CN105592532A - Service single board energy saving method and apparatus - Google Patents

Service single board energy saving method and apparatus Download PDF

Info

Publication number
CN105592532A
CN105592532A CN201410640202.2A CN201410640202A CN105592532A CN 105592532 A CN105592532 A CN 105592532A CN 201410640202 A CN201410640202 A CN 201410640202A CN 105592532 A CN105592532 A CN 105592532A
Authority
CN
China
Prior art keywords
service
thresholding
service board
user
traffic load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410640202.2A
Other languages
Chinese (zh)
Inventor
王转莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201410640202.2A priority Critical patent/CN105592532A/en
Priority to PCT/CN2015/087274 priority patent/WO2016074516A1/en
Publication of CN105592532A publication Critical patent/CN105592532A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The invention discloses a service single board energy saving method and apparatus. The method comprises the following steps: when a service load corresponding to a first service single board is greater than a preset first service load threshold, and/or, the quantity of service users at a radio resource control (RRC) connection state, corresponding to the first service single board is greater than a preset first service user quantity threshold, transferring service on the first service single board to a second service single board, and powering off the first service single board. according to the invention, under the condition that basic coverage of a base station is not affected, the service of a service single board with a small load is displaced to other service single boards through interboard switching, then the service single board is powered off, and when the online service single board load of the base station is heavy, the power-off service single board is automatically powered up an activated. According to the method provided by the invention, the system can meet the requirement for automatically saving energy without additional arrangement of any devices.

Description

A kind of method that service board is energy-conservation and device
Technical field
The present invention relates to communication technical field, relate in particular to a kind of energy-conservation method of service board and device.
Background technology
Base station energy-saving technology is the energy saving direction that common carrier is being pursued always. Traditional base station energy-saving methodBe mainly to adopt base station energy-saving equipment to reach indirectly energy-saving effect, by base station intelligent fresh air be specificallyThe base station energy-saving equipment such as system, heat-exchange system, wet film VMC and air-conditioning electric saver, reduce base station skyThereby reach energy-saving effect the service time of adjusting, but its energy-saving effect that can reach is limited, therefore, asWhat realizes the better energy-conservation urgently technical issues that need to address that become now of base station.
Summary of the invention
In view of above-mentioned analysis, the present invention aims to provide a kind of energy-conservation method of service board and device, in order toFurther improve the energy-saving effect of base station.
For addressing the above problem, the present invention is mainly achieved through the following technical solutions:
One aspect of the present invention provides a kind of service board energy-conservation method, and the method comprises:
Be greater than the first default traffic load thresholding at traffic load corresponding to the first service board,
And/or
Service-user number at radio resource control RRC connected state corresponding to described the first service board is largeIn the time that the first default service-user is counted thresholding,
Business on described the first service board is transferred on the second service board;
Described the first service board is carried out to lower electricity;
Wherein, described the first service board be process to basic coverage cell strengthens covering same covering littleThe veneer of district's business, described the second service board is the veneer of processing described basic coverage cell business.
Preferably, corresponding one or more described the second service boards of described the first service board.
Preferably, described the first traffic load thresholding is less than the traffic load thresholding in cell energy-saving thresholding;
Described the first service-user is counted the service-user that thresholding is less than in cell energy-saving thresholding and is counted thresholding.
Preferably, the method also comprises:
Instantly described in corresponding any one of described the first service board after electricity, basic coverage cell meets defaultWhen condition, described the first service board is powered on.
Preferably, described pre-conditioned comprising:
Described in any one, the traffic load of basic coverage cell is higher than the second default traffic load thresholding;
And/or
Described in any one, the service-user number of basic coverage cell radio resource control RRC connected state is largeCount thresholding in the second default service-user.
The present invention also provides a kind of service board energy-conservation device on the other hand, and this device comprises:
Business shift module, for being greater than the first default business at traffic load corresponding to the first service boardLoad thresholding, and/or, at radio resource control RRC connected state corresponding to described the first service boardService-user number is greater than the first default service-user while counting thresholding, by the business on described the first service boardTransfer on the second service board, and trigger lower electric module;
Described lower electric module, for carrying out lower electricity to described the first service board;
Wherein, described the first service board be process to basic coverage cell strengthens covering same covering littleThe veneer of district's business, described the second service board is the veneer of processing described basic coverage cell business.
Preferably, corresponding one or more described the second service boards of described the first service board.
Preferably, described the first traffic load thresholding is less than the traffic load thresholding in cell energy-saving thresholding;
Described the first service-user is counted the service-user that thresholding is less than in cell energy-saving thresholding and is counted thresholding.
Preferably, this device also comprises: module powers on;
The described module that powers on, for base described in corresponding any one of described the first service board after electricity instantlyPlinth coverage cell meets when pre-conditioned, and described the first service board is powered on.
Preferably, described pre-conditioned comprising:
Described in any one, the traffic load of basic coverage cell is higher than the second default traffic load thresholding;
And/or
Described in any one, the service-user number of basic coverage cell radio resource control RRC connected state is largeCount thresholding in the second default service-user.
Beneficial effect of the present invention is as follows:
The present invention, in the situation that not affecting the covering of basis, base station, passes through the business of service board little loadBetween plate, switch and move on other service board, then to electricity under this service board, realized the automatic of base stationEnergy-conservation, thus the energy-saving effect of base station effectively improved.
Brief description of the drawings
Fig. 1 is the flow chart of the energy-conservation method of a kind of service board of the embodiment of the present invention;
Fig. 2 is the flow chart of the energy-conservation method of the another kind of service board of the embodiment of the present invention;
Fig. 3 is the structural representation of the energy-conservation device of a kind of service board of the embodiment of the present invention;
Fig. 4 is the structural representation of the energy-conservation device of the another kind of service board of the embodiment of the present invention.
Detailed description of the invention
Specifically describe the preferred embodiments of the present invention below in conjunction with accompanying drawing, wherein, accompanying drawing forms the application onePart, and together with embodiments of the present invention for explaining principle of the present invention.
The main purpose of the embodiment of the present invention is to provide a kind of energy-conservation method of service board and device, at shadow notRing in the situation of basis, base station covering, the business of service board little load is moved to not by switching between plateService board on, then to electricity under this service board, when online service board load in base station is heavy, rightThe activation that automatically powers on of the service board of lower electricity. This method does not need to increase any equipment, and system just canTo meet the automatic saving energy. Just by several specific embodiments, technical scheme of the present invention is carried out in detail belowDescribe in detail bright.
The embodiment of the present invention provides a kind of service board energy-conservation method, and referring to Fig. 1, the method comprises:
S101, be greater than the first default traffic load thresholding at traffic load corresponding to the first service board, and/Or, radio resource control corresponding to described the first service board (RadioResourceControl,RRC) when the service-user number of connected state is greater than the first default service-user and counts thresholding, by described the first businessBusiness on veneer is transferred on the second service board;
, when judging that traffic load corresponding to the first service board and the service-user number of RRC connected state are greater thanDefault corresponding the first traffic load thresholding and the first service-user are counted after thresholding, by described the first business sheetService-user on plate is transferred on the second service board;
S102, described the first service board is carried out to lower electricity.
Wherein, described the first service board be process to basic coverage cell strengthens covering same covering littleThe veneer of district's business, described the second service board is the veneer of processing described basic coverage cell business. It is instituteState the first corresponding basic coverage cell of service board and strengthens the business of the same coverage cell of covering, described theThe business of the corresponding described basic coverage cell of two service boards.
The present invention is not in the situation that affecting the covering of basis, base station, and the business of service board little portfolio is logicalCross between plate and switch and move on other service board, then, to electricity under this service board, realize by the methodThe automatic energy saving of base station, thereby effectively improved the energy-saving effect of base station.
Jun Shi energy-saving cell, described same coverage cell in the embodiment of the present invention, concrete, the present invention is by sentencingJun Shi energy-saving cell, all same coverage cell on disconnected service board, and all with covering on this service boardBasic coverage cell corresponding to community meets while setting under veneer electric condition, triggers with place, coverage cell businessElectricity under veneer.
Under service board in the embodiment of the present invention, electric condition is: when judging business corresponding to the first service boardThe service-user number of load and/or radio resource control RRC connected state is greater than default corresponding the first industryBusiness load thresholding and the first service-user are counted thresholding. Be that the present invention is reaching the first traffic load thresholding and firstWhen service-user is counted one or more in thresholding, service board is carried out to lower electricity.
Those skilled in the art can know, and converge the first arbitrary of base station of service board general reference of the present inventionHave the service board of same coverage cell business, the second arbitrary of base station of service board general reference converged basis and coveredThe service board of Zone, basic coverage cell of the present invention is for the community of basic seamless coverage,And be to strengthen coverage cell for the capacity of hot zones with coverage cell, and described the first service board is placeReason strengthens the veneer of the same coverage cell business covering, described the second service board to basic coverage cellFor processing the veneer of described basic coverage cell business. Be that each piece first service board of the present invention can be rightShould one or more described the second service boards.
The method of the embodiment of the present invention also comprises: instantly described the first service board after electricity corresponding any oneWhen individual described basic coverage cell meets the default condition that powers on, described the first service board is powered on.
When the online service board load in base station is heavy, to the activation that automatically powers on of the service board of lower electricity.
Described in the embodiment of the present invention, the condition of powering on comprises: described in any one, the business of basic coverage cell is negativeLotus, higher than the second default traffic load thresholding, can also be set simultaneously: described in any one, basis covers littleThe service-user number of district radio resource control RRC connected state is greater than the second default service-user and counts thresholding.
Or those skilled in the art also can set as required in above-mentioned two conditions any one beCondition powers on.
Concrete, method of the present invention, in the time meeting lower electric condition when service board, touches by platformGenerate electricity under this service board. Under service board after electricity, detect in real time basic coverage cell traffic load andThe service-user number of radio resource control RRC connected state, when any one basic coverage cell meets industryWhen business Board Power up condition, trigger service board and power on.
In order to reach better energy-saving effect, the present invention sets described the first traffic load thresholding and described firstService-user is counted thresholding and is all less than corresponding traffic load thresholding and service-user number in cell energy-saving thresholdingLimit.
The first traffic load thresholding in the embodiment of the present invention, the first service-user are counted thresholding, the second business is negativeLotus thresholding, the second service-user count thresholding and cell energy-saving thresholding all can preset, and can basisActual needs is adjusted. For example, setting the first traffic load thresholding is 4M, the second traffic load thresholding 5M,It is 6 that the first service-user is counted thresholding, and the second service-user is counted 8 of thresholdings, corresponding industry in energy-conservation thresholdingBusiness load thresholding and service-user are counted thresholding and are respectively 6M and 10. Certainly those skilled in the art canAccording to actual needs above-mentioned each thresholding is carried out to other setting.
Specifically, the present invention can be configured to energy-conservation same coverage cell and converge in same business sheetOn plate;
After detecting that all communities are energy-saving cell on a service board, and on this service boardWhen basic coverage cell corresponding to all same coverage cell all meets default lower electric condition, trigger with covering littleElectricity under the service board of place, district, lower electric condition of the present invention comprises following any one condition:
1. the traffic load of all basic coverage cell is lower than the first default traffic load thresholding;
2. the RRC connected state service-user number of all basic coverage cell is less than the first service-user of settingNumber thresholding.
Lower electric switch limit value of the present invention is lower than the energy-conservation thresholding in triggering cell.
When detecting that any one basic coverage cell reaches service board and wakes thresholding (meeting the condition that powers on) upTime, wake-up is by place, the same coverage cell service board of lower electricity, and the condition of powering on of the present invention comprisesAny one condition below:
1. the traffic load of any one basic coverage cell is higher than the second default traffic load thresholding;
2. any one basic coverage cell RRC connected state service-user number exceeds the second default service-userNumber thresholding.
The specific implementation flow process of method of the present invention as shown in Figure 2, below in conjunction with Fig. 2 to of the present inventionMethod is explained in detail explanation:
Whether S201, the same coverage cell of detecting on service board are energy-saving cell, if be all energy-conservation littleDistrict, enters S203, otherwise, enter S202;
S202, end;
Whether S203, all basic coverage cell that this service board of real-time judge is corresponding meet default phaseThe first traffic load thresholding and first service-user of answering are counted thresholding, if lower than appointed threshold, enterS204;
Under S204, transmission service board, electric request message is to platform;
S205, platform send the message of this service board being carried out to lower electricity after receiving request message to base station;
S206, base station receive after this state message, delete one by one the same coverage cell of this service board;
S207, in the time monitoring any basic coverage cell and reach service board and wake thresholding up, transmission businessBoard Power up request message is to platform;
S208, platform receive after request message, send trigger the message that service board powers on to base station;
S209, base station receive after the message powering on, and the service board of lower electricity is re-powered to activation.
With a base station, two service board situations are example below, set forth a kind of specific embodiment party of the present inventionFormula. Concrete implementation step is as follows:
The second service board is set up basic coverage cell 1, the first service board and is set up with coverage cell 2, energy-conservation10 of thresholding numbers of users, the first service-user is counted 6 of thresholdings, and the second service-user is counted 8 of thresholdings;
Base station normally powers on, and planning community 1 and community 2 are successfully established;
30 users are accessed in community 1; 20 users are accessed in community 2;
After operation a period of time, community 1 number of users is 3, and community 2 numbers of users are 2, reach firstService-user is counted thresholding, and system initiatively moves on to community 1 by community 2 numbers of users, and community 2 is in power save mode,The number of users of community 1 is 5, reaches lower electric switch limit, starts electricity under the second service board;
After operation a period of time, the number of users of community 1 reaches 8, starts the second service board and powers on.
With a base station, three service board situations are example again, set forth a kind of detailed description of the invention of the present invention.Concrete implementation step is as follows:
The second service board is set up basic coverage cell 1, the second service board and is set up basic coverage cell 2; TheOne service board is set up with coverage cell 3; Energy-saving doors limits the use of 10 of amounts, and the first service-user is counted thresholding 6Individual, the second service-user is counted 8 of thresholdings;
Base station normally powers on, planning community 1 and community 2, and community 3 is successfully established;
30 users are accessed in community 1; 20 users are accessed in community 2, and 10 users are accessed in community 3;
After operation a period of time, community 1 number of users is 4, and community 2 numbers of users are 3, community 3Number of users is 2, reaches energy-conservation thresholding, and system initiatively moves to community 2 by community 3 numbers of users, community 3In power save mode, the number of users of community 1 is 6, and community 2 numbers of users are 3, reaches lower electric switch limit,Start electricity under the first service board;
After operation a period of time, the number of users of community 1 reaches 8, and community 2 numbers of users are 4, reachThe thresholding that powers on, starts the first service board and powers on.
Also, again with a base station, two service board situations are example, set forth a kind of specific embodiment party of the present inventionFormula. Concrete implementation step is as follows:
The second service board is set up basic coverage cell 1, the second service board and is set up with coverage cell 2; Energy-conservationThresholding load 6M; The first traffic load thresholding 4M, the second traffic load thresholding 5M;
Base station normally powers on, and planning community 1 and community 2 are successfully established;
Community 1 20M that loads, 15M loads in community 2;
After operation a period of time, community 1 load is reduced to 2M, and community 2 loads are reduced to 1M, reach energy-saving doorsLimit. System initiatively moves to community 1 by community 2 numbers of users, and community 2 is in power save mode, community 1Load is 3M, reaches lower electric switch limit, starts electricity under the first service board;
After operation a period of time, the load of community 1 reaches 5M, starts the first service board and powers on.
The embodiment of the present invention also provides a kind of service board energy-conservation device, and referring to Fig. 3, this device comprises:Interconnective business shift module and lower electric module;
Business shift module, for being greater than the first default business at traffic load corresponding to the first service boardLoad thresholding, and/or, at radio resource control RRC connected state corresponding to described the first service boardService-user number is greater than the first default service-user while counting thresholding, by the business on described the first service boardTransfer on the second service board, and trigger lower electric module;
Described lower electric module, for carrying out lower electricity to described the first service board;
Wherein, described the first service board be process to basic coverage cell strengthens covering same covering littleThe veneer of district's business, described the second service board is the veneer of processing described basic coverage cell business.
When concrete enforcement, business shift module and lower electric module all can be arranged on to base station side, also can be by lower electricityModule is arranged on platform side, at business shift module, the business on the first service board is transferred to the second businessAfter on veneer, send out message to platform, platform carries out lower electricity by lower electric module to described the first service board.
Corresponding one or more described the second service boards of described the first service board in the embodiment of the present invention.
Described the first traffic load thresholding in the embodiment of the present invention is less than the traffic load in cell energy-saving thresholdingThresholding, and described the first service-user is counted the service-user that thresholding is less than in cell energy-saving thresholding and is counted thresholding.
Device in the embodiment of the present invention also comprises: the module that powers on, specifically as shown in Figure 4;
The described module that powers on, for base described in corresponding any one of described the first service board after electricity instantlyPlinth coverage cell meets when pre-conditioned, and described the first service board is powered on.
The module that powers on specifically can be arranged on base station side, also can be arranged on platform side.
But no matter how above-mentioned modules to arrange, to the first service board power on or lower electricity all needs to lead toKnow platform.
Wherein, described pre-conditioned comprising:
Described in any one, the traffic load of basic coverage cell is higher than the second default traffic load thresholding;
And/or
Described in any one, the service-user number of basic coverage cell radio resource control RRC connected state is largeCount thresholding in the second default service-user.
The related content of apparatus of the present invention is referring to the related content of the method part described in description of the present invention,This repeats no more.
The present invention at least can bring following beneficial effect:
The invention provides a kind of energy-conservation method of service board and device, base station basis covers not affectingIn situation, the business of service board little load is by switching and move on other service board between plate, rightTo electricity under this service board, in the time that the online service board load of base station weighs, the service board of lower electricity is entered afterwardsThe capable activation that automatically powers on. This method does not need to increase any equipment, and system just can meet automatic saving energySource.
The above, be only preferably detailed description of the invention of the present invention, but not office of protection scope of the present inventionBe limited to this, any be familiar with those skilled in the art the present invention disclose technical scope in, can be easilyThe variation of expecting or replacement, within all should being encompassed in protection scope of the present invention. Therefore, protection of the present inventionScope should be as the criterion with the protection domain of claims.

Claims (10)

1. the energy-conservation method of service board, is characterized in that, comprising:
Be greater than the first default traffic load thresholding at traffic load corresponding to the first service board,
And/or
Service-user number at radio resource control RRC connected state corresponding to described the first service board is largeIn the time that the first default service-user is counted thresholding,
Business on described the first service board is transferred on the second service board;
Described the first service board is carried out to lower electricity;
Wherein, described the first service board be process to basic coverage cell strengthens covering same covering littleThe veneer of district's business, described the second service board is the veneer of processing described basic coverage cell business.
2. method according to claim 1, is characterized in that,
Corresponding one or more described the second service boards of described the first service board.
3. method according to claim 1, is characterized in that,
Described the first traffic load thresholding is less than the traffic load thresholding in cell energy-saving thresholding;
Described the first service-user is counted the service-user that thresholding is less than in cell energy-saving thresholding and is counted thresholding.
4. according to the method described in any one in claim 1-3, it is characterized in that, also comprise:
Instantly described in corresponding any one of described the first service board after electricity, basic coverage cell meets defaultWhen condition, described the first service board is powered on.
5. method according to claim 4, is characterized in that, described pre-conditioned comprising:
Described in any one, the traffic load of basic coverage cell is higher than the second default traffic load thresholding;
And/or
Described in any one, the service-user number of basic coverage cell radio resource control RRC connected state is largeCount thresholding in the second default service-user.
6. the energy-conservation device of service board, is characterized in that, comprising:
Business shift module, for being greater than the first default business at traffic load corresponding to the first service boardLoad thresholding, and/or, at radio resource control RRC connected state corresponding to described the first service boardService-user number is greater than the first default service-user while counting thresholding, by the business on described the first service boardTransfer on the second service board, and trigger lower electric module;
Described lower electric module, for carrying out lower electricity to described the first service board;
Wherein, described the first service board be process to basic coverage cell strengthens covering same covering littleThe veneer of district's business, described the second service board is the veneer of processing described basic coverage cell business.
7. device according to claim 6, is characterized in that,
Corresponding one or more described the second service boards of described the first service board.
8. device according to claim 6, is characterized in that,
Described the first traffic load thresholding is less than the traffic load thresholding in cell energy-saving thresholding;
Described the first service-user is counted the service-user that thresholding is less than in cell energy-saving thresholding and is counted thresholding.
9. according to the device described in any one in claim 6-8, it is characterized in that, also comprise: power onModule;
The described module that powers on, for base described in corresponding any one of described the first service board after electricity instantlyPlinth coverage cell meets when pre-conditioned, and described the first service board is powered on.
10. device according to claim 9, is characterized in that, described pre-conditioned comprising:
Described in any one, the traffic load of basic coverage cell is higher than the second default traffic load thresholding;
And/or
Described in any one, the service-user number of basic coverage cell radio resource control RRC connected state is largeCount thresholding in the second default service-user.
CN201410640202.2A 2014-11-13 2014-11-13 Service single board energy saving method and apparatus Pending CN105592532A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410640202.2A CN105592532A (en) 2014-11-13 2014-11-13 Service single board energy saving method and apparatus
PCT/CN2015/087274 WO2016074516A1 (en) 2014-11-13 2015-08-17 Method and device for saving energy for service board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410640202.2A CN105592532A (en) 2014-11-13 2014-11-13 Service single board energy saving method and apparatus

Publications (1)

Publication Number Publication Date
CN105592532A true CN105592532A (en) 2016-05-18

Family

ID=55931635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410640202.2A Pending CN105592532A (en) 2014-11-13 2014-11-13 Service single board energy saving method and apparatus

Country Status (2)

Country Link
CN (1) CN105592532A (en)
WO (1) WO2016074516A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112291806A (en) * 2020-11-03 2021-01-29 比科奇微电子(杭州)有限公司 Service migration method and device
CN113938331A (en) * 2020-06-29 2022-01-14 中兴通讯股份有限公司 Single board power-on method, main control board and readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232659A (en) * 2008-02-20 2008-07-30 中兴通讯股份有限公司 Method for reducing single board power consumption
CN102083179A (en) * 2010-08-11 2011-06-01 大唐移动通信设备有限公司 Control processing method for energy-saving cell and base station
CN102340825A (en) * 2011-08-12 2012-02-01 中国科学技术大学 Load-transfer-based energy-saving control method and system for mobile communication system
US20130095842A1 (en) * 2010-04-29 2013-04-18 China Academy Of Telecommunications Technology Method and equipment for saving energy

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6584330B1 (en) * 2000-07-18 2003-06-24 Telefonaktiebolaget Lm Ericsson (Publ) Adaptive power management for a node of a cellular telecommunications network
CN103906153B (en) * 2012-12-28 2018-07-17 中国移动通信集团公司 One kind being based on energy-efficient base station dormancy method and apparatus
CN104105151B (en) * 2013-04-01 2017-11-17 华为技术有限公司 Base station handles method, apparatus and base station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232659A (en) * 2008-02-20 2008-07-30 中兴通讯股份有限公司 Method for reducing single board power consumption
US20130095842A1 (en) * 2010-04-29 2013-04-18 China Academy Of Telecommunications Technology Method and equipment for saving energy
CN102083179A (en) * 2010-08-11 2011-06-01 大唐移动通信设备有限公司 Control processing method for energy-saving cell and base station
CN102340825A (en) * 2011-08-12 2012-02-01 中国科学技术大学 Load-transfer-based energy-saving control method and system for mobile communication system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113938331A (en) * 2020-06-29 2022-01-14 中兴通讯股份有限公司 Single board power-on method, main control board and readable storage medium
CN112291806A (en) * 2020-11-03 2021-01-29 比科奇微电子(杭州)有限公司 Service migration method and device
CN112291806B (en) * 2020-11-03 2023-03-14 比科奇微电子(杭州)有限公司 Service migration method and device

Also Published As

Publication number Publication date
WO2016074516A1 (en) 2016-05-19

Similar Documents

Publication Publication Date Title
CN102724715B (en) The control method of a kind of auxiliary carrier wave, control equipment and mobile communication system
RU2019136250A (en) COMMUNICATION SYSTEM, COMMUNICATION TERMINAL DEVICE AND BASE STATION DEVICE
EP2642800A1 (en) Method and device for realizing energy saving in communication system
CN101179814A (en) Energy-saving method and apparatus for base station
CN102740426A (en) Base station energy-saving method, device and system
WO2016000349A1 (en) Power-saving control method and device for base station, and storage medium
CN102681649B (en) Device and method for prolonging battery endurance abilities of all kinds of intelligent equipment
CN101895972A (en) WiFi (Wireless Fidelity) power supply dynamic management system and method
CN104144479A (en) Power consumption adjustment method and device
CN103092319A (en) Method and device for processing data
CN105592532A (en) Service single board energy saving method and apparatus
CN101583162B (en) Configuration method, device and base station for uplink signaling
CN102200761A (en) Radio frequency switch based on internet of things
CN104811965A (en) Method and apparatus for optimizing network resources of terminal
CN103476099A (en) Double dormancy method for wireless sensor nodes
CN106209652A (en) A kind of routing device and power-saving method, device
CN101369839A (en) Communication equipment energy-saving method, base station and communication system
WO2011097766A1 (en) Method for optimizing radio resource control state and device for machine-type communications
CN103685764B (en) Power-saving method in a kind of mobile terminal and device
Wu et al. Revisiting the System Energy Footprint and Power Efficiency on the Way to Sustainable 6G Systems
WO2018171668A1 (en) Logistics appliance and signal transmission method for logistics system
CN104821895A (en) Energy-saving method and device
CN107911876A (en) There is the solar energy auxiliary power supply wireless access point of reference record
CN103491567A (en) Network energy saving method, base station equipment and base station detection method
CN107562176A (en) A kind of Automated library system energy-saving control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160518

RJ01 Rejection of invention patent application after publication