CN105180366B - Operation of air conditioner method - Google Patents
Operation of air conditioner method Download PDFInfo
- Publication number
- CN105180366B CN105180366B CN201510591155.1A CN201510591155A CN105180366B CN 105180366 B CN105180366 B CN 105180366B CN 201510591155 A CN201510591155 A CN 201510591155A CN 105180366 B CN105180366 B CN 105180366B
- Authority
- CN
- China
- Prior art keywords
- air
- conditioning
- air conditioner
- operational factor
- shaping modes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention discloses a kind of operation of air conditioner method.The operation of air conditioner method includes:Step S1:Air-conditioning is controlled to open shaping modes;Step S2:Air conditioner operation parameters are modified, air-conditioning fan-out capability is matched with carrying capacity of environment;Step S3:Air-conditioning is set to be run according to revised air conditioner operation parameters.According to the operation of air conditioner method of the present invention, it is possible to increase the comfortableness of air-conditioning, save air conditioning energy consumption.
Description
Technical field
The present invention relates to air-conditioning technical field, in particular to a kind of operation of air conditioner method.
Background technology
Present air-conditioning, the parameter such as rated cooling capacity, maximum frequency of operation is all fixed after dispatching from the factory, and user can not be more
Change program parameter.But sometimes due to the factors such as type selecting, the diversity of user environment and particularity, the ability and reality of air-conditioning
Border use environment load is not consistent, and can so cause in actual use, due to the limitation of parameter and logic, it may appear that arrive
When near up to the temperature spot of setting, air-conditioning lifting frequency is more frequent, has not only influenceed comfortableness but also has consumed energy.
The content of the invention
A kind of operation of air conditioner method is provided in the embodiment of the present invention, it is possible to increase the comfortableness of air-conditioning, save air conditioning energy consumption.
To achieve the above object, the embodiment of the present invention provides a kind of operation of air conditioner method, including:Step S1:Control air-conditioning
Open shaping modes;Step S2:Air conditioner operation parameters are modified, air-conditioning fan-out capability is matched with carrying capacity of environment;Step
Rapid S3:Air-conditioning is set to be run according to revised air conditioner operation parameters.
Preferably, the step S1 includes:Shaping modes are selected by interactive device.
Preferably, the step S2 also includes:Determine effective start number of air-conditioning;When effective start number of air-conditioning
During less than or equal to n times, effective start operational factor of air-conditioning is recorded, the operational factor of air-conditioning is adjusted afterwards;Work as sky
When tuning to open machine number and being more than N, directly the operational factor of air-conditioning is adjusted according to effective start operational factor of record;Wherein
Effective start number of air-conditioning refers to that the available machine time of air-conditioning is more than K.
Preferably, the refrigeration mode operational factor and heating mode operational factor of air-conditioning are recorded separately.
Preferably, the start operational factor includes following at least one:Available machine time TOpen, Setting pattern, set temperature
Degree, reach setting temperature-time, stable operation frequency, the gentle stable operation outer tube temperature of stable operation inner tube.
Preferably, the step S2 also includes:The power influenceed is adjusted to operational factor according to each adjustment parameter of record
Weight, determine the correction value of impacted each operational factor;Determined after the correction value is integrated with each operational factor of source program
Revised air conditioner operation parameters.
Preferably, the operational factor respectively corrected includes at least one following running frequency:Specified operating point, middle fortune
Row point, maximum operating point, minimum operating point.
Preferably, the operation of air conditioner method also includes:Step S4:Exit or reset shaping modes.
Preferably, when exiting shaping modes, each corrected parameter is preserved, and crash handling is carried out to shaping modes;When
When resetting shaping modes, each corrected parameter is not preserved, while crash handling is carried out to shaping modes, until reopening amendment mould
Formula simultaneously records air conditioner operation parameters.
Preferably, also include before the step S1:Judge whether shaping modes are opened after powering, work as shaping modes
When not opening, air-conditioning is run according to default air conditioner operation parameters.
Apply the technical scheme of the present invention, operation of air conditioner method includes:Step S1:Air-conditioning is controlled to open shaping modes;Step
Rapid S2:Air conditioner operation parameters are modified, air-conditioning fan-out capability is matched with carrying capacity of environment;Step S3:Make air-conditioning according to
Revised air conditioner operation parameters operation., can be according to the use environment of reality to the operational factor of air-conditioning in operation of air conditioner
It is modified, so as to adjust the maximum output ability of air-conditioning, adjusts air conditioner refrigerating amount indirectly or directly, make air conditioning capacity and ring
Border load matching, improves the comfortableness of air-conditioning and saves air conditioning energy consumption.
Brief description of the drawings
Fig. 1 is the control principle drawing of the operation of air conditioner method of the embodiment of the present invention;
Fig. 2 is the control flow chart of the operation of air conditioner method of the embodiment of the present invention.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, but not as the limit to the present invention
It is fixed.
Referring to shown in Fig. 1 and Fig. 2, according to an embodiment of the invention, operation of air conditioner method includes:Step S1:Control air-conditioning
Open shaping modes;Step S2:Air conditioner operation parameters are modified, air-conditioning fan-out capability is matched with carrying capacity of environment;Step
Rapid S3:Air-conditioning is set to be run according to revised air conditioner operation parameters.
In operation of air conditioner, the operational factor of air-conditioning can be modified according to the use environment of reality, so as to adjust
The maximum output ability of air-conditioning, air conditioner refrigerating amount is adjusted indirectly or directly, makes air conditioning capacity and the carrying capacity of environment of actual use
Matching, air-conditioning is in preferably working condition, improve the comfortableness of air-conditioning and save air conditioning energy consumption.
Step S1 includes:Shaping modes are selected by interactive device.When selecting the mode of operation of air-conditioning, friendship can be passed through
Mutual equipment selects shaping modes, and now air-conditioning can enter shaping modes, and operational factor is adjusted.Interactive device can be distant
The control terminal such as device, mobile phone is controlled, these control terminals can carry out information exchange, the operation to air-conditioning by WIFI etc. and air-conditioning
Pattern is controlled.
Step S2 also includes:Determine effective start number of air-conditioning;When effective start number of air-conditioning is less than or equal to n times
When, effective start operational factor of air-conditioning is recorded, afterwards the actual motion according to effective start operational factor of air-conditioning to air-conditioning
Parameter is adjusted;When air-conditioning start number is more than N, directly according to operation of the effective start operational factor of record to air-conditioning
Parameter is adjusted, without recording effective start operational factor of air-conditioning again;Effective start of wherein air-conditioning refers to air-conditioning
Available machine time is more than K start.
N herein is the natural number more than or equal to 1, determines effective start number of air-conditioning, can having according to air-conditioning
Effect start number determines the operation reserve of air-conditioning, when effective start number of air-conditioning is more than N, illustrates to have collected enough
Effectively start operational factor, directly the operational factor of air-conditioning can be adjusted according to these effective operational factors, Neng Goujie
The time that air-conditioning start operational factor is collected is saved, saves air-conditioning resource, while operation of air conditioner ability can also be effectively ensured with working as
Preceding carrying capacity of environment matches, and ensures the comfortableness of operation of air conditioner.
When effective start number of air-conditioning is less than or equal to n times, then illustrate the air conditioner operation parameters data volume collected still
So deficiency until have enough sampled datas, can ensure air-conditioning, it is necessary to continue the collection of air-conditioning start operational factor
The accuracy and reliability of operational factor regulation.N herein can be set according to actual conditions, as long as can ensure to gather
Enough air-conditioning start operational factors.
The refrigeration mode operational factor and heating mode operational factor of air-conditioning are recorded separately.Due to air conditioner refrigerating mode operation
Residing environment difference is larger with heating mode operation, and operation principle also differs, therefore by the operational factor of both patterns
It is recorded separately, it is possible to different operational factors is sampled according to different mode of operations, avoids data from adulterating and causes amendment to be tied
The inaccuracy of fruit, ensure the amendment operational factor finally obtained more accurately and reliably, can preferably meet the refrigeration mould of air-conditioning
The controlling capacity of refrigeration of formula and heating mode.
The start operational factor for needing to record includes following at least one:Available machine time TOpen, Setting pattern PMould, set temperature
tIf, reach temperature-time T be setTemperature spot, stable operation frequency F, stable operation inner tube temperature tInner tubeWith stable operation outer tube temperature tOuter tube。
Step S2 also includes:The weight influenceed is adjusted to operational factor according to each adjustment parameter of record, determined impacted
Each operational factor correction value;Determine that revised air-conditioning is transported after the correction value and each operational factor of source program are integrated
Row parameter.
Adjustment parameter herein refers to effective operational factor in air-conditioning start operational factor, is not being entered after air-conditioning is started shooting
Operational factor before row parameter regulation, the operational factor of air-conditioning refer to the fortune of the actual operation parameters of air-conditioning, generally air-conditioning
The parameter such as line frequency and the aperture of valve.
There is initial operational parameter when air-conditioning dispatches from the factory, the initial operational parameter is source program operational factor, and this programme is according to reality
The parameter that initial operational parameter when the correction value of the operational factor that border collects is dispatched from the factory with air-conditioning integrate after computing is real
Border operational factor, for example, the running frequency under air-conditioning primary condition under P1 patterns is AHz, the correction value calculate herein after is b
Hz, then last actual motion frequency is A+b Hz.
Correction value, which with each operational factor of source program integrate, to be primarily referred to as carrying out mathematics to correction value and initial value synthesis
Computing, it is possible thereby to obtain revised air conditioner operation parameters.
After enough start operational factors are got, it is possible to each operation is joined according to the start operational factor of record
The weight that number influences, calculate the correction value X of impacted each operational factor.The correction value is carried out with each operational factor of source program
Operation of air conditioner is adjusted after comprehensive function.The operational factor respectively corrected includes at least one following running frequency:It is specified
Operating point, middle operating point, maximum operating point, minimum operating point.
The correction value of each operational factor can determine that wherein corrected parameter can use square by corrected parameter and adjustment parameter
Battle array A is represented:
The adjustment parameter of record can be represented with matrix B
The correction value X=AB of each air conditioner operation parameters determined by last.
After the correction value of each operational factor is calculated, it is possible to each operational factor of air-conditioning is entered according to correction value
Row amendment, finally obtains revised air conditioner operation parameters so that the operational factor of air-conditioning can be with the carrying capacity of environment phase of reality
Matching.
After terminating to the amendment of air conditioner operation parameters, operation of air conditioner method also includes:Step S4:Exit or reset tune
Section pattern.
When exiting shaping modes, each corrected parameter is preserved, and crash handling is carried out to shaping modes;Mould is adjusted when resetting
During formula, each corrected parameter is not preserved, while crash handling is carried out to shaping modes, until reopening modification model and recording sky
Adjust operational factor.Exit or correct shaping modes
Also include before step S1:Judge whether shaping modes are opened after powering, when shaping modes are not opened, according to
Default air conditioner operation parameters operation air-conditioning.
Certainly, above is the preferred embodiment of the present invention.It should be pointed out that for those skilled in the art
For, on the premise of its general principles are not departed from, some improvements and modifications can also be made, these improvements and modifications
It is considered as protection scope of the present invention.
Claims (9)
- A kind of 1. operation of air conditioner method, it is characterised in that including:Step S1:Air-conditioning is controlled to open shaping modes;Step S2:Air conditioner operation parameters are modified, air-conditioning fan-out capability is matched with carrying capacity of environment;Step S3:Air-conditioning is set to be run according to revised air conditioner operation parameters;The step S2 also includes:Determine effective start number of air-conditioning;When effective start number of air-conditioning is less than or equal to n times, effective start operational factor of air-conditioning is recorded, afterwards to air-conditioning Operational factor be adjusted;When air-conditioning start number is more than N, directly the operational factor of air-conditioning is carried out according to effective start operational factor of record Regulation;Effective start number of wherein air-conditioning refers to that the available machine time of air-conditioning is more than K.
- 2. operation of air conditioner method according to claim 1, it is characterised in that the step S1 includes:Pass through interactive device Select shaping modes.
- 3. operation of air conditioner method according to claim 1, it is characterised in that the refrigeration mode operational factor of air-conditioning and heating Mode operation parameter is recorded separately.
- 4. operation of air conditioner method according to claim 1, it is characterised in that it is described start operational factor include it is following at least It is a kind of:Available machine time TOpen, Setting pattern, set temperature, reach set temperature-time, stable operation frequency, stable operation inner tube Gentle stable operation outer tube temperature.
- 5. operation of air conditioner method according to claim 1, it is characterised in that the step S2 also includes:The weight influenceed is adjusted to operational factor according to each adjustment parameter of record, determines the amendment of impacted each operational factor Value;Revised air conditioner operation parameters are determined after the correction value and each operational factor of source program are integrated.
- 6. operation of air conditioner method according to claim 5, it is characterised in that the operational factor respectively corrected include it is following at least One of running frequency:Specified operating point, middle operating point, maximum operating point, minimum operating point.
- 7. operation of air conditioner method according to claim 1, it is characterised in that the operation of air conditioner method also includes:Step S4:Exit or reset shaping modes.
- 8. operation of air conditioner method according to claim 7, it is characterised in thatWhen exiting shaping modes, each corrected parameter is preserved, and crash handling is carried out to shaping modes;When resetting shaping modes, each corrected parameter is not preserved, while crash handling is carried out to shaping modes, until reopening Modification model simultaneously records air conditioner operation parameters.
- 9. operation of air conditioner method according to claim 1, it is characterised in that also include before the step S1:Starting shooting Judge whether shaping modes are opened afterwards, when shaping modes are not opened, air-conditioning is run according to default air conditioner operation parameters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510591155.1A CN105180366B (en) | 2015-09-16 | 2015-09-16 | Operation of air conditioner method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510591155.1A CN105180366B (en) | 2015-09-16 | 2015-09-16 | Operation of air conditioner method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105180366A CN105180366A (en) | 2015-12-23 |
CN105180366B true CN105180366B (en) | 2017-12-08 |
Family
ID=54902633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510591155.1A Active CN105180366B (en) | 2015-09-16 | 2015-09-16 | Operation of air conditioner method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105180366B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108613325B (en) * | 2018-05-04 | 2020-06-26 | 广东美的暖通设备有限公司 | Energy demand correction method and system |
CN109751718B (en) * | 2018-11-29 | 2020-04-28 | 珠海格力电器股份有限公司 | Air conditioning system control method and device |
CN109916028B (en) * | 2019-03-20 | 2020-08-14 | 珠海格力电器股份有限公司 | Method and device for controlling matching of output capacity and load of unit and unit |
CN112923539B (en) * | 2019-12-05 | 2022-12-27 | 新奥数能科技有限公司 | Operation optimization method and system for air conditioning unit |
CN113685991B (en) * | 2021-08-02 | 2023-01-13 | 重庆海尔空调器有限公司 | Control method and device for intelligent air conditioner and intelligent air conditioner |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060101868A (en) * | 2005-03-21 | 2006-09-27 | 엘지전자 주식회사 | Control method for air conditioner |
CN102914028A (en) * | 2012-10-19 | 2013-02-06 | 广东美的制冷设备有限公司 | Energy saving control method and system as well as air conditioner |
CN103234257A (en) * | 2013-04-17 | 2013-08-07 | 广东美的制冷设备有限公司 | Inverter air conditioner and energy-saving control method for improving total operation energy efficiency of inverter air conditioner |
CN104374059A (en) * | 2014-10-31 | 2015-02-25 | 四川长虹电器股份有限公司 | System capacity adjusting method and temperature adjusting system |
CN104515245A (en) * | 2013-09-26 | 2015-04-15 | 珠海格力电器股份有限公司 | Control method and device of air conditioning system |
-
2015
- 2015-09-16 CN CN201510591155.1A patent/CN105180366B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060101868A (en) * | 2005-03-21 | 2006-09-27 | 엘지전자 주식회사 | Control method for air conditioner |
CN102914028A (en) * | 2012-10-19 | 2013-02-06 | 广东美的制冷设备有限公司 | Energy saving control method and system as well as air conditioner |
CN103234257A (en) * | 2013-04-17 | 2013-08-07 | 广东美的制冷设备有限公司 | Inverter air conditioner and energy-saving control method for improving total operation energy efficiency of inverter air conditioner |
CN104515245A (en) * | 2013-09-26 | 2015-04-15 | 珠海格力电器股份有限公司 | Control method and device of air conditioning system |
CN104374059A (en) * | 2014-10-31 | 2015-02-25 | 四川长虹电器股份有限公司 | System capacity adjusting method and temperature adjusting system |
Also Published As
Publication number | Publication date |
---|---|
CN105180366A (en) | 2015-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105180366B (en) | Operation of air conditioner method | |
CN107300243B (en) | Air-conditioning system, wind file adjusting method and computer readable storage medium | |
CN105202687B (en) | The control method and control system of air conditioner, air conditioner and remote control | |
CN107166666A (en) | Air conditioner heat-production control method, device and computer-readable recording medium | |
CN106765982B (en) | Air conditioner chamber's inner blower control method and device | |
CN104406272B (en) | A kind of air conditioning control method | |
CN107631428B (en) | A kind of air conditioner temperature/humidity control method and air conditioner | |
CN104110799B (en) | The integrated control method of air-conditioner electric expansion valve and circuit | |
CN110398032A (en) | Air conditioner and its control method for electronic expansion valve, control device and storage medium | |
CN108224698B (en) | Air conditioning control method, device, storage medium and air-conditioning | |
CN108332373B (en) | A kind of control method, device, storage medium and the air-conditioning of indoor environment state | |
CN107621045A (en) | Control method, air conditioner and the computer-readable recording medium of air conditioner | |
CN110375418A (en) | Air conditioner and its control method for electronic expansion valve, control device and storage medium | |
CN104930773B (en) | The control method and device and air-conditioner of electric expansion valve | |
CN104729010B (en) | The control method of air conditioner, apparatus and system | |
CN106123413B (en) | Prevent the method and device that electric expansion valve is stuck | |
CN104913445B (en) | Control method, the control system of blower fan gear and the air conditioner of blower fan gear | |
CN109341013A (en) | Air conditioner and its control method, device | |
CN109059226A (en) | Control method, air conditioner and the computer readable storage medium of electric expansion valve | |
CN107152767A (en) | Control method, device and the computer-readable recording medium of air conditioner | |
CN109357378A (en) | The method, apparatus and computer storage medium of airconditioning control | |
CN105042987B (en) | A kind of refrigerator temperature-changing chamber control method and device | |
CN107894065A (en) | Air conditioner and its control method, control device and computer-readable recording medium | |
CN108458452A (en) | Air conditioner and its control method and computer readable storage medium | |
CN107192179A (en) | The control method and computer-readable recording medium of air conditioner and electric expansion valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |