CN105528055B CN201511021402.0A CN201511021402A CN105528055B CN 105528055 B CN105528055 B CN 105528055B CN 201511021402 A CN201511021402 A CN 201511021402A CN 105528055 B CN105528055 B CN 105528055B
Authority
CN
China
Prior art keywords
run
power consumption
resource
object run
handled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511021402.0A
Other languages
Chinese (zh)
Other versions
CN105528055A (en
Inventor
杨冬东
顾凌华
李国盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiaomi Inc
Original Assignee
Xiaomi Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiaomi Inc filed Critical Xiaomi Inc
Priority to CN201511021402.0A priority Critical patent/CN105528055B/en
Publication of CN105528055A publication Critical patent/CN105528055A/en
Application granted granted Critical
Publication of CN105528055B publication Critical patent/CN105528055B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/329Power saving characterised by the action undertaken by task scheduling

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Power Sources (AREA)

Abstract

The disclosure is directed to run the processing method and processing device of object.This method includes:Determine the power consumption of current each operation object in equipment;According to the power consumption of presently described each operation object, determine that power consumption is more than the object run object of default power consumption from all operation objects;The object run object is handled, to reduce the power consumption of the equipment.The technical solution, in the power consumption according to current each operation object, when automatically determining out the object run object of power consumption exception, the object run object of power consumption exception can be closed or be limited the processing such as resource distributed it, it is out of service or limit its operation to control the object run object, to prevent it from constantly waking up system or reduce its number for waking up system, and then it is effectively reduced the power consumption of equipment, the electricity and standby time of saving system, improve the usage experience of user.

Description

Run the processing method and processing device of object
Technical field
This disclosure relates to run object technology field, more particularly to the processing method and processing device of operation object.
Background technique
Currently, intelligence software, hardware wake up system so that system for its distribute operation resource when, be essentially all by According to some cycles periodic wakeup, and multiple softwares or hardware are often installed in system, and different software, hardware Wake-up period is often different, thus, for alignment, different software, hardware is allow to wake up system simultaneously, usually It is waken up with the minimum period or with one compared with the minor cycle, but this scheme will increase the wake-up times of system, greatly increase The power consumption of system.
Summary of the invention
The embodiment of the present disclosure provides the processing method and processing device of operation object.The technical solution is as follows:
According to the first aspect of the embodiments of the present disclosure, a kind of processing method running object is provided, including:
Determine the power consumption of current each operation object in equipment;
According to the power consumption of presently described each operation object, determine that power consumption is more than pre- from all operation objects If the object run object of power consumption;
The object run object is handled, to reduce the power consumption of the equipment.
In one embodiment, current each power consumption for running object in the determining equipment, including:
Determine current change quantity when successively starting each operation object;
The power consumption of each operation object is determined according to the current change quantity.
In one embodiment, described that the object run object is handled, including:
The object run object is handled according to following at least one processing mode:
The object run object is controlled to exit;
The object run object is forbidden to use operation resource;
It is reduced to the operation resource of the object run object distribution;
It is reduced to the distribution rank of the operation resource of the object run object distribution;Wherein, the operation resource includes: At least one of cpu resource needed for running the object run object, GPU resource, network broadband resource, storage resource money Source.
In one embodiment, described that the object run object is handled, including:
Determine the operation characteristic of the object run object, wherein the operation characteristic includes at least one of following feature: The accumulative frequency of use of the object run object, the current operation power of the object run object, the object run pair The runlevel of elephant;
When the operation characteristic meets default treatment conditions accordingly respectively, at the object run object Reason;Or
When any one of operation characteristic feature does not meet default treatment conditions accordingly, by any one of described feature It is prompted to user, so that the user is confirmed whether to handle the object run object;
When receiving the confirmation for handling object run object instruction, the object run object is handled.
In one embodiment, before the power consumption for reducing the equipment, the method also includes:
Booting No starting item is set by the object run object.
In one embodiment, described to set booting No starting item for the object run object, including:
Determine history run duration of the object run object in historical time section when each run;
When the history run duration when each run is respectively less than the default operation duration of the object run object, Booting No starting item is set by the object run object.
According to the second aspect of an embodiment of the present disclosure, a kind of processing unit running object is provided, including:
First determining module, for determining the power consumption of current each operation object in equipment;
Second determining module, for the power consumption according to presently described each operation object, from all operation objects Determine that power consumption is more than the object run object of default power consumption;
Processing module, for handling the object run object, to reduce the power consumption of the equipment.
In one embodiment, first determining module includes:
First determines submodule, for determining current change quantity when successively starting each operation object;
Second determines submodule, for determining the consumption of each operation object according to the current change quantity
Electricity.
In one embodiment, the processing module includes:
First processing submodule, for by the object run object according to following at least one processing mode at Reason:
The object run object is controlled to exit;
The object run object is forbidden to use operation resource;
It is reduced to the operation resource of the object run object distribution;
It is reduced to the distribution rank of the operation resource of the object run object distribution;Wherein, the operation resource includes: At least one of cpu resource needed for running the object run object, GPU resource, network broadband resource, storage resource money Source.
In one embodiment, the processing module includes:
Third determines submodule, for determining the operation characteristic of the object run object, wherein the operation characteristic packet Include at least one of following feature:The current operation of the accumulative frequency of use of the object run object, the object run object The runlevel of power, the object run object;
Second processing submodule is used for when the operation characteristic meets default treatment conditions accordingly respectively, to described Object run object is handled;Or
Prompting submodule, for when any one of operation characteristic feature does not meet default treatment conditions accordingly, Any one of described feature is prompted to user, so that the user is confirmed whether to handle the object run object;
Third handle submodule, for when receive handle the object run object confirmation instruct when, to the mesh Mark operation object is handled.
In one embodiment, described device further includes:
Setup module, for before the power consumption for reducing the equipment, the object run object being set as being switched on No starting item.
In one embodiment, the setup module includes:
4th determines submodule, for determining history of the object run object in historical time section when each run Operation duration;
Submodule is set, is respectively less than the object run object for the history run duration when each run When default operation duration, booting No starting item is set by the object run object.
According to the third aspect of an embodiment of the present disclosure, a kind of processing unit for running object is provided, including:
Processor;
Memory for storage processor executable instruction;
Wherein, the processor is configured to:
Determine the power consumption of current each operation object in equipment;
According to the power consumption of presently described each operation object, determine that power consumption is more than pre- from all operation objects If the object run object of power consumption;
The object run object is handled, to reduce the power consumption of the equipment.
The technical scheme provided by this disclosed embodiment can include the following benefits:
