that the step (4) is established The logical relation of net Dispatching Control System, and remove apply in original major network scheduling system and distribution scheduling system all and answer With program module, and update the content of the message channel and server operation process in the application of major network and distribution;
(6) adjustment is optimized to the major network and distribution scheduling system that are newly formed in the step (5) and updated, make system Formed main distribution integration, the integrated independent multiple-limb intelligent control in area, county.
In the present embodiment, first when analyzing the real time execution situation of built major network scheduling system in the step (1) First, real-time data acquisition is carried out using data acquisition module, wherein data acquisition module runs on the foreground of major network scheduling system On server, the data of acquisition and the following source of processing: the real time data of substation, switchyard, ring network cabinet, on-pole switch etc. with And real time data in GPS clock signal, frequency, area's tune SCADA system.In the step (6), major network and distribution scheduling system After optimizing adjustment and updating, major network is dispatched system control voltage levels route and is passed through after transformer transformation, with low electricity The wire-outgoing breaker connection of grade is pressed, graph topology regards two single ended lines as same route, can be with by single ended line Realize and from major network figure jump connection, be directly entered distribution figure, accomplish it is one-stop go directly, from major network figure according to network topology Distribution low-voltage-grade transformer substation, distribution box or even end user is directly accessed in relationship.
Compared with prior art, the present invention by establishing Topology connection to major network pictorial statement and distribution pictorial statement, benefit The logical relation that original distribution scheduling control system is substituted with the new spare distribution scheduling control logic relationship of foundation, can To greatly improve the ride comfort of distribution operation, during distribution scheduling, it is less prone to failure, can effectively ensure that distribution just Often operation, can make system formed main distribution integration, the integrated independent multiple-limb intelligent control in area, county.

Claims (3)

1. a kind of distribution back scheduling control system building method based on major network scheduling system, which is characterized in that specifically include Following steps:
Step 1: analyzing the real time execution situation of built major network scheduling system, and dispatch the real time execution of system according to built major network Situation, disk array, database server, the SCADA server, interface of the business in conjunction with scheduled in built major network scheduling system Server, the voltage of actual motion, electric current and load parameter establish the pictorial statement of major network operation;
Step 2: the real time execution situation of analysis first wife's net Dispatching Control System, and according to the real-time fortune of built distribution scheduling system Market condition, application to distribution network model, preposition correlation table, the protection node, shape of the business in conjunction with scheduled in built distribution scheduling system State amount data and limit value check data, establish distribution pictorial statement;
Step 3: the distribution pictorial statement in the major network pictorial statement and the step 2 in the step 1 is imported into Unified Power It controls in graphic platform, and Topology connection is established to major network pictorial statement and distribution pictorial statement, wherein topological relation is to combine The relationship of the distribution pictorial statement in major network pictorial statement and the step 2 in the step 1 controls figure from Unified Power Inquiry obtains in standard topology relational database in platform;
Step 4: topological reparation being carried out to first wife's net Dispatching Control System, according to the topological relation in the step 3, to first wife's net Dispatching Control System carries out topological coefficient reparation, adds on the affiliated feeder line of distribution, affiliated switchyard, affiliated ring network cabinet and affiliated column The field of switch obtains new spare distribution scheduling control and patrols to realize the affiliated accurate positioning of master network equipment and distribution net equipment The relationship of collecting;
Step 5: substituting original distribution tune using the new spare distribution scheduling control logic relationship that the step 4 is established Spend the logical relation of control system, and remove applied in original major network scheduling system and distribution scheduling system it is all using journey Sequence module, and update the message channel in of major network and distribution and the content of server operation process;
Step 6: adjustment being optimized to the major network and distribution scheduling system that are newly formed in the step 4 and is updated, system shape is made At main distribution integration, the integrated independent multiple-limb intelligent control in area, county.
2. a kind of distribution back scheduling control system building method based on major network scheduling system according to claim 1, It is characterized in that when analyzing the real time execution situation of built major network scheduling system, first using data acquisition module in the step 1 Carry out real-time data acquisition, wherein data acquisition module is run on the Front End Server of major network scheduling system, acquisition and processing The data in following source: the real time data and GPS clock signal of substation, switchyard, ring network cabinet, on-pole switch etc., frequency, Real time data in area's tune SCADA system.
3. a kind of distribution back scheduling control system building method based on major network scheduling system according to claim 1, It is characterized in that in the step 6, after major network and distribution scheduling system optimize adjustment and update, major network dispatches system control Voltage levels route passes through after transformer transformation, connect with the wire-outgoing breaker of low-voltage-grade, graph topology is by two Single ended line regards same route as, may be implemented to jump connection from major network figure by single ended line, is directly entered distribution figure Shape, accomplish it is one-stop through, be directly accessed from major network figure according to network topology distribution low-voltage-grade transformer substation, point Meet case or even end user.
CN201610146152.1A 2016-03-15 2016-03-15 Distribution back scheduling control system building method based on major network scheduling system Expired - Fee Related CN105633970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610146152.1A CN105633970B (en) 2016-03-15 2016-03-15 Distribution back scheduling control system building method based on major network scheduling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610146152.1A CN105633970B (en) 2016-03-15 2016-03-15 Distribution back scheduling control system building method based on major network scheduling system

Publications (2)

Publication Number Publication Date
CN105633970A CN105633970A (en) 2016-06-01
CN105633970B true CN105633970B (en) 2019-02-12

Family

ID=56048637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610146152.1A Expired - Fee Related CN105633970B (en) 2016-03-15 2016-03-15 Distribution back scheduling control system building method based on major network scheduling system

Country Status (1)

Country Link
CN (1) CN105633970B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106096824B (en) * 2016-06-06 2019-09-13 国电南瑞科技股份有限公司 A kind of main distribution integrative graph resource share method
CN108769215B (en) * 2018-05-31 2021-03-02 北京全路通信信号研究设计院集团有限公司 Transportation information integration system
CN108985601B (en) * 2018-07-03 2022-03-18 国网江西省电力有限公司经济技术研究院 Integrated management system for main network and distribution network

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104333131A (en) * 2014-10-17 2015-02-04 国家电网公司 Method for establishing prefecture and county power grid regulation data integration
CN105071376A (en) * 2015-07-03 2015-11-18 国网四川省电力公司 Method for implementing integrated framework of main distribution network
CN105260810A (en) * 2015-07-31 2016-01-20 国网四川省电力公司 Method for constructing distribution network standby scheduling and controlling system based on major network scheduling system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005015366A2 (en) * 2003-08-08 2005-02-17 Electric Power Group, Llc Real-time performance monitoring and management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104333131A (en) * 2014-10-17 2015-02-04 国家电网公司 Method for establishing prefecture and county power grid regulation data integration
CN105071376A (en) * 2015-07-03 2015-11-18 国网四川省电力公司 Method for implementing integrated framework of main distribution network
CN105260810A (en) * 2015-07-31 2016-01-20 国网四川省电力公司 Method for constructing distribution network standby scheduling and controlling system based on major network scheduling system

Also Published As

Publication number Publication date
CN105633970A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN102722764B (en) Integration network optimization computer-aided decision support System
CN107730093B (en) System and method for power grid accident re-routing path
CN102801790A (en) Microgrid energy management system based on IEC (International Electrotechnical Commission) 61850 and multi-agent method
CN105633970B (en) Distribution back scheduling control system building method based on major network scheduling system
CN107169880A (en) Platform is monitored in power grid user electricity consumption on-line
CN102957205A (en) Method and system for establishing distribution network model
CN104361457A (en) Information modeling method for production overhaul management of power distribution network and information interactive system and method
CN110119888A (en) A kind of active gridding planing method based on distributed generation resource access
CN109408960B (en) Method and system for automatically generating intelligent transformer substation main wiring diagram based on SCD
CN103455857A (en) Method for finely classifying user requirements to perform power grid load analysis and load prediction
CN101527454B (en) Method for automatically generating annual running mode report of power grid
CN109615088A (en) A kind of processing operation/maintenance work orders based on power information acquisition label
CN103208050A (en) Decision platform for implementing comprehensive power-cut maintenance plan
CN106599293A (en) CIM XML power grid model used for integrated dispatching and distribution system
CN103151840A (en) Communication method and device of IEC (international electrotechnical commission) 61850 system and non-IEC 61850 system
CN105449670B (en) A kind of distribution network load characteristic analysis method
CN111199091A (en) Power system interactive simulation method based on augmented virtual reality
CN107067161B (en) Automatic checking implementation system and method for information point table in smart power grid
CN103577628A (en) Optimization method for virtual circuit design of smart substation
CN104092215B (en) Distribution transformer capacity control method and system
CN104243218B (en) A kind of communication of power system mode list preparation method based on more schedule constraints
CN101685479A (en) Power grid online comprehensive pre-warning method and system based on massively parallel processing
CN109376468B (en) Mapping method of PMS model graphic element of power distribution automation system
CN110310048A (en) A kind of distribution planning overall process appraisal procedure and device
CN102760194B (en) Method and system for combining common information models (CIMs) of transformer substations and master scheduling station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190212