CN104125120B - A kind of full load method for testing reliability, test system and test device - Google Patents

A kind of full load method for testing reliability, test system and test device Download PDF

Info

Publication number
CN104125120B
CN104125120B CN201410401146.7A CN201410401146A CN104125120B CN 104125120 B CN104125120 B CN 104125120B CN 201410401146 A CN201410401146 A CN 201410401146A CN 104125120 B CN104125120 B CN 104125120B
Authority
CN
China
Prior art keywords
user terminal
full load
file data
server end
testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410401146.7A
Other languages
Chinese (zh)
Other versions
CN104125120A (en
Inventor
马振龙
储晟
许梦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing blue galaxy Terminal Technology Co.,Ltd.
Original Assignee
Shanghai Feixun Data Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Feixun Data Communication Technology Co Ltd filed Critical Shanghai Feixun Data Communication Technology Co Ltd
Priority to CN201410401146.7A priority Critical patent/CN104125120B/en
Publication of CN104125120A publication Critical patent/CN104125120A/en
Application granted granted Critical
Publication of CN104125120B publication Critical patent/CN104125120B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a kind of full load method for testing reliability, including:Scan the user terminal being connected with server end;The identity of user terminal is authenticated to determine the legitimacy of user terminal;The automatic user terminal to succeed in registration distributes an IP address after the success of user's endpoint registration;The file data bag being stored in server end is packaged into file data blocks, packed file data blocks are transmitted to user terminal, the downlink transmission rate at calculation server end to user terminal transmission file data blocks according to the IP address;Judge whether downlink transmission rate is more than or equal to the standard transfer rate of downlink transmission rate, and judge transmission interruption whether occurs in a preset time period, if, then it represents that full load reliability testing passes through;If not, then it represents that full load reliability testing does not pass through.The present invention can realize the test for carrying out prolonged full load reliability to LTE module under without personnel's operational circumstances in the environment of no 4G outer nets or 4G jitters.

Description

A kind of full load method for testing reliability, test system and test device
Technical field
The invention belongs to the signal testing technical field of mobile communication, it is related to a kind of method of testing, system and device, especially It is to be related to a kind of full load method for testing reliability, test system and test device.
Background technology
LTE (Long Term Evolution, Long Term Evolution) is one of mainstream technology of forth generation mobile communication.Support FDD (Frequency Division Duplexing, FDD) and TDD (Time Division Duplexing, time-division Duplex) both of which.TD-LTE is the LTE system of time division duplex, and LTE-FDD is the LTE system of FDD.And LTE products Essential support TD-LTE (time-division Long Term Evolution) Band38/39/40, TD-SCDMA (TD SDMA) Band34/39, GSM (global system for mobile communications) Band2/3/8 frequency ranges, recommend to support TD-LTE Band41, GSM Band5, LTE FDD The frequency ranges such as Band7/3/1/17, WCDMA (WCDMA) Band1/2/5.At present, the commercialization of LTE system receives entirely The most commonly used concern of ball operator and equipment vendor.Therefore, base station equipment is determined as network element important in communication network, its performance The quality of whole system is determined.
LTE module, which needs to arrange in pairs or groups, uses SIM card, and after succeeding in registration, by connecting outside 4G reality nets, 4G signals are changed Sent as regular handset and the supported 2.4G of PC WIFI signal and by antenna.Domestic consumer may search for Used after WIFI signal connection;Theoretical maximum downstream rate can reach about 104Mbps, and maximum is up to can reach about 50Mbps. In the good region of 4G covering effect of signals, the networking speed of people can be greatly improved, gives user faster surfing experience.
Although test LTE module should use real name registration SIM card to be tested in theory, downloaded the file into from 4G outer nets The method of local PC carries out full load test to LTE module, if in the access of no 4G outer nets or 4G outer net swingings of signal It can not just be carried out under fixed environment, and pressure test or reliability testing are carried out to LTE, must be requested that it is in unmanned behaviour Continuous operation at full load at least more than ten hour in the case of work, existing method is difficult to realize.And exist in view of 4G signals Department's regional coverage effect is bad, 4G flow pressure testing costs it is higher (during actual test, 300GB data downstreams transmission Completion only need 3-4 hours, 3GB campus network is about 200 yuans in China Mobile's business) etc. factor, use real name The model feasibility that the SIM of registration is tested is not high.
Accordingly, with respect to how to provide a kind of full load method for testing reliability, test system and test device, to solve now Having in technology can not complete to carry out for a long time LTE module in the environment of no 4G outer nets or 4G outer net jitters It is the defects of full load reliability testing, real to have turned into practitioner in the art's technical problem urgently to be resolved hurrily.
The content of the invention
In view of the above the shortcomings that prior art, it is an object of the invention to provide a kind of full load reliability testing side Method, test system and test device, for solving in the prior art in no 4G outer nets or the ring of 4G outer net jitters Can not complete to carry out LTE module under border prolonged full load reliability testing the problem of.
In order to achieve the above objects and other related objects, one aspect of the present invention provides a kind of full load reliability testing side Method, a kind of full load method for testing reliability, the communication network formed applied to server end and user terminal, including:Scanning The user terminal being connected with the server end;The server end stores the file data bag of a preset capacity;The user Terminal has LTE module;The frame structure of the LET modules includes multiple subframes;The identity of the user terminal is authenticated To determine the legitimacy of the user terminal and determine whether the user terminal succeeds in registration;The server end is in the use Family terminal authentication passes through the rear log-on message for obtaining the user terminal;It is automatic for registration after the user terminal succeeds in registration Successful user terminal distributes an IP address;The file data bag being stored in the server end is packaged into file data Block, packed file data blocks are transmitted to the user terminal according to the IP address, calculate the server end to institute State the downlink transmission rate of user terminal transmission file data blocks;Judge whether the downlink transmission rate is more than or equal to descending biography The standard transfer rate of defeated speed, and judge transmission interruption whether occurs in a preset time period, if, then it represents that full load Reliability testing passes through;If not, then it represents that full load reliability testing does not pass through.
Alternatively, the identity of the user terminal is authenticated to be wrapped the step of determining the legitimacy of the user terminal Include:Send authentication instruction;Produce a random string;The random string is sent to the user terminal, the user The key and AES that terminal has according to it, calculate an answer signal to the random string, and will calculate Answer signal sends back the server end;The key of the user terminal is obtained according to the log-on message of the user terminal, Another answer signal is calculated using the random string evidence and the AES;Compare two answer signals whether one Cause, if, then it represents that authentication passes through, and the user terminal is validated user;If not, then it represents that authentication is not by the user terminal For disabled user.
Alternatively, judge whether the downlink transmission rate is more than or equal to standard transfer rate, and judge when one is default Between in the step of transmission interruption whether occurs in section only the downlink transmission rate be more than or equal to standard transfer rate and Do not occur just to represent that the full load reliability testing passes through in the case of transmission interruption in the preset time period.
Alternatively, judge whether the downlink transmission rate is more than or equal to standard transfer rate, and judge when one is default Between in the step of transmission interruption whether occurs in section:The downlink transmission rate is less than standard transfer rate and when described default Between transmission interruption occurs in section in the case of, the downlink transmission rate be more than or equal to standard transfer rate and when described default Between transmission interruption does not occur in section in the case of and the downlink transmission rate be less than standard transfer rate and when described default Between do not occur in section all to represent that the full load reliability testing does not pass through in the case of transmission interruption.
