CN105271076B - A kind of truss-like maritime platform spud leg aerial work platform - Google Patents
A kind of truss-like maritime platform spud leg aerial work platform Download PDFInfo
- Publication number
- CN105271076B CN105271076B CN201510773613.3A CN201510773613A CN105271076B CN 105271076 B CN105271076 B CN 105271076B CN 201510773613 A CN201510773613 A CN 201510773613A CN 105271076 B CN105271076 B CN 105271076B
- Authority
- CN
- China
- Prior art keywords
- cylinder
- spud leg
- sliding block
- controller
- magnetic valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manipulator (AREA)
- Invalid Beds And Related Equipment (AREA)
Abstract
A kind of truss-like maritime platform spud leg aerial work platform, including spud leg, riding boogie board, 5th cylinder, second support plate, second bearing pin, second hollow out, controller, first cylinder, scissor arms, first bearing pin, first hollow out, first support plate, connecting rod, 3rd sliding block, first sliding block, first slide rail, 4th cylinder, second electromagnet, first electromagnet, 3rd cylinder, second cylinder, second sliding block, second slide rail, connecting pole, second side plate, first side plate, connecting shaft, motor, balcony and outlet, the spud leg inner bottom part installs the first support plate, first support plate is provided with the first hollow out, two the first bearing pins are installed in the first hollow out, the first bearing pin positioned at left side is connected with the piston rod of the first cylinder, first cylinder is arranged on spud leg inner bottom part;It is an advantage of the invention that:With function of auto-lift, and there is retractor device.
Description
Technical field
The present invention relates to a kind of truss-like maritime platform spud leg aerial work platform, belong to ship with technical field.
Background technology
Shipbuilding enterprise generally requires to carry out work high above the ground on maritime platform, the plateau of the maritime platform of prior art
All without function of auto-lift, workman oneself is typically all needed to climb up plateau, workman's easy pin during cat ladder is slipped out
Fall, it is very dangerous, and there is no retractor device in plateau, it is impossible to directly from a plateau to another plateau, it is necessary to climb
Lower plateau, then another plateau is climbed up, bother very much.In order to solve above-mentioned difficulties, it is necessary to develop a with automatic lifting work(
Can, and have the maritime platform spud leg aerial work platform of retractor device.
The content of the invention
It is an object of the invention to provide a kind of truss-like maritime platform spud leg aerial work platform.
The problem to be solved in the present invention is all no function of auto-lift of plateau of the maritime platform of prior art, is not also had
The problem of retractor device.
To realize the purpose of the present invention, the technical solution adopted by the present invention is:
A kind of truss-like maritime platform spud leg aerial work platform, including spud leg, riding boogie board, the 5th cylinder, the second support plate,
Two bearing pins, the second hollow out, controller, the first cylinder, scissor arms, the first bearing pin, the first hollow out, the first support plate, connecting rod, the 3rd
Sliding block, the first sliding block, the first slide rail, the 4th cylinder, the second electromagnet, the first electromagnet, the 3rd cylinder, the second cylinder, second
Sliding block, the second slide rail, connecting pole, the second side plate, the first side plate, connecting shaft, motor, balcony and outlet, the spud leg inner bottom part
First support plate is installed, the first support plate, which is provided with the first hollow out, the first hollow out, installs two the first bearing pins, first positioned at left side
Bearing pin is connected with the piston rod of the first cylinder, and the first cylinder is arranged on spud leg inner bottom part, and scissor arms lower end is each side installed
On two the first bearing pins, scissor arms upper end is each side arranged on two the second bearing pins, and two the second bearing pins are arranged on
In second hollow out, the second support plate is provided with the second hollow out, and the second support plate each side installs the first sliding block, and the first sliding block is installed
On the first slide rail, the first slide rail is arranged on spud leg madial wall, and scissor arms each side install connecting rod, and connecting rod is installed
On the 3rd sliding block, the 3rd sliding block is arranged on the first slide rail, is installed and is pacified on two the 5th cylinders, the 5th cylinder on the second support plate
Fill and installation outlet on balcony, balcony be installed on riding boogie board, spud leg, outlet is interconnected with spud leg, and motor is respectively installed on four sides in balcony,
The output shaft of motor is stretched out outside balcony, is installed on the output shaft of motor and the first side plate is installed in connecting shaft, connecting shaft, the first side plate
Installed on the second slide rail of upper installation, the second slide rail and the company of installation under the second side plate, the second side plate is installed on the second sliding block, the second sliding block
Connect post, the piston rod of the second cylinder is arranged under connecting pole, and the second cylinder is arranged in the first side plate, the is installed under the first side plate
First electromagnet is installed, four side walls of spud leg respectively install the 4th cylinder, the 4th cylinder under three cylinders, the piston rod of the 3rd cylinder
Second electromagnet is installed, controller is arranged on the wall of spud leg side, and controller passes through wire and motor, the first electromagnet on piston rod
It is connected with the second electromagnet.
First magnetic valve built in first cylinder, the first magnetic valve is connected by wire with controller.
Second magnetic valve built in second cylinder, the second magnetic valve is connected by wire with controller.
3rd magnetic valve built in 3rd cylinder, the 3rd magnetic valve is connected by wire with controller.
4th magnetic valve built in 4th cylinder, the 4th magnetic valve is connected by wire with controller.
5th magnetic valve built in 5th cylinder, the 5th magnetic valve is connected by wire with controller.
It is an advantage of the invention that:Controller controls the energization or power-off of the first magnetic valve, does the piston rod of the first cylinder
Stretching routine, makes two the first bearing pins close to each other, extends scissor arms, move up the second support plate, make riding boogie board to
Upper movement;Controller controls the piston rod of the 5th cylinder to do stretching routine, moves up riding boogie board;Controller controlled motor is revolved
Turn, rotate connecting shaft, the first side plate is rotated to be horizontality by vertical state;Controller controls the 3rd cylinder and the 4th gas
The piston rod of cylinder does stretching routine, makes the first electromagnet and the second electromagnet close to each other;Controller control the first electromagnet and
Second electromagnet, which is powered, has magnetic, makes the first electromagnet and the second electromagnetism ferromagnetism attracting;Controller controls the second cylinder
Piston rod does stretching routine, the second side plate is moved right, and workman can go to adjacent day from the first side plate and the second side plate
On platform.
Brief description of the drawings
Fig. 1 is a kind of truss-like maritime platform spud leg aerial work platform overall structure figure of the invention;
In figure:1st, spud leg 2, riding boogie board 3, the 5th cylinder 4, the second support plate 5, the second bearing pin 6, second
Hollow out 7, controller 8, the first cylinder 9, scissor arms 10, the first bearing pin 11, the first hollow out 12, first
Support plate 13, connecting rod 14, the 3rd sliding block 15, the first sliding block 16, the first slide rail 17, the 4th cylinder
18th, the second electromagnet 19, the first electromagnet 20, the 3rd cylinder 21, the second cylinder 22, the second sliding block 23,
Second slide rail 24, connecting pole 25, the second side plate 26, the first side plate 27, connecting shaft 28, motor 29,
Balcony 30, outlet.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the present invention is further illustrated.
A kind of truss-like maritime platform spud leg aerial work platform of the present invention, including spud leg 1, riding boogie board 2, the 5th cylinder 3, the
Two support plates 4, the second bearing pin 5, the second hollow out 6, controller 7, the first cylinder 8, scissor arms 9, the first bearing pin 10, the first hollow out 11,
First support plate 12, connecting rod 13, the 3rd sliding block 14, the first sliding block 15, the first slide rail 16, the 4th cylinder 17, the second electromagnet 18,
First electromagnet 19, the 3rd cylinder 20, the second cylinder 21, the second sliding block 22, the second slide rail 23, connecting pole 24, the second side plate 25,
First side plate 26, connecting shaft 27, motor 28, balcony 29 and outlet 30, the inner bottom part of spud leg 1 install the first support plate 12, first
Support plate 12 is provided with the first hollow out 11, and two the first bearing pins 10 are installed in the first hollow out 11, positioned at left side the first bearing pin 10 with
The piston rod of first cylinder 8 is connected, and the first cylinder 8 is arranged on the inner bottom part of spud leg 1, the first magnetic valve, first built in the first cylinder 8
Magnetic valve is connected by wire with controller 7, and the lower end of scissor arms 9 is each side arranged on two the first bearing pins 10, scissor
The upper end of arm 9 is each side arranged on two the second bearing pins 5, and two the second bearing pins 5 are arranged in the second hollow out 6, second
Plate 4 is provided with the second hollow out 6, and the second support plate 4 each side installs the first sliding block 15, and the first sliding block 15 is arranged on the first slide rail
On 16, the first slide rail 16 is arranged on the madial wall of spud leg 1, and scissor arms 9 each side install connecting rod 13, and connecting rod 13 is installed
On the 3rd sliding block 14, the 3rd sliding block 14 is arranged on the first slide rail 16, and two the 5th cylinders 3, the 5th are installed on the second support plate 4
5th magnetic valve built in cylinder 3, the 5th magnetic valve is connected by wire with controller 7, and riding boogie board 2, control are installed on the 5th cylinder 3
Device 7 controls the piston rod of the 5th cylinder 3 to do stretching routine, moves up riding boogie board 2;Installed on spud leg 1 on balcony 29, balcony 29
Installation outlet 30, outlet 30 is interconnected with spud leg 1, and motor 28 is respectively installed on four sides in balcony 29, and the output shaft of motor 28 stretches out
Installed outside balcony 29, on the output shaft of motor 28 in connecting shaft 27, connecting shaft 27 and first side plate 26 is installed, controller 7 controls electricity
Machine 28 rotates, and rotates connecting shaft 27, the first side plate 26 is rotated to be horizontality by vertical state;Installed on first side plate 26
Install and installed on the second sliding block 22, the second sliding block 22 under second side plate 25, the second side plate 25 on second slide rail 23, the second slide rail 23
Connecting pole 24 is installed, the piston rod of the second cylinder 21 is arranged under connecting pole 24, and the second cylinder 21 is arranged in the first side plate 26,
Second magnetic valve built in second cylinder 21, the second magnetic valve is connected by wire with controller 7, and controller 7 controls the second cylinder
21 piston rod does stretching routine, the second side plate 25 is moved right, and workman can walk from the first side plate 26 and the second side plate 25
Onto adjacent balcony 29;First side plate 26 times installs the 3rd cylinder 20, the 3rd magnetic valve built in the 3rd cylinder 20, the 3rd electromagnetism
Valve is connected by wire with controller 7, and the first electromagnet 19 is installed under the piston rod of the 3rd cylinder 20, and 1 four side walls of spud leg are each
4th cylinder 17 is installed, the 4th magnetic valve built in the 4th cylinder 17, the 4th magnetic valve is connected by wire with controller 7, the 4th
Second electromagnet 18 is installed, controller 7 controls the piston rod of the 3rd cylinder 20 and the 4th cylinder 17 to do on the piston rod of cylinder 17
Stretching routine, makes the first electromagnet 19 and the second electromagnet 18 close to each other;The control of controller 7 first electromagnet 19 and the second electricity
Magnet 18, which is powered, has magnetic, makes the first electromagnet 19 and the magnetic of the second electromagnet 18 attracting;Controller 7 is arranged on the side of spud leg 1
On wall, controller 7 is connected by wire with motor 28, the first electromagnet 19 and the second electromagnet 18.
Application method of the present invention:Controller 7 controls the energization or power-off of the first magnetic valve, makes the piston rod of the first cylinder 8
Stretching routine is done, makes two the first bearing pins 10 close to each other, extends scissor arms 9, move up the second support plate 4, make
Riding boogie board 2 is moved up;Controller 7 controls the piston rod of the 5th cylinder 3 to do stretching routine, moves up riding boogie board 2;Controller 7
Controlled motor 28 rotates, and rotates connecting shaft 27, the first side plate 26 is rotated to be horizontality by vertical state;Controller 7 is controlled
The piston rod for making the 3rd cylinder 20 and the 4th cylinder 17 does stretching routine, the first electromagnet 19 and the second electromagnet 18 is mutually leaned on
Closely;Controller 7, which controls the first electromagnet 19 and the second electromagnet 18 to be powered, has magnetic, makes the first electromagnet 19 and the second electromagnetism
The magnetic of iron 18 is attracting;Controller 7 controls the piston rod of the second cylinder 21 to do stretching routine, the second side plate 25 is moved right, work
People can be gone on adjacent balcony 29 from the first side plate 26 and the second side plate 25.
Claims (6)
1. a kind of truss-like maritime platform spud leg aerial work platform, including spud leg(1), riding boogie board(2), the 5th cylinder(3), second
Support plate(4), the second bearing pin(5), the second hollow out(6), controller(7), the first cylinder(8), scissor arms(9), the first bearing pin(10)、
First hollow out(11), the first support plate(12), connecting rod(13), the 3rd sliding block(14), the first sliding block(15), the first slide rail(16)、
4th cylinder(17), the second electromagnet(18), the first electromagnet(19), the 3rd cylinder(20), the second cylinder(21), the second sliding block
(22), the second slide rail(23), connecting pole(24), the second side plate(25), the first side plate(26), connecting shaft(27), motor(28), day
Platform(29)And outlet(30), it is characterized in that:The spud leg(1)Inner bottom part installs the first support plate(12), the first support plate(12)On set
There is the first hollow out(11), the first hollow out(11)Two the first bearing pins of upper installation(10), the first bearing pin positioned at left side(10)With
One cylinder(8)Piston rod be connected, the first cylinder(8)Installed in spud leg(1)Inner bottom part, scissor arms(9)Lower end is each side
Installed in two the first bearing pins(10)On, scissor arms(9)Upper end is each side arranged on two the second bearing pins(5)On, two
Second bearing pin(5)Installed in the second hollow out(6)On, the second support plate(4)It is provided with the second hollow out(6), the second support plate(4)Left and right two
Side is respectively installed by the first sliding block(15), the first sliding block(15)Installed in the first slide rail(16)On, the first slide rail(16)Installed in spud leg
(1)On madial wall, scissor arms(9)Connecting rod is each side installed(13), connecting rod(13)Installed in the 3rd sliding block(14)On,
3rd sliding block(14)Installed in the first slide rail(16)On, the second support plate(4)Two the 5th cylinders of upper installation(3), the 5th cylinder(3)
Upper installation riding boogie board(2), spud leg(1)Upper installation balcony(29), balcony(29)Upper installation outlet(30), outlet(30)With spud leg(1)
It is interconnected, balcony(29)Interior four side is respectively installed by motor(28), motor(28)Output shaft stretch out balcony(29)Outside, motor(28)
Output shaft on connecting shaft is installed(27), connecting shaft(27)The first side plate of upper installation(26), the first side plate(26)It is upper to install second
Slide rail(23), the second slide rail(23)The second sliding block of upper installation(22), the second sliding block(22)The second side plate of upper installation(25), the second side
Plate(25)Lower installation connecting pole(24), the second cylinder(21)Piston rod be arranged on connecting pole(24)Under, the second cylinder(21)Peace
Mounted in the first side plate(26)It is interior, the first side plate(26)The 3rd cylinder of lower installation(20), the 3rd cylinder(20)Piston rod under install
First electromagnet(19), spud leg(1)Four side walls respectively install the 4th cylinder(17), the 4th cylinder(17)Piston rod on install
Two electromagnet(18), controller(7)Installed in spud leg(1)On the wall of side, controller(7)Pass through wire and motor(28), first electricity
Magnet(19)With the second electromagnet(18)It is connected.
2. a kind of truss-like maritime platform spud leg aerial work platform according to claim 1, it is characterized in that:Described first
Cylinder(8)Built-in first magnetic valve, the first magnetic valve passes through wire and controller(7)It is connected.
3. a kind of truss-like maritime platform spud leg aerial work platform according to claim 1, it is characterized in that:Described second
Cylinder(21)Built-in second magnetic valve, the second magnetic valve passes through wire and controller(7)It is connected.
4. a kind of truss-like maritime platform spud leg aerial work platform according to claim 1, it is characterized in that:Described 3rd
Cylinder(20)Built-in 3rd magnetic valve, the 3rd magnetic valve passes through wire and controller(7)It is connected.
5. a kind of truss-like maritime platform spud leg aerial work platform according to claim 1, it is characterized in that:Described 4th
Cylinder(17)Built-in 4th magnetic valve, the 4th magnetic valve passes through wire and controller(7)It is connected.
6. a kind of truss-like maritime platform spud leg aerial work platform according to claim 1, it is characterized in that:Described 5th
Cylinder(3)Built-in 5th magnetic valve, the 5th magnetic valve passes through wire and controller(7)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510773613.3A CN105271076B (en) | 2015-11-13 | 2015-11-13 | A kind of truss-like maritime platform spud leg aerial work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510773613.3A CN105271076B (en) | 2015-11-13 | 2015-11-13 | A kind of truss-like maritime platform spud leg aerial work platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105271076A CN105271076A (en) | 2016-01-27 |
CN105271076B true CN105271076B (en) | 2017-11-03 |
Family
ID=55141026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510773613.3A Active CN105271076B (en) | 2015-11-13 | 2015-11-13 | A kind of truss-like maritime platform spud leg aerial work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105271076B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672196A (en) * | 2016-01-27 | 2016-06-15 | 浙江海洋学院 | Competition wharf |
CN105502237B (en) * | 2016-02-23 | 2018-06-12 | 中建安装工程有限公司 | A kind of walking scissor-type lifting platform certainly for electromechanical moduleization installation |
CN105714732A (en) * | 2016-03-21 | 2016-06-29 | 浙江海洋学院 | Floating terminal |
CN108132048B (en) * | 2016-12-01 | 2020-11-17 | 浙江海洋大学 | Movable tidal current energy observation station |
CN106392587B (en) * | 2016-12-01 | 2018-10-30 | 浙江海洋大学 | Platform leg high-altitude mounting device |
CN108613287A (en) * | 2018-04-08 | 2018-10-02 | 胡和萍 | A kind of air purifier easy to remove |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4846357A (en) * | 1987-06-15 | 1989-07-11 | Paxton-Mitchell Company | Offshore station articulated boom maintenance unit |
US6591770B1 (en) * | 2000-10-23 | 2003-07-15 | St. Croix Marine Products, Inc. | Boating lift |
CN104058340A (en) * | 2014-07-02 | 2014-09-24 | 徐工集团工程机械股份有限公司 | Offshore operation lifting device and offshore operation lifting equipment |
CN204452800U (en) * | 2015-03-13 | 2015-07-08 | 舟山市沥港船舶修造有限公司 | A kind of yacht observation deck |
CN204452845U (en) * | 2015-03-09 | 2015-07-08 | 舟山市沥港船舶修造有限公司 | A kind of public affair law enforcement ship |
CN204611578U (en) * | 2015-06-03 | 2015-09-02 | 浙江海洋学院东海科学技术学院 | A kind of LED |
CN204659957U (en) * | 2015-05-19 | 2015-09-23 | 浙江海洋学院 | Construct platform assisted by a kind of extra large work ship |
CN204689556U (en) * | 2015-04-21 | 2015-10-07 | 浙江海洋学院 | Bay-lift in a kind of harbour construction |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6554533B2 (en) * | 2001-04-12 | 2003-04-29 | Byron L. Godbersen | Hydraulic boat hoist |
-
2015
- 2015-11-13 CN CN201510773613.3A patent/CN105271076B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4846357A (en) * | 1987-06-15 | 1989-07-11 | Paxton-Mitchell Company | Offshore station articulated boom maintenance unit |
US6591770B1 (en) * | 2000-10-23 | 2003-07-15 | St. Croix Marine Products, Inc. | Boating lift |
CN104058340A (en) * | 2014-07-02 | 2014-09-24 | 徐工集团工程机械股份有限公司 | Offshore operation lifting device and offshore operation lifting equipment |
CN204452845U (en) * | 2015-03-09 | 2015-07-08 | 舟山市沥港船舶修造有限公司 | A kind of public affair law enforcement ship |
CN204452800U (en) * | 2015-03-13 | 2015-07-08 | 舟山市沥港船舶修造有限公司 | A kind of yacht observation deck |
CN204689556U (en) * | 2015-04-21 | 2015-10-07 | 浙江海洋学院 | Bay-lift in a kind of harbour construction |
CN204659957U (en) * | 2015-05-19 | 2015-09-23 | 浙江海洋学院 | Construct platform assisted by a kind of extra large work ship |
CN204611578U (en) * | 2015-06-03 | 2015-09-02 | 浙江海洋学院东海科学技术学院 | A kind of LED |
Also Published As
Publication number | Publication date |
---|---|
CN105271076A (en) | 2016-01-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105271076B (en) | A kind of truss-like maritime platform spud leg aerial work platform | |
CN106744312B (en) | The hanging method of tower turnover device and tower | |
CN104527937B (en) | Marine wind turbine whole machine is transported with installing special purpose ship and method | |
CN101525865B (en) | Extroversive posture adjusting method for steel box arch rib section | |
CN202248941U (en) | Integral lifting, positioning and mounting device for large-scale steel members | |
CN105109647B (en) | Self-balancing type oceanographic equipment release platform | |
CN203806117U (en) | Ship launching device | |
CN105775077B (en) | There is cable distance type underwater installation to transport and mounting robot | |
CN108147267A (en) | Leaf blade hanging equipment and leaf blade hanging system | |
CN104632088A (en) | Petroleum drilling machine tower-shaped derrick sleeving mounting method | |
CN103863938B (en) | For carrying the safty hoisting device of wind tunnel experiment car | |
CN105839543A (en) | High bridge pier self-lifting outer frame over-form construction technology | |
CN104916181B (en) | A kind of land analog manipulation device of self-elevating ocean platform | |
CN104527947B (en) | Ship platform water entering trolley | |
CN104727545A (en) | Large water tower cylinder hydraulic slip-form vertical-transportation system and method | |
CN203959758U (en) | Reservoir walls derusting anti-corrosive lift rotating equipment | |
CN108128416A (en) | A kind of marine engineering platform | |
CN205027486U (en) | Power battery immersion test rack | |
CN105564610A (en) | Ship controller | |
CN206377576U (en) | A kind of dynamic lamp system of stage | |
CN103454110A (en) | Test device for pinion-and-rack lifting system of self-elevating drilling platform | |
CN203844767U (en) | Novel vehicle stop system of inclined roadway | |
CN105292400B (en) | A kind of guidance dockage device | |
CN206580492U (en) | The removable lifting positioning apparatus of piping lane pipeline | |
CN107815971A (en) | High pier is from climbing liquid press to turn over molds system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |