CN104166920A CN201410304694.8A CN201410304694A CN104166920A CN 104166920 A CN104166920 A CN 104166920A CN 201410304694 A CN201410304694 A CN 201410304694A CN 104166920 A CN104166920 A CN 104166920A
Authority
CN
China
Prior art keywords
management
bid
client
bidding
service
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410304694.8A
Other languages
Chinese (zh)
Inventor
吴克河
朱亚运
吴金水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
JIANGSU HUADA TIANYI ELECTRIC POWER SCIENCE & TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HUADA TIANYI ELECTRIC POWER SCIENCE & TECHNOLOGY Co Ltd filed Critical JIANGSU HUADA TIANYI ELECTRIC POWER SCIENCE & TECHNOLOGY Co Ltd
Priority to CN201410304694.8A priority Critical patent/CN104166920A/en
Publication of CN104166920A publication Critical patent/CN104166920A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an online bidding method and a system. The system comprises eight subsystems which are basic management system, a business standard management system, an information management system, a bidding process management system, a business support management system, a monitoring management system, a statistic analysis system, and a comprehensive inquiry system. The online bidding system overcomes the problems of low efficiency and high cost, increases the bidding efficiency, reduces the resource consumption, reduces the human factor, and play a positive role of establishing an incorrupt government and preventing corruption. The development mode configured in the invention realizes one-time development for multiple uses, which reduces the cost of system development, unites and standardizes the bidding process and effectively utilizes the related resources.

Description

A kind of online bidding method and system
Technical field
The present invention relates to a kind of online bidding method and system, belong to online service field.
Background technology
Bid is a kind of competitive procurement mode generally adopting in a plurality of industries such as construction project, its be widely used in that holding of bulk supply tariff dealing, engineering construction project given out a contract for a project and the buying of service item with field is provided etc.Because this mode meets market moving law, contribute to fair competition, and make preferentially to become possibility at a low price, so obtained promoting on a large scale.Yet, from current performance, also exist the problem such as length, local protectionism interference of, transaction path numerous and diverse such as bid flow process.Along with being gradually improved of development, continuous development of the reform and the relevant laws and regulations of China's economy, how to raise the efficiency better and to reduce transaction cost, in bid and tender for construction project field, reduce the impact of human factor as far as possible, make Bidding Mode be able to healthy operation, be problem demanding prompt solution always.
Development along with information network technique, electronization bid is as a kind of operator scheme of convenient, efficient, transparent, environmental protection, take advanced computer technology as support, take internet as platform, electronic information technology and traditional Bidding Mode are effectively combined, realize that project for bidding is put on record, call for tender issue, bidding document is made with sell, the electronic management of the bid overall process such as tender documents making and submission, experts' evaluation, generation report on the evaluation of tenders, thereby standard bid transaction and supervise bidding and tendering process effectively.Therefore, using computer information technology to transform traditional bid form, carry out e-bidding and submit a tender, is further effective the standard open, fair and impartial and sincere order of inviting and submitting bids, change the industry development mode of inviting and submitting bids, promote that industry is healthy, the inexorable trend of scientific development.
Many benefits based on electronic bid, in recent years, each government unit, enterprise-like corporation all dispose the Tender System of oneself at active development, when promoting bid business electronization, also exposed many problems.On the one hand, the Tender System existing at present adopts traditional application deployment pattern mostly, thisly take each enterprise use pattern that be unit, discrete type, but often make that enterprise is faced with that hardware device expense too expensive such as software licensing card expense, carrying running software is too huge, the maintenance of software and the data that produce thereof and the problem such as back-up job cost expense is excessive, in medium and small sized enterprises, it is particularly outstanding that this problem seems.On the other hand, for software vendor, the software application pattern of this discrete type, the variety of issue that occurs in the face of in the client's of each family individual requirement and system operational process of having to, has caused huge sale and maintenance cost for it.
Therefore, be necessary to study a kind of configurable software system that can " primary development, repeatedly application ", can to system, be configured according to enterprise customer's demand, to it, provide service.In addition, provider is that information-based needed all network infrastructures and software and hardware running platform are built by enterprise, and be responsible for all enforcement in early stages and the maintenance service work in later stage, final software systems belong to supplier, by it, to enterprise customer, provide software service.Under this software pattern, do not need to buy software and hardware, build machine room, recruit IT maintainer, can pass through internet use infosystem, realized the product customization of software to the transformation of third party's service.This novel software service mode has all been done to a large amount of research and practice work both at home and abroad, the application software such as online crm system, online office system have been developed, can effectively solve the problem existing in above-mentioned traditional software use pattern, but aspect Tender System, not yet carry out effective research work.
Summary of the invention
Goal of the invention: the present invention proposes a kind of online bidding method and system, has solved bid under enterprise's line on the one hand and has taken time and effort, the problem that the transparency is poor; Solved on the other hand Enterprise Informatization system research and development input high, the problem that final-period management maintenance cost is large.
Technical scheme: the technical solution used in the present invention is a kind of online bidding method and system,
1. Technical Design principle
Mature and stable Analyzing on Building A Planning Scheme can guarantee system stability, safety, operation at a high speed, and user can experience high-performance, convenient, operating process efficiently.Wherein, system architecture be ensure application system can be normally, the key of stable operation.In carrying out online bidding systems technology solution design process, follow following 6 principles:
(1) merge adaptability principle
The design of system architecture must be followed and merge the principle adapting to, in system architecture, the deployment of each assembly should take into full account to Integrated Solution technical policy and the principle that online bidding system is relevant, the online bidding system that assurance is built up can be on tender agent's existing system smoothness run, realize the tight fusion with related service application.
(2) safe reliability principle
System architecture design must be followed the principle of reliability, should as much as possible reduce the generation that causes the phenomenon that regular traffic cannot normally carry out because of information infrastructure fault in design.
(3) advanced and mature type principle
System architecture design should have product and technical advance, and product of the future and technology are the assurances of system in future performance.In today of infotech develop rapidly, the product that we select and technology should have certain perspective, can adapt to the needs that following a period of time business demand and technical development change.Meanwhile, take into account as far as possible product and the maturity of technology, strengthen the resistance to overturning of information infrastructure.
(4) open and can expand principle
System architecture design should be selected open technology, meets between system the needs of information interaction flexibly.Meanwhile, take into full account extensibility, meet business and technical need that development changes.
(5) unified standardization principle
System architecture design should be adhered to standardized principle, adopts generally acknowledged industry or the technical standard of industry, reduces management complexity.Meanwhile, the principle of persisting in reunification, all similar information infrastructure in whole system should adopt unified standard as far as possible.
(6) economy principle
System architecture design must be practical, economical, should utilize existing resource as far as possible, adheres to rational investment under advanced person, high-performance prerequisite, to obtaining maximum economic benefit and social benefit under the prerequisite in cost the best.
2. the overall construction scheme of framework
This online bidding system is a complex computer system platform that relates to client and multistage server, multi-tier Heterogeneous network system, except carrying out information and service interaction with various information basic platform, also must and other operation system between carry out information sharing and service interaction.
From system module, divide, system is divided into basic management, traffic criteria management, information management, bid process management, business support management, supervision and management, statistical study, eight subsystems of comprehensive inquiry, and the main construction content of each subsystem is as follows:
Service basic ADMINISTRATION SUBSYSTEM: comprise the platform base deploy contents such as CA management, personnel arrangement management, rights management, workflow management, message management.
Traffic criteria ADMINISTRATION SUBSYSTEM: comprise the traffic criteria organize content such as bid Template Manager, decline mark L. A. Template Manager, model agreements setting, bid link time limit setting, system code management.
Information management subsystem: comprise the public information organize content such as evaluation expert base management, bid inviter's library management, project manager's library management, bid inviter storehouse.
Bid process management subsystem: comprise the bid Whole Course Management such as bid preparation, bid, bid, open sealed tenders, calibration, allocation function, electronic signature.
Business support ADMINISTRATION SUBSYSTEM: comprise the contents such as the management of assessment of bids chamber, expenses management, all planning management, bid situation report-back.
Supervision and management subsystem: realize the supervision and management of whole e-bidding overall process, for aufsichtsrat provides supervision passage.
Statistical study subsystem: can be by the conjunctive query of many conditions and statistics such as tissue, time cycle, procurement methods, provide the statistics of closing the indexs such as rule rate about project process and efficiency, procurement value and joint tariff, project, statistics pattern exhibiting.
General subsystem of integrated query: the query function to each business datum of e-bidding management system is provided, meets different tissues, different post, different personnel's query demand.
As shown in Figure 1.
3. Technical Architecture scheme
The overall framework of the technical scheme of this online bidding System Implementation mainly comprises 6 aspect main contents as shown in Figure 2.
Wherein, application architecture is that the higher layer applications function that online bidding system is carried out is divided, instruct whole system to build and implement, application architecture is set up based on business structure and industry best practice, is the basis of online bidding entire system technical solution.Application architecture mainly comprises: function division, integrated relationship and deployment mode three aspects: main contents.
Integrated architecture has provided online bidding system at the integrated technology route how representing on layer, data Layer and flow process layer with other information system platform assemblies and the application of other related services.Instruct the over all Integration work of online bidding system.
Security architecture is that protecting information safety ability and the technology reply means that under information security overall framework, to online bidding system, should possess design.The running that ensures online bidding system is safe and reliable.
Carry out framework and provided online bidding system applies needed technology component when operation.Comprise physical topology, high available solutions and expansion scheme, physical resource capacity plan etc.The execution framework of online bidding system should take into full account the configurability feature of system applies and the governing principle that existing software and hardware resources is integrated.
Work when development environment refers to support analysis, design, exploitation and maintenance service system and the work of related management flow process.Therefore, the scope of design of development environment has comprised project analysis, has designed, built and has tested required instrument and step, and the rule of system development and quality assurance and standard.
The management objectives of O&M environment are all parts in production environment, or are the constituent of carrying out in framework specifically, have comprised the contents such as environment, hardware, operating system, system software, network.O&M environment, from instrument angle, comprises the system tools such as monitoring, backup recovery; From flow process angle, it has comprised the key operation flow processs such as daily servicing, fault recovery; From Perspective of organization, it comprises O&M team and corresponding responsibility and examination.All parts within the scope of the necessary unified management O&M of O&M management tool, flow process and organizational structure, and can not be only towards independent parts.
Beneficial effect: the 1. implementation of online bidding system and application, overcome the drawback that traditional bid mode efficiency is low, cost is high, promoted bid efficiency, reduce know clearly resource consumption and purchase cost, reduced the impact of human factor, simultaneously to sparing no efforts to build a clean and honest government and growing etc. of preventing corruption all played positive role.
2. adopt configurable development mode, realized " primary development, repeatedly application ", reduced system development costs, unified standard bid flow process, high effective integration has utilized related resource.
3. by traditional software customized, change the pattern that has third-party vendor that software service is provided as required into, reduce the capital input of enterprise in Project-developing process, because supplier monthly charges according to the service providing, be also convenient to the estimation of enterprise to organizational system cost.In addition, there is supplier to unify maintenance and management to system, also reduced the maintenance management cost of enterprise for traditional deployment software.
Accompanying drawing explanation
Fig. 1 is operational flowchart of the present invention;
Fig. 2 is the process flow diagram of open bidding.
Embodiment
Below in conjunction with the drawings and specific embodiments, further illustrate the present invention, should understand these embodiment is only not used in and limits the scope of the invention for the present invention is described, after having read the present invention, those skilled in the art all fall within the application's claims limited range to the modification of various equivalents of the present invention.
As shown in Figure 1, online bidding method of the present invention comprises the following steps:
Step 1, starts to build online bidding service;
Step 2, obtains user's request.Client is carried out to requirement investigation, analyze the demand that client proposes, form requirement analysis report, client's reasonable demand is met to response, to carrying out further negotiation with demand unreasonable or that do not conform to rule with client, revise;
Step 3, is configured system according to customer demand.According to user's request, outside bid trunk flow process, additional customer personalized flow process, and additional function modules, vocabulary definition etc. are configured;
Step 4, shows system after configuration to client, and is confirmed whether to meet customer need.After system demonstration, confirm whether the systemic-function flow process of configuration meets consumers' demand, or whether user increase new demand according to existing system, if meet, continued follow-up work, if do not meet, modification and perfection system configuration, meets customer need;
Step 5, user charges registration management account.After client pays, can Accreditation System manage account, this account can operate institute's configuration-system, and further registers other associated user's account, also can for example, to the account (supplier's account) of registering, manage maintenance in self configuration-system;
Step 6, provides online bidding service to client.To the service of client's open system, and system is carried out to maintenance management, client can utilize the online bidding service that native system provides to complete the bid and purchase task of our company;
Step 7, client utilizes online bidding system to carry out bid procurement business.Client utilizes the online bidding service of distributing to self, purchases bid business;
Step 8, customer issue feedback, reasonably deals with in time to problem.Client feeds back the problem occurring in online bidding system service operational process, system maintenance personnel analyze and form solution feedback problem in time, solve problem the issue resolution status that upgrades in time occurring as far as possible, in the meantime, carry out the communication and consultation work with client;
Step 9, customer satisfaction survey.Client is investigated the satisfaction of provided online bidding service, analyze and form survey report;
Step 10, adjusts service plan.For customer satisfaction survey, the problem wherein occurring is analyzed after summary, service plan is carried out to suitable adjustment, promote to greatest extent service satisfaction;
Step 11, finishes online bidding service.
According to national relevant laws and regulations, first realize the necessary trunk flow process of bid, specifically as shown in Figure 2:
Step 1, starts project for bidding;
Step 2, project entity proposes bid application.Legal person is according to self procurement demand in bid, to relevant departments, proposes and submit bid application;
Step 3, project manager or agency specify bid plan and definite project for bidding essential information, and issue.The agency that project for bidding manager or enterprise entrust, according to procurement demand, specifies bid plan, and fills in the essential information of confirming project for bidding, and externally issue, for follow-up bidding work provides information foundation;
Step 4, establishment bidding document, prequalification file.According to the requirement of project for bidding demand He Dui company qualification, delivered product specification quality, formulate bidding document and prequalification file.
Step 5, prequalification.After supplier's registration, tenderer or agency need to carry out preliminary prequalification to supplier, and audit is by enough, and supplier just can obtain bidding document etc., and carries out follow-up bidding and reply work;
Step 6, supplier obtains bidding document and replys bid.After prequalification is passed through, supplier obtains bidding document, according to bidding document, requires to write tender documents, bid is replied, and can propose to clarify addendum etc.
Step 7, opening of bid.After replying expired date, carry out opening of bid work;
Step 8, the assessment of bids.After opening of bid, according to assessment of bids index and the tender Evaluation Method of appointment, by relevant expert, each bid supplier is given a mark, and calculate final each supplier's assessment of bids score of acquisition;
Step 9, successful tenderer, and issue, notify bid winner.According to assessment of bids score, determine final acceptance of the bid supplier, acceptance of the bid result is published, and the relevant acceptance of the bid of notice supplier;
Step 10, bid main flow finishes.
Due to enterprise in scope of the enterprise, main business, mainly purchase the aspects such as goods and materials kind and have larger difference, therefore, complete on the basis of main flow correlation function module, need to analyze the demand that enterprise may exist, realize personalized function module, finally, according to enterprise practical demand, configuration associated rights, meets enterprise's bid procurement demand to greatest extent.
A kind of online bidding system comprises: this online bidding system is a complex computer system platform that relates to client and multistage server, multi-tier Heterogeneous network system, except carrying out information and service interaction with various information basic platform, also must and other operation system between carry out information sharing and service interaction.
From system module, divide, system is divided into basic management, traffic criteria management, information management, bid process management, business support management, supervision and management, statistical study, eight subsystems of comprehensive inquiry, and the main construction content of each subsystem is as follows:
Service basic ADMINISTRATION SUBSYSTEM: comprise the platform base deploy contents such as CA management, personnel arrangement management, rights management, workflow management, message management.
Traffic criteria ADMINISTRATION SUBSYSTEM: comprise the traffic criteria organize content such as bid Template Manager, decline mark L. A. Template Manager, model agreements setting, bid link time limit setting, system code management.
Information management subsystem: comprise the public information organize content such as evaluation expert base management, bid inviter's library management, project manager's library management, bid inviter storehouse.
Bid process management subsystem: comprise the bid Whole Course Management such as bid preparation, bid, bid, open sealed tenders, calibration, allocation function, electronic signature.
Business support ADMINISTRATION SUBSYSTEM: comprise the contents such as the management of assessment of bids chamber, expenses management, all planning management, bid situation report-back.
Supervision and management subsystem: realize the supervision and management of whole e-bidding overall process, for aufsichtsrat provides supervision passage.
Statistical study subsystem: can be by the conjunctive query of many conditions and statistics such as tissue, time cycle, procurement methods, provide the statistics of closing the indexs such as rule rate about project process and efficiency, procurement value and joint tariff, project, statistics pattern exhibiting.
General subsystem of integrated query: the query function to each business datum of e-bidding management system is provided, meets different tissues, different post, different personnel's query demand.
As shown in Figure 1.
3. Technical Architecture scheme
The overall framework of the technical scheme of this online bidding System Implementation mainly comprises 6 aspect main contents as shown in Figure 2.
Wherein, application architecture is that the higher layer applications function that online bidding system is carried out is divided, instruct whole system to build and implement, application architecture is set up based on business structure and industry best practice, is the basis of online bidding entire system technical solution.Application architecture mainly comprises: function division, integrated relationship and deployment mode three aspects: main contents.
Integrated architecture has provided online bidding system at the integrated technology route how representing on layer, data Layer and flow process layer with other information system platform assemblies and the application of other related services.Instruct the over all Integration work of online bidding system.
Security architecture is that protecting information safety ability and the technology reply means that under information security overall framework, to online bidding system, should possess design.The running that ensures online bidding system is safe and reliable.
Carry out framework and provided online bidding system applies needed technology component when operation.Comprise physical topology, high available solutions and expansion scheme, physical resource capacity plan etc.The execution framework of online bidding system should take into full account the configurability feature of system applies and the governing principle that existing software and hardware resources is integrated.
Work when development environment refers to support analysis, design, exploitation and maintenance service system and the work of related management flow process.Therefore, the scope of design of development environment has comprised project analysis, has designed, built and has tested required instrument and step, and the rule of system development and quality assurance and standard.
The management objectives of O&M environment are all parts in production environment, or are the constituent of carrying out in framework specifically, have comprised the contents such as environment, hardware, operating system, system software, network.O&M environment, from instrument angle, comprises the system tools such as monitoring, backup recovery; From flow process angle, it has comprised the key operation flow processs such as daily servicing, fault recovery; From Perspective of organization, it comprises O&M team and corresponding responsibility and examination.All parts within the scope of the necessary unified management O&M of O&M management tool, flow process and organizational structure, and can not be only towards independent parts.
(1) bid schedule module
Bid and purchase type comprises goods, engineering and service, for goods buying intensive enterprise, needs to build bid schedule module, and this module comprises that bid plan is set up, goods and materials gather, generates the functions such as project for bidding.First by department of subordinate, generate bid plan, the buying goods and materials that propose for multi-service group gather rear submission higher level department to be examined.Higher level department, after the bid plan of receiving department of subordinate, examines, and Bing Yu this department calculated buying goods and materials that self call for bid gather, continue to report, the like.Finally, enterprise procurement plan reports purchasing department, and purchasing department gathers goods and materials according to all bid and purchase plans, and generates project for bidding accordingly, carries out bidding work.
And for engineering or services procurement intensive enterprise, often do not need so complicated goods and materials plan aggregation process but directly specify project for bidding, concrete purchase engineering or service are set in project essential information, therefore do not need the schedule module that calls for bid.Therefore, this module, as additional function, is configured according to customer demand.
(2) material master data module
Equally, for goods buying intensive enterprise, the goods and materials of each buying have very large repeatability, if each counterpoise copy back enters material information, waste time and energy.Therefore need to build material master data module, the material information of enterprise procurement is carried out to unified maintenance and management, each buying only need be chosen correlative and fill in a small amount of information (as purchase quantity etc.) from this module.And for engineering or services procurement intensive enterprise, without subfunction.Therefore, this module also will be configured according to customer demand.
2. functions of modules item configurability
In each functional module partial function details, can be configured according to customer demand, specific as follows:
(1) project for bidding layer of structure
According to the actual investigation of many companies, finding,, when project being carried out to level division, there is two kinds of double-layer structure and three-deckers in project for bidding project initiation phase, and wherein double-layer structure comprises project, bag, and three-decker comprises project, mark, bag.Owing to drawing with different levels difference, subsequent project management and bid flow process are all had to impact, therefore, this part is as configuration feature.When client needs double-layer structure, be configured rear project project initiation phase and subsequent process and all with double-layer structure, carry out functional configuration, needing three-decker is in like manner can obtain.
(2) node type branch
When guaranteeing trunk bid flow process, at fine granularity Nodes, there is type selecting, these select also will have influence on bid fine granularity flow process.Comprise and adopt open bidding still to invite, whether prequalification file needs to buy, and whether bidding document needs to buy, and whether the assessment of bids Committee of Experts divides into groups to set up etc., and these, reasonably configure according to customer requirement all by Configuration.
3. the setting in storehouse
In bid flow process, all there is larger difference in each company to the demand of various masterplates, tender Evaluation Method, therefore, need to set up template base, tender Evaluation Method storehouse, and for no customer demand, distribute corresponding masterplate and tender Evaluation Method.
(1) template base
In bid flow process, need to write heap file, for standardized management, Mei Jia enterprise can set corresponding masterplate for certain class file, and the realization of template base is exactly for convenience of enterprise, to select to be applicable to the document template of oneself requirement.
By file type, in template base, there is bulletin masterplate, supplier's qualification preliminary hearing masterplate, expert's qualification examination masterplate, note masterplate, assessment of bids preliminary assessment masterplate, the auspicious version of discussing and select model workers of the assessment of bids.System is all set multiple format to the template of each type, and client selects according to self-demand the template type needing on the one hand, on the other hand, can select the sample format existing in every class template, and system maintenance personnel will be configured according to customer demand.
(2) assessment of bids index storehouse
When carrying out the assessment of bids, need to set up certain assessment of bids index, expert gives a mark to supplier for index, obtains supplier evaluation basis score data.
System is set up many cover assessment of bids indexs, and client selects according to self-demand.In addition, can open self defined interface, client can, on the basis of existing index set, increase assessment of bids index.
(3) tender Evaluation Method storehouse
Assessment of bids main method comprises minimum Bid Evaluation Price method, comprehensive scoring method, cost performance method, and system realizes the multiple tender Evaluation Method that comprises above-mentioned three kinds of methods, for customer selecting.
In addition, for each tender Evaluation Method, the weight setting of assessment of bids index is crucial, and system arranges multiple weight method to set up, and concrete grammar and implementation process are as follows:
1) Delphi method
Delphi method, its feature is to concentrate expert's experience and suggestion, determines each index weights, and constantly in feedback and modification, is obtaining satisfied result.Basic step is as follows:
1. select expert.In anthology professional domain, existing practical work experience has again the expert 10-30 people left and right of darker theoretical preparation.The rule of the n of a weight undetermined index and interrelated data and definite weight is issued to selected every expert, please they provide independently the weighted value of each index.
2. regain result, and calculate average and the standard deviation of each index weights.
3. the result of calculating and updates are returned to every expert, require all experts to redefine weight on new basis.
4. repeat the above-mentioned second and the 3rd step, until the deviation of each index weights and its average is no more than standard given in advance, namely each expertise reaches unanimity substantially, usings the average of each index weights now as the weight of this index.
2) VC Method
The coefficient of variation is the statistic of measurement data difference conventional in statistics, and the method is come it to compose power in all degree of variation sizes that are evaluated observed reading on object according to each index.The ultimate principle of VC Method is that the index that degree of variation is larger is just larger on the impact of evaluating, and weight size has embodied the size of index resolution characteristic.For avoiding dimension the brought impacts different from the order of magnitude of index, the numerical value after the method is directly used VC Method to process is as the weight of each index.
Suppose to have m item Evaluation of Investment-Benefit index, have n area power grid evaluation object, X is raw data matrix, wherein x ijbe the numerical value of j index of i object.
1. calculate the standard deviation of each index, reflect the absolute degree of variation of each index. s in formula jthe standard deviation that represents j index.
2. calculate the coefficient of variation of each index, reflect the relative variability degree of each index.
3. the coefficient of variation of each index is normalized, obtains the weight of each index.
w j = V j / Σ j = 1 m V j
3) entropy power method
In information theory, entropy is measuring of the unordered degree of system, the effective information can metric data providing.Entropy power method is exactly the method that the size that is transferred to decision maker's quantity of information according to each index is determined index weights.The difference of a certain index is larger, and entropy is less, this index comprise and the information transmitted more, respective weights is larger.According to information-theoretical definition, the quantity of information I of i the signal transmitting in an information channel i=-lnp i, p iit is the probability that this signal occurs.Therefore,, if there be n signal, the probability of its appearance is respectively p 1, p 2..., p n, the average information of this n signal, entropy is
Entropy power method is composed power and is divided into following step:
1. hypothesis is evaluated n area power grid sample by m Evaluation of Investment-Benefit index, x ijbe sample i (i≤n) with respect to the predetermined value of attribute j (j≤m), form original index data matrix
X=(x ij) n×m
2. (2) get the optimal value of each evaluation index if j direct index wherein, be the bigger the better; If j inverse indicators, the smaller the better.
3. (3) define x ijfor degree of approach D ij,
obtain matrix D=(D ij) n * m.
4. to D ijbe normalized:
d ij = D ij / Σ i = 1 n Σ j = 1 m D ij
Make 0≤d ij≤ 1, obtain matrix d=(d ij) m * n.
5. calculate the conditional entropy of evaluation index j:
E j = - Σ i = 1 n d ij d j ln d ij d j , Wherein d j = Σ i = 1 n d ij
6. use E maxto E jbe normalized, obtain representing the entropy of the importance of evaluation index j:
e ( d j ) = - 1 ln n E j = - 1 ln n Σ i = 1 n d ij d j ln d ij d j
7. by e (d j) determine the evaluation weights λ of evaluation index j j
λ j = 1 n - E g [ 1 - e ( d j ) ]
Wherein, and λ jmeet: 0≤λ j≤ 1,
4) multiplication synthetic method
Multiplication synthetic method is by VC Method, entropy weight coefficient, the multiple weight combined sequence of Delphi method, is about to the multiplied by weight of a certain index that multiple tax power method draws, is then normalized, and obtains combining weights.Suppose to have m index, the weight w that q kind method is tried to achieve, combining weights is:
θ j = ∏ k = 1 q w j ( k ) / Σ j = 1 m ∏ k = 1 q w j ( k ) , j = 1,2 , . . . m , k = 1,2 , . . . q
Wherein, θ jcombining weights for index.
5) adding combination method
If p j, q jthe x generating based on subjective enabling legislation and objective weighted model respectively iweight coefficient, claim x j=k 1p j+ k 2q j, j=1,2 ..., m
To there is the weight coefficient that simultaneously embodies subjective and objective information integration characteristic.K in formula 1, k 2undetermined constant (k 1> 0, k 2> 0, and k 1+ k 2=1).
Obviously, the key issue of adding combination method is undetermined coefficient k 1, k 2determine.Provide below by mathematical model and generate k 1, k 2method.
At this moment, be evaluated object s icomprehensive evaluation value be
y i = Σ j = 1 m w j x ij = Σ i = 1 n Σ j = 1 m ( k 1 p j + k 2 q j ) x ij
Value is maximum.
Existence satisfies condition k 1> 0, k 2> 0 time, application Lagrange conditional extremum principle, can obtain
k 1 = Σ i = 1 n Σ j = 1 m p j x ij / ( Σ i = 1 n Σ j = 1 m p j x ij ) 2 + ( Σ i = 1 n Σ j = 1 m q j x ij ) 2
k 2 = Σ i = 1 n Σ j = 1 m q j x ij / ( Σ i = 1 n Σ j = 1 m p j x ij ) 2 + ( Σ i = 1 n Σ j = 1 m q j x ij ) 2
This is also to embody the tax power method that is evaluated a kind of subjective and objective information comprehensive integration of (integral body) maximum difference between object.Certain k 1, k 2also can be determined by embodiment of evaluation person's preference information.
Especially, when getting k 1=k 2time, also can determine w with formula below j:
w j = ( p j + q j ) / Σ j = 1 m ( p j + q j ) , j = 1,2 , . . . , m
Certainly, if " smoothly " produce " difference " of (to being respectively evaluated object) because of objective and subjective synthetic approach, also can be at the k that satisfies condition 1+ k 2=1, k 1> 0,, k 2> 0 time, determines k 1, k 2, make
Σ i = 1 m y i 2 = Σ i = 1 n ( Σ j = 1 m ( k 1 p j + k 2 q j ) x ij ) 2
Value is minimum.
6) self-defined weights
Allow client according to self-demand, select the weights of self-defined each evaluation index.
Therefore, client can be by selecting evaluation indice, index weights method to set up, tender Evaluation Method to specify a set of Evaluating Bidding Model that meets oneself requirement, and more reasonably Dui Ge supplier evaluates.Native system will configure flexibly according to customer selecting.
4. authority resource management
For the configuration of above-mentioned three aspects:, need the support of authority resource management.System adopts by the mode of role assignments resource and authority, various rolls is set, for every kind of role gives corresponding authority.
For system users, according to the demand of its proposition, to it, give relative role associated permissions, its function services is provided as required.In addition, client can configure under this service, and each role who exists in self system, completes enterprise procurement bid task.

Claims (4)

1. an online bidding method, is characterized in that, comprises the following steps:
Step 1, starts to build online bidding service;
Step 2, obtains user's request.Client is carried out to requirement investigation, analyze the demand that client proposes, form requirement analysis report, client's reasonable demand is met to response, to carrying out further negotiation with demand unreasonable or that do not conform to rule with client, revise;
Step 3, is configured system according to customer demand.According to user's request, to the outer additional customer personalized flow process of bid trunk flow process, and additional function modules, vocabulary definition etc. are configured;
Step 4, shows system after configuration to client, and is confirmed whether to meet customer need.After system demonstration, confirm whether the systemic-function flow process of configuration meets consumers' demand, or whether user increase new demand according to existing system, if meet, continued follow-up work, if do not meet, modification and perfection system configuration, meets customer need;
Step 5, user charges registration management account.After client pays, can Accreditation System management account, this account can operate institute's configuration-system, and further registers other associated user's account, also can manage maintenance to the account of registering in self configuration-system;
Step 6, provides online bidding service to client.To the service of client's open system, and system is carried out to maintenance management, client can utilize the online bidding service that native system provides to complete the bid and purchase task of our company;
Step 7, client utilizes online bidding system to carry out bid procurement business.Client utilizes the online bidding service of distributing to self, purchases bid business;
Step 8, customer issue feedback, reasonably deals with in time to problem.Client feeds back the problem occurring in online bidding system service operational process, system maintenance personnel analyze and form solution feedback problem in time, solve problem the issue resolution status that upgrades in time occurring as far as possible, in the meantime, carry out the communication and consultation work with client;
Step 9, customer satisfaction survey.Client is investigated the satisfaction of provided online bidding service, analyze and form survey report;
Step 10, adjusts service plan.For customer satisfaction survey, the problem wherein occurring is analyzed after summary, service plan is carried out to suitable adjustment, promote to greatest extent service satisfaction;
Step 11, finishes online bidding service.
2. an online bidding system, is characterized in that, comprises basic management, traffic criteria management, information management, bid process management, business support management, supervision and management, statistical study, eight subsystems of comprehensive inquiry;
Basic management subsystem: comprise the platform base deploy contents such as CA management, personnel arrangement management, rights management, workflow management, message management;
Traffic criteria ADMINISTRATION SUBSYSTEM: comprise the traffic criteria organize content such as bid Template Manager, decline mark L. A. Template Manager, model agreements setting, bid link time limit setting, system code management;
Information management subsystem: comprise the public information organize content such as evaluation expert base management, bid inviter's library management, project manager's library management, bid inviter storehouse;
Bid process management subsystem: comprise the bid Whole Course Management such as bid preparation, bid, bid, open sealed tenders, calibration, allocation function, electronic signature;
Business support ADMINISTRATION SUBSYSTEM: comprise the contents such as the management of assessment of bids chamber, expenses management, all planning management, bid situation report-back;
Supervision and management subsystem: realize the supervision and management of whole e-bidding overall process, for aufsichtsrat provides supervision passage;
Statistical study subsystem: can be by the conjunctive query of many conditions and statistics such as tissue, time cycle, procurement methods, provide the statistics of closing the indexs such as rule rate about project process and efficiency, procurement value and joint tariff, project, statistics pattern exhibiting;
General subsystem of integrated query: the query function to each business datum of e-bidding management system is provided, meets different tissues, different post, different personnel's query demand.
3. online bidding system according to claim 2, is characterized in that, also comprises bid schedule module.
4. online bidding system according to claim 2, is characterized in that, also comprises material master data module.
CN201410304694.8A 2014-06-27 2014-06-27 Online biding method and system Pending CN104166920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410304694.8A CN104166920A (en) 2014-06-27 2014-06-27 Online biding method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410304694.8A CN104166920A (en) 2014-06-27 2014-06-27 Online biding method and system

Publications (1)

Publication Number Publication Date
CN104166920A true CN104166920A (en) 2014-11-26

Family

ID=51910716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410304694.8A Pending CN104166920A (en) 2014-06-27 2014-06-27 Online biding method and system

Country Status (1)

Country Link
CN (1) CN104166920A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463506A (en) * 2014-12-30 2015-03-25 宁波保税区攀峒信息科技有限公司 Demand docking system
CN105469287A (en) * 2016-01-18 2016-04-06 四川建设网有限责任公司 Engineering bidding quotation electronic data introduction system and method
CN105913295A (en) * 2016-04-01 2016-08-31 福建随行软件有限公司 Electronic bid inquiring method, system and tendering and bidding system
CN106327212A (en) * 2016-08-26 2017-01-11 安徽云图信息技术有限公司 Online bid inviting system
CN106355471A (en) * 2016-08-31 2017-01-25 天津京东智联科技发展有限公司 Bidding data processing method and system
CN106856592A (en) * 2015-12-08 2017-06-16 北京亿阳信通科技有限公司 Recruit shooting method and system
CN107369002A (en) * 2017-07-07 2017-11-21 邓华 Engineering project information processing method and system
CN107578222A (en) * 2017-10-24 2018-01-12 广东华伦招标有限公司 A kind of invitation system
CN108230084A (en) * 2017-11-20 2018-06-29 广东电网有限责任公司物流服务中心 A kind of tendered service platform
CN109658174A (en) * 2018-09-27 2019-04-19 深圳壹账通智能科技有限公司 Bidding and offering method, apparatus, equipment and computer readable storage medium
CN110544069A (en) * 2019-07-23 2019-12-06 成都同玩网络科技有限公司 Visual workflow enterprise management platform
CN112581209A (en) * 2020-11-17 2021-03-30 上海同在互联网科技有限公司 Highly configurable bid evaluation terminal and bid evaluation method
CN113222332A (en) * 2021-03-30 2021-08-06 海尔数字科技(青岛)有限公司 Bidding process configuration method and device, electronic equipment and storage medium
CN113435743A (en) * 2021-06-25 2021-09-24 北方实验室(沈阳)股份有限公司 Information-based engineering overall process data resource sharing system
CN113450196A (en) * 2021-06-29 2021-09-28 上海至贤工程管理咨询有限公司 Construction project online bidding and tendering management system with big data analysis function
CN115907935A (en) * 2023-01-09 2023-04-04 北京长城电子商务有限公司 Online auxiliary review system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101561895A (en) * 2008-04-16 2009-10-21 姜玉娟 Method for remote on-line invitation, submission, evaluation and supervision for bids in network
CN103425778A (en) * 2013-08-16 2013-12-04 国家电网公司 Intelligent development platform for database application system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101561895A (en) * 2008-04-16 2009-10-21 姜玉娟 Method for remote on-line invitation, submission, evaluation and supervision for bids in network
CN103425778A (en) * 2013-08-16 2013-12-04 国家电网公司 Intelligent development platform for database application system

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463506A (en) * 2014-12-30 2015-03-25 宁波保税区攀峒信息科技有限公司 Demand docking system
CN106856592B (en) * 2015-12-08 2020-10-02 北京亿阳信通科技有限公司 Method and system for recruiting
CN106856592A (en) * 2015-12-08 2017-06-16 北京亿阳信通科技有限公司 Recruit shooting method and system
CN105469287A (en) * 2016-01-18 2016-04-06 四川建设网有限责任公司 Engineering bidding quotation electronic data introduction system and method
CN105913295A (en) * 2016-04-01 2016-08-31 福建随行软件有限公司 Electronic bid inquiring method, system and tendering and bidding system
CN106327212A (en) * 2016-08-26 2017-01-11 安徽云图信息技术有限公司 Online bid inviting system
CN106355471A (en) * 2016-08-31 2017-01-25 天津京东智联科技发展有限公司 Bidding data processing method and system
CN107369002A (en) * 2017-07-07 2017-11-21 邓华 Engineering project information processing method and system
CN107578222A (en) * 2017-10-24 2018-01-12 广东华伦招标有限公司 A kind of invitation system
CN108230084A (en) * 2017-11-20 2018-06-29 广东电网有限责任公司物流服务中心 A kind of tendered service platform
CN109658174A (en) * 2018-09-27 2019-04-19 深圳壹账通智能科技有限公司 Bidding and offering method, apparatus, equipment and computer readable storage medium
CN110544069A (en) * 2019-07-23 2019-12-06 成都同玩网络科技有限公司 Visual workflow enterprise management platform
CN112581209A (en) * 2020-11-17 2021-03-30 上海同在互联网科技有限公司 Highly configurable bid evaluation terminal and bid evaluation method
CN113222332A (en) * 2021-03-30 2021-08-06 海尔数字科技(青岛)有限公司 Bidding process configuration method and device, electronic equipment and storage medium
CN113435743A (en) * 2021-06-25 2021-09-24 北方实验室(沈阳)股份有限公司 Information-based engineering overall process data resource sharing system
CN113435743B (en) * 2021-06-25 2023-09-01 北方实验室(沈阳)股份有限公司 Informationized engineering whole-process data resource sharing system
CN113450196A (en) * 2021-06-29 2021-09-28 上海至贤工程管理咨询有限公司 Construction project online bidding and tendering management system with big data analysis function
CN115907935A (en) * 2023-01-09 2023-04-04 北京长城电子商务有限公司 Online auxiliary review system

Similar Documents

Publication Publication Date Title
CN104166920A (en) Online biding method and system
Wang et al. Acquiring logistics process intelligence: Methodology and an application for a Chinese bulk port
US7991631B2 (en) Managing a multi-supplier environment
CN108898200A (en) The singulated system of intelligence, manufacturing schedule management system and its implementation, operating method
CN109189844A (en) A kind of inspection examining report business management system
US20080154753A1 (en) Shared financial service systems and methods
CN104881758A (en) ERP system capable of realizing integrated supply chain cooperative production and operation method thereof
Giaglis et al. It’s time to engineer re-engineering: investigating the potential of simulation modelling for business process redesign
US20160267250A1 (en) Method and System for Managing and Tracking Medical and Legalized Marijuana
CN114816591A (en) Service interface processing method and device, computer equipment and storage medium
CN109447497A (en) A kind of PROJECT TIME estimates management method and system
CN108876577A (en) The system that multilingual mobile visualization collects processing information
JP2003288476A (en) Line capacity integrated evaluation/management operation system for production line and line capacity integrated evaluation/management operation method for the production line
Ladeira Cost estimation methods for software engineering
Luo et al. Value analysis framework for RFID technology adoption in retailers in China
CN101609532A (en) Allocation criterion collocation method and system in the application system
Yang et al. The design of printing enterprise resources planning (ERP) software
Wu et al. Application of virtual network mapping algorithm based on optimal Subnet in enterprise cost accounting platform
Barra Montevechi et al. A simulation-based approach to perform economic evaluation scenarios
CN110807583A (en) Configurable ERP role authority verification system and method based on RBAC
Chang et al. WPG holdings: Electronic integration of supply chain network
Kardan et al. An investigation of the processes of IT management
Robson Computable general equilibrium modelling for urban transport planning and appraisal
Mimura et al. Linking business strategies and system demands using GQM+ Strategies and Systems Modeling Language
CN101350080A (en) Method and system for product quotation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170215

Address after: 102206 Beijing city Changping District Zhu Daxinzhuang North Agricultural Road No. 2

Applicant after: North China Electric Power University

Address before: Shishi Fuda Road Park 212000 city of Jiangsu Province, Zhenjiang Jurong Economic Development Zone, building 02, room 315

Applicant before: Jiangsu Huada Tianyi Electric Power Science & Technology Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141126