The technical scheme provided by this disclosed embodiment is automatically determined in the power consumption according to current each operation object Out when the object run object of power consumption exception, the object run object of power consumption exception can be closed or be limited The processing such as resource that it is distributed, it is out of service or limit its operation to control the object run object, to prevent it not System is waken up disconnectedly or reduces its number for waking up system, and then is effectively reduced the power consumption of equipment, saves the electricity of system Amount and standby time, improve the usage experience of user.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not The disclosure can be limited.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows the implementation for meeting the disclosure Example, and together with specification for explaining the principles of this disclosure.
Fig. 1 is a kind of flow chart of processing method for running object shown according to an exemplary embodiment.
Fig. 2 is the flow chart of the processing method of another operation object shown according to an exemplary embodiment.
Fig. 3 is the flow chart according to the processing method of another operation object shown in an exemplary embodiment one.
Fig. 4 A is the flow chart according to the processing method of another operation object shown in an exemplary embodiment one.
Fig. 4 B is the flow chart according to the processing method of another operation object shown in an exemplary embodiment one.
Fig. 5 is the flow chart according to the processing method of another operation object shown in an exemplary embodiment one.
Fig. 6 is the flow chart according to the processing method of another operation object shown in an exemplary embodiment one.
Fig. 7 is a kind of block diagram of processing unit for running object shown according to an exemplary embodiment.
Fig. 8 is the block diagram of the processing unit of another operation object shown according to an exemplary embodiment.
Fig. 9 is the block diagram of the processing unit of another operation object shown according to an exemplary embodiment.
Figure 10 A is the block diagram of the processing unit of another operation object shown according to an exemplary embodiment.
Figure 10 B is the block diagram of the processing unit of another operation object shown according to an exemplary embodiment.
Figure 11 is the block diagram of the processing unit of another operation object shown according to an exemplary embodiment.
Figure 12 is the block diagram of the processing unit of another operation object shown according to an exemplary embodiment.
Figure 13 is the block diagram of the processing unit shown according to an exemplary embodiment for being suitable for running object.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all implementations consistent with this disclosure.On the contrary, they be only with it is such as appended The example of the consistent device and method of some aspects be described in detail in claims, the disclosure.
Currently, intelligence software, hardware wake up system so that system for its distribute operation resource when, be essentially all by According to some cycles periodic wakeup, and multiple softwares or hardware are often installed in system, and different software, hardware Wake-up period is often different, thus, for alignment, different software, hardware is allow to wake up system simultaneously, usually It is waken up with the minimum period or with one compared with the minor cycle, but this scheme will increase the wake-up times of system, greatly increase The power consumption of system.
In order to solve the above-mentioned technical problem, the embodiment of the present disclosure provides a kind of processing method for running object, this method It can be used for running in the processing routine, system or device of object, and the corresponding executing subject of this method can be user's carrying Terminal, computer etc., as shown in Figure 1, the method comprising the steps of S101 to step S103:
In step s101, the power consumption of current each operation object in equipment is determined;
Power consumption or the operation object when power consumption of each operation object can be operation object starting are run When power consumption;
Each operation object may each be application program, service or process etc..
In step s 102, it according to the power consumption of current each operation object, determines to consume from all operation objects Electricity is more than the object run object of default power consumption;
The default power consumption can be the mean value of the power consumption of current all operation objects, or with each operation pair It, can be by each operation object as corresponding power consumption, and after the power consumption for getting current each operation object It is more than default consumption to automatically determine out power consumption from all operation objects compared with power consumption successively presets power consumption with this The object run object of the power consumption exception of electricity;
In addition, during comparison, it, should if the default power consumption is power consumption corresponding with each operation object The definitive result of abnormal object run object will be more accurate.
In step s 103, object run object is handled, to reduce the power consumption of equipment.
Since operation object in starting abnormal (such as repeatedly starting failure) or is operating abnormally (such as cannot respond to user's operation) When, often power consumption is abnormal, thus, it, can be different to the power consumption when determining the object run object of power consumption exception The processing such as resource distributed it is closed or limited to normal object run object, to control object run object stopping It runs and perhaps limits its operation to prevent it from constantly waking up system or reduce its number for waking up system, and then effectively Ground reduces the power consumption of equipment, saves the electricity and standby time of system, improves the usage experience of user.
As shown in Fig. 2, in one embodiment, above-mentioned steps S101 can be performed as:
In step A1, current change quantity when successively starting each operation object is determined;
In step A2, the power consumption of each operation object is determined according to current change quantity.
When determining the power consumption of current each operation object, electric current when successively starting each operation object can be determined Variable quantity is the current change quantity of system before and after starting each operation object, and then determines each fortune according to the current change quantity The power consumption of row object, that is, directly determining the current change quantity is when the operation object that corresponding operation object has just started starts Power consumption, or the corresponding relationship of power consumption when being started according to the operation object and power consumption when operation, are become by the electric current Change power consumption when measuring the corresponding operation object operation.
As shown in figure 3, in one embodiment, above-mentioned steps S103 can be performed as:
In step bl is determined, object run object is handled according to following at least one processing mode:
Control object run object exits;
It is exited by controlling the object run object, it is out of service to can control the object run object, so that the target Operation object no longer wakes up system, no longer occupies any operation resource, to farthest reduce the power consumption of equipment.
Object run object is forbidden to use operation resource;
By forbidding the object run object using operation resource, the object run object can be made to keep current operation shape State no longer occupies additional operation resource, to be effectively reduced the power consumption of equipment.
It is reduced to the operation resource of object run object distribution;
By being reduced to the operation resource of object run object distribution, such as the maximum of limitation CPU, GPU operation resource Frequency of use or power energy can reduce the runnability of the object run object and the request frequency to system request resource Rate to reduce the power consumption in the object run object unit time, and reduces the influence to system, and then reduces equipment Power consumption.
It is reduced to the distribution rank of the operation resource of object run object distribution;Wherein, operation resource includes:Operational objective CPU (Central Processing Unit, central processing unit) resource, GPU (Graphics needed for running object Processing Unit, graphics processor) resource, network broadband resource (width and bandwidth left amount of such as network bandwidth), At least one of storage resource (such as memory, hard disk, floppy disk resource) resource.
The distribution rank for reducing operation resource will reduce the distribution of high-quality resource (such as CPU), will be the object run Object distribution is some to the lesser resource of object run object runnability effect of optimization, to reduce the object run object Runnability (such as operating rate, the speed of response), reduce the power consumption in the object run object unit time, and then subtract The power consumption of low equipment.
As shown in Figure 4 A, in one embodiment, above-mentioned steps S103 can be performed as:
In step C1, the operation characteristic of object run object is determined, wherein operation characteristic includes at least one of following special Sign:The accumulative frequency of use of object run object, the current operation power of object run object, object run object runtime class Not;
In step C2, when operation characteristic meets default treatment conditions accordingly respectively, object run object is carried out Processing;
When the operation characteristic of the object run object meets default treatment conditions i.e. object run object accordingly respectively Accumulative frequency of use be less than or equal to default accumulative frequency of use, the current operation power of object run object is less than or equal to When the default runlevel for running power, object run object is less than or equal to default runlevel, illustrate the object run pair As seldom running, the rank of the rarely needed object run object of user or the object run object is relatively low, even if exiting The object run object forbids the object run object using operation resource, is reduced to the operation of object run object distribution Resource, and/or the distribution rank for being reduced to the operation resource that the object run object distributes, so that the object run object stops Operation or runnability are lowered, and will not be made a big impact to system, thus can be automatically to the object run pair As being handled, to lower the power consumption of equipment.
Or
As shown in Figure 4 B, in one embodiment, above-mentioned steps S103 can be performed as:
In step C3, when any one of operation characteristic feature does not meet default treatment conditions accordingly, by any one Feature is prompted to user, so that user is confirmed whether that processing target runs object;
When any one of the operation characteristic of object run object feature does not meet default treatment conditions accordingly, explanation The object run object is likely to be normal operation, and the rank of the common object of user or the object run object is relatively high, but Also not necessarily, thus in order to avoid to the object run object carry out accidentally processing, which can be prompted to user, So that user is confirmed whether to handle the object run object according to the particular content and significance level of any feature, so that it is guaranteed that In the case where not affecting user experience with system operation, the object run object can accurately locate in time Reason;
In step C4, when receiving the confirmation instruction of processing target operation object, at object run object Reason.
When receiving confirmation instruction, illustrate that user's expectation handles the object run object, to reduce equipment Power consumption then can immediately be handled the object run object, to reduce the power consumption of equipment.
The embodiment of above-mentioned Fig. 3 can be combined with the embodiment of Fig. 4 A, and the embodiment of Fig. 3 can also be with Fig. 4 B's Embodiment combines.
As shown in figure 5, in one embodiment, before executing step S103, method may also include:
In step S501, booting No starting item is set by object run object.
After handling the object run object, can automatically or manually it set the object run object to Be switched on No starting item, so that the object run object does not start in booting, and only just opens when user starts Dynamic operation simultaneously distributes operation resource for it, to can not only reduce the power consumption of system, but also can not influence user to the target Run the normal use of object.
Wherein, above-mentioned steps S501 can be also placed on object run object is handled after, and set described in the reduction It is executed before standby power consumption.
As shown in fig. 6, in one embodiment, above-mentioned steps S501 can be performed as:
In step D1, history run duration of the object run object in historical time section when each run is determined;
In step d 2, the history run duration when each run is respectively less than the default operation duration of object run object When, booting No starting item is set by object run object.
It, can be in order to avoid being accidentally arranged when determining whether to set the object run object to booting No starting item History run duration of the object run object in historical time section (within past one week) when each run is determined, when each fortune When history run duration when row is respectively less than default operation duration (such as 10 minutes) of the object run object, illustrate that the target is transported The duration of row object each run is not too long, then can be confirmed that user does not prefer to use usually really, then can be by object run pair Do not start the object run object when so that being switched on every time as being automatically set as booting No starting item, can both subtract in this way Few system power consumption, and the normal use experience of user is not influenced.
In addition, can be combined with target in the historical time section when determining whether to be set as booting No starting item and transport The operation total degree of row object, if operation total degree is less than preset times (such as 3 times), and history run duration when each run The also less than default operation duration can then be able adequately determines user and usually be of little use really the object run object, sufficiently avoid Accidentally booting No starting item is set by the object run object.
The processing method for the above-mentioned operation object that the corresponding embodiment of the present disclosure provides, the embodiment of the present disclosure also provide a kind of fortune The processing unit of row object, as shown in fig. 7, the device includes:
First determining module 701 is configured to determine that the power consumption of current each operation object in equipment;
Second determining module 702 is configured as the power consumption according to presently described each operation object, from all operations Determine that power consumption is more than the object run object of default power consumption in object;
Processing module 703 is configured as handling the object run object, to reduce the power consumption of the equipment Amount.
As shown in figure 8, in one embodiment, first determining module 701 includes:
First determines submodule 7011, is configured to determine that electricity when successively starting each operation object
Flow variable quantity;
Second determines submodule 7012, is configured as determining each operation according to the current change quantity
The power consumption of object.
As shown in figure 9, in one embodiment, the processing module 703 includes:
