CN104406623B - Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring - Google Patents

Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring Download PDF

Info

Publication number
CN104406623B
CN104406623B CN201410351222.8A CN201410351222A CN104406623B CN 104406623 B CN104406623 B CN 104406623B CN 201410351222 A CN201410351222 A CN 201410351222A CN 104406623 B CN104406623 B CN 104406623B
Authority
CN
China
Prior art keywords
displacement
slope
monitoring
landslide
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410351222.8A
Other languages
Chinese (zh)
Other versions
CN104406623A (en
Inventor
贺可强
杨德兵
梁运培
张拥军
张嘉鑫
李晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201410351222.8A priority Critical patent/CN104406623B/en
Publication of CN104406623A publication Critical patent/CN104406623A/en
Application granted granted Critical
Publication of CN104406623B publication Critical patent/CN104406623B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

WATER LEVEL CHANGES and displacement monitoring data are based on the invention discloses one kind, determine the method and technology of such slope dynamic stability coefficient, the reason formed that will come down and mechanism couple intersecting with dynamic respond information change and its evaluation method, non-linear unload loading response ratio parametric prediction model by setting up and then set up a kind of stability factor of slope assay method based on level of ground water and change in displacement, the Prediction of Displacement in Landslide method changes traditional displacement time series forecasting method and only chooses landslide displacement or rate of displacement as monitoring and the thinking of evaluating, propose by Landslide Groundwater position and displacement or rate of displacement monitor and integrate simultaneously, with this determination Landslide Groundwater position and displacement or the coupling integration dynamic Forecast parameter and evaluation method of rate of displacement;This method can not only overcome static limit mechanics evaluation method can not analyze and evaluate slope stability to change with time the limitation of rule, while can overcome the drawbacks of landslide mechanism and reason can not be analyzed and evaluated to traditional displacement time sequence forecasting method again.

Description

Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring
Technical field
The invention belongs to the landslide dynamic stability quantitative assessment of water induction type and prevention and control field, and in particular to one kind is based on ground Lower SEA LEVEL VARIATION and displacement monitoring data, determine the method and technology of such slope dynamic stability coefficient.
Background technology
Landslide is current natural calamity and the important research content in environmental science, from the point of view of geological disaster, Landslide be it is a kind of it is common take place frequently, it is widely distributed and with high risks geological disaster, usually to the development of the national economy and the people Lives and properties all bring huge loss.It is well known that groundwater environment change be induced Landslides main formation mechenism with Reason.According to statistics, the landslide for causing groundwater environment change to induce by rainfall accounts for the 70% of landslide sum.In recent years, with dampening The construction and retaining of the development of sharp engineering, the particularly Three Gorges Projects, the change of reservoir level cause groundwater environment change and The landslide of formation also receives much concern, therefore, how scientific and effective to the accurate estimation of stability of such water induction type side slope progress And early warning is by with important scientific meaning and engineering application value.
The key problem of Slope Stability Evaluation is the selection of evaluation method and the determination of stability criteria.At present, on side In Slope Stability Evaluation and Landslide Hazards monitoring and warning and prevention and controls, most widely used prediction and evaluation method is the limit Balance mechanics evaluation assessment and displacement time series predicted method.Limiting equilibrium evaluation method is built upon slope instability mechanism and stress condition Mechanics evaluation model on the basis of clear and definite is actually steady with side slope with clear and definite INSTABILITY CRITERION, i.e. coefficient of stability Fs=1 Determine coefficient whether be more than or equal to 1 or the degree more than 1 differentiate whether side slope stable and degree of stability.But the evaluation of limiting equilibrium The model that method is set up is the static evaluation model of no time parameter, and such method needs accurately determine various things first Mechanics parameter and slip boundary condition are managed, therefore Mobile state can not be entered to the stability of rain-induced landslide with Static Assessment Method Evaluate and monitoring and warning, and in Slope Stability Evaluation, especially in large complicated slopes structure and the side slope of material composition Want correct amount to measure these physical and mechanical parameters in estimation of stability and also there is very big difficulty with slip boundary condition, or at all Do not accomplish, so as to easily make its evaluation result distortion or cause erroneous judgement.Compared with limiting equilibrium evaluation assessment, displacement time series Forecasting Methodology It is based on landslide displacement monitoring, with displacement parameter (displacement, rate of displacement, displacement rate of acceleration) and its becomes that to be turned to side slope steady Whether determine the Prediction Parameters and interpretational criteria with degree of stability.Its displacement (deformation) monitoring has precision height, easily implemented, and reflection The advantages of slope stability state integrates directly perceived, so such method is overcoming the deficiency of limiting equilibrium Mechanical Method to a certain degree With limitation, and it is widely used in China's Important Project landslide areas and has played important function.But displacement time series Forecasting Methodology reflects Landslide Deformation and changed with time trend and rule, and majority is that the displacement based on mathematical statistics rule is apparent Mathematics appraisal, so such evaluation model can only typically explain Landslide Deformation displacement process and rule, and does not explain and draws The deformation on landslide and the formation mechenism of unstability and mechanics reason are played, and does not stablize unified INSTABILITY CRITERION, is successfully monitored though having Case, but because the gained rule of time series analysis is not based on mechanism, it predicts the outcome often with very big probable Property.
The content of the invention
In order to overcome the above mentioned problem that prior art is present, it is an object of the present invention to provide a kind of be based on underground The slope dynamic stability coefficient determination method of water level and displacement monitoring, spy is proposed Landslide Groundwater position and displacement or displacement speed Rate monitor and integrate simultaneously, with this determination and sets up Landslide Groundwater and displacement or the coupling integration power of rate of displacement Prediction Parameters, and with the general principle of damage mechanics, find steady in the dynamic Forecast parameter and conventional stability evaluation method The quantitative relationship of qualitative coefficient.
A kind of slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring that the present invention is provided, it Including step in detail below:
(1) monitoring slope underground water position and displacement master data
1. monitoring instrument:Water table measure equipment:A, pressure type water gauge, b, atmospheric pressure compensated equipment;Slope displacement is supervised Measurement equipment:Wireless GPS displacement monitoring equipments (see Fig. 2);
2. in the domatic arrangement monitoring point of main sliding face correspondence of monitoring side slope, arrived according to domatic actual landform in trailing edge rupture wall Leading edge cuts the domatic equidistant N number of monitoring point for laying domatic change in displacement of mouth, and N is the integer more than or equal to 1;Slided in monitoring Stable basement rock or the region arrangement displacement monitoring datum mark without deformation, no less than 3, form control net beyond slopes;
3. water table measure method:The monitoring location selected in side slope is drilled, and drilling depth should reach basement rock Below face or level of ground water over the years, pressure type water gauge is set in foot of hole, and extra gas is set simultaneously on domatic Press compensation device, the change of common monitoring level of ground water;
4. slope displacement monitoring method:Laid in displacement monitoring criteria point position and side slope drilling monitoring location wireless GPS displacement monitoring equipments;Ensure that embedded slope displacement variation monitoring equipment is combined closely with landslide surface layer, to monitoring point water Flat, vertical displacement changing value is monitored;
5. precision is monitored in real time to Landslide Groundwater position with displacement at a time interval, while recording level of ground water With displacement monitoring data, and long-range monitoring room is transferred to Monitoring Data by side slope place data-signal collector, to monitoring Data carry out classification pretreatment.
(2) Landslide Groundwater power unloads the determination of loading parameter and dynamic respond parameter
1. level of ground water unloads the determination of loading parameter
Statistical analysis and the predetermined period on landslide are determined according to Monitoring Data, and based on statistical analysis and predetermined period Predict unit statistics certain month level of ground water H in landslideiWith preceding moon level of ground water Hi-1Difference DELTA H:
Δ H=Hi-Hi-1Formula (1)
Δ H in formula (1) is unloaded into loading standard as hydrodynamic force.As Δ H > 0, judge to be loading to landslide;As Δ H During < 0, judge to be unloading to landslide;Δ H is counted by each loading positive and negative values of unloading for unloading loading cycle respectively and taken it Average value, can respectively obtain and unload the level of ground water of loadingsequence and unload loading parameterAnd
2. the determination of loading response parameter is unloaded in displacement
In unit statistical analysis and predetermined period, its load deflection response parameter of unloading come down is then with displacement acceleration A is equal on the basis of zero, minus to unload response, is loading response more than zero, slope displacement acceleration is pressed respectively Unload loading response positive and negative values to be counted and take average, can obtain unloading the displacement acceleration response average of loadingsequenceWith
(3) Landslide Groundwater power unloads the determination of load deflection response ratio parameter
1. the determination of loading responsiveness is unloaded on landslide
It is theoretical based on modern nonlinear science, by slope displacement acceleration unloading response averageIts corresponding underground water Position unloading averageThe ratio between be defined as side slope power unloading dynamic respond rate χ-, by slope displacement acceleration loading response average Its corresponding level of ground water loads averageThe ratio between be defined as side slope power load deflection responsiveness χ+, i.e.,:
Formula (2)
Formula (3)
2. Landslide Groundwater power unloads the determination of load deflection response ratio parameter
According to formula (2) and formula (3) and unload loading response ratio definition, it may be determined that slope underground water position power unload loading Dynamic respond is than parameter:
Formula (4)
(4) determination of water induction type landslide dynamic stability property coefficient
1. determination of the side slope damage variable with unloading loading response ratio parameter quantitative relation
According to the principle of the invention (2), its damaging parameter D and the quantitative relationship for unloading loading response ratio parameter are as follows:
Dt=1- γtFormula (5)
Formula (5) shows that unloading between loading response ratio γ and its damaging parameter D for material of rock and soil is present correspondingly Quantitative relationship.
2. the determination of water induction type landslide dynamic stability property coefficient
The quantitative relationship of the stability coefficient determined according to damage variable in slope project and limiting equilibrium evaluation assessmentAnd formula
(5) it can determine that water induction type landslide dynamic stability property coefficient is:
Formula (6)
Formula (6) shows, unloads the corresponding relation existed between loading response ratio and stability of slope coefficient one by one.
(5) determination of water induction type landslide failure early warning criterion
In the real work that preventing land slide and its engineering investigation are designed, generally a safety storage is set to stability coefficient It is standby to obtain a safety coefficient K as its stability whether criterion.According to slope stability significance level and slope geological bar Part complexity and《Hazards control engineering investigation specification》(DB50/143-2003) and《Hydraulic and Hydro-Power Engineering Slope Design Specification》Etc. (SL386-2007) specification, can integrate the safety factor of stability K for determining slope, such as K=1.3,1.25,1.15;It is logical Cross the slope dynamic stability coefficient F to being determined in above-mentioned stepstCompared with conventional security COEFFICIENT K, can be fast and accurately right Water induction type side slope carries out dynamic early-warning evaluation and the Treatment design of stability, that is, works as FtDuring >=K, side slope is in stable state; Work as FtDuring≤k, side slope plays pendulum.
The general principle of the present invention is as follows:
1st, the definition of loading response ratio parameter is unloaded
Modern nonlinear science theory thinks, same thing, in different developing evolution stages, what it was disturbed to external world Response is different.If by the various extraneous factors that can suffer from during landslide development, such as rainfall, reservoir level become Dynamic, Human dried bloodstains etc. are commonly referred to as generalized load effect, and are represented with M;Produced after slope is subjected into generalized load effect Raw response (such as displacement, strain, sound emission state variable) is defined as R, then the relation between generalized load and system response See accompanying drawing 3.If load increment is Δ M, corresponding response increment is Δ R, defines responsiveness χ and is:
Formula (7)
Make χ-With χ+Unloading and loading responsiveness are represented respectively.System is in stable state during load very little, at this moment its R and M Between be linear or linear approximate relationship, responsiveness χ during loading+Responsiveness χ during with unloading-It is of substantially equal;If load is not Disconnected increase, moves closer to critical value Mcr, i.e., when system tends to be unstable, and its responsiveness increases with load and constantly increased;When being During unstability of uniting, X+→∞.This explanation, when system closes on unstability, even extremely small load action can all produce system Violent response.The constant stable state due to system is kept to differ even if therefore being loaded load increment to nonlinear system Its responsiveness of sample also has very big difference, and the bigger system of responsiveness is closer to unstability.In order to find out more generally rule, definition is unloaded Load response ratio:
Formula (8)
In formula:ΔR-With Δ R+Respectively unloading response increment and loading respond increment;ΔM-With Δ M+Respectively unloading increases Amount and loading increment.For elastic system, χ+-=c, so γ=1;But for nonlinear system, γ values are then steady with system Determine state different and change.When system is in stable state, γ=1;When system deviates stable state, γ < 1;Work as system unstability When, γ → 0.What therefore γ values can be quantified portrays nonlinear system stability degree, can also be lost as nonlinear system The criterion surely forecast.
2nd, damage variable and the quantitative relationship of loading response ratio parameter is unloaded from the point of view of damage mechanics, landslide was bred Journey is exactly the damage development process of slopes material.In damage mechanics, damage process can use damaging parameter D with degree of injury Quantitatively to portray and describe, its size is defined as the deformation modulus E of material rate of change, i.e.,:
Formula (9)
E in formula0For the modulus of original state (not damaging), E is the modulus being damaged.When material is not damaged, E=E0, D= 0;When material is destroyed completely, E=0, D=1.
It is the ratio between strain and stress of unloading phase slopes and load phase slope that what the present invention was used, which unloads loading response ratio, The ratio of the ratio between the strain and stress of body.I.e.
Initial elastic modulus E is typically approximately equal in view of modulus of the material in unloading0, i.e. E-=E0, and E+=E, in It is to have:
Formula (11)
As γ=1, D=0;Illustrate that material is without damage, in stable state;As γ → 0, D=1;Illustrate material Damage completely.
3rd, the failure by shear of the quantitative relationship slope ground body of damage variable and stability coefficient is substantially Rock And Soil Structural damage causes the final form of its change in mechanics, and shearing strength is in the research of side slope Rock And Soil damage process Compare factor that is sensitive and easily measuring.When part Rock And Soil reaches its shearing strength, that is, occur partial destruction and general performance It is stable;When its shearing strength is fully achieved in slope ground body, complete destruction occurs for slopes.It therefore, it can from Rock And Soil intensity Damaging parameter D is defined in destruction meaning, is the breaking when shear stress of Rock And Soil on the potential slide surface of side slope is more than shearing strength Bad probability, describes the destructiveness of slope ground body.In the evaluation of slope stability limit equilibrium method, stability coefficient leads to The ratio between skid resistance and sliding force for being often defined as on the potential slide surface of side slope, describe the extent of stability of side slope.Therefore, Stability factor of slope may be defined as limit damaging parameter D in slope projectlimWith side slope any time damaging parameter DtIt Than that is,:
Formula (12)
In formula (12):DtFor the damage variable of t, Dlim1 is taken for limit damage variable.
A kind of slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring that the present invention is provided, its Beneficial effect is, the change of Landslide Groundwater position and the change of landslide displacement response message and its evaluation method has been carried out organic Coupling, the effective and reasonable dynamic stability property coefficient that side slope is determined, and according to this can side slope dynamic stability Evolution enter The rational A+E of row, it is difficult accurate determination landslide physical and mechanical parameter both to have overcome conventional limit balance mechanics evaluation assessment With boundary condition etc. and bring erroneous judgement or misjudge, can not quantitative description landslide while solving traditional displacement time sequence forecasting method again The problems such as dynamic action mechanism and INSTABILITY CRITERION unified without stabilization.
Brief description of the drawings
The slope dynamic stability coefficient that Fig. 1 is the present invention determines flow chart;
Fig. 2 is that processing equipment schematic diagram is collected in the slope underground water and monitoring point for displacement of the present invention and monitoring, wherein 1 is pressure Power formula water-level gauge, 2 be atmospheric pressure compensated equipment, and 3 be monitoring point for displacement, and 4 be change in displacement monitoring device, 5 be monitoring criteria point and Equipment, 6 be data acquisition equipment, and 7 be long-range monitoring room;
Fig. 3 is generalized load and the graph of a relation of system response during slope evolution of the invention;
Fig. 4 is certain side slope and its monitoring point schematic diagram of the embodiment of the present invention;
Fig. 5 is that certain side slope F points of the embodiment of the present invention unload loading response ratio curve map;
Fig. 6 is certain side slope F point stability coefficient curve maps of the embodiment of the present invention.
Embodiment
With reference to the accompanying drawings, in conjunction with the embodiments, the side slope based on level of ground water and displacement monitoring that the present invention is provided is moved State stability coefficient assay method, is described in detail.
Embodiment
It is further as embodiment using certain water induction type landslide induced below in conjunction with the accompanying drawings in order to preferably illustrate the present invention Describe in detail, the landslide area of the landslide induced is 0.73km2, volume about 3 × 107m3, deposit with collapse (slope) accumulate shiver stone Press from both sides based on clay, subterrane face is Silurian sand, shale, and form is more complicated, in the presence of groundwater environment change in On June 12nd, 1985 is destroyed.The monitoring time on the present embodiment landslide destroys in January, 1978 to landslide failure, this hair Bright slope dynamic stability coefficient determines flow as shown in figure 1, specific implementation step is as follows:
The first step:Monitor slope underground water position and displacement master data
1. monitoring instrument:Water table measure equipment:A, pressure type water gauge, b, atmospheric pressure compensated equipment;Slope displacement is supervised Measurement equipment:Wireless GPS displacement monitoring equipments (see Fig. 2);
2. according to the main skating area in the landslide and trailing edge tension fracture, cut the key positions such as mouth and feature and landslide banding point Cloth and basement rock exposure are in the situation of both sides, the selection F points in slopes, (see Fig. 4), and F points are as analysis target monitoring point and set Datum point to shift.
3. the foot of hole in the selected monitoring point F positions in landslide sets pressure type water gauge, monitors the change of level of ground water Change;Wireless GPS displacement monitoring equipments, monitoring criteria point are laid in displacement monitoring criteria point position and side slope drilling monitoring location Landslide displacement speed.
4. the synchronous displacement and ground with the cycle by side slope place data-signal collector to landslide by time interval of the moon Lower water monitoring data carry out data transmission to long-range monitoring room, in monitoring room at regular intervals with the batch processing software such as Excel The pretreatment of data is monitored, underground water place value (being shown in Table 1), slope displacement rate value and acceleration magnitude (being shown in Table 2-3) is obtained.
Second step:Determine that Landslide Groundwater power unloads loading parameter and dynamic respond parameter
1) level of ground water unloads the determination of loading parameter
According to the monitoring materials of the above-mentioned landslide area level of ground water, it is determined that the statistical analysis on landslide is one with predetermined period Year, with certain a month level of ground water H for unloading loading cycleiWith preceding moon level of ground water Hi-1Difference DELTA H be foundation, as Δ H < 0 When be determined as unloading, be determined as loading during Δ H > 0, thus just obtained groundwater effect cycle unload loading month and Unload loading interval, unload that loading is interval according to hydrodynamic force, by Δ H respectively by it is each unload loading cycle year unload the positive and negative Data-Statistics of loading And its average is taken, it is discriminable to unload loadingsequence to level of ground waterWith(being shown in Table 4).
2) determination of loading response parameter is unloaded in displacement
In unit statistical analysis and predetermined period, its load deflection response parameter of unloading come down is then with displacement acceleration A is equal on the basis of zero, minus to unload response, is loading response more than zero.Slope displacement acceleration is pressed respectively Unload loading response positive and negative values to be counted and take average, can obtain unloading the displacement acceleration response average of loadingsequenceWith (being shown in Table 4).
Certain Landslide Groundwater of table 1 position tables of data (unit:mm)
Certain the landslide F points month rate of displacement (unit of table 2:mm/s)
Certain the landslide F points month displacement rate of acceleration (unit of table 3:mm/s2)
Unloading for certain the landslide F point of table 4 loads parameter and unloads loading response parameter
Note:It is mm to unload loading Parameter units;Dynamic respond value unit is the mm/ months 2.
3rd step:Landslide Groundwater power unloads the determination of load deflection response ratio parameter
By in table 4Sequence substitutes into landslide induced and unloaded in loading response ratio forecast model formula (4), obtains To late Archaean monitoring point F unload loading response ratio time series (being shown in Table 5) and unload loading response ratio time plot (see figure 5)。
The loading of unloading of certain the landslide F point of table 5 responds ratio
4th step:The determination of landslide dynamic stability property coefficient
1) determination of the side slope damage variable with unloading loading response ratio parameter quantitative relation
Unloading for side slope loads response ratio parameter and side slope damaging parameter D and unloads loading response ratio parameter in foundation step 2 Quantitative relationship Dt=1- γtThe loss variable such as table 6 of side slope can be obtained:
Table 6:The damage variable value of certain landslide F point
2) determination of water induction type landslide dynamic stability property coefficient
According to the quantitative relationship of damage variable in slope project and stability coefficient(see principle 3) and formula (5) The size (being shown in Table 7) and stability coefficient time-sequence curve chart of water induction type landslide dynamic stability property coefficient can be determined (see Fig. 6):
Table 7:The stability coefficient of certain landslide F point
5th step:The reality that the determination of water induction type landslide failure early warning criterion is designed in preventing land slide and its engineering investigation In work, generally to stability coefficient set a safety stock obtain a safety coefficient K as its stability whether sentence According to.According to slope stability significance level and slope geological complicated condition degree and《Hazards control engineering investigation specification》 (DB50/143-2003) and《Hydraulic and Hydro-Power Engineering Slope Design specification》Etc. (SL386-2007) specification, can integrate and determine slope Safety factor of stability K=1.25.Pass through the slope dynamic stability coefficient F to being determined in above-mentioned stepstWith conventional security system Number K=1.25 compares, and the dynamic early-warning evaluation and improvement that stability can be fast and accurately carried out to water induction type side slope are set Meter.
F point stability factor of slope according to being obtained in step 4 can be drawn:The side slope was at 1978 to 1984 terms Between stability coefficient gradually reduce, but be all higher than Slope Design safety coefficient K=1.25, illustrate that the slope stability is reduced always But in stable state;The stability coefficient of side slope is reduced and less than design safety factor (DSF) K suddenly during 1984 to 1985 =1.25, illustrate that the side slope there occurs larger damage and failure during this and finally destroy unstability.It is above-mentioned steady to the actual side slope The Calculation results of qualitative coefficient are coincide substantially with side slope actual displacement and unstability rule, show to unload with the non-linear dynamic It is effective to load stability factor of slope determined by response ratio parameter and unstability early warning criterion, with stronger prediction Forecast function and practical value.

Claims (1)

1. a kind of slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring, it is characterised in that:It is wrapped Include step in detail below:
First, monitoring slope underground water position and displacement master data
1. monitoring instrument:Water table measure equipment:A, pressure type water gauge, b, atmospheric pressure compensated equipment;Slope displacement monitoring is set It is standby:Wireless GPS displacement monitoring equipments;
2. in the domatic arrangement monitoring point of main sliding face correspondence of monitoring side slope, wall is ruptured to leading edge in trailing edge according to domatic actual landform The domatic equidistant N number of monitoring point for laying domatic change in displacement of mouth is cut, N is the integer more than or equal to 1;In monitoring slip mass Stable basement rock or the region arrangement displacement monitoring datum mark without deformation, no less than 3, form control net in addition;
3. water table measure method:Side slope select monitoring location drilled, drilling depth should reach bedrock surface or Below person's level of ground water over the years, pressure type water gauge is set in foot of hole, and set extra air pressure to mend simultaneously on domatic Device is repaid, the change of common monitoring level of ground water;
4. slope displacement monitoring method:Wireless GPS is laid in displacement monitoring criteria point position and side slope drilling monitoring location Move monitoring device;Ensure that embedded slope displacement variation monitoring equipment is combined closely with landslide surface layer, to monitoring point level with Vertical displacement changing value is monitored;
5. precision is monitored in real time to Landslide Groundwater position with displacement at a time interval, while recording level of ground water and position Monitoring Data is moved, and long-range monitoring room is transferred to Monitoring Data by side slope place data-signal collector, to Monitoring Data Carry out classification pretreatment;
2nd, Landslide Groundwater power unloads the determination of loading parameter and dynamic respond parameter
1. level of ground water unloads the determination of loading parameter
Statistical analysis and the predetermined period on landslide are determined according to Monitoring Data, and based on statistical analysis and predetermined period, in advance Survey unit statistics certain month level of ground water H in landslideiWith preceding moon level of ground water Hi-1Difference DELTA H:
Δ H=Hi-Hi-1Formula (1)
Δ H in formula (1) is unloaded into loading standard as hydrodynamic force;As Δ H>When 0, judge to be loading to landslide;As Δ H<When 0, Judge to be unloading to landslide;Δ H is counted by each loading positive and negative values of unloading for unloading loading cycle respectively and is taken its average value, It can respectively obtain and unload the level of ground water of loadingsequence and unload loading parameterWith
2. the determination of loading response parameter is unloaded in displacement
In unit statistical analysis and predetermined period, its load deflection response parameter of unloading come down is then with displacement acceleration a etc. It is minus for unloading response on the basis of zero;It is loading response more than zero;By slope displacement acceleration respectively by unloading Loading response positive and negative values are counted and take average, can obtain unloading the slope displacement acceleration unloading response average of loadingsequence Response is loaded with slope displacement acceleration
3rd, Landslide Groundwater power unloads the determination of load deflection response ratio parameter
1. the determination of loading responsiveness is unloaded on landslide
It is theoretical based on modern nonlinear science, by slope displacement acceleration unloading response averageIts corresponding level of ground water is unloaded Carry averageThe ratio between be defined as side slope power unloading dynamic respond rate responsiveness χ-, slope displacement acceleration is loaded into responseIts corresponding level of ground water loads averageThe ratio between be defined as side slope power load deflection responsiveness χ+, i.e.,:
2. Landslide Groundwater power unloads the determination of load deflection response ratio parameter
According to formula (2) and formula (3) and unload loading response ratio definition, determine slope underground water position power unload load deflection sound Should be than parameter:
In formula:ΔR-With Δ R+Respectively unloading response increment and loading respond increment;ΔM-With Δ M+Respectively unloading increment and Load increment;
4th, the determination of water induction type landslide dynamic stability property coefficient
1. determination of the side slope damage variable with unloading loading response ratio parameter quantitative relation
Damaging parameter D and the quantitative relationship for unloading loading response ratio parameter are as follows:
Dt=1- γtFormula (5)
Formula (5) shows that unloading between loading response ratio γ and its damaging parameter D for material of rock and soil has one-to-one quantify Relation;
2. the determination of water induction type landslide dynamic stability property coefficient
The quantitative relationship of the stability coefficient determined according to damage variable in slope project and limiting equilibrium evaluation assessmentWith Formula (5) can determine that water induction type landslide dynamic stability property coefficient is:
Formula (6) shows, unloads and there is one-to-one relation between loading response ratio and stability of slope coefficient;
5th, the determination of water induction type landslide failure early warning criterion
In the real work that preventing land slide and its engineering investigation are designed, generally set a safety stock to stability coefficient and obtain It is multiple according to slope stability significance level and slope geological condition to a safety coefficient K as its stability whether criterion Miscellaneous degree and《DB50/143-2003 hazards control engineering investigation specifications》With《SL386-2007 Hydraulic and Hydro-Power Engineering side slopes Design specification》, the safety factor of stability K for determining slope can be integrated, it is dynamic by being come down to the water induction type determined in above-mentioned steps State stability coefficient FtCompared with conventional security COEFFICIENT K, stability fast and accurately can be carried out to water induction type side slope and moved State Alarm Assessment and Treatment design, that is, work as FtDuring >=K, side slope is in stable state;Work as FtDuring≤K, side slope is in unstable shape State.
CN201410351222.8A 2014-07-23 2014-07-23 Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring Active CN104406623B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410351222.8A CN104406623B (en) 2014-07-23 2014-07-23 Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410351222.8A CN104406623B (en) 2014-07-23 2014-07-23 Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring

Publications (2)

Publication Number Publication Date
CN104406623A CN104406623A (en) 2015-03-11
CN104406623B true CN104406623B (en) 2017-08-25

Family

ID=52644270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410351222.8A Active CN104406623B (en) 2014-07-23 2014-07-23 Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring

Country Status (1)

Country Link
CN (1) CN104406623B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104833392A (en) * 2015-04-30 2015-08-12 广西大学 Device and method for measuring soil displacement and moisture content of slope
CN104931095B (en) * 2015-05-27 2017-10-10 中国地质大学(武汉) Underground heat fluid communication abnormal flow monitoring system
CN106198922B (en) * 2016-06-23 2018-07-06 青岛理工大学 The determining method of the critical startup rainfall of rain-induced landslide and unstability pre-warning time
CN106205060B (en) * 2016-08-19 2018-03-27 临沂大学 For outdoor pit Tailings Dam slope and land slide early alarming and forecasting method
CN106405675B (en) * 2016-08-25 2018-05-18 山东科技大学 For the dynamic monitoring method of outdoor pit Tailings Dam slope and land slide early warning
CN107655444A (en) * 2017-09-08 2018-02-02 广西交通科学研究院有限公司 With reference to monitoring with finite element amendment with determine slope sliding face change method
CN107727830A (en) * 2017-09-27 2018-02-23 三峡大学 A kind of device and method for simulating air-cushion type landslide
CN109490950A (en) * 2018-11-30 2019-03-19 中国地震台网中心 Earthquake prediction method and system
CN109597119A (en) * 2018-11-30 2019-04-09 中国地震台网中心 Loading ami deloading response ratio calculation method and system
CN109680669B (en) * 2018-12-18 2020-08-25 青岛理工大学 Foundation pit stability monitoring and early warning method based on underground water dynamic loading
CN109740108B (en) * 2019-01-25 2020-05-12 北京科技大学 Flat-pushing type landslide stability evaluation method considering step settlement
CN109785584A (en) * 2019-01-29 2019-05-21 青岛理工大学 Compound hydrodynamic force reservoir stability stability prediction method
CN112085921B (en) * 2020-08-20 2022-11-11 青岛地质工程勘察院(青岛地质勘查开发局) Landslide comprehensive monitoring and early warning method based on displacement and power multi-parameter
CN111982004A (en) * 2020-09-09 2020-11-24 中国五冶集团有限公司 High and steep slope geological disaster monitoring and early warning structure and early warning method
CN112102588B (en) * 2020-09-22 2022-01-04 温州大学 Self-powered highway side slope monitoring and early warning system
CN113216219B (en) * 2021-04-09 2023-03-07 中国电建集团西北勘测设计研究院有限公司 Method for controlling slope deformation by limiting reservoir water level lifting rate
CN114137601A (en) * 2021-11-26 2022-03-04 华北水利水电大学 Wedge stability evaluation method
CN115050163B (en) * 2022-06-15 2023-10-03 中铁第四勘察设计院集团有限公司 Slope monitoring and early warning system
CN117291349B (en) * 2023-11-24 2024-03-19 济宁御龙源水务有限公司 Groundwater level restoration prediction method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150871A (en) * 2013-01-31 2013-06-12 青岛理工大学 Landslide forecasting method capable of utilizing underground water levels and displacement real-time monitoring
CN103198619A (en) * 2013-03-08 2013-07-10 青岛理工大学 Motive power monitoring and warning method of rock mass landslide
CN103558360A (en) * 2013-11-11 2014-02-05 青岛理工大学 Method for determining critical instable starting rainfall capacity of rainfall type landslip
CN103646181A (en) * 2013-12-20 2014-03-19 青岛理工大学 Method for determining wriggle slide type artificial side slope stability coefficient and early warning criteria
CN103792593A (en) * 2014-01-13 2014-05-14 青岛理工大学 Method for determining stability of reservoir bank slope based on reservoir water level and displacement

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002074569A (en) * 2000-08-28 2002-03-15 Mitsui Bussan Plant Kk Method for generating measured data

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150871A (en) * 2013-01-31 2013-06-12 青岛理工大学 Landslide forecasting method capable of utilizing underground water levels and displacement real-time monitoring
CN103198619A (en) * 2013-03-08 2013-07-10 青岛理工大学 Motive power monitoring and warning method of rock mass landslide
CN103558360A (en) * 2013-11-11 2014-02-05 青岛理工大学 Method for determining critical instable starting rainfall capacity of rainfall type landslip
CN103646181A (en) * 2013-12-20 2014-03-19 青岛理工大学 Method for determining wriggle slide type artificial side slope stability coefficient and early warning criteria
CN103792593A (en) * 2014-01-13 2014-05-14 青岛理工大学 Method for determining stability of reservoir bank slope based on reservoir water level and displacement

Also Published As

Publication number Publication date
CN104406623A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN104406623B (en) Slope dynamic stability coefficient determination method based on level of ground water and displacement monitoring
Heap et al. Towards more realistic values of elastic moduli for volcano modelling
Stille et al. Classification as a tool in rock engineering
Hatzor et al. Continuous and discontinuous stability analysis of the bell-shaped caverns at Bet Guvrin, Israel
CN103150871B (en) Utilize the Prediction of Landslide of underground water table and real-time displacement monitoring
Robertson Soil behaviour type from the CPT: an update
Niazi et al. CPTu-based enhanced UniCone method for pile capacity
Liu et al. Estimation of the compression behaviour of reconstituted clays
CN104318103A (en) Landslide hazard monitoring and early warning rainfall threshold judging method
Basarir et al. Preliminary estimation of rock mass strength using diamond bit drilling operational parameters
Harnett et al. Evolution of mechanical properties of lava dome rocks across the 1995–2010 eruption of Soufrière Hills Volcano, Montserrat
CN103558360A (en) Method for determining critical instable starting rainfall capacity of rainfall type landslip
Baecher Bayesian thinking in geotechnics
CN111861107A (en) Landslide dynamic stability evaluation method based on intensity reduction method
Yang et al. Deformation characteristics of unstable shallow slopes triggered by rainfall infiltration
CN104535346B (en) A kind of stability against sliding detection method on concrete gravity danger dam
CN108021763A (en) A kind of old goaf residual settlement Forecasting Methodology
Salgado et al. Site variability analysis using cone penetration test data
Yuan et al. Reliability analysis of soil nail internal limit states using default FHWA load and resistance models
Hatami et al. Laboratory performance of reduced-scale reinforced embankments at different moisture contents
Burbey Use of time–subsidence data during pumping to characterize specific storage and hydraulic conductivity of semi-confining units
CN113267814A (en) Method and device for measuring and calculating field shear wave velocity
Zhou et al. Practice of Bayesian probability theory in geotechnical engineering
Yin et al. Consolidation analyses of soils
Zhou et al. Prospective forecast of sliding instability time using a precursory AE time series

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: He Keqiang

Inventor after: Yang Debing

Inventor after: Liang Yunpei

Inventor after: Zhang Yongjun

Inventor after: Zhang Jiaxin

Inventor after: Li Jing

Inventor before: He Keqiang

Inventor before: Yang Debing

Inventor before: Zhang Jiaxin

Inventor before: Li Jing