CN104143123A - Equipment alarm management method applied to package test production line - Google Patents

Equipment alarm management method applied to package test production line Download PDF

Info

Publication number
CN104143123A
CN104143123A CN201310163140.6A CN201310163140A CN104143123A CN 104143123 A CN104143123 A CN 104143123A CN 201310163140 A CN201310163140 A CN 201310163140A CN 104143123 A CN104143123 A CN 104143123A
Authority
CN
China
Prior art keywords
packaging
equipment
testing
production line
warning message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310163140.6A
Other languages
Chinese (zh)
Inventor
王宏
敖鹏蛟
林跃
康凯
姬小兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Zhongke Bowei Automation Technology Co Ltd
Original Assignee
Shenyang Zhongke Bowei Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Zhongke Bowei Automation Technology Co Ltd filed Critical Shenyang Zhongke Bowei Automation Technology Co Ltd
Priority to CN201310163140.6A priority Critical patent/CN104143123A/en
Publication of CN104143123A publication Critical patent/CN104143123A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses an equipment alarm management method applied to a package test production line. According to the method, how to manage equipment alarms in the production line through a package test production line host is described. The method comprises the steps that (1) the enabled status reported by alarm information is set to be Enable when the package test production line host starts, (2) the package test production line host receives the equipment alarm information and obtains detailed content of the alarm information through analysis, (3) the alarms are classified according to the equipment alarm information to analyze the degree of influence on a machine cabinet, and (4) post-processing that the alarm information result is stored into a database and the alarm information is displayed at a Web terminal is carried out. The method comprises the four steps and has the advantages that control is achieved in real time, the structure is reasonable, functions are comprehensive, and the equipment alarm data can be clearly and effectively managed.

Description

A kind of equipment alarm management method that is applied to packaging and testing production line
Technical field
The inventive method is the method that in semicon industry, packaging and testing line main management and control devices is reported to the police.Being the multiple devices in packaging and testing line main management and control production line specifically, can there is much warnings such as maloperation, material request, equipment failure in equipment in process of production.So the invention provides a kind of software solution, capture device warning message, management equipment is reported to the police.
Background technology
Automaticity in packaging and testing production line is improving constantly at present, and adding of software solution, has encouraged the automated process of packaging and testing production lines especially.In production line, the warning that equipment causes due to situations such as maloperation, material request, equipment failures, with device security, product yield, product quality has close association, so can realize the management to equipment alarm, just becomes in packaging and testing production line and improves product yield, improve product quality, reduce the key of equipment failure rate.
Summary of the invention
For the feature of communicating by letter between packaging and testing line main and packaging and testing apparatus for production line, the invention provides the management method that packaging and testing apparatus for production line is reported to the police.
The technical solution used in the present invention is:
Be applied to an equipment alarm management method for packaging and testing production line, it is characterized in that the warning message reporting according to equipment analyzes, adds up, processes, effectively manage the warning of each equipment.
Comprise the following steps:
Step 1, packaging and testing line main arranges equipment alarm information enable state while being connected with device initialize be ENABLE;
Step 2, packaging and testing line main receives equipment alarm information, analyzes the detailed content of warning message;
Step 3, the warning message reporting, parses alert levels from equipment.According to alert levels, to reporting to the police, sort out, analyze the influence degree of reporting to the police to the packaging and testing production line condition of production;
Step 4, post-processed, deposits warning message analysis result in database, in web end display alarm historical information.
In described step 1, when packaging and testing line main is connected with device initialize, packaging and testing line main will be carried out a series of initialization settings to equipment, comprising the setting that enables to equipment alarm information; Now equipment alarm enabled state is set to ENABLE, just can make packaging and testing line main receive the warning message that equipment reports.
In described step 2, packaging and testing line main receives equipment alarm information, analyzes the detailed content of warning message; When packaging and testing line main receives warning message, can from warning message, obtain ALCD, ALID, tri-data of ALTX; And can from ALCD, obtain the information such as alert levels, from ALTX, obtain the reason of reporting to the police and occurring.
In described step 3, the warning message reporting from equipment, parse alert levels; According to alert levels, to reporting to the police, sort out, analyze the influence degree of reporting to the police to the packaging and testing production line condition of production.
In described step 4, deposit equipment alarm information analysis result in database, at the analysis result of Web end display alarm information.
The present invention has the following advantages:
1, the present invention has real-time reception and has real-time management and control.
2, the management to equipment alarm data rational in infrastructure of the present invention is clear, effective.
3, the present invention has the features such as careful of analyzing.
Accompanying drawing explanation
Fig. 1 outline flowchart of the present invention.
The initialization of Fig. 2 packaging and testing apparatus for production line of the present invention alarming and managing connects process flow diagram.
Fig. 3 packaging and testing apparatus for production line of the present invention alarm information processing process flow diagram.
Embodiment
At packaging and testing line main and apparatus for production line, carry out initialize communications while being connected, just enabling of every equipment being carried out to warning message reports arranges, making every equipment alarm enabled state is ENABLE, and the equipment in packaging and testing production line all can report warning message in time like this.
Equipment is reported to the police, and just can send warning message to packaging and testing line main, comprising: ALCD, ALID, tri-data of ALTX.This management method by the parsing to ALCD, can get state (occur/remove), alert levels, the warning object of equipment alarm, because alert levels and warning object are respectively 5 kinds, so can be combined into altogether 25 kinds of warnings.ALID is the unique identification of reporting to the police.ALTX is the descriptor of reporting to the police, and describes the reason that equipment alarm occurs.
The influence degree of the warning of equipment to production equipment, by alert levels, determined, this management method confirms to learn according to Commissioning Analysis and field condition, and packaging and testing production line is divided into three major types by warning, the first kind: can make equipment stop production, alert levels is ALARM, FAILURE.Equations of The Second Kind: equipment can be produced for a moment, but production line operation personnel can be warned, if processed not in time, can produce serious warning.Alert levels is WARNING.The 3rd class: only send warning message, without impact, alert levels is NOTIFICATION, REQUESTFORASSIST on device fabrication.
The warning message of equipment is the real-time reflection of status of equipment, so will focus on stores processor, in the methods of the invention, reporting each time of warning message, all can deposit database in real time.And if WEB end need to be understood the alarm condition in certain hour, statistics, Presentation Function to warning message in the inventive method, are provided.
In sum, by obtaining, analyzing equipment alarm information, other division of level waits operation, just can effectively to the situation of equipment in packaging and testing production line, conclude and prediction, be conducive to make equipment to maintain a good state, correct the faulty operation in production line, improve product yield and quality.
Inventive method treatment step:
Step 1, packaging and testing line main arranges equipment alarm information enable state while being connected with device initialize be ENABLE.
Step 2, packaging and testing line main receives equipment alarm information, analyzes the detailed content of warning message.
Step 3, the warning message reporting, parses alert levels from equipment.According to alert levels, to reporting to the police, sort out, analyze the influence degree of reporting to the police to the packaging and testing production line condition of production.
Step 4, post-processed, deposits warning message analysis result in database, in web end display alarm historical information.
In described step 1, when packaging and testing line main is connected with device initialize, packaging and testing line main will be carried out a series of initialization settings to equipment, comprising the setting that enables to equipment alarm information.Now equipment alarm enabled state is set to ENABLE, just can make packaging and testing line main receive the warning message that equipment reports.
In described step 2, packaging and testing line main receives equipment alarm information, analyzes the detailed content of warning message.When packaging and testing line main receives warning message, can from warning message, obtain ALCD, ALID, tri-data of ALTX.And can from ALCD, obtain the information such as alert levels, from ALTX, obtain the reason of reporting to the police and occurring.
In described step 3, the warning message reporting from equipment, parse alert levels.According to alert levels, to reporting to the police, sort out, analyze the influence degree of reporting to the police to the packaging and testing production line condition of production.
In described step 4, deposit equipment alarm information analysis result in database, at the analysis result of Web end display alarm information.
As shown in Figure 1
After packaging and testing line main and equipment connect, when equipment occurs to report to the police, packaging and testing line main receives the warning message that equipment sends, therefrom analyze significant data, and these data are added up, analyze, then store database into, in web end display alarm information.
As shown in Figure 2
Packaging and testing line main is set up initialization with equipment and is connected, if do not carry out initialization connection, packaging and testing line main initialization connection device, the enabled state that equipment is set is ENABLE, when equipment occurs to report to the police, packaging and testing line main can receive the warning message that equipment reports, and obtains warning detailed content, it is sorted out, then carry out later stage storage, Graphics Processing.If connect with equipment, when equipment occurs to report to the police, packaging and testing line main receives the warning message that equipment reports, and then carries out post-processed.
As shown in Figure 3
It is complete that the initialization of packaging and testing line main connects, and receives the warning message that equipment end sends over, and packaging and testing line main is to the ALCD in information, ALID, and the data analysis such as ALTX are processed, and deposit analysis result in database.If need to hold display alarm information at wab, carry out corresponding operating, from database read, fetch data, at web end, show.If need to be in foreground display alarm information, this reception, processing, store alarms informational function finish.

Claims (6)

1. be applied to an equipment alarm management method for packaging and testing production line, it is characterized in that the warning message reporting according to equipment analyzes, adds up, processes, effectively manage the warning of each equipment.
2. according to a kind of equipment alarm management method that is applied to packaging and testing production line claimed in claim 1, it is characterized in that: comprise the following steps:
Step 1, packaging and testing line main arranges equipment alarm information enable state while being connected with device initialize be ENABLE;
Step 2, packaging and testing line main receives equipment alarm information, analyzes the detailed content of warning message;
Step 3, the warning message reporting, parses alert levels from equipment.According to alert levels, to reporting to the police, sort out, analyze the influence degree of reporting to the police to the packaging and testing production line condition of production;
Step 4, post-processed, deposits warning message analysis result in database, in web end display alarm historical information.
3. according to a kind of equipment alarm management method that is applied to packaging and testing production line claimed in claim 2, it is characterized in that: in described step 1, when packaging and testing line main is connected with device initialize, packaging and testing line main will be carried out a series of initialization settings to equipment, comprising the setting that enables to equipment alarm information; Now equipment alarm enabled state is set to ENABLE, just can make packaging and testing line main receive the warning message that equipment reports.
4. according to a kind of equipment alarm management method that is applied to packaging and testing production line claimed in claim 2, it is characterized in that: in described step 2, packaging and testing line main receives equipment alarm information, analyzes the detailed content of warning message; When packaging and testing line main receives warning message, can from warning message, obtain ALCD, ALID, tri-data of ALTX; And can from ALCD, obtain the information such as alert levels, from ALTX, obtain the reason of reporting to the police and occurring.
5. according to a kind of equipment alarm management method that is applied to packaging and testing production line claimed in claim 2, it is characterized in that: in described step 3, the warning message reporting from equipment, parse alert levels; According to alert levels, to reporting to the police, sort out, analyze the influence degree of reporting to the police to the packaging and testing production line condition of production.
6. according to a kind of equipment alarm management method that is applied to packaging and testing production line claimed in claim 2, it is characterized in that: in described step 4, deposit equipment alarm information analysis result in database, at the analysis result of Web end display alarm information.
CN201310163140.6A 2013-05-06 2013-05-06 Equipment alarm management method applied to package test production line Pending CN104143123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310163140.6A CN104143123A (en) 2013-05-06 2013-05-06 Equipment alarm management method applied to package test production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310163140.6A CN104143123A (en) 2013-05-06 2013-05-06 Equipment alarm management method applied to package test production line

Publications (1)

Publication Number Publication Date
CN104143123A true CN104143123A (en) 2014-11-12

Family

ID=51852292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310163140.6A Pending CN104143123A (en) 2013-05-06 2013-05-06 Equipment alarm management method applied to package test production line

Country Status (1)

Country Link
CN (1) CN104143123A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105654253A (en) * 2016-03-14 2016-06-08 福州丹诺西诚电子科技有限公司 Production management method and system
CN105807742A (en) * 2016-03-10 2016-07-27 京东方科技集团股份有限公司 Production equipment monitoring method and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030001737A1 (en) * 2001-06-18 2003-01-02 Kazuhiro Shiratori Automatic alarm system
CN102361014A (en) * 2011-10-20 2012-02-22 上海大学 State monitoring and fault diagnosis method for large-scale semiconductor manufacture process
CN102568147A (en) * 2010-12-29 2012-07-11 沈阳中科博微自动化技术有限公司 Alarm method for software failure of semiconductor device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030001737A1 (en) * 2001-06-18 2003-01-02 Kazuhiro Shiratori Automatic alarm system
CN102568147A (en) * 2010-12-29 2012-07-11 沈阳中科博微自动化技术有限公司 Alarm method for software failure of semiconductor device
CN102361014A (en) * 2011-10-20 2012-02-22 上海大学 State monitoring and fault diagnosis method for large-scale semiconductor manufacture process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105807742A (en) * 2016-03-10 2016-07-27 京东方科技集团股份有限公司 Production equipment monitoring method and system
US10013866B2 (en) 2016-03-10 2018-07-03 Boe Technology Group Co., Ltd. Production equipment monitoring method and system
CN105654253A (en) * 2016-03-14 2016-06-08 福州丹诺西诚电子科技有限公司 Production management method and system

Similar Documents

Publication Publication Date Title
CN102937930B (en) Application program monitoring system and method
CN106776226B (en) Monitoring method and device of self-service terminal
CN105791028A (en) Monitoring method, server and system of server cluster
CN110084490B (en) Quality risk early warning method for rolling workshop
CN103905259A (en) Server monitoring system
CN105182125A (en) High-speed ultra-fine enameled wire online detection method
CN112529223A (en) Equipment fault repair method and device, server and storage medium
CN115615732A (en) Quality detector abnormal state monitoring method and system
US8078303B2 (en) Electronic supervisor
US11120037B2 (en) Test data integration system and method thereof
CN103780689A (en) Automated production line equipment data acquisition method and system
CN103763143A (en) Method and system for equipment abnormality alarming based on storage server
CN111539696A (en) Two-ticket omnibearing electronic monitoring method and system
CN105300447A (en) System and method for monitoring operation state of equipment
CN110471822A (en) Method, apparatus, computer system and medium for monitoring host computer system
CN104143123A (en) Equipment alarm management method applied to package test production line
CN103701657A (en) Device and method for monitoring and processing dysfunction of continuously running data processing system
CN110572467A (en) System and method for reporting large amount of process data
CN202735418U (en) Power quality monitoring system
CN112711507A (en) Device alarm method, electronic device, and medium
CN103163402B (en) Relay protection device state monitoring apparatus based on secondary circuit and monitoring method
CN112198477A (en) Detection equipment for performance of omnidirectional alarm equipment and detection method thereof
CN106251589A (en) A kind of device failure alert system
CN102637617A (en) Wafer quality detection system and wafer quality detection method
CN113381880B (en) Internet of things equipment management method, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141112

WD01 Invention patent application deemed withdrawn after publication