CN105024858A - Soft switch error detecting system for electric power telecommunication - Google Patents
Soft switch error detecting system for electric power telecommunication Download PDFInfo
- Publication number
- CN105024858A CN105024858A CN201510437789.1A CN201510437789A CN105024858A CN 105024858 A CN105024858 A CN 105024858A CN 201510437789 A CN201510437789 A CN 201510437789A CN 105024858 A CN105024858 A CN 105024858A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- media gateway
- sends
- data collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/50—Testing arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Telephonic Communication Services (AREA)
Abstract
The invention discloses a soft switch error detecting system for electric power telecommunication. The system includes data collecting modules, a waveform restoring and energy analyzing module and a server. After data collecting modulescollect voice record data, waveform restoration is carried out through the waveform restoring and energy analyzing module and crest, trough and wavelength data are acquired. Through the comparison of a comparison module, the data collecting module with sudden data change is determined and a media gateway with the sudden data change can be obtained. A control module receives information of the media gateway with the sudden data change and sends a control signal to the media gateway with the sudden data change. According to the invention, testing signals are sent timely during a soft switch process of electric power telecommunication for judging whether the lines are working well or not and line states are adjusted timely, so that influence on normal working and timely scheduling task delivery is avoided. During data communication, if failure occurs, line fault signals can be sent by either party involved in data communication. Line states can be adjusted by the system provided by the invention and normal operation of secondary communication is ensured.
Description
Technical field
The invention belongs to communication software and change support equipment technical field in technology, be specifically related to the fault detection system in a kind of communication soft switch be applied in power industry.
Background technology
Along with the development of next generation communication (NGN) technology and wireless fiber optic network, Softswitch technology has replaced public phone network (PSTN) and the status of program controlled switch technology in power communication gradually.Softswitch telephony business also reaches its maturity, and is applied in power communication administration telephone and dispatching telephone.The fax accessed through soft switch and POS are also absolutely necessary, and have a common trait, the voice channel of call will be switched to data channel exactly, effective transmission of guarantee signal by IP realization fax and POS business.The whole access softswitch system of my unit administration telephone at present, transformer station's phone progressively access softswitch system.In the process that soft switch accesses comprehensively, encounter many problems, the phenomenon that such as fax has occurred receiving and can not send out, POS dialing cannot be connected to bank server.Therefore we have proposed power communication soft switch fault detection system to solve the problem.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of power communication soft switch fault detection system, alarm signal and alert data can be sent after discovery mistake, active detecting is carried out to the power communication software system of changing simultaneously, avoid affecting issuing in time of normal work and scheduler task.
The present invention solves the problems of the technologies described above by the following technical programs:
A kind of power communication soft switch fault detection system, comprises data collection module, waveform reduction and energy spectrometer module, server, it is characterized in that,
Described data collection module, the media gateway of changing with power communication software is connected, and carries out recording collect the data by media gateway;
Described waveform reduction and energy spectrometer module, receive the recording data that data collection module sends, recording data is carried out waveform reduction, obtain the time domain beamformer of recording data, energy spectrometer is carried out to the time domain beamformer obtained, obtains crest, trough and wavelength data;
Described server, comprises comparison module and control module;
Described comparison module, crest, trough and wavelength data that the recording data obtained by front and back adjacent data collection module obtains after described waveform reduction and energy spectrometer resume module compare, obtain comparing data, determine the data collection module that data sudden change occurs;
Described control module, receives the comparing data that comparison module sends, and sends control signal to the media gateway of mating with the data collection module that generation data are suddenlyd change;
After described data collection module collects recording data, carry out waveform reduction by waveform reduction and energy spectrometer module, obtain crest, trough and wavelength data; Compared by comparison module, judge the data collection module that data sudden change occurs, and then obtain the media gateway that data sudden change occurs; Control module accepts the information that data sudden change media gateway occurs, and sends control signal to data sudden change media gateway.
In order to obtain better technique effect, described server also comprises time block, described time block is connected with control module, timing sends time signal to control module, send test signal to media gateway after control module time of reception signal, described media gateway sends test data after receiving test signal;
Described server also comprises time synchronized module, when providing time school to data collection module, ftp server, control module;
Described server also comprises input/output module, and described input module sends Non-follow control instruction to control module; The control signal that described output module display control module sends, receives and shows the comparing data that comparison module obtains, reception and the time domain beamformer that display waveform reduces and energy spectrometer module obtains;
Also have ftp server, described ftp server receives and stores the recording data that data collection module sends;
Also has alarm switch, described alarm switch is connected with power communication soft switch terminal, data exception signal is sent to server, server extracts the recording data of this time from ftp server, after being sent to waveform reduction and energy spectrometer module, determine the data collection module that data sudden change occurs, and send control signal to the data collection module that data sudden change occurs.
The present invention's timing in power communication soft switch process sends test signal, judges that circuit is whether normal, and adjusts line status in time, avoids affecting normally working and scheduler task issues in time.In data communication, if broken down, line fault signal can be sent by either party of carrying out data communication, automatically adjust line status by the present invention, guarantee that secondary communication is in normal condition.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention power communication soft switch structural representation;
Fig. 2 is embodiment of the present invention structural representation.
Embodiment
Content of the present invention is explained in detail further below in conjunction with drawings and Examples.
A kind of power communication soft switch fault detection system, comprises data collection module, waveform reduction and energy spectrometer module, server, alarm switch and ftp server,
Described data collection module, the media gateway of changing with power communication software is connected, and carries out recording collect the data by media gateway;
Described waveform reduction and energy spectrometer module, receive the recording data that data collection module sends, recording data is carried out waveform reduction, obtain recording data time domain beamformer, energy spectrometer is carried out to the time domain beamformer obtained, obtains crest, trough and wavelength data;
Described server, comprises comparison module, control module, time block, time synchronized module and input/output module;
Described comparison module, the oscillogram of the recording data obtained by different pieces of information collection module after described waveform reduction and energy spectrometer resume module compares, and determines the data collection module that data sudden change occurs;
Described control module, receives the comparing data that comparison module sends, and sends control signal to the media gateway of mating with the data collection module that generation data are suddenlyd change;
Described time block, described time block is connected with control module, and timing sends time signal to control module, sends test signal after control module time of reception signal to media gateway, and described media gateway sends test data after receiving test signal;
Described time synchronized module, when providing time school to data collection module, ftp server, control module;
Described input/output module, described input module sends Non-follow control instruction to control module; The control signal that described output module display control module sends, receives and shows the comparing data that comparison module obtains, reception and the time domain beamformer that display waveform reduces and energy spectrometer module obtains;
After described data collection module collects recording data, carry out waveform reduction by waveform reduction and energy spectrometer module, obtain crest, trough and wavelength data; Compared by comparison module, judge the data collection module that data sudden change occurs, and then obtain the media gateway that data sudden change occurs; Control module accepts the information that data sudden change media gateway occurs, and sends control signal to data sudden change media gateway.
Described ftp server, described ftp server receives and stores the recording data that data collection module sends;
Described alarm switch, described alarm switch is connected with power communication soft switch terminal, data exception signal is sent to server, server extracts the recording data of this time from ftp server, after being sent to waveform reduction and energy spectrometer module, determine the data collection module that data sudden change occurs, and send control signal to the data collection module that data sudden change occurs.
When power communication soft switch runs, when the timing of time synchronized module provides time school to data collection module, ftp server, control module; Time block regularly sends time signal to control module, sends test signal after control module time of reception signal to media gateway, and media gateway sends test data after receiving test signal; After data recording module detects test data, carry out waveform by waveform reduction and energy spectrometer module and reduce and Wave data analysis, then have comparison module compare test data; If compare test data are in permissible range, then judge that power communication soft switch is normal; If compare test data exceed permissible range, then control module sends control signal to media gateway, the parameters of adjustment media gateway.
When power communication soft switch uses, if when user finds signal fault, user is by opening alarm switch, data exception signal is sent to server, server extracts the recording data of alarm switch start-up time from ftp server, and is sent to waveform reduction and energy spectrometer resume module, after determining the data collection module of generation data sudden change, send control signal to the data collection module that data sudden change occurs, now recover normal talking between user.
Claims (6)
1. a power communication soft switch fault detection system, comprises data collection module, waveform reduction and energy spectrometer module, server, it is characterized in that,
Described data collection module, the media gateway of changing with power communication software is connected, and carries out recording collect the data by media gateway;
Described waveform reduction and energy spectrometer module, receive the recording data that data collection module sends, recording data is carried out waveform reduction, obtain the time domain beamformer of recording data, energy spectrometer is carried out to the time domain beamformer obtained, obtains crest, trough and wavelength data;
Described server, comprises comparison module and control module;
Described comparison module, crest, trough and wavelength data that the recording data obtained by front and back adjacent data collection module obtains after described waveform reduction and energy spectrometer resume module compare, obtain comparing data, determine the data collection module that data sudden change occurs;
Described control module, receives the comparing data that comparison module sends, and sends control signal to the media gateway of mating with the data collection module that generation data are suddenlyd change;
After described data collection module collects recording data, carry out waveform reduction by waveform reduction and energy spectrometer module, obtain crest, trough and wavelength data; Compared by comparison module, judge the data collection module that data sudden change occurs, and then obtain the media gateway that data sudden change occurs; Control module accepts the information that data sudden change media gateway occurs, and sends control signal to data sudden change media gateway.
2. power communication soft switch fault detection system as claimed in claim 1, it is characterized in that, described server also comprises time block, described time block is connected with control module, timing sends time signal to control module, send test signal to media gateway after control module time of reception signal, described media gateway sends test data after receiving test signal.
3. power communication soft switch fault detection system as claimed in claim 1 or 2, it is characterized in that, described server also comprises time synchronized module, when providing time school to data collection module, ftp server, control module.
4. power communication soft switch fault detection system as claimed in claim 1 or 2, it is characterized in that, described server also comprises input/output module, and described input module sends Non-follow control instruction to control module; The control signal that described output module display control module sends, receives and shows the comparing data that comparison module obtains, reception and the time domain beamformer that display waveform reduces and energy spectrometer module obtains.
5. power communication soft switch fault detection system as claimed in claim 1 or 2, is characterized in that, also has ftp server, and described ftp server receives and stores the recording data that data collection module sends.
6. power communication soft switch fault detection system as claimed in claim 5, it is characterized in that, also has alarm switch, described alarm switch is connected with power communication soft switch terminal, send data exception signal to server, server extracts the recording data of this time from ftp server, after being sent to waveform reduction and energy spectrometer module, determine the data collection module that data sudden change occurs, and send control signal to the data collection module that data sudden change occurs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510437789.1A CN105024858A (en) | 2015-07-23 | 2015-07-23 | Soft switch error detecting system for electric power telecommunication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510437789.1A CN105024858A (en) | 2015-07-23 | 2015-07-23 | Soft switch error detecting system for electric power telecommunication |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105024858A true CN105024858A (en) | 2015-11-04 |
Family
ID=54414586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510437789.1A Pending CN105024858A (en) | 2015-07-23 | 2015-07-23 | Soft switch error detecting system for electric power telecommunication |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105024858A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105515863A (en) * | 2015-12-12 | 2016-04-20 | 林炜 | Electric power telecommunication soft-switch error detection system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2444222Y (en) * | 2000-10-26 | 2001-08-22 | 刘成 | Monitor for sensitive state on line rotating machinery |
CN101068132A (en) * | 2007-05-29 | 2007-11-07 | 广州人民广播电台 | Broadcasting intelligent monitoring system and method |
CN101345796A (en) * | 2008-08-19 | 2009-01-14 | 烽火通信科技股份有限公司 | Soft exchange user line intelligent test system and method based on user line test module |
CN104614617A (en) * | 2015-02-09 | 2015-05-13 | 安徽中普盛德电子科技有限公司 | Intelligent lightning protection on-line monitoring and early warning device |
CN104635128A (en) * | 2015-02-06 | 2015-05-20 | 福州大学 | Arc fault recognition capability experimental analysis device and experimental analysis method thereof |
-
2015
- 2015-07-23 CN CN201510437789.1A patent/CN105024858A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2444222Y (en) * | 2000-10-26 | 2001-08-22 | 刘成 | Monitor for sensitive state on line rotating machinery |
CN101068132A (en) * | 2007-05-29 | 2007-11-07 | 广州人民广播电台 | Broadcasting intelligent monitoring system and method |
CN101345796A (en) * | 2008-08-19 | 2009-01-14 | 烽火通信科技股份有限公司 | Soft exchange user line intelligent test system and method based on user line test module |
CN104635128A (en) * | 2015-02-06 | 2015-05-20 | 福州大学 | Arc fault recognition capability experimental analysis device and experimental analysis method thereof |
CN104614617A (en) * | 2015-02-09 | 2015-05-13 | 安徽中普盛德电子科技有限公司 | Intelligent lightning protection on-line monitoring and early warning device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105515863A (en) * | 2015-12-12 | 2016-04-20 | 林炜 | Electric power telecommunication soft-switch error detection system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1699172B1 (en) | Method and apparatus for locating in-house wiring defects | |
US8467321B1 (en) | Real time voice quality statistics in audio teleconferencing | |
US8594278B2 (en) | Test system for voice communications systems | |
US20080175228A1 (en) | Proactive quality assessment of voice over IP calls systems | |
CN102333163B (en) | External auxiliary testing apparatus, and testing system thereof and method thereof | |
US8363557B2 (en) | Methods, systems, and computer readable media for remotely evaluating and controlling voice over IP (VoIP) subscriber terminal equipment | |
CN101047456B (en) | Terminal monitory system and method | |
CN104486359A (en) | Method and system for testing as well as method and system for monitoring voice quality of IMS network | |
US20130250755A1 (en) | Real-Time Dynamic Failover For Redundant Data Communication Network | |
EP2288199A1 (en) | Communication information collecting method, testing method and network side equipment | |
US20090074423A1 (en) | Method and apparatus for configuring an optical network terminal | |
CN101035159A (en) | Dialed monitoring system for the troubleshooting of the communication network and its monitoring method | |
CN105024858A (en) | Soft switch error detecting system for electric power telecommunication | |
US8767566B2 (en) | Method and apparatus for verifying signaling and bearer channels in a packet switched network | |
WO2008027891A2 (en) | Method and apparatus to troubleshoot voice over internet protocol (voip) | |
CN107786931A (en) | Audio-frequency detection and device | |
CN102546476A (en) | Media gateway and method for detecting highway resources | |
CN101998426A (en) | Handshaking signal processing method of voice assessment algorithm in voice test system | |
CN103858415A (en) | Diagnostic engine | |
CN105515863A (en) | Electric power telecommunication soft-switch error detection system | |
CN103248775A (en) | Implementation scheme based on IP Internet doubling recording | |
CN204598106U (en) | Based on call center's communication link monitoring system of electric current | |
CN114640576B (en) | Method and apparatus for fault localization of passive access devices for broadband networks | |
CN114157761A (en) | System and method for voice test of multi-channel voice gateway equipment based on router | |
CN104735811A (en) | Secondary dialing method based on wireless access system and wireless access equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151104 |
|
WD01 | Invention patent application deemed withdrawn after publication |