CN104916105B - The wireless communication and control method of intelligent electric energy meter - Google Patents

The wireless communication and control method of intelligent electric energy meter Download PDF

Info

Publication number
CN104916105B
CN104916105B CN201510258719.XA CN201510258719A CN104916105B CN 104916105 B CN104916105 B CN 104916105B CN 201510258719 A CN201510258719 A CN 201510258719A CN 104916105 B CN104916105 B CN 104916105B
Authority
CN
China
Prior art keywords
electric energy
intelligent electric
energy meter
manual intervention
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510258719.XA
Other languages
Chinese (zh)
Other versions
CN104916105A (en
Inventor
邵泽华
向海堂
吴岳飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meishan Qinchuan Intelligent Sensor Co ltd
Original Assignee
Chengdu Qinchuan IoT Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Qinchuan IoT Technology Co Ltd filed Critical Chengdu Qinchuan IoT Technology Co Ltd
Priority to CN201510258719.XA priority Critical patent/CN104916105B/en
Publication of CN104916105A publication Critical patent/CN104916105A/en
Application granted granted Critical
Publication of CN104916105B publication Critical patent/CN104916105B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the wireless communication of intelligent electric energy meter and control methods, are used for the interactive communication between multiple intelligent electric energy meters and main website management system and control, include the following steps, S1:Intelligent electric energy meter manages system upload information by uplink time section under setting condition to main website;S2:Intelligent electric energy meter receives the return information that main website management system is sent out;S3:Intelligent electric energy meter handles return information;S4:Intelligent electric energy meter returns to response message to main website management system;Setting condition described in step S1 includes that the condition of manual intervention and intelligent electric energy meter impose a condition automatically, and the uplink time section includes the first manual intervention uplink time section and the automatic uplink time section of intelligent electric energy meter;Under manual intervention setting condition, intelligent electric energy meter uploads in real time;In the case where intelligent electric energy meter imposes a condition automatically, intelligent electric energy meter manages the automatic upload information of system to main website, and the automatic uplink time section of intelligent electric energy meter is divided into n timeslice Tslot, every intelligent electric energy meter one regular time piece of correspondence.

Description

The wireless communication and control method of intelligent electric energy meter
Technical field
The present invention relates to intelligent electric energy meter fields, more particularly to the wireless communication and controlling party of a kind of intelligent electric energy meter Method.
Background technology
With the continuous development of Internet of Things, sensor technology, the not no remote meter reading of the intelligent electric energy meter of externally fed, remote The functions such as journey intelligent management, long-distance intelligent control are increasingly taken seriously, and wireless communication technique will be in these intelligent electric energy meters Play the role of in the remote control management very important.Remote wireless management system is by main website management system, concentrator, repeater Formed with multiple intelligent electric energy meters, intelligent electric energy meter since not lasting external electric energy is supplied, these intelligent electric energy meters it is remote Thread management, remote control etc. can only rely on the offers power supplies such as battery, solar panel therefore in communication process, only to disappear The power consumption for consuming polar region, just can make battery etc. for electric original copy long-term work.
Existing wireless communication technique, mainly by the way of Remote Wake Up, the wireless module at table end is connected to intelligent electricity Can be on the sensor of table, various information for acquiring intelligent electric energy meter simultaneously store, the most of the time all in sleep state, when When sensor has signal to come in, module is waken up, and upload information.Though the module most of the time is in sleep state, need Continual to wake up automatically, whether the detection external world has wake-up signal, once having detected wake-up signal, it will be waken up, and hold Row relevant operation.Since existing common arousal method receiving time is long, and intelligent electric energy meter needs uninterruptedly detect whether automatically There is wake-up signal, causes power consumption big.
Further, some intelligent electric energy meters do not use wake-up mechanism, but timing is sent from trend main website management system Information, although saving power consumption in this way, there are still some drawbacks:Two or more instrument are easy when sending information There is information collision, causes main website management system that can not accurately receive the information of multiple intelligent electric energy meters.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of wireless communication of intelligent electric energy meter and controls Method, power consumption is big when the solution prior art wirelessly communicates, and information collision etc. easily occurs when multiple intelligent electric energy meters communicate simultaneously and asks Topic.
The purpose of the present invention is achieved through the following technical solutions:The wireless communication and controlling party of intelligent electric energy meter Method is used for the interactive communication between n intelligent electric energy meter and main website management system and control, and intelligent electric energy meter is under setting condition By uplink time section information is sent to main website management system.
The setting condition includes that intelligent electric energy meter imposes a condition automatically, the uplink time section include intelligent electric energy meter from Dynamic uplink time section.
In the case where intelligent electric energy meter imposes a condition automatically, in the automatic uplink time section of intelligent electric energy meter, intelligent electric energy meter master Trend main website manages system and sends automatic upload information, and the automatic uplink time section of intelligent electric energy meter is divided into n timeslice Tslot, one regular time piece T of every intelligent electric energy meter correspondenceslot, when fixed corresponding to it of every intelligent electric energy meter Between piece Tslot, send automatic upload information to main website management system, wherein n is natural number.
The setting condition further includes that manual intervention imposes a condition, and the uplink time section further includes in the first manual intervention The period is passed, under manual intervention setting condition, in the first manual intervention uplink time section, intelligent electric energy meter is in real time to main website Management system sends manual intervention information.
The timeslice TslotExist including single automatic uplink period and reserved transmission period, intelligent electric energy meter The single automatic uplink period actively sends automatic upload information, single automatic uplink time to main website management system The length of section is Tt, each timeslice TslotLength be at least time TtM times, i.e. Tslot≥mTt, m >=1.
The single automatic uplink period is timeslice TslotIn m-th of time Tt
The reserved transmission period is timeslice TslotIn the 1~m -1 time Tt
The setting condition further includes that manual intervention imposes a condition, and the reserved transmission period includes that manual intervention is kept out of the way Period, in manual intervention back off time section and single automatic uplink period, intelligent electric energy meter cannot be to main website pipe Reason system sends manual intervention information, and generated manual intervention information delay etc. is to be sent at this time.
The manual intervention back off time section is timeslice TslotIn m -1 time Tt
The reserved transmission period further includes the second manual intervention uplink time section, under manual intervention setting condition, In the second manual intervention uplink time section, intelligent electric energy meter sends manual intervention information to main website management system.
The second manual intervention uplink time section is timeslice TslotIn the 1~m -2 time Tt
It includes that automatic upload, return of the intelligent electric energy meter in setting time are believed that the intelligent electric energy meter imposes a condition automatically Automatic upload under breath treated response passback and intelligent electric energy meter abnormal conditions.
The single automatic uplink period includes intelligent electric energy meter active upload information time Ts1, intelligent electric energy meter Dormancy time T after active upload informationx1, intelligent electric energy meter receive return information receiving time Tr, intelligent electric energy meter processing The processing time T of return informationx2The time of return T of response message is sent with intelligent electric energy meters2
The beneficial effects of the invention are as follows:
1)When System production time is divided into the first manual intervention uplink time section by the present invention, intelligent electric energy meter uploads automatically Between section implement manual intervention and keep out of the way upload and when the automatic upload procedure of intelligent electric energy meter encounters manual intervention.
2)In the first manual intervention uplink time section, for intelligent electric energy meter under the conditions of manual intervention, direct upload information is simultaneously It is communicated, ensure that the real-time of communication, and the case where be not in intelligent electric energy meter active bubbling upload information, reduced Collision problem even is avoided, ensure that the stabilization of communication and reliable;
3)Intelligent electric energy meter after the automatic uplink time section of intelligent electric energy meter, bubble sort in the timeslice of distribution from Dynamic upload information, on the one hand reduces power consumption, on the other hand solves the collision problem that multiple intelligent electric energy meters are uploaded without sequence, And system command can also be received after automatic upload, ensure that the real-time communicated between system;
4)Intelligent electric energy meter after the automatic uplink time section of intelligent electric energy meter, bubble sort is in the feelings for manual intervention occur When condition, upload is kept out of the way by manual intervention, on the one hand ensure that on the other hand the promptness of manual intervention requirement communication is also kept away Communication collision problem caused by artificial not timing intervention uploads is exempted from.
Description of the drawings
Fig. 1 is the flow diagram of intelligent electric energy meter of the present invention wireless communication and control method;
Fig. 2 is the uplink time section sequence diagram of intelligent electric energy meter upload information of the present invention;
Fig. 3 is the sequence diagram of the automatic uplink time section of intelligent electric energy meter of the present invention;
Fig. 4 is the automatic uplink time T of intelligent electric energy meter single of the present inventiontSequence diagram.
Specific implementation mode
Technical scheme of the present invention is described in further detail below in conjunction with the accompanying drawings, but protection scope of the present invention is not limited to It is as described below.
As shown in Figure 1, a kind of intelligent electric energy meter wireless communication proposed by the present invention and control method, are suitable for n intelligence Interactive communication between electric energy meter and main website management system and control, wherein n is natural number.
The wireless communication and control method include the following steps:
S1:Intelligent electric energy meter manages system upload information by uplink time section under setting condition to main website;
S2:Intelligent electric energy meter receives the return information that main website management system is sent out;
S3:Intelligent electric energy meter handles return information;
S4:Intelligent electric energy meter returns to response message to main website management system.
Setting condition described in step S1 includes that manual intervention setting condition and intelligent electric energy meter impose a condition automatically.
Wherein, manual intervention condition specifically may include:The artificial inquiry button pressed on intelligent electric energy meter or to intelligence Electric energy meter such as is powered off, is powered at the operations.
Intelligent electric energy meter imposes a condition automatically specifically may include:Intelligent electric energy meter in setting time it is automatic upload, Automatic upload under return information treated response passback and intelligent electric energy meter abnormal conditions.The intelligent electric energy meter exception feelings Condition may include:Low voltage conditions, high voltage situation, power down situation and magnetic disturbance situation etc..
As shown in Fig. 2, Fig. 2 is the uplink time section sequence diagram of intelligent electric energy meter upload information of the present invention, intelligent electric energy meter The uplink time section that system upload information is managed to main website includes that the first manual intervention uplink time section and intelligent electric energy meter are automatic Uplink time section.
Under manual intervention setting condition, in the first manual intervention uplink time section, intelligent electric energy meter is in real time to main website Management system sends manual intervention information.
In the case where intelligent electric energy meter imposes a condition automatically, in the automatic uplink time section of intelligent electric energy meter, intelligent electric energy meter master Trend main website manages system and sends automatic upload information.
In step S1, when triggering manual intervention condition, that is, occur manually to press intelligent electric energy meter inquiry button or to intelligence Can electric energy meter when the operations such as being powered on, powered off, intelligent electric energy meter is managed to main website at the uplink time section of system upload information In the first manual intervention uplink time section, intelligent electric energy meter is not delayed waiting directly to main website management system transmission manual intervention letter Breath.
In step S1, when triggering intelligent electric energy meter imposes a condition automatically, intelligent electric energy meter is uploaded to main website management system The uplink time section of information is in the automatic uplink time section of intelligent electric energy meter.
As shown in figure 3, intelligent electric energy meter sends automatic upload information to main website management system, using bubble sort upload side The automatic uplink time section of intelligent electric energy meter is divided into n timeslice T by formulaslot, n >=1, quantity n and the intelligence electric energy of timeslice The quantity n of table is identical, and every intelligent electric energy meter corresponds to a regular time piece Tslot, i.e. in n intelligent electric energy meter, every intelligence It can regular time piece T of the electric energy meter corresponding to itslot, automatic upload information is sent to main website management system.
The timeslice TslotExist including single automatic uplink period and reserved transmission period, intelligent electric energy meter The single automatic uplink period actively sends automatic upload information, single automatic uplink time to main website management system The length of section is Tt, each timeslice TslotLength be at least time TtM times, i.e. Tslot≥mTt, m >=1, each timeslice TslotIt is T including m time spantPeriod.
Transmission period is reserved in setting, to ensure that intelligent electric energy meter uploads automatically in intelligent electric energy meter in practical applications Information transfer process in period, when triggering manual intervention condition, to need the information uploaded reserved in the case of manual intervention Enough information transmission spaces, and then mutual interference is avoided, and improve intelligent electric energy meter and moved back under the conditions of manual intervention Keep away the real-time of the information exchange of upload.
Transmission period is reserved in setting, is reserved when being on the one hand to need upload information in the case of manual intervention, another party Face is that other occur reserving such as the case where to prevent alternate covering, two kinds of situations that however, it is not limited to this.
The reserved transmission period includes manual intervention back off time section, manual intervention back off time section and single from In the dynamic uplink period, intelligent electric energy meter cannot manage system to main website and send manual intervention information, generated at this time Manual intervention information delay etc. is to be sent.
The reserved transmission period further includes the second manual intervention uplink time section, under manual intervention setting condition, In the second manual intervention uplink time section, intelligent electric energy meter sends manual intervention information to main website management system.
The single automatic uplink period is timeslice TslotIn m-th of time Tt
The reserved transmission period is timeslice TslotIn the 1~m -1 time Tt
The manual intervention back off time section is timeslice TslotIn m -1 time Tt
The second manual intervention uplink time section is timeslice TslotIn the 1~m -2 time Tt
As m=1, each timeslice T in the automatic uplink time section of intelligent electric energy meterslotOnly include that a single is automatic The uplink period.
As m=2, each timeslice T in the automatic uplink time section of intelligent electric energy meterslotIncluding a single it is automatic on Pass call duration time section and a manual intervention back off time section, wherein the 1st period Tt1For manual intervention back off time section, 2nd period Tt2For the single automatic uplink period.
As m=3, each timeslice T in the automatic uplink time section of intelligent electric energy meterslotIncluding a single it is automatic on Pass call duration time section, a manual intervention back off time section and a second manual intervention uplink time section, wherein at the 1st Between section Tt1For the second manual intervention uplink time section, the 2nd period Tt2For manual intervention back off time section, the 3rd period Tt3For the single automatic uplink period.
Work as m>When 3, each timeslice T in the automatic uplink time section of intelligent electric energy meterslotIncluding a single it is automatic on Pass call duration time section, a manual intervention back off time section and a second manual intervention uplink time section, wherein 1~m -2 A period Tt1~Ttm–2For the second manual intervention uplink time section, m -1 period Ttm–1For manual intervention back off time Section, m-th of period Tt mFor the single automatic uplink period.
As shown in figure 4, the single automatic uplink period includes intelligent electric energy meter active upload information time Ts1, intelligence Dormancy time T after electric energy meter active upload informationx1, intelligent electric energy meter receive return information receiving time Tr, intelligent electric energy The processing time T of list processing return informationx2The time of return T of response message is sent with intelligent electric energy meters2
In practical application, timeslice TslotIt should be greater than upload information time Ts1, dormancy time Tx1, receiving time Tr, processing Time Tx2With time of return Ts2The sum of, i.e. Tslot≥mTt=m(Ts1+Tx1+Tr+Tx2+Ts2), timeslice TslotOccurrence need root Different according to the setting of system redundancy, general m values are more than or equal to 3, timeslice TslotGenerally 3 times or more time Tt
As one embodiment, in step S1, in the automatic uplink time section of intelligent electric energy meter, intelligent electric energy meter is to main website pipe When the automatic upload information of reason system, the timeslice T where oneself can be used directlyslotIn the automatic uplink time T of m-th of singlet Communication is interacted, timeslice TslotIn the 1st to the m-1 automatic uplink time T of singletAs reserved transmission space.
In the automatic uplink time section of intelligent electric energy meter, if triggering manual intervention condition, when needing to upload manual intervention information, The time of system is managed according to main website to judge timeslice T that the intelligent electric energy meter is presently in firstslot, and in the time Piece TslotIn which period TtIt is interior, if being in m-th of TtOr the m-1 period TtIt is interior, then intelligent electric energy meter institute The manual intervention information to be uploaded delay waits until the occupied timeslice T of next intelligent electric energy meterslotInterior the 1st A period Tt1, manual intervention upload information just starts to upload, otherwise directly starts to communicate, i.e., current time is in the 1st extremely The m-2 TtIn period, manual intervention information directly starts to upload to main website management system.
Upload information includes described in step S1:Device id, ordered state, timeslice ID, the intelligence electricity of intelligent electric energy meter It can list time automatic uplink time ID and intelligent electric energy meter state etc..
In the state that multiple intelligent electric energy meters are unsorted, ordered state 0, timeslice ID is 0, intelligent electric energy meter single Automatic uplink time ID is 0.
Under multiple intelligent electric energy meter ordered states, ordered state is non-zero, and timeslice ID is distributed by system, intelligent electric energy meter Single automatic uplink time ID is Tslot/TtQuotient.
Intelligent electric energy meter state includes:Electric energy meter remaining sum supplements number, period accumulative electricity consumption, valve state, battery electricity with money Amount, whether super stream, whether in high pressure, whether by magnetic disturbance, whether time-out, valve exception information, force pass valve etc..
In step S2, intelligent electric energy meter is in the first manual intervention uplink time section, in the initial state, intelligent electric energy meter In unsorted state, one section fixed dormancy time T of intelligent electric energy meter after the completion of upload informationx1, wherein dormancy time Tx1Including intelligent electric energy meter to concentrator, concentrator to main website manages the communication time of system, but is not arrived including intelligent electric energy meter The communication time of repeater, because under unsorted state, main website management system has no knowledge about whether intelligent electric energy meter is connected with Repeater;If being in ordered state, each intelligent electric energy meter according to oneself sequencing information to determine whether there is repeater information, And further determine that its sleep time, if non-relay device information, which is Tx1If there is repeater information, should stop A length of T when dormancyx1+TREG, wherein TREGFor the communication time of intelligent electric energy meter to repeater, when one section of the intelligent electric energy meter suspend mode Between after enter reception state.
In step S2, if intelligent electric energy meter receives the receiving time T of return information in intelligent electric energy meterrIt is interior, intelligent electric energy Table receives the return information that main website management system is sent out, then continues in step S3 and step S4 after execution, the intelligent electric energy meter one Directly in a dormant state.
In step S3, intelligent electric energy meter handles it and receives return information, at the wireless communication module of the intelligent electric energy meter In dormant state, dormancy time is handled the processing time T of return information by intelligent electric energy meterx2It determines, intelligent electric energy meter processing After complete return information, terminate dormant state, executes step S4.
The return information that intelligent electric energy meter receives in step S3 includes:It opens an account information, charging information, Query Information, tune Valence information, synchronised clock information, valve opening information, pass valve information etc..
In step S4, intelligent electric energy meter returns to response message to main website management system, which sends response letter The time of return T of breaths2It is automatically determined according to the length of return information by intelligent electric energy meter, intelligent electric energy meter is sending response letter Automatically into suspend mode after breath.
The response message that intelligent electric energy meter returns in step S4 includes device id, ordered state, timeslice ID, intelligent electric energy The information such as list time automatic uplink time ID, intelligent electric energy meter state, instruction execution state.

Claims (7)

1. the wireless communication and control method of intelligent electric energy meter, for the friendship between n intelligent electric energy meter and main website management system Mutual communication and control, it is characterised in that:Intelligent electric energy meter is sent by uplink time section to main website management system under setting condition Information;
The setting condition includes that intelligent electric energy meter imposes a condition automatically, and the uplink time section includes on intelligent electric energy meter is automatic Pass the period;
In the case where intelligent electric energy meter imposes a condition automatically, in the automatic uplink time section of intelligent electric energy meter, intelligent electric energy meter actively to Main website manages system and sends automatic upload information, and the automatic uplink time section of intelligent electric energy meter is divided into n timeslice Tslot, Every intelligent electric energy meter corresponds to a regular time piece Tslot, regular time piece of the every intelligent electric energy meter corresponding to it Tslot, send automatic upload information to main website management system, wherein n is natural number;
The setting condition further includes that manual intervention imposes a condition, when the uplink time section further includes that the first manual intervention uploads Between section, manual intervention setting condition under, in the first manual intervention uplink time section, intelligent electric energy meter is in real time to main website management System sends manual intervention information.
2. the wireless communication and control method of intelligent electric energy meter according to claim 1, it is characterised in that:The timeslice TslotIncluding single automatic uplink period and reserved transmission period, intelligent electric energy meter is in the automatic uplink of single Between section actively send automatic upload information to main website management system, the length of single automatic uplink period is Tt, each Timeslice TslotLength be at least time TtM times, i.e. Tslot≥mTt, m >=1.
3. the wireless communication and control method of intelligent electric energy meter according to claim 2, it is characterised in that:The setting item Part further includes that manual intervention imposes a condition, and the reserved transmission period includes manual intervention back off time section, in manual intervention In back off time section and single automatic uplink period, intelligent electric energy meter cannot manage system to main website and send manual intervention Information, generated manual intervention information delay etc. is to be sent at this time.
4. the wireless communication and control method of intelligent electric energy meter according to claim 3, it is characterised in that:It is described pre- to hand down to posterity The defeated period further includes the second manual intervention uplink time section, under manual intervention setting condition, is uploaded in the second manual intervention In period, intelligent electric energy meter sends manual intervention information to main website management system.
5. the wireless communication and control method of intelligent electric energy meter according to claim 1, it is characterised in that:The intelligence electricity Can table to impose a condition automatically include that automatic in setting time of intelligent electric energy meter uploads, return information treated response returns With the automatic upload under intelligent electric energy meter abnormal conditions.
6. the wireless communication and control method of intelligent electric energy meter according to claim 2, it is characterised in that:The single is certainly The dynamic uplink period includes intelligent electric energy meter active upload information time Ts1, stopping after intelligent electric energy meter active upload information Sleep time Tx1, intelligent electric energy meter receive return information receiving time Tr, intelligent electric energy meter processing return information processing time Tx2The time of return T of response message is sent with intelligent electric energy meters2
7. the wireless communication and control method of intelligent electric energy meter according to claim 4, it is characterised in that:
The single automatic uplink period is timeslice TslotIn m-th of time Tt
The reserved transmission period is timeslice TslotIn the 1~m -1 time Tt
The manual intervention back off time section is timeslice TslotIn m -1 time Tt
The second manual intervention uplink time section is timeslice TslotIn the 1~m -2 time Tt
CN201510258719.XA 2015-05-20 2015-05-20 The wireless communication and control method of intelligent electric energy meter Active CN104916105B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510258719.XA CN104916105B (en) 2015-05-20 2015-05-20 The wireless communication and control method of intelligent electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510258719.XA CN104916105B (en) 2015-05-20 2015-05-20 The wireless communication and control method of intelligent electric energy meter

Publications (2)

Publication Number Publication Date
CN104916105A CN104916105A (en) 2015-09-16
CN104916105B true CN104916105B (en) 2018-07-31

Family

ID=54085138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510258719.XA Active CN104916105B (en) 2015-05-20 2015-05-20 The wireless communication and control method of intelligent electric energy meter

Country Status (1)

Country Link
CN (1) CN104916105B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109118656B (en) * 2018-08-20 2021-09-14 成都博高信息技术股份有限公司 Intelligent meter and energy control center

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101025784A (en) * 2007-03-23 2007-08-29 东莞市太平洋计算机科技有限公司 Active RFID system anti-collision method
CN102612124A (en) * 2012-03-15 2012-07-25 成都秦川科技发展有限公司 Communication method of Internet of Things
CN103186973A (en) * 2011-12-28 2013-07-03 深圳市华奥通通信技术有限公司 Wireless meter reading method and system
CN104009829A (en) * 2014-06-11 2014-08-27 沈阳中科博微自动化技术有限公司 Wireless network retransmission algorithm of intelligent meter reading system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8477830B2 (en) * 2008-03-18 2013-07-02 On-Ramp Wireless, Inc. Light monitoring system using a random phase multiple access system
CN102905389B (en) * 2011-07-28 2015-05-06 华为技术有限公司 Access control method and device
CN103559785A (en) * 2013-11-14 2014-02-05 西安亮丽仪器仪表有限责任公司 Automatic meter reading method by using micropower wireless module

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101025784A (en) * 2007-03-23 2007-08-29 东莞市太平洋计算机科技有限公司 Active RFID system anti-collision method
CN103186973A (en) * 2011-12-28 2013-07-03 深圳市华奥通通信技术有限公司 Wireless meter reading method and system
CN102612124A (en) * 2012-03-15 2012-07-25 成都秦川科技发展有限公司 Communication method of Internet of Things
CN104009829A (en) * 2014-06-11 2014-08-27 沈阳中科博微自动化技术有限公司 Wireless network retransmission algorithm of intelligent meter reading system

Also Published As

Publication number Publication date
CN104916105A (en) 2015-09-16

Similar Documents

Publication Publication Date Title
CN105388991B (en) Timing wake-up processing system and method
CN101802750B (en) Apparatus and method for reducing power consumption in system on chip
CN104916102B (en) The wireless communication and control method of intelligent gas meter
CN109976501A (en) A kind of Low-power-consumptiocontrol control method, device, system and storage medium
CN108777862B (en) Bluetooth transmission method, Bluetooth controller and Bluetooth device
TWI417731B (en) Bus-handling device and method
CN101387896B (en) Method and device for implementing system-on-chip wake and sleep function in SOC
CN104916104B (en) The wireless communication and control method of intellectual water meter
CN104916103B (en) The wireless communication and control method of intelligence instrument
CN104916105B (en) The wireless communication and control method of intelligent electric energy meter
CN104780596A (en) Communication method, communication device and communication system capable of realizing ultra-low power consumption
CN105022469A (en) Portable electronic device and core swapping method thereof
CN104916106B (en) The wireless communication and control method of intellectual heat meter
CN205450962U (en) Energy -conserving computery
CN106972498B (en) Power demand response control system and load control method thereof
CN103809727B (en) The power-saving processing method of a kind of mobile terminal, system and mobile terminal
CN106331805B (en) A kind of method and system for realizing low power consumption control intelligent TV set
CN201821085U (en) Self-power-supply protection device for power transmission and distribution circuit
Zheng et al. Design and implementation of the CNC monitoring system based on Internet of Things
CN104536840B (en) A kind of Watch Dog Timer and its control method
TWI409606B (en) Solar energy control system
CN209642666U (en) A kind of low-power consumption short distance half-duplex Power Carrier telecommunication circuit
CN103632518B (en) USB wireless network connections equipment, onboard system and its awakening method
CN106998508B (en) ONU (optical network unit) state transition method and ONU
CN101976884B (en) Self-powdered protection device for power transmission and distribution lines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610199 Longquanyi, Sichuan Province Industrial Park licensing

Applicant after: CHENGDU QINCHUAN IOT TECHNOLOGY Co.,Ltd.

Address before: 610199 Longquanyi, Sichuan Province Industrial Park licensing

Applicant before: CHENGDU QINCHUAN TECHNOLOGY DEVELOPMENT Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221012

Address after: South District, Ganmei Industrial Park, Dongpo District, Meishan City, Sichuan Province, 610000

Patentee after: Meishan Qinchuan Intelligent Sensor Co.,Ltd.

Address before: 610199 Jiepai Industrial Park, Longquanyi District, Chengdu, Sichuan

Patentee before: CHENGDU QINCHUAN IOT TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right