CN104850132B CN201510195591.7A CN201510195591A CN104850132B CN 104850132 B CN104850132 B CN 104850132B CN 201510195591 A CN201510195591 A CN 201510195591A CN 104850132 B CN104850132 B CN 104850132B
Authority
CN
China
Prior art keywords
mission payload
module
sent
multichannel
telecommand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510195591.7A
Other languages
Chinese (zh)
Other versions
CN104850132A (en
Inventor
周尹强
李德
李�杰
李杉格
卫海粟
孙虎胆
李道斌
范波翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Special Aircraft Systems Engineering Co., Ltd.
Original Assignee
In Dianke (deyang Guanghan) Special Aircraft System Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by In Dianke (deyang Guanghan) Special Aircraft System Engineering Co Ltd filed Critical In Dianke (deyang Guanghan) Special Aircraft System Engineering Co Ltd
Priority to CN201510195591.7A priority Critical patent/CN104850132B/en
Publication of CN104850132A publication Critical patent/CN104850132A/en
Application granted granted Critical
Publication of CN104850132B publication Critical patent/CN104850132B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The invention discloses a kind of multitask load management apparatus and method.The device includes navigation data processing module, navigation data distribution module, multichannel and can configure communication module, main control module, task data selecting module, task data processing module.The device can configure communication module using multichannel and the hardware interface of different task load be adapted to, and mission payload telecommand is decomposed and distributed by main control module, while being returned after the status data of comprehensive task load;The timesharing of task data all the way chosen using task data selecting module in multiple tasks load is returned;The distribution of navigation data and clock signal is completed using navigation data processing module and navigation data distribution module.Using the device of the present invention, the mission payload that is changed the outfit on unmanned plane different or when loading multiple tasks load simultaneously, the hardware or modification flight control and management software of original airborne equipment need not be changed, manpower and materials input is effectively reduced, significantly shortens system development cycle.

