CN104537069B - A kind of document configuration and application system and its method - Google Patents

A kind of document configuration and application system and its method Download PDF

Info

Publication number
CN104537069B
CN104537069B CN201410840435.7A CN201410840435A CN104537069B CN 104537069 B CN104537069 B CN 104537069B CN 201410840435 A CN201410840435 A CN 201410840435A CN 104537069 B CN104537069 B CN 104537069B
Authority
CN
China
Prior art keywords
list
document
data
unit
document project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410840435.7A
Other languages
Chinese (zh)
Other versions
CN104537069A (en
Inventor
向万红
毕伟
熊文军
刘培锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuanguang Software Co Ltd
Original Assignee
Yuanguang Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuanguang Software Co Ltd filed Critical Yuanguang Software Co Ltd
Priority to CN201410840435.7A priority Critical patent/CN104537069B/en
Publication of CN104537069A publication Critical patent/CN104537069A/en
Application granted granted Critical
Publication of CN104537069B publication Critical patent/CN104537069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2291User-Defined Types; Storage management thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Software Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of configuration of document and application process, the document project data of input is configured by dispensing unit;By list generation unit according to postpone document project data generation corresponding to list;Process modeling is carried out to the list of generation by process modeling unit;Application server is parsed and handled to the above-mentioned form data with the document project data postponed, generation according to the flow that process modeling obtains.The document configuration of the present invention and application system and method, not only simplify the processing of the change to intermediate demand, and reduce cost.

Description

A kind of document configuration and application system and its method
Technical field
The present invention relates to materiel warehouse-in list in data configuration and application field, more particularly to a kind of ERP System According to configuration and application system and method.
Background technology
It is increasing to the demand of ERP System with the continuous development of economy.So-called ERP System, it is a kind of system for referring to provide real-time, related, accurate, complete data.Resource management system leads in the market Often it is required for developer to get involved deeply in, does not support data modeling, the business verification rule of flexible configuration, the server of dynamically changeable " hot-swappable " extension and integration configuration management etc..Traditional resource management system development mode, is manufactured almost exclusively by The technology platform server of bottom is built, and then carries out the exploitation of business logic systems on its basis.This exploitation enterprise money The drawbacks of management system, is that the construction cycle is grown, and intermediate demand change is frequently difficult to reply change, and cost is higher.
The content of the invention
For above mentioned problem of the prior art, the invention provides a kind of configuration of document and application system and method, no The processing of the change to intermediate demand is only simplified, and reduces cost.
A kind of document configuration and application system, including document configuration server, application server and database, document configuration Server includes dispensing unit, list generation unit and process modeling unit, and application server includes document project and form solution Unit and flow resolution unit are analysed,
Wherein
Dispensing unit, for being configured to the document project data of input;
List generation unit, for the list according to corresponding to the document project data generation postponed;
Process modeling unit, for carrying out process modeling to the list of generation;
Application server, for according to the flow that process modeling obtains to it is above-mentioned with the document project data postponed, generation Form data parsed and handled;
Database, for storing the data of the system.
Further, dispensing unit, for being configured specially to the document project data of input:
The document project required for target service is created by dispensing unit;During document project is created, set The title and type of document project;Dispensing unit is additionally operable to as document project configuration logical process formula and business verification rule.
Further, list generation unit is specific for the list according to corresponding to the document project data generation postponed For:
After the configuration for completing document project, link is generated into list;According to target service needs, selection is needed in table Document project data shown in single lattice formula, list generation unit automatically generate default table single lattice according to selected document project Formula;Format layout is adjusted according to demand;Setting option purpose default value and visual attribute during list is configured;It is described to set Put and be analyzed and processed in the resolving of application server.
Further, process modeling unit, it is specially for carrying out process modeling to the list of generation:
After generating list, into process modeling link;Process modeling unit selects the service node needed according to demand And logical node.
Further, application server, for according to the flow that process modeling obtains to above-mentioned with the document project postponed Data, the form data of generation are parsed and handled specially:
Application server loads document project data and format content data first, and document project data is passed through into form wash with watercolours Contaminate unit and form list;Entry format resolver parses to the form of document project data;After list input data Carry out workflow, the definition of flow resolution unit process of analysis, the selection being route according to flow definition.
A kind of document configuration and application process, comprise the following steps:
Step 1, by dispensing unit the document project data of input is configured;
Step 2, by list generation unit according to postpone document project data generation corresponding to list;
Step 3, the list progress process modeling by process modeling unit to generation;
Step 4, application server are according to the flow that process modeling obtains to above-mentioned with the document project data postponed, generation Form data parsed and handled;
Step 5, according to demand selection terminate or returned return to step 1.
Further, bills data is configured specially in step 1:
The document project required for target service is created by document dispensing unit;During document project is created, The title and type of document project are set;It is that document project configuration logical process formula and business verify by document dispensing unit Rule.
Further, will be specially with list corresponding to the document project data generation postponed in step 2:
After the configuration for completing document project, link is generated into list;According to target service needs, selection is needed in table Document project data shown in single lattice formula, list generation unit automatically generate default table single lattice according to selected document project Formula;Format layout is adjusted according to demand;Setting option purpose default value and visual attribute during list is configured;It is described to set Put and be analyzed and processed in the resolving of application server;
Further, carrying out process modeling to the list of generation by process modeling unit in step 3 is specially:
After generating list, into process modeling link;Process modeling unit selects the service node needed according to demand And logical node.
Further, in step 4 application server according to process modeling to it is above-mentioned with the document project data postponed, generation Form data handled and parsed specially:
Application server loads document project data and format content data first, and document project data is passed through into form wash with watercolours Contaminate unit and form list;Entry format resolver parses to the form of document project data;After list input data Carry out workflow, the definition of flow resolution unit process of analysis, the selection being route according to flow definition.
Beneficial effect of the present invention:
The document configuration of the present invention and application system and method, by integral data, list and flow three zones, for enterprise The materiel warehouse-in of industry level resource administration system provides flexible business configuration, and is rendered and flow engine technology by grid control Enable developer, operation maintenance personnel faster application system, the business demand that more efficient reply enterprise complicates more.
Brief description of the drawings
Accompanying drawing is only used for showing the purpose of specific embodiment, and is not considered as limitation of the present invention, in whole accompanying drawing In, identical reference symbol represents identical part.
Fig. 1 is the structured flowchart of the present invention
Fig. 2 is flow chart of the method for the present invention
Fig. 3 is the data structure diagram schematic diagram of the present invention
Embodiment
The preferred embodiments of the present invention are specifically described below in conjunction with the accompanying drawings, wherein, accompanying drawing forms the application part, and It is used for the principle for explaining the present invention together with embodiments of the present invention.
The system of the present invention supports the flexible software prototype of Dynamical Deployment, base based on the expansible OSGi framework of micro-kernel In configurable, assembly type ERP model, using the document of logistics storage as object, by document setting unit, Form dispensing unit, three big component of process modeling unit form configuration server, by document project and format analysis unit and Flow resolution unit forms application server.
Describing the document configuration of the present invention and application system, the system in detail with reference to Fig. 1 includes document configuration service Device, application server and database, document configuration server include dispensing unit, list generation unit and process modeling unit, Application server includes document project and format analysis unit and flow resolution unit, wherein
Dispensing unit, for being configured to the document project data of input;
List generation unit, for the list according to corresponding to the document project data generation postponed;
Process modeling unit, for carrying out process modeling to the list of generation;
Application server, for according to the flow that process modeling obtains to it is above-mentioned with the document project data postponed, generation Form data parsed and handled;
Database, for storing the data of the system.
Dispensing unit, it is dynamic using intellectuality for providing dynamic configuration project name, field attribute and logic verify rule State generates the mode of project table, and supports multistage sublist.
List generation unit, visualize, can pull, the mode of What You See Is What You Get for offer, facilitate user to complete list Form is drawn;List form drawing unit is additionally operable to project data binding, item setup logical formula (such as access, computing and hook Check expression formula).
Process modeling unit, visualize, can pull, the mode of What You See Is What You Get for offer, facilitate user to complete The drafting of flow;Service node (such as fill out single, examination & approval, assets are alloted) and logical node (including conditional branching, parallel are provided With free branch);Process modeling unit is additionally operable to using ranks conversion memory technology implementation process extended attribute, and can be realized Dynamic configuration, extension is because the attribute that business needs and increases newly.
The flow resolution unit of application server uses XPDL flow engine agreements, supports a variety of flow routing operations, bag Include positive transmission, rollback, branch, free and parallel.
The project and format analysis unit of application server use Data cache technology, the table that application server is parsed Single lattice formula, flow data caching, booster response speed.
Application server extends work(based on the expansible OSGi framework of micro-kernel by way of realizing Server Extension point Can, by increment and it is hot-swappable in a manner of cooperated with application server, add function for document application server.
Describe document configuration and the application process of the ERP System of the present invention in detail with reference to Fig. 2, including Following steps:
Step 1, by dispensing unit the document project data of input is configured;
Step 2, by list generation unit according to postpone document project data generation corresponding to list;
Step 3, the list progress process modeling by process modeling unit to generation;
Step 4, application server are according to the flow that process modeling obtains to above-mentioned with the document project data postponed, generation Form data parsed and handled;
Step 5, according to demand selection terminate or returned return to step 1.
The document project required for target service is created by document dispensing unit;During document project is created, The title and type of document project are set;It is that document project configuration logical process formula and business verify by document dispensing unit Rule.
After the configuration for completing document project, link is generated into list;According to target service needs, selection is needed in table Document project data shown in single lattice formula, list generation unit automatically generate default table single lattice according to selected document project Formula;Format layout is adjusted according to demand;Setting option purpose default value and visual attribute during list is configured;It is described to set Put and be analyzed and processed in the resolving of application server;
After generating list, into process modeling link;Process modeling unit selects the service node needed according to demand And logical node.
Application server loads document project data and format content data first, and document project data is passed through into form wash with watercolours Contaminate unit and form list;Entry format resolver parses to the form of document project data;After list input data Carry out workflow, the definition of flow resolution unit process of analysis, the selection being route according to flow definition.
Below by taking the handling of goods and materials storage document in ERP System as an example, technical scheme is carried out Describe in detail:
1) the document project configuration unit in configuration server, newly-built document types are passed through.
2) the related essential information data of document types, such as name of product are inputted.
3) new projects are set, increase project at the same level newly, at project configuration detail interface, input relevant information, such as ProductName Claim, field attribute, field width etc..
4) judge whether to need to continue new projects, if it is, continuing new projects in the way of step 3);Otherwise Into step 5).
5) document types are preserved, now configuration server will dynamically be saved in this document types in the form of tables of data In database.
If 6) preserve after find miss project, can be increased newly on the basis of original, re-execute 3), 4), 5) step.
7) after setting document project, form drawing unit is set, according to specifically needing selection to need to be illustrated in lattice Document project in formula, it is determined that afterwards, specific list will be produced, and be stored in the form of html in database.
8) the size thickness to set font, for example the title " handling of goods and materials storage " of expression is adjusted to runic.
9) after the drawing for completing list form, into process modeling stage, setting procedure modeling unit.
10) node for selecting operation flow to need, and it is each by traffic flow precedence, condition and demand assembling Node.
11) after link is started, single node is filled out in selection, fills out single node connection examination & verification node etc..
12) it is yes to set the extended attribute of examination & verification node " allowing to retract ", is supported in examination & verification not in the case of single Rewritten according to retracting to filling out one.
13) according to the business needs of reality, the default data for auditing link is set, when the default setting can save selection Between, effectively improve operating efficiency.
14) logical formula is configured, expression formula is checked as hooked.
Except by server intrinsic configuration and application, additionally providing advanced characteristic, being realized by way of coding Expanded application, here are its specific embodiments:
15) the document event extension point of configuration server issue is realized, with the specific service logic of written in code.
16) this document event is registered in configuration server, the information of registration exists in xml format.
17) for quote server while document configuration is parsed, parsing is registered to document event therein in the lump, and performs Document event, complete the service logic of expanded function.
In summary, the embodiments of the invention provide a kind of document configuration and application system and method, by integral data, List and flow three zones, flexible, complicated business configuration is provided for enterprise-level resource management system, and pass through grid control Render enables developer, operation maintenance personnel more rapidly constructing system with flow engine technology, and more efficient reply enterprise is changeable multiple Miscellaneous business demand, and greatly reduce cost.
It will be understood by those skilled in the art that realizing all or part of flow of above-described embodiment method, meter can be passed through Calculation machine program instructs the hardware of correlation to complete, and described program can be stored in computer-readable recording medium.Wherein, institute Computer-readable recording medium is stated as disk, CD, read-only memory or random access memory etc..
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Those skilled in the art are within the scope of presently disclosed techniques, and the change or replacement that can readily occur in should all be contained Cover within protection scope of the present invention.

Claims (8)

1. a kind of document configuration and application system, it is characterised in that including document configuration server, application server and data Storehouse, document configuration server include dispensing unit, list generation unit and process modeling unit, and application server includes document item Mesh and format analysis unit and flow resolution unit, wherein
Dispensing unit, for being configured to the document project data of input;
List generation unit, for the list according to corresponding to the document project data generation postponed;
Process modeling unit, for carrying out process modeling to the list of generation;
Application server, for according to the flow that process modeling obtains to it is above-mentioned with the document project data postponed, generation table Forms data is parsed and handled;
Database, for storing the data of the system;
Dispensing unit, for being configured specially to the document project data of input:
The document project required for target service is created by dispensing unit;During document project is created, document is set The title and type of project;Dispensing unit is additionally operable to as document project configuration logical process formula and business verification rule.
2. the system as claimed in claim 1, it is characterised in that list generation unit, for according to the document project postponed Data generation corresponding to list be specially:
After the configuration for completing document project, link is generated into list;According to target service needs, selection is needed in list lattice Document project data shown in formula, list generation unit automatically generate default table single lattice formula according to selected document project; Format layout is adjusted according to demand;Setting option purpose default value and visual attribute during list is configured;The setting It is analyzed and processed in the resolving of application server.
3. system as claimed in claim 1 or 2, it is characterised in that process modeling unit, for being flowed to the list of generation Cheng Jianmo is specially:
After generating list, into process modeling link;Process modeling unit selects the service node needed and patrolled according to demand Collect node.
4. system as claimed in claim 3, it is characterised in that application server, for the flow obtained according to process modeling The above-mentioned form data with the document project data postponed, generation is parsed and handled specially:
Application server loads document project data and format content data first, and document project data is rendered into list by form Member forms list;Entry format resolver parses to the form of document project data;Carried out after list input data Workflow, the definition of flow resolution unit process of analysis, the selection being route according to flow definition.
5. a kind of document configuration and application process, it is characterised in that comprise the following steps:
Step 1, by dispensing unit the document project data of input is configured;
Step 2, by list generation unit according to postpone document project data generation corresponding to list;
Step 3, the list progress process modeling by process modeling unit to generation;
Step 4, application server are according to the flow that process modeling obtains to the above-mentioned table with the document project data postponed, generation Forms data is parsed and handled;
Step 5, according to demand selection terminate or return to step 1;
Bills data is configured specially in step 1:
The document project required for target service is created by document dispensing unit;During document project is created, set The title and type of document project;It is document project configuration logical process formula and business verification rule by document dispensing unit Then.
6. method as claimed in claim 5, it is characterised in that will be generated in step 2 with the document project data postponed corresponding List be specially:
After the configuration for completing document project, link is generated into list;According to target service needs, selection is needed in list lattice Document project data shown in formula, list generation unit automatically generate default table single lattice formula according to selected document project; Format layout is adjusted according to demand;Setting option purpose default value and visual attribute during list is configured;The setting It is analyzed and processed in the resolving of application server.
7. method as claimed in claim 6, it is characterised in that entered in step 3 by process modeling unit to the list of generation Row process modeling is specially:
After generating list, into process modeling link;Process modeling unit selects the service node needed and patrolled according to demand Collect node.
8. method as claimed in claim 7, it is characterised in that application server is matched somebody with somebody according to process modeling to above-mentioned in step 4 Document project data, the form data of generation postponed is handled and parsed specially:
Application server loads document project data and format content data first, and document project data is rendered into list by form Member forms list;Entry format resolver parses to the form of document project data;Carried out after list input data Workflow, the definition of flow resolution unit process of analysis, the selection being route according to flow definition.
CN201410840435.7A 2014-12-26 2014-12-26 A kind of document configuration and application system and its method Active CN104537069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410840435.7A CN104537069B (en) 2014-12-26 2014-12-26 A kind of document configuration and application system and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410840435.7A CN104537069B (en) 2014-12-26 2014-12-26 A kind of document configuration and application system and its method

Publications (2)

Publication Number Publication Date
CN104537069A CN104537069A (en) 2015-04-22
CN104537069B true CN104537069B (en) 2017-12-26

Family

ID=52852597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410840435.7A Active CN104537069B (en) 2014-12-26 2014-12-26 A kind of document configuration and application system and its method

Country Status (1)

Country Link
CN (1) CN104537069B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109711809A (en) * 2018-12-28 2019-05-03 广东益萃网络科技有限公司 Trade company's property setting method, device, computer equipment and storage medium

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104850665B (en) * 2015-06-12 2017-11-24 江苏中威科技软件系统有限公司 The method and system to be circulated by flow nesting implementation process
CN105183463A (en) * 2015-08-27 2015-12-23 携程计算机技术(上海)有限公司 Air ticket order processing system based on message mechanism
CN105678509A (en) * 2015-12-31 2016-06-15 中国广核电力股份有限公司 Data processing method and system
CN105787708A (en) * 2016-03-16 2016-07-20 浪潮通用软件有限公司 Bill processing method based on task pool
CN106779613A (en) * 2016-12-28 2017-05-31 北京奇鱼时代科技有限公司 A kind of method and apparatus for examining configuration
CN108460570B (en) * 2017-02-22 2021-04-30 北京京东尚科信息技术有限公司 Reusable service management configuration method, device, system and storage medium
CN108491367B (en) * 2018-02-11 2020-06-12 苏州朗动网络科技有限公司 Report document generation method and device, computer equipment and storage medium
CN108629017A (en) * 2018-05-08 2018-10-09 山东浪潮通软信息科技有限公司 A kind of document flow implementation method that explanation type alternative is configured and run
CN108932293B (en) * 2018-05-31 2022-03-22 浪潮金融信息技术有限公司 Customized electronic receipt generation method based on visual configuration
CN110648090A (en) * 2018-06-26 2020-01-03 优信拍(北京)信息科技有限公司 Logistics process node management method and system
CN109409728B (en) * 2018-10-19 2022-02-15 厦门金龙联合汽车工业有限公司 Integrity detection method and system for configurable bill of material
CN109377106A (en) * 2018-12-06 2019-02-22 浪潮通用软件有限公司 A kind of operation flow implementation method based on pilot pattern
CN111352983A (en) * 2018-12-24 2020-06-30 深圳市优必选科技有限公司 Service attribute dynamic expansion method and device, computer equipment and storage medium
CN109710910A (en) * 2018-12-29 2019-05-03 益萃网络科技(中国)有限公司 Document generation method and system, storage medium
CN110428217A (en) * 2019-07-03 2019-11-08 深圳市华宇讯科技有限公司 A kind of ERP system
CN111897801A (en) * 2020-08-05 2020-11-06 上海伯俊软件科技有限公司 Autonomous form configuration method based on metadata layer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5765167A (en) * 1994-12-26 1998-06-09 Casio Computer Co., Ltd. Data file update processing apparatus
CN102135990A (en) * 2011-03-11 2011-07-27 北京神舟航天软件技术有限公司 Java server page (JSP) template-based intelligent table system capable of being defined freely and generating method
CN103294788A (en) * 2013-05-20 2013-09-11 广州迅睿网络科技有限公司 Universal background processing method and system for websites
CN103617047A (en) * 2013-12-16 2014-03-05 北京中电普华信息技术有限公司 Method, device and processor for developing business processes
CN104063495A (en) * 2014-07-04 2014-09-24 用友软件股份有限公司 Form extension method and form extension device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5765167A (en) * 1994-12-26 1998-06-09 Casio Computer Co., Ltd. Data file update processing apparatus
CN102135990A (en) * 2011-03-11 2011-07-27 北京神舟航天软件技术有限公司 Java server page (JSP) template-based intelligent table system capable of being defined freely and generating method
CN103294788A (en) * 2013-05-20 2013-09-11 广州迅睿网络科技有限公司 Universal background processing method and system for websites
CN103617047A (en) * 2013-12-16 2014-03-05 北京中电普华信息技术有限公司 Method, device and processor for developing business processes
CN104063495A (en) * 2014-07-04 2014-09-24 用友软件股份有限公司 Form extension method and form extension device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109711809A (en) * 2018-12-28 2019-05-03 广东益萃网络科技有限公司 Trade company's property setting method, device, computer equipment and storage medium

Also Published As

Publication number Publication date
CN104537069A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN104537069B (en) A kind of document configuration and application system and its method
US8271935B2 (en) Methods and tools for data-driven application engineering
US8019860B2 (en) Service accounting method and apparatus for composite service
US9552400B2 (en) Defining and mapping application interface semantics
US9875276B2 (en) Database view generation
Sy et al. Product design analysis based on life cycle features
US20080222599A1 (en) Web services mashup designer
CN104866426A (en) Software test integrated control method and system
CN104408605A (en) Order splitting method and system
US20160357787A1 (en) Metadata extractor for software applications
CN104156313A (en) Method for automatically generating Web service testing case
US9304746B2 (en) Creating a user model using component based approach
US20170011135A1 (en) Conversion Automation through Data and Object Importer
US20150006225A1 (en) Project management application with business rules framework
Lee et al. NESIS: a neutral schema for a web-based simulation model exchange service across heterogeneous simulation software
CN111813739A (en) Data migration method and device, computer equipment and storage medium
CN110058849A (en) Generation method, device, computer equipment and the storage medium of flow chart
US9280361B2 (en) Methods and systems for a real time transformation of declarative model and layout into interactive, digital, multi device forms
US9471640B2 (en) Automatic conversion of units of measure during data stream processing
May et al. Toward a reference terminology for product-service systems in the manufacturing domain
JP6403527B2 (en) Design diversion support device, design diversion support method and program
CN107066271B (en) Hierarchical management method and system for display object
Uddin et al. A feature-based engineering methodology for cyclic modeling and analysis processes in plastic product development
Helle et al. Smart component modeling for complex system development
US8566814B2 (en) Transporting object packets in a nested system landscape

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant