CN104394020A - Automatic fault processing and safety control system and method for power information collection device - Google Patents

Automatic fault processing and safety control system and method for power information collection device Download PDF

Info

Publication number
CN104394020A
CN104394020A CN201410726794.XA CN201410726794A CN104394020A CN 104394020 A CN104394020 A CN 104394020A CN 201410726794 A CN201410726794 A CN 201410726794A CN 104394020 A CN104394020 A CN 104394020A
Authority
CN
China
Prior art keywords
collecting device
electricity consumption
bus
automatic
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410726794.XA
Other languages
Chinese (zh)
Inventor
冯勇军
山宪武
张海丽
朱敏
叶新青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG CHUANGWEI ENGINEERING AUTOMATION ENGINEERING Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd
Original Assignee
ZHEJIANG CHUANGWEI ENGINEERING AUTOMATION ENGINEERING Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG CHUANGWEI ENGINEERING AUTOMATION ENGINEERING Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Xinjiang Electric Power Co Ltd filed Critical ZHEJIANG CHUANGWEI ENGINEERING AUTOMATION ENGINEERING Co Ltd
Priority to CN201410726794.XA priority Critical patent/CN104394020A/en
Publication of CN104394020A publication Critical patent/CN104394020A/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The invention relates to an automatic fault processing and safety control system and an automatic fault processing and safety control method for a power information collection device. The automatic fault processing and safety control system includes an on-site electric energy meter, an on-site terminal and a master station connected to the on-site terminal through GPRS; the master station includes an automatic remote processing module and a safety control module, wherein the automatic remote processing module is used for performing automatic remote process on a failure device that can communicate normally on the day, the safety control module is used for performing process control, logic control and verification on a remote processing instruction. According to the automatic fault processing and safety control system and method for the power information collection device, the failure device that can communicate normally on the day is intelligently judged by the system, and the system tries to automatically process the faults, which can be automatically processed by the system, of the collection device, and records processing journals. Automatic recovery judgment is performed by the system after the processing is successful. According to the safety control method based on a bus technology provided by the invention, running statuses of programs in the system are automatically monitored, receiving, transmitting and distribution of a message are managed in a unified manner, the message to be issued is verified, and the correction and influence range of the message to be issued is strictly controlled.

Description

Electricity consumption collecting device fault processes and safety control system and method automatically
Technical field
The application relates to field of power, provides one and automatically processes and safety control system for electricity consumption collecting device fault.
Background technology
Power information acquisition technique is complicated, link is various, complete gatherer process needs marketing system, acquisition system, communication channel (mobile GPRS or 3G), collection in worksite terminal, each link of on-the-spot table meter is closely connected normal operation, just can guarantee the timely, correct, stable of collection.At present along with the realization of State Grid Corporation of China's power information acquisition system " all standing, full collection ", because number of users is extremely huge, for faulty equipment, by work on hand flow process, arrange personnel on site to process after directly sending work by system, bring the workload of great on-site maintenance.Simultaneously traditional processing procedure is generally divided into and sends instruction, receives instruction and return results, and for how guaranteeing that the secure context such as the correctness of instruction, the reliability of transmission does not have strict guarantee, affects efficiency and the accuracy of automatic remote process.
Summary of the invention
The object of the application is that proposing one carries out improving for prior art and improve, there is provided a kind of electricity consumption to gather faulty equipment automatically to process and safety control system, can the faulty equipment of normal communication for the same day, process automatically is first attempted when safe and reliable, and recording processing daily record.
The object of the application is achieved in that electricity consumption collecting device fault processes and safety control system and method automatically, the main website comprising field electric energy table, on-site terminal and be connected by GPRS with on-site terminal, automatic remote processing module and safety control module is comprised in main website, automatic remote processing module can the faulty equipment of normal communication for the same day, when safe and reliable, carry out automatic remote process, safety control module is responsible for carrying out Row control, logic control and checking to teleprocessing instruction.
Electricity consumption gathers faulty equipment automatic processing method can the faulty equipment of normal communication for the same day, by terminal pair time, archives are synchronous, parameter synchronization of checking meter, relaying are checked meter, the step of task configuration synchronization carries out step-by-step processing.
Electricity consumption collecting device failure safe control method comprises following treatment step:
1) Row control program inquiring is to the failed terminals needing teleprocessing;
2) Row control program assembles pending request by business need, and records original value;
3) Row control program pushes the pending request of fault to bus;
4) bus program obtains pending request;
5) bus sends pending request to logic control program;
6) logic control program is by the pending request of stipulations requirement assembling, and records logical value;
7) bus program obtains processed request, sends pending request to arranging proving program;
8) original value and logical value that proving program verifies pending request are set, and record the result;
9) bus obtains the result;
10) Row control program obtains bus verification result;
11) Row control program sends instructions under sending parameter of checking meter;
12) repeat 2-11, process next.
Owing to implementing technique scheme, the application can the faulty equipment of normal communication for the same day, carries out intelligent decision, for the collecting device fault that system can process automatically, when safe and reliable, first attempt process automatically by system, and recording processing daily record.Process and successfully automatically recovered to judge by system.To this partial fault equipment, reach the effect of " automatically find, automatically process, automatically recover ", greatly reduce the workload that fault collection device context is safeguarded.
The application guarantees safe and reliable by a kind of method of controlling security based on bussing technique, realize the running status of each program in automatic monitored control system, to packet sending and receiving, distribute and carry out unified management, and downward message is verified, strict correctness and the coverage controlling downward message.
Accompanying drawing illustrates: the concrete structure of the application is provided by following drawings and Examples:
Fig. 1 is that electricity consumption gathers faulty equipment automatic processing method flow chart;
Fig. 2 is electricity consumption collecting device failure safe control method schematic diagram;
Fig. 3 is electricity consumption collecting device failure safe control method flow chart;
Fig. 4 is that electricity consumption collecting device fault processes and the structure principle chart of safety control system automatically.
Embodiment:
The application by the restriction of following embodiment, can not determine concrete execution mode according to the technical scheme of the application and actual conditions.
Embodiment: as shown in Figure 4, the main website that electricity consumption collecting device fault processes automatically and safety control system is comprised field electric energy table, on-site terminal and is connected by GPRS with on-site terminal, automatic remote processing module and safety control module is comprised in main website, automatic remote processing module can the faulty equipment of normal communication for the same day, automatic remote process is carried out when safe and reliable, safety control module is responsible for carrying out Row control, logic control and checking to teleprocessing instruction, ensures safety.
As shown in Figure 1, it is can the faulty equipment of normal communication for the same day that electricity consumption gathers faulty equipment automatic processing method, by terminal pair time, archives are synchronous, parameter synchronization of checking meter, relaying are checked meter, the step of task configuration synchronization carries out step-by-step processing.System in the application refers to 95598 systems that grid company has adopted, and matching used power distribution automation management system and power information acquisition system with it, power information acquisition system comprises collecting device and on-site terminal, it is prior art, the non-the present application point of its concrete structure, circuit, program and operational process, therefore be not described in detail.Its workflow comprises: in 95598 systems (marketing system), and arrange respectively in matching used power distribution automation management system and power information acquisition system with it and report fault message pushing module, line fault info push module and with adopting fault message pushing module for repairment, the fault message collected initiatively is sent to 95598 intrasystem fault message receiver modules by each module.
The electricity consumption collecting device fault automatic processing method of the application comprises the following steps:
1) during terminal pair: system remote is called together and surveyed collecting device clock, judges whether its clock exists deviation, if there is deviation, instruction when automatically sending long-range pair;
2) archives are synchronous: compare the archive information of collecting device in power information acquisition system and marketing system, mainly comprise the address of table meter, electric energy meter stipulations, electric energy meter baud rate, terminal password, CT(current transformer), PT(voltage transformer) etc. information, if inconsistent, then automatic synchronization power information acquisition system, ensures the consistency of archive information in power information acquisition system and system of collecting device;
3) to check meter parameter synchronization: system remote is called together and surveyed collecting device and to check meter parameter, comprise the address of table meter, electric energy meter stipulations, electric energy meter baud rate, terminal password, CT(current transformer), PT(voltage transformer) etc. the value of information and marketing system record compare, if inconsistent, then automatically send parameter setting instruction of checking meter, ensure the consistency of collecting device local parameter and system value;
4) relaying is checked meter: system sends relaying meter reading instruction from trend collecting device, judges collecting device and the on-the-spot communication condition showing to count (on-site terminal), unsuccessful, advises in-situ processing;
5) task configuration synchronization: system remote is called together and surveyed collecting device task configuration information, judge collecting device whether configuration task and whether consistent with marketing system value, not configure or inconsistent, then automatically send instruction and configure to collecting device by system template requirement synchronous task.
In the automatic processing procedure of the application, judge the faulty equipment needing in-situ processing, arrange operation maintenance personnel in-situ processing after sending work by system, automatically process termination.
The collecting device that automatic process completes, system second day is according to data acquisition situation, and whether automatic decision fault repairs, if fault is repaired, then automatic archiving faulty equipment work order, forms closed loop.
As shown in Figure 2, the hardware setting of the electricity consumption collecting device failure safe control method of the application comprises server 1-n in parallel, internal storage data is stored in server 1-n, each server 1-n is connected with corresponding bus 1-n, each bus 1-n far-end merges into bus VIP, and the far-end server being equiped with Row control program, logic control program and arranging proving program is set at this far-end, be provided with database D B in far-end server, far-end server is also connected with on-site terminal network B P1-BPn.Wherein: 1, bus 1-n, bus VIP: interaction data information and the process progress between each system be responsible for is preserved, recovered; 2, Row control program: be responsible for each Business Process Control, preserves and arranges class business original value, and preserve troubleshooting daily record; 3, logic control program: be responsible for all kinds of request encapsulation, management sends, receive request; And preserve and class business original value is set is converted to logical value; 4, proving program is set and carries out contrast verification to arranging class business original value and arranging class service logic value.
As shown in Figure 3, when each step in aforementioned electricity consumption collecting device fault automatic processing method relates to and sends instruction to on-site terminal, then need to carry out safety verification by safety control module, to check meter, parameter issues automatically, and electricity consumption collecting device failure safe control method comprises following treatment step:
1) Row control program inquiring is to the failed terminals needing teleprocessing;
2) Row control program assembles pending request by business need, and records original value;
3) Row control program pushes the pending request of fault to bus;
4) bus program obtains pending request;
5) bus sends pending request to logic control program;
6) logic control program is by the pending request of stipulations requirement assembling, and records logical value;
7) bus program obtains processed request, sends pending request to arranging proving program;
8) original value and logical value that proving program verifies pending request are set, and record the result; Mainly comprise Unit code, terminal station number, ammeter office number for Verification content of checking meter, measure period, state's network planning is about terminal electric energy meter/ac sampling device configuration parameter, call measured value together (call measured value together and comprise baud rate, port numbers, communication protocol, mailing address, collector mailing address, the integer-bit of active energy indicating value and decimal place number);
9) bus obtains the result;
10) Row control program obtains bus verification result;
11) Row control program sends instructions under sending parameter of checking meter;
12) repeat 2-11, process next.
Before Row control program is run, each server 1-n needs to bus VIP registration after starting, so that bus VIP correctly returns result to each server 1-n.
Row control program is run between rear system and is generated a flowing water ID, transmits unique identification using this ID as message.
A traffic ID is also generated, as traffic differentiation unique identification, so that returned packet correctly preserves back the corresponding internal storage data of each system between system.
Proving program is set there is special flow process control authority, when in section sometime, message contrast abnormal quantity exceedes certain threshold values, emptying data in memory can be sent to bus, stop all flow process requests, and send note to related personnel, remind related personnel's Flow ends.
Above technical characteristic constitutes the most preferred embodiment of the application, and it has stronger adaptability and best implementation result, can increase and decrease inessential technical characteristic according to actual needs, meet the needs of different situations.

Claims (13)

1. an electricity consumption collecting device fault processes and safety control system and method automatically, the main website comprising field electric energy table, on-site terminal and be connected by GPRS with on-site terminal, it is characterized in that: in main website, comprise automatic remote processing module and safety control module, automatic remote processing module can the faulty equipment of normal communication for the same day, when safe and reliable, carry out automatic remote process, safety control module is responsible for carrying out Row control, logic control and checking to teleprocessing instruction.
2. electricity consumption as claimed in claim 1 gathers faulty equipment automatic processing method, it is characterized in that: can the faulty equipment of normal communication for the same day, by terminal pair time, archives are synchronous, parameter synchronization of checking meter, relaying are checked meter, the step of task configuration synchronization carries out step-by-step processing, comprise the following steps:
1) during terminal pair: system remote is called together and surveyed collecting device clock, judges whether its clock exists deviation, if there is deviation, instruction when automatically sending long-range pair;
2) archives are synchronous: compare the archive information of collecting device in power information acquisition system and marketing system, mainly comprise the address of table meter, electric energy meter stipulations, electric energy meter baud rate, terminal password, CT(current transformer), PT(voltage transformer) etc. information, if inconsistent, then automatic synchronization power information acquisition system, ensures the consistency of archive information in power information acquisition system and system of collecting device;
3) to check meter parameter synchronization: system remote is called together and surveyed collecting device and to check meter parameter, comprise the address of table meter, electric energy meter stipulations, electric energy meter baud rate, terminal password, CT(current transformer), PT(voltage transformer) etc. the value of information and marketing system record compare, if inconsistent, then automatically send parameter setting instruction of checking meter, ensure the consistency of collecting device local parameter and system value;
4) relaying is checked meter: system sends relaying meter reading instruction from trend collecting device, judges collecting device and the on-the-spot communication condition showing to count (on-site terminal), unsuccessful, advises in-situ processing;
5) task configuration synchronization: system remote is called together and surveyed collecting device task configuration information, judge collecting device whether configuration task and whether consistent with marketing system value, not configure or inconsistent, then automatically send instruction and configure to collecting device by system template requirement synchronous task.
3. electricity consumption as claimed in claim 1 gathers faulty equipment automatic processing method, and it is characterized in that: the collecting device automatically processed, system second day is according to data acquisition situation, whether automatic decision fault repairs, if fault is repaired, then automatic archiving faulty equipment work order, forms closed loop.
4. electricity consumption collecting device failure safe control method as claimed in claim 1, is characterized in that: electricity consumption collecting device failure safe control method comprises following treatment step:
1) Row control program inquiring is to the failed terminals needing teleprocessing;
2) Row control program assembles pending request by business need, and records original value;
3) Row control program pushes the pending request of fault to bus;
4) bus program obtains pending request;
5) bus sends pending request to logic control program;
6) logic control program is by the pending request of stipulations requirement assembling, and records logical value;
7) bus program obtains processed request, sends pending request to arranging proving program;
8) original value and logical value that proving program verifies pending request are set, and record the result;
9) bus obtains the result;
10) Row control program obtains bus verification result;
11) Row control program sends instructions under sending parameter of checking meter;
12) repeat 2-11, process next.
5. electricity consumption collecting device failure safe control method as claimed in claim 4, is characterized in that: before Row control program is run, and each server 1-n needs to bus VIP registration after starting, so that bus VIP correctly returns result to each server 1-n.
6. electricity consumption collecting device failure safe control method as claimed in claim 4, is characterized in that: Row control program is run between rear system and generated a flowing water ID, transmits unique identification using this ID as message.
7. electricity consumption collecting device failure safe control method as claimed in claim 4, is characterized in that: also generate a traffic ID between system, as traffic differentiation unique identification, so that returned packet correctly preserves back the corresponding internal storage data of each system.
8. electricity consumption collecting device failure safe control method as claimed in claim 4, it is characterized in that: proving program is set there is Row control authority, when message contrast abnormal quantity exceedes threshold values, send emptying data in memory to bus, stop all flow process requests.
9. electricity consumption collecting device failure safe control method as claimed in claim 4, it is characterized in that: the hardware setting of electricity consumption collecting device failure safe control method comprises server 1-n in parallel, internal storage data is stored in server 1-n, each server 1-n is connected with corresponding bus 1-n, each bus 1-n far-end merges into bus VIP, and be equiped with Row control program in the setting of this far-end, logic control program and the far-end server of proving program is set, database D B is provided with in far-end server, far-end server is also connected with on-site terminal network B P1-BPn.
10. electricity consumption collecting device failure safe control method as claimed in claim 9, is characterized in that: bus 1-n, bus VIP: interaction data information and the process progress between each system be responsible for is preserved, recovered.
11. electricity consumption collecting device failure safe control methods as claimed in claim 9, is characterized in that: Row control program: be responsible for each Business Process Control, preserve and arrange class business original value, and preserve troubleshooting daily record.
12. electricity consumption collecting device failure safe control methods as claimed in claim 9, is characterized in that: logic control program: be responsible for all kinds of request encapsulation, management sends, receive request; And preserve and class business original value is set is converted to logical value.
13. electricity consumption collecting device failure safe control methods as claimed in claim 9, is characterized in that: arrange proving program and carry out contrast verification to arranging class business original value and arranging class service logic value.
CN201410726794.XA 2014-12-04 2014-12-04 Automatic fault processing and safety control system and method for power information collection device Pending CN104394020A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410726794.XA CN104394020A (en) 2014-12-04 2014-12-04 Automatic fault processing and safety control system and method for power information collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410726794.XA CN104394020A (en) 2014-12-04 2014-12-04 Automatic fault processing and safety control system and method for power information collection device

Publications (1)

Publication Number Publication Date
CN104394020A true CN104394020A (en) 2015-03-04

Family

ID=52611856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410726794.XA Pending CN104394020A (en) 2014-12-04 2014-12-04 Automatic fault processing and safety control system and method for power information collection device

Country Status (1)

Country Link
CN (1) CN104394020A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105354681A (en) * 2015-11-26 2016-02-24 新疆信息产业有限责任公司 Method for automatically studying, judging and correcting acquisition file of marketing acquisition interface data
CN107451742A (en) * 2017-08-04 2017-12-08 国网浙江省电力公司 A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure
CN107481503A (en) * 2017-08-15 2017-12-15 广东电网有限责任公司佛山供电局 A kind of kilowatt meter reading-out system and meter register method
CN107566157A (en) * 2017-08-04 2018-01-09 国网浙江省电力公司 Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator
CN107704931A (en) * 2017-07-07 2018-02-16 国网浙江省电力公司电力科学研究院 A kind of equipment fault closed-loop process method for being used to measure fully-automatic production operation
CN108449250A (en) * 2018-05-22 2018-08-24 三明学院 A kind of IO-LINK master station devices and method for supporting multibus
CN108648549A (en) * 2018-05-10 2018-10-12 杭州佳和电气股份有限公司 A kind of the power information acquisition closed-loop simulation system and control method of object-oriented
CN108919172A (en) * 2018-07-27 2018-11-30 国家电网有限公司 A kind of automatic time synchronization method of electric energy meter, device and terminal device
CN112532694A (en) * 2020-11-12 2021-03-19 许继集团有限公司 Remote centralized control method and system suitable for master station communication
CN113066276A (en) * 2021-03-18 2021-07-02 国网陕西省电力公司电力科学研究院 Communication fault monitoring method and device for electricity consumption information acquisition system and storage medium
CN114449018A (en) * 2022-04-08 2022-05-06 安徽南瑞中天电力电子有限公司 Automatic log file uploading method and system for power acquisition terminal

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102024318A (en) * 2009-09-09 2011-04-20 浙江省电力公司 Automatic adjustment method based on planned power utilization information collection terminal
US20120290232A1 (en) * 2009-12-02 2012-11-15 Nec Corporation Electric power measurement system, electric power measurement method, and information processing device
CN202872466U (en) * 2012-10-19 2013-04-10 吉林省电力有限公司通化供电公司 Power using information acquisition system
CN103516054A (en) * 2011-12-04 2014-01-15 江苏省电力公司南京供电公司 Power distribution and utilization network fault automatic processing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102024318A (en) * 2009-09-09 2011-04-20 浙江省电力公司 Automatic adjustment method based on planned power utilization information collection terminal
US20120290232A1 (en) * 2009-12-02 2012-11-15 Nec Corporation Electric power measurement system, electric power measurement method, and information processing device
CN103516054A (en) * 2011-12-04 2014-01-15 江苏省电力公司南京供电公司 Power distribution and utilization network fault automatic processing method
CN202872466U (en) * 2012-10-19 2013-04-10 吉林省电力有限公司通化供电公司 Power using information acquisition system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105354681A (en) * 2015-11-26 2016-02-24 新疆信息产业有限责任公司 Method for automatically studying, judging and correcting acquisition file of marketing acquisition interface data
CN107704931A (en) * 2017-07-07 2018-02-16 国网浙江省电力公司电力科学研究院 A kind of equipment fault closed-loop process method for being used to measure fully-automatic production operation
CN107451742A (en) * 2017-08-04 2017-12-08 国网浙江省电力公司 A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure
CN107566157A (en) * 2017-08-04 2018-01-09 国网浙江省电力公司 Remote diagnosis processing method of the ammeter completely without data fault under a kind of concentrator
CN107481503A (en) * 2017-08-15 2017-12-15 广东电网有限责任公司佛山供电局 A kind of kilowatt meter reading-out system and meter register method
CN108648549A (en) * 2018-05-10 2018-10-12 杭州佳和电气股份有限公司 A kind of the power information acquisition closed-loop simulation system and control method of object-oriented
CN108449250A (en) * 2018-05-22 2018-08-24 三明学院 A kind of IO-LINK master station devices and method for supporting multibus
CN108449250B (en) * 2018-05-22 2023-08-04 三明学院 IO-LINK master station device and method supporting multiple buses
CN108919172A (en) * 2018-07-27 2018-11-30 国家电网有限公司 A kind of automatic time synchronization method of electric energy meter, device and terminal device
CN112532694A (en) * 2020-11-12 2021-03-19 许继集团有限公司 Remote centralized control method and system suitable for master station communication
CN113066276A (en) * 2021-03-18 2021-07-02 国网陕西省电力公司电力科学研究院 Communication fault monitoring method and device for electricity consumption information acquisition system and storage medium
CN114449018A (en) * 2022-04-08 2022-05-06 安徽南瑞中天电力电子有限公司 Automatic log file uploading method and system for power acquisition terminal

Similar Documents

Publication Publication Date Title
CN104394020A (en) Automatic fault processing and safety control system and method for power information collection device
CN113066276B (en) Communication fault monitoring method and device for electricity consumption information acquisition system and storage medium
CN105389166B (en) A kind of method that self-described plug and play distribution terminal automatically accesses
CN104410067A (en) Zone area power failure analyzing method based on common transformer and analysis of big data acquired by users
CN109743191B (en) Accurate positioning centralized processing system, method and device for equipment alarm
WO2016004652A1 (en) Intelligent power usage management method and system based on ami and j2ee
CN103368263B (en) The detection method of dispatch automated system IEC104 stipulations communication state
CN110728836A (en) Concentrator meter reading abnormity analysis method and system
CN104811433A (en) Distributed IoT (Internet of Things) solution scheme of C/S configuration
CN103326465A (en) Power distribution network terminal access method based on IEC61850 standard
CN105978159A (en) Telecontrol testing online execution-free check method for transformer station
CN104052633A (en) Integrated testing method for intelligent station 61850 and telecontrol 104 protocol
CN103107914A (en) Detection method and detection system for remote power acquisition terminal
CN101609407A (en) Detection method based on the full station model file coupling of publisher/subscriber's pattern
CN102024318A (en) Automatic adjustment method based on planned power utilization information collection terminal
CN103684903A (en) GOOSE message anomaly online detection method
CN109473945A (en) A kind of verification of relay protection model data and method of automatic configuration
CN108123544A (en) For the power failure check method of supply line
CN102904721B (en) Signature and authentication method for information safety control of intelligent substations and device thereof
CN103279702A (en) Method for monitoring full-substation model file version during debugging of intelligent substation
CN111435843B (en) High-speed carrier CCO communication method based on wireless interface
CN109246131B (en) Safety reinforcing method and system for electricity consumption information acquisition terminal
CN111525689A (en) Accurate two location distribution terminal monitoring management system
CN105610846A (en) System for managing electrical energy monitoring terminal data acquisition energy consumption and application method thereof
CN203587709U (en) Intelligent transformer station integrated monitoring system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150304

WD01 Invention patent application deemed withdrawn after publication