Alternatively, the step of file data bag being stored in the server end being packaged into file data blocks also includes Study document packet with obtain service rate, the transmission spectrum efficiency of user terminal, each subframe duration, according to industry Business speed, the transmission spectrum efficiency of user terminal, the duration of each subframe calculate Physical Resource Block needed for transmission, per height The code length of frame, and determine the length and modulation and coding strategy series of file data blocks.
Alternatively, the calculation formula of Physical Resource Block needed for transmission is Physical Resource Block=service rate/use needed for transmission The transmission spectrum efficiency of family terminal;The calculation formula of the code length of each subframe is fast for code length=business of each subframe The duration of rate/each subframe.
Alternatively, the subframe in the LTE module is used for modulation and text in descending Physical Downlink Shared Channel The mapping table of part data block length series obtains file data block length and modulation and encoding measurement series.
Alternatively, the calculation formula of the downlink transmission rate is downlink transmission rate=file data block length/each The duration of subframe.
Another aspect of the present invention also provides a kind of full load reliability test system, including:Server end and at least one User terminal;Wherein, the server end includes:Scanning element, for scanning the user terminal being connected with the server end; Wherein, the server end stores the file data bag of a preset capacity;The user terminal has LTE module;The LET moulds The frame structure of block includes multiple subframes;Authenticating unit, for being authenticated to the identity of the user terminal to determine the use Whether the legitimacy and the determination user terminal of family terminal succeed in registration;The server end leads in the subscriber terminal authority Later the log-on message of the user terminal is obtained;Allocation unit, for automatic for note after the user terminal succeeds in registration Successfully user terminal distributes an IP address to volume;Processing unit, for the file data bag that will be stored in the server end File data blocks are packaged into, packed file data blocks are transmitted to the user terminal according to the IP address, calculate institute Server end is stated to the downlink transmission rate of user terminal transmission file data blocks;Judging unit, for judge it is described under Whether row transmission rate is more than or equal to standard transfer rate, and judges transmission interruption whether occurs in a preset time period, if It is, then it represents that the full load reliability testing passes through;If not, then it represents that the full load reliability testing does not pass through.
Another aspect of the invention also provides a kind of full load RTA reliability test assembly, including:Comprehensive test instrument, for scanning and its The user terminal of connection, the comprehensive test instrument store the file data bag of a preset capacity;The identity of the user terminal is carried out Authenticate to determine the legitimacy of the user terminal and determine whether the user terminal succeeds in registration;Treat the user terminal note The automatic user terminal to succeed in registration distributes an IP address after volume success;The file data bag of storage is packaged into file data Block, packed file data blocks are transmitted to the user terminal according to the IP address, calculate the comprehensive test instrument to described User terminal transmits the downlink transmission rate of file data blocks;Judge whether the downlink transmission rate is more than or equal to standard transmission Speed, and judge transmission interruption whether occurs in a preset time period, if, then it represents that the full load reliability testing is led to Cross;If not, then it represents that the full load reliability testing does not pass through;The comprehensive test instrument obtains in the subscriber terminal authority after Take the log-on message of the user terminal;The user terminal has LTE module;The frame structure of the LET modules is divided into up Subframe and descending sub frame;The user terminal is the router with LTE module.
As described above, full load method for testing reliability, test system and the test device of the present invention, have with following Beneficial effect:The present invention can be realized under without personnel's operational circumstances in the environment of no 4G outer nets or 4G jitters, taken A LTE full load environment is built, the test of prolonged full load reliability is carried out to the user terminal with LTE module, is obtained Take reliability test result.
Brief description of the drawings
Fig. 1 is shown as the full load method for testing reliability schematic flow sheet of the present invention.
Fig. 2 is shown as the idiographic flow schematic diagram of step S2 in the full load method for testing reliability of the present invention.
Fig. 3 is shown as the full load reliability test system theory structure schematic diagram of the present invention.
Fig. 4 is shown as the full load RTA reliability test assembly structural representation of the present invention.
Component label instructions
1 full load reliability test system
11 server ends
111 memory cell
112 scanning elements
113 authenticating units
114 allocation units
115 processing units
116 judging units
117 display units
12 user terminals
2 full load RTA reliability test assemblies
21 comprehensive test instruments
22 user terminals
S1~S5 steps
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also be based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.It should be noted that in the case where not conflicting, following examples and implementation Feature in example can be mutually combined.
It should be noted that the diagram provided in following examples only illustrates the basic structure of the present invention in a schematic way Think, only show the component relevant with the present invention in schema then rather than according to component count, shape and the size during actual implement Draw, kenel, quantity and the ratio of each component can be a kind of random change during its actual implementation, and its assembly layout kenel It is likely more complexity.
The present invention is tested white primarily directed in the environment of no 4G outer nets or 4G jitters by using 4G Card and comprehensive test instrument, using comprehensive test instrument as virtual 4G signals base station, and deposit sufficiently large file data on virtual base station Method, builds LTE and is fully loaded with environment, and prolonged full load reliability testing is carried out to LTE module.
Embodiment one
The present embodiment provides a kind of full load method for testing reliability, is formed applied to server end and user terminal logical Communication network, referring to Fig. 1, full load method for testing reliability is shown as, as shown in figure 1, the full load reliability testing side Method includes:
S1, the server end scanning are present in its surrounding environment and are connected thereto (including wireless connection or wired connection) User terminal.The user terminal includes smart mobile phone, router etc..The server end stores a preset capacity, It is more than 200GB file data bag.The user terminal has LTE module, and the frame structure of the LTE module is divided into up son Frame and descending sub frame.
S2, the server end are authenticated to the identity of the user terminal to determine the legitimacy of the user terminal Whether succeed in registration with the determination user terminal and (complete registration of the user terminal on the server end).It is described Server end can obtain the log-on message of the user terminal in the subscriber terminal authority after.Referring to Fig. 2, it is shown as Step S2 particular flow sheet, as shown in Fig. 2 step S2 includes:
S21, after authentication starts, the server end sends authentication instruction, and produces a random string RAND.
S21, the server end send caused random string RAND to the user terminal.
S23, the key and AES that the user terminal has according to itself, to the random string received RAND calculates an answer signal SRES, and the answer signal calculated is sent back into the server end.In the present embodiment, The AES uses AES A3, but is not limited thereto, every to be used to encrypt work(in the application example of reality The purpose of the present invention can be can reach, is stated clearly hereby.
S24, the server end obtain the key of the user terminal according to the log-on message of the user terminal, use The random string evidence and the AES calculate another answer signal SRES.
S25, whether two answer signals of comparison are consistent, if, then it represents that authentication passes through, and user terminal is validated user; If not, then it represents that authentication is by the way that the user terminal is disabled user.
S3, the server end succeed in registration after the user terminal succeeds in registration on the server end User terminal distributes an IP address.
S4, there will be file data bag thereon to be packaged into data block for the server end, by packed data root tuber Transmitted according to the server end to the IP address that user terminal distributes to the user terminal, the server end Study document number According to bag with obtain service rate, the transmission spectrum efficiency of user terminal, subframe duration, according to the business got Speed, the transmission spectrum efficiency of user terminal, the duration of subframe calculate Physical Resource Block, the volume of each subframe needed for transmission Code length, and the length and modulation and coding strategy series of file data blocks are determined, and the server end is calculated to the use The downlink transmission rate of family terminal transmission file data blocks.In the present embodiment, physical resource needed for transmission in the step S4 The calculation formula of block is:
The transmission spectrum efficiency of Physical Resource Block=service rate/user terminal needed for downlink transfer.
In the present embodiment, the transmission spectrum efficiency of the user terminal is the mapping by descending signal to noise ratio and modulation system Relation determination, wherein, the descending signal to noise ratio is determined by the proprietary pilot tone of cell again.
The calculation formula of the code length of each subframe is in the step S4:
The duration of code length=service rate of each subframe/each subframe.
In the present embodiment, used by determining the user terminal by the mapping relations of descending signal to noise ratio and modulation system Modulation system, descending descending transmission channel, i.e. PDSCH (physical downs are used for by the subframe in the LTE module Shared channel) with the mapping table of file data block length obtain modulation and coding strategy sum of series file data block length.
Server end described in the step S4 to the user terminal transmits the downlink transmission rate of file data blocks Calculation formula is:
The duration of downlink transmission rate=file data block length/each subframe.
S5, the server end judge whether the downlink transmission rate is more than or equal to the standard transmission of downlink transmission rate Speed, while judge transmission interruption whether occurs in a preset time period, if, then it represents that the full load reliability testing By being transferred to step S6, i.e. display passes through;If not, then it represents that the full load reliability testing not by, be transferred to step S7, Display does not pass through.In the present embodiment, the preset time period can be 72 hours in theory.Server end described in step S5 Judged result is only more than or equal to standard transfer rate in the downlink transmission rate and not occurred in the preset time period Just represent that the full load reliability testing passes through in the case of transmission interruption.The server end judged result is described descending Transmission rate is less than standard transfer rate and occurred in the preset time period in the case of transmitting interruption, the downlink transfer It is in the case that speed is more than or equal to standard transfer rate and transmission interruption does not occur in the preset time period and described descending Described in transmission rate all represents less than standard transfer rate and in the case of transmission interruption does not occur in the preset time period Full load reliability testing does not pass through.
Can be in no 4G outer nets or 4G jitters in the full load method for testing reliability that the present embodiment is provided In the environment of realize prolonged full load reliability carried out to the user terminal with LTE module under without personnel's operational circumstances Test, obtain reliability test result.
Embodiment two
The present embodiment provides a kind of full load reliability test system 1, referring to Fig. 3, being shown as the survey of full load reliability Test system principle assumption diagram, as shown in Fig. 2 the full load reliability test system 1 includes:Server end 11 and at least one User terminal 12.Wherein, the server end 11 includes memory cell 111, scanning element 112, authenticating unit 113, distribution list Member 114, processing unit 115, judging unit 116 and display unit 117.
Wherein, the memory cell 111 is used to store a preset capacity, i.e., the file data bag more than 200GB.
The scanning element 112 being connected with the memory cell 111 is present in around the server end for scanning Environment and the user terminal 12 for being connected thereto (including wireless connection or wired connection).The user terminal 12 includes intelligent hand Machine, router etc..The user terminal 12 has a LTE module, and the frame structure of the LTE module is divided into sub-frame of uplink and descending Subframe.
The authenticating unit 113 being connected with scanning element 112 is used to authenticate the identity of the user terminal 12 (user terminal is completed to determine the legitimacy of the user terminal 12 and determine whether the user terminal succeeds in registration 12 registration on the server end 11).The server end 11 can obtain institute after the user terminal 12 authentication passes through State the log-on message of user terminal 12.Specifically, the course of work of the authenticating unit 113 is the authentication after authentication starts Unit 113 sends authentication instruction, and produces a random string RAND, and caused random string RAND is sent to the use Family terminal 12, the key and AES for making the user terminal 12 have according to itself, to the random character received String RAND calculates an answer signal SRES, and the answer signal calculated is sent back into the authenticating unit 113.In this implementation In example, the AES uses AES A3, but is not limited thereto, every to be used in the application example of reality Encryption function can reach the purpose of the present invention, state clearly hereby.The authenticating unit 113 is according to the registration of the user terminal 12 The key of user terminal 12 described in acquisition of information, another response is calculated using the random string evidence and the AES Signal SRES, whether two answer signals of comparison are consistent, if, then it represents that authentication passes through, and the user terminal is validated user;If It is no, then it represents that authentication is by the way that the user terminal is disabled user.
The allocation unit 114 being connected with the authenticating unit 113 is used to treat the user terminal 12 in the service After being succeeded in registration on device end 11, the user terminal 12 to succeed in registration distributes an IP address.
The processing unit 115 being connected with the allocation unit 114 and memory cell 111 is for there will be the storage The file data bag of unit 111 is packaged into data block, gives packed data block to user terminal according to the allocation unit 114 The IP address of distribution is transmitted to the user terminal 12, and Study document packet is to obtain the transmission of service rate, user terminal The duration of spectrum efficiency, subframe, according to get the service rate, transmission spectrum efficiency, the subframe of user terminal Duration calculate transmission needed for Physical Resource Block, the code length of each subframe, and determine file data blocks length and Modulation and coding strategy series, and the server end is calculated to the downlink transfer speed of user terminal transmission file data blocks Rate.In the present embodiment, the calculation formula of Physical Resource Block is needed for the calculating of processing unit 115 transmission:
The transmission spectrum efficiency of Physical Resource Block=service rate/user terminal needed for downlink transfer.
In the present embodiment, the transmission spectrum efficiency of the user terminal is the mapping by descending signal to noise ratio and modulation system Relation determination, wherein, the descending signal to noise ratio is determined by the proprietary pilot tone of cell again.
The calculation formula for the code length that the processing unit 115 calculates each subframe is:
The duration of code length=service rate of each subframe/each subframe.
In the present embodiment, used by determining the user terminal by the mapping relations of descending signal to noise ratio and modulation system Modulation system, descending descending transmission channel, i.e. PDSCH (physical downs are used for by the subframe in the LTE module Shared channel) with the mapping table of file data block length obtain modulation and coding strategy sum of series file data block length.
The processing unit 115 calculates the server end to the downlink transfer of user terminal transmission file data blocks The calculation formula of speed is:
The duration of downlink transmission rate=file data block length/each subframe.
The judging unit 116 being connected with the processing unit 115 is used to judge whether the downlink transmission rate is big In the standard transfer rate equal to downlink transmission rate, while judge transmission interruption whether occurs in a preset time period, if It is, then it represents that the full load reliability testing passes through;If not, then it represents that the full load reliability testing does not pass through.At this In embodiment, the preset time period can be 72 hours in theory.In the present embodiment, the judged result of judging unit 115 Only it is more than or equal to standard transfer rate in the downlink transmission rate and transmission interruption does not occur in the preset time period In the case of just represent that the full load reliability testing passes through.The server end judged result is in the downlink transmission rate Occur less than standard transfer rate and in the preset time period in the case of transmitting interruption, the downlink transmission rate is more than Do not occur equal to standard transfer rate and in the preset time period transmission interruption in the case of and the downlink transmission rate Do not occur all to represent that the full load can in the case of transmission interruption less than standard transfer rate and in the preset time period Do not pass through by property test.In the present embodiment, the judging unit 116 is additionally operable to will determine that result is transmitted to the display unit 117。
The display unit 117 is used to show the judged result so that staff knows the test of full load reliability As a result.
Can be in no 4G outer nets or 4G jitters in the full load reliability test system that the present embodiment is provided In the environment of realize prolonged full load reliability carried out to the user terminal with LTE module under without personnel's operational circumstances Test, obtain reliability test result.
Embodiment three
The present embodiment provides a kind of full load RTA reliability test assembly 2, referring to Fig. 4, being shown as the survey of full load reliability Apparatus structure schematic diagram is tried, as shown in figure 3, the full load RTA reliability test assembly 2 includes comprehensive test instrument 21, there is LTE module User terminal 22, in the present embodiment, have LTE module user terminal 22 for one carry LTE module router 22, institute Stating router 22 has 4 LAN mouths, a WAN mouth, in addition to the PC with an Ethernet interface.The comprehensive test instrument and The router 22 needs to be connected with 2 radio frequency lines.
In the present embodiment, the comprehensive test instrument 21 is defined as a 4G signals base station.The comprehensive test instrument 21 is used to store one One preset capacity, i.e., the file data bag more than 200GB, scanning is present in the server end surrounding environment and is connected thereto The user terminal 22 of (including wireless connection or wired connection).The user terminal 22 includes smart mobile phone, router etc..Institute Stating user terminal 22 has LTE module, and the frame structure of the LTE module is divided into sub-frame of uplink and descending sub frame.
The comprehensive test instrument 21 is additionally operable to authenticate the identity of the user terminal 22 to determine the user terminal 12 Legitimacy and determine whether the user terminal succeeds in registration and (complete the user terminal 22 on the comprehensive test instrument 21 Registration).The comprehensive test instrument 21 can obtain the log-on message of the user terminal 22 after the user terminal 22 authentication passes through.It is comprehensive The authentication process of instrument 21 is surveyed, after authentication starts, sends authentication instruction, and produces a random string RAND, it is random by caused by Character string RAND sends the key and AES for the user terminal 22, making the user terminal 22 have according to itself, One answer signal SRES is calculated to the random string RAND received, and the answer signal calculated is sent back into institute State comprehensive test instrument 21.In the present embodiment, the AES uses AES A3, but is not limited thereto, in answering for reality With in example, every purpose that can be used for encryption function and can reach the present invention, state clearly hereby.The comprehensive test instrument 21 is according to described The log-on message of user terminal 22 obtains the key of the user terminal 22, is calculated using the random string evidence and the encryption Method calculates another answer signal SRES, and whether two answer signals of comparison are consistent, if, then it represents that authentication passes through, the user Terminal is validated user;If not, then it represents that authentication is by the way that the user terminal is disabled user.
After the user terminal 22 succeeds in registration on the comprehensive test instrument 21, the comprehensive test instrument 21 is the use to succeed in registration Family terminal 22 distributes an IP address.There will be the file data bag on the comprehensive test instrument 21 to be packaged into data block, will be packed Data block is transmitted to the user terminal 22 according to the IP address of distribution, and Study document packet is to obtain service rate, user The transmission spectrum efficiency of terminal, the duration of subframe, according to the service rate, the transmission spectrum of user terminal got Efficiency, the duration of subframe calculate Physical Resource Block, the code length of each subframe needed for transmission, and determine file data blocks Length and modulation with coding strategy series, and calculate the server end to the user terminal transmit file data blocks under Row transmission rate.In the present embodiment, the calculation formula of Physical Resource Block is needed for calculating transmission:
The transmission spectrum efficiency of Physical Resource Block=service rate/user terminal needed for downlink transfer.
In the present embodiment, the transmission spectrum efficiency of the user terminal is the mapping by descending signal to noise ratio and modulation system Relation determination, wherein, the descending signal to noise ratio is determined by the proprietary pilot tone of cell again.
In the present embodiment, the calculation formula for calculating the code length of each subframe is:
The duration of code length=service rate of each subframe/each subframe.
In the present embodiment, used by determining the user terminal by the mapping relations of descending signal to noise ratio and modulation system Modulation system, descending descending transmission channel, i.e. PDSCH (physical downs are used for by the subframe in the LTE module Shared channel) with the mapping table of file data block length obtain modulation and coding strategy sum of series file data block length.
The comprehensive test instrument 21 calculates its calculating to the downlink transmission rate of the user terminal 22 transmission file data blocks Formula is:
The duration of downlink transmission rate=file data block length/each subframe.
The comprehensive test instrument 21 is used for the standard biography for judging whether the downlink transmission rate is more than or equal to downlink transmission rate Defeated speed, while judge transmission interruption whether occurs in a preset time period, if, then it represents that the full load reliability is surveyed Pinged;If not, then it represents that the full load reliability testing does not pass through.In the present embodiment, the preset time period is theoretical On can be 72 hours.In the present embodiment, judged result is only more than or equal to standard transfer rate in the downlink transmission rate With do not occur in the preset time period transmission interruption in the case of just represent that the full load reliability testing passes through.It is described Server end judged result is less than standard transfer rate in the downlink transmission rate and passed in the preset time period In the case of defeated interruption, the downlink transmission rate is more than or equal to and standard transfer rate and do not occur in the preset time period It is less than standard transfer rate with the downlink transmission rate in the case of transmission interruption and does not occur in the preset time period All represent that the full load reliability testing does not pass through in the case of transmission interruption.In the present embodiment, the comprehensive test instrument 21 is gone back For showing judged result so that staff knows the test result of full load reliability.
It is that full load RTA reliability test assembly 2 builds operating process below:
Step 1: first initializing comprehensive test instrument, " LTE signal " are tested, and connected mode is arranged to " two for selection Ports out " (the present embodiment it is router used on LTE module be double antenna, can according to actual conditions select RF1/2 Out), analysis mode is arranged to " data application ", choose the frequency range of needs, open LTE switches.
Step 2: the Ethernet interface of the Ethernet interface of router and PC is connected by netting twine;By PC DHCP patterns are arranged to, router is automatically assigned to IP address (such as 192.168.0.100).
Step 3: the router with LTE module is connected with comprehensive test instrument by radio frequency line;Check on comprehensive test instrument Whether upper and lower two radio frequency mouths lamp lights simultaneously.
Step 4: comprehensive test instrument is from tape operation system, in the ad-hoc location of its hard disk, (i.e. PC ends can be direct by ftp addresses In the Shared Folders of access) on deposit a sufficiently large file (offer document is more than 200GB), between meeting LTE module not It is disconnected to download at least more than ten hour;
Step 5: be first turned on comprehensive test instrument LTE switch, it is normally-open and ensure environment correctly connection after, to road By electricity on device, about 20s is waited, can be shown on instrument and distribute IP address to LTE module.
Step 6: PC " RUN "-input " ftp:172.22.1.*** " enter comprehensive test instrument shared document operation interface, The file made in particular file folder is found, " right button "-" target saves as " can download.LTE module is entered so as to realize The prolonged full load reliability testing of row.
Full load method for testing reliability, test system and test device of the present invention can not have 4G outer nets Or realized in the environment of 4G jitters under without personnel's operational circumstances, a LTE full load environment is built, to LTE The user terminal of module carries out the test of prolonged full load reliability, obtains reliability test result.
So the present invention effectively overcomes various shortcoming of the prior art and has high industrial utilization.
The above-described embodiments merely illustrate the principles and effects of the present invention, not for the limitation present invention.It is any ripe Know the personage of this technology all can carry out modifications and changes under the spirit and scope without prejudice to the present invention to above-described embodiment.Cause This, those of ordinary skill in the art is complete without departing from disclosed spirit and institute under technological thought such as Into all equivalent modifications or change, should by the present invention claim be covered.

Claims (10)

1. a kind of full load method for testing reliability, the communication network formed applied to server end and user terminal, its feature It is, including:
Scan the user terminal being connected with the server end;The server end stores the file data bag of a preset capacity; The user terminal has LTE module;The frame structure of the LTE module includes multiple subframes;
The identity of the user terminal is authenticated to determine the legitimacy of the user terminal and determine the user terminal Whether succeed in registration;The server end passes through the rear log-on message for obtaining the user terminal in the subscriber terminal authority;
The automatic user terminal to succeed in registration distributes an IP address after the user terminal succeeds in registration;
The file data bag being stored in the server end is packaged into file data blocks, by packed file data root tuber Transmitted according to the IP address to the user terminal, calculate the server end to user terminal transmission file data blocks Downlink transmission rate;
Judge whether the downlink transmission rate is more than or equal to the standard transfer rate of downlink transmission rate, and judge default one Whether transmission interruption is not occurred in period, if, then it represents that full load reliability testing passes through;If not, then it represents that full load Reliability testing does not pass through.
2. full load method for testing reliability according to claim 1, it is characterised in that:To the identity of the user terminal Authenticated to include the step of determining the legitimacy of the user terminal:
Send authentication instruction;
Produce a random string;
The random string is sent to the user terminal, the user terminal and calculated according to the key that it has and encryption Method, an answer signal is calculated to the random string, and the answer signal calculated is sent back into the server end;
The key of the user terminal is obtained according to the log-on message of the user terminal, using the random string evidence and institute State AES and calculate another answer signal;
Whether consistent compare two answer signals, if, then it represents that authentication passes through, and the user terminal is validated user;If it is not, then Represent authentication not by the way that the user terminal is disabled user.
3. full load method for testing reliability according to claim 1, it is characterised in that:Judge the downlink transmission rate In the step of whether being more than or equal to standard transfer rate, and judging transmission interruption whether does not occur in a preset time period only It is more than or equal to standard transfer rate in the downlink transmission rate and the feelings of transmission interruption does not occur in the preset time period Just represent that the full load reliability testing passes through under condition.
4. full load method for testing reliability according to claim 3, it is characterised in that:Judge the downlink transmission rate In the step of whether being more than or equal to standard transfer rate, and judging transmission interruption whether does not occur in a preset time period:
The downlink transmission rate be less than standard transfer rate and in the preset time period occur transmission interruption in the case of, The downlink transmission rate be more than or equal to standard transfer rate and in the preset time period occur transmission interruption in the case of, In the case of being less than standard transfer rate with the downlink transmission rate and transmission interruption not occurring in the preset time period All represent that the full load reliability testing does not pass through.
5. full load method for testing reliability according to claim 1, it is characterised in that:The server end will be stored in In also to include Study document packet whole to obtain service rate, user file data bag the step of being packaged into file data blocks The transmission spectrum efficiency at end, the duration of each subframe, according to the transmission spectrum efficiency, each of service rate, user terminal The duration of subframe calculates Physical Resource Block, the code length of each subframe needed for transmission, and determines the length of file data blocks Degree and modulation and coding strategy series.
6. full load method for testing reliability according to claim 5, it is characterised in that:
The calculation formula of Physical Resource Block needed for transmission is the transmission of Physical Resource Block=service rate/user terminal needed for transmission Spectrum efficiency;
The calculation formula of the code length of each subframe continues for code length=service rate/each subframe of each subframe Time.
7. full load method for testing reliability according to claim 5, it is characterised in that:According in the LTE module Subframe is used for the mapping table of modulation and file data block length series in descending Physical Downlink Shared Channel and obtains number of files According to block length and modulation and encoding measurement series.
8. full load method for testing reliability according to claim 1, it is characterised in that:The meter of the downlink transmission rate Calculation formula is the duration of downlink transmission rate=file data block length/each subframe.
A kind of 9. full load reliability test system, it is characterised in that including:Server end and at least one user terminal;Its In,
The server end includes:
Scanning element, for scanning the user terminal being connected with the server end;Wherein, the server end storage one is default The file data bag of capacity;The user terminal has LTE module;The frame structure of the LTE module includes multiple subframes;
Authenticating unit, for being authenticated to the identity of the user terminal to determine the legitimacy of the user terminal and determination Whether the user terminal succeeds in registration;The server end obtains the user terminal in the subscriber terminal authority by rear Log-on message;
Allocation unit, for the user terminal automatically to succeed in registration after the user terminal succeeds in registration with distributing an IP Location;
Processing unit, will be packed for the file data being stored in server end bag to be packaged into file data blocks File data blocks transmitted according to the IP address to the user terminal, calculate the server end to the user terminal and pass The downlink transmission rate of defeated file data blocks;
Judging unit, for judging whether the downlink transmission rate is more than or equal to standard transfer rate, and judge default one Whether transmission interruption is not occurred in period, if, then it represents that the full load reliability testing passes through;If not, then it represents that institute Full load reliability testing is stated not pass through.
A kind of 10. full load RTA reliability test assembly, it is characterised in that including:
Comprehensive test instrument, for scanning connected user terminal, the comprehensive test instrument stores a preset capacity file data bag;To institute The identity for stating user terminal is authenticated to determine the legitimacy of the user terminal and determine whether the user terminal is registered Success;The automatic user terminal to succeed in registration distributes an IP address after the user terminal succeeds in registration;By the text of storage Part packet is packaged into file data blocks, and packed file data blocks are transmitted to user end according to the IP address End, the comprehensive test instrument is calculated to the downlink transmission rate of user terminal transmission file data blocks;Judge the downlink transfer Whether speed is more than or equal to standard transfer rate, and judges transmission interruption whether does not occur in a preset time period, if so, then Represent that the full load reliability testing passes through;If not, then it represents that the full load reliability testing does not pass through;
The comprehensive test instrument passes through the rear log-on message for obtaining the user terminal in the subscriber terminal authority;The user terminal With LTE module;The frame structure of the LTE module is divided into sub-frame of uplink and descending sub frame;The user terminal is with LTE moulds The router of block.
CN201410401146.7A 2014-08-14 2014-08-14 A kind of full load method for testing reliability, test system and test device Active CN104125120B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410401146.7A CN104125120B (en) 2014-08-14 2014-08-14 A kind of full load method for testing reliability, test system and test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410401146.7A CN104125120B (en) 2014-08-14 2014-08-14 A kind of full load method for testing reliability, test system and test device

Publications (2)

Publication Number Publication Date
CN104125120A CN104125120A (en) 2014-10-29
CN104125120B true CN104125120B (en) 2018-01-02

Family

ID=51770389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410401146.7A Active CN104125120B (en) 2014-08-14 2014-08-14 A kind of full load method for testing reliability, test system and test device

Country Status (1)

Country Link
CN (1) CN104125120B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113923703A (en) * 2020-07-08 2022-01-11 中国移动通信有限公司研究院 State detection method, device and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2020647A1 (en) * 2007-08-03 2009-02-04 Insigna Security Srl Automatic multi-user system for localization, alarm and personal emergency, operating in multi-standard mode in aerial environment
CN102075961A (en) * 2009-11-23 2011-05-25 中兴通讯股份有限公司 Control method and device of automatic testing process
CN102209004A (en) * 2010-03-30 2011-10-05 中华电信股份有限公司 Network transmission rate testing method
CN102281559A (en) * 2010-06-12 2011-12-14 中兴通讯股份有限公司 Method and device for testing packet switch (PS) performance of wireless network by performing file transfer protocol (FTP) service through multiple data cards

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3916591B2 (en) * 2003-06-16 2007-05-16 アンリツ株式会社 Test equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2020647A1 (en) * 2007-08-03 2009-02-04 Insigna Security Srl Automatic multi-user system for localization, alarm and personal emergency, operating in multi-standard mode in aerial environment
CN102075961A (en) * 2009-11-23 2011-05-25 中兴通讯股份有限公司 Control method and device of automatic testing process
CN102209004A (en) * 2010-03-30 2011-10-05 中华电信股份有限公司 Network transmission rate testing method
CN102281559A (en) * 2010-06-12 2011-12-14 中兴通讯股份有限公司 Method and device for testing packet switch (PS) performance of wireless network by performing file transfer protocol (FTP) service through multiple data cards

Also Published As

Publication number Publication date
CN104125120A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
CN106130828B (en) Narrowband internet-of-things terminal conformance test method and system
CN108810922A (en) A kind of communication means and terminal, base station
CN110169164A (en) User terminal and wireless communications method
CN104159240B (en) Communication means and terminal based on terminal
CN108141824A (en) Use the DRX and SPS of the MTC of binding transmission
CN108141729A (en) The system and method that device-to-device communication is carried out with evolved machine type communication
CN109076343A (en) The network verification of wearable device
CN106465472B (en) Communication system and method
CN108029144A (en) The Listen Before Talk of direct LTE on unlicensed radio-frequency spectrum band
CN107079496A (en) The technology of cell is accessed using unauthorized radio-frequency spectrum band
CN106465293A (en) Terminal device and method
CN107005873A (en) Flexible channels status information feedback is managed
CN109661847A (en) User terminal and wireless communications method
CN107852267A (en) Uplink signalling for dual link
CN104995978A (en) Terminal device, integrated circuit, radio communication method, and base station device
CN110073714A (en) For rebuilding the method and apparatus of Radio Communications Link due to radio bearer setup complete
CN108886537A (en) For realizing the mechanism of connectivity session and IP session establishment
CN108353404A (en) The physical layer signaling of different UE groups on different physical resources
CN109155692A (en) uplink control information report
CN107613509A (en) Apparatus and method for the pilot scrambling of the physical downlink control channel of enhancing
CN106664548A (en) Mobile station device and base station device
CN105850169A (en) Apparatus, system and method of securing communications of user equipment (UE) in wireless local area network
CN109417810A (en) Method and apparatus for seizing business in the licensed frequency band communicated for task key
CN109417809A (en) For accessing the method and apparatus for exempting from licensed band and licensed frequency band
CN109804586A (en) Uplink voice and video source modeling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201203

Address after: 313021 industrial function area of Donglin Town, Huzhou City, Zhejiang Province

Patentee after: ZHEJIANG YUANTE NEW MATERIAL Co.,Ltd.

Address before: 201616 Shanghai city Songjiang District Sixian Road No. 3666

Patentee before: Phicomm (Shanghai) Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210526

Address after: Room 10242, No. 260, Jiangshu Road, Xixing street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Jiji Intellectual Property Operation Co., Ltd

Address before: 313021 industrial functional zone, Donglin Town, Huzhou City, Zhejiang Province

Patentee before: ZHEJIANG YUANTE NEW MATERIAL Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220216

Address after: 522, floor 5, No. 56, dongxinglong street, Dongcheng District, Beijing 100010

Patentee after: Beijing blue galaxy Terminal Technology Co.,Ltd.

Address before: Room 10242, No. 260, Jiangshu Road, Xixing street, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: Hangzhou Jiji Intellectual Property Operation Co.,Ltd.