CN104184215B - Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method - Google Patents

Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method Download PDF

Info

Publication number
CN104184215B
CN104184215B CN201410464334.4A CN201410464334A CN104184215B CN 104184215 B CN104184215 B CN 104184215B CN 201410464334 A CN201410464334 A CN 201410464334A CN 104184215 B CN104184215 B CN 104184215B
Authority
CN
China
Prior art keywords
station
command information
master control
remote
scheduling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410464334.4A
Other languages
Chinese (zh)
Other versions
CN104184215A (en
Inventor
张霁明
吴设军
林超
张莺
卢恒
孙斌
徐燚鑫
袁丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410464334.4A priority Critical patent/CN104184215B/en
Publication of CN104184215A publication Critical patent/CN104184215A/en
Application granted granted Critical
Publication of CN104184215B publication Critical patent/CN104184215B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Selective Calling Equipment (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

This application discloses a kind of transformer station dispatching automation joint debugging method, after obtaining the command information that scheduling station issues, it is judged that the data type of described command information;When the data type judging described command information is remote control execution instruction;Mate with described command information according to the data message in the database of the master control device obtained, according to matching result to scheduling station feedback message information.Visible, the command information using transformer station disclosed in the present application dispatching automation joint debugging method remote control to perform type need not be sent to described master control device, also can carry out transformer station's dispatching automation joint debugging, solve the problem having a power failure of entirely standing that needs when carrying out transformer station's dispatching automation joint debugging in prior art.

Description

Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method
Technical field
The application relates to transformer substation system automated information joint debugging technical field, more particularly, it relates to one Plant transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method.
Background technology
Dispatch automated system is the important system ensureing power network safety operation, and its operation is the most normal It is directly connected to dispatcher's monitoring capacity to whole electrical network.Just because of dispatch automated system at electrical network Safe operation plays an important role, therefore when a set of new dispatch automated system reaches the standard grade trail run, The numerous transformer stations accessing this system are required to carry out automated information joint debugging, to guarantee that access dispatching is automatic The substation information of change system is correct, thus prevents the wrong report of automation of transformation substations information, fails to report Control equipment the most by mistake, cause power grid accident.
In prior art, during automated information joint debugging, transformer station is the most generally had a power failure by full station Mode completes information joint debugging, thus has had a strong impact on power supply reliability, produces the live and work of user Raw impact.
Summary of the invention
In view of this, the application provides a kind of transformer station dispatching automation joint debugging system, for when described change After power station is added new dispatch automated system, the transformer station accessing this system is carried out automated information connection Adjust, by the problem solving to carry out information joint debugging by full station in the way of being had a power failure in prior art.
A kind of transformer station dispatching automation joint debugging method, including:
Obtain the data message in transformer station's master control facility database, according in described master control facility database Data message carry out kinematic parameter setting, simulate described master control plant running;
Gather the real time data of transformer station's master control device and be transmitted to scheduling station;
Obtain the command information that scheduling station issues, and judge the data type of described command information;
When the data type judging described command information is remote control execution instruction;
Mate with described command information according to the data message in the database of the master control device obtained, According to matching result to scheduling station feedback message information.
Preferably, in above-mentioned transformer station dispatching automation joint debugging method, it is also possible to including:
When the data type judging described command information is remote signals;
Simulate trip protection information according to described remote signals, and the trip protection information of simulation is sent to Scheduling station.
Preferably, in above-mentioned transformer station dispatching automation joint debugging method, it is also possible to including:
When the data type judging described command information is remote control selection instruction;
Select instruction to send to master control device described remote control, obtain and send described master control device according to institute Stating remote control selects the message of returning to school of instruction transmission to scheduling station.
Preferably, in above-mentioned transformer station dispatching automation joint debugging method, get under described scheduling station After the command information sent out, it is judged that also include before the data type of described command information:
Judge whether described command information meets 104 rule schematas, if it is, continue executing with, otherwise lose Abandon this instruction.
A kind of remote station, may include that
Analogue unit, for obtaining the data message in transformer station's master control facility database, according to described always Data message in control facility database carries out kinematic parameter setting, simulates described master control device;
Data acquisition unit, for gathering the real time data of master control device and being transmitted to scheduling station;
Instruction acquisition unit, for obtaining the command information that scheduling station issues;
Judging unit, for judging the data type of described command information;
First processing unit, when the data type judging described command information is remote control execution instruction;Sentence Disconnected described remote control performs instruction and judges that described remote control performs the correctness of instruction, and according to judged result to institute State the corresponding message of transmission.
Preferably, in above-mentioned remote station, it is also possible to including:
Second processing unit, for when the data type judging described command information is remote signals, depends on Simulate trip protection information according to described remote signals, and it is main that the trip protection information of simulation is sent to scheduling Stand.
Preferably, in above-mentioned remote station, it is also possible to including:
3rd processing unit, is used for when the data type judging described command information is remote control selection instruction, Select instruction to send to master control device described remote control, obtain and send described master control device according to described distant Control selects the message of returning to school of instruction transmission to scheduling station.
Preferably, in above-mentioned remote station, it is also possible to including:
Stipulations judging unit, is used for judging whether described command information meets 104 rule schematas, if it is, Continue executing with, otherwise abandon this instruction.
A kind of transformer station dispatching automation joint debugging system, may include that scheduling station, transformer station's master control dress Put and be arranged on the remote station between described scheduling station and transformer station's master control device, wherein said Remote station is the remote station described in above-mentioned any one.
Preferably, in above-mentioned transformer station dispatching automation joint debugging system, described remote station the first end leads to Crossing data/address bus to be connected with transformer station master control device, the other end passes sequentially through transformer station's router, Communication ray Terminal, scheduling station router are connected with described scheduling station.
Transformer station's dispatching automation joint debugging method disclosed in the embodiment of the present application, obtains what scheduling station issued After command information, it is judged that the data type of described command information;When the data class judging described command information When type is remote control execution instruction;According to the data message in the database of the master control device obtained and described finger Information is made to mate, according to matching result to scheduling station feedback message information.Visible, use this Shen Transformer station's dispatching automation joint debugging method remote control disclosed in please perform the command information of type need not be sent to institute State master control device, also can carry out transformer station's dispatching automation joint debugging, solve in prior art and becoming The problem having a power failure of entirely standing is needed during the dispatching automation joint debugging of power station.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below, Accompanying drawing in description is only embodiments of the invention, for those of ordinary skill in the art, not On the premise of paying creative work, it is also possible to obtain other accompanying drawing according to the accompanying drawing provided.
Fig. 1 is the flow chart of transformer station's dispatching automation joint debugging method disclosed in the embodiment of the present application;
Fig. 2 is the flow chart of transformer station's dispatching automation joint debugging method disclosed in another embodiment of the application;
Fig. 3 is the structure chart of remote station disclosed in the embodiment of the present application;
Fig. 4 is the structure chart of remote station disclosed in another embodiment of the application;
Fig. 5 is the structure chart of transformer station's dispatching automation joint debugging system disclosed in the embodiment of the present application;
Fig. 6 is the structure chart of transformer station's dispatching automation joint debugging system disclosed in another embodiment of the application.
Detailed description of the invention
It is directed in prior art, after adding new equipment in transformer station, new equipment is carried out transformer station's tune During degree automation joint debugging, needing stands entirely to transformer station has a power failure and the live and work of user is produced shadow The problem rung, this application provides a kind of transformer station dispatching automation joint debugging method, a kind of remote station With the system applying described remote station.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not doing Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of protection of the invention.
Described method in the embodiment of the present application can set up the basis of remote station in the prior art On implement, described remote station is: in power network schedule automation joint debugging system, be arranged on generating In factory, transformer station, a kind of have, remote measurement, remote signalling, remote control, shake and adjust the automatic of four kinds of remote moving functions Change equipment.
Embodiment one
Fig. 1 is the flow chart of transformer station's dispatching automation joint debugging method disclosed in the embodiment of the present application.
Seeing Fig. 1, described method may include that
Step S101: obtain the data message in transformer station's master control facility database, fill according to described master control Put the data message in database and carry out kinematic parameter setting, simulate described master control plant running;
It is understood that need in this step to obtain the number in current transformer substation master control facility database It is believed that breath, simulate the running status of master control device according to the data message in described database, enter at needs During the dispatching automation information joint debugging of row transformer station, can be directly by scheduling station and the described master control simulated The running status of device carries out joint debugging, thus the operation of described master control device will not be produced shadow when joint debugging Ring.
Step S102: gather the real time data of master control device and be transmitted to scheduling station;
Wherein, during the real time data of collection master control device described in this step mainly includes described in Real-time Collection The Real-time Power Flow data of control device, described enforcement flow data includes: master control fills the various electricity centered Tolerance (value such as voltage on circuit, electric current, power) and load uncertainty etc., get described in real time After flow data, more described Real-time Power Flow data are forwarded to scheduling station, complete in " four is distant " " remote measurement ";
Step S103: obtain the command information that scheduling station issues, and judge the data of described command information Type;When the data type judging described command information is remote control execution instruction, perform step S104;
Wherein, in performing this step, the instruction issued by scheduling station is also believed by disclosed method The data type of breath judges, when the instruction type described command information being detected is that remote control performs instruction Time, i.e. show that the most described scheduling station is performing instruction to the described remote control of execution of described control device, should Remote control performs instruction major control master control device and carries out divide-shut brake action, and feedback performs result, due to such as Fruit uses described master control device perform this instruction and generate feedback result transformer station can be caused to occur entirely standing power-off Phenomenon, therefore, is judging that described command information is, after remote control performs instruction, to hold in the application said method Row step S104;
Step S104: according to the data message in the database of the master control device obtained and described command information Mate, according to matching result to scheduling station feedback message information.
Wherein, this step can be: resolve described command information obtain control object information, it is judged that described in obtain Whether the data message in the database of the master control device taken comprises described control object information, if raw Become the first message information to be fed back to described scheduling station, otherwise generate the second message information and be fed back to described tune Degree main website.
Wherein, the data message in the database of the master control device of described acquisition includes described master control device control The information of the control object of system, described control object is described remote control and performs holding of instruction divide-shut brake action Row object, such as, the control object of command information described in this step is A, and the execution action of described A is Open a sluice gate, then the data message in the database of the master control device of described acquisition judges whether to control Whether object A, described A can carry out switching-off action, if in the database of the master control device of described acquisition Data message exists control object A, and described A can be performed switching-off action, then main to described scheduling Feedback of standing represents the first message information that command information is correct, otherwise, represents to described scheduling station feedback Second message information of command information mistake, it is to be understood that after above-mentioned steps is finished, can Abandon this command information.
Visible by foregoing description, use method disclosed in the above embodiments of the present application to transformer station's scheduling certainly During dynamicization joint debugging, first obtain the data message in transformer station's master control facility database, according to described master control Data message in facility database carries out kinematic parameter setting, simulates described master control device, when described tune When the command information that degree main website sends is remote control execution instruction, it is not required to send extremely described command information Master control device, but directly described command information is resolved, obtain the control that this command information is corresponding Object information, it is judged that whether the data message in the control facility database of described acquisition includes described control Object information, if it is, if generating the first message information to be fed back to described scheduling station, otherwise give birth to The second message information is become to be fed back to described scheduling station.So that described remote control performs the instruction letter of type Breath need not be sent to described master control device, also can carry out transformer station's dispatching automation joint debugging, solve existing Technology needs the problem having a power failure of entirely standing when carrying out transformer station's dispatching automation joint debugging.
Fig. 2 is the flow chart of transformer station's dispatching automation joint debugging method disclosed in another embodiment of the application.
It is understood that see Fig. 2, the application said method can also include:
When the judged result of the data type of described command information is remote signals, perform step S105;
Step S105: simulate trip protection information according to described remote signals, and by the trip protection of simulation Information is sent to scheduling station.
Wherein, in method disclosed in the above embodiments of the present application, in described step S101, get After data message in described transformer station master control facility database, simulate described master control plant running, therefore When the type judging described command information is remote signals, simulate trip signal according to described command information, And described trip signal is fed back to scheduling station with message form.
It is understood that see Fig. 2, the application said method can also include:
When the data type judging described command information is remote control selection instruction, perform step S106;
Step S106: select instruction to send to master control device described remote control, obtain and send described master control Device selects the message of returning to school of instruction transmission to scheduling station according to described remote control, performs step S107;
Step S107: in the remote control sequence number returned to school described in judgement in message and described scheduling station database Whether remote control sequence number mates, and exports judged result, to verify the remote control sequence number in scheduling station database Correctness..
It is understood that the application said method is in data transmission procedure, special agreement can be used Or stipulations, such as 104 stipulations.When in said method, data transmission form is the form of 104 stipulations, Said method is after getting the command information that described scheduling station issues, it is judged that the number of described command information Can also include according to before type: judge whether described command information meets 104 rule schematas, if it is, Continue executing with, otherwise abandon this instruction.
Embodiment two
Fig. 3 is the structure chart of remote station disclosed in the embodiment of the present application.
Corresponding to said method, disclosed herein as well is a kind of should remote station 100 in aforementioned manners, Technical characteristic in remote station disclosed in said method part and the present embodiment can mutually be used for reference, described Remote station 100 may include that
Analogue unit 101, for obtaining the data message in transformer station's master control facility database, according to described Data message in master control facility database carries out kinematic parameter setting, simulates described master control plant running;
Data acquisition unit 102, for gathering the real time data of master control device and being transmitted to scheduling station;
Instruction acquisition unit 103, for obtaining the command information that scheduling station issues;
Judging unit 104, for judging the data type of described command information;
First processing unit 105, when the data type judging described command information is remote control execution instruction; Mate with described command information according to the data message in the database of the master control device obtained, foundation Matching result is to scheduling station feedback message information.
Fig. 4 is the structure chart of remote station disclosed in another embodiment of the application.
Corresponding with described method, remote station in the above embodiments of the present application, see Fig. 4, it is also possible to Including:
Second processing unit 106, is used for when the data type judging described command information is remote signals, Simulate trip protection information according to described remote signals, and the trip protection information of simulation is sent to scheduling Main website.
With or
3rd processes single tube 107, is that remote control selects instruction for working as the data type judging described command information Time, select instruction to send to master control device described remote control, obtain and send described master control device according to institute Stating remote control selects the message of returning to school of instruction transmission to scheduling station.
Wherein, the remote station in the above embodiments of the present application can in can be provided with that to be loaded with 104 stipulations soft The chip of part, the data transmission of the unit of above-mentioned remote station meets 104 stipulations.Now, institute State remote station and can also include a stipulations judging unit, be used for judging whether described command information meets 104 rule schematas, if it is, continue executing with, otherwise abandon this instruction.
Embodiment three
Fig. 5 is the structure chart of transformer station's dispatching automation joint debugging system disclosed in the embodiment of the present application.
Seeing Fig. 5, corresponding to described remote station, the present embodiment is opened and is disclosed the scheduling of a kind of transformer station certainly Dynamicization joint debugging system, including scheduling station 200, transformer station's master control device 300 and be arranged on described scheduling Remote station 100 between main website 200 and transformer station's master control device 300, wherein said remote station 100 can be for remote station 100 disclosed in the above-mentioned any one embodiment of the application.
Fig. 6 is the structure chart of transformer station's dispatching automation joint debugging system disclosed in another embodiment of the application.
See Fig. 6, between described remote station 100 and described master control device 300, scheduling station 200 Annexation can be: described remote station 100 first end is filled with transformer station master control by data/address bus Putting 300 to be connected, the other end passes sequentially through transformer station's router 4, Communication ray terminal 5, scheduling station route Device 6 is connected with described scheduling station 200.
In this specification, each embodiment uses the mode gone forward one by one to describe, and each embodiment stresses Being the difference with other embodiments, between each embodiment, identical similar portion sees mutually.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses The present invention.Multiple amendment to these embodiments will be aobvious and easy for those skilled in the art See, generic principles defined herein can without departing from the spirit or scope of the present invention, Realize in other embodiments.Therefore, the present invention is not intended to be limited to the embodiments shown herein, And it is to fit to the widest scope consistent with principles disclosed herein and features of novelty.

Claims (10)

1. transformer station's dispatching automation joint debugging method, it is characterised in that including:
Obtain the data message in transformer station's master control facility database, according in described master control facility database Data message simulate described master control device running status;
Gather the real time data of transformer station's master control device and be transmitted to scheduling station;
Obtain the command information that scheduling station issues, and judge the data type of described command information;
When the data type judging described command information is remote control execution instruction, according to the master control dress obtained Data message in the database put mates with described command information, main to scheduling according to matching result Stand feedback message information.
Transformer station the most according to claim 1 dispatching automation joint debugging method, it is characterised in that also Including:
When the data type judging described command information is remote signals, simulate according to described remote signals Trip protection information, and the trip protection information of simulation is sent to scheduling station.
Transformer station the most according to claim 1 dispatching automation joint debugging method, it is characterised in that also Including:
When the data type judging described command information is remote control selection instruction, select to refer to by described remote control Order sends to master control device, obtains and sends described master control device and select instruction to send according to described remote control Return to school message to scheduling station.
Transformer station the most according to claim 1 dispatching automation joint debugging method, it is characterised in that obtain After getting the command information that described scheduling station issues, it is judged that also wrap before the data type of described command information Include:
Judge whether described command information meets 104 rule schematas, if it is, continue executing with, otherwise lose Abandon this instruction.
5. a remote station, it is characterised in that including:
Analogue unit, for obtaining the data message in transformer station's master control facility database, according to described always Data message in control facility database simulates the running status of described master control device;
Data acquisition unit, for gathering the real time data of master control device and being transmitted to scheduling station;
Instruction acquisition unit, for obtaining the command information that scheduling station issues;
Judging unit, for judging the data type of described command information;
First processing unit, when the data type judging described command information is remote control execution instruction, sentences Disconnected described remote control performs the correctness of instruction, and sends corresponding to described scheduling station according to judged result Message.
Remote station the most according to claim 5, it is characterised in that also include:
Second processing unit, for when the data type judging described command information is remote signals, depends on Simulate trip protection information according to described remote signals, and it is main that the trip protection information of simulation is sent to scheduling Stand.
Remote station the most according to claim 5, it is characterised in that also include:
3rd processing unit, is used for when the data type judging described command information is remote control selection instruction, Select instruction to send to master control device described remote control, obtain and send described master control device according to described distant Control selects the message of returning to school of instruction transmission to scheduling station.
Remote station the most according to claim 5, it is characterised in that also include:
Stipulations judging unit, is used for judging whether described command information meets 104 rule schematas, if it is, Continue executing with, otherwise abandon this instruction.
9. transformer station's dispatching automation joint debugging system, it is characterised in that including: scheduling station, change Power station master control device and the telemechanical work being arranged between described scheduling station and transformer station's master control device Standing, wherein said remote station is the remote station described in claim 5-8 any one.
Transformer station the most according to claim 9 dispatching automation joint debugging system, it is characterised in that Described remote station the first end is connected with transformer station master control device by data/address bus, and the other end leads to successively Cross transformer station's router, Communication ray terminal, scheduling station router are connected with described scheduling station.
CN201410464334.4A 2014-09-12 2014-09-12 Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method Active CN104184215B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410464334.4A CN104184215B (en) 2014-09-12 2014-09-12 Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410464334.4A CN104184215B (en) 2014-09-12 2014-09-12 Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method

Publications (2)

Publication Number Publication Date
CN104184215A CN104184215A (en) 2014-12-03
CN104184215B true CN104184215B (en) 2016-08-24

Family

ID=51965048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410464334.4A Active CN104184215B (en) 2014-09-12 2014-09-12 Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method

Country Status (1)

Country Link
CN (1) CN104184215B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105554454B (en) * 2015-12-15 2018-07-13 成都交大光芒科技股份有限公司 Disconnecting switch visualizes Remote monitor and control system and method
CN105978152B (en) * 2016-06-21 2018-05-04 国网福建省电力有限公司 A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN109191082B (en) * 2018-09-18 2022-08-19 广东电网有限责任公司 Programming method and system of scheduling platform and computer readable storage medium
CN110021995A (en) * 2019-01-30 2019-07-16 国网浙江宁波市鄞州区供电有限公司 A kind of distribution network automated information joint debugging emulation test system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6795789B2 (en) * 2001-05-21 2004-09-21 Omnicron Electronics Corp. Usa System for testing of intelligent electronic devices with digital communications
CN103545917A (en) * 2012-07-12 2014-01-29 吉林省电力有限公司四平供电公司 Scheduling-automation sub-station simulation system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007179309A (en) * 2005-12-28 2007-07-12 Nec Corp Debug system for grid environment, grid service management device, debug method and program

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6795789B2 (en) * 2001-05-21 2004-09-21 Omnicron Electronics Corp. Usa System for testing of intelligent electronic devices with digital communications
CN103545917A (en) * 2012-07-12 2014-01-29 吉林省电力有限公司四平供电公司 Scheduling-automation sub-station simulation system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
不停电进行变电站综自系统联调的方法;周耀辉;《电子设计工程》;20120131;第20卷(第2期);第78-80页 *
监控系统不停电遥控联调方案探讨;唐晓玲等;《机电信息》;20121231(第33期);第17,19页 *
调度自动化主站与变电站远动设备调试相关问题的研究;王洪哲等;《全国城市供用电自动化及电力通讯应用技术论文集》;20050127;第106-109页 *

Also Published As

Publication number Publication date
CN104184215A (en) 2014-12-03

Similar Documents

Publication Publication Date Title
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN103123758B (en) A kind of dispatching automation numeral physical mixed simulation training system
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN105445601B (en) A kind of current transformer interface test device and method
CN105302121A (en) Sequential control operation order automatic anti-error check method based on simulation IED device
CN106026087B (en) Fault scenes analogy method containing distributed power distribution network
CN106329730A (en) Substation monitoring information automatic acceptance system based on intelligent power grid scheduling system
CN108020742A (en) The live Auto-Test System and method of distribution feeder automation
CN104184215B (en) Transformer station's dispatching automation joint debugging method and the Apparatus and system of application the method
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
EP2930634A2 (en) System and method for automated substation design and configuration
CN110784020A (en) Automatic checking and accepting equipment, system and method for monitoring information
CN204291050U (en) A kind of dispatching and monitoring information check system
CN102768705A (en) IEC (International Electrotechnical Commission) 61968-based power distribution network model interoperation and functional verification method
CN103905275A (en) Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN105262220A (en) Method and system for checking telecontrol information of intelligent gateway machine of transformer station
CN105207366A (en) IEC61850-based power distribution terminal, namely plug and play model configuration tool and realization method of IEC61850-based power distribution terminal
CN109217472A (en) A kind of monitoring information verification automated closed-loop joint debugging method
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN103676669B (en) The check method of a kind of telecontrol information and nucleus correcting system
CN103699760B (en) A kind of multilayer closed-loop main station detection data source simulation method
Li et al. Factory acceptance test of a five-terminal MMC control and protection system using hardware-in-the-loop method
CN104600848B (en) A kind of transformer station process layer virtual secondary equipment and its implementation
CN106909615B (en) Method and device for verifying data information consistency between master station and substation
CN105405334A (en) Power distribution automation system and simulation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 315000 185 Huifeng East Road, Yinzhou District, Ningbo, Zhejiang

Co-patentee after: State Grid Corporation of China

Patentee after: Yinzhou District power supply Co., Ltd., Ningbo City, Zhejiang, China

Co-patentee after: Ningbo Power Supply Company of State Grid Zhejiang Electric Power Company

Address before: 315100 185 Huifeng East Road, Yinzhou District, Ningbo, Zhejiang

Co-patentee before: State Grid Corporation of China

Patentee before: State Grid Zhejiang Ningbo City Yinzhou District Power Supply Company

Co-patentee before: Ningbo Power Supply Company of State Grid Zhejiang Electric Power Company

CP03 Change of name, title or address