CN105303304A - Method for engineering field management based on handheld terminal - Google Patents

Method for engineering field management based on handheld terminal Download PDF

Info

Publication number
CN105303304A
CN105303304A CN201510669732.4A CN201510669732A CN105303304A CN 105303304 A CN105303304 A CN 105303304A CN 201510669732 A CN201510669732 A CN 201510669732A CN 105303304 A CN105303304 A CN 105303304A
Authority
CN
China
Prior art keywords
data
engineering
intelligent terminal
mobile intelligent
handheld terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510669732.4A
Other languages
Chinese (zh)
Inventor
蓝善根
侯庆
李晟
赵杭
陈豪
王艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Planning & Design Institute Of Posts & Telecommunications Co Ltd
Original Assignee
Guizhou Planning & Design Institute Of Posts & Telecommunications Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Planning & Design Institute Of Posts & Telecommunications Co Ltd filed Critical Guizhou Planning & Design Institute Of Posts & Telecommunications Co Ltd
Priority to CN201510669732.4A priority Critical patent/CN105303304A/en
Publication of CN105303304A publication Critical patent/CN105303304A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method for engineering field management based on a handheld terminal, which comprises the steps that engineering field construction information and location information are collected by the handheld terminal, the handheld terminal processes the collected information and then transmits the processed information to a server, the server carries out analysis and processing on the received construction information and generates a report, and finally, location information marking is carried out on the report. The method for engineering field management can allow the project management personnel to know progress, quality and safety conditions of engineering construction, an effective and timely means of supervision is provided for engineering field management, the progress, the quality and the safety of an engineering project are controlled, and smooth implementation of the project is ensured.

Description

A kind of engineering site management method based on handheld terminal
Technical field
The present invention relates to communication terminal data processing field, particularly a kind of engineering site management method based on handheld terminal.
Background technology
Communication engineering construction has the features such as a little many, wide, line length, dispersion, and the Supervision Organization of the construction unit of project, designing unit, unit in charge of construction and project all will face following a few hang-up:
The first, in time whether field staff, truly reach the spot enforcement, management, and Project Management Body lacks effectively, supervision means timely;
The second, whether after field staff reaches the spot, can effectively check on to the progress of engineering, quality and safety, guarantee that construction quality is qualified, Project Management Body cannot be verified in time, causes also having problems during the acceptance of work;
3rd, how to ensure engineering site data specification, complete; Engineering site Data acquisition, not in time; The establishment of engineering site data is lack of standardization, can not Timeliness coverage and rectification.
Domestic less about engineering investigation class field management software at present, whether majority is only limitted to Word message typing, cannot supervise field staff and put in place, in time, accurately cannot grasp engineering investigation field condition.
Summary of the invention
In view of this, the object of this invention is to provide a kind of engineering site management method based on handheld terminal, facilitate project manager to understand the progress of engineering construction, quality and security situation at any time.
The object of the invention is to be achieved through the following technical solutions:
Engineering site management method based on handheld terminal of the present invention, comprises the following steps:
Step 1: user carries the mobile intelligent terminal with Mobile Transmission module through checking, enters engineering construction scene;
Step 2: utilize mobile intelligent terminal to carry out data acquisition to the situation at engineering construction scene, the data gathered comprise the latitude and longitude information of working-yard, the photo of working-yard or video and the on-the-spot actual voice data recorded, and utilize the human-computer interaction interface of mobile intelligent terminal to carry out engineering information registration;
Step 3: false proof process is carried out to the Various types of data of mobile intelligent terminal collection;
Step 4: by the image data handled well, format encapsulation is carried out according to information transmission criteria agreement, simultaneously by needing the data of transmission to be encrypted, guaranteeing the security of data transmission procedure, finally utilizing the Mobile Transmission module of mobile intelligent terminal that data are sent to background server;
Data after deciphering are resolved, are then processed according to engineering construction quality and safety management Prediction Model by step 5: in the data of received server-side on-site terminal transmission, and to the decrypt data received, and by result stored in database.
Step 6: by process and the result data after analyzing, generate corresponding report according to prefabricated report model.
Further, in described step 2, utilize the GPS module of terminal to the latitude and longitude information collection of working-yard; Utilize the camera of terminal take pictures to working-yard or record a video, comprise Practical Completion present situation or exist construction quality, potential safety hazard information acquisition and preserve; Microphone module is utilized to record to scene.
Further, in described step 3, described false proof process comprises the compression of picture, audio/video flow and adds watermark.
Further, in step 4, described Mobile Transmission module comprises GPRS module, 3G module or 4G module.
Further, in step 1, described checking is by the built-in program of mobile intelligent terminal, inputs account and password, carry out authority checking by the webserver to it by user.
Further, in step 6, while generating report forms, longitude and latitude related data is presented to supervisor of construction in the enterprising row labels of map, the early warning information of quality and safety is given notice and announced simultaneously.
The invention has the beneficial effects as follows:
The present invention is based on the engineering site management method of handheld terminal, the truth at engineering construction scene in Process of Engineering Construction is gathered timely, reported, by server end, data processed, analyze, the situation at engineering construction scene is shown in patterned mode, and carry out early warning, comprise the progress of engineering construction, quality and security situation.For engineering site management provide effectively, supervision means timely, the progress of engineering project, quality and safety are checked on, guarantee that engineering is implemented smoothly.
Other advantages of the present invention, target and feature will be set forth to a certain extent in the following description, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or can be instructed from the practice of the present invention.Target of the present invention and other advantages can be realized by instructions below and claims and be obtained.
Accompanying drawing explanation
In order to make the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, the present invention is described in further detail, wherein:
Fig. 1 is the engineering site management method process flow diagram that the present invention is based on handheld terminal.
Embodiment
Hereinafter with reference to accompanying drawing, the preferred embodiments of the present invention are described in detail.Should be appreciated that preferred embodiment only in order to the present invention is described, instead of in order to limit the scope of the invention.
As shown in Figure 1, a kind of engineering site management method based on handheld terminal of the present invention, comprises the following steps:
Step 1: user carries the mobile intelligent terminal with Mobile Transmission module through checking, enters engineering construction scene; In the present embodiment, checking is by the built-in program of mobile intelligent terminal, inputs account and password, carry out authority checking by the webserver to it by user.
Step 2: utilize mobile intelligent terminal to carry out data acquisition to the situation at engineering construction scene, the data gathered comprise the latitude and longitude information of working-yard, the photo of working-yard or video and the on-the-spot actual voice data recorded, and utilize the human-computer interaction interface of terminal to carry out engineering information registration; In the present embodiment, mainly utilize the GPS module of terminal to the latitude and longitude information collection of working-yard; Utilize the camera of terminal take pictures to working-yard or record a video, comprise Practical Completion present situation or exist construction quality, potential safety hazard information acquisition and preserve; Microphone module is utilized to record to scene.
Step 3: false proof process is carried out to the Various types of data of mobile intelligent terminal collection; In the present embodiment, false proof process comprises the compression of picture, audio/video flow and adds watermark.
Step 4: by the image data handled well, format encapsulation is carried out according to information transmission criteria agreement, simultaneously by needing the data of transmission to be encrypted, guaranteeing the security of data transmission procedure, finally utilizing the Mobile Transmission module of mobile intelligent terminal that data are sent to background server; In actual applications, Mobile Transmission module can adopt GPRS module, 3G module or 4G module.
Data after deciphering are resolved, are then processed according to engineering construction quality and safety management Prediction Model by step 5: in the data of received server-side on-site terminal transmission, and to the decrypt data received, and by result stored in database.
Step 6: by process and the result data after analyzing, generate corresponding report according to prefabricated report model; While generating report forms, longitude and latitude related data is presented to supervisor of construction in the enterprising row labels of map, the early warning information of quality and safety is given notice and announced simultaneously.
Handheld terminal in the present invention, except being except mobile phone, can also be other equipment such as special iPad.
The present invention is based on the engineering site management method of handheld terminal, the truth at engineering construction scene in Process of Engineering Construction is gathered timely, reported, by server end, data processed, analyze, show the situation at engineering construction scene in patterned mode, and carry out early warning.For engineering site management provide effectively, supervision means timely, the progress of engineering project, quality and safety are checked on, guarantee that engineering is implemented smoothly.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of the technical program, it all should be encompassed in the middle of right of the present invention.

Claims (6)

1., based on an engineering site management method for handheld terminal, it is characterized in that: comprise the following steps:
Step 1: user carries the mobile intelligent terminal with Mobile Transmission module through checking, enters engineering construction scene;
Step 2: utilize mobile intelligent terminal to carry out data acquisition to the situation at engineering construction scene, the data gathered comprise the latitude and longitude information of working-yard, the photo of working-yard or video and the on-the-spot actual voice data recorded, and utilize the human-computer interaction interface of mobile intelligent terminal to carry out engineering information registration;
Step 3: on mobile intelligent terminal, false proof process is carried out to the Various types of data gathered;
Step 4: the image data will handled well on mobile intelligent terminal, format encapsulation is carried out according to information transmission criteria agreement, to the data of transmission be needed to be encrypted simultaneously, guarantee the security of data transmission procedure, finally utilize the Mobile Transmission module of mobile intelligent terminal that data are sent to background server;
Step 5: in the data of received server-side mobile intelligent terminal transmission, and to the decrypt data received, data after deciphering are resolved, then processes according to engineering construction quality and safety management Prediction Model, and by result stored in database.
Step 6: by process and the result data after analyzing, generate corresponding report according to prefabricated report model.
2. a kind of engineering site management method based on handheld terminal according to claim 1, is characterized in that: described step 2) in, utilize the GPS module of mobile intelligent terminal to the latitude and longitude information collection of working-yard; Utilize the camera of mobile intelligent terminal take pictures to working-yard or record a video, comprise Practical Completion present situation or exist construction quality, potential safety hazard information acquisition and preserve; The microphone module of mobile intelligent terminal is utilized to record to scene.
3. a kind of engineering site management method based on handheld terminal according to claim 1 and 2, is characterized in that: described step 3) in, described false proof process comprises the compression of picture, audio/video flow and adds watermark.
4. a kind of engineering site management method based on handheld terminal according to claim 1, is characterized in that: in step 4) in, described Mobile Transmission module comprises GPRS module, 3G module or 4G module.
5. a kind of engineering site management method based on handheld terminal according to claim 1, it is characterized in that: in step 1, described checking is by the built-in program of mobile intelligent terminal, inputs account and password, carry out authority checking by the webserver to it by user.
6. a kind of engineering site management method based on handheld terminal according to claim 1, it is characterized in that: in step 6) in, while generating report forms, longitude and latitude related data is presented to supervisor of construction in the enterprising row labels of map, the early warning information of quality and safety is given notice and announced simultaneously.
CN201510669732.4A 2015-10-15 2015-10-15 Method for engineering field management based on handheld terminal Pending CN105303304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510669732.4A CN105303304A (en) 2015-10-15 2015-10-15 Method for engineering field management based on handheld terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510669732.4A CN105303304A (en) 2015-10-15 2015-10-15 Method for engineering field management based on handheld terminal

Publications (1)

Publication Number Publication Date
CN105303304A true CN105303304A (en) 2016-02-03

Family

ID=55200541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510669732.4A Pending CN105303304A (en) 2015-10-15 2015-10-15 Method for engineering field management based on handheld terminal

Country Status (1)

Country Link
CN (1) CN105303304A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105824977A (en) * 2016-04-21 2016-08-03 南京市水利规划设计院股份有限公司 Hydraulic engineering picture management system and method based on GPS (Global Positioning System) and label information
CN105933321A (en) * 2016-05-30 2016-09-07 中交机电工程局有限公司 Subway construction information system
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof
CN105956736A (en) * 2016-04-19 2016-09-21 成都晨越建设项目管理股份有限公司 Information management device for subway engineering supervision
CN106127412A (en) * 2016-07-05 2016-11-16 重庆交通大学 A kind of engineering quality supervision and management method and device
CN107230163A (en) * 2017-06-07 2017-10-03 北京友泰科技发展有限责任公司 The system and method for power engineering quality in site supervision and check
CN107481162A (en) * 2017-07-31 2017-12-15 黄静波 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)
CN107527155A (en) * 2017-09-06 2017-12-29 北京北控建设发展有限公司 Construction project supervisory systems
CN107564401A (en) * 2017-10-25 2018-01-09 安徽建工集团有限公司 Project map shows method in real time
CN107590875A (en) * 2017-07-24 2018-01-16 成都东易盛泰科技有限公司 A kind of hand-held process cycle index instrument
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN108229807A (en) * 2017-12-28 2018-06-29 广州建软科技股份有限公司 A kind of marketing programs construction rotation managing and control system
CN108364113A (en) * 2017-12-26 2018-08-03 中国移动通信集团广东有限公司 Base station Acceptance Test System and computer readable storage medium
CN109784750A (en) * 2019-01-28 2019-05-21 珠海金慧科技有限公司 Finishing progress and the unmanned long-range policing algorithm of quality
CN112000036A (en) * 2020-08-14 2020-11-27 河南高建工程管理有限公司 Remote monitoring management system and method thereof
CN112163832A (en) * 2020-09-25 2021-01-01 中铁一局集团电务工程有限公司 Online security quality management method and device, mobile terminal and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004139230A (en) * 2002-10-16 2004-05-13 Nishimatsu Constr Co Ltd Construction project information management server and construction project information management system
CN102377974A (en) * 2010-08-04 2012-03-14 中国电信股份有限公司 Mobile terminal, receiving end and video acquiring method and system
CN103226622A (en) * 2013-04-19 2013-07-31 国家电网公司 Inspection mobile terminal for 10 kV user inspection
CN104978692A (en) * 2014-04-08 2015-10-14 国家电网公司 Handheld terminal collecting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004139230A (en) * 2002-10-16 2004-05-13 Nishimatsu Constr Co Ltd Construction project information management server and construction project information management system
CN102377974A (en) * 2010-08-04 2012-03-14 中国电信股份有限公司 Mobile terminal, receiving end and video acquiring method and system
CN103226622A (en) * 2013-04-19 2013-07-31 国家电网公司 Inspection mobile terminal for 10 kV user inspection
CN104978692A (en) * 2014-04-08 2015-10-14 国家电网公司 Handheld terminal collecting system

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956736A (en) * 2016-04-19 2016-09-21 成都晨越建设项目管理股份有限公司 Information management device for subway engineering supervision
CN105824977B (en) * 2016-04-21 2019-08-23 南京市水利规划设计院股份有限公司 Hydraulic engineering photo management systems and method based on GPS and label information
CN105824977A (en) * 2016-04-21 2016-08-03 南京市水利规划设计院股份有限公司 Hydraulic engineering picture management system and method based on GPS (Global Positioning System) and label information
CN105930973A (en) * 2016-04-22 2016-09-07 广州硕品物联网科技有限公司 BIM-based construction site griddization management system and control method thereof
CN105933321A (en) * 2016-05-30 2016-09-07 中交机电工程局有限公司 Subway construction information system
CN106127412A (en) * 2016-07-05 2016-11-16 重庆交通大学 A kind of engineering quality supervision and management method and device
CN107230163A (en) * 2017-06-07 2017-10-03 北京友泰科技发展有限责任公司 The system and method for power engineering quality in site supervision and check
CN107230163B (en) * 2017-06-07 2020-09-08 北京友泰科技发展有限责任公司 System for on-site quality supervision and inspection of power engineering
CN107590875A (en) * 2017-07-24 2018-01-16 成都东易盛泰科技有限公司 A kind of hand-held process cycle index instrument
CN107481162A (en) * 2017-07-31 2017-12-15 黄静波 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN107527155A (en) * 2017-09-06 2017-12-29 北京北控建设发展有限公司 Construction project supervisory systems
CN107564401A (en) * 2017-10-25 2018-01-09 安徽建工集团有限公司 Project map shows method in real time
CN108364113A (en) * 2017-12-26 2018-08-03 中国移动通信集团广东有限公司 Base station Acceptance Test System and computer readable storage medium
CN108229807A (en) * 2017-12-28 2018-06-29 广州建软科技股份有限公司 A kind of marketing programs construction rotation managing and control system
CN109784750A (en) * 2019-01-28 2019-05-21 珠海金慧科技有限公司 Finishing progress and the unmanned long-range policing algorithm of quality
CN112000036A (en) * 2020-08-14 2020-11-27 河南高建工程管理有限公司 Remote monitoring management system and method thereof
CN112163832A (en) * 2020-09-25 2021-01-01 中铁一局集团电务工程有限公司 Online security quality management method and device, mobile terminal and storage medium

Similar Documents

Publication Publication Date Title
CN105303304A (en) Method for engineering field management based on handheld terminal
CN104978692B (en) Handheld terminal acquisition system
CN108197801A (en) Site staff's management method and system and method based on visualized presence monitoring system
CN109889791A (en) A kind of electric power construction field managing and control system and method
JP6125035B2 (en) Video surveillance system using mobile terminals
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN104952253A (en) Traffic violation behavior recording and early warning system and method
KR101386591B1 (en) CCTV integrated management system
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN105491102A (en) Intelligent monitoring system based on cloud computing technology and device thereof
CN110852611A (en) Real-time management and control system for construction workers on capital construction project site
CN110826930A (en) Security task scheduling method, device, equipment and readable storage medium
CN110264723A (en) A kind of traffic engineering construction intelligent Warning Systrm and method
CN110991979A (en) Attendance management method, device and equipment for intelligent construction site and computer storage medium
CN113538825A (en) Campus wall-turning event alarm method and system
CN104504768A (en) Real-time monitoring system for mobile operation of high-voltage transmission line and monitoring method of real-time monitoring system
CN111738115A (en) Mobile camera automatic identification method and system based on artificial intelligence
CN206271047U (en) Environmentally friendly management system
CN111695069A (en) Police service resource visualization method, system, device and storage medium
KR20050065199A (en) Spatial imagery information delivery system of disaster management and method
CN102595098B (en) Method and device for monitoring relative processing of video and audio information and business information
CN104023205B (en) Intelligent safety defense monitoring system
CN205427969U (en) Wireless system of patrolling and examining
CN111696201A (en) Real-scene 3D GIS map-based warning situation display method and system
CN114827200B (en) Intelligent automobile basic map data safety protection assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203

RJ01 Rejection of invention patent application after publication