CN104679927A - Operation realization method for power grid wiring diagram local area - Google Patents
Operation realization method for power grid wiring diagram local area Download PDFInfo
- Publication number
- CN104679927A CN104679927A CN201310636661.9A CN201310636661A CN104679927A CN 104679927 A CN104679927 A CN 104679927A CN 201310636661 A CN201310636661 A CN 201310636661A CN 104679927 A CN104679927 A CN 104679927A
- Authority
- CN
- China
- Prior art keywords
- window
- picture
- mouse
- line frame
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses an operation realization method for a power grid wiring diagram local area. The steps are: moving a mouse to the top left corner of a local area needs key monitoring, pressing the left key of the mouse, moving the mouse to the lower right corner of the local area, releasing the mouse, and monitoring the displaying of an imaginary line frame which indicates the area selected at current on the picture; moving the mouse into the imaginary line frame, pressing the mouse without release, dragging the imaginary line frame to a window needing displaying and releasing the imaginary line frame; releasing the selected area at the corresponding position of a specified window; making the cut picture as the permanent picture or the temporary picture for saving after the cut picture is displayed in the window; and moving the mouse to the window when the picture of the local area does not need observing, pressing the mouse, dragging the window out of the picture window and releasing the window. The operation realization method for the power grid wiring diagram local area can call the model base information in the new window, realizes automatic generation under the operational mode, does not need off-line cutting and manual intervention, meets the needs of operating personnel and greatly simplifies the process.
Description
Technical field
The present invention relates to a kind of electric network wiring scheme carry out the cutting of regional area online and amplify the method for display, especially a kind of in Power Graphics System, cutting can be carried out flexibly, quickly and easily by the regional area needing emphasis to monitor and the implementation method shown in tool window in picture Real time displaying instrument and driving cabin running tool.
Background technology
In traditional Power Graphics System, electric network wiring scheme is all adopt first off-line to draw, the then mode of Real time displaying.In this manner, the work such as the drafting of electric network wiring scheme, data correlation are separated from surveillance, realize safeguarding separately.
Operating personnel, when supervision electric network wiring scheme image information, if keep in mind the image information heavily checking certain regional area in this wiring diagram, are then needed the wiring diagram first drawing separately this regional area, then can be checked by Real time displaying instrument.Such operation in actual use, can be very inconvenient, is embodied in: first: drawing process complex steps, needs to draw in off-line tools; Second: real time data needs again to associate; 3rd: after all drawing process all complete, just can open in show tools and check.
If need to newly increase a monitoring image, just must be re-started by the drawing tool of off-line and draw and associated data, then can check this picture in surveillance, thus the supervision of online, dynamic, variable electric network wiring scheme picture cannot be realized.
Even if other Power Graphics Systems current employ the concept of some templates, as modes such as interval module, picture modules, realize different information to show in same template pictures, also just under fixing visual format, different pieces of information is shown, that is, prerequisite must be in this Power Graphics System, first draw the template pictures having and need to show.
And along with Power Graphics System more and more consequence in operation of power networks monitors, its operations staff also improves constantly using the requirement of graphics system.Namely traditional function of first drawing, browsing cannot meet the requirement of operations staff in reality use and operating process.Operations staff, when using overall situation supervision electric network wiring scheme in Power Graphics System process, can require the regional area that can change in electric network wiring scheme to pay close attention to.If adopt the mode of pattern visual evoked potentials, then the other parts of electric network wiring scheme cannot be taken into account; If check whole electric network wiring scheme, then cannot give prominence to the regional area needing emphasis to check; If the picture of regional area to be drawn separately a picture, then need to carry out a series of loaded down with trivial details step, as the drafting of picture, data correlation, picture are issued, then just can see this picture.And these work are not obviously operations staffs can implement.
Comprehensively above-mentioned, existing Power Graphics System method of operating haves much room for improvement, and this case produces thus.
Summary of the invention
Object of the present invention, be the operation realizing method that a kind of electric network wiring scheme regional area is provided, it can at new window calling model library information, check the wiring diagram of complete electric network wiring scheme and a certain regional area in same interfaces windows simultaneously, thus the automatic generation realized in the operating mode, do not need switch off-line and manually participate in, while realizing operations staff's demand, enormously simplify process.
In order to reach above-mentioned purpose, solution of the present invention is:
An operation realizing method for electric network wiring scheme regional area, comprises the steps:
(1) in Power Graphics System, select the electric network wiring scheme monitored, mouse is moved to the upper left corner of the regional area needing emphasis to monitor, press left mouse button, and move to the lower right corner of this regional area, then mouse is discharged, at this time monitoring image can show a dotted line frame, represent the current region chosen;
(2) mouse is moved to dotted line frame inner, press mouse and do not put, be dragged to the window needing display, and discharge; When triggering dragging event, by resolving the image information in current selection part, the topological relation of the primitive information in the selected picture of record, facility information, Information Monitoring, model information and equipment room;
(3) region selected is discharged at specified window correspondence position, the topological relation of the primitive information of originally preserving, facility information, Information Monitoring, model information and equipment room is imported in new picture, and according to these information automatic mappings, the size of newly-generated picture size and original selected zone is consistent in proportion;
(4) after the picture of cutting shows in the window, name according to being prompted to current window, and this picture is preserved as permanent picture or interim picture;
(5) when the picture of regional area no longer needs to observe, mouse is moved to this window, press and be dragged to picture window after mouse allows and then discharge outward, then this picture window is deleted automatically.
In above-mentioned steps (1), also comprise after choosing dotted line frame, judge that the size of described dotted line frame is the need of amendment, if desired revises, then mouse is moved to dotted line frame frame portion, carry out after pressing mouse dragging to suitable position; Or the picture can double-clicked outside dotted line frame, then cancel selected dotted line frame, and repeat above-mentioned steps (1), reselects.
In above-mentioned steps (5), after mouse pulls release, according to point of release and the relative position specifying region, the mode of replacement or new window is selected to open the picture of selected zone in accordance with the following steps:
(51) setting regulation region, adopts the mode of central point rectangle 2/3, namely discharges the rectangular area of 2/3 size of window isocenter;
(52) in this region, open display for directly replacing and generate new picture, outside this region, open display for automatically creating new window and generating new picture;
(53) when creating window, if on the left of rectangular area, then represent newly-built in the left side of release window; On the right side of rectangular area, then represent newly-built on the right side of release window.
After adopting such scheme, the present invention is in Power Graphics System, operations staff only needs operating mouse, and will the regional area paid close attention to be needed to carry out drawing frame to select, the picture of regional area be shown in new location window by the mode then pulled by mouse.While realizing operations staff's demand, also greatly simplify process.
Operating personnel are when monitoring electric network wiring scheme image information, pass through mouse action, frame is drawn to select by needing the regional area picture of primary part observation in electric network wiring scheme, then pull and move to the release of specific position, just can according to the topological relation of the primitive information in selected zone, facility information, Information Monitoring, model information and equipment room, the electric network wiring scheme picture that generation one is new quickly and easily, and show in the window of this position, newly-generated picture can show according to the size adaptation of residing window.
After aforesaid operations completes, the wiring diagram of complete electric network wiring scheme and a certain regional area can be checked in same interfaces windows simultaneously, and support the display of multiple electric network wiring scheme regional area, and whole cutting process and display, amplifieroperation can, by automatically completing, not need switch off-line and manually participate in.
Accompanying drawing explanation
Fig. 1 is latticed layout regulation area schematic in the present invention;
Fig. 2 is level single layout regulation area schematic in the present invention;
Fig. 3 is vertical single layout regulation area schematic in the present invention.
Embodiment
Below with reference to accompanying drawing, technical scheme of the present invention is described in detail.
The invention provides a kind of operation realizing method of electric network wiring scheme regional area, be mainly by mouse action, the electric network wiring scheme realizing monitoring, in line clipping also display in real time, specifically comprises the steps:
(1) in Power Graphics System, select the electric network wiring scheme monitored, mouse is moved to the upper left corner of the regional area needing emphasis to monitor, press left mouse button, and move to the lower right corner of this regional area, then mouse is discharged, at this time monitoring image can show a dotted line frame, represent the current region chosen.
(2) if the size of described dotted line frame needs amendment, then mouse is moved to dotted line frame frame portion, carry out after pressing mouse dragging to suitable position; Or the picture can double-clicked outside dotted line frame, then cancel selected dotted line frame, and repeat above-mentioned steps (1), reselects.
(3) after choosing the region needing to reduce, mouse is moved to dotted line frame inner, press mouse and do not put, be dragged to the window needing display, and discharge.
