CN104346262B - Method and device for acquiring power consumption information of application program and mobile terminal - Google Patents

Method and device for acquiring power consumption information of application program and mobile terminal Download PDF

Info

Publication number
CN104346262B
CN104346262B CN201310311853.2A CN201310311853A CN104346262B CN 104346262 B CN104346262 B CN 104346262B CN 201310311853 A CN201310311853 A CN 201310311853A CN 104346262 B CN104346262 B CN 104346262B
Authority
CN
China
Prior art keywords
application program
mobile terminal
power consumption
consumption information
electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310311853.2A
Other languages
Chinese (zh)
Other versions
CN104346262A (en
Inventor
韦航
李丁盼
马健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kingsoft Internet Security Software Co Ltd
Conew Network Technology Beijing Co Ltd
Shell Internet Beijing Security Technology Co Ltd
Zhuhai Juntian Electronic Technology Co Ltd
Beijing Kingsoft Internet Science and Technology Co Ltd
Original Assignee
Beijing Kingsoft Internet Security Software Co Ltd
Conew Network Technology Beijing Co Ltd
Shell Internet Beijing Security Technology Co Ltd
Zhuhai Juntian Electronic Technology Co Ltd
Beijing Kingsoft Internet Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kingsoft Internet Security Software Co Ltd, Conew Network Technology Beijing Co Ltd, Shell Internet Beijing Security Technology Co Ltd, Zhuhai Juntian Electronic Technology Co Ltd, Beijing Kingsoft Internet Science and Technology Co Ltd filed Critical Beijing Kingsoft Internet Security Software Co Ltd
Priority to CN201310311853.2A priority Critical patent/CN104346262B/en
Priority to PCT/CN2014/082839 priority patent/WO2015010624A1/en
Publication of CN104346262A publication Critical patent/CN104346262A/en
Application granted granted Critical
Publication of CN104346262B publication Critical patent/CN104346262B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3003Monitoring arrangements specially adapted to the computing system or computing system component being monitored
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3055Monitoring arrangements for monitoring the status of the computing system or of the computing system component, e.g. monitoring if the computing system is on, off, available, not available
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3058Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations
    • G06F11/3062Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations where the monitored property is the power consumption
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/32Monitoring with visual or acoustical indication of the functioning of the machine
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3003Monitoring arrangements specially adapted to the computing system or computing system component being monitored
    • G06F11/3013Monitoring arrangements specially adapted to the computing system or computing system component being monitored where the computing system is an embedded system, i.e. a combination of hardware and software dedicated to perform a certain function in mobile devices, printers, automotive or aircraft systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2201/00Indexing scheme relating to error detection, to error correction, and to monitoring
    • G06F2201/865Monitoring of software

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Computing Systems (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Telephone Function (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the invention provides a method and a device for acquiring power consumption information of an application program and a mobile terminal. The method comprises the following steps: acquiring an application program running in a mobile terminal; when the condition that the preset measurement condition is met is determined according to the states of the mobile terminal and the application program, recording first time and first electric quantity of the mobile terminal; when the preset measurement condition is determined not to be met according to the states of the mobile terminal and the application program, recording second time and second electric quantity of the mobile terminal; and acquiring first average power consumption information of the application program according to the first time, the first electric quantity, the second time and the second electric quantity. According to the method provided by the embodiment of the invention, the current time and the current electric quantity of the mobile terminal are obtained according to whether the states of the mobile terminal and the application program meet the preset measurement condition, and the power consumption information of the application program in unit time is obtained according to the current time and the current electric quantity of the mobile terminal, so that reference is provided for a user to reasonably use the battery electric quantity of the mobile terminal, and the user experience is improved.

Description

Acquisition methods, device and the mobile terminal of application program power consumption information
Technical field
The present invention relates to technical field of mobile terminals, particularly relates to a kind of acquisition methods of application program power consumption information, dress Put and mobile terminal.
Background technology
With the broadband development of network technology, Mobile Communication Industry will move towards the real mobile message epoch, meanwhile, with The rapid development of integrated circuit technique, mobile terminal has very strong disposal ability, and mobile terminal is from simple logical Words instrument is changed into an integrated information processing platform.Modern mobile terminal has possessed extremely powerful disposal ability, memory, has consolidated Change storage medium and the operating system as computer, be a complete superminicomputer system, complexity can be completed Processing task, can not only converse, take pictures, listening to music, playing game, but also can realize and be swept including positioning, information processing, fingerprint Retouch, identity card scanning, bar code scan, RFID(Radio Frequency Identification, electronic tag, less radio-frequency Identification)The abundant functions such as scanning, IC card scanning and alcohol content detection, become mobile law enforcement, mobile office and mobile business The important tool of business.
The rapid development of mobile terminal is brought greatly while facilitate, and technical problem also occurs:Small but excellent The development of mobile terminal is confined to the battery capacity of battery, for example, lithium battery etc..The reason for mobile terminal power consumption, mainly includes big Screen highlight is shown, operating system and application program(Application, APP)Running background power consumption etc..Solve at present Method is as follows:The problem of being highlighted for giant-screen, the brightness that user can turn down giant-screen by operation are shown Show, timely screen locking during without mobile terminal;Power consumption problem during for operating system, user can be reduced to related system The usage time of function, such as uses 3G less as far as possible(3rd-generation, 3rd generation mobile communication technology)、Wi-Fi (Wireless fidelity, radio high-fidelity)Etc..
The system parameter values of mobile terminal are obtained for the ease of software developer, the operating system of mobile terminal is software The application programming interface that developer provides(Application Programming Interface, API).Deposit at present The problem of be that the operating system of a variety of mobile terminals can not obtain the power consumption of installed application program by api interface Situation, therefore the power consumption problem user of application program can not accurately be known, user is difficult to clearly know which application program is " power consumption rich and influential family ", can not reasonably arrange to have installed the usage time of application program.
The content of the invention
It is contemplated that at least solve one of above-mentioned technical problem.
For this reason, first purpose of the present invention is to propose a kind of acquisition methods of application program power consumption information.This method Reference reasonably is provided using the battery capacity of mobile terminal for user, improves user experience.
Second object of the present invention is to propose a kind of acquisition device of application program power consumption information.
Third object of the present invention is to propose a kind of mobile terminal.
To achieve these goals, the acquisition methods of the application program power consumption information of first aspect present invention embodiment, bag Include:Obtain the application program being currently running in mobile terminal;When the state according to the mobile terminal and the application program is true When fixed satisfaction presets measuring condition, first time and the first electricity of the mobile terminal are recorded;When according to the mobile terminal When determining to be unsatisfactory for default measuring condition with the state of the application program, the second time and second of the mobile terminal is recorded Electricity;And the application is obtained according to the first time, first electricity, second time and second electricity First average consumption information of program.
The acquisition methods of application program power consumption information according to embodiments of the present invention, according to mobile terminal and application program Whether state meets that default measuring condition obtains the current time and current electric quantity of mobile terminal, and according to the current of mobile terminal Time and current electric quantity obtain the unit interval power consumption information of application program, are that user is reasonably electric using the battery of mobile terminal Amount provides reference.
To achieve these goals, the acquisition device of the application program power consumption information of second aspect of the present invention embodiment, bag Include:Application program acquisition module, for obtaining the application program being currently running in mobile terminal;Remember at the first time with the first electricity Module is recorded, for when determining to meet default measuring condition according to the state of the mobile terminal and the application program, recording The first time of the mobile terminal and the first electricity;Second time and the second electricity logging modle, for when according to the shifting When the state of dynamic terminal and the application program determines to be unsatisfactory for default measuring condition, the second time of the mobile terminal is recorded With the second electricity;And the first average consumption data obtaining module, for according to the first time, first electricity, institute Stated for the second time and second electricity obtains the first average consumption information of the application program.
The acquisition device of application program power consumption information according to embodiments of the present invention, according to mobile terminal and application program Whether state meets that default measuring condition obtains the current time and current electric quantity of mobile terminal, and according to the current of mobile terminal Time and current electric quantity obtain the unit interval power consumption information of application program, are that user is reasonably electric using the battery of mobile terminal Amount provides reference, improves user experience.
To achieve these goals, the mobile terminal of third aspect present invention embodiment, including:Shell, screen, processor And circuit board;On the housing, the circuit board is placed in the interior volume that the shell surrounds, described for the screen placement Processor is arranged on the circuit board;The processor is used to handle data, is specifically used for:Obtain and transported in mobile terminal Capable application program;When determining to meet default measuring condition according to the state of the mobile terminal and the application program, note Record first time and the first electricity of the mobile terminal;Determined when according to the state of the mobile terminal and the application program When being unsatisfactory for default measuring condition, the second time and the second electricity of the mobile terminal are recorded;And during according to described first Between, first electricity, second time and second electricity obtain the first average consumption information of the application program.
Whether mobile terminal according to embodiments of the present invention, meet default survey according to the state of mobile terminal and application program Amount condition obtains the current time and current electric quantity of mobile terminal, and is obtained according to the current time and current electric quantity of mobile terminal The unit interval power consumption information of application program, reasonably provides reference using the battery capacity of mobile terminal for user, improves User experience.
The additional aspect of the present invention and advantage will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Of the invention above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments Substantially and it is readily appreciated that, wherein,
Fig. 1 is the flow chart of the acquisition methods of application program power consumption information according to an embodiment of the invention;
Fig. 2 is the flow chart of the acquisition methods of application program power consumption information in accordance with another embodiment of the present invention;
Fig. 3 is the flow chart of the acquisition methods of the application program power consumption information of another embodiment according to the present invention;
Fig. 4(a)It is the flow chart of the acquisition methods of the application program power consumption information of further embodiment according to the present invention;
Fig. 4(b)It is a kind of example schematic diagram of the second average consumption information according to embodiments of the present invention and power consumption grade;
Fig. 4(c)It is that prompting user according to embodiments of the present invention closes one kind of the higher ranked application program of power consumption and shows Illustrate and be intended to;
Fig. 5(a)Be according to the present invention again further embodiment application program power consumption information acquisition methods flow chart;
Fig. 5(b)、(c)、(d)With(e)It is the example schematic diagram of the second average consumption information according to embodiments of the present invention;
Fig. 6 is the structure diagram of the acquisition device of application program power consumption information according to an embodiment of the invention;
Fig. 7 is the structure diagram of the acquisition device of application program power consumption information in accordance with another embodiment of the present invention;
Fig. 8 is the structure diagram of the acquisition device of the application program power consumption information of another embodiment according to the present invention;
Fig. 9 is the structure diagram of the acquisition device of the application program power consumption information of further embodiment according to the present invention;
Figure 10 be according to the present invention again further embodiment application program power consumption information acquisition device structure diagram.
Embodiment
The embodiment of the present invention is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or has the function of same or like element.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining the present invention, and is not considered as limiting the invention.On the contrary, this The embodiment of invention includes falling into all changes in the range of the spirit and intension of attached claims, modification and equivalent Thing.
In the description of the present invention, it is to be understood that term " first ", " second " etc. are only used for description purpose, without It is understood that to indicate or implying relative importance.In the description of the present invention, it is necessary to which explanation, provides unless otherwise clear and definite And restriction, term " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, Or it is integrally connected;Can mechanically connect or be electrically connected;It can be directly connected, intermediary can also be passed through It is indirectly connected.For the ordinary skill in the art, the tool of above-mentioned term in the present invention can be understood with concrete condition Body implication.In addition, in the description of the present invention, unless otherwise indicated, " multiple " are meant that two or more.
Any process or method described otherwise above description in flow chart or herein is construed as, and represents to include Module, fragment or the portion of the code of the executable instruction of one or more the step of being used for realization specific logical function or process Point, and the scope of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discuss suitable Sequence, including according to involved function by it is basic at the same time in the way of or in the opposite order, carry out perform function, this should be of the invention Embodiment person of ordinary skill in the field understood.
In order to solve not obtaining the power consumption information of installed application program in mobile terminal at present, the present invention proposes A kind of acquisition methods, device and the mobile terminal of application program power consumption information.Below with reference to the accompanying drawings describe to implement according to the present invention Acquisition methods, device and the mobile terminal of the application program power consumption information of example.
Fig. 1 is the flow chart of the acquisition methods of application program power consumption information according to an embodiment of the invention.Such as Fig. 1 institutes Show, the acquisition methods of application program power consumption information comprise the following steps.
S101, obtains the application program being currently running in mobile terminal.
For example, the corresponding application program being currently running is obtained according to the process being currently running in mobile terminal, wherein, root An application program is can determine that according to process.
S102, when determining to meet default measuring condition according to the state of mobile terminal and application program, records mobile whole The first time at end and the first electricity.
Wherein, the state of mobile terminal may include charged state, plug-in state etc., and the state of application program may include foreground Operation, running background etc., default measuring condition can be that mobile terminal is not in charged state and application program is in front stage operation.
In one embodiment of the invention, determined to meet default measurement bar according to the state of mobile terminal and application program Part specifically includes:When application program is in front stage operation, judge whether mobile terminal is in charged state;If in charging shape State, then wait and pull out electric signal;And if be not in charged state, or wait until pull out electric signal, it is determined that meet default measurement Condition.Thus, whether can meet that default measuring condition obtains working as mobile terminal according to the state of mobile terminal and application program Preceding time and current electric quantity, improve accuracy.
S103, when determining to be unsatisfactory for default measuring condition according to the state of mobile terminal and application program, record movement Second time of terminal and the second electricity.
In one embodiment of the invention, determined to be unsatisfactory for default measurement according to the state of mobile terminal and application program Condition specifically includes:Mobile terminal is monitored, when mobile terminal is in plug-in state or application program enters backstage, is determined discontented The default measuring condition of foot.It according to above-mentioned logic, in specific programming, can in the following ways realize, first listen to mobile whole Whether end is in plug-in state;If being not in plug-in state, determine whether application program enters backstage;And such as Fruit enters backstage, or in plug-in state, it is determined that is unsatisfactory for default measuring condition, it should be understood that can also first judge whether into Enter backstage, carry out plug-in condition adjudgement again afterwards.Thus, whether can meet to preset according to the state of mobile terminal and application program Measuring condition obtains the current time and current electric quantity of mobile terminal, improves accuracy.
Specifically, when application program enters running background, or mobile terminal is in plug-in state, mobile terminal is recorded The second time and the second electricity.
S104, the first average consumption of application program is obtained according to first time, the first electricity, the second time and the second electricity Power information.
Specifically, averaged according to first time, the first electricity, the second time and the second electricity and obtain application program Unit interval power consumption information, for example, according to formula(Second the-the first electricity of electricity)/(M- first time when second)Unit of account Time power consumption information, so as to obtain the first average consumption information of application program.
The acquisition methods of application program power consumption information according to embodiments of the present invention, according to mobile terminal and application program Whether state meets that default measuring condition obtains the current time and current electric quantity of mobile terminal, and according to the current of mobile terminal Time and current electric quantity obtain the unit interval power consumption information of application program, are that user is reasonably electric using the battery of mobile terminal Amount provides reference, improves user experience.
Fig. 2 is the flow chart of the acquisition methods of application program power consumption information in accordance with another embodiment of the present invention.Pass through The method being repeatedly averaging obtains the application program power consumption information closest to actual value.Specifically, as shown in Fig. 2, application program The acquisition methods of power consumption information comprise the following steps.
S201, obtains the application program being currently running in mobile terminal.
S202, when determining to meet default measuring condition according to the state of mobile terminal and application program, records mobile whole The first time at end and the first electricity.
S203, when determining to be unsatisfactory for default measuring condition according to the state of mobile terminal and application program, record movement Second time of terminal and the second electricity.
S204, the first average consumption of application program is obtained according to first time, the first electricity, the second time and the second electricity Power information.
S205, the first average consumption information is sent to server, wherein, server is sent according to multiple mobile terminals First average consumption information determines the second average consumption information of application program for other mobile terminal enquiries.
Specifically, server is sent according to multiple mobile terminals the first average consumption information and stored journey is applied Second average consumption information of sequence, the application program power consumption obtained by the method being repeatedly averaging closest to actual value are believed Breath, and the second average consumption information of the stored application program is updated for other mobile terminal enquiries.
The acquisition methods of application program power consumption information according to embodiments of the present invention, by the first average consumption information send to Server, so that server obtains the second average consumption closest to the application program of actual value by the method being repeatedly averaging Power information, improves accurate rate, in addition, application program and corresponding second average consumption information are storable in server, reduces Local storage pressure and quadratic response speed.
Fig. 3 is the flow chart of the acquisition methods of the application program power consumption information of another embodiment according to the present invention.In order to So that user becomes more apparent upon the current electric quantity consumption situation of mobile terminal, application program can be obtained according to current remaining capacity Usage time.Specifically, as shown in figure 3, the acquisition methods of application program power consumption information comprise the following steps.
S301, obtains the application program being currently running in mobile terminal.
S302, when determining to meet default measuring condition according to the state of mobile terminal and application program, records mobile whole The first time at end and the first electricity.
S303, when determining to be unsatisfactory for default measuring condition according to the state of mobile terminal and application program, record movement Second time of terminal and the second electricity.
S304, the first average consumption of application program is obtained according to first time, the first electricity, the second time and the second electricity Power information.
S305, the first average consumption information is sent to server, wherein, server is sent according to multiple mobile terminals First average consumption information determines the second average consumption information of application program for other mobile terminal enquiries.
S306, the second average consumption information of application program is obtained from server.
For example, the client of mobile terminal provides the application program of the second average consumption information inquiry, Yong Hutong to the user Server can be accessed by crossing the application program, the second average consumption information of each application program be stored in server, thus The second average consumption information of application program can be obtained.
S307, obtains the current residual electricity of mobile terminal.
S308, according to the second average consumption acquisition of information of current residual electricity and application program under current residual electricity Application program usage time and display.
For example, when calculating acquisition use in the ideal case according to the power consumption information and current residual electricity of application program Between, the usage time can be also corrected more to adapt to actual power consumption environment, selectively be closed by using time user Closing part point application program is to save electricity.
The acquisition methods of application program power consumption information according to embodiments of the present invention, according to current residual electricity and using journey The usage time of application program of the second average consumption acquisition of information of sequence under current residual electricity and display, can to use Family is more visually known the current charge condition of mobile terminal, lifts user experience.
Fig. 4(a)It is the flow chart of the acquisition methods of the application program power consumption information of further embodiment according to the present invention.For So that user becomes more apparent upon the electric quantity consumption situation of application program, the power consumption of application program can be classified.Specifically, Such as Fig. 4(a)Shown, the acquisition methods of application program power consumption information comprise the following steps.
S401, obtains the application program being currently running in mobile terminal.
S402, when determining to meet default measuring condition according to the state of mobile terminal and application program, records mobile whole The first time at end and the first electricity.
S403, when determining to be unsatisfactory for default measuring condition according to the state of mobile terminal and application program, record movement Second time of terminal and the second electricity.
S404, the first average consumption of application program is obtained according to first time, the first electricity, the second time and the second electricity Power information.
S405, the first average consumption information is sent to server, wherein, server is sent according to multiple mobile terminals First average consumption information determines the second average consumption information of application program for other mobile terminal enquiries.
S406, the second average consumption information of application program is obtained from server.
S407, according to the power consumption grade of the second average consumption acquisition of information application program of application program, and shows second Average consumption information and/or power consumption grade.
Fig. 4(b)It is a kind of example schematic diagram of the second average consumption information according to embodiments of the present invention and power consumption grade, Such as Fig. 4(b)The the second average consumption information and power consumption grade of shown display application program.
Wherein, in higher application program, user is prompted not run or close when the electricity of mobile terminal is relatively low Close this application program.Such as Fig. 4(c)It is shown, remind user to close the higher ranked application program of power consumption to save mobile terminal Electricity.
The acquisition methods of application program power consumption information according to embodiments of the present invention, according to the second of application program the average consumption Power information obtains the power consumption grade of application program, and shows the second average consumption information and/or power consumption grade, can cause user The power consumption grade for the application program being more visually known in mobile terminal, lifts user experience, in addition, in emergency Under, such as the high application program of power consumption grade can be closed in the case that electricity is low, further lift user experience.
In one embodiment of the invention, application program, corresponding second average consumption information and power consumption grade can deposit In the server, user inputs the application information to be installed for storage, for example, application name, is answered according to input by user The second average consumption information of the application program is obtained from server and power consumption grade and be shown in mobile terminal with program information Display screen on, whether download installation with for reference.Thus, user experience is improved.
Fig. 5(a)Be according to the present invention again further embodiment application program power consumption information acquisition methods flow chart. In order to enable user is more visually known the power consumption condition of system-level and/or application layer application program, can show The power consumption information of application program is shown on screen.Specifically, such as Fig. 5(a)It is shown, the acquisition methods of application program power consumption information Comprise the following steps.
S501, obtains the application program being currently running in mobile terminal.
S502, when determining to meet default measuring condition according to the state of mobile terminal and application program, records mobile whole The first time at end and the first electricity.
S503, when determining to be unsatisfactory for default measuring condition according to the state of mobile terminal and application program, record movement Second time of terminal and the second electricity.
S504, the first average consumption of application program is obtained according to first time, the first electricity, the second time and the second electricity Power information.
S505, the first average consumption information is sent to server, wherein, server is sent according to multiple mobile terminals First average consumption information determines the second average consumption information of application program for other mobile terminal enquiries.
S506, the second average consumption information of application program is obtained from server.
S507, receives the power consumption idsplay order of user.
For example, the client of mobile terminal provides the application program of the second average consumption information inquiry, Yong Hutong to the user Cross and start the application program power consumption idsplay order etc. can be transmitted.
S508, if power consumption idsplay order is the first power consumption idsplay order, the installation of display of system level is currently running Application program and/or installed off-duty application program the second average consumption information.
For example, the second average consumption that user obtains system-level application program by sending the first power consumption idsplay order is believed Breath, such as Fig. 5(b)It is shown, show mobile terminal in it is system-level the application program being currently running has been installed and/or has been installed do not transport Second average consumption information of capable application program, such as shows positioning, network, phone, short message, setting, mail(Mail)Deng The second average consumption information.
S509, if power consumption idsplay order is the second power consumption idsplay order, the installation of display application layer is currently running Application program and/or installed off-duty application program the second average consumption information.
For example, the second average consumption of the application program that user obtains application layer by sending the second power consumption idsplay order is believed Breath, such as Fig. 5(c)It is shown, show the second average consumption for having installed application program currently in use of application layer in mobile terminal Information, such as shows game Fruit Ninja, the second average consumption information of QQ2012, Fig. 5(d)It is shown, show mobile whole The the second average consumption information for having installed temporary untapped application program of application layer in end.
S510, if power consumption idsplay order is the 3rd power consumption idsplay order, the installation of display of system level and application layer The application program that is currently running and/or installed off-duty application program the second average consumption information.
For example, user obtains the second flat of the system-level and application program of application layer by sending the 3rd power consumption idsplay order Equal power consumption information, such as Fig. 5(e)Shown, display of system level and application layer have been installed the application program being currently running and/or have been pacified Fill the second average consumption information of the application program of off-duty.
The acquisition methods of application program power consumption information according to embodiments of the present invention, receive the power consumption idsplay order of user, The of system-level, application layer or system-level and application layer application program is shown on the display screen according to power consumption idsplay order Two average consumption information, can cause user to be more visually known the power consumption condition of each application program, further lifting User experience.
In order to realize above-described embodiment, the present invention also proposes a kind of acquisition device of application program power consumption information.
Fig. 6 is the structure diagram of the acquisition device of application program power consumption information according to an embodiment of the invention.Such as Fig. 6 Shown, the acquisition device of application program power consumption information includes application program acquisition module 10, is recorded at the first time with the first electricity Module 20, the second time and the second electricity logging modle 30 and the first average consumption data obtaining module 40.
Specifically, application program acquisition module 10 is used to obtain the application program being currently running in mobile terminal.For example, root The corresponding application program being currently running is obtained according to the process being currently running in mobile terminal, wherein, it can determine that one according to process A application program.
At the first time and the first electricity logging modle 20 is used to determine completely when according to the state of mobile terminal and application program When foot presets measuring condition, first time and the first electricity of mobile terminal are recorded.Wherein, the state of mobile terminal may include to fill Electricity condition, plug-in state etc., the state of application program may include front stage operation, running background etc., and default measuring condition can be to move Dynamic terminal is not in charged state and application program is in front stage operation.
