CN104460589B - Mobile debugging system with simulation dispatching master station - Google Patents

Mobile debugging system with simulation dispatching master station Download PDF

Info

Publication number
CN104460589B
CN104460589B CN201410568998.5A CN201410568998A CN104460589B CN 104460589 B CN104460589 B CN 104460589B CN 201410568998 A CN201410568998 A CN 201410568998A CN 104460589 B CN104460589 B CN 104460589B
Authority
CN
China
Prior art keywords
mobile terminal
debugging
main website
scheduling station
operation simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410568998.5A
Other languages
Chinese (zh)
Other versions
CN104460589A (en
Inventor
倪玮强
龚强
张烨
韩学
田欣平
李倩
康伟
孙海新
李汉枝
刘雅倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410568998.5A priority Critical patent/CN104460589B/en
Publication of CN104460589A publication Critical patent/CN104460589A/en
Application granted granted Critical
Publication of CN104460589B publication Critical patent/CN104460589B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0421Multiprocessor system
    • H02J13/0079
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a mobile debugging system with a simulation dispatching master station, and relates to the technical field of power supply or power distribution devices or systems. The mobile debugging system comprises a mobile terminal, an industrial switch, a serial port server and multiple telecontrol devices. The simulation dispatching master station is installed on the mobile terminal of the system, the telecontrol devices are directly connected with the industrial switch through network connecting lines and indirectly connected with the industrial switch through the serial port server, and the industrial switch is connected with the mobile terminal through a network connecting line. Through arranging the simulation dispatching master station on the mobile terminal, the system automatically achieves on-site automatic construction transmission of monitoring information, working quality and inspection and acceptance efficiency of the monitoring information are improved, the power failure time of a transformer substation is shortened, and the correctness of information inspection and acceptance and secure and stable operation of a power grid are guaranteed.

Description

Moving analog scheduling station debugging system
Technical field
The present invention relates to power or distribution device or systems technology field, more particularly to a kind of moving analog scheduling master Stand debugging system.
Background technology
Before putting into operation, all of remote signalling, remote measurement, remote control, remote regulating signal should carry out pointwise biography for newly-built or enlarging transformer station It is dynamic to check and accept.Under traditional mode, supervisory control of substation information checking and accepting must be after passage erection debugging be unimpeded, could be by scheduling station End commissioning staff and plant stand end(Transformer station)Commissioning staff carries out pointwise verification.Because scheduling station regulates and controls center in electric company In machine room, and transformer station enter row information check and accept can only by way of phone, due to the limitation of phone cause transformer substation end without Method sees scheduling station picture data, and dispatching terminal cannot see field condition, and needs are described explanation and coordinate, when one end is asked During topic, other end personnel will wait, inefficiency, and it is very big that mutual restriction involves energy.As transformer substation construction quantity increases How the quickening of long and construction speed, improve information and check and accept efficiency, it is ensured that transformer station puts into operation on schedule, it has also become monitoring information is checked and accepted The technical barrier that work need to be solved as early as possible.
The content of the invention
The technical problem to be solved is to provide a kind of moving analog scheduling station debugging system, the system By arranging operation simulation main website on mobile terminals, realize that automatically-monitored Information Field is independently constructed transmission, improves work Make the examination efficiency of quality and monitoring information, reduce the power off time of transformer station, it is ensured that information check and accept correctness and The safe and stable operation of electrical network.
To solve above-mentioned technical problem, the technical solution used in the present invention is:A kind of moving analog scheduling station is adjusted Test system, it is characterised in that including mobile terminal, debugging switch, serial server and several telemechanical apparatus, the system Operation simulation main website is installed, several telemechanical apparatus directly pass through network connection with debugging switch on the mobile terminal of system Connect and be simultaneously connected with debugging switch indirectly by serial server, the debugging switch passes through network connection with movement eventually End connection.
Further technical scheme is that the mobile terminal is notebook computer, PC or minicomputer.
Further technical scheme is, the operation simulation main website to set up process as follows:
(1)The preposition program and SCADA for extracting scheduling station from the automation of transformation substations regulator control system of actual motion is basic Using, by two kinds application associated with extracted, formed minimum system, associated with is configured and compiling at Reason, it is ensured that operation simulation main website can normally start on mobile terminals and apply, and carry out compiling and the configuration file of source code Modification;
(2)By the installing DB of scheduling station on mobile terminal, independent database instance is run, and carry out data Design in storehouse, it is ensured that and the uniformity of the scheduling station system of operation at present, carry out the verification of database;
(3)The scheduling station file and configuration file of extraction are installed on the mobile terminal of linux operating systems, are carried out Secondary source code compiling, it is ensured that the optimum of system, forms operation simulation main website.
It is using the beneficial effect produced by above-mentioned technical proposal:The debugging system is by arranging on mobile terminals Operation simulation main website, realizes the transmission of scheduling station model and actual schedule main website indifference, can carry out unit operation, and ties Close debugging switch, telemechanical apparatus and serial server and realize simulative debugging, so as to realize the scene of monitoring information on the spot from Main transmission is checked and accepted, and is shortened transformer station and is put into operation the time, the efficiency that monitoring information is checked and accepted is improved, while ensure that the correct of information transfer Property and reliability, reduce transformer substation construction time, sound assurance electrical network again while human and material resources, financial resources are saved Safe and stable operation.
Description of the drawings
With reference to the accompanying drawings and detailed description the present invention is further detailed explanation.
Fig. 1 is the theory diagram of the debugging system of the present invention.
Specific embodiment
With reference to the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground description, it is clear that described embodiment a part of embodiment only of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Many details are elaborated in the following description in order to fully understand the present invention, but the present invention can be with It is different from alternate manner described here to implement using other, those skilled in the art can be without prejudice to intension of the present invention In the case of do similar popularization, therefore the present invention is not limited by following public specific embodiment.
As shown in figure 1, the invention discloses a kind of moving analog scheduling station debugging system, including mobile terminal, adjust Examination switch, serial server and several telemechanical apparatus, the mobile terminal can be notebook computer, PC or small-sized Machine.Operation simulation main website is installed, several telemechanical apparatus directly pass through with debugging switch on the mobile terminal of the system Network connection is connected and is connected with debugging switch indirectly by serial server, and the debugging switch passes through network connection Line is connected with mobile terminal.
It is corresponding with said system that there is a kind of supervisory control of substation information debugging side based on moving analog scheduling station Method, the method comprising the steps of:
(1)Operation simulation main website is set up in the terminal;
(2)Operating personnel operate above-mentioned operation simulation main website, and with switch and telemechanical apparatus several virtual local areas are constituted Net, carries out the debugging of supervisory control of substation information.
Specifically, methods described process is as follows:
(1)Extraction document, is encoded
The preposition program and SCADA of scheduling station are extracted from the automation of transformation substations regulator control system of actual motion(Data are adopted Collection and supervisor control)Basic application, the associated with of two kinds of applications is extracted, and forms minimum system, to association File is configured and process of compilation, it is ensured that operation simulation main website can normally start on mobile terminals and apply, and carry out The compiling of source code and the modification of configuration file;
(2)Database is debugged
By the installing DB of scheduling station on mobile terminal, independent database instance is run, and carry out database Design, it is ensured that and the uniformity of the scheduling station system of operation at present, carry out the verification of database;
(3)Secondary coding, optimizes system
The scheduling station file and configuration file of extraction are installed on the mobile terminal of linux operating systems, two are carried out Secondary source code compiling, it is ensured that the optimum of system, forms operation simulation main website;
(4)Channel pattern is configured
Configure to debugging switch, and multiple VLANs are divided with reference to telemechanical apparatus and operation simulation main website VLAN, realizes that operation simulation main website can receive the real time data of biplane upload, special line setting is carried out, by special line data access To operation simulation main website.
Mobile terminal is equipped with linux operating systems, interface routine is write by Visual C Plus Plus, for being based on The electrical network CIM of G language is set up and XML format data processing, by scheduling station installing DB on mobile terminal, goes forward side by side The design and optimization of row self contained data base, can realize and operation simulation main website database one-way transmission, receive scheduling station number According to storehouse and the data of artwork.Bis- compilings of QT are carried out to operating system and implant system, one-touch startup, a key synchronization is realized Picture library model, the function of a bond beam filing.
Communication module is designed and assembles, the transmission channel of transformer station generally comprises 2 kinds of network channels, a kind of special line passage.For Realize that a mobile terminal accesses various passages, the combination for devising debugging switch with serial server is used as communication transfer mould Block.By designing switch configuration, mobile terminal accesses a netting twine and can be achieved with leading to more from debugging switch Single port Track data simultaneous transmission.
Application effect:
1st, newly-built or transformation transformer station is solved because of the obstructed restriction that communicates, reduction of erection time.
Newly-built or transformation transformer station automatically-monitored information transmission will wait passage construction erection debugging unimpeded in the past after, Can just be scheduled and the construction and examination at end of standing are driven work.After using the method, can be by mobile terminal directly at station end Construction transmission is carried out, is no longer restricted by passage, the rectification duration averagely shortens 3-5 days.
2nd, the operating efficiency of automation transmission cooperation personnel, significant increase operating efficiency are reduced.
The transmission of automatically-monitored information at present needs converting station debugging personnel and dispatching automation personnel two ends phone ditch Logical to carry out, transformer substation end can't see picture data, and dispatching terminal can't see field condition, and needs are described explanation and coordinate, when one When holding problematic, other end personnel will wait, inefficiency, and it is very big that mutual restriction involves energy.Running into 220kV stations will relate to And three Levels Scheduling, phone contact transmission respectively.By the use of methods described, graph data is intuitively illustrated in work on the spot In face of personnel, it is no longer necessary to the cooperation of dispatching terminal, manpower is reduced simultaneously, improve efficiency 60% or so, and work on the spot Person works arrange more autonomous, can arrange while carrying out dosage transmission, live work while telemechanical main frame and background system Make efficiency significant increase.
3rd, responsibility becomes apparent from, it is ensured that the safe operation of the correct and electrical network of information.
At present at 1500 or so, the information at 110kV stations needs the actual biography of dosage to the information at 220kV stations at 700 or so Move, often acceptance following construction, after the problem of operation generation below scene adjusts, work above will not ensure that correctly, Sometimes for being driven again.The use of operation simulation main website can clearly divide the construction transmission at scene from management and dispatch The examination transmission at end, after site operation transmission is errorless, scheduling can be according to the historical record of operation simulation main website transmission and biography Dynamic report is checked and accepted, and is targetedly checked and accepted the correct of transmission guarantee information.Rectification construction transmission in addition is carried out in transformer station, The malfunction at other stations is not resulted in, it is ensured that the safety of electrical network.
4th, operation simulation master function is easy to use directly perceived.
Operation simulation main website adopts linux operating systems, it is ensured that the safety and stability of system, and debugging function uses letter Single, three buttons can complete installation and debugging and the filing-up work of required substation data figure.One button is that a key is same Step artwork, the substation data figure of dispatch automated system is synchronously imported operation simulation main website, it is not necessary to extra work;The Two buttons start field adjustable function, carry out visual debugging;3rd button terminates filing, terminates debugging function and will pass Dynamic record carries out preservation filing.
Current information transmission mode, plant stand end commissioning staff and main website commissioning staff carry out telephonic communication, and transformer substation end is seen Less than the picture data for above sending, dispatching terminal can't see field condition, and plant stand needs to be driven all of data and needs phone More than 25 hours of transmission, and need to be driven with multiple main websites, cause transmission efficiency low.Using operation simulation main website Afterwards, the end personnel that stand can anywhere or anytime carry out transmission test and Information Authentication work, not limited by communication restriction and main website, Optimized transmission scheme can be carried out according to field condition, reduce the substantial amounts of time.Report reporting will be driven after transmission, be supervised Control personnel enter taking a sample test for row information, can check and accept the transmission that the transmission of the phone of more than 20 hours is changed into 30 minutes.
To sum up, the debugging system realizes scheduling station model by arranging operation simulation main website on mobile terminals With the transmission of actual schedule main website indifference, unit operation can be carried out, and combine debugging switch, telemechanical apparatus and serial ports clothes Business device realizes simulative debugging, so as to the scene for realizing monitoring information is checked and accepted on the spot from main transmission, shortens transformer station and puts into operation the time, carries The efficiency that high monitoring information is checked and accepted, while ensure that the correctness and reliability of information transfer, is saving human and material resources, wealth Reduce transformer substation construction time, sound assurance power grid security, stable operation while power again.

Claims (2)

1. a kind of moving analog scheduling station debugging system construction method, it is characterised in that:The moving analog scheduling master Debugging system of standing includes mobile terminal, debugging switch, serial server and several telemechanical apparatus, the movement of the system Operation simulation main website is installed, several telemechanical apparatus are directly connected by network connection and are led to debugging switch in terminal Cross serial server to be connected with debugging switch indirectly, the debugging switch is connected by network connection with mobile terminal;
The operation simulation main website to set up process as follows:
(1)The preposition program and SCADA for extracting scheduling station from the automation of transformation substations regulator control system of actual motion is applied substantially, The associated with of two kinds of applications is extracted, minimum system is formed, associated with is configured and process of compilation, it is ensured that Operation simulation main website can normally start on mobile terminals and apply, and carry out the compiling of source code and the modification of configuration file;
(2)By the installing DB of scheduling station on mobile terminal, independent database instance is run, and carries out database and set Meter, it is ensured that and the uniformity of the scheduling station system of operation at present, carry out the verification of database;
(3)The scheduling station file and configuration file of extraction are installed on the mobile terminal of linux operating systems, are carried out secondary Source code is compiled, it is ensured that the optimum of system, forms operation simulation main website.
2. moving analog scheduling station debugging system construction method according to claim 1, it is characterised in that the shifting Dynamic terminal is notebook computer, PC or minicomputer.
CN201410568998.5A 2014-10-23 2014-10-23 Mobile debugging system with simulation dispatching master station Expired - Fee Related CN104460589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410568998.5A CN104460589B (en) 2014-10-23 2014-10-23 Mobile debugging system with simulation dispatching master station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410568998.5A CN104460589B (en) 2014-10-23 2014-10-23 Mobile debugging system with simulation dispatching master station

Publications (2)

Publication Number Publication Date
CN104460589A CN104460589A (en) 2015-03-25
CN104460589B true CN104460589B (en) 2017-04-26

Family

ID=52906814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410568998.5A Expired - Fee Related CN104460589B (en) 2014-10-23 2014-10-23 Mobile debugging system with simulation dispatching master station

Country Status (1)

Country Link
CN (1) CN104460589B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105262230A (en) * 2015-11-26 2016-01-20 国网辽宁省电力有限公司大连供电公司 Method for establishing portable scheduling master station system to debug newly-built substation
CN105680441B (en) * 2016-01-25 2018-03-20 许继集团有限公司 Simulation based on stimulated replacement technology is to a device
CN105827437A (en) * 2016-03-10 2016-08-03 积成电子股份有限公司 System for enhancing debugging efficiency in accessing plant station to master station and method thereof
CN107492240A (en) * 2016-06-13 2017-12-19 国网天津市电力公司 A kind of method that distribution automation transformation debugging is carried out using 4G networks
CN107733090A (en) * 2017-11-23 2018-02-23 国网上海市电力公司 A kind of power distribution automation movement simulation main website and its Application way
CN109246392A (en) * 2018-09-21 2019-01-18 南京七宝机器人技术有限公司 A kind of transformer substation sequence control capacity checking device based on machine vision
CN110112831A (en) * 2019-06-03 2019-08-09 国网四川省电力公司电力科学研究院 A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN110244638B (en) * 2019-06-27 2021-03-19 宁波三星医疗电气股份有限公司 Data monitoring device and method
CN113741374A (en) * 2021-09-14 2021-12-03 中国长江电力股份有限公司 Debugging platform and debugging method of giant hydropower station monitoring system
CN114612079B (en) * 2022-05-16 2022-09-02 国网江西省电力有限公司电力科学研究院 Automatic checking method for monitoring information graph library of centralized control station
CN114785680B (en) * 2022-06-17 2022-11-15 深圳市信润富联数字科技有限公司 Wind power industrial control equipment transformation method and terminal transformation method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050033481A1 (en) * 2003-08-08 2005-02-10 Budhraja Vikram S. Real-time performance monitoring and management system
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN103488835A (en) * 2013-09-26 2014-01-01 国家电网公司 Simulation platform and method for dispatching automation system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050033481A1 (en) * 2003-08-08 2005-02-10 Budhraja Vikram S. Real-time performance monitoring and management system
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN103488835A (en) * 2013-09-26 2014-01-01 国家电网公司 Simulation platform and method for dispatching automation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
继电保护故障信息系统子站自助测试系统设计开发;王峰,张智锐,任春梅,陈志光,张冉;《电力系统保护与控制》;20120916;第40卷(第18期);第127-131页 *

Also Published As

Publication number Publication date
CN104460589A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN104460589B (en) Mobile debugging system with simulation dispatching master station
CN104269934B (en) Based on the supervisory control of substation information adjustment method of moving analog scheduling station
CN108400908B (en) Automatic checking and accepting method for monitoring information of transformer substation
CN201608541U (en) Solar-energy photovoltaic intelligent power station based on Ethernet
CN106971351A (en) The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN203233238U (en) Intelligent type fault recording online management system
CN104269924A (en) Power distribution terminal system based on IEC 61850 and realizing plug and play mechanism
CN103441570A (en) One-button type sequential control operation control method based on integrated information platform
CN106532935B (en) For carrying out the method and its system of secondary system of intelligent substation fault diagnosis
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN103412533B (en) The mechanical check system of intelligent grid dispatching and monitoring information
CN102981087B (en) RTDS and intelligent relay protection device interface system
CN103414251A (en) Substation network communication simulation system based on IEC 61850
CN105100252A (en) Network topology structure of distributed power monitoring system
CN102709894A (en) On-line checking method and system for relay protection setting value
CN105069587A (en) Mobile Internet-based relay protection verification device
CN104580245A (en) Power distribution terminal 104 message parsing system and parsing method thereof
CN102169343B (en) Programmed remote operation system and method of grid centralized monitoring center
CN203366087U (en) Automated control and monitoring system for digital cinema equipment
CN102064602A (en) Operating method of B/S framework networked electronic simulation drawing board system
CN104156230A (en) Automatic red and black figure implementation method based on debug system data objectification
CN106685759A (en) High-efficiency and zero-error updating and upgrading verification test method for scheduling main station
CN101924392B (en) Bipolar automatic power control method of high-voltage direct-current transmission
CN104182818A (en) Method and system for collecting substation information automatically and intelligently
CN104317868A (en) Control integration method based on single-front and multi-SCADA (Supervisory Control and Data Acquisition) application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20211023