CN105577475B - Automated performance testing system and method - Google Patents

Automated performance testing system and method Download PDF

Info

Publication number
CN105577475B
CN105577475B CN201511005077.9A CN201511005077A CN105577475B CN 105577475 B CN105577475 B CN 105577475B CN 201511005077 A CN201511005077 A CN 201511005077A CN 105577475 B CN105577475 B CN 105577475B
Authority
CN
China
Prior art keywords
test
unit
client
control module
management module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511005077.9A
Other languages
Chinese (zh)
Other versions
CN105577475A (en
Inventor
温涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Gaoyou Information Technology Service Co., Ltd
SHANGHAI HANDPAL INFORMATION TECHNOLOGY SERVICE Co.,Ltd.
Original Assignee
Shanghai Hanzhiyou Information Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hanzhiyou Information Technology Service Co Ltd filed Critical Shanghai Hanzhiyou Information Technology Service Co Ltd
Priority to CN201511005077.9A priority Critical patent/CN105577475B/en
Publication of CN105577475A publication Critical patent/CN105577475A/en
Application granted granted Critical
Publication of CN105577475B publication Critical patent/CN105577475B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters

Abstract

The present invention relates to automatic test field more particularly to a kind of automated performance testing system and methods.Applied to fictitious load condition in the automatic test of client performance, test macro includes: demand management module, manages and sends performance requirement;Automation control module receives and disposes test environment according to performance requirement, generates test assignment;Testing control module transfers test assignment, and according to test assignment fictitious load condition and test process;Automation control module starts resource management module, and resource management module carries out the automated performance testing of client according to loading condition and test process in test environment.Test method includes: generation and sends performance requirement;It receives and test environment is disposed according to performance requirement, generates test assignment;Test assignment is transferred, and according to test assignment fictitious load condition and test process;The automated performance testing of client is carried out in test environment according to loading condition and test process.

Description

Automated performance testing system and method
Technical field
The present invention relates to automatic test field more particularly to a kind of automated performance testing system and methods.
Background technique
In existing Performance Test System, it usually needs simulate a variety of loading conditions, performance test is intended to pass through simulation Test when be supported on gradually increase etc. under the conditions of when, the situation of change of the performance indexes of test application program, but existing Test macro in test resource there is no unified management, from the compiling of the application package of early period, path construction and version Originally be deployed to building for the test scene in later period and need to expend more manpower and time, this just will increase the cost of test and Reduce testing efficiency.
Summary of the invention
It aiming at the problems existing in the prior art, can be with the present invention relates to a kind of automated performance testing system and method Workflow in an automated fashion meets actual performance test scene and implements.
The following technical solution of the present invention:
A kind of automated performance testing system, applied to fictitious load condition in the automatic test of client performance, The automated performance testing system includes:
Demand management module manages and sends performance requirement;
Automation control module is connect with the demand management module, is received and is disposed according to the performance requirement and is tested Environment generates test assignment;
Testing control module is connect with the automation control module, transfers the test assignment, and according to the test Loading condition and test process described in task simulation;
Resource management module is connect with the automation control module, the testing control module respectively;And
The automation control module starts the resource management module, and the resource management module is according to the load bar Part and test process carry out the automated performance testing of the client in the test environment.
Preferably, the performance requirement includes the performance requirement of the performance requirement that service line is submitted and/or normalization.
Preferably, the resource management module includes:
Load unit sends request of data according to the loading condition, and acts on behalf of the survey according to the test process The service of examination process;
Server unit is connect with the load unit, provides the client to the access mechanism of the server, and According to data interaction operation is carried out between the request of data and the client, to be tested for the property.
Preferably, the server unit includes:
Application server element connect with the automation control module, the client respectively, provides the client To the access mechanism of the server;
Database server unit is connect with the load unit and the client respectively, according to the request of data Data interaction operation is carried out between the client.
Preferably, the automation control module includes:
Initialization unit is connect with the demand management module, is reset according to the performance requirement to the test environment, So that the test environment restoration is to baseline state;
Environment deployment unit is connect with the initialization unit, after restoring baseline state, is obtained data packet and/or is matched It sets file and/or instance parameter and the test wrapper is disposed according to the data packet and/or configuration file and/or instance parameter Border;
Service operational unit is connect with the environment deployment unit, starts and verify the application server element;
Application control unit connect with the environment deployment unit, service operational unit respectively, is pre-stored with data packet And/or configuration file and/or instance parameter, and the testing control module is controlled, is operated.
Preferably, the automation control module further include:
Service alerts unit is connect with the resource management module, service condition to the resource management module and/or Application error is alarmed;
Log tracing unit, respectively with the resource management module, the testing control module, the demand management module Connection, records each operation in the automated performance testing system.
Preferably, the testing control module includes:
Scene configuration unit is connect with the application control unit, control and/or behaviour by the application control unit Make to call the test assignment;
Script bank connect with the scene configuration unit, is pre-stored with test script, and
The scene configuration unit runs the test script, and the configuration of test parameter is carried out according to the test assignment, To simulate the loading condition and test process.
Preferably, the testing control module further include:
Index monitoring unit is connect, to pair of setting respectively with the resource management module, the automation control module Monitoring and/or management as carrying out test index;
Data acquisition unit is connect with the resource management module, the client respectively, during performance test, Acquire the test data of the resource management module and/or the client.
A kind of automated performance testing method, the automated performance testing method include:
Step S1 is generated and is sent performance requirement;
Step S2 is received and is disposed test environment according to the performance requirement, generates test assignment;
Step S3 transfers the test assignment, and according to the test assignment fictitious load condition and test process;
Step S4 carries out the automation of client according to the loading condition and test process in the test environment It can test.
Preferably, it is specifically included in the step S2:
Step S21 resets the test environment according to the performance requirement, so that the test environment restoration is to baseline State;
Step S22 obtains data packet and/or configuration file and/or instance parameter and according to the data packet and/or configuration File and/or instance parameter dispose the test environment;
Step S23, starting and verifying application server element;
Step S24 starts the testing control module.
Preferably, the step S3 is specifically included:
Step S31 runs test script, and configuring to test parameter according to the test assignment, with simulation The loading condition and test process;
Preferably, the step S4 is specifically included:
Step S41 sends request of data according to the loading condition and the test process, and is asked according to the data The progress data interaction operation between the client is asked, to complete automated performance testing.
The beneficial effects of the present invention are:
The present invention can reach rapid deployment, reasonable construction, compiling and automatic performance according to actual project demands Implement;And under no manual intervention environment, can according to current default strategy implement automatic performance regression test activity, Real-time update and maintainability test environment application package and relevant parameter file are latest edition, to mention for business is online , can also be from project implementation angle for data reference and quality suggestion, can make rational planning for performance test plan, scene and resource Human cost and time cost are saved in configuration.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of automated performance testing system of the present invention;
Fig. 2 is a kind of flow diagram of automated performance testing method of the present invention.
Specific embodiment
It should be noted that in the absence of conflict, following technical proposals be can be combined with each other between technical characteristic.
A specific embodiment of the invention is further described with reference to the accompanying drawing:
Embodiment one
As shown in Figure 1, present embodiments providing a kind of automated performance testing system, the object of test be can be to client The test for holding performance, the automatization test system in the present embodiment includes: resource management module, to the resource in test macro into Row management, resource management module may include server unit and load unit, and the effect of resource management module is that clothes The management of business device unit and load unit, load unit are connected with server unit, and server unit can also be logical with client Letter connection, load unit are the Primary proxy process service of automated performance testing, and (it can be client and answers simulant-client With program) it the loads such as request of data, such as press machine carried out to server unit all can serve as load unit, and load list Press machine (i.e. one kind of load machine) in member can be one or more, can be set according to the actual situation, actual rings It can be showed in the form of cluster in border, press machine is the test resource in test macro.Server unit may include using clothes Business device unit and database server unit, corresponding application server element can be application server, database server Unit can be database server.
Further, application server element and the quantity of database server unit can also determine according to the actual situation One still multiple, and business logic can be exposed to this application program of client by various agreements by application server.It The approach of access business logic is provided for client application use, application server is using this business logic just as adjusting It is the same with a method of object.In addition, database server provides service for client applications, mainly for the treatment of data Inquiry or data manipulation request, these services can be inquiry, update, transaction management, index, cache, query optimization, Safety and multi-user access control etc..
The automatization test system of the present embodiment can also be including an automation control module and demand management module, first Demand management module is illustrated, demand management module can be to the performance requirement and presetting normality that service line is submitted The demand of change is managed, and arranges the demand of the demand of normalization and service line submission wherein the mode managed can be Table generates a demand task list, enumerates the demand of normalization and/or the demand of task line, the detailed programs enumerated in inventory It can be set according to the actual situation, the demand of normalization can be presetting in demand management module, and the need of service line Ask to generate in real time, and demand management module can also determine the hair of service line demand and normalization demand according to practical situation It send.
Above-mentioned automation control module is connect with resource management module and demand management module respectively, automation control mould Block be mainly application server module provide application environment initialized, disposed, service operations, using alarm and application Log output etc..Automation control module may include initialization unit, and initialization unit is connect with demand management module, need After asking management module to generate demand task list according to presetting normalization demand and/or real-time service line demand, demand Demand task list can be sent to the initialization unit of automation control module by management module, and initialization unit can be to negative at this time The test environment for carrying performance is reset, and baseline state is made it restore to;Automation control module can also include that environment is disposed Unit and application control unit, environment deployment unit is after testing environment restoration to baseline state, in application control unit Service line packet, configuration parameter file and instance parameter etc. carry out the deployment of application software and build, and the operation disposed and built is complete Cheng Hou, another unit in automation control module is service operational unit, and service operational unit can be with application server list Member connection, and the related service of application server the operation such as is successively started, is verified according to specific configure, to sum up, Automation control module is mainly used for test environment is initialized, disposed, service operations and application alarm, meanwhile, note Picture recording closes operation information to judge that operation executes correctness.
