CN104240027A - Transaction schedule tracking management method and device - Google Patents
Transaction schedule tracking management method and device Download PDFInfo
- Publication number
- CN104240027A CN104240027A CN201410459762.8A CN201410459762A CN104240027A CN 104240027 A CN104240027 A CN 104240027A CN 201410459762 A CN201410459762 A CN 201410459762A CN 104240027 A CN104240027 A CN 104240027A
- Authority
- CN
- China
- Prior art keywords
- time
- mark block
- transaction
- server
- progress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- User Interface Of Digital Computer (AREA)
Abstract
The invention provides a transaction schedule tracking management method which is applied to computers or mobile devices. The method includes the following steps that two time vertical axes are displayed on a display screen by receiving a starting operation instruction of a user, a transaction time schedule marker is transversely arranged between the two time vertical axes, and a set of parallel collaboration marker blocks are displayed; collaboration marker block set state data and time schedule marker state data are synchronized to a server, and the server is configured to be used for conducting data synchronization on real time data in a broadcasting mode to a plurality of computers or mobile devices connected to the server; whether an editing operation instruction of the user to the collaboration marker blocks is received or not; if yes, the display state of each operated collaboration marker block is changed and synchronized to the server; if not, whether data synchronization information sent by the server is received or not is judged, if the data synchronization information is received, the display state of each collaboration marker block is changed according to the synchronous data, and if not, the display state of each collaboration marker block is maintained.
Description
Technical field
The present invention relates to computer technology and transaction management technical field, in particular to a kind of transaction progress method for tracking and managing and device.
Background technology
Traditional affairs schedule method for tracking and managing, the single management of usual employing, the mode of reporting layer by layer realize, or by many people's management, concentrate the mode of reporting to realize, but no matter adopt which kind of mode above-mentioned, all there is many defects, such as: 1) tracking results is not in time, report by reporting layer by layer or concentrating, when arriving related personnel, this report result just like becomes " historical data ", cannot reflect current transaction progress and state; 2) imperfection of data, no matter adopt which kind of mode above-mentioned, if one of them link or someone occur to report obstacle, whole result generation serious loss will be caused, the progress of the actual schedule of affairs and relative whole Transaction cannot be reflected in real time, exactly.
And, existing return method often form is single, the such as form such as form, form, need the time of at substantial, human and material resources carry out adding up, gather, conclude, when arriving related personnel, still needing to carry out oral report summary, or individual reading comprehension is carried out to written generalise results, progress situation and the state of whole affairs can be obtained, visual poor.
Summary of the invention
A first aspect of the present invention discloses a kind of transaction progress method for tracking and managing being applied to computing machine or mobile device, comprises the following steps:
By receiving the start-up operation instruction of user, the display screen of described computing machine or mobile device shows two time vertical pivots and a horizontal transaction time progress indicates between two time vertical pivots, and show one be parallel to described transaction time progress indicate collaborative mark block group, wherein:
A described time vertical pivot is configured for instruction affairs initial time, and another time vertical pivot is configured for instruction affairs planned end time;
Described time schedule indicates the proportional positions being configured for represent that current time is residing in whole transaction progress;
Described collaborative mark block group is made up of some collaborative mark blocks distributed according to user, each mark block be used for for user carry out operating representing current mark block the completion status of subtransaction that defines;
The status data that aforementioned collaborative mark block group and time schedule indicate is synchronized to a server, and this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
Judge whether to receive the editing operation instruction of user to collaborative mark block:
If, then change by the display state of collaborative mark block that operates to represent completing of subtransaction, and, by the real-time data synchronization of the display state of described collaborative mark block to aforementioned server, this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
If not, then judge whether to receive the data synchronization information sent by described server, if receive data synchronization information, then change the display state of collaborative mark block according to synchrodata; Otherwise, keep collaborative mark block display state.
In further embodiment, when the display screen of described computing machine or mobile device is shown two time vertical pivots, further comprising the steps of:
Also show the temporal information indicated by these two time vertical pivots by described display screen.
In further embodiment, when the display screen of described computing machine or mobile device is shown two time vertical pivots, comprise:
The transaction time progress also expressed with a time progress bar form by described display screen display is indicated.
In further embodiment, in described method, comprise:
By the collaborative mark block of described display screen display with a kind of the showed display state in following form:
Triangle pattern; Regular polygon pattern (such as quadrangle patterns; Hexagonal shaped pattern) and mulle.
In further embodiment, in described method, comprise:
By changing the color of collaborative mark block, realize the change of display state.
In further embodiment, in described method, comprise:
By changing the shape of collaborative mark block, realize the change of display state.
In further embodiment, further comprising the steps of:
By receiving the operational order of the increase affairs of user, show the affairs increased and schedule thereof on the display.
In further embodiment, further comprising the steps of:
By receiving the operational order of the deletion affairs of user, show the result after removing these affairs and schedule thereof on the display.
Another aspect of the present invention also discloses a kind of transaction progress tracing management device being applied to computing machine or mobile device, comprising:
First module, on the display screen of described computing machine or mobile device, two time vertical pivots are shown and a horizontal transaction time progress indicates and shows that one is parallel to the collaborative mark block group that described transaction time progress indicates between two time vertical pivots for the start-up operation instruction by receiving user, wherein:
A described time vertical pivot is configured for instruction affairs initial time, and another time vertical pivot is configured for instruction affairs planned end time;
Described time schedule indicates the proportional positions being configured for represent that current time is residing in whole transaction progress
Described collaborative mark block group is made up of some collaborative mark blocks distributed according to user, each mark block be used for for user carry out operating representing current mark block the completion status of subtransaction that defines;
Second module, for real-time data synchronization to server that real time data and the transaction time progress of the display state by described collaborative mark block indicate, this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
3rd module, receives the editing operation instruction of user to collaborative mark block for judging whether, and performs corresponding process, wherein:
3rd module comprises the first judging unit and the first processing unit, this first judging unit receives the editing operation instruction of user to collaborative mark block for judging whether, this first processing unit is used for changing by the display state of collaborative mark block operated based on this editing operation instruction of user, and by real-time data synchronization extremely described server that the real time data of the display state of collaborative mark block and transaction time progress indicate by aforementioned second module;
3rd module also comprises the second judging unit and the second processing unit, this second judging unit is used for whether receiving the data synchronization information sent by described server, and the synchrodata that this second processing unit is used for sending according to described server changes the display state of collaborative mark block.
From the above technical solution of the present invention shows that, beneficial effect of the present invention is:
1, utilize the solution of the present invention, can realize affairs and upgrade with synchronous in the real-time status of many equipment, transaction information is followed the tracks of in time;
The display of the state that synchronously realizes 2, between each equipment, data can not be lost, the true reflection actual schedule of affairs and the progress of relative whole Transaction;
3, in the virtual condition of the affairs subtask that each equipment end can be born according to it by an operator, carry out state updating, Network Based and server realizes synchronously automatically.
Accompanying drawing explanation
Fig. 1 is an illustrative diagram of mobile device, and indicating 100a in figure is magnet controlled display screen, and sign 100b is acknowledgement key, and indicating 100c is deletion/cancel key.
Fig. 2 is the illustrative diagram of computer system.
Fig. 3 is the realization flow schematic diagram of an embodiment of the present invention transaction progress method for tracking and managing.
Fig. 4 is the example of the contract progress chasing management that demonstrates on the display screen of mobile device.
Fig. 5 is the schematic diagram of an embodiment of the present invention transaction progress tracing management device.
Figure 6 shows that the schematic diagram of the 3rd module in Fig. 5 embodiment transaction progress tracing management device.
Embodiment
In order to more understand technology contents of the present invention, institute's accompanying drawings is coordinated to be described as follows especially exemplified by specific embodiment.
Figure 1 shows that an illustrative diagram of mobile device, mobile device 100 comprises a display screen 100a and a processor (not shown), display 100a is connected with this processor, for information such as display device running status, processing transactions, working procedures (APP).Exemplarily give in Fig. 1 and confirm enter key 100b and deletion/cancel key 100c, these two keys are for receiving the operational order of user and being converted to corresponding operation by described microprocessor.
Figure 2 shows that the example of computer system, multiple equipment 100 realizes exchanges data by mobile Internet, such as by the network connecting module in equipment, the data syn-chronization of local side is extremely served 200, server 200 with the form such as broadcasted to other device synchronization data, other equipment are after receiving synchrodata, upgrade the data in this equipment, thus realize data syn-chronization and share.
Be illustrated in figure 3 the realization flow of an embodiment of the present invention transaction progress method for tracking and managing, according to of the present invention open, a kind of transaction progress method for tracking and managing being applied to computing machine or mobile device, comprises the following steps:
By receiving the start-up operation instruction of user, the display screen of described computing machine or mobile device shows two time vertical pivots and a horizontal transaction time progress indicates between two time vertical pivots, and show one be parallel to described transaction time progress indicate collaborative mark block group, wherein:
A described time vertical pivot is configured for instruction affairs initial time, and another time vertical pivot is configured for instruction affairs planned end time;
Described time schedule indicates the proportional positions being configured for represent that current time is residing in whole transaction progress;
Described collaborative mark block group is made up of some collaborative mark blocks distributed according to user, each mark block be used for for user carry out operating representing current mark block the completion status of subtransaction that defines;
The status data that aforementioned collaborative mark block group and time schedule indicate is synchronized to a server, and this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
Judge whether to receive the editing operation instruction of user to collaborative mark block:
If, then change by the display state of collaborative mark block that operates to represent completing of subtransaction, and, by the real-time data synchronization of the display state of described collaborative mark block to aforementioned server, as previously shown, this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
If not, then judge whether to receive the data synchronization information sent by described server, if receive data synchronization information, then change the display state of collaborative mark block according to synchrodata; Otherwise, keep collaborative mark block display state.
Fig. 4 shows the example of the contract progress chasing management that demonstrates on the display screen of mobile device, when the display screen 100a of mobile device 100 shows two time vertical pivots, further comprising the steps of:
Also show the temporal information indicated by these two time vertical pivots by described display screen, as shown in Figure 4, the start time of contract (, two, three, four, five) is February 23, end time is June 5 (contract one), July 23 (contract two), etc.
As preferred embodiment, when showing two time vertical pivots on a display screen, comprise:
The transaction time progress also expressed with a time progress bar form by described display screen display is indicated, as shown in Figure 4.
In the present embodiment, by the collaborative mark block of described display screen display with a kind of the showed display state in following form:
Triangle pattern; Regular polygon pattern (such as quadrangle patterns; Hexagonal shaped pattern) and mulle.
Exemplarily, the collaborative mark block shown in Fig. 4 is the square pattern of quadrilateral.
Alternatively, by changing the color of collaborative mark block, the change of display state is realized.Certainly, in a further embodiment, also by changing the shape of collaborative mark block, the change of display state is realized.
Example shown in composition graphs 3 and Fig. 4, in the management method of the present embodiment, can also comprise the following steps:
By receiving the operational order of the increase affairs of user, show the affairs increased and schedule thereof on the display.
Example shown in composition graphs 3 and Fig. 4, further comprising the steps of:
By receiving the operational order of the deletion affairs of user, show the result after removing these affairs and schedule thereof on the display.
So, the deletion of different contracts (i.e. affairs) can be carried out on contract management interface, increase entry management.
Disclose according to of the present invention another, as shown in Figure 5, Figure 6, a kind of transaction progress tracing management device 100 being applied to computing machine or mobile device, comprising:
First module 101, on the display screen of described computing machine or mobile device, two time vertical pivots are shown and a horizontal transaction time progress indicates and shows that one is parallel to the collaborative mark block group that described transaction time progress indicates between two time vertical pivots for the start-up operation instruction by receiving user, wherein:
A described time vertical pivot is configured for instruction affairs initial time, and another time vertical pivot is configured for instruction affairs planned end time;
Described time schedule indicates the proportional positions being configured for represent that current time is residing in whole transaction progress
Described collaborative mark block group is made up of some collaborative mark blocks distributed according to user, each mark block be used for for user carry out operating representing current mark block the completion status of subtransaction that defines;
Second module 102, for real-time data synchronization to server that real time data and the transaction time progress of the display state by described collaborative mark block indicate, this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
3rd module 103, receives the editing operation instruction of user to collaborative mark block for judging whether, and performs corresponding process, shown in composition graphs 6, wherein:
3rd module 103 comprises the first judging unit 1031 and the first processing unit 1032, this first judging unit 1031 receives the editing operation instruction of user to collaborative mark block for judging whether, this first processing unit 1032 changes by the display state of collaborative mark block operated for this editing operation instruction based on user, and by real-time data synchronization extremely described server that the real time data of the display state of collaborative mark block and transaction time progress indicate by aforementioned second module 102;
3rd module 103 also comprises the second judging unit 1033 and the second processing unit 1034, whether this second judging unit 1033 is for receiving the data synchronization information sent by described server, and this second processing unit 1034 changes the display state of collaborative mark block for the synchrodata sent according to described server.
The transaction progress tracing management device proposed in the present embodiment, process description shown in composition graphs 3, the function of aforesaid first module, the second module, the 3rd module and four module, effect all as previously mentioned, have been done detailed description, have not been repeated them here.Those skilled in the art, according to record of the present invention, can develop the program code being applied to computing machine or mobile device, perform this program code and can implement this transaction progress tracing management device.
Although the present invention with preferred embodiment disclose as above, so itself and be not used to limit the present invention.Persond having ordinary knowledge in the technical field of the present invention, without departing from the spirit and scope of the present invention, when being used for a variety of modifications and variations.Therefore, protection scope of the present invention is when being as the criterion depending on those as defined in claim.
Claims (8)
1. be applied to a transaction progress method for tracking and managing for computing machine or mobile device, it is characterized in that, comprise the following steps:
By receiving the start-up operation instruction of user, the display screen of described computing machine or mobile device shows two time vertical pivots and a horizontal transaction time progress indicates between two time vertical pivots, and show one be parallel to described transaction time progress indicate collaborative mark block group, wherein:
A described time vertical pivot is configured for instruction affairs initial time, and another time vertical pivot is configured for instruction affairs planned end time;
Described time schedule indicates the proportional positions being configured for represent that current time is residing in whole transaction progress;
Described collaborative mark block group is made up of some collaborative mark blocks distributed according to user, each mark block be used for for user carry out operating representing current mark block the completion status of subtransaction that defines;
The status data that aforementioned collaborative mark block group and time schedule indicate is synchronized to a server, and this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
Judge whether to receive the editing operation instruction of user to collaborative mark block:
If so, then change by the display state of collaborative mark block that operates to represent completing of subtransaction, and, by the real-time data synchronization of the display state of described collaborative mark block to aforementioned server;
If not, then judge whether to receive the data synchronization information sent by described server, if receive data synchronization information, then change the display state of collaborative mark block according to synchrodata; Otherwise, keep collaborative mark block display state.
2. the transaction progress method for tracking and managing being applied to computing machine or mobile device according to claim 1, is characterized in that, in preceding method, when the display screen of described computing machine or mobile device is shown two time vertical pivots, further comprising the steps of:
Also show the temporal information indicated by these two time vertical pivots by described display screen.
3. the transaction progress method for tracking and managing being applied to computing machine or mobile device according to claim 1, is characterized in that, in preceding method, when the display screen of described computing machine or mobile device is shown two time vertical pivots, comprises:
The transaction time progress also expressed with a time progress bar form by described display screen display is indicated.
4. the transaction progress method for tracking and managing being applied to computing machine or mobile device according to claim 1, it is characterized in that, described method also comprises:
By changing the color of collaborative mark block, realize the change of display state.
5. the transaction progress method for tracking and managing being applied to computing machine or mobile device according to claim 1, it is characterized in that, described method also comprises:
By changing the shape of collaborative mark block, realize the change of display state.
6. the transaction progress method for tracking and managing being applied to computing machine or mobile device according to claim 1, it is characterized in that, described method is further comprising the steps of:
By receiving the operational order of the increase affairs of user, show the affairs increased and schedule thereof on the display.
7. the transaction progress method for tracking and managing being applied to computing machine or mobile device according to claim 1, it is characterized in that, described method is further comprising the steps of:
By receiving the operational order of the deletion affairs of user, show the result after removing these affairs and schedule thereof on the display.
8. be applied to a transaction progress tracing management device for computing machine or mobile device, it is characterized in that, comprising:
First module, on the display screen of described computing machine or mobile device, two time vertical pivots are shown and a horizontal transaction time progress indicates and shows that one is parallel to the collaborative mark block group that described transaction time progress indicates between two time vertical pivots for the start-up operation instruction by receiving user, wherein:
A described time vertical pivot is configured for instruction affairs initial time, and another time vertical pivot is configured for instruction affairs planned end time;
Described time schedule indicates the proportional positions being configured for represent that current time is residing in whole transaction progress
Described collaborative mark block group is made up of some collaborative mark blocks distributed according to user, each mark block be used for for user carry out operating representing current mark block the completion status of subtransaction that defines;
Second module, for real-time data synchronization to server that real time data and the transaction time progress of the display state by described collaborative mark block indicate, this server is arranged to and aforementioned two kinds of real time datas is carried out data syn-chronization with the form of broadcast to the multiple computing machine or mobile device being connected to this server;
3rd module, receives the editing operation instruction of user to collaborative mark block for judging whether, and performs corresponding process, wherein:
3rd module comprises the first judging unit and the first processing unit, this first judging unit receives the editing operation instruction of user to collaborative mark block for judging whether, this first processing unit is used for changing by the display state of collaborative mark block operated based on this editing operation instruction of user, and by real-time data synchronization extremely described server that the real time data of the display state of collaborative mark block and transaction time progress indicate by aforementioned second module;
3rd module also comprises the second judging unit and the second processing unit, this second judging unit is used for whether receiving the data synchronization information sent by described server, and the synchrodata that this second processing unit is used for sending according to described server changes the display state of collaborative mark block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410459762.8A CN104240027A (en) | 2014-09-10 | 2014-09-10 | Transaction schedule tracking management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410459762.8A CN104240027A (en) | 2014-09-10 | 2014-09-10 | Transaction schedule tracking management method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104240027A true CN104240027A (en) | 2014-12-24 |
Family
ID=52228048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410459762.8A Pending CN104240027A (en) | 2014-09-10 | 2014-09-10 | Transaction schedule tracking management method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104240027A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108255926A (en) * | 2017-11-14 | 2018-07-06 | 宫辉 | A kind of legal affairs management method and system based on Gantt chart |
CN109636344A (en) * | 2018-12-14 | 2019-04-16 | 泰康保险集团股份有限公司 | Demand variation, device, medium and electronic equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6839722B2 (en) * | 2000-10-17 | 2005-01-04 | Siemens Aktiengesellschaft | Method for referencing time-related entries in different files in a planning program |
CN1728168A (en) * | 2004-06-15 | 2006-02-01 | 微软公司 | Method and system for restarting a project management system scheduling engine based on user input of contractual start/ finish data |
CN101276273A (en) * | 2007-03-30 | 2008-10-01 | 株式会社日立制作所 | Automatic monitoring system and method |
US20120116834A1 (en) * | 2010-11-08 | 2012-05-10 | Microsoft Corporation | Hybrid task board and critical path method based project application |
CN102752294A (en) * | 2012-06-19 | 2012-10-24 | 中国科学院计算技术研究所 | Method and system for synchronizing data of multiple terminals on basis of equipment capacity |
CN103136618A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project progress plan |
-
2014
- 2014-09-10 CN CN201410459762.8A patent/CN104240027A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6839722B2 (en) * | 2000-10-17 | 2005-01-04 | Siemens Aktiengesellschaft | Method for referencing time-related entries in different files in a planning program |
CN1728168A (en) * | 2004-06-15 | 2006-02-01 | 微软公司 | Method and system for restarting a project management system scheduling engine based on user input of contractual start/ finish data |
CN101276273A (en) * | 2007-03-30 | 2008-10-01 | 株式会社日立制作所 | Automatic monitoring system and method |
US20120116834A1 (en) * | 2010-11-08 | 2012-05-10 | Microsoft Corporation | Hybrid task board and critical path method based project application |
CN103136618A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project progress plan |
CN102752294A (en) * | 2012-06-19 | 2012-10-24 | 中国科学院计算技术研究所 | Method and system for synchronizing data of multiple terminals on basis of equipment capacity |
Non-Patent Citations (1)
Title |
---|
微软公司: "Microsoft Office Project 2002 and 2003", 《高等教育出版社》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108255926A (en) * | 2017-11-14 | 2018-07-06 | 宫辉 | A kind of legal affairs management method and system based on Gantt chart |
CN109636344A (en) * | 2018-12-14 | 2019-04-16 | 泰康保险集团股份有限公司 | Demand variation, device, medium and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104143127B (en) | CIM-based three-diagram linkage processing method for distribution network | |
CN108388711A (en) | A kind of engineering design based on BIM and management system | |
CN108287533A (en) | A kind of industrial manufaturing data acquisition system based on the displaying of VR panoramas | |
CN103926900A (en) | Production line management control system | |
US8549093B2 (en) | Updating a user session in a mach-derived system environment | |
WO2007108776A3 (en) | Systems and methods for collaborative interactive visualization of 3d data sets over a network ('dextronet') | |
CN209170419U (en) | One kind is based on the twinborn apparatus remote maintenance system of digitlization | |
CN106330986B (en) | Message transmission method and device | |
CN109144562B (en) | A kind of smart code publication alarm method based on zookeeper | |
CN111191154B (en) | Optical cable label management method of two-dimensional code | |
CN104933495A (en) | Work task assessment system on Android-based mobile terminal | |
CN105930985A (en) | BIM model-based port equipment inspection system | |
CN104992301A (en) | Flow circulation control method and apparatus for project management of beyond enterprise/organization | |
CN109272285A (en) | A kind of intelligent repair method based on telecommunication | |
CN108540571A (en) | High Availabitity Internet of Things manufacturing execution system based on industry internet and production method | |
CN110523782A (en) | A kind of rail rolling production line real-time monitoring system and method | |
CN104240027A (en) | Transaction schedule tracking management method and device | |
CN112859759A (en) | Intelligent manufacturing system | |
CN103679381A (en) | Collaborative plotting method and system for situation map | |
CN105488226A (en) | Digital museum visiting and exhibiting system | |
CN107688898A (en) | A kind of Electric Power Marketing System and method based on intelligent management platform | |
CN104899794A (en) | Power distribution network perambulation visual executing method based on mobile terminal map | |
CN105636317B (en) | A kind of intelligent road lamp management system and information processing method | |
CN104361484B (en) | A kind of office automation system and method for realizing multiple platform data interactive | |
CN104391779A (en) | System for automatically identifying physical location of equipment in asset operation and maintenance process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141224 |