In order to improve accuracy, need to be determined whether to meet default measurement bar according to the state of mobile terminal and application program Part, is additionally operable to the first electricity logging modle 20 at the first time:When application program is in front stage operation, whether mobile terminal is judged In charged state, and when in charged state, electric signal is pulled out in wait, and is being not in charged state, or wait until When pulling out electric signal, determine to meet default measuring condition.Thus, whether can be met according to the state of mobile terminal and application program pre- If measuring condition obtains the current time and current electric quantity of mobile terminal, accuracy is improved.
Second time and the second electricity logging modle 30 are used to work as to be determined not according to the state of mobile terminal and application program When meeting default measuring condition, the second time and the second electricity of mobile terminal are recorded.
In order to improve accuracy, need to be determined whether to meet default measurement bar according to the state of mobile terminal and application program Part, the second time and the second electricity logging modle 30 are additionally operable to:Mobile terminal is monitored, when mobile terminal is in plug-in state or should When entering backstage with program, determine to be unsatisfactory for default measuring condition.According to above-mentioned logic, in specific programming, can use with Under type is realized, first listens to whether mobile terminal is in plug-in state, and when being not in plug-in state, determining whether should Whether enter backstage with program, and platform after entering, or during in plug-in state, determine to be unsatisfactory for default measuring condition, should It can also first judge whether to enter backstage when understanding, carry out plug-in condition adjudgement again afterwards.Thus, according to mobile terminal and can answer Whether meet that default measuring condition obtains the current time and current electric quantity of mobile terminal with the state of program, it is accurate to improve Property.
More specifically, when application program enters running background, or mobile terminal is in plug-in state, record mobile whole Hold the second time and the second electricity.As a result, it is more accurate to obtain result.
First average consumption data obtaining module 40 is used for according to first time, the first electricity, the second time and the second electricity Amount obtains the first average consumption information of application program.More specifically, the first average consumption data obtaining module 40 is according to first Time, the first electricity, the second time and the second electricity, which are averaged, obtains the unit interval power consumption information of application program, for example, According to formula(Second the-the first electricity of electricity)/(M- first time when second)Unit of account time power consumption information, so as to obtain First average consumption information of application program.
The acquisition device of application program power consumption information according to embodiments of the present invention, according to mobile terminal and application program Whether state meets that default measuring condition obtains the current time and current electric quantity of mobile terminal, and according to the current of mobile terminal Time and current electric quantity obtain the unit interval power consumption information of application program, are that user is reasonably electric using the battery of mobile terminal Amount provides reference, improves user experience.
Fig. 7 is the structure diagram of the acquisition device of application program power consumption information in accordance with another embodiment of the present invention.Such as Shown in Fig. 7, the acquisition device of application program power consumption information includes application program acquisition module 10, remembers at the first time with the first electricity Record module 20, the second time and the second electricity logging modle 30, the first average consumption data obtaining module 40 and sending module 50.
Specifically, sending module 50 is used to send the first average consumption information to server, wherein, server is according to more The first average consumption information that a mobile terminal is sent determines the second average consumption information of application program so that other movements are whole End inquiry.More specifically, the first average consumption information that server is sent according to multiple mobile terminals and stored application Second average consumption information of program, the application program power consumption obtained by the method being repeatedly averaging closest to actual value are believed Breath, and the second average consumption information of the stored application program is updated for other mobile terminal enquiries.
The acquisition device of application program power consumption information according to embodiments of the present invention, is averagely consumed by sending module by first Power information is sent to server, so that server obtains the application program closest to actual value by the method being repeatedly averaging The second average consumption information, accurate rate is improved, in addition, application program and corresponding second average consumption information are storable in clothes Business device, reduces local storage pressure and quadratic response speed.
Fig. 8 is the structure diagram of the acquisition device of the application program power consumption information of another embodiment according to the present invention.Such as Shown in Fig. 8, the acquisition device of application program power consumption information includes application program acquisition module 10, remembers at the first time with the first electricity Record module 20, the second time and the second electricity logging modle 30, the first average consumption data obtaining module 40, sending module 50, Second average consumption data obtaining module 60, remaining capacity acquisition module 70 and usage time acquisition module 80.
Specifically, the second average consumption data obtaining module 60 is used for the second average consumption that application program is obtained from server Power information.For example, the client of mobile terminal provides the application program of the second average consumption information inquiry to the user, user passes through The application program can access server, and the second average consumption information of each application program is stored in server, thus may be used To obtain the second average consumption information of application program.
Remaining capacity acquisition module 70 is used for the current residual electricity for obtaining mobile terminal.
Usage time acquisition module 80 is used to be obtained according to the second average consumption information of current residual electricity and application program Take the usage time of the application program under current residual electricity and display.For example, according to the power consumption information of application program and work as Preceding remaining capacity calculates acquisition usage time in the ideal case, also the usage time can be corrected actual more to adapt to Power consumption environment, is selectively gated off certain applications program to save electricity by using time user.
The acquisition device of application program power consumption information according to embodiments of the present invention, according to current residual electricity and using journey The usage time of application program of the second average consumption acquisition of information of sequence under current residual electricity and display, can to use Family is more visually known the current charge condition of mobile terminal, lifts user experience.
Fig. 9 is the structure diagram of the acquisition device of the application program power consumption information of further embodiment according to the present invention.Such as Shown in Fig. 9, the acquisition device of application program power consumption information includes application program acquisition module 10, remembers at the first time with the first electricity Record module 20, the second time and the second electricity logging modle 30, the first average consumption data obtaining module 40, sending module 50, Second average consumption data obtaining module 60, remaining capacity acquisition module 70, usage time acquisition module 80 and power consumption grade obtain Modulus block 90.
Specifically, power consumption grade acquisition module 90 is used for the second average consumption acquisition of information application journey according to application program The power consumption grade of sequence, and show the second average consumption information and/or power consumption grade.Thus, it is possible to so that user more intuitively Recognize the power consumption grade of the application program in mobile terminal, lift user experience, in addition, in case of emergency, such as electricity The high application program of power consumption grade can be closed in the case of low, further lifts user experience.
In one embodiment of the invention, application program, corresponding second average consumption information and power consumption grade can deposit In the server, user inputs the application information to be installed for storage, for example, application name, is answered according to input by user The second average consumption information of the application program is obtained from server and power consumption grade and be shown in mobile terminal with program information Display screen on, whether download installation with for reference.Thus, user experience is improved.
Figure 10 be according to the present invention again further embodiment application program power consumption information acquisition device structure diagram. As shown in Figure 10, the acquisition device of application program power consumption information includes application program acquisition module 10, first time and the first electricity Measure logging modle 20, the second time and the second electricity logging modle 30, the first average consumption data obtaining module 40, sending module 50th, the second average consumption data obtaining module 60, remaining capacity acquisition module 70, usage time acquisition module 80, power consumption grade Acquisition module 90, receiving module 100 and display module 110.
Specifically, receiving module 100 is used for the power consumption idsplay order for receiving user.For example, the client of mobile terminal is User provides the application program of the second average consumption information inquiry, and user, which can be transmitted power consumption and show by starting the application program, to be referred to Order etc..
Display module 110 is used for when power consumption idsplay order is the first power consumption idsplay order, the installation of display of system level The application program that is currently running and/or installed off-duty application program the second average consumption information, and shown in power consumption Instruct for the second power consumption idsplay order when, show having installed the application program being currently running and/or installed and not transporting for application layer Second average consumption information of capable application program, and when power consumption idsplay order is the 3rd power consumption idsplay order, display system The average consumption of the second of the application program installed the application program being currently running and/or installed off-duty of irrespective of size and application layer Power information.
The acquisition device of application program power consumption information according to embodiments of the present invention, receives the power consumption idsplay order of user, The of system-level, application layer or system-level and application layer application program is shown on the display screen according to power consumption idsplay order Two average consumption information, can cause user to be more visually known the power consumption condition of each application program, further lifting User experience.
In order to realize above-described embodiment, the present invention also proposes a kind of mobile terminal.
A kind of mobile terminal, including:Shell, screen, processor and circuit board;Screen disposes on the shell, circuit board peace The interior volume surrounded in shell is put, processor is set on circuit boards;Processor be used for handle data, specifically for perform with Lower step:
S101 ', obtains the application program being currently running in mobile terminal.
For example, the corresponding application program being currently running is obtained according to the process being currently running in mobile terminal, wherein, root An application program is can determine that according to process.
S102 ', when determining to meet default measuring condition according to the state of mobile terminal and application program, records mobile whole The first time at end and the first electricity.
Wherein, the state of mobile terminal may include charged state, plug-in state etc., and the state of application program may include foreground Operation, running background etc., default measuring condition can be that mobile terminal is not in charged state and application program is in front stage operation.
In order to improve accuracy, need to be determined whether to meet default measurement bar according to the state of mobile terminal and application program Part, processor also particularly useful for:When application program is in front stage operation, judge whether mobile terminal is in charged state, and During in charged state, electric signal is pulled out in wait, and is being not in charged state, or when until pulling out electric signal, determines to meet Default measuring condition.Thus, whether can meet that default measuring condition obtains movement according to the state of mobile terminal and application program The current time and current electric quantity of terminal, improve accuracy.
S103 ', when determining to be unsatisfactory for default measuring condition according to the state of mobile terminal and application program, record movement Second time of terminal and the second electricity.
In order to improve accuracy, need to be determined whether to meet default measurement bar according to the state of mobile terminal and application program Part, processor also particularly useful for:Mobile terminal is monitored, when mobile terminal is in plug-in state or application program enters backstage, Determine to be unsatisfactory for default measuring condition.According to above-mentioned logic, in specific programming, it can in the following ways realize, supervise first Listen whether mobile terminal is in plug-in state, and when being not in plug-in state, after determining whether application program enters Platform, and platform after entering, or during in plug-in state, determine to be unsatisfactory for default measuring condition, it should be understood that can also first sentence It is disconnected whether to enter backstage, carry out plug-in condition adjudgement again afterwards.Thus, can according to the state of mobile terminal and application program whether Meet that default measuring condition obtains the current time and current electric quantity of mobile terminal, improve accuracy.
S104 ', obtain application program according to first time, the first electricity, the second time and the second electricity first are averaged Power consumption information.
Specifically, averaged according to first time, the first electricity, the second time and the second electricity and obtain application program Unit interval power consumption information, for example, according to formula(Second the-the first electricity of electricity)/(M- first time when second)Unit of account Time power consumption information, so as to obtain the first average consumption information of application program.
Whether mobile terminal according to embodiments of the present invention, meet default survey according to the state of mobile terminal and application program Amount condition obtains the current time and current electric quantity of mobile terminal, and is obtained according to the current time and current electric quantity of mobile terminal The unit interval power consumption information of application program, reasonably provides reference using the battery capacity of mobile terminal for user, improves User experience.
Application program power consumption information closest to actual value is obtained by the method being repeatedly averaging, processor is also specifically used In:First average consumption information is sent to server, wherein, the first average consumption that server is sent according to multiple mobile terminals Power information determines the second average consumption information of application program for other mobile terminal enquiries.
Specifically, server is sent according to multiple mobile terminals the first average consumption information and stored journey is applied Second average consumption information of sequence, the application program power consumption obtained by the method being repeatedly averaging closest to actual value are believed Breath, and the second average consumption information of the stored application program is updated for other mobile terminal enquiries.Thus, improve Accurate rate, in addition, application program and corresponding second average consumption information are storable in server, reduces local storage pressure With quadratic response speed.
In order to enable user becomes more apparent upon the current electric quantity consumption situation of mobile terminal, can be according to current remaining capacity Obtain application program usage time, processor also particularly useful for:The second average consumption letter of application program is obtained from server Breath, and the current residual electricity of mobile terminal is obtained, and the second average consumption according to current residual electricity and application program The usage time of application program of the acquisition of information under current residual electricity and display.
In order to enable user becomes more apparent upon the electric quantity consumption situation of application program, the power consumption of application program can be divided Level, processor also particularly useful for:According to the power consumption grade of the second average consumption acquisition of information application program of application program, and show Show the second average consumption information and/or power consumption grade.
In one embodiment of the invention, application program, corresponding second average consumption information and power consumption grade can deposit In the server, user inputs the application information to be installed for storage, for example, application name, is answered according to input by user The second average consumption information of the application program is obtained from server and power consumption grade and be shown in mobile terminal with program information Display screen on, whether download installation with for reference.Thus, it is possible to so that user is more visually known is intended to install Application program power consumption condition, improve user experience.
In order to enable user is more visually known the power consumption condition of system-level and/or application layer application program, can To show the power consumption information of application program on the display screen, processor also particularly useful for:The power consumption of reception user, which is shown, to be referred to Order, and when power consumption idsplay order is the first power consumption idsplay order, display of system level has installed the application program being currently running And/or the second average consumption information of the application program of off-duty has been installed, show and refer to for the second power consumption in power consumption idsplay order When making, show that the second of the application program installed the application program being currently running and/or installed off-duty of application layer is flat Equal power consumption information, and when power consumption idsplay order is the 3rd power consumption idsplay order, the installation of display of system level and application layer The application program that is currently running and/or installed off-duty application program the second average consumption information.
It should be appreciated that each several part of the present invention can be realized with hardware, software, firmware or combinations thereof.Above-mentioned In embodiment, software that multiple steps or method can be performed in memory and by suitable instruction execution system with storage Or firmware is realized.If, and in another embodiment, can be with well known in the art for example, realized with hardware Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal Discrete logic, have suitable combinational logic gate circuit application-specific integrated circuit, programmable gate array(PGA), scene Programmable gate array(FPGA)Deng.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description Point is contained at least one embodiment of the present invention or example.In the present specification, schematic expression of the above terms is not Necessarily refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any One or more embodiments or example in combine in an appropriate manner.
In each method embodiment of the present invention, the priority that the sequence number of each step can not be used to limit each step is suitable Sequence, for those of ordinary skill in the art, without creative efforts, changes the priority of each step Within protection scope of the present invention.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not In the case of departing from the principle of the present invention and objective a variety of change, modification, replacement and modification can be carried out to these embodiments, this The scope of invention is limited by claim and its equivalent.

Claims (21)

  1. A kind of 1. acquisition methods of application program power consumption information, it is characterised in that including:
    Obtain the application program being currently running in mobile terminal;
    When determining to meet default measuring condition according to the state of the mobile terminal and the application program, the movement is recorded The first time of terminal and the first electricity, wherein, the default measuring condition for the mobile terminal be not in charged state and The application program is in front stage operation;
    When determining to be unsatisfactory for default measuring condition according to the state of the mobile terminal and the application program, the shifting is recorded Second time of dynamic terminal and the second electricity;And
    The application program is obtained according to the first time, first electricity, second time and second electricity The first average consumption information.
  2. 2. the method as described in claim 1, it is characterised in that described according to the mobile terminal and the shape of the application program State determines to meet that default measuring condition specifically includes:
    When the application program is in front stage operation, judge whether the mobile terminal is in the charged state;
    If being in the charged state, electric signal is pulled out in wait;And
    If being not in the charged state, or wait until described pull out electric signal, it is determined that meet the default measuring condition.
  3. 3. the method as described in claim 1, it is characterised in that described according to the mobile terminal and the shape of the application program State determines that being unsatisfactory for default measuring condition specifically includes:
    The mobile terminal is monitored, when the mobile terminal is in plug-in state or the application program enters backstage, is determined It is unsatisfactory for the default measuring condition.
  4. 4. such as claim 1-3 any one of them methods, it is characterised in that further include:
    The first average consumption information is sent to server, wherein, the server is sent out according to multiple mobile terminals The the first average consumption information sent determines the second average consumption information of the application program so that other mobile terminals are looked into Ask.
  5. 5. method as claimed in claim 4, it is characterised in that further include:
    The second average consumption information of the application program is obtained from the server;
    Obtain the current residual electricity of the mobile terminal;And
    According to the second average consumption acquisition of information of the current residual electricity and the application program in current residual electricity The usage time of the application program under amount and display.
  6. 6. method as claimed in claim 4, it is characterised in that further include:
    The second average consumption information of the application program is obtained from the server;And
    According to the power consumption grade of application program described in the second average consumption acquisition of information of the application program, and show described Two average consumption information and/or the power consumption grade.
  7. 7. method as claimed in claim 4, it is characterised in that further include:
    The second average consumption information of the application program is obtained from the server;
    Receive the power consumption idsplay order of user;
    If the power consumption idsplay order is the first power consumption idsplay order, display of system level has installed the application being currently running Program and/or installed off-duty application program the second average consumption information;
    If the power consumption idsplay order is the second power consumption idsplay order, display application layer has installed the application being currently running Program and/or installed off-duty application program the second average consumption information;And
    If the power consumption idsplay order is the 3rd power consumption idsplay order, the installation of display of system level and application layer is being transported Second average consumption information of capable application program and/or the application program for having installed off-duty.
  8. A kind of 8. acquisition device of application program power consumption information, it is characterised in that including:
    Application program acquisition module, for obtaining the application program being currently running in mobile terminal;
    At the first time with the first electricity logging modle, determined for working as according to the state of the mobile terminal and the application program When meeting default measuring condition, first time and the first electricity of the mobile terminal are recorded, wherein, the default measuring condition Charged state is not in for the mobile terminal and the application program is in front stage operation;
    Second time and the second electricity logging modle, determine for working as according to the state of the mobile terminal and the application program When being unsatisfactory for default measuring condition, the second time and the second electricity of the mobile terminal are recorded;And
    First average consumption data obtaining module, for according to the first time, first electricity, second time and Second electricity obtains the first average consumption information of the application program.
  9. 9. device as claimed in claim 8, it is characterised in that the first time and the first electricity logging modle are additionally operable to: When the application program is in front stage operation, judge whether the mobile terminal is in the charged state, and in described During charged state, electric signal is pulled out in wait, and is being not in the charged state, or when until it is described pull out electric signal when, really Surely the default measuring condition is met.
  10. 10. device as claimed in claim 8, it is characterised in that second time and the second electricity logging modle are additionally operable to: The mobile terminal is monitored, when the mobile terminal is in plug-in state or the application program enters backstage, is determined discontented The foot default measuring condition.
  11. 11. such as claim 8-10 any one of them devices, it is characterised in that further include:
    Sending module, for sending the first average consumption information to server, wherein, the server is according to multiple institutes The the first average consumption information for stating mobile terminal transmission determines the second average consumption information of the application program for it His mobile terminal enquiry.
  12. 12. device as claimed in claim 11, it is characterised in that further include:
    Second average consumption data obtaining module, for obtaining the second average consumption letter of the application program from the server Breath;
    Remaining capacity acquisition module, for obtaining the current residual electricity of the mobile terminal;And
    Usage time acquisition module, for the second average consumption information according to the current residual electricity and the application program Obtain the usage time of the application program under the current residual electricity and display.
  13. 13. device as claimed in claim 11, it is characterised in that further include:
    Power consumption grade acquisition module, for application program described in the second average consumption acquisition of information according to the application program Power consumption grade, and show the second average consumption information and/or the power consumption grade.
  14. 14. device as claimed in claim 11, it is characterised in that further include:
    Receiving module, for receiving the power consumption idsplay order of user;
    Display module, for when the power consumption idsplay order is the first power consumption idsplay order, the installation of display of system level to be just Operation application program and/or installed off-duty application program the second average consumption information, and shown in the power consumption Show instruction when being the second power consumption idsplay order, show having installed the application program being currently running and/or having installed not for application layer Second average consumption information of the application program of operation, and when the power consumption idsplay order is the 3rd power consumption idsplay order, The second of display of system level and the application program installed the application program being currently running and/or installed off-duty of application layer Average consumption information.
  15. A kind of 15. mobile terminal, it is characterised in that including:Shell, screen, processor and circuit board;
    On the housing, the circuit board is placed in the interior volume that the shell surrounds, the processing for the screen placement Device is arranged on the circuit board;
    The processor is used to handle data, is specifically used for:
    Obtain the application program being currently running in mobile terminal;
    When determining to meet default measuring condition according to the state of the mobile terminal and the application program, the movement is recorded The first time of terminal and the first electricity, wherein, the default measuring condition for the mobile terminal be not in charged state and The application program is in front stage operation;
    When determining to be unsatisfactory for default measuring condition according to the state of the mobile terminal and the application program, the shifting is recorded Second time of dynamic terminal and the second electricity;And
    The application program is obtained according to the first time, first electricity, second time and second electricity The first average consumption information.
  16. 16. mobile terminal as claimed in claim 15, it is characterised in that the processor also particularly useful for:When the application Program judges whether the mobile terminal is in the charged state in front stage operation, and when in the charged state, Electric signal is pulled out in wait, and is being not in the charged state, or when until it is described pull out electric signal when, determine to meet described default Measuring condition.
  17. 17. mobile terminal as claimed in claim 15, it is characterised in that the processor also particularly useful for:Monitor the shifting Dynamic terminal, when the mobile terminal is in plug-in state or the application program enters backstage, determines to be unsatisfactory for described default Measuring condition.
  18. 18. such as claim 15-17 any one of them mobile terminals, it is characterised in that the processor also particularly useful for:Will The first average consumption information is sent to server, wherein, the institute that the server is sent according to multiple mobile terminals Stating the first average consumption information determines the second average consumption information of the application program for other mobile terminal enquiries.
  19. 19. mobile terminal as claimed in claim 18, it is characterised in that the processor also particularly useful for:From the service Device obtains the second average consumption information of the application program, and obtains the current residual electricity of the mobile terminal, Yi Jigen According to the second average consumption acquisition of information of the current residual electricity and the application program under the current residual electricity The usage time of the application program and display.
  20. 20. mobile terminal as claimed in claim 18, it is characterised in that the processor also particularly useful for:Answered according to described The power consumption grade of application program described in the second average consumption acquisition of information of program, and show the second average consumption information And/or the power consumption grade.
  21. 21. mobile terminal as claimed in claim 18, it is characterised in that the processor also particularly useful for:Receive user's Power consumption idsplay order, and when the power consumption idsplay order is the first power consumption idsplay order, the installation of display of system level is The application program of operation and/or installed off-duty application program the second average consumption information, show and refer in the power consumption Make for the second power consumption idsplay order when, show having installed the application program being currently running and/or having installed off-duty for application layer Application program the second average consumption information, and when the power consumption idsplay order is the 3rd power consumption idsplay order, display System-level and the application program installed the application program being currently running and/or installed off-duty of application layer second is average Power consumption information.
CN201310311853.2A 2013-07-23 2013-07-23 Method and device for acquiring power consumption information of application program and mobile terminal Active CN104346262B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310311853.2A CN104346262B (en) 2013-07-23 2013-07-23 Method and device for acquiring power consumption information of application program and mobile terminal
PCT/CN2014/082839 WO2015010624A1 (en) 2013-07-23 2014-07-23 Method and device for obtaining application program power consumption information, and mobile terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310311853.2A CN104346262B (en) 2013-07-23 2013-07-23 Method and device for acquiring power consumption information of application program and mobile terminal

Publications (2)

Publication Number Publication Date
CN104346262A CN104346262A (en) 2015-02-11
CN104346262B true CN104346262B (en) 2018-04-27

Family

ID=52392742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310311853.2A Active CN104346262B (en) 2013-07-23 2013-07-23 Method and device for acquiring power consumption information of application program and mobile terminal

Country Status (2)

Country Link
CN (1) CN104346262B (en)
WO (1) WO2015010624A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105467329B (en) * 2016-01-25 2018-09-28 上海斐讯数据通信技术有限公司 A kind of terminal continuation of the journey test system and method
JP6440643B2 (en) * 2016-01-26 2018-12-19 株式会社日立製作所 Software update system, server
GB201812240D0 (en) * 2018-07-27 2018-09-12 Ibm Device, system and method for detection of compromise through automated power analysis
US11277120B2 (en) 2019-03-12 2022-03-15 International Business Machines Corporation Dynamic signal processing
CN110134219B (en) * 2019-05-13 2024-03-19 深圳传音通讯有限公司 Application program background power consumption processing method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102369647A (en) * 2011-09-14 2012-03-07 华为技术有限公司 Power supply managment method and device of mobile terminal
CN102508761A (en) * 2011-11-17 2012-06-20 宇龙计算机通信科技(深圳)有限公司 Management method for terminal electric quantity and terminal
CN102591766A (en) * 2011-12-31 2012-07-18 惠州Tcl移动通信有限公司 Mobile equipment and method and system for carrying out prompt processing on power consumption of programs of mobile equipment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102918473B (en) * 2010-06-07 2015-07-08 松下电器(美国)知识产权公司 Mobile-type information processing terminal
CN103177086B (en) * 2013-03-08 2019-08-27 百度在线网络技术(北京)有限公司 A kind of pair of method and device being ranked up using search result

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102369647A (en) * 2011-09-14 2012-03-07 华为技术有限公司 Power supply managment method and device of mobile terminal
CN102508761A (en) * 2011-11-17 2012-06-20 宇龙计算机通信科技(深圳)有限公司 Management method for terminal electric quantity and terminal
CN102591766A (en) * 2011-12-31 2012-07-18 惠州Tcl移动通信有限公司 Mobile equipment and method and system for carrying out prompt processing on power consumption of programs of mobile equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
移动终端耗电性能研究与测试解决方案;吕永峰;《电子测试》;20121231;第46-51页 *

Also Published As

Publication number Publication date
CN104346262A (en) 2015-02-11
WO2015010624A1 (en) 2015-01-29

Similar Documents

Publication Publication Date Title
CN104346256B (en) Method and device for acquiring power consumption information of application program and mobile terminal
CN104346262B (en) Method and device for acquiring power consumption information of application program and mobile terminal
CN103327102B (en) A kind of method and apparatus recommending application program
CN103473011B (en) A kind of mobile terminal performance detection method, device and mobile terminal
CN108880867A (en) A kind of network equipment collecting method and system
Moldovan et al. Energy-aware mobile learning: Opportunities and challenges
CN107356261B (en) Air navigation aid and Related product
CN108810116A (en) Message treatment method and Related product
CN107809542A (en) application control method, device, storage medium and electronic equipment
CN107222914A (en) Application control method and related product
CN109800101A (en) Report method, device, terminal device and the storage medium of small routine abnormal conditions
KR20150084541A (en) Method for controlling and an electronic device thereof
CN107277230A (en) The voice broadcast method and Related product of message
CN106413070B (en) A kind of power regulating method, mobile terminal and computer readable storage medium
CN107391518A (en) Count system, the method and device of page load performance information
CN106714275A (en) Wi-Fi connection method and mobile terminal
CN108924908B (en) WiFi scanning method and device and electronic device
CN105914826A (en) Charging and discharging reminding method and device
CN109753425A (en) Pop-up processing method and processing device
CN105607006A (en) Battery capacity determination method, system and terminal thereof
CN114167132B (en) Power consumption detection method and device of wireless terminal, electronic equipment and storage medium
CN103198543B (en) Informing battery state of lock in real time
CN108235237A (en) data reporting method, device, mobile terminal and computer-readable medium
CN107864442B (en) Test method based on intelligent voice equipment, intelligent voice equipment and storage medium
CN103309822B (en) identification system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant