CN105430590A - Method and equipment for transmitting and configuring emergent periodical service - Google Patents

Method and equipment for transmitting and configuring emergent periodical service Download PDF

Info

Publication number
CN105430590A
CN105430590A CN201410441552.6A CN201410441552A CN105430590A CN 105430590 A CN105430590 A CN 105430590A CN 201410441552 A CN201410441552 A CN 201410441552A CN 105430590 A CN105430590 A CN 105430590A
Authority
CN
China
Prior art keywords
resource
equipment
burst period
user equipment
secondary resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410441552.6A
Other languages
Chinese (zh)
Other versions
CN105430590B (en
Inventor
焦斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN201410441552.6A priority Critical patent/CN105430590B/en
Publication of CN105430590A publication Critical patent/CN105430590A/en
Application granted granted Critical
Publication of CN105430590B publication Critical patent/CN105430590B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

An embodiment of the invention relates to the technical field of wireless communication, and particularly to a method and equipment for transmitting and configuring an emergent periodical service, wherein the method and the equipment are used for settling a problem of relatively long waiting time delay in a whole emergent periodical service transmission process caused by a waiting time delay which is introduced because of a resource allocation process in arriving of each data packet for the emergent periodical service in prior art. User equipment provided by the embodiment of the invention transmits the initial data packet of the emergent periodical service to a receiving end through a first resource, wherein the first resource is the resource which is grabbed or pre-allocated and is based on a dedicated channel. After the initial data package is transmitted to the receiving end through the first resource, a subsequent data package of the emergent periodical service is transmitted to the receiving end through a second resource, wherein the second resource is a common transmission resource based on scheduling. The method and the equipment according to the embodiment of the invention can shorten the waiting time delay in the whole emergent periodical service transmission process.

Description

The method and apparatus of a kind of transmission and configuration Burst Period business
Technical field
The present invention relates to wireless communication technology field, particularly the method and apparatus of a kind of transmission and configuration Burst Period business.
Background technology
Existing LTE (LongTermEvolution, Long Term Evolution) in cellular system, be user equipment allocation uplink transmission resource by base stations being in charge, after UE (subscriber equipment) upstream data arrives, first subscriber equipment initiates dispatch request process, acquisition uplink transmission resource is distributed, and upstream data could be sent to base station by the transfer resource distributed by subscriber equipment afterwards.Subscriber equipment before carrying out actual traffic data transmission, because dispatch request process will introduce extra wait time delay.
In uplink burst data transmitting procedure, after user equipment side uplink transmission data bag arrives, first subscriber equipment obtains ascending resource by dispatch request process and distributes and recover uplink synchronous, usual SR the shortest configuration cycle is 5ms, arrive user device transmissions layer from uplink burst data bag and transmit to the actual uplink of packet as seen, subscriber equipment will experience the wait time delay of one period of long period.
Existing cellular communication system D2D (DevicetoDevice, device-to-device) in communication process, D2D transmit leg user equipment (UE) (Tx) first will send to base station requests the resource adopted before carrying out D2D and directly sending for D2D, D2D transmit leg UE (Tx) is after successfully obtaining the schedule information directly sent for D2D, D2D transmit leg user equipment (UE) (Tx) first sends D2D Scheduling assistance information on D2D link, and D2D recipient's user equipment (UE) (Rx) obtains the resource information of D2D transfer of data use and the configuration information needed for reception according to the D2D schedule information received.D2D transmit leg user equipment (UE) (Tx) carries out the transmission of D2D real data according to schedule information in respective resources, and D2D recipient's user equipment (UE) (Rx) carries out the reception of D2D real data according to the schedule information obtained in advance in respective resources.
There is a kind of Burst Period business model in following inter-machine communication, as shown in Figure 1.This business model mainly for alarm class message, such as, in car connected network communication scene, when vehicle finds that front occurs after traffic accident, will sending a warning message in certain duration periodically, notice surrounding vehicles; Warning information also needs the remote server notifying core network internal in addition.The feature of this business model is that data send with fixing interval in business sending duration, and message size is fixed.
Prior art cannot obtain the first bag due in of Burst Period business in advance due to base station, on the other hand because the Inter-arrival Time of Burst Period business cannot be prejudged out in base station, each packet of Burst Period business is therefore caused to arrive the wait time delay that can cause introducing due to resource allocation process.
In sum, at present for Burst Period business, because each packet arrives the wait time delay that can cause introducing due to resource allocation process, thus cause the wait time delay of whole Burst Period business process of transmitting long.
Summary of the invention
The invention provides the method and apparatus of a kind of transmission and configuration Burst Period business, exist for Burst Period business in order to solve in prior art, because each packet arrives the wait time delay that can cause introducing due to resource allocation process, thus the problem causing the wait time delay of whole Burst Period business process of transmitting long.
A kind of method sending Burst Period business that the embodiment of the present invention provides, comprising:
First user equipment sends the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Described first user equipment, after sending described initial data packets by described first resource to receiving terminal, sends the follow-up data bag of described Burst Period business to receiving terminal by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described first user equipment also comprises before sending the initial data packets of Burst Period business by first resource:
The resource allocation information that described first user equipment is broadcasted according to network equipment or received when accessing community, determines described first resource.
Preferably, described first user equipment also comprises before sending the follow-up data bag of described Burst Period business by Secondary resource:
Described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, determines described Secondary resource.
Preferably, described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, before determining described Secondary resource, also comprises:
The traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information.
Preferably, the traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, comprising:
Described traffic performance information is sent to described network equipment by media access control protocol data unit MACPDU by described first user equipment together with initial data packets; Or
Described traffic performance information, after transmission initial data packets, is sent to described network equipment by MACPDU by described first user equipment.
Preferably, described receiving terminal is the second subscriber equipment;
After the pre-scheduling configuration information of the described network equipment that described first user equipment receives, also comprise:
Described first user equipment is according to described pre-scheduling configuration information, the the first device-to-device D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag; Or
Described first user equipment is according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag.
Preferably, described first user equipment, is also comprised to after receiving terminal sends the follow-up data bag of described Burst Period business by Secondary resource:
Described first user equipment setting business continue timer then after, discharge described Secondary resource; And/or
Described first user equipment, after determining to need to discharge described Secondary resource, discharges described Secondary resource.
Preferably, described first user equipment, after determining to need to discharge described Secondary resource, also comprises:
Described first user equipment notifies that described network equipment is released to the described Secondary resource of described user equipment allocation.
The another kind that the embodiment of the present invention provides receives the method for Burst Period business, comprising:
Receiving terminal receives the initial data packets from the Burst Period business of first user equipment by first resource, and wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Described receiving terminal, after receiving described initial data packets by described first resource, receives the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, and wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described receiving terminal is the second subscriber equipment;
Described receiving terminal receives the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, comprising:
Described receiving terminal dispatches indication information according to what receive for the D2D dispatching a packet, receives a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource; Or
Described receiving terminal dispatches indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, and receives the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
Preferably, described receiving terminal is network equipment;
Described receiving terminal also comprises after receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource:
Described receiving terminal is according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
Described receiving terminal, according to the destination server address comprised in the packet of the described Burst Period business received, sends the packet of the described Burst Period business received.
A kind of resource allocation method configuring transmission Burst Period business that the embodiment of the present invention provides, comprising:
Network equipment determination first user equipment needs transmission Burst Period business;
Described network equipment be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets;
Wherein, described Secondary resource is the common transmission resource based on scheduling, and described Secondary resource is different from the first resource of the initial data packets for transmitting Burst Period business, and described first resource is based on seizing or the pre-assigned resource based on dedicated channel.
Preferably, described network equipment be described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource before, also comprise:
The resource allocation information of described network equipment broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
Preferably, described network equipment is according to following manner determination resource allocation information:
All first resources are divided into multiple dedicated signaling by described network equipment, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
Preferably, described network equipment determination first user equipment needs transmission Burst Period business, comprising:
Described network equipment, after receiving the traffic performance information from the Burst Period business of described first user equipment, determines that first user equipment needs transmission Burst Period business;
Described network equipment be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets, comprising:
Described network equipment is Secondary resource described in described first user Equipments Setting according to described traffic performance information.
Preferably, described network equipment receives the traffic performance information from the Burst Period business of described first user equipment, comprising:
Described network equipment receives described traffic performance information by MACPDU.
Preferably, described network equipment be described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, also comprise:
Described network equipment business continue timer then after, discharge described Secondary resource; And/or
Described network equipment receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
A kind of first user equipment sending Burst Period business that the embodiment of the present invention provides, comprising:
First transport module, for being sent the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Second transport module, for after sending described initial data packets by described first resource to receiving terminal, sends the follow-up data bag of described Burst Period business to receiving terminal by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described first transport module also for:
Sent the initial data packets of Burst Period business by first resource before, the resource allocation information of broadcasting according to network equipment or receiving when accessing community, determines described first resource.
Preferably, described second transport module also for:
According to the pre-scheduling configuration information of the described network equipment received, determine described Secondary resource.
Preferably, described second transport module also for:
According to the pre-scheduling configuration information of the described network equipment received, before determining described Secondary resource, the traffic performance information of described Burst Period business is sent to described network equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information.
Preferably, described second transport module specifically for:
By MACPDU, described traffic performance information is sent to described network equipment together with initial data packets; Or after transmission initial data packets, by MACPDU, described traffic performance information is sent to described network equipment.
Preferably, described receiving equipment is the second subscriber equipment;
Described second transport module also for:
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag; Or
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag.
Preferably, described second transport module also for:
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, the business of setting continue timer then after, discharge described Secondary resource; And/or
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, after determining to need to discharge described Secondary resource, discharge described Secondary resource.
Preferably, described second transport module also for:
After determining to need to discharge described Secondary resource, notify that described network equipment is released to the described Secondary resource of described user equipment allocation.
A kind of receiving equipment receiving Burst Period business that the embodiment of the present invention provides, comprising:
First receiver module, for being received the initial data packets from the Burst Period business of first user equipment by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Second receiver module, for after receiving described initial data packets by described first resource, receive the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described receiving equipment is the second subscriber equipment;
Described second receiver module specifically for:
Dispatch indication information according to what receive for the D2D dispatching a packet, receive a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource; Or dispatch indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, receive the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
Preferably, described receiving equipment is network equipment;
Described second receiver module also for:
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, the destination server address comprised in packet according to the described Burst Period business received, sends the packet of the described Burst Period business received.
A kind of network equipment configuring the resource of transmission Burst Period business that the embodiment of the present invention provides, comprising:
Determination module, for determining that first user equipment needs transmission Burst Period business;
Configuration module, for for described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets;
Wherein, described Secondary resource is the common transmission resource based on scheduling, and described Secondary resource is different from the first resource of the initial data packets for transmitting Burst Period business, and described first resource is based on seizing or the pre-assigned resource based on dedicated channel.
Preferably, described configuration module also for:
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource before, the resource allocation information of broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
Preferably, described configuration module also for, according to following manner determination resource allocation information:
All first resources are divided into multiple dedicated signaling, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
Preferably, described determination module specifically for:
After receiving the traffic performance information from the Burst Period business of described first user equipment, determine that first user equipment needs transmission Burst Period business;
Described configuration module specifically for:
Be Secondary resource described in described first user Equipments Setting according to described traffic performance information.
Preferably, described determination module specifically for:
Described traffic performance information is received by MACPDU.
Preferably, described configuration module also for:
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, business continue timer then after, discharge described Secondary resource; And/or
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
