CN104202365B - Method for clustered intelligent gateway platform for deploying expanded business application - Google Patents

Method for clustered intelligent gateway platform for deploying expanded business application Download PDF

Info

Publication number
CN104202365B
CN104202365B CN201410406299.0A CN201410406299A CN104202365B CN 104202365 B CN104202365 B CN 104202365B CN 201410406299 A CN201410406299 A CN 201410406299A CN 104202365 B CN104202365 B CN 104202365B
Authority
CN
China
Prior art keywords
gateway device
server
gateway
access server
convergence center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410406299.0A
Other languages
Chinese (zh)
Other versions
CN104202365A (en
Inventor
叶柯
李可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN FENGLIAN TECHNOLOGY Co Ltd
Original Assignee
SHENZHEN FENGLIAN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN FENGLIAN TECHNOLOGY Co Ltd filed Critical SHENZHEN FENGLIAN TECHNOLOGY Co Ltd
Priority to CN201410406299.0A priority Critical patent/CN104202365B/en
Publication of CN104202365A publication Critical patent/CN104202365A/en
Application granted granted Critical
Publication of CN104202365B publication Critical patent/CN104202365B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a clustered intelligent gateway platform and a method thereby for deploying expanded business application, which solve the problem that the scheme for deploying expanded business application used by a conventional large-scale clustered gateway device is complicated in design, has low utility ratio and cannot be used for large-scale deployment. The clustered intelligent gateway platform comprises a converging central server, at least two access servers connected with the converging central server, at least a shunt server, a database server, and at least a gateway device connected with the access servers. The clustered intelligent gateway platform has a reasonable design, has low complexity, and can be used for deploying the large-scale clustered gateway device efficiently, rapidly and flexibly, thereby having high application value.

Description

A kind of concentrating type intelligent gateway Platform deployment is activated business the method for application
Technical field
The present invention relates to a kind of intelligent gateway platform, and in particular to be a kind of extension of concentrating type intelligent gateway Platform deployment The method of service application.
Background technology
With mobile Internet high speed development and Mobile solution it is widely available, user to the demand of intelligent gateway also with Day all increasings.Intelligent gateway is the hinge that Multi net voting is accessed and Intranet is managed, and it is used as operator, digital content provider and net Network equipment vendors provide the passage of network service, in addition to providing wideband data, voice and video, also provide household safe, energy Other network applications such as source control, health monitoring and service, significantly improve the networking experience of user.
At the same time, the intelligent gateway device deployment of extensive, concentrating type is also increasingly becoming development trend.For example, China Telecommunications program completed the deployment of home gateway of 3,000,000 support IPv6 functions and open-minded in 2014.But in the face of so big The gateway deployment of scale, along with the various complicated application of activating business of development need deployment of Network, therefore, pass The deployment scheme of system is relatively costly and network structure can more sophisticated, application efficiency is low, it is difficult to safeguard huge gateway device Presence information, is not suitable for large scale deployment.
Therefore, how rapid expansion user capacity and application of activating business, and it is also easy to the unification of intelligent gateway platform Management, so that user obtains more abundant, perfect business experience, becomes the problem for urgent need to resolve.
The content of the invention
For above-mentioned technical deficiency, the application the invention provides a kind of concentrating type intelligent gateway Platform deployment is activated business Method, activating business with efficient, quick, flexible deployment, application, low complexity, responsiveness and utility ratio are high, facilitate user to unite The characteristics of one management and low hardware cost.
To achieve these goals, the technical solution used in the present invention is as follows:
A kind of concentrating type intelligent gateway Platform deployment is activated business the method for application, is comprised the following steps:
S1:Access server respectively with basic business application passage and activate business to be set up one by one using passage and be connected;
S2:Gateway device is set up into connection with the access server for being connected basic service application passage;
S3:Gateway device sends facility information to access server, and by access server by the equipment of gateway device Information is forwarded to convergence center server;
S4:Convergence center server checks the device identification of the gateway device that whether is stored with database server, is, Then convergence center server is verified according to device identification to gateway device;It is no, then it is the gateway device distributing equipment mark, And be stored in database server, then the gateway device is verified according to the device identification of distribution;
S5:Convergence center server judges whether gateway device is proved to be successful, and is, then convergence center server is in database The status information of the gateway device is revised as " online " in server, and sends the information of " being proved to be successful " to access server In;It is no, then original equipment mark is removed, it is repeatedly gateway device distributing equipment mark, and verified, until gateway device checking Success, then convergence center server is revised as the status information of the gateway device " online " in database server, and The information of transmission " being proved to be successful " is in access server;
S6:Access server sends the message of " succeeding in registration " to gateway device;
S7:User logs in intelligent gateway plateform system, and user equipment is connected with shunting server, shunting server will User equipment allocation is to convergence center server;
S8:User equipment is set up UDP and is connected with gateway device, and is bound;
S9:After binding success, user account information is sent to the gateway device of binding by convergence center server, and is stored In gateway device;
S10:User equipment sends and is connected to activating business using channel instruction to gateway device of specifying;
S11:Gateway device is received after instruction, set up TCP connections using the access server of passage with being connected to activate business, And send start activate business using passage and registration message;
S12:Gateway equipment login success, and send command request using passage to activating business, complete to activate business and answer Configuration and installation with plug-in unit on intelligent gateway platform;
S13:Circulation step S10~S12.
Further, in step S2, gateway device and it is connected the access server acquiescence of basic service application passage Connection is set up by the way of UDP, if connection is unsuccessful, connection is set up by the way of TCP.
Specifically, step S2 is comprised the following steps:
S201:The access server of the basic service application passage of gateway device random selection connection, and set up connection;
S202:Gateway device sends connection request to server is currently accessed, and opens the timer in the gateway device;
S203:Within the time of timer setting, the gateway device determines whether there is the sound for receiving access server transmission Should ask, be, then gateway device and access server successful connection;It is no, then execution step S204;
S204:Judge that gateway device, to whether the connection request of server transmission is currently accessed more than three times, is, then automatically Next access server of connection, and repeat step S202;No, then gateway device sends again connection and asks to access server Ask, and reset timer, then repeat step S203.
Yet further, in step S4, convergence center server is identified and tested for gateway device distributing equipment The detailed process of card is as follows:
(1)Convergence center server to access server send be all zero sequence number, access server generate one with Machine number, then and replies to gateway device with the set of serial numbers into the device identification of gateway device, and gateway device gets equipment Mark;
(2)Gateway device is encrypted according to the mode of Message Digest 5 MD5 to device identification, and sends to access clothes In business device;
(3)Access server receives the device identification of encryption, and it is decrypted, and confirms that received device identification is It is no consistent with what it was stored, it is then to be proved to be successful, and the device identification is sent to convergence center server, execution step (4);No, then removing original equipment is identified, and feeds back to convergence center server, then repeat step(1);
(4)Convergence center server is verified according to device identification to gateway device.
Yet further, in step S6, after gateway equipment login success, according further to setting heart beat cycle periodically to Convergence center server reporting state information, convergence center server adjusts the heart beat cycle of gateway device according to loading condition, Guarantee the normal connection of gateway device and access server.
Specifically, convergence center server adjusts the heart beat cycle of gateway device, guarantees gateway device and access service The detailed process that device normally connects is as follows:
(1)Gateway device periodically reports its status information according to the heart beat cycle of setting to access stratum server;
(2)Access server determines whether the status information that timing receipt sends to gateway device, is, then believe state Breath is forwarded to convergence center server, and execution step(3)Extremely(5);It is no, then execution step(6)Extremely(8);
(3)Converge stratum server and receive gateway device status information, whether the quantity of the gateway device of the current connection of judgement Its default threshold value is exceeded, has been, then continued to keep the heart beat cycle, while replying access server;It is no, then by gateway device Heart beat cycle double, and return back to access server;
(4)Return information is gone to gateway device by access server;
(5)Judge whether gateway device receives reply, be, then repeat step(1);It is no, then execution step(6);
(6)Gateway device judges its number of times for sending status information does not still meet with a response after whether having more than three times, is, Then execution step(7);No, then gateway device halves the heartbeat cycle time of setting, and repeat step(1);
(7)Gateway device is disconnected with access server;
(8)Access server sends " status modifier " message to convergence center server, and convergence center server is in data The status information of the gateway device is revised as " offline " in the server of storehouse, and execution step(9);
(9)Gateway device is re-established with access server and is connected.
Further, in step S8, the detailed process that user equipment is bound with gateway device is as follows:
(1)User equipment to gateway device initiates bind request;
(2)User sends certification request, and gateway device is authenticated to the certification request;
(3)Gateway device certification success, replys user equipment " binding success ";If certification is unsuccessful, replys user and set Standby " Bind Failed ", and forbid the subsequent operation of the user equipment.
Specifically, step S9 is comprised the following steps:
S901:Convergence center server is that user account password distributes random key, and by the random key Merge with user account password, be then encrypted according still further to the mode of Message Digest 5 MD5;
S902:Convergence center server sends encryption information to access stratum server;
S903:The encryption information that access stratum server is received goes to the gateway device with user equipment binding, gateway Equipment stores user account information.
Compared with prior art, the invention has the advantages that:
(1)High efficiency:The present invention adopts stratification Design of Hardware Architecture, solves extensive, the concurrently visit of clustered deploy(ment) Ask and status tracking problem, can effectively mitigate server load, greatly improve responsiveness and application efficiency.
(2)Extensibility:On the one hand the present invention can realize equipment end and user side according to the layered design method for adopting UNICOM, so as to set up basic business application passage;On the other hand, then it is, based on the service channel, to introduce and activate business Using passage, the passage is responsible for configuring gateway device pin function, pacifies the operations such as loading, unloading, startup/stopping, and right The operation of plug-in unit is managed, and so as to quickly, neatly extend different types of service application passage, carries one or more industry Business application, to meet the diversity of user's request.
(3)It is open:Client can quickly develop various value-added services on intelligent gateway platform of the present invention, be conducive to client The sustainable development of business, while supporting user class information sharing and management mode, catches user behavior information.
(4)Security:The present invention first passes through gateway equipment login, user equipment certification, then again by user equipment and net The mode of apparatus bound is closed, the UNICOM of user and gateway device is controlled, disabled user's access is limited, so as to efficiently solve The security hidden trouble that open type intelligent Networking Platform is brought;Meanwhile, the present invention is also based on the eap-message digest that security is higher Algorithm MD5 is encrypted to device identification and user account information, not only increases the security of device identification transmission, it is ensured that its The crypticity of device identification, and be encrypted again after user cipher is merged with the key being randomly assigned, strengthen and crack Difficulty, even if decrypted, it is also difficult to obtain user cipher in plain text.
(5)Compatibility:The technology of the present invention carries out unifying identifier using the device identification of design to gateway device, and provides The binding of various ways, is applicable not only to the gateway device of different manufacturers, and does not result in extra hardware cost.
(6)Manageability:The present invention can be accessed different user setting by the way that user equipment and gateway device are bound Authority, reduces the complexity that multi-level user is managed;Meanwhile, it is of the invention based on " heartbeat keep-alive " technology, in real time Monitoring gateway device status, it is ensured that the accuracy of status tracking, and according to gateway device status information, server-assignment is adjusted, Such that it is able to further realize server load balancing, stability, reliability and the utilization rate of server is improved.
(7)Complexity is low:The present invention actively sends its status information by gateway device, it is easy to accomplish, do not result in extra Hardware cost.
(8)Cost performance of the present invention is at a relatively high, and reliability is stable, practical, can well meet extensive, collection The gateway device deployment of group's formula, therefore it has very high practical value and promotional value.
Description of the drawings
Fig. 1 is the hardware system block diagram of the present invention.
Fig. 2 is the information exchange schematic diagram of the present invention.
Fig. 3 be the present invention realize schematic flow sheet.
Fig. 4 is the schematic diagram that the present invention sets up basic business application passage.
Fig. 5 is that the present invention sets up the schematic diagram activated business using passage.
Fig. 6 is the schematic flow sheet that convergence center server is gateway device distributing equipment mark.
Fig. 7 is the schematic flow sheet of gateway device and user equipment binding.
Fig. 8 is sent to the schematic flow sheet of the gateway device of binding for user account information.
Specific embodiment
With reference to the accompanying drawings and examples the invention will be further described, and embodiments of the present invention are included but is not limited to The following example.
Embodiment
The invention provides a kind of concentrating type intelligent gateway platform, according to the difference of function, it can be divided into gateway device Layer, Access Layer, convergence-level and shunting layer, function at all levels is as follows respectively:
(1)Gateway device layer:The level is used to provide easily wireless network access services for all terminal uses, and to Access Layer sends registration and status information;
(2)Access Layer:The level is used to receive the registration from mechanical floor and status information, and reports gateway to convergence-level The status information of mechanical floor, including the monitoring of the information such as the load of cpu load, internal memory, gateway device number;
(3)Convergence-level:The level is responsible for preserving the status information of all devices layer, and to Access Layer gateway device layer letter is provided The inquiry of breath, including the sequence number of gateway device, IP address and online or off-line state.In view of gateway device presence Information is very huge, and the level increased database server, is responsible for all legal gateway device MAC and sequence number SN of storage The information such as the binding relationship of information, user account information, user and gateway;
(4)Shunting layer:The level is responsible for connecting subscriber equipment to convergence-level, once user equipment needs connection gateway to set It is standby, distribution can be attached according to the load condition of convergence-level.
And as shown in figure 1, in terms of hardware configuration, the plateform system of the present invention then includes convergence center server, accesses Server, shunting server(That is dns server), database server and gateway device.The access server, shunting clothes Business device and database server are connected with convergence center server, and the gateway device is then connected with access server.Also, The shunting server and gateway device are at least one.And the access server then be at least two, and with basis Service application passage connects one by one with activating business using passage.For example, when access server is two, wherein an access Server is used to connect basic service application passage(Such as remote control management), and another access server is then used to connect Activate business and apply passage(Such as service application such as electronic emporium, smart home).
Preferably, in the present embodiment, above-mentioned server adopts Xeon, can conform better to big data quantity Intensive consecutive operations, and the configuration of these processors is respectively as follows:
Access server:Xeon, 8GB internal memories, double dish mirror images, the double network interfaces of gigabit;
Convergence center server:Xeon, 16GB internal memories, double dish mirror images, the double network interfaces of gigabit;
Database server:Double Xeons, 16GB internal memories, double dish mirror images, the double network interfaces of gigabit;
Shunting server:Xeon, 8GB internal memories, double dish mirror images, the double network interfaces of gigabit.
Table 1 is deployment scenario explanation of the intelligent gateway platform of the present invention to each level(It is for reference only).
Table 1
According to above-mentioned hardware configuration, realize that user equipment is applied with activating business to intelligent gateway platform of the present invention below The process of row information interaction describes in detail.Fig. 2 is that gateway device layer, Access Layer, convergence-level, shunting layer are at all levels, with And the information exchange schematic diagram between user equipment, and as shown in figure 3, the present invention's realizes that flow process is as described below.
First, access server respectively with basic business application passage and activate business to be set up one by one using passage and be connected, Fig. 4 is the schematic diagram of the basic business application passage that the present invention sets up, and Fig. 5 then applies passage for activating business for present invention foundation Schematic diagram.Then, the access server of the basic service application passage of gateway device random selection connection, and set up connection;At this In step, gateway device is set up by the way of UDP with access server acquiescence and is connected, if connection is unsuccessful, using TCP's Mode sets up connection.It is so designed that, being primarily due to udp protocol and implementing that the Transmission Control Protocol that compares is simpler, TCP's holds Hand process can consume resource, and UDP without handshake procedure, so resource will not be consumed.It is contemplated that the design of the present invention is special Point, therefore, in order to avoid the waste of resource, the present invention is preferentially connected using UDP, reduction communication-cost, and to a certain extent Response time delay is reduced, strengthens user experience.
Then, gateway device sends connection request to server is currently accessed, and opens the timer in the gateway device, Within the time of timer setting, the gateway device determines whether there is the respond request for receiving access server transmission, is, then net Pass equipment and access server successful connection;It is no, then judge that gateway device is to the connection request for being currently accessed server transmission No is then to connect next access server automatically more than three times, and again a downward server sends connection request;It is no, Then gateway device sends again connection request to access server, and resets timer, then proceedes to when timer sets It is interior, determine whether there is the respond request for receiving access server transmission.
After gateway device receives the respond request of access server transmission, gateway device sends facility information to connecing Enter server, and the facility information of gateway device is forwarded to into convergence center server by access server.Then, convergence center Server checks the device identification of the gateway device that whether is stored with database server(ID), it is, then convergence center service Device is verified according to device identification to gateway device;It is no, then it is the gateway device distributing equipment mark, and it is stored in database In server, then the gateway device is verified according to the device identification of distribution;As shown in fig. 6, in the present embodiment, when need When wanting convergence center server to identify and verified for gateway device distributing equipment, its detailed process is as follows:
(1)Convergence center server sends the sequence number for being all zero to access server(Such as 00000), access server Generate a random number(Such as 23456), then with the set of serial numbers into gateway device device identification(For example sequence number with Machine number constitutes 23456, then the device identification of gateway device is 23456), and gateway device is replied to, gateway device is obtained To device identification;
(2)Gateway device is encrypted according to the mode of Message Digest 5 MD5 to device identification, and sends to access clothes In business device;Due to adopting the technology of md5 encryption for the ripe technology of existing application, therefore the mistake that the present embodiment is no longer encrypted to it Journey describes in detail;
(3)Access server receives the device identification of encryption, and it is decrypted, and confirms that received device identification is It is no consistent with what it was stored, it is then to be proved to be successful, and the device identification is sent to convergence center server, execution step (4);No, then removing original equipment is identified, and feeds back to convergence center server, then repeat step(1);
(4)Convergence center server is verified according to device identification to gateway device.
Followed by convergence center server judges whether gateway device is proved to be successful, and is, then convergence center server is being counted According to the status information of the gateway device being revised as " online " in the server of storehouse, and send the information of " being proved to be successful " to accessing clothes In business device;It is no, then original equipment mark is removed, it is repeatedly gateway device distributing equipment mark, and verified, until gateway device Be proved to be successful, then convergence center server the status information of the gateway device is revised as in database server " Line ", and the information of " being proved to be successful " is sent in access server, and access server then sends the message for succeeding in registration to net Pass equipment.
Also, in order that the load balance of convergence center server, realize carrying out real-time tracking to the state of gateway device, Guarantee that gateway device is normally connected with access server simultaneously, after succeeding in registration, it can be according to the heartbeat of setting for gateway device Cycle is periodically to convergence center server reporting state information.Then according to loading condition, adjustment gateway sets convergence center server Standby heart beat cycle, it is ensured that the normal connection of gateway device and access server.In the present embodiment, the adjustment of convergence center server The heart beat cycle of gateway device, guarantee that gateway device is as follows with the detailed process that access server is normally connected:
(1)Gateway device periodically reports its status information according to the heart beat cycle of setting to access stratum server;
(2)Access server determines whether the status information that timing receipt sends to gateway device, is, then believe state Breath is forwarded to convergence center server, and execution step(3)Extremely(5);It is no, then execution step(6)Extremely(8);
(3)Converge stratum server and receive gateway device status information, whether the quantity of the gateway device of the current connection of judgement Its default threshold value is exceeded, has been, then continued to keep the heart beat cycle, while replying access server;It is no, then by gateway device Heart beat cycle double, and return back to access server;
(4)Return information is gone to gateway device by access server;
(5)Judge whether gateway device receives reply, be, then repeat step(1);It is no, then execution step(6);
(6)Gateway device judges its number of times for sending status information does not still meet with a response after whether having more than three times, is, Then execution step(7);No, then gateway device halves the heartbeat cycle time of setting, and repeat step(1);
(7)Gateway device is disconnected with access server;
(8)Access server sends " status modifier " message to convergence center server, and convergence center server is in data The status information of the gateway device is revised as " offline " in the server of storehouse, and execution step(9);
(9)Gateway device is re-established with access server and is connected.
After gateway device and access server are set up and are connected and are proved to be successful, User logs in intelligent gateway plateform system, And user equipment is connected with shunting server, shunting server is by user equipment allocation to convergence center server.Then, use Family equipment is set up UDP and is connected with gateway device, and is bound.As shown in fig. 7, in the present embodiment, user equipment sets with gateway It is for specific binding procedure:(1)User equipment to gateway device initiates bind request;(2)User sends certification request, gateway Equipment is authenticated to the certification request;(3)Gateway device certification success, then reply user equipment " binding success ";If certification It is unsuccessful, then user equipment " Bind Failed " is replied, and forbid the subsequent operation of the user equipment.
After binding success, user account information is sent to the gateway device of binding by convergence center server, and is stored in Gateway device, as shown in figure 8, the specific process is as follows:
(1)Convergence center server is that user account password distributes random key, and by the random key with User account password merges, and is then encrypted according still further to the mode of Message Digest 5 MD5;
(2)Convergence center server sends encryption information to access stratum server;
(3)The encryption information that access stratum server is received goes to the gateway device with user equipment binding, and gateway sets Standby storage user account information;So it is capable of achieving remote management of the user equipment to gateway device.
Then, user equipment sends and is connected to activating business using channel instruction to gateway device, gateway device of specifying Receive instruction after, be connected activate business using the access server of passage set up TCP connection, and send startup activate business answer With the message and registration message of passage, in the step, gateway device is built with being connected to activate business using the access server of passage After vertical connection, its registration process is as above-mentioned registration process.
After gateway equipment login success, send command request using passage to activating business, complete the application of activating business Configuration and installation of the plug-in unit on intelligent gateway platform, realizes Disposition & Operation pipe of the intelligent gateway platform to application of activating business Reason(Such as submission, examination & verification, issue, offline, sequence, recommendation etc.).
Further to illustrate technical scheme, the present embodiment is carried out with user equipment with smart home application The example of information exchange is illustrating.
First, access server is set up be connected one by one with remote management application and smart home application, then gateway device Set up with the access server for being connected to remote management application and be connected.
Then, gateway device is set up with convergence center server and is connected, and it is verified by convergence center server, It is verified, and the device identification that the gateway device is assigned to is 23456, and equipment state is " online ";Meanwhile, the gateway sets Standby periodically to report its status information of equipment to convergence center server, detailed process is as follows:
(1)Gateway device reports its status information every 60s according to the heart beat cycle of acquiescence to access server;
(2)Access server is properly received status information, and status information is forwarded to into convergence center server;
(3)Convergence center server receives the status information of gateway device, and judges the number of the gateway device of current connection Mesh is not above alarm threshold value 2, then heart beat cycle is doubled as into 120s, and replys access server;
(4)Return information is gone to gateway device by access server;
(5)Gateway device receives reply, and the heart beat cycle according to setting reports its shape every 120s to access server State information, accesses stratum server and is properly received status information, and status information is forwarded to into convergence center server;
(6)Convergence center server receives the status information of gateway device, judges the gateway device number of current connection still Threshold value 2 is so not above, thus heart beat cycle is doubled as into 240s, and reply access server;
(7)Return information is gone to gateway device by access server;
(8)Gateway device does not receive reply;
(9)Due to gateway device send reporting state information number of times not less than three times, therefore, gateway device by set Heartbeat cycle time is halved to 60s by original 120s, and continues periodically to be reported to access server according to the heart beat cycle of 60s Its status information, access server is properly received the status information again, then proceedes to repeat the above steps.
User logs in intelligent gateway plateform system, and make its mobile phone(User equipment)Set up with gateway device and be connected, then Click on " bound device ", mobile phone to gateway device initiates bind request(For example mobile phone scanning Quick Response Code logs in intelligent gateway platform After system, to intelligent gateway plateform system the request with gateway device binding is initiated).User sends certification request(For example it is intelligent Networking Platform system sends at random identifying code to user mobile phone, the identifying code that then user input is received), gateway device to Family mobile phone is authenticated, certification success, and the user is named as " U1 ", mobile phone and gateway device binding success, and sets up such as Mapping table shown in table 2.
Device identification Device name Device type Device IP Equipment state User's name
23456 Gateway device Gateway 202.115.43.11 Online U1
Table 2
After user mobile phone and gateway device binding success, convergence center server is that user U1 passwords distribute random key Code Key1, and random key Key1 is combined with user U1 password Password1, is finally carried out with MD5 again Encryption(Key1+ Password1).Then, convergence center server sends encryption information to access server, finally again by Access server is gone to the gateway device of binding, and gateway device stores the account information of user U1.Then, user mobile phone is sent out Send and be connected to the instruction of " smart home application " to gateway device, gateway device is received after instruction, and " smart home should to connection With " access server send initiation message and registration message, and set up TCP connections.After gateway equipment login success, to " intelligence The access server of energy domestic applications " sends command request, performs the operation such as installation, configuration, so just completes intelligent gateway The deployment that platform is applied to " smart home ", other are activated business using by that analogy.
The present invention realizes well extensive, cluster gateway device deployment so that user can remotely be managed collectively net Pass equipment.The present invention is by setting up basic business application passage and being needed according to user to expand different type on this basis Service application passage, meanwhile, it also increases the security of user account and password, therefore, the present invention is extensive, cluster The deployment of formula gateway device provides efficient solution with application, its compared with prior art, with prominent substance Feature and significant progress.
Above-described embodiment is only the preferred embodiments of the present invention, not limiting the scope of the invention, as long as using The design principle of the present invention, and the change for carrying out non-creativeness work on this basis and making, all should belong to the present invention's Within protection domain.

Claims (8)

1. a kind of concentrating type intelligent gateway Platform deployment is activated business the method for application, it is characterised in that comprised the following steps:
S1:Access server respectively with basic business application passage and activate business to be set up one by one using passage and be connected;
S2:Gateway device is set up into connection with the access server for being connected basic service application passage;
S3:Gateway device sends facility information to access server, and by access server by the facility information of gateway device It is forwarded to convergence center server;
S4:Convergence center server checks the device identification of the gateway device that whether is stored with database server, is then to converge Poly- central server is verified according to device identification to gateway device;It is no, then it is the gateway device distributing equipment mark, and deposit In being stored in database server, then the gateway device is verified according to the device identification of distribution;
S5:Convergence center server judges whether gateway device is proved to be successful, and is, then convergence center server is in database service The status information of the gateway device is revised as " online " in device, and sends the information of " being proved to be successful " in access server; It is no, then original equipment mark is removed, it is repeatedly gateway device distributing equipment mark, and verified, until gateway device is verified into Work(, then convergence center server the status information of the gateway device is revised as into " online " in database server, concurrently The information of " being proved to be successful " is sent in access server;
S6:Access server sends the message of " succeeding in registration " to gateway device;
S7:User logs in intelligent gateway plateform system, and user equipment is connected with shunting server, server is shunted by user Equipment distributes to convergence center server;
S8:User equipment is set up UDP and is connected with gateway device, and is bound;
S9:After binding success, user account information is sent to the gateway device of binding by convergence center server, and is stored in net Pass equipment;
S10:User equipment sends and is connected to activating business using channel instruction to gateway device of specifying;
S11:Gateway device is received after instruction, set up TCP connections using the access server of passage with being connected to activate business, concurrently Startup is sent to activate business using passage and the message registered;
S12:Gateway equipment login success, and send command request using passage to activating business, complete to activate business using slotting Configuration and installation of the part on intelligent gateway platform;
S13:Circulation step S10~S12.
2. a kind of concentrating type intelligent gateway Platform deployment according to claim 1 is activated business the method for application, its feature It is that in step S2, gateway device is given tacit consent to by the way of UDP with the access server for being connected basic service application passage Connection is set up, if connection is unsuccessful, connection is set up by the way of TCP.
3. a kind of concentrating type intelligent gateway Platform deployment according to claim 1 and 2 is activated business the method for application, and it is special Levy and be, step S2 is comprised the following steps:
S201:The access server of the basic service application passage of gateway device random selection connection, and set up connection;
S202:Gateway device sends connection request to server is currently accessed, and opens the timer in the gateway device;
S203:Timer setting time in, the gateway device determine whether there is receive access server transmission response please Ask, be, then gateway device and access server successful connection;It is no, then execution step S204;
S204:Judge that gateway device, to whether the connection request of server transmission is currently accessed more than three times, is then to connect automatically Next access server, and repeat step S202;No, then gateway device sends again connection request to access server, and Timer is reset, then repeat step S203.
4. a kind of concentrating type intelligent gateway Platform deployment according to claim 3 is activated business the method for application, its feature Be, in step S4, convergence center server be the gateway device distributing equipment detailed process that identifies and verified such as Under:
(1)Convergence center server sends the sequence number for being all zero to access server, and access server generates a random number, Then and gateway device is replied to into the device identification of gateway device with the set of serial numbers, gateway device gets device identification;
(2)Gateway device is encrypted according to the mode of Message Digest 5 MD5 to device identification, and sends to access server In;
(3)Access server receives the device identification of encryption, and it is decrypted, confirm received device identification whether with It is consistent that it is stored, and is then to be proved to be successful, and the device identification is sent to convergence center server, execution step(4);It is no, Original equipment mark is then removed, and feeds back to convergence center server, then repeat step(1);
(4)Convergence center server is verified according to device identification to gateway device.
5. a kind of concentrating type intelligent gateway Platform deployment according to claim 4 is activated business the method for application, its feature It is, in step S6, after gateway equipment login success, according further to the heart beat cycle of setting periodically to convergence center server Reporting state information, convergence center server adjusts the heart beat cycle of gateway device according to loading condition, it is ensured that gateway device with The normal connection of access server.
6. a kind of concentrating type intelligent gateway Platform deployment according to claim 5 is activated business the method for application, its feature It is the heart beat cycle of convergence center server adjustment gateway device, to guarantee what gateway device and access server were normally connected Detailed process is as follows:
(1)Gateway device periodically reports its status information according to the heart beat cycle of setting to access stratum server;
(2)Access server determines whether the status information that timing receipt sends to gateway device, is, then turn status information It is sent to convergence center server, and execution step(3)Extremely(5);It is no, then execution step(6)Extremely(8);
(3)Converge stratum server and receive gateway device status information, whether the quantity for judging the gateway device of current connection exceedes Its default threshold value, is then to continue to keep the heart beat cycle, while replying access server;It is no, then by the heart of gateway device Hop cycle is doubled, and returns back to access server;
(4)Return information is gone to gateway device by access server;
(5)Judge whether gateway device receives reply, be, then repeat step(1);It is no, then execution step(6);
(6)Gateway device judges its number of times for sending status information does not still meet with a response after whether having more than three times, is then to hold Row step(7);No, then gateway device halves the heartbeat cycle time of setting, and repeat step(1);
(7)Gateway device is disconnected with access server;
(8)Access server sends " status modifier " message to convergence center server, and convergence center server takes in database The status information of the gateway device is revised as " offline " in business device, and execution step(9);
(9)Gateway device is re-established with access server and is connected.
7. a kind of concentrating type intelligent gateway Platform deployment according to claim 5 or 6 is activated business the method for application, and it is special Levy and be, in step S8, the detailed process that user equipment is bound with gateway device is as follows:
(1)User equipment to gateway device initiates bind request;
(2)User sends certification request, and gateway device is authenticated to the certification request;
(3)Gateway device certification success, replys user equipment " binding success ";If certification is unsuccessful, replys user equipment and " tie up Fixed failure ", and forbid the subsequent operation of the user equipment.
8. a kind of concentrating type intelligent gateway Platform deployment according to claim 7 is activated business the method for application, its feature It is that step S9 is comprised the following steps:
S901:Convergence center server is that user account password distributes random key, and by the random key and is used Family account password merges, and is then encrypted according still further to the mode of Message Digest 5 MD5;
S902:Convergence center server sends encryption information to access stratum server;
S903:The encryption information that access stratum server is received goes to the gateway device with user equipment binding, gateway device Storage user account information.
CN201410406299.0A 2014-08-15 2014-08-15 Method for clustered intelligent gateway platform for deploying expanded business application Expired - Fee Related CN104202365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410406299.0A CN104202365B (en) 2014-08-15 2014-08-15 Method for clustered intelligent gateway platform for deploying expanded business application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410406299.0A CN104202365B (en) 2014-08-15 2014-08-15 Method for clustered intelligent gateway platform for deploying expanded business application

Publications (2)

Publication Number Publication Date
CN104202365A CN104202365A (en) 2014-12-10
CN104202365B true CN104202365B (en) 2017-05-10

Family

ID=52087590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410406299.0A Expired - Fee Related CN104202365B (en) 2014-08-15 2014-08-15 Method for clustered intelligent gateway platform for deploying expanded business application

Country Status (1)

Country Link
CN (1) CN104202365B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105376309B (en) * 2015-10-30 2021-08-13 青岛海尔智能家电科技有限公司 Access gateway allocation method and device
CN107707583B (en) * 2016-08-08 2020-11-17 环旭电子股份有限公司 Cloud data transmission system and dynamic distribution method thereof
CN107249209A (en) * 2017-06-09 2017-10-13 苏州汉明科技有限公司 wireless local area network gateway management method and system
CN107196958B (en) * 2017-06-21 2020-04-07 深圳市盛路物联通讯技术有限公司 Encryption method and system for data transmission of Internet of things
CN109639746B (en) * 2017-10-09 2021-07-27 北京安软天地科技有限公司 Load balancing method for security authentication transmission gateway cluster
CN109040197A (en) * 2018-07-13 2018-12-18 中天宽带技术有限公司 A kind of intelligent gateway management system and method based on web SiteServer LBS
CN110798329A (en) * 2018-08-01 2020-02-14 中兴通讯股份有限公司 Internet of things gateway access method, equipment and storage medium
CN113490207B (en) * 2021-06-29 2024-02-06 深圳Tcl新技术有限公司 Internet of things equipment binding method and device, computer equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1523152A2 (en) * 2003-10-07 2005-04-13 Accenture Global Services GmbH Connector gateway
CN1905503A (en) * 2005-07-27 2007-01-31 上海龙林通信技术有限公司 Multimedia metropolitan area network and application thereof
CN1905502A (en) * 2005-07-27 2007-01-31 上海龙林通信技术有限公司 Multimedia network and application thereof
CN102025593A (en) * 2009-09-21 2011-04-20 中国移动通信集团公司 Distributed user access system and method
CN102202389A (en) * 2010-03-25 2011-09-28 中兴通讯股份有限公司 Method and system for realizing gateway management

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1523152A2 (en) * 2003-10-07 2005-04-13 Accenture Global Services GmbH Connector gateway
CN1905503A (en) * 2005-07-27 2007-01-31 上海龙林通信技术有限公司 Multimedia metropolitan area network and application thereof
CN1905502A (en) * 2005-07-27 2007-01-31 上海龙林通信技术有限公司 Multimedia network and application thereof
CN102025593A (en) * 2009-09-21 2011-04-20 中国移动通信集团公司 Distributed user access system and method
CN102202389A (en) * 2010-03-25 2011-09-28 中兴通讯股份有限公司 Method and system for realizing gateway management

Also Published As

Publication number Publication date
CN104202365A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104202365B (en) Method for clustered intelligent gateway platform for deploying expanded business application
CN104158684B (en) Gateway device status tracking based on open type intelligent Networking Platform
CN106301785B (en) Method and system for binding intelligent household equipment and intelligent terminal
CN104158710B (en) Service application channel automatic switching method based on open type intelligent Networking Platform
CN104144168B (en) Binding method based on open type intelligent Networking Platform user account and gateway device
CN103685210B (en) The register method and device of terminal
US9967738B2 (en) Methods and arrangements for enabling data transmission between a mobile device and a static destination address
CN107493280A (en) Method, intelligent gateway and the certificate server of user authentication
US9973399B2 (en) IPV6 address tracing method, apparatus, and system
CN101924785A (en) Data uploading and downloading methods and system
CN104468619B (en) A kind of method and authentication gateway for realizing double stack web authentications
CN104104926A (en) Universal plug and play (UPnP) monitoring terminal access method and access device
CN103428211A (en) Network authentication system on basis of switchboards and authentication method for network authentication system
CN104144096A (en) Virtual network layer construction method, device and system
CN104618522B (en) The method and Ethernet access equipment that IP address of terminal automatically updates
CN106302353A (en) Identity identifying method, identity authorization system and relevant device
US8769623B2 (en) Grouping multiple network addresses of a subscriber into a single communication session
CN101800686A (en) Method, device and system for realizing service
CN109041036A (en) WIFI connection method and equipment
CN107547339A (en) A kind of gateway media access control MAC address feedback method and device
WO2017000625A1 (en) Dynamic host configuration protocol (dhcp) server management method and apparatus
CN104243625A (en) IP address distribution method and device
CN105072669B (en) The connection control method and device of website
CN108306875B (en) Method and device for controlling access of wired terminal
CN106341374A (en) Method and device for restricting access of unlicensed user device to home gateway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

Termination date: 20210815