CN104727796B - A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method - Google Patents

A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method Download PDF

Info

Publication number
CN104727796B
CN104727796B CN201510092721.4A CN201510092721A CN104727796B CN 104727796 B CN104727796 B CN 104727796B CN 201510092721 A CN201510092721 A CN 201510092721A CN 104727796 B CN104727796 B CN 104727796B
Authority
CN
China
Prior art keywords
coring
coiled tubing
sliding bush
sliding sleeve
components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510092721.4A
Other languages
Chinese (zh)
Other versions
CN104727796A (en
Inventor
刘军
王大江
石玉民
姜建平
李斌
程永红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petroleum Engineering Technology Research Institute Of Hanjiang Oil Field Branch Sinopec
China Petroleum and Chemical Corp
Original Assignee
Oil Production Technology Research Institute Of Jianghan Oilfield Branch China Petroleum & Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oil Production Technology Research Institute Of Jianghan Oilfield Branch China Petroleum & Chemical Corp filed Critical Oil Production Technology Research Institute Of Jianghan Oilfield Branch China Petroleum & Chemical Corp
Priority to CN201510092721.4A priority Critical patent/CN104727796B/en
Publication of CN104727796A publication Critical patent/CN104727796A/en
Application granted granted Critical
Publication of CN104727796B publication Critical patent/CN104727796B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method, its construction procedure is:Formation horizontal well can use core sliding sleeve multistage fracturing completion tubular column, and it can coring pitching fracturing sliding bush including multistage;Then each section of pressing crack construction is implemented;Well is sealed in using coiled tubing band corer, take out can be in coring pitching fracturing sliding bush its components;As needed, using coiled tubing belt switch pipe seal in well it is corresponding to water exit interval can coring pitching fracturing sliding bush carry out repeat be turned on and off operation.This construction method can realize full-bore after tubing string pressure;Step is released in tubing string than conventional bore using coiled tubing corer string and grinds that efficiency of construction is high, risk is small, it is easy to operate, using coiled tubing selective switch slide bunch tube pair can coring pitching fracturing sliding bush implement selective switch operation, be conducive to the later stage to repeat transformation, test and control water measure operation, played a significant role to playing horizontal well volume increase advantage to greatest extent.

Description

A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method
Technical field
The invention belongs to oil and gas industry horizontal well measure construction method, more particularly to a kind of horizontal well can coring cunning Cover the construction method of multistage fracturing completion tubular column.
Background technology
With continuing to develop and continuous improvement to technological requirement for oil and gas industry technology, the pressure break of one-trip string Series is continuously increased.Exist because horizontal well completion tubular pile has in the characteristics of can not being taken out after well, post-fracturing tubing string Multistage sliding sleeve fuse by limit produce passage, influence the later stage test, repeat transform, be mainly manifested in the following aspects: (1)The multi-stage stairs existed in completion tubular column, the later stage repeats transformation tubing string and the tripping in of production test instrument is difficult;(2)Completion tubular After post water outlet, later stage control water task difficulty is big, and the volume increase advantage of horizontal well can not give full play to;(3)Completion tubular column series is more, Tubing string passage is small, the problems such as causing production to throttle and limit the production;
In view of the above-mentioned problems, conventional mode is by boring grinding except limitation of the sliding sleeve fuse to hole diameter, but bore honed journey There is greater risk, there may come a time when to cause high operating cost, and efficiency is low, and the later stage can not horizontal well control water measure in fact.
The content of the invention
The technical problems to be solved by the invention are a kind of pipe of not enough offer existed for above-mentioned prior art Post takes out all sliding sleeve inner cores, realizes tubing string full-bore, for later stage production, test and repeats transformation and provides larger passage and can With realize pitching fracturing sliding bush switch repeat switch horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method.
The technical solution adopted in the present invention is:A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction party Method, it is characterised in that:It includes following construction procedure:
Step 1: formation horizontal well can use core sliding sleeve multistage fracturing completion tubular column, it includes tieback intubation, intubation packing Device, multiple packers, multistage can coring pitching fracturing sliding bush, constant-pressure sliding sleeve, setting ball seat and ball-and-seat and guide shoe, it is described can Coring pitching fracturing sliding bush includes top connection, outer sleeve, sandblasting joint, the lower contact being sequentially connected from top to bottom, in outer sleeve Outer core is inside arranged with, outer core is fixedly installed on outer sleeve by cutting member, pressure break passage is provided with outer core, outside Its components are arranged in the lower end of core, its components are connected by locking device with outer core, its components include ball seat, Ball seat upper end is provided with connecting portion;
Step 2: pressing crack construction, is specially:Opened successively from tubing string toe-end by pressure break design requirement order input ball sealer It is at different levels can coring pitching fracturing sliding bush, implement each section of pressing crack construction;
Step 3: after the completion of pressing crack construction, well is sealed in using coiled tubing band corer, taking-up can coring pitching pressure break cunning Its components in set;
Step 4: after its components take out, as needed, well is sealed in going out using coiled tubing selective switch sliding sleeve pipe Water layer section it is corresponding can coring pitching fracturing sliding bush carry out repeat be turned on and off operation.
By above-mentioned technical proposal, the bottom of the coiled tubing corer string is provided with coring joint, coring joint For fish for can coring pitching fracturing sliding bush its components, be provided with the lower end of coring joint and fish for pawl and its components The connecting portion of ball seat is matched, above carries the dynamic ball seat of coiled tubing band corer ribbon and moves up, can coring pitching so as to take out Its components in fracturing sliding bush.
By above-mentioned technical proposal, connector is fixedly connected with the ball seat lower end of its components, the lower end of the connector with The connecting portion of ball seat upper end is mutually arranged, connector be used for remove one-level can coring pitching fracturing sliding bush its components, under realization Enter a coiled tubing and take out its components that can be in coring pitching fracturing sliding bush at different levels with corer string.
By above-mentioned technical proposal, the step 4 is specially:The coiled tubing selective switch of offer, which slides bunch tube, to be included Derailing switch, derailing switch includes top connection, central tube, the lower contact being sequentially connected from top to down, is set with successively on central tube Opened by pressure mechanism, closing piece, diameter changing mechanism, the opened by pressure mechanism can be fixed along central tube axial slip, the closing piece On centrally disposed pipe, the opened by pressure mechanism is connected by pin with closing piece, the lower end suit of the opened by pressure mechanism In the upper end of diameter changing mechanism, so that diameter changing mechanism be locked, annular slot is provided with the upper end of outer core and is selected with coiled tubing The derailing switch set on property switching sliding sleeve pipe string is mutually arranged;Slide and extremely may be used under the derailing switch of bunch tube when coiled tubing selective switch During the design attitude of coring pitching fracturing sliding bush, turn on pump sand washing, while slowly decentralization coiled tubing selective switch slides bunch tube, Until derailing switch, which was descended, to improve flushing discharge capacity after the neck of coring pitching fracturing sliding bush, when hydraulic coupling reaches that the pressure of setting is pushed away During dynamic pressure opener slides to central tube top, diameter changing mechanism unblock, the increasing radius and radial direction of diameter changing mechanism Stretching is installed on the neck of sliding sleeve, now, is slowly above carried coiled tubing selective switch and is slided bunch tube, and observes tubing string suspending weight Change, whether judging the diameter changing mechanism of derailing switch, be installed on can be on the outer core upper end neck of coring pitching fracturing sliding bush, and suspending weight increases Illustrate to have dragged for carried in outer core, continuation coiled tubing selective switch slide bunch tube, when can coring pitching fracturing sliding bush close after Suspending weight will reduce moment, and coiled tubing selective switch is carried in continuation and slides in bunch tube that suspending weight is without significant change, until will be continuous Oil pipe selective switch slides bunch tube and takes out well head.
Having the beneficial effect that acquired by the present invention:This construction method can realize full-bore after horizontal well completion tubular pile pressure;Adopt Step, which is released in tubing string, with coiled tubing corer string than conventional bore grinds that efficiency of construction is high, risk is small, it is easy to operate, using continuous Oil pipe selective switch slide bunch tube pair can coring pitching fracturing sliding bush implement selective switch operation, be conducive to the later stage repeat change Water measure operation is made, tested and controlled, is played a significant role to playing horizontal well volume increase advantage to greatest extent.
Brief description of the drawings
Fig. 1 be horizontal well can coring sliding sleeve multistage fracturing completion tubular column schematic diagram.
Fig. 2 for can coring pitching fracturing sliding bush structure chart.
Fig. 3 connects coiled tubing corer string structure schematic diagram.
Fig. 4 is that coiled tubing selective switch slides bunch tube schematic diagram.
Fig. 5 is the structural representation of derailing switch in Fig. 4.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
As shown in figure 1, the present embodiment provide a kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction party Method it comprise the following steps:
Step 1: configurations horizontal well can coring sliding sleeve multistage fracturing completion tubular column, it include tieback intubation 42, intubation Packer 43, multiple packers 44,46,48,50,52, multistage can coring sliding sleeve 45,47,49,51, constant-pressure sliding sleeve 53, setting balls Seat 54 and ball-and-seat and guide shoe 55.Wherein, as shown in Fig. 2 can coring pitching fracturing sliding bush include be sequentially connected from top to bottom Top connection 1, outer sleeve 3, sandblasting joint 6, lower contact 14, outer core 4 is arranged with outer sleeve 3, the lower end of outer core 4 is extended to In lower contact 14, dust ring 7 is provided with the two ends of the pressure break passage of the sandblasting joint 6, the upper end of outer core 4 passes through Cutting member 2 is fixedly installed on outer sleeve 3, pressure break passage is provided with outer core 4, between the lower end of outer core 4 and outer sleeve 3 Combined seal ring 5 is provided with, the lower end of outer core 4 is connected with outer support cylinder 17, is provided with the lower end of lower contact 14 for preventing The limited step that outer support cylinder 17 is moved downward.Be arranged its components in the lower end of outer core 4, its components by locking device with Outer core 4 is connected, and its components include the ball seat 9, inner support cylinder 11, connector 13 being sequentially connected, and are set in the upper end of ball seat 9 There is the connecting portion being coupled with coiled tubing corer string.The connecting portion is the sawtooth internal thread 16 for being arranged on the upper end of ball seat 9.Even Joint 13 be used to removing one-level can coring pitching fracturing sliding bush its components, the lower end of connector 13 and the connection of ball seat upper end Portion is mutually arranged.It is provided with the lower end of connector 13 and fishes for pawl, sawtooth external screw thread is provided with pawl is fished for, the edge on pawl is fished for Circumference, which is provided with, conveniently to be fished for pawl and occurs radially to inside contract the slot of deformation, is easy to more preferable with the sawtooth internal thread 16 of ball seat upper end Mating.
The locking device refers to 10 including snap lock, and the upper outer end for referring to 10 in the snap lock is provided with positive stop lug boss, The groove that clamp snap lock refers to positive stop lug boss is provided with the lower end inner wall of outer core, the limit for referring to snap lock by the lower end of ball seat Position boss be fastened in groove, on interior support tube 11 correspondence snap lock refer to be provided with permission snap lock refer to radial direction produce inside contract The receiving space 18 of deformation, the lower end that the snap lock refers to is fixedly installed on its components by unlocking pin 12.
Step 2: pressing crack construction, is specially:Tubing string is pressed after detail design tripping in place, and pitching sets insertion pipe packer 43 And packer 44,46,48,50,52 etc., then connect tieback oil pipe 42, and successively pitching open step by step can coring pitching Fracturing sliding bush 45,47,49,51 etc. carries out each section of sand fracturing construction.In pressure break, after stifled ball 8 reaches ball seat 9, from oil pipe When building the pressure to setting pressure, cut ring 2 and be sheared, outer core 4, ball seat 9, snap lock refer to 10, inner support cylinder 11, unblock pin 12, connected Joint 13 is moved down, when the sand jet outlet on outer core 4 aligns with the sand jet outlet of sandblasting joint 6(Namely outer support cylinder 17 is moved When to limited step), sliding sleeve is fully opened, and fracturing fluid can enter stratum out of tubing string.
Step 3: after the completion of pressing crack construction, tripping in coiled tubing corer string, as shown in figure 3, coiled tubing corer string Including coiled tubing 19, coiled tubing joint 20, safety joint 21, bumper jar 22, centralizer 23, counterbalance valve 24, coring Joint 25, the lower end of wherein coring joint 25, which is provided with, fishes for pawl, and slot is circumferentially provided with pawl is fished for, and is easy to and ball seat The sawtooth internal thread of upper end is matched, vulcanization filling elastic caoutchouc, its supporting role in slot.
When coiled tubing corer string reach can coring pitching fracturing sliding bush design attitude when, by bumper jar 22 to continuous Apply 10~20kN power, the sawtooth of the ball seat for fishing for portion and its components of coiled tubing corer string in oil pipe corer string Inner nut is meshed, and upper lifting pipe ribbon is moved ball seat 9 and moved up.Produced by bumper jar 22 and hit power, 40 are reached when above hitting power During~50kN, after unblock pin 12 is sheared, coiled tubing corer string certain distance is carried in continuation, snap lock refers to 10 and lost Lock refers to interior receipts after the support of ball seat 9, snap lock refer to 10 with outer core 4 it is contactless after, can continue above to carry coiled tubing corer string, take Go out ball seat 9, stifled ball 8, snap lock and refer to latus rectum in the parts such as 10, support tube 11, unblock pin 12, connector 13, sliding sleeve to be extended to Full-bore(It is consistent with the outer latus rectum of core 4);Also can according to circumstances, continue to transfer coiled tubing corer string promote stifled ball 8, ball seat 9, Snap lock refers to 10, support tube 11, unblock pin 12, at the ball seat 9 of connector 13 to next stage sliding sleeve, turn on pump sand washing and it is slow under Tubing string is put, after the power for applying 10~20kN to coiled tubing corer string, connector 13 and the upper end of ball seat 9 of next stage sliding sleeve Engagement, then upper lifting pipe post, by bumper jar 22 produce on hit power and unlock the inner core of sliding sleeve, repeat the above steps, Until all sliding sleeve inner cores are realized unblock and docked, finally by above carrying coiled tubing corer string by core ribbon in all sliding sleeves Go out, complete one-trip string take out it is all can coring pitching fracturing sliding bush inner core, latus rectum is recovered in tubing string.
Step 4: completing after the construction of coiled tubing coring, according to the later stage condition of production and needs, the selection of tripping in coiled tubing Property switching sliding sleeve pipe string pair can coring pitching fracturing sliding bush carry out repeat switch operation.
Wherein, annular slot 15 is provided with the upper end of outer core 4 and slides setting on bunch tube with coiled tubing selective switch Derailing switch mutually arrange.As shown in Figure 4,5, the coiled tubing selective switch slide bunch tube include coiled tubing 19, it is continuous Oil connection 20, safety joint 21, bumper jar 22, communicating valve 26, centralizer 23, derailing switch 27, standby ball seat 28, back pressure The compositions such as valve 24, rotation sand flushing tool 29.As shown in figure 4, the derailing switch 27 includes the top connection being sequentially connected from top to down 30th, central tube 33, lower contact 41, are set with opened by pressure mechanism, closing piece 36, diameter changing mechanism successively on central tube 33, described Opened by pressure mechanism can be fixedly installed on central tube 33 along the axial slip of central tube 33, the closing piece 36, and the pressure is opened Open mechanism by pin 37 with closing piece 36 to be connected, the lower end of the opened by pressure mechanism is sleeved on the upper end of diameter changing mechanism, so that Diameter changing mechanism is locked.
Wherein, the opened by pressure mechanism include being sleeved on upper overcoat 31 outside central tube 33, with helping that upper overcoat is connected Positive set 35, the inlet opening 34 opened up on central tube 33, wherein, upper overcoat 31 can along top connection 30 outer wall axial slip, Annular space between upper overcoat 31 and central tube 33 is arranged with return spring 32, lower end and the supporting positive cover 35 of return spring Upper-end contact, the return for opened by pressure mechanism.The inlet opening 34 is connected with the inwall of supporting positive cover 35, in inlet opening 34 Both sides be provided with sealing ring, the lower end of the supporting positive cover 35 is fixedly installed on closing piece 36 by pin 37.
The diameter changing mechanism is included along the circumferentially disposed some key blocks 38 of central tube, and the two ends of key block 38 are taper, institute State and bow spring 39 is provided with key block 38, one end tapered portion of key block 38 is sleeved on by supporting positive cover, so that key block 38 is pressed into solid Fixed, the other end configuration lock tube 40 of key block 38, lock tube 40 is fixed by a pin in lower contact 41.
In the present embodiment, in order to be able to smoothly start opened by pressure mechanism, set on central tube positioned at the lower section of inlet opening There is a conical surface that internal diameter diminishes, aspect pitching builds the pressure Opening pressure opener.
Being slided when coiled tubing selective switch extremely can coring pitching fracturing sliding bush design attitude under the derailing switch 27 of bunch tube When, turn on pump sand washing, while slowly transferring tubing string, can be improved until derailing switch 27 was descended after the neck 15 of coring pitching fracturing sliding bush Discharge capacity is rinsed, promotes upper overcoat 31 and supporting positive cover 35 to be slid to top connection direction after hydraulic coupling is by inlet opening 34, supporting positive cover 35 during sliding, and key block 38 loses binding force, and under the elastic force effect of bow spring 39, key block 38 extends radially out and makes key block 38 are installed on the neck 15 of sliding sleeve,(When hydraulic coupling is not enough to promote the movement of opened by pressure mechanism, can pitching pitching build the pressure and make Key block 38 is stretched out), and slow upper lifting pipe post, and observe the change of tubing string suspending weight, whether judging the key block of derailing switch, drag for can coring The outer upper end neck of core 4 of pitching fracturing sliding bush, suspending weight increase explanation has dragged for outer core 4, continues upper lifting pipe post, suspending weight after sliding sleeve is closed It will reduce moment, coiled tubing switching tube string suspending weight carried in continuation without significant change, until coiled tubing is taken out into well head(Or Load variations are had no, upper lifting pipe post is smooth);As do not dragged for, then coiled tubing will be transferred again, derailing switch was descended into coring pitching Fracturing sliding bush physical location, and slow upper lifting pipe post, are confirmed whether to drag for according to load variations.

Claims (4)

1. a kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method, it is characterised in that:It includes applying as follows Work step is rapid:
Step 1: formation horizontal well can use core sliding sleeve multistage fracturing completion tubular column, it includes tieback intubation, insertion pipe packer, many Individual packer, multistage can coring pitching fracturing sliding bush, constant-pressure sliding sleeve, setting ball seat and ball-and-seat and guide shoe, it is described can coring Pitching fracturing sliding bush includes top connection, outer sleeve, sandblasting joint, the lower contact being sequentially connected from top to bottom, in outer sleeve inner sleeve Provided with outer core, outer core is fixedly installed on outer sleeve by cutting member, and the cutting member is cuts ring, the ring of cutting Snip is fastened in the neck that outer core periphery is set, and pressure break passage is provided with outer core, the lower end of each pressure break passage is all provided with Have in long thin seam, the lower end of outer core and be arranged its components, its components are connected by locking device with outer core, its components Lower part connected by unlocking the bottom split-phase of pin and locking device, its components include ball seat, are set in ball seat upper end It is equipped with connecting portion;
Step 2: pressing crack construction, is specially:Open at different levels successively from tubing string toe-end by pressure break design requirement order input ball sealer Can coring pitching fracturing sliding bush, each section of pressing crack construction of implementation;
Step 3: after the completion of pressing crack construction, well is sealed in using coiled tubing band corer, taking-up can be in coring pitching fracturing sliding bush Its components;
Step 4: after its components take out, as needed, well is sealed in water-yielding stratum using coiled tubing selective switch sliding sleeve pipe Section it is corresponding can coring pitching fracturing sliding bush carry out repeat be turned on and off operation.
2. a kind of horizontal well according to claim 1 can coring sliding sleeve multistage fracturing completion tubular column construction method, it is special Levy and be, coring joint is provided with the bottom of the coiled tubing corer string, coring joint can coring throwing for fishing for Its components of ball fracturing sliding bush, the connecting portion that the ball seat for fishing for pawl and its components is provided with the lower end of coring joint matches Connect, above put forward coiled tubing band corer ribbon and move ball seat and move up, so as to take out inner core that can be in coring pitching fracturing sliding bush Component.
3. a kind of horizontal well according to claim 2 can coring sliding sleeve multistage fracturing completion tubular column construction method, it is special Levy and be, connector is fixedly connected with the ball seat lower end of its components, the lower end of the connector and the connecting portion of ball seat upper end Mutually arrange, connector be used for remove one-level can coring pitching fracturing sliding bush its components, realize time coiled tubing band of tripping in Corer string takes out its components that can be in coring pitching fracturing sliding bush at different levels.
4. a kind of horizontal well according to claim 1 or 2 can coring sliding sleeve multistage fracturing completion tubular column construction method, its It is characterised by, the step 4 is specially:The coiled tubing selective switch of offer, which slides bunch tube, includes derailing switch, derailing switch bag The top connection being sequentially connected from top to down, central tube, lower contact are included, opened by pressure mechanism, lock is set with successively on central tube Block, diameter changing mechanism, the opened by pressure mechanism can be fixedly installed on central tube along central tube axial slip, the closing piece, The opened by pressure mechanism is connected by pin with closing piece, and the lower end of the opened by pressure mechanism is sleeved on the upper of diameter changing mechanism End, so that diameter changing mechanism be locked, annular slot is provided with the upper end of outer core and slides bunch tube with coiled tubing selective switch The derailing switch of upper setting is mutually arranged;Being slided when coiled tubing selective switch extremely can coring pitching pressure break cunning under the derailing switch of bunch tube During the design attitude of set, turn on pump sand washing, while slowly decentralization coiled tubing selective switch slides bunch tube, until derailing switch was descended Flushing discharge capacity can be improved after the neck of coring pitching fracturing sliding bush, when hydraulic coupling reaches the pressure pushing pressure opener of setting During sliding above central tube, diameter changing mechanism unblock, the increasing radius of diameter changing mechanism simultaneously extends radially out and is installed on sliding sleeve Neck on, now, slowly above carry coiled tubing selective switch slide bunch tube, and observe tubing string suspending weight change, judge switch Whether the diameter changing mechanism of device is installed on can be on the outer core upper end neck of coring pitching fracturing sliding bush, and suspending weight increase explanation has dragged for outer Carried in core, continuation coiled tubing selective switch slide bunch tube, when can coring pitching fracturing sliding bush close after suspending weight will moment Reduce, coiled tubing selective switch is carried in continuations and slides in bunch tube that suspending weight is without significant change, up to continuous oil pipe is selectively opened Close sliding bunch tube and take out well head.
CN201510092721.4A 2015-03-02 2015-03-02 A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method Active CN104727796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510092721.4A CN104727796B (en) 2015-03-02 2015-03-02 A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510092721.4A CN104727796B (en) 2015-03-02 2015-03-02 A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method

Publications (2)

Publication Number Publication Date
CN104727796A CN104727796A (en) 2015-06-24
CN104727796B true CN104727796B (en) 2017-08-29

Family

ID=53452137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510092721.4A Active CN104727796B (en) 2015-03-02 2015-03-02 A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method

Country Status (1)

Country Link
CN (1) CN104727796B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703706B (en) * 2015-07-24 2018-11-16 中国石油天然气股份有限公司 Injection-production column jacket and the method for using it
CN105134092B (en) * 2015-08-05 2017-07-28 中国海洋石油总公司 The HTHP horizontal well completion tubular column of middle part shut-in well injection low-gravity liquid
CN111237848B (en) * 2020-01-16 2021-06-29 安徽理工大学 Direct heating device utilizing abandoned mine and construction method thereof
CN113279694B (en) * 2021-06-15 2022-05-20 成都高峰石油机械有限公司 Ultrashort two-way full-hydraulic drilling jar

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714364U (en) * 2010-07-02 2011-01-19 中国石油集团川庆钻探工程有限公司 Tubular column for horizontal well barefoot well completion staged fracturing acidizing tool
CN102022104A (en) * 2010-11-06 2011-04-20 大庆油田有限责任公司 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN202280447U (en) * 2011-09-30 2012-06-20 中国石油化工股份有限公司 Control valve used for fracturing well completion and capable of being opened and closed
CN202832376U (en) * 2012-08-07 2013-03-27 新疆华油油气工程有限公司 Full-bore closable stratified sliding sleeve
CN103277078A (en) * 2013-06-04 2013-09-04 中国海洋石油总公司 Hydraulic sliding sleeve
CN103362488A (en) * 2012-03-31 2013-10-23 大港油田集团有限责任公司 Sand blasting device allowing fracturing sliding sleeve to be fished
CN203321474U (en) * 2013-05-14 2013-12-04 中国石油天然气股份有限公司 Gas field horizontal well immovable string hydraulic power sand blast clustering multistage fracturing string
CN203716933U (en) * 2014-02-19 2014-07-16 中国海洋石油总公司 Hydraulic sliding sleeve opening and closing tool

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714364U (en) * 2010-07-02 2011-01-19 中国石油集团川庆钻探工程有限公司 Tubular column for horizontal well barefoot well completion staged fracturing acidizing tool
CN102022104A (en) * 2010-11-06 2011-04-20 大庆油田有限责任公司 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN202280447U (en) * 2011-09-30 2012-06-20 中国石油化工股份有限公司 Control valve used for fracturing well completion and capable of being opened and closed
CN103362488A (en) * 2012-03-31 2013-10-23 大港油田集团有限责任公司 Sand blasting device allowing fracturing sliding sleeve to be fished
CN202832376U (en) * 2012-08-07 2013-03-27 新疆华油油气工程有限公司 Full-bore closable stratified sliding sleeve
CN203321474U (en) * 2013-05-14 2013-12-04 中国石油天然气股份有限公司 Gas field horizontal well immovable string hydraulic power sand blast clustering multistage fracturing string
CN103277078A (en) * 2013-06-04 2013-09-04 中国海洋石油总公司 Hydraulic sliding sleeve
CN203716933U (en) * 2014-02-19 2014-07-16 中国海洋石油总公司 Hydraulic sliding sleeve opening and closing tool

Also Published As

Publication number Publication date
CN104727796A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN104653162B (en) One kind can coring pitching fracturing sliding bush
CN105484695B (en) Mechanical and hydraulic double-acting expansion device suitable for expansion tube drilling well
CN104727796B (en) A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method
CN201031662Y (en) Down-hole controllable type boring tool by-pass valve
CN204532322U (en) A kind of horizontal well desirable core sliding sleeve multistage fracturing completion tubular column
CN110454129B (en) Gas well separate-layer fracturing and water control integrated process pipe column
CN104695929B (en) A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column
CN204532321U (en) A kind of desirable core pitching fracturing sliding bush
CN107060702B (en) A kind of coupling type underground throttle device
CN111101895A (en) Underground multilayer seat pressure one-way plugging type switch
CN212803153U (en) High-strength casing high-pressure bridge plug for horizontal well
CN205778794U (en) The latus rectum segmented fracturing devices such as one
CN105089581B (en) A kind of Large Diameter Pipeline gas well well flow rate controller and process
CN203239310U (en) Unlimited-section fracture casing pipe sliding sleeve
CN205532453U (en) Novel oil pipe blanking plug in pit
CN206319872U (en) Completion multistage fracturing counts sliding sleeve
CN107100587B (en) Three-in-one process pipe column for string inspection, water plugging and seal inspection in petroleum production
CN204532260U (en) The sliding bunch tube of coiled tubing selective switch
CN104675361B (en) Coiled tubing selective switch slides bunch tube
CN103867161B (en) A kind of steam injection plugging valve
CN207609399U (en) A kind of novel sound wave wax control device
CN202402003U (en) Lead sealing sand control packer for 4-inch small holes
CN202000937U (en) Anti-sand anti-gliding tool for gas well
CN113090231B (en) Gas lift drainage and gas production integrated speed pipe column and operation process thereof
CN215761571U (en) Unlimited secondary bypass valve device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 430035 Hubei city in Wuhan province two Qiaokou Gutian Road No. 37 HSBC Nanniwan Avenue headquarters block fifth B

Patentee after: PETROLEUM ENGINEERING TECHNOLOGY Research Institute OF HANJIANG OIL FIELD BRANCH SINOPEC

Address before: 430035 Hubei city in Wuhan province two Qiaokou Gutian Road No. 37 HSBC Nanniwan Avenue headquarters block fifth B

Patentee before: OIL PRODUCTION TECHNOLOGY Research Institute OF JIANGHAN OILFIELD COMPANY SINOPEC

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20191217

Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Co-patentee after: PETROLEUM ENGINEERING TECHNOLOGY Research Institute OF HANJIANG OIL FIELD BRANCH SINOPEC

Patentee after: CHINA PETROLEUM & CHEMICAL Corp.

Address before: 430035 Hubei city in Wuhan province two Qiaokou Gutian Road No. 37 HSBC Nanniwan Avenue headquarters block fifth B