First processing submodule 7031 is configured as the object run object according to following at least one processing mode It is handled:
The object run object is controlled to exit;
The object run object is forbidden to use operation resource;
It is reduced to the operation resource of the object run object distribution;
It is reduced to the distribution rank of the operation resource of the object run object distribution;Wherein, the operation resource includes: At least one of cpu resource needed for running the object run object, GPU resource, network broadband resource, storage resource money Source.
As shown in Figure 10 A, in one embodiment, the processing module 703 includes:
Third determines submodule 7032, is configured to determine that the operation characteristic of the object run object, wherein the fortune Row feature includes at least one of following feature:The accumulative frequency of use of the object run object, the object run object The runlevel of current operation power, the object run object;
Second processing submodule 7033 is configured as meeting default treatment conditions accordingly respectively when the operation characteristic When, the object run object is handled;Or
As shown in Figure 10 B, in one embodiment, the processing module 703 includes:
Prompting submodule 7034 is configured as not meeting corresponding default processing when any one of operation characteristic feature When condition, any one of described feature is prompted to user, so that the user is confirmed whether to handle the object run object;
Third handles submodule 7035, is configured as when receiving the confirmation for handling object run object instruction, The object run object is handled.
As shown in figure 11, in one embodiment, described device further includes:
Setup module 1101 is configured as before the power consumption for reducing the equipment, the object run object is set It is set to booting No starting item.
As shown in figure 12, in one embodiment, the setup module 1101 includes:
4th determines submodule 11011, is configured to determine that the object run object is transported every time in historical time section History run duration when row;
Submodule 11012 is set, is configured as the history run duration when each run and is respectively less than the target When running the default operation duration of object, booting No starting item is set by the object run object.
According to the third aspect of an embodiment of the present disclosure, a kind of processing unit running object is provided, including:
Processor;
Memory for storage processor executable instruction;
Wherein, processor is configured as:
Determine the power consumption of current each operation object in equipment;
According to the power consumption of presently described each operation object, determine that power consumption is more than pre- from all operation objects If the object run object of power consumption;
The object run object is handled, to reduce the power consumption of the equipment.
Above-mentioned processor is also configured to:
The power consumption of current each operation object in the determining equipment, including:
Determine current change quantity when successively starting each operation object;
The power consumption of each operation object is determined according to the current change quantity.
Above-mentioned processor is also configured to:
It is described that the object run object is handled, including:
The object run object is handled according to following at least one processing mode:
The object run object is controlled to exit;
The object run object is forbidden to use operation resource;
It is reduced to the operation resource of the object run object distribution;
It is reduced to the distribution rank of the operation resource of the object run object distribution;Wherein, the operation resource includes: At least one of cpu resource needed for running the object run object, GPU resource, network broadband resource, storage resource money Source.
Above-mentioned processor is also configured to:
It is described that the object run object is handled, including:
Determine the operation characteristic of the object run object, wherein the operation characteristic includes at least one of following feature: The accumulative frequency of use of the object run object, the current operation power of the object run object, the object run pair The runlevel of elephant;
When the operation characteristic meets default treatment conditions accordingly respectively, at the object run object Reason;Or
When any one of operation characteristic feature does not meet default treatment conditions accordingly, by any one of described feature It is prompted to user, so that the user is confirmed whether to handle the object run object;
When receiving the confirmation for handling object run object instruction, the object run object is handled.
Above-mentioned processor is also configured to:
Before the power consumption for reducing the equipment, the method also includes:
Booting No starting item is set by the object run object.
Above-mentioned processor is also configured to:
It is described to set booting No starting item for the object run object, including:
Determine history run duration of the object run object in historical time section when each run;
When the history run duration when each run is respectively less than the default operation duration of the object run object, Booting No starting item is set by the object run object.
Figure 13 be it is shown according to an exemplary embodiment a kind of for running the block diagram of the processing unit 1300 of object, should Device is suitable for terminal device.For example, device 1300 can be mobile phone, computer, digital broadcast terminal, information receiving and transmitting set It is standby, game console, tablet device, Medical Devices, body-building equipment, personal digital assistant etc..
Referring to Fig.1 3, device 1300 may include with next or at least two components:Processing component 1302, memory 1304, power supply module 1306, multimedia component 1308, audio component 1310, the interface 1312 of input/output (I/O), sensor Component 1314 and communication component 1316.
The integrated operation of the usual control device 1300 of processing component 1302, such as with display, telephone call, data communication, Camera operation and record operate associated operation.Processing component 1302 may include one or at least two processors 1320 It executes instruction, to perform all or part of the steps of the methods described above.In addition, processing component 1302 may include one or at least Two modules, convenient for the interaction between processing component 1302 and other assemblies.For example, processing component 1302 may include multimedia Module, to facilitate the interaction between multimedia component 1308 and processing component 1302.
Memory 1304 is configured as storing various types of data to support the operation in equipment 1300.These data Example includes the instruction for any storage object or method that operate on device 1300, contact data, telephone book data, Message, picture, video etc..Memory 1304 can by any kind of volatibility or non-volatile memory device or they Combination is realized, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), it is erasable can Program read-only memory (EPROM), programmable read only memory (PROM), read-only memory (ROM), magnetic memory, flash memory Reservoir, disk or CD.
Electric power assembly 1306 provides electric power for the various assemblies of device 1300.Electric power assembly 1306 may include power management System, one or at least two power supplys and other with for device 1300 generate, manage, and distribute the associated component of electric power.
Multimedia component 1308 includes the screen of one output interface of offer between described device 1300 and user.? In some embodiments, screen may include liquid crystal display (LCD) and touch panel (TP).If screen includes touch panel, Screen may be implemented as touch screen, to receive input signal from the user.Touch panel includes one or at least two touchings Sensor is touched to sense the gesture on touch, slide, and touch panel.The touch sensor can not only sense touch or cunning The boundary of movement, but also detect duration and pressure associated with the touch or slide operation.In some embodiments In, multimedia component 1308 includes a front camera and/or rear camera.When equipment 1300 is in operation mode, such as When screening-mode or video mode, front camera and/or rear camera can receive external multi-medium data.Before each Setting camera and rear camera can be a fixed optical lens system or has focusing and optical zoom capabilities.
Audio component 1310 is configured as output and/or input audio signal.For example, audio component 1310 includes a wheat Gram wind (MIC), when device 1300 is in operation mode, when such as call mode, recording mode, and voice recognition mode, microphone quilt It is configured to receive external audio signal.The received audio signal can be further stored in memory 1304 or via communication Component 1316 is sent.In some embodiments, audio component 1310 further includes a loudspeaker, is used for output audio signal.
I/O interface 1312 provides interface, above-mentioned peripheral interface module between processing component 1302 and peripheral interface module It can be keyboard, click wheel, button etc..These buttons may include, but are not limited to:Home button, volume button, start button and Locking press button.
Sensor module 1314 includes one or at least two sensors, for providing the shape of various aspects for device 1300 State assessment.For example, sensor module 1314 can detecte the state that opens/closes of equipment 1300, the relative positioning of component, example Such as the display and keypad that the component is device 1300, sensor module 1314 can be with detection device 1300 or device The position change of 1300 1 components, the existence or non-existence that user contacts with device 1300,1300 orientation of device or acceleration/subtract The temperature change of speed and device 1300.Sensor module 1314 may include proximity sensor, be configured to not any Physical contact when detect the presence of nearby objects.Sensor module 1314 can also include optical sensor, as CMOS or CCD schemes As sensor, for being used in imaging applications.In some embodiments, which can also include acceleration Sensor, gyro sensor, Magnetic Sensor, pressure sensor or temperature sensor.
Communication component 1316 is configured to facilitate the communication of wired or wireless way between device 1300 and other equipment.Dress The wireless network based on communication standard, such as WiFi can be accessed by setting 1300,2G or 3G or their combination.It is exemplary at one In embodiment, communication component 1316 receives broadcast singal or broadcast correlation from external broadcasting management system via broadcast channel Information.In one exemplary embodiment, the communication component 1316 further includes near-field communication (NFC) module, to promote short distance Communication.For example, radio frequency identification (RFID) technology, Infrared Data Association (IrDA) technology, ultra wide band can be based in NFC module (UWB) technology, bluetooth (BT) technology and other technologies are realized.
In the exemplary embodiment, device 1300 can by one or at least two application specific integrated circuits (ASIC), Digital signal processor (DSP), digital signal processing appts (DSPD), programmable logic device (PLD), field-programmable gate array It arranges (FPGA), controller, microcontroller, microprocessor or other electronic building bricks to realize, for executing the above method.
In the exemplary embodiment, a kind of non-transitorycomputer readable storage medium including instruction, example are additionally provided It such as include the memory 1304 of instruction, above-metioned instruction can be executed by the processor 1320 of device 1300 to complete the above method.Example Such as, the non-transitorycomputer readable storage medium can be ROM, random access memory (RAM), CD-ROM, tape, soft Disk and optical data storage devices etc..
A kind of non-transitorycomputer readable storage medium, when the instruction in the storage medium is by above-mentioned apparatus 1300 When processor executes, so that above-mentioned apparatus 1300 is able to carry out a kind of processing method for running object, including:
Determine the power consumption of current each operation object in equipment;
According to the power consumption of presently described each operation object, determine that power consumption is more than pre- from all operation objects If the object run object of power consumption;
The object run object is handled, to reduce the power consumption of the equipment.
In one embodiment, current each power consumption for running object in the determining equipment, including:
Determine current change quantity when successively starting each operation object;
The power consumption of each operation object is determined according to the current change quantity.
In one embodiment, described that the object run object is handled, including:
The object run object is handled according to following at least one processing mode:
The object run object is controlled to exit;
The object run object is forbidden to use operation resource;
It is reduced to the operation resource of the object run object distribution;
It is reduced to the distribution rank of the operation resource of the object run object distribution;Wherein, the operation resource includes: At least one of cpu resource needed for running the object run object, GPU resource, network broadband resource, storage resource money Source.
In one embodiment, described that the object run object is handled, including:
Determine the operation characteristic of the object run object, wherein the operation characteristic includes at least one of following feature: The accumulative frequency of use of the object run object, the current operation power of the object run object, the object run pair The runlevel of elephant;
When the operation characteristic meets default treatment conditions accordingly respectively, at the object run object Reason;Or
When any one of operation characteristic feature does not meet default treatment conditions accordingly, by any one of described feature It is prompted to user, so that the user is confirmed whether to handle the object run object;
When receiving the confirmation for handling object run object instruction, the object run object is handled.
In one embodiment, before the power consumption for reducing the equipment, the method also includes:
Booting No starting item is set by the object run object.
In one embodiment, described to set booting No starting item for the object run object, including:
Determine history run duration of the object run object in historical time section when each run;
When the history run duration when each run is respectively less than the default operation duration of the object run object, Booting No starting item is set by the object run object.
Those skilled in the art will readily occur to its of the disclosure after considering specification and practicing disclosure disclosed herein Its embodiment.This application is intended to cover any variations, uses, or adaptations of the disclosure, these modifications, purposes or Person's adaptive change follows the general principles of this disclosure and including the undocumented common knowledge in the art of the disclosure Or conventional techniques.The description and examples are only to be considered as illustrative, and the true scope and spirit of the disclosure are by following Claim is pointed out.
It should be understood that the present disclosure is not limited to the precise structures that have been described above and shown in the drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present disclosure is only limited by the accompanying claims.

Claims (9)

1. a kind of processing method for running object, which is characterized in that including:
Determine the power consumption of current each operation object in equipment;
According to the power consumption of presently described each operation object, determine that power consumption is more than default consumption from all operation objects The object run object of electricity;
The object run object is handled, to reduce the power consumption of the equipment;
It is described that the object run object is handled, including:
It is reduced to the distribution rank of the operation resource of the object run object distribution;
Before the power consumption for reducing the equipment, the method also includes:
Booting No starting item is set by the object run object;
It is described to set booting No starting item for the object run object, including:
Determine history run duration of the object run object in historical time section when each run;
When the history run duration when each run is respectively less than the default operation duration of the object run object, by institute It states object run object and is set as booting No starting item.
2. the method according to claim 1, wherein
The power consumption of current each operation object in the determining equipment, including:
Determine current change quantity when successively starting each operation object;
The power consumption of each operation object is determined according to the current change quantity.
3. the method according to claim 1, wherein
It is described that the object run object is handled, further include:
The object run object is handled according to following at least one processing mode:
The object run object is controlled to exit;
The object run object is forbidden to use operation resource;
It is reduced to the operation resource of the object run object distribution;Wherein, the operation resource includes:Run the target fortune At least one of cpu resource needed for row object, GPU resource, network broadband resource, storage resource resource.
4. the method according to claim 1, wherein
It is described that the object run object is handled, including:
Determine the operation characteristic of the object run object, wherein the operation characteristic includes at least one of following feature:It is described The accumulative frequency of use of object run object, the current operation power of the object run object, the object run object Runlevel;
When the operation characteristic meets default treatment conditions accordingly respectively, the object run object is handled;Or Person
When any one of operation characteristic feature does not meet default treatment conditions accordingly, any one of described feature is prompted To user, so that the user is confirmed whether to handle the object run object;
When receiving the confirmation for handling object run object instruction, the object run object is handled.
5. a kind of processing unit for running object, which is characterized in that including:
First determining module, for determining the power consumption of current each operation object in equipment;
Second determining module is determined from all operation objects for the power consumption according to presently described each operation object Power consumption is more than the object run object of default power consumption out;
Processing module, for handling the object run object, to reduce the power consumption of the equipment;
The processing module includes:
First processing submodule, for reducing the distribution rank for the operation resource distributed for the object run object;
Described device further includes:
Setup module, for setting booting for the object run object and forbidding before the power consumption for reducing the equipment Startup item;
The setup module includes:
4th determines submodule, for determining history run of the object run object in historical time section when each run Duration;
Submodule is set, is respectively less than the default of the object run object for the history run duration when each run When operation duration, booting No starting item is set by the object run object.
6. device according to claim 5, which is characterized in that
First determining module includes:
First determines submodule, for determining current change quantity when successively starting each operation object;
Second determines submodule, for determining the power consumption of each operation object according to the current change quantity.
7. device according to claim 5, which is characterized in that
The first processing submodule is also used to the object run object at according to following at least one processing mode Reason:
The object run object is controlled to exit;
The object run object is forbidden to use operation resource;
It is reduced to the operation resource of the object run object distribution;Wherein, the operation resource includes:Run the target fortune At least one of cpu resource needed for row object, GPU resource, network broadband resource, storage resource resource.
8. device according to claim 5, which is characterized in that
The processing module includes:
Third determines submodule, for determining the operation characteristic of the object run object, wherein the operation characteristic include with At least one of lower feature:The accumulative frequency of use of the object run object, the object run object current operation power, The runlevel of the object run object;
Second processing submodule is used for when the operation characteristic meets default treatment conditions accordingly respectively, to the target Operation object is handled;Or
Prompting submodule, for when any one of operation characteristic feature does not meet default treatment conditions accordingly, by institute It states any one feature and is prompted to user, so that the user is confirmed whether to handle the object run object;
Third handles submodule, for being transported to the target when receiving the confirmation for handling object run object instruction Row object is handled.
9. a kind of non-transitorycomputer readable storage medium, is stored thereon with computer program, which is characterized in that described program The step of any one of claims 1 to 4 the method is realized when being executed by processor.
CN201511021402.0A 2015-12-30 2015-12-30 Run the processing method and processing device of object Active CN105528055B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511021402.0A CN105528055B (en) 2015-12-30 2015-12-30 Run the processing method and processing device of object

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511021402.0A CN105528055B (en) 2015-12-30 2015-12-30 Run the processing method and processing device of object

Publications (2)

Publication Number Publication Date
CN105528055A CN105528055A (en) 2016-04-27
CN105528055B true CN105528055B (en) 2018-11-23

Family

ID=55770331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511021402.0A Active CN105528055B (en) 2015-12-30 2015-12-30 Run the processing method and processing device of object

Country Status (1)

Country Link
CN (1) CN105528055B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106055365B (en) * 2016-05-31 2019-10-25 Oppo广东移动通信有限公司 A kind of closing application program method and apparatus
CN106371831A (en) * 2016-08-25 2017-02-01 北京小米移动软件有限公司 Awakening control method and device and terminal
CN106648730A (en) * 2016-09-26 2017-05-10 北京小米移动软件有限公司 Processing method and device of abnormal application
CN110008008A (en) * 2017-12-29 2019-07-12 广东欧珀移动通信有限公司 Applied program processing method and device, electronic equipment, computer readable storage medium
CN109993525B (en) * 2017-12-29 2022-06-10 Oppo广东移动通信有限公司 Application program processing method and device, electronic equipment and computer readable storage medium
CN109992368B (en) * 2017-12-29 2023-10-20 Oppo广东移动通信有限公司 Application processing method and device, electronic equipment and computer readable storage medium
CN109992371A (en) * 2017-12-29 2019-07-09 广东欧珀移动通信有限公司 Applied program processing method, device, electronic equipment, computer readable storage medium
CN108541013B (en) * 2018-03-29 2022-06-10 Oppo广东移动通信有限公司 Information processing method, device, mobile terminal and computer readable storage medium
CN110633169B (en) * 2019-01-07 2020-09-22 北京聚通达科技股份有限公司 Backup computer storage system
CN111951169A (en) * 2019-04-29 2020-11-17 泰州悦诚科技信息咨询中心 Adaptive data correction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102508761A (en) * 2011-11-17 2012-06-20 宇龙计算机通信科技(深圳)有限公司 Management method for terminal electric quantity and terminal
CN103701970A (en) * 2013-12-04 2014-04-02 中国科学院深圳先进技术研究院 Power consumption prompting method and device for mobile terminal and mobile terminal
CN103729052A (en) * 2013-12-31 2014-04-16 贝壳网际(北京)安全技术有限公司 Processing method and system for power consumption of application program and mobile terminal
CN104281510A (en) * 2013-07-05 2015-01-14 贝壳网际(北京)安全技术有限公司 Method and system for obtaining power consumption degree of application program and energy-saving method and system
CN104298335A (en) * 2013-07-19 2015-01-21 贝壳网际(北京)安全技术有限公司 Application program process cleaning method and device of mobile terminal and mobile terminal
CN104298336A (en) * 2013-07-19 2015-01-21 贝壳网际(北京)安全技术有限公司 Mobile terminal and control method and device of application program of mobile terminal
CN104317608A (en) * 2014-09-30 2015-01-28 北京金山安全软件有限公司 Management method and device for pre-installed application program in mobile terminal and client
CN104699218A (en) * 2013-12-10 2015-06-10 华为终端有限公司 Task management method and equipment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103984538B (en) * 2014-03-27 2017-04-26 华为技术有限公司 Application scenario identification method, power consumption management method, devices and terminal equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102508761A (en) * 2011-11-17 2012-06-20 宇龙计算机通信科技(深圳)有限公司 Management method for terminal electric quantity and terminal
CN104281510A (en) * 2013-07-05 2015-01-14 贝壳网际(北京)安全技术有限公司 Method and system for obtaining power consumption degree of application program and energy-saving method and system
CN104298335A (en) * 2013-07-19 2015-01-21 贝壳网际(北京)安全技术有限公司 Application program process cleaning method and device of mobile terminal and mobile terminal
CN104298336A (en) * 2013-07-19 2015-01-21 贝壳网际(北京)安全技术有限公司 Mobile terminal and control method and device of application program of mobile terminal
CN103701970A (en) * 2013-12-04 2014-04-02 中国科学院深圳先进技术研究院 Power consumption prompting method and device for mobile terminal and mobile terminal
CN104699218A (en) * 2013-12-10 2015-06-10 华为终端有限公司 Task management method and equipment
CN103729052A (en) * 2013-12-31 2014-04-16 贝壳网际(北京)安全技术有限公司 Processing method and system for power consumption of application program and mobile terminal
CN104317608A (en) * 2014-09-30 2015-01-28 北京金山安全软件有限公司 Management method and device for pre-installed application program in mobile terminal and client

Also Published As

Publication number Publication date
CN105528055A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN105528055B (en) Run the processing method and processing device of object
CN106375604B (en) The method and apparatus of controlling terminal electricity
KR101837333B1 (en) Method and apparatus for awakening electronic device
EP3133874B1 (en) Method and apparatus for starting energy saving mode
EP3113549A1 (en) Method and device for waking up mcu chip
US20170025874A1 (en) Charging method
EP3112979B1 (en) Method and device for waking up mcu
CN105137831B (en) Energy-saving mode open method and device
US10216248B2 (en) Method and device for controlling power consumption
WO2020223885A1 (en) Timeout processing method and device for inactivity timer
EP3288148B1 (en) Method and apparatus for device control
CN105807894B (en) Using the treating method and apparatus for holding lock
CN104023129A (en) Power saving method and device thereof
CN107783790B (en) Terminal awakening method and device
CN112201242A (en) Method and device for waking up equipment, electronic equipment and storage medium
CN104657172A (en) System upgrading method and device
CN105867592B (en) A kind of method and apparatus managing electric quantity consumption
CN110941321A (en) Power supply method and device for electronic equipment and intelligent equipment
CN108874450B (en) Method and device for waking up voice assistant
CN109062625A (en) The method, apparatus and readable storage medium storing program for executing of application program load
US20170147134A1 (en) Method and apparatus for controlling touch-screen sensitivity
CN107659727B (en) Terminal control method, device and storage medium
CN104991634A (en) Terminal control method and device
CN108710558A (en) Progress control method and device for computer
CN105188112A (en) Method and device for controlling dormant state

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant