CN105279616A - Method and apparatus for graded management - Google Patents

Method and apparatus for graded management Download PDF

Info

Publication number
CN105279616A
CN105279616A CN201510823754.1A CN201510823754A CN105279616A CN 105279616 A CN105279616 A CN 105279616A CN 201510823754 A CN201510823754 A CN 201510823754A CN 105279616 A CN105279616 A CN 105279616A
Authority
CN
China
Prior art keywords
management
branch
fractionated
project
corresponding relation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510823754.1A
Other languages
Chinese (zh)
Inventor
王传霖
刘勃
张超
张大勇
杨家林
梁超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201510823754.1A priority Critical patent/CN105279616A/en
Publication of CN105279616A publication Critical patent/CN105279616A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application provides an embodiment of a method for graded management. According to the embodiment, branch departments of projects to be graded and a plurality of management departments are displayed for users in a graded management interface; after the users choose some target management department(s) from the management departments, corresponding relations between the branch departments of projects to be graded and the target management department(s) are established and saved. It is clear that corresponding management departments can be set for branch departments of projects to be graded by the embodiment and graded management for the branch departments of projects to be graded is realized. Furthermore, the application also provides an embodiment of an apparatus for graded management to ensure the practical application and realization of the mentioned method.

Description

Grading management method and device
Technical field
The application relates to engineering department's administrative skill field, more specifically, is grading management method and device.
Background technology
Engineering project, being take engineering construction as the project of carrier, is the disposable engineering construction task as managed object.It for target output object with buildings or structures, needs according to certain program, completes within the regular hour, and needs to conform to quality requirements.
In order to supervise schedule and the quality of engineering project, be usually provided with project management system.Specifically, engineering management flow process is comprised in project management system, multiple node is comprised in engineering management flow process, the organizational structure that each node is all corresponding respective, after the organizational structure of previous node completes flow operations, engineering management flow process just can circulate to next node, completes flow operations corresponding to it to make the institutional framework of next node.
Comprise project branch in the organizational structure that the node of engineering management flow process is corresponding, it is a direct superintendent office of engineering project.Project branch is disposed after flow operations, needs to trigger engineering management workflow to next node, and organizational structure corresponding to this next node is the upper management department of project branch.Therefore, in order to ensure that engineering management flow process circulates smoothly to next node, need for upper management department corresponding to project branch configuration.
Summary of the invention
In view of this, this application provides a kind of grading management method, in order to realize the configuration to the upper management department of project branch.In addition, present invention also provides a kind of differentiated control device, in order to ensure the application in practice of described method and realization.
For realizing described object, the technical scheme that the application provides is as follows:
A kind of grading management method, comprising:
In differentiated control interface, show project branch to be fractionated and some administrative authoritys;
In response to the operation that user is select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys;
Preserve described corresponding relation.
Alternatively, above-mentioned grading management method also comprises:
In response to the engineering management workflow instruction received, from the instruction of described engineering management workflow, extract project branch to be fractionated;
According to described corresponding relation, determine the management by objective department corresponding with described project branch to be fractionated;
Trigger the described engineering management flow process node that extremely described management by objective department is corresponding, process the flow operations of described node to make described management by objective department.
Alternatively, in above-mentioned grading management method, described in differentiated control interface, show project branch to be fractionated and some administrative authoritys, comprising:
In differentiated control interface, show described project branch to be fractionated in the mode of drop-down list, and show described some administrative authoritys in the mode of check box.
Alternatively, in above-mentioned grading management method, the described corresponding relation of described preservation, comprising:
In presetting database, preserve described corresponding relation.
Alternatively, in above-mentioned grading management method, described some administrative authoritys comprise: sub-branch office, engineering agent directorate of office and engineering management control group.
In addition, present invention also provides a kind of differentiated control device, comprising:
Branch and department's display module, in differentiated control interface, show project branch to be fractionated and some administrative authoritys;
Corresponding relation building module, in response to user being the operation of select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys;
Corresponding relation preserves module, for preserving described corresponding relation.
Alternatively, above-mentioned differentiated control device also comprises:
Branch's extraction module, in response to the engineering management workflow instruction received, extracts project branch to be fractionated from the instruction of described engineering management workflow;
Department's determination module, for according to described corresponding relation, determines the management by objective department corresponding with described project branch to be fractionated;
Workflow module, for triggering the described engineering management flow process node that extremely described management by objective department is corresponding, processes the flow operations of described node to make described management by objective department.
Alternatively, in above-mentioned differentiated control device, described branch and department's display module comprise:
First display sub-module, in differentiated control interface, shows described project branch to be fractionated in the mode of drop-down list, and shows described some administrative authoritys in the mode of check box.
Alternatively, in above-mentioned differentiated control device, described corresponding relation is preserved module and is comprised:
Database preserves submodule, in presetting database, preserves described corresponding relation.
Alternatively, in above-mentioned differentiated control device, some administrative authoritys of described branch and department's display module display comprise: sub-branch office, engineering agent directorate of office and engineering management control group.
From above technical scheme, this application provides a kind of grading management method embodiment, the present embodiment can in differentiated control interface, for user shows project branch to be fractionated and some administrative authoritys, after user selects certain (a bit) management by objective department in some administrative authoritys, the present embodiment sets up the corresponding relation between project branch to be fractionated and management by objective department, and preserves this corresponding relation.Visible, the present embodiment can arrange corresponding administrative authority for project branch to be fractionated, realizes the differentiated control to project branch to be fractionated.The present embodiment can carry out differentiated control for the project branch in organizational structure, makes engineering project dissimilar, of different nature obtain rationalization, the needs of more realistic service management, realizes the multiple differentiated control of project branch.
Certainly, the arbitrary product implementing the application might not need to reach above-described all advantages simultaneously.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only the embodiment of the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
The process flow diagram of the grading management method embodiment 1 that Fig. 1 provides for the application;
The process flow diagram of the grading management method embodiment 2 that Fig. 2 provides for the application;
The structural representation of the differentiated control device embodiment 1 that Fig. 3 provides for the application;
The structural representation of the differentiated control device embodiment 2 that Fig. 4 provides for the application.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, be clearly and completely described the technical scheme in the embodiment of the present application, obviously, described embodiment is only some embodiments of the present application, instead of whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the application's protection.
See Fig. 1, it illustrates the flow process of the grading management method embodiment 1 that the application provides.As shown in Figure 1, the present embodiment can specifically comprise step S101 ~ step S103.
Step S101: in differentiated control interface, shows project branch to be fractionated and some administrative authoritys.
Wherein, in Engineering Project Mgmt System, comprise one or more engineering project, each engineering project all has direct administrative authority, i.e. project branch.Project branch also may have upper management department, to carry out leading and managing to project branch.
The object of the application is classification items selection upper management department, for convenience of description, classification project is called project branch to be fractionated.
It should be noted that, in differentiated control interface, the project branch to be fractionated of display can be the title of project branch to be fractionated, such as, for A railway engineering project, is provided with four project branches, and one of them project branch is " two project branches of company ".Therefore, in differentiated control interface, display " two project branches of company ".In like manner, in differentiated control interface, the title of display management department, selects for user, and such as, the department of display comprises " two companies ", " four companies ", " A railway engineering directorate " and " the second management control group " etc.
Step S102: the operation in response to user being select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys.
Wherein, user is in some administrative authoritys of display, can select certain or some administrative authoritys for project branch to be fractionated, and then the administrative authority that user selects by the application is as management by objective department, and sets up the corresponding relation between project branch to be fractionated and management by objective administrative authority.Or corresponding relation also can be called binding relationship.
In force, the administrative authority that user selects can be one, also can be multiple.When selecting multiple administrative authority, need to set up project branch to be fractionated and each administrative authority corresponding relation separately respectively.
Such as, user is that the management by objective department that project branch to be fractionated " two project branches of company " is selected comprises " two companies ", " A railway engineering directorate " and " the second management control group ".Therefore, then set up the corresponding relation between project branch to be fractionated " two project branches of company " and management by objective department " two companies " respectively, set up the corresponding relation between project branch to be fractionated " two project branches of company " and management by objective department " A railway engineering directorate ", and set up the corresponding relation between project branch to be fractionated " two project branches of company " and management by objective department " second manages control group ".
It should be noted that, from the angle of project branch, administrative authority corresponding to each project branch can be one, also can be multiple.In addition, the application can be for multiple administrative authority arranges each self-corresponding administrative authority, and therefore, from the angle of administrative authority, the corresponding project branch of each administrative authority possibility also can be multiple project branch.
Therefore, the corresponding relation of above " one to one " and " one-to-many " can be presented as that organizational structure sets.Node in organizational structure tree comprises project branch, also comprises administrative authority.
Step S103: preserve described corresponding relation.
Wherein, in Engineering Project Mgmt System, preserve the corresponding relation between project branch to be fractionated and management by objective department, with in order in the operation process of engineering management flow process, use this corresponding relation, for the process that corresponding management by objective department carries out flow process is searched by project branch to be fractionated.
From above technical scheme, this application provides a kind of grading management method embodiment, the present embodiment can in differentiated control interface, for user shows project branch to be fractionated and some administrative authoritys, after user selects certain (a bit) management by objective department in some administrative authoritys, the present embodiment sets up the corresponding relation between project branch to be fractionated and management by objective department, and preserves this corresponding relation.Visible, the present embodiment can arrange corresponding administrative authority for project branch to be fractionated, realizes the differentiated control to project branch to be fractionated.
The present embodiment can carry out differentiated control for the project branch in organizational structure, makes engineering project dissimilar, of different nature obtain rationalization, the needs of more realistic service management, realizes the multiple differentiated control of project branch.
In actual applications, in Engineering Project Mgmt System, be provided with some engineering management flow processs.Engineering management flow process comprises multiple node, each node and organizational structure, and each organizational structure processes the flow operations of this node.After the organizational structure of previous node has processed, the organizational structure of giving next node has carried out subsequent treatment, moves to most end node like this, to complete the management of whole engineering.
In above engineering management flow process, the institutional administrative authority of the organizational structure of next node previous node often.Therefore, the corresponding relation that above grading management method is preserved is the basis that projects management process is normally run.
See Fig. 2, it illustrates the flow process of the grading management method embodiment 2 that the application provides.As shown in Figure 2, the present embodiment can specifically comprise step S201 ~ step S206.
Step S201: in differentiated control interface, shows project branch to be fractionated and some administrative authoritys.
Step S202: the operation in response to user being select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys.
Step S203: preserve described corresponding relation.
It should be noted that, the explanation of above step S201 ~ step S203 see grading management method embodiment 1 provided above, can not repeat herein.
Step S204: in response to the engineering management workflow instruction received, extract project branch to be fractionated from the instruction of described engineering management workflow.
Wherein, project branch to be fractionated, as the node of in engineering management flow process, after it processes the flow operations of this node, just needs to be committed to next node and operates.
Such as, in the engineering management flow process of A railway engineering project, comprise project branch to be fractionated " two project branches of company " this node, the management by objective department arranged for it comprises three, i.e. " two companies ", " A railway engineering directorate " and " the second management control group ".Project branch to be fractionated " two project branches of company ", after completing the flow operations of own node, submits to after filling in project progress form, and trigger flow circulates.Like this, engineering management requirements of process circulation is to next node, and perform corresponding flow operations by next node, as project progress form is given management by objective department by needs, by management by objective, department audits.
It should be noted that, the submit operation in above engineering management flow process can generate circulation instruction, and this circulation instruction is for triggering engineering management workflow to next node.In addition, in this flow process instruction, comprise the mark of present node, i.e. the mark of project branch to be fractionated.Therefore, the mark of project branch to be fractionated can be extracted in this flow process instruction.It should be noted that, project branch to be fractionated herein completes differentiated control, and it has had corresponding management by objective department.
Step S205: according to described corresponding relation, determines the management by objective department corresponding with described project branch to be fractionated.
Wherein, according to the corresponding relation between the project branch to be fractionated preserved and management by objective department, for the project branch to be fractionated extracted determines corresponding management by objective department.It should be noted that, supervisory engineering department can be one, also can be multiple.
Such as, the project branch to be fractionated extracted is " two project branches of company ", for its management by objective department determined comprises three, is respectively " two companies ", " A railway engineering directorate " and " the second management control group ".
Step S206: trigger the described engineering management flow process node that extremely described management by objective department is corresponding, process the flow operations of described node to make described management by objective department.
Wherein, after for the present node determination management by objective department in engineering management flow process, then can trigger engineering management workflow to next node, node corresponding to next node and management by objective administrative authority.It is appreciated that the flow operations that in engineering management flow process, each node is all corresponding respective, after engineering management workflow to node corresponding to management by objective department, management by objective department needs to process the flow operations corresponding to this node.
Such as, when the engineering management workflow of A railway engineering project is to " two companies ", " A railway engineering directorate " and " the second management control group " three Nodes, these three organizational structures need respective treatment scheme to operate, as the project progress form that examination & verification " two project branches of company " is submitted to.
Certainly, after management by objective department processes the flow operations of this node, can continue to be committed to next node.
In force, in above grading management method embodiment 1, the specific implementation of step S101 (in differentiated control interface, showing project branch to be fractionated and some administrative authoritys) can comprise the following steps A1.
Steps A 1: in differentiated control interface, shows described project branch to be fractionated in the mode of drop-down list, and shows described some administrative authoritys in the mode of check box.
Wherein, be provided with differentiated control interface in projects management system, this differentiated control interface is for arranging the administrative authority corresponding to it for project branch to be fractionated.Particularly, project branch to be fractionated and some administrative authoritys need to be presented in differentiated control interface, and wherein, both modes of display can be different.
Alternatively, project branch can be included in drop-down list, and user, after click drop-down list, can select certain project branch in drop-down list, this project branch that user selects and project branch to be fractionated.
In addition, some administrative authoritys can the mode of check box be presented in differentiated control interface, and like this, user can select one or more administrative authority as management by objective department for this project branch to be fractionated.
Certainly, be a kind of display mode in this implementation, in actual applications, can also be other modes, the application be also not specifically limited.
In force, in each grading management method embodiment above corresponding relation between the project branch to be fractionated, set up and management by objective department can specifically be kept in presetting database.Certainly, can also be that the data structure form set is preserved.
In addition, some upper management departments of project branch to be fractionated can specifically comprise: sub-branch office, engineering agent directorate of office and engineering management control group.
Specifically, in actual life, for certain engineering project, generally be provided with a project branch, but, for strengthening the management to branch, this project branch needs the management accepting multiple higher level department, in this application scenarios, is the corresponding relation of " one-to-many ".
Illustrate for middle iron construction group, the A railway engineering project that this group is building, because quantities is comparatively large, rank unit of office sets up A railway engineering directorate, and they can configuration management whole project branches relevant to this A railway engineering project.Wherein, the second branch office of middle iron construction group is provided with a project branch, is " two project branches of company ".Be somebody's turn to do the project branch that " two project branches of company " is correlated with for A railway engineering project, it has Liang Ge upper management department, is respectively the second branch office and A railway engineering directorate.
In addition, according to correlation engineering regulation, the project branch of all projects in construction needs again the technical jurisdiction accepting " the first management and control group ".Like this, " two project branches of company " generally speaking, need accept the management of the second branch office, A railway engineering directorate and " the first management and control group " three administrative authoritys.
For with the service conditions of begin a project " one-to-many " between branch and administrative authority, the application can configure the corresponding relation of " one-to-many ", thus achieves the multiple differentiated control of project branch.
Present application addresses all kinds project branch in practice of construction production management and there is the problem of multiple differentiated control.Specifically, dissimilar project branch both may belong to the management of Ge Zi branch office executive, and business accepts again Ge Ju directorate, management for directorate of office drawn game management and control group.Therefore, the application sets up project management department's type attribute especially when creating project branch, for directorate of office, increase service management subordinate selection function for directorate of office, management and control group mechanism, make project branch on the basis of administrative management level, meet the needs of multi-play Services management level, and then ensure the accuracy of tabulate statistics, and ensure that the order of engineering management flow process performs.
Wherein, the type of project branch can specifically be divided into five kinds, that is: (1) independent project department, refers to the project administration that Ge Zi branch office manages independently.(2) Ju Zhi project branch, refers to that Ge Zi branch office is set up and the engineering project branch of directorate of acceptance office service management.(3) for project branch belonging to Ju Zhi company, be that the office of referring to refers to and certain project branch affiliated is all under the jurisdiction of the engineering project branch of same Ge Zi branch office management.(4) project branch belonging to non-generation Ju Zhi company, what refer to certain sub-branch office establishment is under the jurisdiction of the engineering project branch of other sub-branch officies for office's vial reason.(5) refer to for office, refer to that the engineering project branch of certain sub-branch office establishment bears simultaneously and refer to function for office.
Therefore, can dissimilar according to project branch, be that it selects each self-corresponding management by objective department.Certainly, in actual applications, the type of project branch can be not limited to above five kinds, can also be other types.
Below the differentiated control device embodiment that the application provides is introduced, it should be noted that, hereafter about the explanation of differentiated control device embodiment see grading management method embodiment provided above, can not repeat below.
Corresponding with above-mentioned grading management method embodiment 1, this application provides a kind of differentiated control device embodiment 1.See Fig. 3, it illustrates the structure of the differentiated control device embodiment 1 that the application provides.As shown in Figure 3, the present embodiment can specifically comprise: branch and department's display module 301, corresponding relation building module 302 and corresponding relation preserve module 303; Wherein:
Branch and department's display module 301, in differentiated control interface, show project branch to be fractionated and some administrative authoritys;
Corresponding relation building module 302, in response to user being the operation of select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys;
Corresponding relation preserves module 303, for preserving described corresponding relation.
From above technical scheme, this application provides a kind of differentiated control device embodiment, branch in the present embodiment and department's display module 301 can in differentiated control interfaces, for user shows project branch to be fractionated and some administrative authoritys, after user selects certain (a bit) management by objective department in some administrative authoritys, corresponding relation building module 302 sets up the corresponding relation between project branch to be fractionated and management by objective department, and corresponding relation preservation module 303 preserves this corresponding relation.Visible, the present embodiment can arrange corresponding administrative authority for project branch to be fractionated, realizes the differentiated control to project branch to be fractionated.
The present embodiment can carry out differentiated control for the project branch in organizational structure, makes engineering project dissimilar, of different nature obtain rationalization, the needs of more realistic service management, realizes the multiple differentiated control of project branch.
Corresponding with above-mentioned grading management method embodiment 2, this application provides a kind of differentiated control device embodiment 2.See Fig. 4, it illustrates the structure of the differentiated control device embodiment 2 that the application provides.As shown in Figure 4, the present embodiment can specifically comprise: branch and department's display module 301, corresponding relation building module 302, corresponding relation preserve module 303, branch's extraction module 304, department's determination module 305 and workflow module 306; Wherein:
Branch and department's display module 301, in differentiated control interface, show project branch to be fractionated and some administrative authoritys.
Corresponding relation building module 302, in response to user being the operation of select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys.
Corresponding relation preserves module 303, for preserving described corresponding relation.
Branch's extraction module 304, in response to the engineering management workflow instruction received, extracts project branch to be fractionated from the instruction of described engineering management workflow.
Department's determination module 305, for according to described corresponding relation, determines the management by objective department corresponding with described project branch to be fractionated.
Workflow module 306, for triggering the described engineering management flow process node that extremely described management by objective department is corresponding, processes the flow operations of described node to make described management by objective department.
In the present embodiment, according to the corresponding relation between the project branch to be fractionated preserved and administrative authority, engineering management flow process normal stream can be triggered and goes to next node.
In actual applications, the branch in above-mentioned differentiated control device embodiment 1 and department's display module can specifically comprise: the first display sub-module; Wherein:
First display sub-module, in differentiated control interface, shows described project branch to be fractionated in the mode of drop-down list, and shows described some administrative authoritys in the mode of check box.
In actual applications, the corresponding relation in above-mentioned differentiated control device embodiment 1 is preserved module and can specifically be comprised: database preserves submodule; Wherein:
Database preserves submodule, in presetting database, preserves described corresponding relation.
Alternatively, in any one differentiated control device above-mentioned, some administrative authoritys that described branch and department's display module 301 show comprise: sub-branch office, engineering agent directorate of office and engineering management control group.
It should be noted that, each embodiment in this instructions all adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar part mutually see.
Also it should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or operational zone, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising above-mentioned key element and also there is other identical element.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the application.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from the spirit or scope of the application, can realize in other embodiments.Therefore, the application can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. a grading management method, is characterized in that, comprising:
In differentiated control interface, show project branch to be fractionated and some administrative authoritys;
In response to the operation that user is select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys;
Preserve described corresponding relation.
2. grading management method according to claim 1, is characterized in that, also comprises:
In response to the engineering management workflow instruction received, from the instruction of described engineering management workflow, extract project branch to be fractionated;
According to described corresponding relation, determine the management by objective department corresponding with described project branch to be fractionated;
Trigger the described engineering management flow process node that extremely described management by objective department is corresponding, process the flow operations of described node to make described management by objective department.
3. grading management method according to claim 1, is characterized in that, described in differentiated control interface, shows project branch to be fractionated and some administrative authoritys, comprising:
In differentiated control interface, show described project branch to be fractionated in the mode of drop-down list, and show described some administrative authoritys in the mode of check box.
4. grading management method according to claim 1, is characterized in that, the described corresponding relation of described preservation, comprising:
In presetting database, preserve described corresponding relation.
5. the grading management method according to claim 1-4 any one, is characterized in that, described some administrative authoritys comprise: sub-branch office, engineering agent directorate of office and engineering management control group.
6. a differentiated control device, is characterized in that, comprising:
Branch and department's display module, in differentiated control interface, show project branch to be fractionated and some administrative authoritys;
Corresponding relation building module, in response to user being the operation of select target administrative authority of described project branch to be fractionated, for described project branch to be fractionated and described management by objective department set up corresponding relation; Wherein, described corresponding relation is for describing the organizational structure tree be made up of described project branch to be fractionated and described some administrative authoritys;
Corresponding relation preserves module, for preserving described corresponding relation.
7. differentiated control device according to claim 6, is characterized in that, also comprise:
Branch's extraction module, in response to the engineering management workflow instruction received, extracts project branch to be fractionated from the instruction of described engineering management workflow;
Department's determination module, for according to described corresponding relation, determines the management by objective department corresponding with described project branch to be fractionated;
Workflow module, for triggering the described engineering management flow process node that extremely described management by objective department is corresponding, processes the flow operations of described node to make described management by objective department.
8. differentiated control device according to claim 6, is characterized in that, described branch and department's display module comprise:
First display sub-module, in differentiated control interface, shows described project branch to be fractionated in the mode of drop-down list, and shows described some administrative authoritys in the mode of check box.
9. differentiated control device according to claim 6, is characterized in that, described corresponding relation is preserved module and comprised:
Database preserves submodule, in presetting database, preserves described corresponding relation.
10. the differentiated control device according to claim 6-9 any one, is characterized in that, some administrative authoritys of described branch and department's display module display comprise: sub-branch office, engineering agent directorate of office and engineering management control group.
CN201510823754.1A 2015-11-23 2015-11-23 Method and apparatus for graded management Pending CN105279616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510823754.1A CN105279616A (en) 2015-11-23 2015-11-23 Method and apparatus for graded management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510823754.1A CN105279616A (en) 2015-11-23 2015-11-23 Method and apparatus for graded management

Publications (1)

Publication Number Publication Date
CN105279616A true CN105279616A (en) 2016-01-27

Family

ID=55148588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510823754.1A Pending CN105279616A (en) 2015-11-23 2015-11-23 Method and apparatus for graded management

Country Status (1)

Country Link
CN (1) CN105279616A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN106503966A (en) * 2016-10-24 2017-03-15 深圳神马宝典信息技术有限公司 Information of building project management system
CN106529779A (en) * 2016-10-24 2017-03-22 深圳神马宝典信息技术有限公司 Information management system of construction project
CN106548420A (en) * 2016-10-24 2017-03-29 深圳神马宝典信息技术有限公司 Information of building project management system
CN106548419A (en) * 2016-10-24 2017-03-29 深圳神马宝典信息技术有限公司 Information of building project management system
CN106919688A (en) * 2017-03-03 2017-07-04 济南浪潮高新科技投资发展有限公司 A kind of membership credentials methods of exhibiting and device
CN107038550A (en) * 2016-10-24 2017-08-11 深圳神马宝典信息技术有限公司 Information of building project management system
CN107169884A (en) * 2016-08-25 2017-09-15 深圳神马宝典信息技术有限公司 Building products information dissemination system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1218233A (en) * 1997-11-21 1999-06-02 株式会社日立制作所 Method and apparatus for controlling task stream according to data input status
CN101706896A (en) * 2009-11-24 2010-05-12 苏州锐创通信有限责任公司 Workflow management method facing mobile communication of third generation
CN103226758A (en) * 2013-05-08 2013-07-31 灏域联华科技(北京)有限公司 Project development management method
CA2805527A1 (en) * 2012-02-01 2013-08-01 James Joseph Anthony Pinto Collaborative systems, devices, and processes for performing organizational projects, pilot projects and analyzing new technology adoption
CN103646315A (en) * 2013-12-16 2014-03-19 国家电网公司 Method and device for data processing in electricity bureau engineering project workflow
US20140278694A1 (en) * 2013-03-15 2014-09-18 ConnectWise Inc. Systems and methods for business management using product data with product classes
CN104392310A (en) * 2014-11-13 2015-03-04 深圳市玖昔物联科技发展有限公司 Networked work coordinated management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1218233A (en) * 1997-11-21 1999-06-02 株式会社日立制作所 Method and apparatus for controlling task stream according to data input status
CN101706896A (en) * 2009-11-24 2010-05-12 苏州锐创通信有限责任公司 Workflow management method facing mobile communication of third generation
CA2805527A1 (en) * 2012-02-01 2013-08-01 James Joseph Anthony Pinto Collaborative systems, devices, and processes for performing organizational projects, pilot projects and analyzing new technology adoption
US20140278694A1 (en) * 2013-03-15 2014-09-18 ConnectWise Inc. Systems and methods for business management using product data with product classes
CN103226758A (en) * 2013-05-08 2013-07-31 灏域联华科技(北京)有限公司 Project development management method
CN103646315A (en) * 2013-12-16 2014-03-19 国家电网公司 Method and device for data processing in electricity bureau engineering project workflow
CN104392310A (en) * 2014-11-13 2015-03-04 深圳市玖昔物联科技发展有限公司 Networked work coordinated management system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN107169884A (en) * 2016-08-25 2017-09-15 深圳神马宝典信息技术有限公司 Building products information dissemination system
CN106503966A (en) * 2016-10-24 2017-03-15 深圳神马宝典信息技术有限公司 Information of building project management system
CN106529779A (en) * 2016-10-24 2017-03-22 深圳神马宝典信息技术有限公司 Information management system of construction project
CN106548420A (en) * 2016-10-24 2017-03-29 深圳神马宝典信息技术有限公司 Information of building project management system
CN106548419A (en) * 2016-10-24 2017-03-29 深圳神马宝典信息技术有限公司 Information of building project management system
CN107038550A (en) * 2016-10-24 2017-08-11 深圳神马宝典信息技术有限公司 Information of building project management system
CN106919688A (en) * 2017-03-03 2017-07-04 济南浪潮高新科技投资发展有限公司 A kind of membership credentials methods of exhibiting and device

Similar Documents

Publication Publication Date Title
CN105279616A (en) Method and apparatus for graded management
CN106131203A (en) A kind of automatic customer service system for electronic commerce
Jafri et al. Impact of social capital and firms’ innovative capability on sustainable growth of women owned technoprises (SMEs): A study in Malaysia
Franco et al. Lean design in building projects: Guiding principles and exploratory collection of good practices
Ojala Discovering and creating business opportunities for cloud services
CN106529823A (en) Management and control system
Prasetyo et al. Usability evaluation of ERP systems: A comparison between SAP S/4 Hana & Oracle Cloud
Cooper The 5-th generation stage-gate idea-to-launch process
Wang et al. Continuous process improvement in banking sector and a model design for performance enhancement
Savino et al. Lean manufacturing within critical healthcare supply chain: an exploratory study through value chain simulation
CN110472996A (en) A kind of client information management method and system
Redondo et al. Digital marketing as a promoter of entrepreneurship in the footwear sector in Colombia
Liu et al. A multi-agent-based mould due date setting approach in stochastic production
Lee et al. R&D performance monitoring, evaluation, and management system: a model and methods
Papic et al. Digital built environment maturity model: Digital twins advancing smart infrastructure asset management
CN105512895A (en) Power transaction management method based on multi-factor combination modeling and power transaction management system thereof
CN104881740B (en) By paper lattice color matching generation with the method and device of the multiple BOM of money in ERP
Abraham et al. An empirical investigation of sustainability innovation systems and the stages of sustainability maturity
Hecklau et al. Requirements for a Methodology for the Analysis and Assessment of Technological Capability in Research and Technology Organizations
Martek et al. Enterprise localization practices and their implication for knowledge management in foreign participation in the Chinese construction sector
Kistasamy et al. The Role of Service Oriented Architecture as an enabler for Enterprise Architecture.
KR20150109142A (en) Apparatus for comprising community for cooperation, method thereof and system using the same
Maria A retrospective of evaluation models on intellectual capital
Xue-Min et al. Development of the Command Simulation Training System Architecture Framework
Buglione et al. Multidimensional Project Management Tracking & Control-Related Measurement Issues

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160127