Embodiment of the present invention subscriber equipment sends the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel; After sending described initial data packets by described first resource to receiving terminal, sent the follow-up data bag of described Burst Period business by Secondary resource to receiving terminal, wherein said Secondary resource is the common transmission resource based on scheduling.To seize due to the employing of Burst Period business first arrival bag or pre-assigned private resource transmits, no longer need being transmitting uplink data scheduling of upstream transmissions resource by random access procedure trigger base station, and for the transmission of follow-up data bag, the embodiment of the present invention is transmitted in common transmission resource, do not need under traditional approach, after each follow-up data bag arrives, subscriber equipment all needs to carry out Stochastic accessing, thus shortens the wait time delay of whole Burst Period business process of transmitting; Further shortening Burst Period real-time messages, in the wait time delay of MAC layer, can better meet such as alarm class message to the requirement transmitting real-time and reliability.
Accompanying drawing explanation
Fig. 1 is the packet schematic diagram of Burst Period business in background technology;
Fig. 2 A is embodiment of the present invention resource schematic diagram;
Fig. 2 B is embodiment of the present invention dedicated channel schematic diagram;
Fig. 3 A is the system configuration schematic diagram that the embodiment of the present invention one transmits Burst Period business;
Fig. 3 B is the system configuration schematic diagram that the embodiment of the present invention two transmits Burst Period business;
Fig. 4 is the structural representation of the embodiment of the present invention three first user equipment;
Fig. 5 is the structural representation of the embodiment of the present invention four receiving equipment;
Fig. 6 is the structural representation of the embodiment of the present invention five network equipment;
Fig. 7 is the structural representation of the embodiment of the present invention six first user equipment;
Fig. 8 is the structural representation of the embodiment of the present invention seven receiving equipment;
Fig. 9 is the structural representation of the embodiment of the present invention eight network equipment;
Figure 10 is the method flow schematic diagram that the embodiment of the present invention nine sends Burst Period business;
Figure 11 is the method flow schematic diagram that the embodiment of the present invention ten receives Burst Period business;
Figure 12 is the method flow schematic diagram that the embodiment of the present invention 11 configures Burst Period business;
Figure 13 is that the embodiment of the present invention 12 ascending resource distributes the method flow schematic diagram with transmission;
Figure 14 is the embodiment of the present invention 13 MACPDU structural representation;
Figure 15 is the embodiment of the present invention 14 explicit carrying out uplink pre-scheduling configuration release schematic flow sheet;
Figure 16 is that the embodiment of the present invention 15 honeycomb D2D configures the method flow schematic diagram with transmission with scheduling;
Figure 17 is the embodiment of the present invention 16 MACPDU structural representation;
Figure 18 is the embodiment of the present invention 17 honeycomb D2D pre-scheduling configuration release schematic flow sheet.
Embodiment
Embodiment of the present invention subscriber equipment sends the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel; After sending described initial data packets by described first resource to receiving terminal, sent the follow-up data bag of described Burst Period business by Secondary resource to receiving terminal, wherein said Secondary resource is the common transmission resource based on scheduling.To seize due to the employing of Burst Period business first arrival bag or pre-assigned private resource transmits, no longer need being transmitting uplink data scheduling of upstream transmissions resource by random access procedure trigger base station, and for the transmission of follow-up data bag, the embodiment of the present invention is transmitted in common transmission resource, do not need under traditional approach, after each follow-up data bag arrives, subscriber equipment all needs to carry out Stochastic accessing, thus shortens the wait time delay of whole Burst Period business process of transmitting; Further shortening Burst Period real-time messages is at MAC (MediumAccessControl; Medium education) the wait time delay of layer, the requirement of such as alarm class message to transmission real-time and reliability can be better met.
Below in conjunction with Figure of description, the embodiment of the present invention is described in further detail.
The system of embodiment of the present invention transmission Burst Period business comprises: first user equipment and receiving equipment.
First user equipment, for being sent the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel; After sending described initial data packets by described first resource to receiving terminal, sent the follow-up data bag of described Burst Period business by Secondary resource to receiving terminal, wherein said Secondary resource is the common transmission resource based on scheduling;
Receiving equipment, for being received the initial data packets from the Burst Period business of first user equipment by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel; After receiving described initial data packets by described first resource, receive the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Current system available resources are divided into two parts by the embodiment of the present invention, and a part is based on seizing or pre-assigned dedicated transmissions resource, i.e. first resource; Another part is the common transmission resource of side apparatus Network Based scheduling, i.e. Secondary resource.Two parts resource is separated in frequency aspect, as shown in Figure 2 A.The employing of Burst Period business first arrival bag to be seized or pre-assigned private resource transmits, and the Bao Ze of follow-up arrival is transmitted in common transmission resource.Doing reason like this, to be that mode resource frequency resource utilance is seized or allocated in advance in employing very low, therefore for the first arrival data packet transmission of Burst Period business, wait for that therefore time delay have employed the lower mode of the availability of frequency spectrum for lowering, and the data packet transmission that follow-up a large amount of cycle is arrived, because network equipment has obtained information in traffic performance, therefore network equipment can carry out pre-scheduling to follow-up arrival data.
Above-mentioned available resources are time-domain resource or frequency domain resource or running time-frequency resource.
Wherein, receiving equipment can be the second subscriber equipment or network equipment.Be introduced respectively below.
Situation one, receiving equipment are network equipments.Specifically can see Fig. 3 A.
The network equipment of the embodiment of the present invention is except carrying out resource distribution for first user equipment as receiving equipment.
Concrete, network equipment determination first user equipment needs transmission Burst Period business; For described first user Equipments Setting is for transmitting the Secondary resource of follow-up data bag, wherein said follow-up data bag is the packet in the packet of Burst Period business except initial data packets.
In force, carrying out the network equipment of resource distribution and can be same network equipment as the network equipment of receiving equipment, also can be different network equipments.
Except Secondary resource, the network equipment of the embodiment of the present invention can also distribute first resource for first user equipment.
Concrete, the resource allocation information of described network equipment broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
Accordingly, the resource allocation information that described first user equipment is broadcasted according to network equipment or received when accessing community, determines described first resource.
For improving the level of resources utilization, whole first resource can be distributed to subscriber equipment used in system and share by the embodiment of the present invention, the benefit of this mode is when system business amount is lower, collision probability can control a lower level, when in system, traffic carrying capacity is higher, collision probability sharply increases, thus has a strong impact on reliability.
In force, all first resources all can be distributed to each subscriber equipment, each like this subscriber equipment can use whole first resource.
Preferably, in order to average out in collision probability and the level of resources utilization, simultaneously for different business subscriber equipment provides different Reliability Assurances, a kind of mode is that whole first resource Further Division is become some dedicated channels, by carrying out resource multiplex to several different user devices each dedicated channel allocation thus improving resource utilization.Simultaneously because the resource used between dedicated channel is mutually orthogonal, the subscriber equipment being therefore only assigned with same dedicated channel just likely collides (in such as Fig. 2 B, the initial data transfer of subscriber equipment 1 and subscriber equipment 2 just may collide).
Concrete, all first resources are divided into multiple dedicated signaling by described network equipment, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
Wherein, network equipment can for user equipment allocation be for carrying out the dedicated channel resource of initial data packets transmission and the transformation parameter for carrying out initial transmission after subscriber equipment access network.In addition network equipment can according to the difference of different user devices to reliability requirement, dedicated channel is distributed, be such as the dedicated channel (collision probability that collateral security is lower) that user equipment allocation users multiplexing number of devices that reliability requirement is higher is as far as possible few, a dedicated channel can also be distributed separately for the subscriber equipment that reliability requirement is higher; And the higher dedicated channel of users multiplexing number of devices (thus ensureing higher resource utilization) can be distributed for it for the subscriber equipment lower to reliability requirement.
For Secondary resource, network equipment can by pre-scheduling configuration information be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets;
Accordingly, described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, determines described Secondary resource.
Based on the characteristic of Burst Period business, when network equipment unclear needs are user device configuration Secondary resource, thus one preferably mode be:
The traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information;
Accordingly, described network equipment is after receiving the traffic performance information from the Burst Period business of described first user equipment, determine that first user equipment needs transmission Burst Period business, and be Secondary resource described in described first user Equipments Setting according to described traffic performance information.
Wherein, the traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, comprising:
Described traffic performance information is sent to described network equipment by MACPDU (MediumAccessControlPacketDataUnit, media access control protocol data unit) by described first user equipment together with initial data packets; Or
Described traffic performance information, after transmission initial data packets, is sent to described network equipment by MACPDU by described first user equipment.
Accordingly, described network equipment receives described traffic performance information by MACPDU.
Below to send to described network equipment to be described together with initial data packets described traffic performance information.
For cellular uplink transmission situation, when after first user device transmission layer after first packet of Burst Period business arrives, packet and business attribute information (shown in table 1) are packaged into protocol layer PDU (this patent is described for the packaged type of mac-layer protocol to business attribute information, but also do not get rid of business attribute information is encapsulated to the implementation then transferring to MAC layer to transmit by more upper-layer protocol) and send to network equipment by preempt-mode or dedicated channel mode by first user equipment.After network equipment successfully receives initial data packets by preempting resources or dedicated channel mode, forward wherein business datum on the one hand, be on the other hand that the transmission of follow-up data bag is carried out pre-scheduling and configured wherein pre-scheduling configuration information and comprise allocation of radio resources and (comprise the position of the time slot that Radio Resource takies according to the business attribute information of wherein carrying, bandwidth, carrier frequency, cycle, frequency-hopping mode etc.), and transformation parameter configuration (comprising modulation coding mode, multiple antennas configuration etc.).Here pre-scheduling refers to before the actual uplink data of first user equipment arrive, and network equipment will carry out allocation of radio resources that uplink distributes and transformation parameter configuration notification to the process of first user equipment in advance.
Network equipment by pre-scheduling information configuration to first user equipment and after first user equipment side comes into force, when first user equipment side follow-up data bag arrives, first user equipment directly uses the pre-assigned Radio Resource of network equipment to use pre-configured transformation parameter to carry out uplink according to the instruction of pre-scheduling information.Network equipment, according to pre-scheduling configuration information, on preallocated Radio Resource, adopts pre-configured transformation parameter to attempt receiving.Detailed process is see can see Figure 13.
Type of service Data package size The Packet Generation cycle Duration
Burst Period business 500bits 20ms 1s
Table 1 business attribute information example
After network equipment successfully receives the upstream data bag transmission from first user equipment, the far-end server be transmitted to by upstream data in core net processes.
After being assigned with Secondary resource, the embodiment of the present invention additionally provides scheme that is explicit or implicit expression two kinds release Secondary resource.
Implicit expression discharges:
Described first user equipment and network equipment set a business separately and continue timer, described first user equipment and network equipment business separately continue timer then after, discharge described Secondary resource.
Business is continued to the duration of timer, first user equipment is in advance by business duration informing network side apparatus, therefore network equipment can be first user equipment pre-scheduling resource settings effective time, and after exceeding effective time, carry out this locality release, the same pre-scheduling opening timing effective time device carried in first user equipment needs configure according to pre-scheduling, and after timer expiry, carry out the local release of pre-scheduling configuration.
Explicit release:
Described first user equipment, after determining to need to discharge described Secondary resource, discharges described Secondary resource, and notifies that described network equipment is released to the described Secondary resource of described user equipment allocation;
Accordingly, described network equipment receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
In force, first user equipment can be determined to need the reason discharging described Secondary resource to have a lot, is such as sent completely with data, alarm event releasing etc.
Preferably, the release of above-mentioned implicit expression and explicit release also can together with use.
That is, can discharge with reference to timer, if because some reasons need to discharge in advance, then first user equipment can the release of informing network side apparatus.
Such as because such as alarm event removes the situation that the Burst Period transfer of data caused occurs to stop in advance before not reaching the duration for the main triggering reason of explicit pre-scheduling configuration release, first network side apparatus can by triggering the pre-scheduling configuration dispose procedure of display in this case, trigger network side apparatus discharges the Radio Resource that pre-scheduling configuration distributes in advance, reaches the object avoiding waste of radio resources.
In force, network equipment, after the packet receiving Burst Period business, needs Packet Generation to server.
Concrete, network equipment is according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
Network equipment, according to the destination server address comprised in the packet of the described Burst Period business received, sends the packet of the described Burst Period business received.
Situation two, receiving equipment are the second subscriber equipmenies.Specifically can see Fig. 3 B.
For situation two, owing to being D2D transmission, so the embodiment of the present invention also needs network equipment to be that first user equipment carries out resource distribution.
Concrete, network equipment determination first user equipment needs transmission Burst Period business; For described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets.
Except Secondary resource, the network equipment of the embodiment of the present invention can also distribute first resource for first user equipment.
Concrete, the resource allocation information of described network equipment broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
Accordingly, the resource allocation information that described first user equipment is broadcasted according to network equipment or received when accessing community, determines described first resource.
For improving the level of resources utilization, whole first resource can be distributed to subscriber equipment used in system and share by the embodiment of the present invention, the benefit of this mode is when system business amount is lower, collision probability can control a lower level, when in system, traffic carrying capacity is higher, collision probability sharply increases, thus has a strong impact on reliability.
In order to average out in collision probability and the level of resources utilization, simultaneously for different business subscriber equipment provides different Reliability Assurances, a kind of mode is that whole first resource Further Division is become some dedicated channels, by carrying out resource multiplex to several different user devices each dedicated channel allocation thus improving resource utilization.Simultaneously because the resource used between dedicated channel is mutually orthogonal, the subscriber equipment being therefore only assigned with same dedicated channel just likely collides (in such as Fig. 2 B, the initial data transfer of subscriber equipment 1 and subscriber equipment 2 just may collide).
Concrete, all first resources are divided into multiple dedicated signaling by described network equipment, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
Wherein, network equipment can for user equipment allocation be for carrying out the dedicated channel resource of initial data packets transmission and the transformation parameter for carrying out initial transmission after subscriber equipment access network.In addition network equipment can according to the difference of different user devices to reliability requirement, distributing dedicated channel, such as, is the dedicated channel (collision probability that collateral security is lower) that user equipment allocation users multiplexing number of devices that reliability requirement is higher is as far as possible few; And the higher dedicated channel of users multiplexing number of devices (thus ensureing higher resource utilization) can be distributed for it for the subscriber equipment lower to reliability requirement.
For Secondary resource, network equipment can by pre-scheduling configuration information be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets;
Accordingly, described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, determines described Secondary resource.
Based on the characteristic of Burst Period business, when network equipment unclear needs are user device configuration Secondary resource, thus one preferably mode be:
The traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information;
Accordingly, described network equipment is after receiving the traffic performance information from the Burst Period business of described first user equipment, determine that first user equipment needs transmission Burst Period business, and be Secondary resource described in described first user Equipments Setting according to described traffic performance information.
Wherein, the traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, comprising:
Described traffic performance information is sent to described network equipment by MACPDU by described first user equipment together with initial data packets;
Accordingly, described network equipment receives described traffic performance information by MACPDU.
Concrete, directly situation is transmitted for honeycomb D2D, when after first user device transmission layer after first packet of Burst Period business arrives, send first user equipment on the one hand by business datum by based on to seize or dedicated channel mode sends on D2D direct link, send first user equipment on the other hand and business attribute information (business attribute information is with consistent above) is sent to network equipment, network equipment carries out pre-scheduling configuration wherein for sending the follow-up data transmission on D2D link of first user equipment, wherein pre-scheduling information comprises allocation of radio resources and (comprises the position of the time slot that Radio Resource takies, bandwidth, carrier frequency, cycle, frequency-hopping mode etc.), and transformation parameter configuration (comprises modulation coding mode, multiple antennas configuration etc.).Here pre-scheduling refers to before the actual uplink data sending first user equipment arrive, and network equipment directly transmits distributed allocation of radio resources and transformation parameter configuration notification to the process of first user equipment by carrying out D2D in advance.
Follow-up data bag arrive before, first user equipment (D2D sends subscriber equipment) by D2D direct link by pre-scheduling message notice second subscriber equipment (D2D receives subscriber equipment).After follow-up data bag arrives, first user equipment carries out D2D according to pre-scheduling configuration and directly sends, and the second subscriber equipment is attempted receiving according to the pre-scheduling configuration information obtained in advance from first user equipment.Detailed process is see Figure 16.
Wherein, first user equipment by D2D direct link by pre-scheduling message notice the second subscriber equipment time, can each need to send follow-up data bag to the second subscriber equipment before all by the resource notification of correspondence to the second subscriber equipment; Also can by all resources notifying user equipment corresponding for follow-up data bag.Be described below.
Mode one:
Described first user equipment is according to described pre-scheduling configuration information, the D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag;
Accordingly, described receiving terminal dispatches indication information according to what receive for the D2D dispatching a packet, receives a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource.
Mode two:
Described first user equipment is according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag;
Accordingly, described receiving terminal dispatches indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, and receives the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
After being assigned with Secondary resource, the embodiment of the present invention additionally provides scheme that is explicit or implicit expression two kinds release Secondary resource.
Implicit expression discharges:
Described first user equipment and network equipment set a business separately and continue timer, described first user equipment and network equipment business separately continue timer then after, discharge described Secondary resource.
Business is continued to the duration of timer, first user equipment is in advance by business duration informing network side apparatus, therefore network equipment can be first user equipment pre-scheduling resource settings effective time, and after exceeding effective time, carry out this locality release, the same pre-scheduling opening timing effective time device carried in first user equipment needs configure according to pre-scheduling, and after timer expiry, carry out the local release of pre-scheduling configuration.
Explicit release:
Described first user equipment, after determining to need to discharge described Secondary resource, discharges described Secondary resource, and notifies that described network equipment is released to the described Secondary resource of described user equipment allocation;
Accordingly, described network equipment receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
In force, first user equipment can be determined to need the reason discharging described Secondary resource to have a lot, is such as sent completely with data, alarm event releasing etc.
Preferably, the release of above-mentioned implicit expression and explicit release also can together with use.
That is, can discharge with reference to timer, if because some reasons need to discharge in advance, then first user equipment can the release of informing network side apparatus.
Such as because such as alarm event removes the situation that the Burst Period transfer of data caused occurs to stop in advance before not reaching the duration for the main triggering reason of explicit pre-scheduling configuration release, first network side apparatus can by triggering the pre-scheduling configuration dispose procedure of display in this case, trigger network side apparatus discharges the Radio Resource that pre-scheduling configuration distributes in advance, reaches the object avoiding waste of radio resources.
Also the mode similar with network equipment can be adopted to discharge Secondary resource for the second subscriber equipment, detailed process repeats no more.
In force, the network equipment of the embodiment of the present invention can be base station (such as macro base station, Home eNodeB etc.), and also can be RN (relaying) equipment, can also be other network equipment.
As shown in Figure 4, the embodiment of the present invention three first user equipment comprises: the first transport module 400 and the second transport module 401.
First transport module 400, for being sent the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Second transport module 401, for after sending described initial data packets by described first resource to receiving terminal, sent the follow-up data bag of described Burst Period business to receiving terminal by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described first transport module 400 also for:
Sent the initial data packets of Burst Period business by first resource before, the resource allocation information of broadcasting according to network equipment or receiving when accessing community, determines described first resource.
Preferably, described second transport module 401 also for:
According to the pre-scheduling configuration information of the described network equipment received, determine described Secondary resource.
Preferably, described second transport module 401 also for:
According to the pre-scheduling configuration information of the described network equipment received, before determining described Secondary resource, the traffic performance information of described Burst Period business is sent to described network equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information.
Preferably, described second transport module 401 specifically for:
By MACPDU, described traffic performance information is sent to described network equipment together with initial data packets; Or after transmission initial data packets, by MACPDU, described traffic performance information is sent to described network equipment.
Preferably, described receiving equipment is the second subscriber equipment;
Described second transport module 401 also for:
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag; Or
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag.
Preferably, described second transport module 401 also for:
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, the business of setting continue timer then after, discharge described Secondary resource; And/or
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, after determining to need to discharge described Secondary resource, discharge described Secondary resource.
Preferably, described second transport module 401 also for:
After determining to need to discharge described Secondary resource, notify that described network equipment is released to the described Secondary resource of described user equipment allocation.
As shown in Figure 5, the embodiment of the present invention four receiving equipment comprises: the first receiver module 500 and the second receiver module 501.
First receiver module 500, for being received the initial data packets from the Burst Period business of first user equipment by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Second receiver module 501, for after receiving described initial data packets by described first resource, receive the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described receiving equipment is the second subscriber equipment;
Described second receiver module 501 specifically for:
Dispatch indication information according to what receive for the D2D dispatching a packet, receive a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource; Or dispatch indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, receive the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
Preferably, described receiving equipment is network equipment;
Described second receiver module 501 also for:
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, the destination server address comprised in packet according to the described Burst Period business received, sends the packet of the described Burst Period business received.
In force, if receiving equipment is the second subscriber equipment, then the module in Fig. 4 and Fig. 5 can be combined in a subscriber equipment.When subscriber equipment is as transmitting terminal, the module in Fig. 4 is selected to perform corresponding function; When subscriber equipment is as receiving terminal, the module in Fig. 5 is selected to perform corresponding function.
As shown in Figure 6, the embodiment of the present invention five network equipment comprises: determination module 600 and configuration module 601.
Determination module 600, for determining that first user equipment needs transmission Burst Period business;
Configuration module 601, for for described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets;
Wherein, described Secondary resource is the common transmission resource based on scheduling, and described Secondary resource is different from the first resource of the initial data packets for transmitting Burst Period business, and described first resource is based on seizing or the pre-assigned resource based on dedicated channel.
Preferably, described configuration module 601 also for:
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource before, the resource allocation information of broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
Preferably, described configuration module 601 also for, according to following manner determination resource allocation information:
All first resources are divided into multiple dedicated signaling, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
Preferably, described determination module 600 specifically for:
After receiving the traffic performance information from the Burst Period business of described first user equipment, determine that first user equipment needs transmission Burst Period business;
Described configuration module 601 specifically for:
Be Secondary resource described in described first user Equipments Setting according to described traffic performance information.
Preferably, described determination module 600 specifically for:
Described traffic performance information is received by MACPDU.
Preferably, described configuration module 601 also for:
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, business continue timer then after, discharge described Secondary resource; And/or
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
In force, if receiving equipment is network equipment, then the subscriber equipment in Fig. 6 can also comprise all modules in Fig. 5.
As shown in Figure 7, the embodiment of the present invention six first user equipment comprises:
Processor 701, for the program for reading in memory 704, performs following process:
Control transceiver 702 sends Burst Period business to receiving terminal initial data packets by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel; After sending described initial data packets by described first resource to receiving terminal, control transceiver 702 sends described Burst Period business to receiving terminal follow-up data bag by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling;
Transceiver 702, for receiving and sending data under the control of processor 701.
Preferably, described processor 701 also for:
Sent the initial data packets of Burst Period business by first resource before, control the resource allocation information that transceiver 702 is broadcasted according to network equipment or received when accessing community, determine described first resource.
Preferably, described processor 701 also for:
According to the pre-scheduling configuration information of the described network equipment received, determine described Secondary resource.
Preferably, described processor 701 also for:
According to the pre-scheduling configuration information of the described network equipment received, before determining described Secondary resource, controlling transceiver 702 and the traffic performance information of described Burst Period business is sent to described network equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information.
Preferably, described processor 701 specifically for:
Control transceiver 702, by MACPDU, described traffic performance information is sent to described network equipment together with initial data packets; Or after transmission initial data packets, control transceiver 702, by MACPDU, described traffic performance information is sent to described network equipment.
Preferably, described receiving equipment is the second subscriber equipment;
Described processor 701 also for:
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag; Or
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag.
Preferably, described processor 701 also for:
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, the business of setting continue timer then after, discharge described Secondary resource; And/or
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, after determining to need to discharge described Secondary resource, discharge described Secondary resource.
Preferably, described processor 701 also for:
After determining to need to discharge described Secondary resource, notify that described network equipment is released to the described Secondary resource of described user equipment allocation.
In the figure 7, bus architecture (representing by bus 700), bus 700 can comprise interconnected bus and the bridge of any amount, and the various electrical chains comprising the memory that one or more processor of being represented by processor 701 and memory 704 represent are connected together by bus 700.Other electrical chains various of such as ancillary equipment, pressurizer and management circuit etc. and so on can also be connected together by bus 700, and these are all known in the field, therefore, are no longer described further it herein.Bus interface 703 provides interface between bus 700 and transceiver 702.Transceiver 702 can be an element, also can be multiple element, such as multiple receiver and transmitter, is provided for the unit communicated with other devices various over a transmission medium.The data that treated device 701 processes are transmitted on the radio medium by antenna 705, and further, antenna 705 also receives data and sends data to processor 701.
Processor 701 is in charge of bus 700 and common process, can also provide various function, comprises timing, peripheral interface, voltage-regulation, power management and other controlling functions.And memory 704 can be used to the data that storage of processor 701 uses when executable operations.
Optionally, processor 701 can be CPU (centre buries device), ASIC (ApplicationSpecificIntegratedCircuit, application-specific integrated circuit (ASIC)), FPGA (Field-ProgrammableGateArray, field programmable gate array) or CPLD (ComplexProgrammableLogicDevice, CPLD).
As shown in Figure 8, the embodiment of the present invention seven receiving equipment comprises:
Processor 801, for the program for reading in memory 804, performs following process:
Control transceiver 802 by the initial data packets of first resource reception from the Burst Period business of first user equipment, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel; After receiving described initial data packets by described first resource, control transceiver 802 by the follow-up data bag of Secondary resource reception from the described Burst Period business of first user equipment, wherein said Secondary resource is the common transmission resource based on scheduling;
Transceiver 802, for receiving and sending data under the control of processor 801.
Preferably, described receiving equipment is the second subscriber equipment;
Described processor 801 specifically for:
Dispatch indication information according to what receive for the D2D dispatching a packet, receive a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource; Or dispatch indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, receive the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
Preferably, described receiving equipment is network equipment;
Described processor 801 also for:
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, the destination server address comprised in packet according to the described Burst Period business received, sends the packet of the described Burst Period business received.
In fig. 8, bus architecture (representing by bus 800), bus 800 can comprise interconnected bus and the bridge of any amount, and the various electrical chains comprising the memory that one or more processor of being represented by processor 801 and memory 804 represent are connected together by bus 800.Other electrical chains various of such as ancillary equipment, pressurizer and management circuit etc. and so on can also be connected together by bus 800, and these are all known in the field, therefore, are no longer described further it herein.Bus interface 803 provides interface between bus 800 and transceiver 802.Transceiver 802 can be an element, also can be multiple element, such as multiple receiver and transmitter, is provided for the unit communicated with other devices various over a transmission medium.The data that treated device 801 processes are transmitted on the radio medium by antenna 805, and further, antenna 805 also receives data and sends data to processor 801.
Processor 801 is in charge of bus 800 and common process, can also provide various function, comprises timing, peripheral interface, voltage-regulation, power management and other controlling functions.And memory 804 can be used to the data that storage of processor 801 uses when executable operations.
Optionally, processor 801 can be CPU, ASIC, FPGA or CPLD.
In force, if receiving equipment is the second subscriber equipment, then the function of the identity unit in Fig. 7 and Fig. 8 can complete with in a device, in such as Fig. 7 processor 701 and processor 801 function can with in a processor.When subscriber equipment is as transmitting terminal, the function of selection processor 701 correspondence; When subscriber equipment is as receiving terminal, the function of selection processor 801 correspondence.
As shown in Figure 9, the embodiment of the present invention eight network equipment comprises:
Processor 901, for reading the program in memory 904, performs following process:
Determine that first user equipment needs transmission Burst Period business; By transceiver 902 be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets; Wherein, described Secondary resource is the common transmission resource based on scheduling, and described Secondary resource is different from the first resource of the initial data packets for transmitting Burst Period business, and described first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Transceiver 902, for receiving and sending data under the control of processor 901.
Preferably, described processor 901 also for:
By transceiver 902 be described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource before, the resource allocation information of broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
Preferably, described processor 901 also for, according to following manner determination resource allocation information:
All first resources are divided into multiple dedicated signaling, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
Preferably, described processor 901 specifically for:
After receiving the traffic performance information from the Burst Period business of described first user equipment, determine that first user equipment needs transmission Burst Period business; Be Secondary resource described in described first user Equipments Setting by transceiver 902 according to described traffic performance information.
Preferably, described processor 901 specifically for:
Control transceiver 902 and receive described traffic performance information by MACPDU.
Preferably, described processor 901 also for:
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, business continue timer then after, discharge described Secondary resource; And/or
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
In fig .9, bus architecture (representing by bus 900), bus 900 can comprise interconnected bus and the bridge of any amount, and the various electrical chains comprising the memory that one or more processor of being represented by processor 901 and memory 904 represent are connected together by bus 900.Other electrical chains various of such as ancillary equipment, pressurizer and management circuit etc. and so on can also be connected together by bus 900, and these are all known in the field, therefore, are no longer described further it herein.Bus interface 903 provides interface between bus 900 and transceiver 902.Transceiver 902 can be an element, also can be multiple element, such as multiple receiver and transmitter, is provided for the unit communicated with other devices various over a transmission medium.The data that treated device 901 processes are transmitted on the radio medium by antenna 905, and further, antenna 905 also receives data and sends data to processor 901.
Processor 901 is in charge of bus 900 and common process, can also provide various function, comprises timing, peripheral interface, voltage-regulation, power management and other controlling functions.And memory 904 can be used to the data that storage of processor 901 uses when executable operations.
Optionally, processor 901 can be CPU, ASIC, FPGA or CPLD
In force, if receiving equipment is network equipment, then the function of the identity unit in Fig. 8 and Fig. 9 can complete with in a device, in such as Fig. 8 processor 801 and processor 901 function can with in a processor.When network equipment is as receiving terminal, the function of selection processor 801 correspondence; When network equipment is user device configuration resource, the function of selection processor 901 correspondence.
Based on same inventive concept, a kind of method sending Burst Period business is additionally provided in the embodiment of the present invention, because the equipment that the method is corresponding is the first user equipment that the embodiment of the present invention sends in the system of Burst Period business, and the principle that the method is dealt with problems and this unit affinity, therefore the enforcement of the method see the enforcement of system, can repeat part and repeats no more.
As shown in Figure 10, the method that the embodiment of the present invention nine sends Burst Period business comprises:
Step 1000, first user equipment send the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Step 1001, described first user equipment are after sending described initial data packets by described first resource to receiving terminal, sent the follow-up data bag of described Burst Period business to receiving terminal by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described first user equipment also comprises before sending the initial data packets of Burst Period business by first resource:
The resource allocation information that described first user equipment is broadcasted according to network equipment or received when accessing community, determines described first resource.
Preferably, described first user equipment also comprises before sending the follow-up data bag of described Burst Period business by Secondary resource:
Described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, determines described Secondary resource.
Preferably, described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, before determining described Secondary resource, also comprises:
The traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information.
Preferably, the traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, comprising:
Described traffic performance information is sent to described network equipment by MACPDU by described first user equipment together with initial data packets; Or
Described traffic performance information, after transmission initial data packets, is sent to described network equipment by MACPDU by described first user equipment.
Preferably, described receiving terminal is the second subscriber equipment;
After the pre-scheduling configuration information of the described network equipment that described first user equipment receives, also comprise:
Described first user equipment is according to described pre-scheduling configuration information, the D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag; Or
Described first user equipment is according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag.
Preferably, described first user equipment, is also comprised to after receiving terminal sends the follow-up data bag of described Burst Period business by Secondary resource:
Described first user equipment setting business continue timer then after, discharge described Secondary resource; And/or
Described first user equipment, after determining to need to discharge described Secondary resource, discharges described Secondary resource.
Preferably, described first user equipment, after determining to need to discharge described Secondary resource, also comprises:
Described first user equipment notifies that described network equipment is released to the described Secondary resource of described user equipment allocation.
As shown in figure 11, the method that the embodiment of the present invention ten receives Burst Period business comprises:
Step 1100, receiving terminal receive the initial data packets from the Burst Period business of first user equipment by first resource, and wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Step 1101, described receiving terminal are after receiving described initial data packets by described first resource, receive the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
Preferably, described receiving terminal is the second subscriber equipment;
Described receiving terminal receives the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, comprising:
Described receiving terminal dispatches indication information according to what receive for the D2D dispatching a packet, receives a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource; Or
Described receiving terminal dispatches indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, and receives the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
Preferably, described receiving terminal is network equipment;
Described receiving terminal also comprises after receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource:
Described receiving terminal is according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
Described receiving terminal, according to the destination server address comprised in the packet of the described Burst Period business received, sends the packet of the described Burst Period business received.
As shown in figure 12, the method for the embodiment of the present invention 11 configuration Burst Period business comprises:
Step 1200, network equipment determination first user equipment need transmission Burst Period business;
Step 1201, described network equipment be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets; Wherein, described Secondary resource is the common transmission resource based on scheduling, and described Secondary resource is different from the first resource of the initial data packets for transmitting Burst Period business, and described first resource is based on seizing or the pre-assigned resource based on dedicated channel.
Preferably, described network equipment be described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource before, also comprise:
The resource allocation information of described network equipment broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
Preferably, described network equipment is according to following manner determination resource allocation information:
All first resources are divided into multiple dedicated signaling by described network equipment, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
Preferably, described network equipment determination first user equipment needs transmission Burst Period business, comprising:
Described network equipment, after receiving the traffic performance information from the Burst Period business of described first user equipment, determines that first user equipment needs transmission Burst Period business;
Described network equipment be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets, comprising:
Described network equipment is Secondary resource described in described first user Equipments Setting according to described traffic performance information.
Preferably, described network equipment receives the traffic performance information from the Burst Period business of described first user equipment, comprising:
Described network equipment receives described traffic performance information by MACPDU.
Preferably, described network equipment be described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, also comprise:
Described network equipment business continue timer then after, discharge described Secondary resource; And/or
Described network equipment receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
Row give some instances and to be described in detail to the solution of the present invention below.
Wherein the receiving terminal of one and two is base station; The receiving terminal of three and four is subscriber equipment.
One, as shown in figure 13, the distribution of the embodiment of the present invention 12 ascending resource comprises with the method for transmission:
Step 1: after initial data packets arrives, subscriber equipment directly carries out uplink by first resource.
Preferably, in the PDU of MAC layer, initial transmitted data packet and service feature information is carried.
Wherein, service feature information can include but not limited to: the information such as size, cycle, duration of message bag.
In force, first resource can be base station is user equipment allocation in advance, and system broadcasts mode can be passed through in such as base station, and instruction current area can be used for the up information seizing transmission; Also can access in this community process for the first time at subscriber equipment, be user equipment allocation dedicated transmissions resource.Except base station is allocated in advance, first resource can also specify in the protocol.
Initial uplink transmission MAC layer PDU forms schematic diagram can see Figure 14, it should be noted that the main purpose of this schematic diagram is to illustrate that this MACPDU needs the key message item carried and the object of carrying these items of information, comprising MAC layer packet header form in practical implementations and the order of each item of information in MACPDU can change as required.
Carry out initial uplink transmission for based on preempt-mode, due to the id information of the uplink transmission resource associated user equipment that base station cannot adopt according to subscriber equipment, therefore subscriber equipment needs to carry self-ID information when carrying out uplink.In addition because business datum and control information are concentrated in original position and the length therefore being indicated control information and business information in a MACPDU by MAC header.Preferably, for ensureing that initial transmission can not be tampered, can also in the integrity check information finally comprised for current PDU of MACPDU.
Step 2: the information that base station is relevant according to the service attribute obtained from initial transmission (comprises traffic type information, the size of packet, Packet Generation cycle and duration), and in conjunction with initial data packets due in, for pre-scheduling configuration is carried out in the transmission of follow-up data bag.
Wherein, pre-scheduling configuration information comprises allocation of radio resources and transformation parameter configuration, and (allocation of radio resources comprises the position of the time slot that Radio Resource takies, bandwidth, carrier frequency, cycle, frequency-hopping mode etc., transformation parameter configuration comprises modulation coding mode, multiple antennas configuration etc.)
Carrying out uplink pre-scheduling information is sent to subscriber equipment by dedicated control signaling mode by base station.
In addition pre-scheduling can also be configured effective time announcement subscriber equipment by base station, and after pre-scheduling configuration time-out effective time, subscriber equipment needs implicit expression to discharge pre-scheduling configuration.
Step 2a: after base station correctly receives initial uplink transfer of data from subscriber equipment, can obtain destination server address according to the subscriber equipment ID preserved in advance and destination server address mapping relations; Also according to the destination address of carrying initial transmitted data packet itself, can determine destination server address, base station, according to destination address, will receive initial uplink packet is transmitted to destination server.
Step 3: after subscriber equipment successfully obtains pre-scheduling configuration, trigger pre-scheduling configuration take-effective, and configured message informing base station pre-scheduling configuration by carrying out uplink pre-scheduling and come into force in user equipment side, if carry pre-scheduling in pre-scheduling configuration information to configure effective temporal information, then subscriber equipment is opened pre-scheduling and is configured effective time timer.
Step 4: after follow-up data bag arrives, configured by pre-scheduling, subscriber equipment carries out the transmission of upstream data bag.
Wherein, the MACPDU group packet mode for the uplink based on scheduling mode can see existing LTE system mac-layer protocol.
Base station side, according to pre-scheduling configuration information, on preallocated Radio Resource, adopts pre-configured transformation parameter to attempt receiving.
Step 4a: after base station correctly receives subsequent upstream transfer of data from subscriber equipment, can obtain destination server address according to the subscriber equipment ID preserved in advance and destination server address mapping relations; Also according to the destination address of carrying initial transmitted data packet itself, can determine destination server address, base station, according to destination address, will receive subsequent upstream packet is transmitted to destination server.
Two, as shown in figure 15, in the embodiment of the present invention 14 explicit carrying out uplink pre-scheduling configuration release flow process, subscriber equipment finds Burst Period business premature termination (such as operation layer alarm is removed), at this moment can by carrying out uplink pre-scheduling resource allocation explicit dispose procedure trigger base station release preassignment ascending wireless resource.
Step 1: subscriber equipment determines to discharge Secondary resource in advance, sends carrying out uplink pre-scheduling configuration release Indication message to base station.
Step 2: base station is released to the preallocated Secondary resource of current user equipment, and completes message by up preassignment and will successfully discharge result notifying user equipment after receiving pre-scheduling configuration release instruction from subscriber equipment.
Step 3: subscriber equipment release Secondary resource.
Wherein, step 3 also can perform together with step 1.
Three, as shown in figure 16, the embodiment of the present invention 15 honeycomb D2D and scheduling configure and comprise with the method for transmission:
Step 1: after initial data packets arrives, subscriber equipment directly carries out D2D by first resource directly to be transmitted.
Wherein, subscriber equipment carries initial transmitted data packet in MAC layer PDU.
In force, first resource can be base station is user equipment allocation in advance, and system broadcasts mode can be passed through in such as base station, and instruction current area can be used for the up information seizing transmission; Also can access in this community process for the first time at subscriber equipment, be user equipment allocation dedicated transmissions resource.Except base station is allocated in advance, first resource can also specify in the protocol.
Initial D2D transmits MAC layer PDU and forms schematic diagram as shown in figure 17, it should be noted that the main purpose of this schematic diagram is to illustrate that this MACPDU needs the key message item carried and the object of carrying these items of information, comprising MAC layer packet header form in practical implementations and the order of each item of information in MACPDU can change as required.
Initial data packets D2D is directly transmitted, because D2D communication receiver does not obtain the relevant information of scheduling in advance, therefore receive transmission subscriber equipment ID that subscriber equipment needs to carry according to MAC and receive subscriber equipment ID, judging that current initial data packets is reported and submitted and whether should receive and submit high level to.
Preferably, for ensureing that initial transmission can not be tampered, can also in the integrity check information finally comprised for current PDU of MACPDU.
Step 2: send subscriber equipment and send D2D pre-scheduling configuration request message to base station, and carry business attribute information in pre-scheduling request message.
Wherein, service feature information can include but not limited to: the information such as size, cycle, duration of message bag.
Step 3: the information that base station is relevant according to the service attribute obtained from initial transmission (comprises traffic type information, the size of packet, Packet Generation cycle and duration), and in conjunction with initial data packets due in, for pre-scheduling configuration is carried out in the transmission of follow-up data bag.
Wherein, pre-scheduling configuration information comprises allocation of radio resources and transformation parameter configuration, and (allocation of radio resources comprises the position of the time slot that Radio Resource takies, bandwidth, carrier frequency, cycle, frequency-hopping mode etc., transformation parameter configuration comprises modulation coding mode, multiple antennas configuration etc.)
Carrying out uplink pre-scheduling information is sent to subscriber equipment by dedicated control signaling mode by base station.
In addition D2D pre-scheduling can be configured effective time announcement subscriber equipment by base station, and after pre-scheduling configuration time-out effective time, sending subscriber equipment needs implicit expression to discharge pre-scheduling configuration.
Step 4:D2D sends after subscriber equipment successfully obtains D2D pre-scheduling configuration, triggers D2D pre-scheduling configuration take-effective, and configure the D2D pre-scheduling of message informing base station by D2D pre-scheduling and configure and come into force in user equipment side.
If carry D2D pre-scheduling in D2D pre-scheduling configuration information to configure effective temporal information, then subscriber equipment is opened pre-scheduling and is configured effective time timer.
Step 5: before follow-up data bag arrives, D2D sends subscriber equipment and dispatches Indication message by pre-scheduling message notice D2D reception subscriber equipment by D2D.
Step 6: after follow-up data bag arrives, D2D transmission subscriber equipment carries out D2D according to pre-scheduling configuration and directly sends, and D2D reception subscriber equipment attempts reception according to the pre-scheduling configuration information obtained in advance from D2D transmission subscriber equipment.
The D2D scheduling indication information that in Figure 16, D2D transmission subscriber equipment sends is the 2nd D2D scheduling indication information for the multiple packet of schedule subsequent; The mode that the D2D sent for dispatching a packet dispatches indication information and transmission the 2nd D2D dispatches indication information is similar, when difference is only to need to send follow-up data bag at every turn, all need mode first D2D to dispatch indication information, do not repeat them here.
Four, as shown in figure 18, in the embodiment of the present invention 17 honeycomb D2D pre-scheduling configuration release schematic flow sheet, under user apparatus service finds Burst Period business premature termination situation, D2D directly transmits (such as operation layer alarm is removed), can transmit preassignment uplink transmission resource by honeycomb D2D pre-scheduling resource allocation dispose procedure trigger base station release D2D.
Step 1:D2D sends D2D pre-scheduling assignment configuration and discharges Indication message to base station after sending the subscriber equipment decision preallocated D2D scheduling in release base station in advance configuration.
Step 2: base station is released to the preallocated D2D transfer resource of present terminal after receiving the pre-scheduling configuration release instruction of D2D transmission subscriber equipment, and complete message informing D2D transmission subscriber equipment by successfully discharging result by D2D preassignment.
Step 3:D2D sends subscriber equipment release Secondary resource.
Wherein, step 3 also can perform together with step 1.
It can be seen from the above: embodiment of the present invention subscriber equipment sends the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel; After sending described initial data packets by described first resource to receiving terminal, sent the follow-up data bag of described Burst Period business by Secondary resource to receiving terminal, wherein said Secondary resource is the common transmission resource based on scheduling.To seize due to the employing of Burst Period business first arrival bag or pre-assigned private resource transmits, no longer need being transmitting uplink data scheduling of upstream transmissions resource by random access procedure trigger base station, and for the transmission of follow-up data bag, the embodiment of the present invention is transmitted in common transmission resource, do not need under traditional approach, after each follow-up data bag arrives, subscriber equipment all needs to carry out Stochastic accessing, thus shortens the wait time delay of whole Burst Period business process of transmitting; Further shortening Burst Period real-time messages, in the wait time delay of MAC layer, can better meet such as alarm class message to the requirement transmitting real-time and reliability.
Obviously, those skilled in the art can carry out various change and modification to the present invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (34)

1. send a method for Burst Period business, it is characterized in that, the method comprises:
First user equipment sends the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Described first user equipment, after sending described initial data packets by described first resource to receiving terminal, sends the follow-up data bag of described Burst Period business to receiving terminal by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
2. the method for claim 1, is characterized in that, described first user equipment also comprises before sending the initial data packets of Burst Period business by first resource:
The resource allocation information that described first user equipment is broadcasted according to network equipment or received when accessing community, determines described first resource.
3. the method for claim 1, is characterized in that, described first user equipment also comprises before sending the follow-up data bag of described Burst Period business by Secondary resource:
Described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, determines described Secondary resource.
4. method as claimed in claim 3, it is characterized in that, described first user equipment, according to the pre-scheduling configuration information of the described network equipment received, before determining described Secondary resource, also comprises:
The traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information.
5. method as claimed in claim 4, it is characterized in that, the traffic performance information of described Burst Period business is sent to described network equipment by described first user equipment, comprising:
Described traffic performance information is sent to described network equipment by media access control protocol data unit MACPDU by described first user equipment together with initial data packets; Or
Described traffic performance information, after transmission initial data packets, is sent to described network equipment by MACPDU by described first user equipment.
6. method as claimed in claim 3, it is characterized in that, described receiving terminal is the second subscriber equipment;
After the pre-scheduling configuration information of the described network equipment that described first user equipment receives, also comprise:
Described first user equipment is according to described pre-scheduling configuration information, the the first device-to-device D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag; Or
Described first user equipment is according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag.
7. the method as described in as arbitrary in claim 2 ~ 6, is characterized in that, described first user equipment, is also comprised to after receiving terminal sends the follow-up data bag of described Burst Period business by Secondary resource:
Described first user equipment setting business continue timer then after, discharge described Secondary resource; And/or
Described first user equipment, after determining to need to discharge described Secondary resource, discharges described Secondary resource.
8. method as claimed in claim 7, it is characterized in that, described first user equipment, after determining to need to discharge described Secondary resource, also comprises:
Described first user equipment notifies that described network equipment is released to the described Secondary resource of described user equipment allocation.
9. receive a method for Burst Period business, it is characterized in that, the method comprises:
Receiving terminal receives the initial data packets from the Burst Period business of first user equipment by first resource, and wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Described receiving terminal, after receiving described initial data packets by described first resource, receives the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, and wherein said Secondary resource is the common transmission resource based on scheduling.
10. method as claimed in claim 9, it is characterized in that, described receiving terminal is the second subscriber equipment;
Described receiving terminal receives the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, comprising:
Described receiving terminal dispatches indication information according to what receive for the D2D dispatching a packet, receives a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource; Or
Described receiving terminal dispatches indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, and receives the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
11. methods as claimed in claim 9, it is characterized in that, described receiving terminal is network equipment;
Described receiving terminal also comprises after receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource:
Described receiving terminal is according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
Described receiving terminal, according to the destination server address comprised in the packet of the described Burst Period business received, sends the packet of the described Burst Period business received.
12. 1 kinds configure the resource allocation method transmitting Burst Period business, and it is characterized in that, the method comprises:
Network equipment determination first user equipment needs transmission Burst Period business;
Described network equipment be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets;
Wherein, described Secondary resource is the common transmission resource based on scheduling, and described Secondary resource is different from the first resource of the initial data packets for transmitting Burst Period business, and described first resource is based on seizing or the pre-assigned resource based on dedicated channel.
13. methods as claimed in claim 12, is characterized in that, described network equipment be described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource before, also comprise:
The resource allocation information of described network equipment broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
14. methods as claimed in claim 13, it is characterized in that, described network equipment is according to following manner determination resource allocation information:
All first resources are divided into multiple dedicated signaling by described network equipment, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
15. methods as claimed in claim 12, is characterized in that, described network equipment determination first user equipment needs transmission Burst Period business, comprising:
Described network equipment, after receiving the traffic performance information from the Burst Period business of described first user equipment, determines that first user equipment needs transmission Burst Period business;
Described network equipment be described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets, comprising:
Described network equipment is Secondary resource described in described first user Equipments Setting according to described traffic performance information.
16. methods as claimed in claim 15, is characterized in that, described network equipment receives the traffic performance information from the Burst Period business of described first user equipment, comprising:
Described network equipment receives described traffic performance information by MACPDU.
17. as arbitrary in claim 12 ~ 16 as described in method, it is characterized in that, described network equipment be described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, also comprise:
Described network equipment business continue timer then after, discharge described Secondary resource; And/or
Described network equipment receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
18. 1 kinds of first user equipment sending Burst Period business, it is characterized in that, this first user equipment comprises:
First transport module, for being sent the initial data packets of Burst Period business to receiving terminal by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Second transport module, for after sending described initial data packets by described first resource to receiving terminal, sends the follow-up data bag of described Burst Period business to receiving terminal by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
19. equipment as claimed in claim 18, is characterized in that, described first transport module also for:
Sent the initial data packets of Burst Period business by first resource before, the resource allocation information of broadcasting according to network equipment or receiving when accessing community, determines described first resource.
20. equipment as claimed in claim 18, is characterized in that, described second transport module also for:
According to the pre-scheduling configuration information of the described network equipment received, determine described Secondary resource.
21. equipment as claimed in claim 20, is characterized in that, described second transport module also for:
According to the pre-scheduling configuration information of the described network equipment received, before determining described Secondary resource, the traffic performance information of described Burst Period business is sent to described network equipment, is described first user Equipments Setting pre-scheduling configuration information to make described network equipment according to described traffic performance information.
22. equipment as claimed in claim 21, is characterized in that, described second transport module specifically for:
By MACPDU, described traffic performance information is sent to described network equipment together with initial data packets; Or after transmission initial data packets, by MACPDU, described traffic performance information is sent to described network equipment.
23. equipment as claimed in claim 20, it is characterized in that, described receiving equipment is the second subscriber equipment;
Described second transport module also for:
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the D2D determining a scheduling packet dispatches indication information, and before needing transmission follow-up data bag at every turn, send a described D2D to described second subscriber equipment and dispatch indication information, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag; Or
After the pre-scheduling configuration information of the described network equipment received, according to described pre-scheduling configuration information, the 2nd D2D determining the multiple packet of schedule subsequent dispatches indication information, and send described 2nd D2D scheduling indication information to described second subscriber equipment, dispatch indication information to make described second subscriber equipment according to a described D2D and receive follow-up data bag.
24. as arbitrary in claim 19 ~ 23 as described in equipment, it is characterized in that, described second transport module also for:
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, the business of setting continue timer then after, discharge described Secondary resource; And/or
By Secondary resource to after receiving terminal sends the follow-up data bag of described Burst Period business, after determining to need to discharge described Secondary resource, discharge described Secondary resource.
25. equipment as claimed in claim 24, is characterized in that, described second transport module also for:
After determining to need to discharge described Secondary resource, notify that described network equipment is released to the described Secondary resource of described user equipment allocation.
26. 1 kinds of receiving equipments receiving Burst Period business, it is characterized in that, this equipment comprises:
First receiver module, for being received the initial data packets from the Burst Period business of first user equipment by first resource, wherein said first resource is based on seizing or the pre-assigned resource based on dedicated channel;
Second receiver module, for after receiving described initial data packets by described first resource, receive the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, wherein said Secondary resource is the common transmission resource based on scheduling.
27. equipment as claimed in claim 26, it is characterized in that, described receiving equipment is the second subscriber equipment;
Described second receiver module specifically for:
Dispatch indication information according to what receive for the D2D dispatching a packet, receive a follow-up data Bao Yuan from the described Burst Period business of first user equipment by Secondary resource; Or dispatch indication information according to the 2nd D2D for the multiple packet of schedule subsequent received, receive the multiple follow-up data bags from the described Burst Period business of first user equipment by Secondary resource.
28. equipment as claimed in claim 26, it is characterized in that, described receiving equipment is network equipment;
Described second receiver module also for:
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, according to the corresponding relation of first user equipment and destination server address, determine the destination server address that described first user equipment is corresponding, and send the packet of the described Burst Period business received according to the described destination server address determined; Or
After receiving the follow-up data bag from the described Burst Period business of first user equipment by Secondary resource, the destination server address comprised in packet according to the described Burst Period business received, sends the packet of the described Burst Period business received.
29. 1 kinds of network equipments configuring the resource of transmission Burst Period business, it is characterized in that, this equipment comprises:
Determination module, for determining that first user equipment needs transmission Burst Period business;
Configuration module, for for described first user Equipments Setting for transmit Burst Period business packet in the Secondary resource of follow-up data bag except initial data packets;
Wherein, described Secondary resource is the common transmission resource based on scheduling, and described Secondary resource is different from the first resource of the initial data packets for transmitting Burst Period business, and described first resource is based on seizing or the pre-assigned resource based on dedicated channel.
30. equipment as claimed in claim 29, is characterized in that, described configuration module also for:
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource before, the resource allocation information of broadcast for distributing described first resource, or send resource allocation information when described first user equipment access community to described first user equipment.
31. equipment as claimed in claim 30, is characterized in that, described configuration module also for, according to following manner determination resource allocation information:
All first resources are divided into multiple dedicated signaling, and each special signal is distributed at least one subscriber equipment, and according to distribution condition determination resource allocation information.
32. equipment as claimed in claim 29, is characterized in that, described determination module specifically for:
After receiving the traffic performance information from the Burst Period business of described first user equipment, determine that first user equipment needs transmission Burst Period business;
Described configuration module specifically for:
Be Secondary resource described in described first user Equipments Setting according to described traffic performance information.
33. equipment as claimed in claim 32, is characterized in that, described determination module specifically for:
Described traffic performance information is received by MACPDU.
34. as arbitrary in claim 29 ~ 33 as described in equipment, it is characterized in that, described configuration module also for:
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, business continue timer then after, discharge described Secondary resource; And/or
For described first user Equipments Setting for transmit Burst Period business packet in follow-up data bag except initial data packets Secondary resource after, receive described first user equipment need discharge Secondary resource notice after, discharge described Secondary resource.
CN201410441552.6A 2014-09-01 2014-09-01 A kind of method and apparatus transmitted and configure Burst Period business Active CN105430590B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410441552.6A CN105430590B (en) 2014-09-01 2014-09-01 A kind of method and apparatus transmitted and configure Burst Period business

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410441552.6A CN105430590B (en) 2014-09-01 2014-09-01 A kind of method and apparatus transmitted and configure Burst Period business

Publications (2)

Publication Number Publication Date
CN105430590A true CN105430590A (en) 2016-03-23
CN105430590B CN105430590B (en) 2018-10-23

Family

ID=55508464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410441552.6A Active CN105430590B (en) 2014-09-01 2014-09-01 A kind of method and apparatus transmitted and configure Burst Period business

Country Status (1)

Country Link
CN (1) CN105430590B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106034328A (en) * 2016-05-11 2016-10-19 西安交通大学 Access control method oriented to differentiated service coexistence scene in wireless medical treatment network
CN107484249A (en) * 2016-06-07 2017-12-15 大唐移动通信设备有限公司 A kind of pre-scheduling method and system based on type of service
WO2018133843A1 (en) * 2017-01-23 2018-07-26 华为技术有限公司 Uplink transmission method and apparatus
CN109195224A (en) * 2018-10-12 2019-01-11 南方电网科学研究院有限责任公司 A kind of the wireless communication resources distribution system and method for the business of intelligence adapted electric industry
WO2019019055A1 (en) * 2017-07-26 2019-01-31 Oppo广东移动通信有限公司 Data transmission method, terminal device and network device
CN109842946A (en) * 2017-11-29 2019-06-04 华为技术有限公司 The method that preempting resources carry out data transmission
CN109964519A (en) * 2016-12-27 2019-07-02 华为技术有限公司 A kind of data transmission method for uplink, terminal device and access network equipment
WO2019196826A1 (en) * 2018-04-12 2019-10-17 维沃移动通信有限公司 Sidelink information transmission method and device
WO2022040897A1 (en) * 2020-08-25 2022-03-03 北京小米移动软件有限公司 Transmission scheduling method and apparatus, communication device, and storage medium
WO2022193254A1 (en) * 2021-03-18 2022-09-22 华为技术有限公司 Communication method, apparatus and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917772A (en) * 2010-08-26 2010-12-15 张若南 Media access control method based on double-buffer area mixed type media access control protocol
CN102833275A (en) * 2011-06-14 2012-12-19 中兴通讯股份有限公司 Document transmission control method and device
US20140003402A1 (en) * 2008-03-11 2014-01-02 Alex Kesselman Techniques enabling dynamic bandwidth reservation in a wireless personal area network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140003402A1 (en) * 2008-03-11 2014-01-02 Alex Kesselman Techniques enabling dynamic bandwidth reservation in a wireless personal area network
CN101917772A (en) * 2010-08-26 2010-12-15 张若南 Media access control method based on double-buffer area mixed type media access control protocol
CN102833275A (en) * 2011-06-14 2012-12-19 中兴通讯股份有限公司 Document transmission control method and device

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106034328A (en) * 2016-05-11 2016-10-19 西安交通大学 Access control method oriented to differentiated service coexistence scene in wireless medical treatment network
CN106034328B (en) * 2016-05-11 2019-08-23 西安交通大学 Connection control method towards differentiated service coexistence scenario in wireless medical networks
CN107484249A (en) * 2016-06-07 2017-12-15 大唐移动通信设备有限公司 A kind of pre-scheduling method and system based on type of service
CN107484249B (en) * 2016-06-07 2020-08-18 大唐移动通信设备有限公司 Pre-scheduling method and system based on service type
CN109964519A (en) * 2016-12-27 2019-07-02 华为技术有限公司 A kind of data transmission method for uplink, terminal device and access network equipment
WO2018133843A1 (en) * 2017-01-23 2018-07-26 华为技术有限公司 Uplink transmission method and apparatus
CN108347318A (en) * 2017-01-23 2018-07-31 华为技术有限公司 A kind of ascending transmission method and device
CN108347318B (en) * 2017-01-23 2021-02-12 华为技术有限公司 Uplink transmission method and device
WO2019019055A1 (en) * 2017-07-26 2019-01-31 Oppo广东移动通信有限公司 Data transmission method, terminal device and network device
CN110731066A (en) * 2017-07-26 2020-01-24 Oppo广东移动通信有限公司 Data transmission method, terminal equipment and network equipment
CN110731066B (en) * 2017-07-26 2020-12-01 Oppo广东移动通信有限公司 Data transmission method, terminal equipment and network equipment
US10931358B2 (en) 2017-07-26 2021-02-23 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Data transmission method, terminal device and network device
CN109842946B (en) * 2017-11-29 2023-01-13 华为技术有限公司 Method for preempting resource to perform data transmission
CN109842946A (en) * 2017-11-29 2019-06-04 华为技术有限公司 The method that preempting resources carry out data transmission
WO2019105322A1 (en) * 2017-11-29 2019-06-06 华为技术有限公司 Method for preempting resources for data transmission
WO2019196826A1 (en) * 2018-04-12 2019-10-17 维沃移动通信有限公司 Sidelink information transmission method and device
CN110381463A (en) * 2018-04-12 2019-10-25 维沃移动通信有限公司 A kind of transmission method and equipment of by-link information
CN110381463B (en) * 2018-04-12 2021-02-26 维沃移动通信有限公司 Method and equipment for transmitting sidelink information
CN109195224A (en) * 2018-10-12 2019-01-11 南方电网科学研究院有限责任公司 A kind of the wireless communication resources distribution system and method for the business of intelligence adapted electric industry
CN109195224B (en) * 2018-10-12 2023-05-02 南方电网科学研究院有限责任公司 Wireless communication resource allocation system and method for intelligent power distribution and utilization service
WO2022040897A1 (en) * 2020-08-25 2022-03-03 北京小米移动软件有限公司 Transmission scheduling method and apparatus, communication device, and storage medium
WO2022193254A1 (en) * 2021-03-18 2022-09-22 华为技术有限公司 Communication method, apparatus and system

Also Published As

Publication number Publication date
CN105430590B (en) 2018-10-23

Similar Documents

Publication Publication Date Title
CN105430590A (en) Method and equipment for transmitting and configuring emergent periodical service
US11758542B2 (en) Method and apparatus for sidelink communication in wireless communication system
CN108781452B (en) Method and apparatus for wireless communication in wireless communication system
CN102083224B (en) Contention-based uplink data transmission method and device
CN110213799B (en) Method and device for transmitting downlink small data
JP6542469B2 (en) Method of transmitting and receiving V2X (vehicle-to-everything) signal of terminal in wireless communication system, and terminal using the method
KR20210042345A (en) Information transmission method and device
CN107370573B (en) Method and equipment for transmitting downlink data
CN108810976A (en) The method and its device of transmission data
CN109076566A (en) Dispatching method, equipment and system
CN105207754A (en) Information sending method, information receiving method, device and system
CN109547168A (en) Data transmission method, terminal device and the network equipment
CN105307180A (en) Data transmission method and device based on LAA (Licensed-Assisted Access) system
WO2017134578A1 (en) Latency reduction for communication elements
CN106162909A (en) Uplink data transmission method under a kind of unauthorized frequency range and device
CN105282855A (en) Resource grabbing method and site
CN111385760B (en) Transmission method and device
US20200296557A1 (en) V2x operation method implemented by terminal in wireless communication system and terminal using same
CN107211459B (en) Access point AP, station STA, communication system and data transmission method
CN103379581A (en) Data transmission method, user devices, base station and system
WO2017113173A1 (en) Link resource request method, user equipment and base station
CN105025593B (en) Method and equipment for releasing entity
CN112771917A (en) Method and apparatus for transmitting buffer status report in wireless communication system
CN111328140A (en) Side-chain communication method and device
CN114449675B (en) Information transmission method and related product

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20210602

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right