Further, the automation control module in the present embodiment further includes service alerts unit and log tracing unit, Service condition and application error of the service alerts unit primarily directed to the resource (can be load machine) in resource management center (application error that can be load machine) gives information alert, and furthermore log tracing unit believes the operation at automation control center Breath carries out relevant record.Further, above-mentioned each unit in automation control module can be sent out after completing its operation Send a completion signal to next unit for needing to operate, so that next need the unit operated to continue to grasp accordingly Make.
Automatization test system in the present embodiment can also include a testing control module, testing control module respectively with Resource management module is connected with automation control module, is mainly responsible for the execution of test script, is carried out task tune to test scene Degree and center control, while the object of monitoring (can be load machine) desired indicator supervisory control and data acquisition (SCADA) etc. is operated, and will The result of index supervisory control and data acquisition (SCADA) is fed back.Testing control module in order to realize above-mentioned function, in the present embodiment There can be multiple specific units to realize, wherein may include scene configuration unit, scene configuration unit and application control list Member connection, after service operational unit starts and/or verifies application server, scene configuration unit is in active state, and Parameter configuration is carried out to the test scene for the load performance built and disposed, it can be with the automatic test script in Run Script library The operations such as the transferring of carry out demand, center control, while the index monitoring unit in testing control module can be pre- to test object Fixed index is monitored, manages, and the data acquisition unit in testing control module can be to the load in automatic test course Unit, application server, database server carry out the acquisition of data.
Embodiment two
As shown in Fig. 2, a kind of automated performance testing method is present embodiments provided, each mould based on embodiment one kind Block, the test method in the present embodiment may include steps of:
Firstly, performance requirement and normalization demand that demand management module submits service line are managed, manage Mode is to generate new demand task list, if there is new performance requirement work order, triggers automation control module, makes its touching It sends out associated component operation and carries out subsequent performance test operation.Automation control module triggers initialization unit therein to specified Performance test client the reset operation that is initialized of application environment, make it restore to baseline state.
Later, after automation control module receives the completion signal of initialization unit, environment deployment unit passes through acquisition Newest data packet, configuration file and the instance parameter being pre-stored in application control unit are carried out using deployment and/or are built, A new test environment, and ring are generated by disposing, building operation accordingly after testing environment restoration to baseline state Border deployment unit can generate test assignment according to performance requirement;Automation control module receives the completion letter of environment deployment unit After number, the related service that service operational unit starts application server carries out order control and behaviour according to configuration order successively Make, wherein operation can be starting (stop/restarting), verification operation.
Automation control module receive service operations component complete signal after, application control unit send control command or Operational order is in active state scene configuration unit, scene configuration unit can carry out test ginseng to testing control module Several configurations and center control operation, after testing control module receives the completion signal of scene configuration unit, appoint according to test Business triggering script bank carries out the initiation operation of application scenarios, fictitious load condition and test process, and at the same time, index monitoring is single Member is in active state with data acquisition unit.
Further, service alerts unit is for the system resource service condition and application error in resource management module Information alert is given, log tracing unit is to various operation information relative recordings.
Further, monitoring, management of the index monitoring unit to set monitored object desired indicator, data acquisition are single Member is acquired to system resource in test process (resource management center), using (client) and test process data, and is back to One console.
In conclusion the present invention can according to actual project demands, reach rapid deployment, reasonable construction, compiling and Automatic performance is implemented;And under no manual intervention environment, it can be returned according to current default strategy implement automatic performance Return test activity, real-time update and maintainability test environment application package and relevant parameter file is latest edition, thus Data reference and quality suggestion are provided for business is online, can also be from project implementation angle, can make rational planning for performance test meter It draws, scene and resource distribution, saves human cost and time cost.
By description and accompanying drawings, the exemplary embodiments of the specific structure of specific embodiment are given, based on present invention essence Mind can also make other conversions.Although foregoing invention proposes existing preferred embodiment, however, these contents are not intended as Limitation.
For a person skilled in the art, after reading above description, various changes and modifications undoubtedly be will be evident. Therefore, appended claims should regard the whole variations and modifications for covering true intention and range of the invention as.It is weighing The range and content of any and all equivalences, are all considered as still belonging to the intent and scope of the invention within the scope of sharp claim.

Claims (10)

1. a kind of automated performance testing system, which is characterized in that applied to fictitious load condition to the automatic of client performance Change in test, the automated performance testing system includes:
Demand management module manages and sends performance requirement;
Automation control module is connect with the demand management module, receive and according to the performance requirement dispose test environment, Generate test assignment;
Testing control module is connect with the automation control module, transfers the test assignment, and according to the test assignment Simulate the loading condition and test process;
Resource management module is connect with the automation control module, the testing control module respectively;And
The automation control module starts the resource management module, the resource management module according to the loading condition and Test process carries out the automated performance testing of the client in the test environment;
The resource management module includes:
Load unit, according to the loading condition send request of data, and according to the test process agency it is described test into The service of journey;
Server unit is connect with the load unit, provides the client to the access mechanism of the server, and according to Data interaction operation is carried out between the request of data and the client, to be tested for the property;
The server unit includes:
Application server element is connect with the automation control module, the client respectively, provides the client to institute The access mechanism of server is stated, business logic is exposed to the client by various agreements by the application server element Application program provides the approach of access business logic so that the application program of the client uses;
Database server unit is connect with the load unit and the client respectively, according to the request of data and institute It states progress data interaction operation, the database server unit between client and provides clothes for the application program of the client Business, for handling the request of data query or data manipulation.
2. automated performance testing system according to claim 1, which is characterized in that the performance requirement includes service line The performance requirement of submission and/or the performance requirement of normalization.
3. automated performance testing system according to claim 1, which is characterized in that the automation control module packet It includes:
Initialization unit is connect with the demand management module, is reset according to the performance requirement to the test environment, so that The test environment restoration is to baseline state;
Environment deployment unit is connect with the initialization unit, after restoring baseline state, obtains data packet and/or configuration text Part and/or instance parameter simultaneously dispose the test environment according to the data packet and/or configuration file and/or instance parameter;
Service operational unit is connect with the environment deployment unit, starts and verify the application server element;
Application control unit is connect with the environment deployment unit, service operational unit respectively, be pre-stored with data packet and/or Configuration file and/or instance parameter, and the testing control module is controlled, is operated.
4. automated performance testing system according to claim 1, which is characterized in that the automation control module also wraps It includes:
Service alerts unit is connect with the resource management module, to the service condition and/or application of the resource management module Mistake is alarmed;
Log tracing unit connects with the resource management module, the testing control module, the demand management module respectively It connects, each operation in the automated performance testing system is recorded.
5. automated performance testing system according to claim 4, which is characterized in that the testing control module includes:
Scene configuration unit is connect with the application control unit, is adjusted by the control and/or operation of the application control unit With the test assignment;
Script bank connect with the scene configuration unit, is pre-stored with test script, and
The scene configuration unit runs the test script, carries out the configuration of test parameter, according to the test assignment with mould Intend the loading condition and test process.
6. automated performance testing system according to claim 1, which is characterized in that the testing control module is also wrapped It includes:
Index monitoring unit is connect with the resource management module, the automation control module respectively, to the object of setting into The monitoring and/or management of row test index;
Data acquisition unit is connect with the resource management module, the client respectively, during performance test, acquisition The test data of the resource management module and/or the client.
7. a kind of automated performance testing method, which is characterized in that the automated performance testing method includes:
Step S1 is generated and is sent performance requirement;
Step S2 is received and is disposed test environment according to the performance requirement, generates test assignment;
Step S3 transfers the test assignment, and according to the test assignment fictitious load condition and test process;
Step S4 is surveyed according to the automation performance that the loading condition and test process carry out client in the test environment Examination;
In the step S4, application server element is provided, is used to provide the described client to the access mechanism of server, institute The application program that application server element is exposed to business logic by various agreements the client is stated, access quotient is provided The approach of industry logic uses for the application program of the client;
Database server unit, according to progress data interaction operation, the number between the request of data and the client Application program according to library server unit for the client provides service, for handling asking for data query or data manipulation It asks.
8. automated performance testing method according to claim 7, which is characterized in that specifically included in the step S2:
Step S21 resets the test environment according to the performance requirement, so that the test environment restoration is to baseline shape State;
Step S22 obtains data packet and/or configuration file and/or instance parameter and according to the data packet and/or configuration file And/or instance parameter disposes the test environment;
Step S23, starting and verifying application server element;
Step S24 starts the testing control module.
9. automated performance testing method according to claim 8, which is characterized in that the step S3 is specifically included:
Step S31 runs test script, and configuring to test parameter according to the test assignment, described in simulation Loading condition and test process.
10. automated performance testing method according to claim 8, which is characterized in that the step S4 is specifically included:
Step S41 sends request of data according to the loading condition and the test process, and according to the request of data with Data interaction operation is carried out between the client, to complete automated performance testing.
CN201511005077.9A 2015-12-28 2015-12-28 Automated performance testing system and method Active CN105577475B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511005077.9A CN105577475B (en) 2015-12-28 2015-12-28 Automated performance testing system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511005077.9A CN105577475B (en) 2015-12-28 2015-12-28 Automated performance testing system and method

Publications (2)

Publication Number Publication Date
CN105577475A CN105577475A (en) 2016-05-11
CN105577475B true CN105577475B (en) 2019-07-05

Family

ID=55887170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511005077.9A Active CN105577475B (en) 2015-12-28 2015-12-28 Automated performance testing system and method

Country Status (1)

Country Link
CN (1) CN105577475B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106774254A (en) * 2016-12-16 2017-05-31 四川长虹电器股份有限公司 The automatization test system and method for wireless intelligent control module and Mobile solution
CN106874159A (en) * 2016-12-30 2017-06-20 北京同有飞骥科技股份有限公司 A kind of concentrating type automated testing method
CN107634878B (en) * 2017-09-14 2021-02-02 苏州浪潮智能科技有限公司 Performance test management platform
CN110458379B (en) * 2018-05-08 2022-12-27 阿里巴巴集团控股有限公司 Pressure testing system, method and device and electronic equipment
CN109032611B (en) * 2018-06-06 2022-01-28 平安科技(深圳)有限公司 Script deployment method and device, computer equipment and storage medium
CN108933711B (en) * 2018-06-29 2021-06-18 华勤技术股份有限公司 Automatic testing method and system for terminal equipment
CN109379249A (en) * 2018-09-30 2019-02-22 福建星瑞格软件有限公司 A method of monitoring network interface card can bear maximum packet sending speed
CN109358968B (en) * 2018-10-08 2021-06-25 北京数码视讯软件技术发展有限公司 Server resource allocation method and device
CN111324524A (en) * 2018-12-14 2020-06-23 北京奇虎科技有限公司 Advertisement stability testing method and device
CN109614337B (en) * 2018-12-24 2023-07-21 普华基础软件股份有限公司 Performance test system and test tool based on linux system
CN111400186B (en) * 2020-03-19 2023-05-05 时时同云科技(成都)有限责任公司 Performance test method and system
CN111787368A (en) * 2020-05-21 2020-10-16 视联动力信息技术股份有限公司 Server testing method and device
CN114416589B (en) * 2022-01-27 2022-09-16 北京永信至诚科技股份有限公司 Network target range comprehensive detection method, device, equipment and readable storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727389A (en) * 2009-11-23 2010-06-09 中兴通讯股份有限公司 Automatic test system and method of distributed integrated service
CN101739334A (en) * 2008-11-21 2010-06-16 上海科梁信息工程有限公司 Automatic testing method of embedded software
CN102141962A (en) * 2011-04-07 2011-08-03 北京航空航天大学 Safety distributed test framework system and test method thereof
CN102354298A (en) * 2011-07-27 2012-02-15 哈尔滨工业大学 Software testing automation framework (STAF)-based fault injection automation testing platform and method for high-end fault-tolerant computer
CN102693183A (en) * 2012-05-30 2012-09-26 瑞斯康达科技发展股份有限公司 Method and system for realizing automatic software testing
CN104378252A (en) * 2014-08-26 2015-02-25 国家电网公司 Cloud testing service platform
CN104978259A (en) * 2014-04-01 2015-10-14 中国银联股份有限公司 Mobile equipment software automation test cluster system and test method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9087041B2 (en) * 2012-07-24 2015-07-21 Michael Weir Enterprise test system platform and associated method for interoperable test data management, test development, test libraries and test workflow management and automation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101739334A (en) * 2008-11-21 2010-06-16 上海科梁信息工程有限公司 Automatic testing method of embedded software
CN101727389A (en) * 2009-11-23 2010-06-09 中兴通讯股份有限公司 Automatic test system and method of distributed integrated service
CN102141962A (en) * 2011-04-07 2011-08-03 北京航空航天大学 Safety distributed test framework system and test method thereof
CN102354298A (en) * 2011-07-27 2012-02-15 哈尔滨工业大学 Software testing automation framework (STAF)-based fault injection automation testing platform and method for high-end fault-tolerant computer
CN102693183A (en) * 2012-05-30 2012-09-26 瑞斯康达科技发展股份有限公司 Method and system for realizing automatic software testing
CN104978259A (en) * 2014-04-01 2015-10-14 中国银联股份有限公司 Mobile equipment software automation test cluster system and test method thereof
CN104378252A (en) * 2014-08-26 2015-02-25 国家电网公司 Cloud testing service platform

Also Published As

Publication number Publication date
CN105577475A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN105577475B (en) Automated performance testing system and method
US10496768B2 (en) Simulating a production environment using distributed computing technologies
CN105027108B (en) Example host is configured
US10268574B2 (en) Deployment testing for infrastructure delivery automation
CN105095059B (en) A kind of method and apparatus of automatic test
CN110618924B (en) Link pressure testing method of web application system
US20130167139A1 (en) Method and system for distributed application stack test certification
US10387295B1 (en) Application testing using multiple context-aware threads
US20200110598A1 (en) Dependency lock in cicd pipelines
WO2013148265A2 (en) Method and system for testing of mobile web sites
CN109683982B (en) MES system control method, MES system control device, computer equipment, and storage medium
US11151025B1 (en) Generating software test plans based at least in part on monitored traffic of a production application
CN111324599B (en) Block chain experiment system and management method
CN103377101A (en) Testing system and testing method
CN104615486B (en) For searching for the multi-task scheduling of Extension Software Platform and executing methods, devices and systems
CN112433944A (en) Service testing method, device, computer equipment and storage medium
JP2018173703A (en) Fault analysis apparatus, fault analysis method and fault analysis program
JP2013524312A (en) Method, computer program, and apparatus for verifying task execution in an adaptive computer system
CN116466959A (en) Deployment method and device of micro-service system, readable storage medium and electronic equipment
CN114912255A (en) On-line simulation experiment system and method
EP4327205A1 (en) Transition manager system
CN115048257A (en) System service function verification method and device, computer equipment and storage medium
CN112052179B (en) Simulation method, simulation system and computer readable medium for software system
US8930908B2 (en) Aspect and system landscape capability-driven automatic testing of software applications
CN104679648A (en) Cross-application automatic testing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190917

Address after: Room 331, East, 3rd Floor, 569 Tibetan South Road, Huangpu District, Shanghai 200021

Patentee after: Shanghai Bangdao Information Technology Co., Ltd.

Address before: 200003 building, building 3, building 763, Mengzi Road, Huangpu District, Shanghai

Patentee before: SHANGHAI HANZHIYOU INFORMATION TECHNOLOGY SERVICE CO., LTD.

TR01 Transfer of patent right

Effective date of registration: 20210412

Address after: Room 301, 763 Mengzi Road, Huangpu District, Shanghai 200001

Patentee after: SHANGHAI HANDPAL INFORMATION TECHNOLOGY SERVICE Co.,Ltd.

Address before: 200021 room 331, East, 3rd floor, 569 Xizang South Road, Huangpu District, Shanghai

Patentee before: Shanghai Bangdao Information Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210615

Address after: Room 103, No.2, Lane 99, South Changjiang Road, Baoshan District, Shanghai 200441

Patentee after: Shanghai Gaoyou Information Technology Service Co.,Ltd.

Address before: Room 301, 763 Mengzi Road, Huangpu District, Shanghai 200001

Patentee before: SHANGHAI HANDPAL INFORMATION TECHNOLOGY SERVICE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220105

Address after: 200001 Fengsheng Building, No. 763 Mengzi Road, Huangpu District, Shanghai

Patentee after: SHANGHAI HANDPAL INFORMATION TECHNOLOGY SERVICE Co.,Ltd.

Patentee after: Shanghai Gaoyou Information Technology Service Co., Ltd

Address before: Room 103, No.2, Lane 99, South Changjiang Road, Baoshan District, Shanghai 200441

Patentee before: Shanghai Gaoyou Information Technology Service Co.,Ltd.

TR01 Transfer of patent right