Description

A kind of multitask load management device and method
Technical field
The present invention relates to avionics field, more particularly to a kind of multitask load management device and method.
Background technology
With the increasingly maturation of unmanned air vehicle technique, its application field is more and more wider, and the task species of execution is also more and more, Such as scout, monitor, communication is relayed.Need to carry different tasks loads on unmanned plane when performing these different types of tasks Lotus, such as photoelectric platform, multifunction radar, aerial camera, communication trunking.Wherein, mission payload refers to be used to perform The equipment of certain task or function.
Fig. 1 is the structural representation of unmanned plane task management system of the prior art.As shown in figure 1, UAS In, control of the unmanned plane operator to the mission payload 6 on unmanned plane 5 is carried out by TTC channel.TTC channel includes ground Stand detection and control terminal 2 and airborne detection and control terminal 7, two channels are generally set up by radio link between the two:One low speed letter Road is used for the telecommand for uploading unmanned plane and the telemetry for passing unmanned plane down;Another IA High Speed Channel is used to pass task load down Infrared/the visible images and the SAR image of multifunction radar of the task data of lotus, such as photoelectric platform.
The flight remote control that unmanned plane operator is sent to flight control with managing computer 8 by earth station's computer 1 refers to Make and to the task telecommand of mission payload 6, airborne detection and control terminal 7 be sent to through radio link by earth station's detection and control terminal 2, Flight telecommand receives post processing with management computer 8 by flight control and performed, and task telecommand is again through flight control Send to mission payload 6 and perform after being handled with management computer 8.The telemetry of mission payload 6 be sent to first flight control with Computer 8 is managed, flight control and management computer 8 are comprehensive by the other telemetry parameters of the telemetry of mission payload 6 and unmanned plane Sent after closing packing by airborne detection and control terminal 7 through radio link to earth station's detection and control terminal 2, then through earth station's computer 1 In the control interface that unmanned plane operator is shown in after processing.The task data of mission payload 6 is directly passed through by airborne detection and control terminal 7 Radio link is sent to earth station's detection and control terminal 2, then carries out subsequent treatment by task data processing equipment 3.The work of mission payload 6 The navigation datas such as unmanned plane real-time attitude, position, ground velocity needed for making and clock signal (generally pps pulse per second signal) are by navigating System 9 is provided.
A frame unmanned plane is typically only capable to install a mission payload under the conditions of prior art, is mainly limited by following conditions: One is that flight control and management computer hardware interface resource are limited, generally only provides a hardware interface for mission payload;Two It is that airborne detection and control terminal is only mission payload and provided and passes channel under the task data of a hardware interface and a high speed;Three are Navigation system generally also only provides a hardware interface for mission payload.Above three hardware interface is under prior art conditions all It is to use point-to-point signal transmission form, so as to define that a frame unmanned plane can only install a mission payload.Due to difference The hardware interface of mission payload is usual and differs, and fly control and management computer, airborne detection and control terminal and navigation system The hardware interface type provided for mission payload can not be changed after determining, thus change the outfit different mission payloads when need to original The hardware interface of flight control and management computer, airborne detection and control terminal, navigation system or mission payload carries out certain repair Change.
In addition the communications protocol of different task load is there is also difference, for example baud rate, data bit format, data receiver and Transmission cycle, telecommand frame and telemetry frame format etc., are required to be controlled and handle by software.In existing skill Under the conditions of art, the software code relevant with mission payload is contained among flight control and management software mostly, mission payload Flight control and the modification of management software code will be caused by changing the outfit.If multiple tasks load is carried simultaneously, with mission payload Relevant software code necessarily increases, so as to increase flight control and the burden of management computer, and influences flight control and pipe Manage the real-time of software.
The function and performance of flight control and management software directly affect the flight safety of unmanned plane, are a kind of high securities With the embedded software of high real-time, belong to the critical software of UAS, even if simply to flight control and management software Potential safety hazard may also be brought, it is necessary to carry out perfect, high standard software test and verify to ensure by carrying out the modification of part Flight control and the security of management software, therefore larger manpower and materials can be brought to put into, while the required time cycle It is longer.In the case where keeping flight control and management software constant, if simply to the non-pass in mission payload management equipment Key software is modified, and corresponding software test and validation criteria requirement will be reduced substantially, required manpower and materials and time Cycle can also greatly reduce.
In summary, unmanned plane task management system of the prior art, due to being limited by prior art condition, nothing It is man-machine when carrying multiple-task load in the mission payload for changing the outfit different or simultaneously, existing equipment hardware and flight must be controlled Larger modification is carried out, it is necessary to put into substantial amounts of manpower and materials with management software, and spends the longer time cycle.
The content of the invention
It is an object of the invention to provide a kind of multitask load management device and method, can simultaneously it be carried on unmanned plane Multiple tasks load, subsequently without carrying out larger modification with management software to existing equipment hardware and flight control, saves people Power material resources and shortening lead time.
To achieve the above object, the invention provides following scheme:
A kind of multitask load management device, including navigation data distribution module (101), navigation data processing module (102), multichannel can configure communication module (103), main control module (104), task data selecting module (105), task data Processing module (106);
It is configurable logical that mission payload telecommand is first sent to the multichannel by flight control and management computer (8) Module (103) is interrogated, then generation is sent to the telecommand of each mission payload after the main control module (104) resolution process, Communication module (103) can configure by the multichannel again and be distributed to mission payload first (11), mission payload second (12) and task load Lotus third (13);
The telemetry of mission payload first (11), mission payload second (12) and mission payload third (13) is first sent to described more logical Road can configure communication module (103), again by the configurable communication mould of the multichannel after then being integrated through the main control module (104) Block (103) is sent to flight control and management computer (8);
The task data of the mission payload first (11), the mission payload second (12) and the mission payload third (13) is first First send to the task data selecting module (105), the main control module (104) calculates according to the flight control with management Wherein task data is sent to the task data processing module (106) all the way for the telecommand selection of machine (8), after treatment Send to airborne detection and control terminal (7);
Navigation data and clock signal are first sent to the navigation data processing module (102) by navigation system (9) After reason, then the mission payload first (11), the mission payload second (12) is distributed to by the navigation data distribution module (101) With the mission payload third (13).
Optionally:The main control module (104) is according to the flight control and management computer (8), the mission payload The hardware interface type of first (11), the mission payload second (12) and the mission payload third (13), can match somebody with somebody to the multichannel Put the corresponding hardware interface passage of communication module (103) to be configured, realize the adaptation of hardware interface.
Optionally:The remote control that the main control module (104) can send according to the flight control with management computer (8) refers to The order control task data selecting module (105) selects the mission payload first (11), the mission payload second (12) and institute State in the multichannel task data of mission payload third (13) output that riches all the way delivers to the task data processing module (106), pass through Retransmited after crossing task data processing module (106) processing to the airborne detection and control terminal (7), realize multiple tasks load Task data timesharing passback.
Optionally:The navigation data and clock signal that the navigation system (9) sends are through the navigation data processing module (102) handle after, then by the navigation data distribution module (101) be distributed to the mission payload first (11), the task carry Lotus second (12) and the mission payload third (13), realize and are supplied to multiple tasks to carry simultaneously single channel navigation data and clock signal Lotus uses.
Multichannel described above can configure communication module (103) configuration, the decomposition of mission payload telecommand and distribution, The main software internal by the main control module (104) of the selection of the synthesis, task data of mission payload telemetry is carried out Control, and communication module (103), the main control module (104) and task data selection mould can configure by the multichannel The hardware circuit of block (105), which coordinates, to be achieved;The processing and forwarding of navigation data and clock signal are general by the navigation number Realized according to processing module (102) and the navigation data distribution module (101) in the way of hardware circuit;The processing of task data Also generally realized by the task data processing module (106) in the way of hardware circuit.
A kind of multitask load management method, methods described is applied to multitask load management device (10), described many Business load management device includes:Navigation data distribution module (101), navigation data processing module (102), multichannel are configurable logical Interrogate module (103), main control module (104), task data selecting module (105), task data processing module (106);
Methods described includes:
The main control module (104) is according to flight control and management computer (8), mission payload first (11), mission payload The hardware interface of second (12) and mission payload third (13) can configure communication module (103) to the multichannel and configure, then Carry out following circular treatment:
It is configurable logical that mission payload telecommand is first sent to the multichannel by flight control and management computer (8) Module (103) is interrogated, then generation is sent to the telecommand of each mission payload after the main control module (104) resolution process, Communication module (103) can configure by the multichannel again and be distributed to mission payload first (11), mission payload second (12) and task load Lotus third (13);
The telemetry of mission payload first (11), mission payload second (12) and mission payload third (13) is first sent to described more logical Road can configure communication module (103), again by the configurable communication mould of the multichannel after then being integrated through the main control module (104) Block (103) is sent to flight control and management computer (8);
The task data of the mission payload first (11), the mission payload second (12) and the mission payload third (13) is first First send to the task data selecting module (105), the main control module (104) calculates according to the flight control with management Wherein task data is sent to the task data processing module (106) all the way for the telecommand selection of machine (8), after treatment Send to airborne detection and control terminal (7).
Optionally, after main control module (104) resolution process generation send to each mission payload telecommand, specifically Including:
Sent according to flight control and management computer (8) to the telecommand of the multitask load management device (10) Device flag in frame, correspondence is copied to by the switch order in the telecommand frame, combined command and combined command parameter In the telecommand frame of mission payload, while the switch order in the telecommand frame of miscellaneous equipment, combined command are inserted into sky Instruction, combined command parameter are reset, and realize the flight control and the telecommand of management computer (8) to multiple mission payloads Distribution.
Optionally, communication module (103) can configure by the multichannel again after the synthesis through the main control module (104) Flight control and management computer (8) are sent to, is specifically included:
By the telemetry parameter of the mission payload first (11), the mission payload second (12) and the mission payload third (13) It is divided into often aobvious telemetry parameter and the extension class of telemetry parameter two, according to the flight control and the telecommand of management computer (8) Select a mission payload in the mission payload first (11), the mission payload second (12) and the mission payload third (13) Extension telemetry parameter, by the extension telemetry parameter and device flag of the mission payload, with all mission payloads and described many The often aobvious telemetry parameter of business load management device (10) is put into the multitask load management device (10) and sent to the flight Control under realizing while multiple tasks load telemetry parameter with the telemetry frame of management computer (8), passing.
The specific embodiment provided according to the present invention, the invention discloses following technique effect:
Multitask load management device and method in the embodiment of the present invention, can carry multiple simultaneously on unmanned plane Business load, subsequently without carrying out larger modification to existing equipment and flight control and management software, uses manpower and material resources sparingly, shortens Lead time.
Specifically, when loading multiple tasks load in the mission payload for changing the outfit different or simultaneously, without change flight control With management computer and airborne detection and control terminal hardware, greatly reduce hardware and change brought man power and material's input, significantly contracting Short system development cycle;
It is soft without modification flight control and management when loading multiple tasks load in the mission payload for changing the outfit different or simultaneously Part, it is to avoid the flight safety hidden danger come to the change tape of critical software, reduces expense and the cycle of software test;
Improve unmanned aerial vehicle platform carry different type mission payload versatility and ease for use, simplify flight control with The interface relationship between computer and airborne miscellaneous equipment is managed, flight control and the burden of management computer is alleviated, necessarily The reliability of system is enhanced in degree.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the present invention Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the structural representation of unmanned plane task management system of the prior art;
Fig. 2 is the structure chart of the multitask load management device embodiment of the present invention;
Fig. 3 is the structural representation of the unmanned plane task management system of the present invention;
Fig. 4 is the structural representation of the telecommand frame of the present invention;
Fig. 5 is sent to the structural representation of the telemetry frame of multitask load management device for the mission payload of the present invention;
Fig. 6 is sent to flight control and the telemetry frame of management computer for the multitask load management device of the present invention Structural representation;
Fig. 7 is the flow chart of the multitask load management embodiment of the method for the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
In order to facilitate the understanding of the purposes, features and advantages of the present invention, it is below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is further detailed explanation.
Fig. 2 is the structure chart of the multitask load management device embodiment of the present invention.
Fig. 3 is the structural representation of the unmanned plane task management system of the present invention.As shown in Figures 2 and 3,
Multitask load management device 10 includes navigation data distribution module 101, navigation data processing module 102, led to more Road can configure communication module 103, main control module 104, task data selecting module 105, task data processing module 106.Navigation Data distribution module 101 carries out the level signal conversion of navigation data and clock signal, such as by navigation data processing module 102 The navigation data of processing output is converted to RS232 or RS422 signals by TTL signal, and clock signal is converted to by TTL signal 27V pulse signals.The content for the navigation data frames that navigation data processing module 102 sends navigation system 8 is according to mission payload The need for cut and combined, generation meets the navigation data frames of mission payload input requirements, generally real using fpga chip It is existing.Multichannel can configure communication module 103 and include multiple configurable communication interfaces, the signal type of communication interface, baud rate, Data bit format can be configured by main control module 104, and Typical Representative is multichannel serial card, the class signal of each communication interface Type can be selected by being arranged between RS232, RS422 and RS485 for the internal register of multichannel serial card control chip Select, corresponding baud rate, data bit format can be also configured by the internal register of multichannel serial card control chip, from And meet the requirement communicated with different task load.Main control module 104 includes the basic component units such as CPU, RAM and FLASH, tool Body form can be single board computer, single-chip microcomputer, embedded controller etc..Task data selecting module 105 is according to main control module 104 Instruction selected from multichannel input signal all the way signal carry out data, relay can be thrown using multi-path choice chip or hilted broadsword more Realized etc. mode.Task data processing module 106 such as is decoded, compressed, being recoded at the processing to task data, is generally used Fpga chip is realized.Main control module 104 and multichannel are configurable logical between communication module 103 and task data selecting module 105 Cross internal bus interface to be attached, conventional internal bus interface is including ISA, PC104, PCI and CPCI etc..
Relation between above-mentioned each module is:Main control module 104 is according to flight control and management computer 8, mission payload The hardware interface type of first 11, mission payload second 12 and mission payload the third 13, can configure communication module 103 corresponding to multichannel Hardware corridor is configured, to realize the adaptation of hardware interface;Telecommand is sent first by flight control with management computer 8 Communication module 103 is can configure to multichannel, then generation sends distant to each mission payload after the resolution process of main control module 104 Command frame is controlled, then communication module 103 can configure by multichannel and is distributed to mission payload first 11, mission payload second 12 and mission payload The third 13.Navigation data and clock signal are first sent to after navigation data processing module 102 handles, then by leading by navigation system 9 Boat data distribution module 101 is distributed to mission payload first 11, mission payload second 12 and mission payload the third 13;Mission payload first 11, The task data of mission payload second 12 and mission payload the third 13 is first sent to task data selecting module 105, main control module 104 According to flight control and the telecommand selection of management computer 8, wherein task data is sent to task data processing module all the way 106, send after treatment to airborne detection and control terminal 7.
The present invention is when it is implemented, multichannel can configure communication module 103, the input of task data selecting module 105 is led to The output channel of road number and navigation data distribution module 101 it is several according to system to 10 management roles of multitask load management device The maximum quantity of load determines that managerial role load is 3 to multitask load management device 10 simultaneously in such as Fig. 2.
Flight control is sent to multitask load management device 10 and multitask load management device 10 with management computer 8 Be sent to mission payload first 11, mission payload second 12, mission payload the third 13 telecommand frame structure can with as shown in figure 4,
Wherein frame head and postamble are used for frame synchronization, and device flag shows the purpose equipment that current telecommand frame is sent to, opened It is the instruction without parameter to close instruction, and combined command is the instruction with parameter, and combined command parameter is corresponding to combined command Parameter, is verified and for judging and correcting mistake present in frame data.It is assumed that mission payload first 11, mission payload second 12 and appoint The device flag of load of being engaged in the third 13 is respectively 0x55,0x99,0xAA, and the device flag of multitask load management device 10 is Switch order do-nothing instruction in 0x66, telecommand frame is 0x52, and combined command do-nothing instruction is 0xEE.When unmanned plane operator to When mission payload first 11 sends telecommand, device flag inserts 0x55 in telecommand frame, and the telecommand passes through ground first Face station computer 1 is sent, then is sent by earth station's detection and control terminal 2 through Radio Link to airborne detection and control terminal 7, is then sent to flight Control and management computer 8, then it is forwarded to multitask load management device 10.The multichannel of multitask load management device 10 can Configuration communication module 103 is received after the telecommand frame, and main control module 104 carries out the processing such as frame synchronization, verification and calculating to it, And control will be flown with managing switch order, group in the telecommand frame that computer 8 is sent according to device flag 0x55 therein Close instruction and combined command parameter is copied and is sent into correspondence in the telecommand frame of mission payload first 11, and mission payload will be sent to Switch order inserts do-nothing instruction 0x52, combined command and inserts do-nothing instruction in the telecommand frame of second 12 and mission payload the third 13 0xEE, combined command parameter insert 0x00, while the device flag being sent in three different task load telecommand frames is divided Do not fill out as 0x55,0x99,0xAA, then calculate respectively verification and after communication module 103 can configure by multichannel be again sent to respectively Individual mission payload.Unmanned plane operator sends to mission payload second 12, mission payload the third 13 and multitask load management device 10 The method of telecommand is similar with said process, wherein being sent to the telecommand of multitask load management device 10 by main control module 104 directly processing are performed.
Mission payload is sent to the telemetry frame structure schematic diagram of multitask load management device 10 as shown in figure 5, many Business load management device 10 be sent to the telemetry frame structure schematic diagram of flight control and management computer 8 as shown in fig. 6,
Wherein frame head, postamble and verification and effect it is similar with telecommand frame, device flag shows current telemetry data Source device, equipment often show telemetry parameter be mission payload current operating state key parameter, it is desirable to be shown in ground always Stand on computer 1 to monitor its working condition, device extension telemetry parameter is on the detailed of mission payload current operating state Parameter, is only just shown on earth station's computer 1 when needed.Mission payload first 11, mission payload second 12 and mission payload third 13 multichannels that respective telemetry frame is sent at most mission payload managing device 10 respectively can configure communication module 103; Main control module 104 is carried out after the processing such as frame synchronization, verification and calculating, is respectively filled each mission payload and multitask load management Put 10 often aobvious telemetry parameter insert successively be sent to flight control with the telemetry frame of management computer 8 each equipment it is often aobvious In telemetry parameter;Mission payload second is returned when unmanned plane operator sends telecommand selection to multitask load management device 10 During 12 extension telemetry parameter, main control module 104 will be sent to flight control and selecting in the telemetry frame of management computer 8 Device flag inserts 0x99, and the extension telemetry parameter of mission payload second 12 is copied to the selected device extension of telemetry frame In telemetry parameter, calculate verification and after by multichannel can configure communication module 103 be sent to flight control with manage computer 8; Flight control with management computer 8 receive after the telemetry frame of multitask load management device 10, with its collect it is other distant Send to airborne detection and control terminal 7, then sent through Radio Link to earth station's detection and control terminal 2, and by earth station after surveying aggregation of data Detection and control terminal 2 is forwarded to earth station's computer 1, and decoded wait shows after processing on the screen of earth station's computer 1.Unmanned plane The method of the extension telemetry parameter of operator's selection return mission payload first 11 and mission payload the third 13 is similar with said process.When When unmanned plane operator needs the task data passback of mission payload the third 13, task data is sent by earth station's computer 1 and selected Instruction is selected, the instruction is through earth station's detection and control terminal 2, airborne detection and control terminal 7 and flight control with reaching many after management computer 8 The be engaged in middle multichannel of load management device 10 can configure communication module 103, then main control module 104 according to the instruction to number of tasks It is controlled according to selecting module 105, the task data of selection mission payload the third 13 enters task data processing module 106, passes through The processing such as decoding, compression, recodification, are then forwarded to airborne detection and control terminal 7, then send whole to earth station's observing and controlling through Radio Link End 2, is finally handled by task data processing unit 3.Unmanned plane operator selection mission payload first 11, times of mission payload second 12 The method of business data back is similar with said process.
The navigation data and clock signal of navigation system 9 are first sent to the navigation data of multitask load management device 10 Processing module 102, as the data and signal form needed for each mission payload after processing, then distributes mould by navigation data again Block 101 is respectively sent to mission payload first 11, mission payload second 12 and mission payload the third 13, to meet its requirements of one's work.
From the foregoing, the multitask load management device of the present invention can realize following function:
1) providing multichannel can be by the hardware communication interface of software merit rating, to the distribution of multiple tasks load from flight control With managing the mission payload telecommand of computer, and the telemetry of each mission payload is received, beamed back after synthesis Flight control and management computer;
2) control instruction sent according to flight control with management computer, the task data to multiple tasks load is carried out Selection and switching, and sent after proper treatment to airborne detection and control terminal;
3) navigation data such as unmanned plane real-time attitude, position that UAV Navigation System is provided and clock clock signal warp Cross after proper treatment and be distributed to each mission payload, the need for meeting mission payload.
According to the technical scheme designed by the present invention, the hardware interface that can configure communication module 103 by multichannel is configured, Realize and be adapted between flight control and management computer 8 and multiple tasks load different hardware communication interface so that not more The ability of the both-way communication between multiple tasks load can be extended under the hardware condition for changing flight control and management computer 8, Control instruction can be sent to multiple tasks load and the operating state data that beam back of multiple tasks load is received, so as to realize pair The management and control of multiple tasks load.
According to the technical scheme designed by the present invention, due to carrying multiple tasks load or the different task load that changes the outfit When, the functional requirement such as the flight control telecommand transmission related with mission payload to management computer 8 and telemetry reception Do not change, flight control and the correlative code of management software can immobilize, it is to avoid the modification to critical software.Many Software in business load management device can on a small quantity be changed when changing the outfit different task load according to actual conditions, but due to this Software does not influence the flight safety of unmanned plane, is non-critical software, and related test and validation criteria is substantially reduced.
According to the technical scheme designed by the present invention, main control module 104 can be according to flight control and the finger of management computer 8 Order is controlled to task data selecting module 105, one specified in the multichannel task data of selection multiple tasks load output Road task data, after being handled through task data processing module 106, ground is beamed back in output to airborne detection and control terminal 7, so as to not change Become under conditions of the airborne hardware of detection and control terminal 7, realize the timesharing passback of multichannel task data.
According to the technical scheme designed by the present invention, the navigation data and clock signal of the output of the single channel of navigation system 9 pass through After the processing and distribution of navigation data processing module 102 and navigation data distribution module 101, extension, which is converted to, meets multiple differences Navigation data and clock signal that mission payload needs, it is ensured that job requirement multiple tasks load is carried simultaneously when.
Therefore, multiple tasks can be carried simultaneously on unmanned plane using the multitask load management device of the present invention to carry Lotus, subsequently without carrying out larger modification with management software to original airborne equipment hardware interface and flight control, saves manpower Material resources, shortening lead time.
The invention also discloses a kind of multitask load management method.Methods described is filled applied to multitask load management Put, the multitask load management device includes:
Navigation data processing module, main control module, task data processing module, multichannel can configure communication module, navigation Data distribution module, task data selecting module.
The multitask load management device, can be the multitask load management device 10 shown in Fig. 2.
Fig. 7 is the flow chart of the multitask load management embodiment of the method for the present invention.As shown in fig. 7, this method can be wrapped Include:
Step 701:The main control module (104) according to flight control with management computer (8), mission payload first (11), The hardware interface of mission payload second (12) and mission payload third (13) can configure communication module (103) to the multichannel and match somebody with somebody Put, then carry out following circular treatment:
Step 702:Mission payload telecommand is first sent to the multichannel by flight control and management computer (8) Configurable communication module (103), then generation sends distant to each mission payload after the main control module (104) resolution process Control instruction, then by the multichannel can configure communication module (103) be distributed to mission payload first (11), mission payload second (12) and Mission payload third (13);
Step 703:The telemetry of mission payload first (11), mission payload second (12) and mission payload third (13) is first sent to The multichannel can configure communication module (103), can be matched somebody with somebody by the multichannel again after then being integrated through the main control module (104) Put communication module (103) and be sent to flight control and management computer (8);
Step 704:Times of the mission payload first (11), the mission payload second (12) and the mission payload third (13) Business data are first sent to the task data selecting module (105), the main control module (104) according to the flight control with Wherein task data is sent to the task data processing module (106), warp all the way for the telecommand selection of management computer (8) Sent after crossing processing to airborne detection and control terminal (7).
Multiple tasks load can be carried simultaneously on unmanned plane using the multitask load management method of the present invention, subsequently Without carrying out larger modification with management software to existing equipment and flight control, use manpower and material resources sparingly.
In practical application, generation is sent to the telecommand of each mission payload after main control module (104) resolution process, Specifically include:
Sent according to flight control and management computer (8) to the telecommand of the multitask load management device (10) Device flag in frame, correspondence is copied to by the switch order in the telecommand frame, combined command and combined command parameter In the telecommand frame of mission payload, while the switch order in the telecommand frame of miscellaneous equipment, combined command are inserted into sky Instruction, combined command parameter are reset, and realize the flight control and the telecommand of management computer (8) to multiple mission payloads Distribution.
In practical application, communication module can configure by the multichannel again after the synthesis through the main control module (104) (103) flight control and management computer (8) are sent to, is specifically included:
By the telemetry parameter of the mission payload first (11), the mission payload second (12) and the mission payload third (13) It is divided into often aobvious telemetry parameter and the extension class of telemetry parameter two, according to the flight control and the telecommand of management computer (8) Select a mission payload in the mission payload first (11), the mission payload second (12) and the mission payload third (13) Extension telemetry parameter, by the extension telemetry parameter and device flag of the mission payload, with all mission payloads and described many The often aobvious telemetry parameter of business load management device (10) is put into the multitask load management device (10) and sent to the flight Control under realizing while multiple tasks load telemetry parameter with the telemetry frame of management computer (8), passing.
The embodiment of each in this specification is described by the way of progressive, and what each embodiment was stressed is and other Between the difference of embodiment, each embodiment identical similar portion mutually referring to.For method disclosed in embodiment For, because it is corresponding with device disclosed in embodiment, so description is fairly simple, related part is said referring to device part It is bright.
Specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said The bright method and its core concept for being only intended to help to understand the present invention;Simultaneously for those of ordinary skill in the art, foundation The thought of the present invention, will change in specific embodiments and applications.In summary, this specification content is not It is interpreted as limitation of the present invention.

Claims (5)

1. a kind of multitask load management device, it is characterised in that:At navigation data distribution module (101), navigation data Manage module (102), multichannel can configure communication module (103), main control module (104), task data selecting module (105), appoint Business data processing module (106);
Mission payload telecommand is first sent to the configurable communication mould of the multichannel by flight control and management computer (8) Block (103), then generation is sent to the telecommand of each mission payload after the main control module (104) resolution process, then by The multichannel can configure communication module (103) and be distributed to mission payload first (11), mission payload second (12) and mission payload third (13);
The telemetry of mission payload first (11), mission payload second (12) and mission payload third (13) is first sent to the multichannel can Communication module (103) is configured, communication module can configure by the multichannel again after then being integrated through the main control module (104) (103) flight control and management computer (8) are sent to;
The task data of the mission payload first (11), the mission payload second (12) and the mission payload third (13) is sent out first The task data selecting module (105) is delivered to, the main control module (104) is according to the flight control and management computer (8) wherein task data is sent to the task data processing module (106) all the way for telecommand selection, is sent out after treatment Deliver to airborne detection and control terminal (7);
Navigation data and clock signal are first sent to after navigation data processing module (102) processing by navigation system (9), The mission payload first (11), the mission payload second (12) and institute are distributed to by the navigation data distribution module (101) again State mission payload third (13).
2. a kind of multitask load management device according to claim 1, it is characterised in that:The main control module (104) According to the flight control and management computer (8), the mission payload first (11), the mission payload second (12) and described The hardware interface type of load third of being engaged in (13), the corresponding hardware interface passage of communication module (103) is can configure to the multichannel Configured, realize the adaptation of hardware interface.
3. a kind of multitask load management method, it is characterised in that:Methods described is applied to multitask load management device (10), The multitask load management device includes:Navigation data processing module (102), main control module (104), task data processing mould Block (106), in addition to multichannel can configure communication module (103), navigation data distribution module (101), task data selection mould Block (105);
Methods described includes:
The main control module (104) is according to flight control and management computer (8), mission payload first (11), mission payload second (12) and mission payload third (13) hardware interface to the multichannel can configure communication module (103) configure, Ran Houjin The following circular treatment of row:
Mission payload telecommand is first sent to the configurable communication mould of the multichannel by flight control and management computer (8) Block (103), then generation is sent to the telecommand of each mission payload after the main control module (104) resolution process, then by The multichannel can configure communication module (103) and be distributed to mission payload first (11), mission payload second (12) and mission payload third (13);
The telemetry of mission payload first (11), mission payload second (12) and mission payload third (13) is first sent to the multichannel can Communication module (103) is configured, communication module can configure by the multichannel again after then being integrated through the main control module (104) (103) flight control and management computer (8) are sent to;The mission payload first (11), the mission payload second (12) and described The task data of mission payload third (13) is first sent to the task data selecting module (105), the main control module (104) According to the flight control and the telecommand selection of management computer (8), wherein task data is sent to the number of tasks all the way According to processing module (106), send after treatment to airborne detection and control terminal (7).
4. method according to claim 3, it is characterised in that generate and send after main control module (104) resolution process To the telecommand of each mission payload, specifically include:
Sent according to flight control and management computer (8) into the telecommand frame of the multitask load management device (10) Device flag, by the switch order in the telecommand frame, combined command and combined command parameter be copied to correspondence task In the telecommand frame of load, at the same by the switch order in the telecommand frame of miscellaneous equipment, combined command insert do-nothing instruction, Combined command parameter is reset, and realizes the flight control and point of the telecommand of management computer (8) to multiple mission payloads Hair.
5. method according to claim 3, it is characterised in that again by institute after the synthesis through the main control module (104) State the configurable communication module (103) of multichannel and be sent to flight control and management computer (8), specifically include:
The telemetry parameter of the mission payload first (11), the mission payload second (12) and the mission payload third (13) is divided into Often aobvious telemetry parameter and the extension class of telemetry parameter two, are selected according to the flight control and the telecommand of management computer (8) The expansion of the mission payload first (11), the mission payload second (12) and a mission payload in the mission payload third (13) Telemetry parameter is opened up, the extension telemetry parameter and device flag of the mission payload are carried with all mission payloads and the multitask The often aobvious telemetry parameter of lotus managing device (10) is put into the multitask load management device (10) and sent to the flight control With in the telemetry frame of management computer (8), being passed under realizing while multiple tasks load telemetry parameter.
CN201510195591.7A 2015-04-23 2015-04-23 A kind of multitask load management device and method Active CN104850132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510195591.7A CN104850132B (en) 2015-04-23 2015-04-23 A kind of multitask load management device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510195591.7A CN104850132B (en) 2015-04-23 2015-04-23 A kind of multitask load management device and method

Publications (2)

Publication Number Publication Date
CN104850132A CN104850132A (en) 2015-08-19
CN104850132B true CN104850132B (en) 2017-09-22

Family

ID=53849842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510195591.7A Active CN104850132B (en) 2015-04-23 2015-04-23 A kind of multitask load management device and method

Country Status (1)

Country Link
CN (1) CN104850132B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105468019B (en) * 2015-12-23 2018-03-02 中国工程物理研究院总体工程研究所 A kind of UAV Flight Control method of multitask independent parallel
CN106850050A (en) * 2016-01-22 2017-06-13 广州极飞科技有限公司 Communication system, the method for unmanned plane and earth station and unmanned plane
CN106230913B (en) * 2016-07-25 2019-10-01 北京云汉通航科技有限公司 Data processing transmission method and device
CN106406327A (en) * 2016-11-01 2017-02-15 中国航空无线电电子研究所 Unmanned aerial vehicle task architecture rapid verification platform
CN106406356A (en) * 2016-12-13 2017-02-15 天津成周科技有限公司 Control system for electronic-information-based unmanned aerial vehicle formation management and management method thereof
CN107024937B (en) * 2017-03-13 2020-09-04 武汉飞流智能技术有限公司 Unmanned aerial vehicle load self-identification and parameter self-matching method and ground self-adaption system
CN109101037A (en) * 2017-06-20 2018-12-28 深圳市小氪科技有限公司 The unmanned aerial photography aircraft of transmission and far distance control is realized using mobile network
CN108847920B (en) * 2018-06-25 2021-06-29 北京零态空间数码科技有限公司 Communication method and system
CN108776346B (en) * 2018-07-26 2022-01-07 西南电子技术研究所(中国电子科技集团公司第十研究所) Method for transmitting operational assistance information to a satellite payload
CN109398709B (en) * 2018-12-03 2023-06-02 中航技进出口有限责任公司 External airborne weapon fire control system and use method
WO2020133104A1 (en) * 2018-12-27 2020-07-02 深圳市大疆创新科技有限公司 Control method and apparatus, and unmanned aerial vehicle and storage medium
CN109981730B (en) * 2019-01-04 2022-04-29 哈瓦国际航空技术(深圳)有限公司 Method, device, equipment and storage medium for controlling mounting of unmanned aerial vehicle by ground station
CN112116798B (en) * 2020-09-15 2022-02-08 中国人民解放军63660部队 Two-target measurement and control cross multiplexing method under parallel tasks
CN113778643A (en) * 2021-08-13 2021-12-10 中电科芜湖通用航空产业技术研究院有限公司 Unmanned aerial vehicle task management computer software architecture system and configuration switching method
CN116483128B (en) * 2023-06-19 2023-10-27 湖南林科达信息科技有限公司 Unmanned aerial vehicle multitasking load device conversion method and system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101159687B (en) * 2007-11-07 2010-07-28 中国科学院计算技术研究所 System, device and method of multi-channel communication transmitting data
CN101738608B (en) * 2009-12-11 2013-03-20 北京航空航天大学 Telemetry information comprehensive treatment system of unmanned plane and compressive treatment display method thereof
CN101913427B (en) * 2010-08-04 2013-01-09 北京航空航天大学 Avionics system suitable for multi-purpose unmanned aircraft
CA2845094A1 (en) * 2011-08-16 2013-04-18 Unmanned Innovation Inc. Modular flight management system incorporating an autopilot
CN103368638B (en) * 2012-03-29 2016-08-24 中国科学院空间科学与应用研究中心 A kind of TTC & DT Systems for deep space probe and method
CN202754148U (en) * 2012-07-16 2013-02-27 北京航空航天大学 Universal land station capable of being allocated with unmanned aerial vehicles
CN103777545B (en) * 2013-12-17 2016-06-01 中国航天空气动力技术研究院 Without man-machine mission payload controller system

Also Published As

Publication number Publication date
CN104850132A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN104850132B (en) A kind of multitask load management device and method
CN105007115B (en) Unmanned helicopter relays data link system and its control method
CN104331292B (en) A kind of configuration generating method of car networking middleware protocols conversion
US20200174466A1 (en) Drone communication system and communication system of drone server
CN103970044B (en) General hierarchical design method for unmanned aerial vehicle remote control command/telemetry parameter frame
CN109345804A (en) A kind of unmanned aerial vehicle (UAV) control signaling and data transmission method based on mobile network
CN108183770A (en) A kind of automatic clearance management method of unmanned plane
CN104915482A (en) Satellite data receiving simulation analysis platform
CN104076820A (en) Unmanned aerial vehicle electric power line polling control system and method based on three-dimensional GIS
CN107544531A (en) Line data-logging method, apparatus and unmanned plane
CN112650279B (en) Cloud flight management system and cloud flight management method for airplane
CN109696922A (en) A kind of long range telemetering environmental protection unmanned aerial vehicle control system and method
CN113158116A (en) Unmanned aerial vehicle control platform based on mobile internet
CN104615019A (en) System and method for remotely controlling UAV (Unmanned Aerial Vehicle) based on wireless communication
CN107479876A (en) A kind of five layer architecture design methods for building unmanned aerial vehicle station software
CN205121345U (en) Multitask load management device
CN108873942B (en) A kind of method that unmanned plane flight pattern Internet-based is kept
CN107776912A (en) A kind of aircraft ground TT&C system net of center control
CN102497540A (en) Adaptive adjustment and transmission method of video information
CN204089891U (en) The Ethernet interface conversion equipment of difference SPI signal
CN109841092A (en) A kind of unmanned aerial vehicle command and control system
CN205670192U (en) Big Dipper location and communicating integral general-purpose system
EP3690862A1 (en) Four-dimensional trajectory uplinking system for aircraft
CN209560368U (en) A kind of long range telemetering environmental protection unmanned aerial vehicle control system
CN110430254B (en) Unmanned aerial vehicle remote controller signal analyzing method, signal processing method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 643000 No.9 Aviation Avenue, Zigong Aviation Industrial Park, Sichuan Province

Patentee after: China Electric Special Aircraft Systems Engineering Co., Ltd.

Address before: 618300 No. 74 Taizhong Road, Guanghan City, Deyang City, Sichuan Province

Patentee before: In Dianke (Deyang Guanghan) Special Aircraft System Engineering Co. Ltd.