CN104914823A - Operation and maintenance time efficiency management method facing sewage plant - Google Patents

Operation and maintenance time efficiency management method facing sewage plant Download PDF

Info

Publication number
CN104914823A
CN104914823A CN201510186440.5A CN201510186440A CN104914823A CN 104914823 A CN104914823 A CN 104914823A CN 201510186440 A CN201510186440 A CN 201510186440A CN 104914823 A CN104914823 A CN 104914823A
Authority
CN
China
Prior art keywords
equipment
sewage plant
fault
situation
management method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510186440.5A
Other languages
Chinese (zh)
Inventor
童飞
阮俊斌
杜春红
王俊媛
杜兴治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shi Dongkou Sewage Treatment Plant Of Shanghai Chengtou Sewage Management Co Ltd
Original Assignee
Shi Dongkou Sewage Treatment Plant Of Shanghai Chengtou Sewage Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shi Dongkou Sewage Treatment Plant Of Shanghai Chengtou Sewage Management Co Ltd filed Critical Shi Dongkou Sewage Treatment Plant Of Shanghai Chengtou Sewage Management Co Ltd
Priority to CN201510186440.5A priority Critical patent/CN104914823A/en
Publication of CN104914823A publication Critical patent/CN104914823A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an operation and maintenance time efficiency management method facing a sewage plant. All equipment records of the sewage plant are put into a system to achieve interactive sharing, and the system acquires a parameter set by equipment, a usage state and repairing and maintenance states in real time; and a management method of a contingency plan is increased on the basis of conventional routing inspection, remote distribution of an emergency work order is achieved, recording and feedback are performed on an equipment fault, a time efficiency system can satisfy a requirement for timely and effective communication between personnel, who maintain and handle the equipment fault and a data abnormity, and a monitoring system, and an unmanned management method of the process operation monitoring process of the sewage plant is achieved. The method saves labor cost, improves working efficiency, and enables monitoring work to be performed in a more standard and orderly manner.

Description

Towards Sewage Plant O&M aging management method
Technical field
The present invention relates to a kind of device management method, particularly a kind of method of the prescriptive jurisdiction be applicable in sewage treatment plant's equipment control and operation maintenance process.
Background technology
Sewage treatment plant is by automatically-monitored software monitors production run, according to Central Control Room instruction, the equipment such as inlet pumping station, fan blower, dehydration machine room are controlled, and the parameters in equipment running process and historical data are reached in server by fieldbus.The production of Sewage Plant, machinery, electrically, instrument, PLC device be of a great variety, requires higher to the maintenance of equipment and maintenance, the various kinds of equipment of effective management Sewage Plant to the normal operation ensureing sewage treatment plant, important effect of increasing work efficiency.
Under normal circumstances, sewage treatment plant can according to the needs of actual motion, inevitable needs are transformed local, so most Sewage Plant exists the history upgrading and transform, the equipment simultaneously run there will be the problems such as fault after there is longer, the long-time use of life cycle.For ensureing the normal operation of equipment, most Sewage Plant carries out patrolling and examining and management of equipment by artificial mode, technician needs to carry out maintenance by working experience and to the account of the history understanding of equipment to equipment, fix a breakdown, the hidden danger that may exist during equipment oepration at full load is processed in time simultaneously, this work also has higher requirement to the staff in post, but the social mobility of personnel is relatively large at present, also brings adverse influence to equipment routing inspection and management etc.
Summary of the invention
The present invention be directed to sewage treatment plant's device category various, safeguard and maintenance require high problem, propose a kind of towards Sewage Plant O&M aging management method, system is supervised by information-based means are auxiliary, realizes unmanned management and the maintenance of the equipment situation of Sewage Plant.
Technical scheme of the present invention is: a kind of towards Sewage Plant O&M aging management method, specifically comprises the steps:
1) system of being put into by Sewage Plant all devices record realizes mutual sharing, the parameter that system Real-time Collection equipment sets, using state, maintenance and maintaining state;
2) system is carried out routine and is patrolled and examined, and carries out conventional operation and data registration according to the testing requirement of each equipment;
3) break down report to the police or collect abnormal data time, carry out emergency treatment as accident, call emergency preplan management, facility information is judged, information is sent to the personnel of administering and maintaining, according to occur processing scheme carry out accident process.
Described emergency preplan supervisory packet is reported to the police containing unit exception, device analysis is evaluated, initiate emergency plan database,
Unit exception alarm criteria equipment situation is carried out classification and is stored, manages, programming count warning quantity, supervises staff's state and the equipment obstacle management situation of receiving a crime report simultaneously;
Device analysis evaluation is after device failure alert, according to concrete equipment and trouble spot situation, the impact of the sewage treatment process that analytical equipment fault is brought, make equipment failure grade in time to judge, high-grade fault directly can be sent to the upper management department of Sewage Plant, ordinary failures information is sent to patrol officer in time, and initiate emergency plan instructs patrol officer's very first time remover apparatus fault, prevents the generation of below standard sewage discharge situation;
Emergency preplan database is that the fault that may occur for equipment pre-establishes countermeasure and preparedness plan, implementing measure displays by the form of emergency preplan with digital file in infosystem, database is worked out with reference to typical unit exception data processing scheme, by the scheme write into Databasce of maturation according to the situation of fault.
Beneficial effect of the present invention is: the present invention is towards Sewage Plant O&M aging management method, the basis that routine is patrolled and examined increases the management method of emergency preplan, realization is met an urgent need, and work order is long-range to be distributed, equipment failure is recorded and feeds back, aging system can meet the demand of equipment failure and data exception overhaul plan personnel and the timely and effective communication of supervisory system, realize the unmanned management method of Sewage Plant process operation monitor procedure, the method saves human cost, increase work efficiency, make the carrying out that monitoring work is more standardized and orderly.
Embodiment
For realizing the unmanned prescriptive jurisdiction pattern in device management process, first carry out perfect to centralized control system, the various kinds of equipment information of sewage treatment plant is recorded in system and realizes mutual sharing, and to the parameter situation of equipment, using state, maintenance and maintaining monitoring state and analysis.On perfect device systems basis, implement on-the-spot personal management system, give full play to the effect of prescriptive jurisdiction method.
Conventional system of patrolling and examining formulates the plan of plant maintenance work order when Sewage Plant carries out information system management according to the situation of each equipment, feature and working time, failure condition and maintenance regulation usually, staff carries out routine according to work order execution information guiding and patrols and examines and equipment operating, the way to manage of work order does not need staff to carry out real-time monitoring to operation state, optimizes the personnel depaly of sewage treatment plant.
When accident, the emergency preplan management mode of KXG is triggered, Emergency system comprises reception and the transmission of the warning message of abnormal conditions, and abnormal data information is managed, the information such as when receiving device failure alert information, the database by emergency preplan is made a response rapidly, the kind of foundation equipment judge, information is sent to related management and patrol officer, in the putting on record of experts database, chooses the situation of suitable solution reply burst.
Emergency preplan management mainly comprises unit exception warning, device analysis evaluation, initiate emergency plan database.
Unit exception is reported to the police and be can be implemented in each alarm procedure, carries out classification and stores, manages, programming count warning quantity, supervise staff's state and the equipment obstacle management situation of receiving a crime report simultaneously according to equipment situation.
After device analysis evaluation can be implemented in device failure alert, according to concrete equipment and trouble spot situation, the impact of the sewage treatment process that analytical equipment fault is brought, make equipment failure grade in time to judge, high-grade fault directly can be sent to the upper management department of Sewage Plant, ordinary failures information is sent to patrol officer in time, and initiate emergency plan instructs patrol officer's very first time remover apparatus fault, prevents the generation of the situations such as below standard sewage discharge.
Emergency preplan database is that the fault that may occur for equipment pre-establishes countermeasure and preparedness plan, implementing measure displays by the form of emergency preplan with digital file in infosystem, database is worked out with reference to typical unit exception data processing scheme, by the scheme write into Databasce of maturation according to the situation of fault.When fault occurs, system call emergency preplan database, is directly sent to patrol officer on duty by failure condition and processing scheme and processes.
Can be optimized the process operation process of supervision of sewage treatment plant by the enforcement of the program, general headquarters managerial personnel can see the real-time working condition of equipment by supervisory system.The management of Sewage Plant layer coordinates emergency preplan to manage monitoring by patrolling and examining of routine, and each Sewage Plant only need be equipped with 1-2 name staff and patrol and examine, and substantially accomplishes the unmanned operation of sewage treatment plant, and optimizing personnel depaly is that human resources effectively utilize.
In the performance evaluation of personnel, the true operation situation of each Sewage Plant can be grasped in time by the monitoring of infosystem.Operation personnel's work of patrolling and examining is instructed, remote monitoring patrol officer performance with the form distributing work order; When there is the equipment failure of burst, unit exception is reported to the police to put on record and can be understood the efficiency of equipment failure situation and abnormal conditions process in time.Process of work and the efficiency of foundation operation personnel can carry out performance evaluation accurately to it.
At the beginning of 2015, this system is implementing 5 months in the new creek in Shanghai Songyuan south of the River portion, calm lakelet port, leaf pavilion three factory, and implementation result is obvious.After system monitoring method changes, the operation management personnel of this factory are changed 2 current people into by 8 original people and are patrolled and examined and failture evacuation.The enforcement of simultaneity factor effectively raises emergency response capability and the treatment effeciency of equipment catastrophic failure, reduces the personal management of full factory and runs the cost of supervision, substantially realizing the aging management method of wtp layer.

Claims (2)

1., towards a Sewage Plant O&M aging management method, it is characterized in that, specifically comprise the steps:
1) system of being put into by Sewage Plant all devices record realizes mutual sharing, the parameter that system Real-time Collection equipment sets, using state, maintenance and maintaining state;
2) system is carried out routine and is patrolled and examined, and carries out conventional operation and data registration according to the testing requirement of each equipment;
3) break down report to the police or collect abnormal data time, carry out emergency treatment as accident, call emergency preplan management, facility information is judged, information is sent to the personnel of administering and maintaining, according to occur processing scheme carry out accident process.
2. according to claim 1 towards Sewage Plant O&M prescriptive jurisdiction method, it is characterized in that, described emergency preplan supervisory packet reported to the police containing unit exception, device analysis is evaluated, initiate emergency plan database,
Unit exception alarm criteria equipment situation is carried out classification and is stored, manages, programming count warning quantity, supervises staff's state and the equipment obstacle management situation of receiving a crime report simultaneously;
Device analysis evaluation is after device failure alert, according to concrete equipment and trouble spot situation, the impact of the sewage treatment process that analytical equipment fault is brought, make equipment failure grade in time to judge, high-grade fault directly can be sent to the upper management department of Sewage Plant, ordinary failures information is sent to patrol officer in time, and initiate emergency plan instructs patrol officer's very first time remover apparatus fault, prevents the generation of below standard sewage discharge situation;
Emergency preplan database is that the fault that may occur for equipment pre-establishes countermeasure and preparedness plan, implementing measure displays by the form of emergency preplan with digital file in infosystem, database is worked out with reference to typical unit exception data processing scheme, by the scheme write into Databasce of maturation according to the situation of fault.
CN201510186440.5A 2015-04-20 2015-04-20 Operation and maintenance time efficiency management method facing sewage plant Pending CN104914823A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510186440.5A CN104914823A (en) 2015-04-20 2015-04-20 Operation and maintenance time efficiency management method facing sewage plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510186440.5A CN104914823A (en) 2015-04-20 2015-04-20 Operation and maintenance time efficiency management method facing sewage plant

Publications (1)

Publication Number Publication Date
CN104914823A true CN104914823A (en) 2015-09-16

Family

ID=54083980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510186440.5A Pending CN104914823A (en) 2015-04-20 2015-04-20 Operation and maintenance time efficiency management method facing sewage plant

Country Status (1)

Country Link
CN (1) CN104914823A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108614510A (en) * 2018-05-30 2018-10-02 青岛城投双元水务有限公司 sewage plant operation management method and system
CN109709919A (en) * 2018-12-27 2019-05-03 上海城投污水处理有限公司曲阳污水处理厂 A kind of sewage plant area operation management system
CN109976270A (en) * 2019-02-28 2019-07-05 重庆工商大学 Municipal sewage treatment cloud management platform
CN111533290A (en) * 2020-04-30 2020-08-14 重庆市水务资产经营有限公司 Method for generating optimal operation plan library of sewage treatment process and applying complex scene
CN111813012A (en) * 2020-05-26 2020-10-23 广西益江环保科技股份有限公司 Rural sewage intelligence fortune dimension management system
CN111830871A (en) * 2020-07-14 2020-10-27 上海威派格智慧水务股份有限公司 Equipment abnormity automatic diagnosis system
CN112015128A (en) * 2019-05-30 2020-12-01 上海顺樊环保科技有限公司 Waste water purification handles uses thing networking cloud platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101182069A (en) * 2007-11-13 2008-05-21 清华大学 Oxidation ditch intelligent control system based on change of water entry
US20100228586A1 (en) * 2009-03-03 2010-09-09 Lloyd Frank Hay System and method of monitoring private utilities
CN103546536A (en) * 2013-08-28 2014-01-29 北京清控人居环境研究院有限公司 Internet of things system of sewage treatment plant
US20140214891A1 (en) * 2013-01-28 2014-07-31 Hadronex, Inc. Hierarchical user interface and functional apparatus
US20140325331A1 (en) * 2011-03-05 2014-10-30 Kapaleeswar Madireddi Form-based user-configurable process information system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101182069A (en) * 2007-11-13 2008-05-21 清华大学 Oxidation ditch intelligent control system based on change of water entry
US20100228586A1 (en) * 2009-03-03 2010-09-09 Lloyd Frank Hay System and method of monitoring private utilities
US20140325331A1 (en) * 2011-03-05 2014-10-30 Kapaleeswar Madireddi Form-based user-configurable process information system and method
US20140214891A1 (en) * 2013-01-28 2014-07-31 Hadronex, Inc. Hierarchical user interface and functional apparatus
CN103546536A (en) * 2013-08-28 2014-01-29 北京清控人居环境研究院有限公司 Internet of things system of sewage treatment plant

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108614510A (en) * 2018-05-30 2018-10-02 青岛城投双元水务有限公司 sewage plant operation management method and system
CN109709919A (en) * 2018-12-27 2019-05-03 上海城投污水处理有限公司曲阳污水处理厂 A kind of sewage plant area operation management system
CN109976270A (en) * 2019-02-28 2019-07-05 重庆工商大学 Municipal sewage treatment cloud management platform
CN112015128A (en) * 2019-05-30 2020-12-01 上海顺樊环保科技有限公司 Waste water purification handles uses thing networking cloud platform
CN111533290A (en) * 2020-04-30 2020-08-14 重庆市水务资产经营有限公司 Method for generating optimal operation plan library of sewage treatment process and applying complex scene
CN111813012A (en) * 2020-05-26 2020-10-23 广西益江环保科技股份有限公司 Rural sewage intelligence fortune dimension management system
CN111830871A (en) * 2020-07-14 2020-10-27 上海威派格智慧水务股份有限公司 Equipment abnormity automatic diagnosis system
CN111830871B (en) * 2020-07-14 2024-04-05 上海威派格智慧水务股份有限公司 Automatic equipment abnormality diagnosis system

Similar Documents

Publication Publication Date Title
CN104914823A (en) Operation and maintenance time efficiency management method facing sewage plant
CN106655522B (en) A kind of main station system suitable for electric grid secondary equipment operation management
US10013866B2 (en) Production equipment monitoring method and system
CN109450098A (en) Power regulation integral system warning information optimization method
CN105049223B (en) A kind of power telecom network defect troubleshooting decision assistant analysis method
CN110033186A (en) A kind of huge hydroelectric power plant's intelligence prison disc system
CN105491125A (en) Air conditioner fault alarming and repairing system and air conditioner fault alarming and repairing method
CN109599948A (en) Power regulation integral system intelligent alarm method
CN109639477A (en) A kind of secondary device in-service monitoring and analysis system and method
CN104639587A (en) Robot fault monitoring system and method based on Internet of Things
CN204496241U (en) Based on the PLC long distance control system in high in the clouds
CN103325019A (en) Event-driven power grid fault information judgment method
CN110161953A (en) A kind of Granulation Equipments intelligence control novel maintenance platform
CN112804106A (en) Intelligent operation and maintenance fault diagnosis and management method based on IMS
CN105743220A (en) Dispatching automation monitoring information analyzing and processing system and method
CN107545519A (en) A kind of power grid enterprises' fortune inspection management-control method
CN109100994A (en) A kind of production line for manufacturing battery method for real-time monitoring
CN102975745B (en) Preventative maintenance system and preventative maintenance method of subway signal system
CN204578209U (en) A kind of automation equipment condition intelligent on-line monitoring system
CN207748684U (en) One kind managing system based on Internet of Things intelligent remote monitoring fault diagnosis
CN115246609A (en) Elevator safety prevention and control cloud platform and operation state evaluation and processing method
CN104578423A (en) Intelligent online monitoring system for state of automation equipment
CN111722601A (en) Cement production line real-time monitoring system
CN115239227B (en) Production station monitoring method and system
CN104218680A (en) Real-time alarm system and communication method thereof for supervisory control and data acquisition (SCADA) system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150916