When triggering dragging event, by resolving the image information in current selection part, the topological relation of the primitive information in the selected picture of record, facility information, Information Monitoring, model information and equipment room.
(4) region selected is discharged at specified window correspondence position, the topological relation of the primitive information of originally preserving, facility information, Information Monitoring, model information and equipment room is imported in new picture, and according to these information automatic mappings, the size of newly-generated picture size and original selected zone is consistent in proportion.
(5) after the picture of cutting shows in the window, user can be pointed out to name to current window, and this picture is preserved as permanent picture or interim picture.
(6) when the picture of regional area no longer needs to observe, mouse can be moved to this window, press and be dragged to picture window after mouse allows and then discharge outward, then this picture window is deleted automatically.
Mouse generates the size setting screen size of new picture according to selected zone after pulling release, but due to the Aspect Ratio of new picture and the Aspect Ratio of display window inconsistent, so can automatically adjust according to isometric ratio or wide ratio when showing, the length breadth ratio of picture is such as selected to be 2:1, and the Aspect Ratio of window is 3:2, then picture lower regions in the process of display can widen automatically, thus adapts to the ratio of window.
After mouse pulls release, can, according to point of release and the relative position specifying region, the mode of replacement or new window be selected to open the picture of selected zone.Its main judgment mode is as follows:
Setting regulation region, the present invention adopts the mode of central point rectangle 2/3, namely discharges the rectangular area of 2/3 size of window isocenter;
In this region, open display for directly replacing and generate new picture, outside this region, open display for automatically creating new window and generating new picture.
When creating window, if on the left of rectangular area, then represent newly-built in the left side of release window; On the right side of rectangular area, then represent newly-built on the right side of release window.
In sum, the present invention has following feature:
1) online electric network wiring scheme cutting and picture generate
In Power Graphics System software, can quick and easy, dynamically generate new picture by the present invention and monitor, and just can see new image content after screen customisation need not being carried out in advance by offline mode.
2) cutting of regional area is carried out by mouse action
On existing electric network wiring scheme, can conveniently select by mouse action the regional area that needs emphasis to check, and carry out cutting, selected picture is shown in new window.
The local region information that electric network wiring scheme is selected comprises the primitive information etc. of electric network wiring scheme facility information, annexation, corresponding model information, corresponding collection point information and picture display.
By resolving existing image information, the subsequent operation of record aspect is the function of first robotization coupling, and does not need drawing personnel to carry out manually participating in mating, and greatly saves the time of drawing personnel, and improves accuracy.
3) mouse pulls and carries out picture generation and display
By the method that mouse pulls, by the information of selected regional area, comprise electric network wiring scheme facility information, annexation, corresponding model information, corresponding collection point information, picture display primitive information etc. automatically generate new picture file and show in new window.
In picture automatic mapping process, according to the original size of selected zone, new picture dimension is set, and automatically generate primary connection figure according to facility information, model information, primitive information and annexation, comprise the annexation, connecting line etc. of picture pel display mode, equipment, and automatically save as picture file and show in new window.Thus break away from conventional electric power graphics system software and need the method customized in advance can see new electric system figure picture.
4) multiple displaying scheme is formed according to mouse off-position
Pulled the diverse location of rear release by mouse, the display mode of picture in Power Graphics System after cutting can be determined neatly, be included in original graphical window to replace to open and open two kinds of modes with new window.
The diverse location of release mainly refers to the regulation region that current release window is corresponding, as 2/3 region (this area size is configurable) of the same central point of release window.If in regulation region, then replace in original graphical window and open, otherwise then create new window, open in new window.If in the left side in regulation region, open on the right side in regulation region if then increase a window newly in the left side of release window, then open at the newly-increased window in the right side of release window, the same process of upper and lower sides release.
If current release window limit is the single window arrangement of level, then specify that top and the bottom, region and release window overlap; Be shown as vertical single window arrangement, then specify that the left and right department in region and release window overlap.In detail as shown in Figure 1 to Figure 3.
By the way, autoplacement and the adjustment of window can be realized, not need update routine or configuration file just can automatically increase new window and show corresponding informance.
5) pull by mouse regional area picture cutting generated to delete
When newly-generated picture no longer needs to pay close attention to, the mode that can be pulled by mouse is removed fast.And traditional electric power graphs software can determine the display of certain window or remove after all needing to redefine window layout.
After the regional area picture that needs are deleted is pulled frame out scope by mouse, the window manager of native system can obtain this dragging event, and judge whether to need to delete current drag window according to this event, if need to delete, then first removed needing the window deleted from current interface by window manager, and again to the window layout occuping region, then the related information of window is deleted in release, and final releasing memory
Above embodiment is only and technological thought of the present invention is described, can not limit protection scope of the present invention with this, and every technological thought proposed according to the present invention, any change that technical scheme basis is done, all falls within scope.
Claims (3)
1. an operation realizing method for electric network wiring scheme regional area, is characterized in that comprising the steps:
(1) in Power Graphics System, select the electric network wiring scheme monitored, mouse is moved to the upper left corner of the regional area needing emphasis to monitor, press left mouse button, and move to the lower right corner of this regional area, then mouse is discharged, at this time monitoring image can show a dotted line frame, represent the current region chosen;
(2) mouse is moved to dotted line frame inner, press mouse and do not put, be dragged to the window needing display, and discharge; When triggering dragging event, by resolving the image information in current selection part, the topological relation of the primitive information in the selected picture of record, facility information, Information Monitoring, model information and equipment room;
(3) region selected is discharged at specified window correspondence position, the topological relation of the primitive information of originally preserving, facility information, Information Monitoring, model information and equipment room is imported in new picture, and according to these information automatic mappings, the size of newly-generated picture size and original selected zone is consistent in proportion;
(4) after the picture of cutting shows in the window, name according to being prompted to current window, and this picture is preserved as permanent picture or interim picture;
(5) when the picture of regional area no longer needs to observe, mouse is moved to this window, press and be dragged to picture window after mouse allows and then discharge outward, then this picture window is deleted automatically.
2. the operation realizing method of a kind of electric network wiring scheme regional area as claimed in claim 1, it is characterized in that: in described step (1), also comprise after choosing dotted line frame, judge that the size of described dotted line frame is the need of amendment, if desired revise, then mouse is moved to dotted line frame frame portion, carry out after pressing mouse dragging to suitable position; Or the picture can double-clicked outside dotted line frame, then cancel selected dotted line frame, and repeat above-mentioned steps (1), reselects.
3. the operation realizing method of a kind of electric network wiring scheme regional area as claimed in claim 1, it is characterized in that: in described step (5), after mouse pulls release, according to point of release and the relative position specifying region, the mode of replacement or new window is selected to open the picture of selected zone in accordance with the following steps:
(51) setting regulation region, adopts the mode of central point rectangle 2/3, namely discharges the rectangular area of 2/3 size of window isocenter;
(52) in this region, open display for directly replacing and generate new picture, outside this region, open display for automatically creating new window and generating new picture;
(53) when creating window, if on the left of rectangular area, then represent newly-built in the left side of release window; On the right side of rectangular area, then represent newly-built on the right side of release window.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310636661.9A CN104679927A (en) | 2013-12-02 | 2013-12-02 | Operation realization method for power grid wiring diagram local area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310636661.9A CN104679927A (en) | 2013-12-02 | 2013-12-02 | Operation realization method for power grid wiring diagram local area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104679927A true CN104679927A (en) | 2015-06-03 |
Family
ID=53314967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310636661.9A Pending CN104679927A (en) | 2013-12-02 | 2013-12-02 | Operation realization method for power grid wiring diagram local area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104679927A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109002336A (en) * | 2017-06-06 | 2018-12-14 | 许继电气股份有限公司 | A kind of charging pile remotely monitors the generation method and device of navigation form |
CN111008931A (en) * | 2019-12-05 | 2020-04-14 | 北京科东电力控制系统有限责任公司 | Method for automatically splicing and displaying power grid graphs |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101419617A (en) * | 2008-12-10 | 2009-04-29 | 深圳市迅雷网络技术有限公司 | Method and apparatus for determining web page object |
CN101483342A (en) * | 2008-07-30 | 2009-07-15 | 上海同盛工程建设配套管理有限公司 | Geographical information system used for electric system |
CN101676940A (en) * | 2008-06-13 | 2010-03-24 | 阿海珐输配电公司 | Energy management system that provides real time situation awareness of a potential energy management failure |
US20100122195A1 (en) * | 2008-11-13 | 2010-05-13 | Hwang Hoyoung | Mobile terminal with touch screen and method of processing data using the same |
CN101894386A (en) * | 2010-07-19 | 2010-11-24 | 深圳市雅都软件股份有限公司 | Method and system for intuitively displaying interlayer relation of graphic element in multi-level model |
CN101923697A (en) * | 2010-09-09 | 2010-12-22 | 大道计算机技术(上海)有限公司 | Geographic information accessory system applicable to large screen and implementation method thereof |
CN103164103A (en) * | 2011-12-15 | 2013-06-19 | 腾讯科技(深圳)有限公司 | Date display method and device |
-
2013
- 2013-12-02 CN CN201310636661.9A patent/CN104679927A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101676940A (en) * | 2008-06-13 | 2010-03-24 | 阿海珐输配电公司 | Energy management system that provides real time situation awareness of a potential energy management failure |
CN101483342A (en) * | 2008-07-30 | 2009-07-15 | 上海同盛工程建设配套管理有限公司 | Geographical information system used for electric system |
US20100122195A1 (en) * | 2008-11-13 | 2010-05-13 | Hwang Hoyoung | Mobile terminal with touch screen and method of processing data using the same |
CN101419617A (en) * | 2008-12-10 | 2009-04-29 | 深圳市迅雷网络技术有限公司 | Method and apparatus for determining web page object |
CN101894386A (en) * | 2010-07-19 | 2010-11-24 | 深圳市雅都软件股份有限公司 | Method and system for intuitively displaying interlayer relation of graphic element in multi-level model |
CN101923697A (en) * | 2010-09-09 | 2010-12-22 | 大道计算机技术(上海)有限公司 | Geographic information accessory system applicable to large screen and implementation method thereof |
CN103164103A (en) * | 2011-12-15 | 2013-06-19 | 腾讯科技(深圳)有限公司 | Date display method and device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109002336A (en) * | 2017-06-06 | 2018-12-14 | 许继电气股份有限公司 | A kind of charging pile remotely monitors the generation method and device of navigation form |
CN109002336B (en) * | 2017-06-06 | 2021-10-22 | 许继电气股份有限公司 | Charging pile remote monitoring navigation window generation method and device |
CN111008931A (en) * | 2019-12-05 | 2020-04-14 | 北京科东电力控制系统有限责任公司 | Method for automatically splicing and displaying power grid graphs |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103336686B (en) | The editing device of the terminal plays template of digital signage system and edit methods thereof | |
CN109859326B (en) | Cross-platform two-dimensional and three-dimensional graph linkage display system and method for transformer substation | |
DE60021385T2 (en) | DEVICE AND METHOD FOR MULTIMEDIA DISPLAY | |
CN107551547B (en) | Game information display method and device | |
CN106126489A (en) | A kind of report file dynamic chart edit methods and system | |
CN104391620B (en) | Document processing method, terminal and system | |
KR101251304B1 (en) | Picture control device | |
CN104679927A (en) | Operation realization method for power grid wiring diagram local area | |
CN114816189A (en) | Cloud-based industrial intelligent equipment remote configuration method | |
CN113255302A (en) | Method for operating tissue architecture diagram, computer device and computer storage medium | |
CN101141629A (en) | Multi-stage picture division based fast digital video control method | |
KR102555223B1 (en) | Apparatus for editing object | |
CN105554589A (en) | Subtitle superposition method of back end display | |
CN110321679A (en) | A kind of O&M method pulling configuration visualization screen | |
CN103793152A (en) | Online customizing method for pictures of monitoring system of transformer substation | |
CN116456052A (en) | Configuration method, device, system and storage medium for association relation of equipment | |
CN106992985B (en) | protocol group generation method and device | |
TWI544354B (en) | Graphic Control Interface Design System and Its Graphic Control Interface Design and Operation | |
CN112584040B (en) | Image display method and device and electronic equipment | |
CN114581546A (en) | SVG technology-based building graphic display method | |
CN113312125A (en) | Multi-window adjusting method, system, readable storage medium and electronic equipment | |
DE112016004057T5 (en) | DATA PROCESSING DEVICE, DATA PROCESSING PROCESS AND PROGRAM | |
CN104238905A (en) | Method and device for adjusting local magnification of medical images | |
CN205087819U (en) | Hoist operation supervisory equipment | |
KR20190114508A (en) | HMI Device with Secondary Screen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150603 |
|
WD01 | Invention patent application deemed withdrawn after publication |