CN104050606A - Method for analyzing weak links of power distribution network status - Google Patents

Method for analyzing weak links of power distribution network status Download PDF

Info

Publication number
CN104050606A
CN104050606A CN201410295711.6A CN201410295711A CN104050606A CN 104050606 A CN104050606 A CN 104050606A CN 201410295711 A CN201410295711 A CN 201410295711A CN 104050606 A CN104050606 A CN 104050606A
Authority
CN
China
Prior art keywords
distribution network
power distribution
power
construction
present situation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410295711.6A
Other languages
Chinese (zh)
Inventor
王哲
宗志刚
徐晶
夏冬
张章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410295711.6A priority Critical patent/CN104050606A/en
Publication of CN104050606A publication Critical patent/CN104050606A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a method for analyzing weak links of the power distribution network status. The method includes the steps of analyzing characteristics of a regional power distribution network, establishing a power distribution network status weak link analysis index system, collecting power distribution network status data corresponding to all indexes in the analysis index system, checking and analyzing the power distribution network status data in the analysis index system item by item so as to find out the weak links of the power distribution network status and other steps. The method has the advantages that when the weak links of the power distribution network status are analyzed, the single problem of existence of the power distribution network is considered, and the integrality and the sustainable development of the power distribution network are considered simultaneously, so the analysis method is more scientific and comprehensive; the method provides a beneficial reference for power distribution network planners to analyze the weak links of the power distribution network status, and provides a powerful technical support for power distribution network planning work in the future; the index system is easy to master and operate, power distribution network construction target making, power distribution network status data acquisition and the like can be easily understood, and the index system can be conveniently mastered by actual operation personnel.

Description

A kind of power distribution network present situation method for analyzing weak link
Technical field
The invention belongs to distribution network control technology field, particularly relate to a kind of power distribution network present situation method for analyzing weak link.
Background technology
In electric system, conventional power distribution network present situation method for analyzing weak link is only paid close attention to power distribution network present situation in a certain respect at present, and lacks an individual system.In addition, it is the basis using distribution system grid structure relative strength index and distribution system overall security index as Security Analysis of Distribution Networks, be confined to power distribution network individual event capability evaluation but shortcoming is setup measures, lack according to current load level and the comprehensive assessment of situation of change to electric power network technique economic rationality.
Another kind of analytical approach is distribution network reliability analytical approach.The method proposes economic reliability index to assess and can ensure that electrical network has good economic benefit in having higher reliability.The comprehensive of power distribution network assessment strengthened in the combination of different indexs.But being assessment result, shortcoming fails to solve some outstanding problems in distribution network construction, planning, the one, and the proposition of immediate plan and construction project and decision-making, the 2nd, planning, the required source book of load prediction are collected and accumulation.
Also having a kind of analytical approach is power distribution network economy row analytical approach.The method points out that the Economic Equivalent of safe reliability measure is implement economic interests that a certain security measures can bring and its implementation cost poor, it is the implementation benefit of security measures, but its shortcoming is not obvious to the directive significance of real work, evaluation work could not be combined preferably with the main business of Utilities Electric Co., assessment achievement is utilized insufficient
Summary of the invention
In order to address the above problem, the object of the present invention is to provide a kind of power distribution network present situation method for analyzing weak link.
In order to achieve the above object, power distribution network present situation method for analyzing weak link provided by the invention comprises the following step of carrying out in order:
Step 1) analyze the feature of local distribution network:
The related economic data that distribution network planning personnel announce by searching government's yearbook and government, analyze regional geographic position, economic society historical development and planning, grasp city developing stage of living in; Utilize the existing dispatch automated system of grid company, PMS system, generalized information system to search electrical network present situation, analyze power construction, power grid construction, network load situation, grasp power network development nargin; Analyzed area is built the matching degree with distribution network construction, thereby determines distribution network construction principle and construction object;
Step 2) set up power distribution network present situation weak link analysis indexes system:
On the basis of above-mentioned definite distribution network construction principle and construction object, utilize area of computer aided to set up a set of analysis indexes system that can thoroughly evaluating power distribution network present situation weak link; Analysis indexes system is divided into four major parts: security, economy, adaptability, harmony;
Step 3) power distribution network as-is data corresponding to each index in collection analysis index system:
Distribution network planning personnel collect power distribution network as-is data corresponding to each index in above-mentioned analysis indexes system by Utilities Electric Co. in the infosystem of building, the infosystem relating to comprises GIS, PMS, dispatching automation, power consumer power information acquisition system, thereby grasps power distribution network ruuning situation comprehensively;
Step 4) the power distribution network as-is data in check analysis index system to be to find out power distribution network present situation weak link item by item:
Distribution network planning personnel are entered into the above-mentioned power distribution network as-is data of collecting in the analysis indexes system of utilizing computing machine foundation, and the power distribution network as-is data in analysis indexes system is compared with distribution network construction target item by item, to find out power distribution network present situation weak link; The weak link that can analyze by this system is as follows: N-1 percent of pass is on the low side, capacity-load ratio is not in rational scope, the equipment operation time limit is long, operating cost and construction cost are bigger than normal, electrical network utilization ratio is on the low side, power grid construction passage deficiency, for the investment of next step power distribution network and construction have indicated direction.
In step 2) in, described security comprises: power distribution network N-1 percent of pass, capacity-load ratio, equipment; Economy comprises performance driving economy, builds economy; Adaptability comprises that electrical network utilization ratio, electrical network can extend ability, power supply and demand adaptability; Harmony comprises power network development speed coordination, power network development scale harmony, Connection Mode harmony, power grid construction passage harmony.
The beneficial effect of power distribution network present situation method for analyzing weak link provided by the invention:
(1) this method, in the time analyzing power distribution network present situation weak link, has not only been considered the single problem that power distribution network exists, and has considered globality and the sustainable developability of power distribution network simultaneously, therefore more science, comprehensive of this analytical approach.
(2) this method provides useful reference for distribution network planning personnel carry out the analysis of power distribution network present situation weak link, for distribution network planning work in the future provides strong technical support.
(3) this index system is easy to grasp and operation, no matter, from aspects such as distribution network construction target making or power distribution network as-is data obtain, is all easily understood, and facilitates practical operation personnel skillfully to grasp.
Brief description of the drawings
Fig. 1 is power distribution network present situation method for analyzing weak link process flow diagram provided by the invention.
Fig. 2 is power distribution network present situation weak link index system figure provided by the invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, power distribution network present situation method for analyzing weak link provided by the invention is elaborated.
As shown in Figure 1, power distribution network present situation method for analyzing weak link provided by the invention comprises the following step of carrying out in order:
Step 1) analyze the feature of local distribution network:
The related economic data that distribution network planning personnel announce by searching government's yearbook and government, analyze regional geographic position, economic society historical development and planning, grasp city developing stage of living in; Utilize the existing dispatch automated system of grid company, PMS system, generalized information system to search electrical network present situation, analyze the situations such as power construction, power grid construction, network load, grasp power network development nargin; Analyzed area is built the matching degree with distribution network construction, thereby determines distribution network construction principle and construction object;
Step 2) set up power distribution network present situation weak link analysis indexes system:
On the basis of above-mentioned definite distribution network construction principle and construction object, utilize area of computer aided to set up a set of analysis indexes system that can thoroughly evaluating power distribution network present situation weak link, see Fig. 2; Analysis indexes system is divided into four major parts: security, economy, adaptability, harmony;
Wherein, security comprises: power distribution network N-1 percent of pass, capacity-load ratio, equipment; Economy comprises performance driving economy, builds economy; Adaptability comprises that electrical network utilization ratio, electrical network can extend ability, power supply and demand adaptability; Harmony comprises power network development speed coordination, power network development scale harmony, Connection Mode harmony, power grid construction passage harmony;
Step 3) power distribution network as-is data corresponding to each index in collection analysis index system:
Distribution network planning personnel collect power distribution network as-is data corresponding to each index in above-mentioned analysis indexes system by Utilities Electric Co. in the infosystem of building, the infosystem relating to comprises the infosystems such as GIS, PMS, dispatching automation, the collection of power consumer power information, thereby grasps power distribution network ruuning situation comprehensively;
Step 4) the power distribution network as-is data in check analysis index system to be to find out power distribution network present situation weak link item by item:
Distribution network planning personnel are entered into the above-mentioned power distribution network as-is data of collecting in the analysis indexes system of utilizing computing machine foundation, and the power distribution network as-is data in analysis indexes system is compared with distribution network construction target item by item, to find out power distribution network present situation weak link; The weak link that can analyze by this system is as follows: N-1 percent of pass is on the low side, capacity-load ratio is not in rational scope, the equipment operation time limit is long, operating cost and construction cost are bigger than normal, electrical network utilization ratio is on the low side, power grid construction passage deficiencies etc., for the investment of next step power distribution network and construction have indicated direction.
The analysis of power distribution network present situation weak link is the basis of distribution network planning, grasps the existing outstanding problem of power distribution network, equipment deficiency and potential safety hazard by it, improves specific aim and the validity of distribution network planning.Need to adopt more scientific, rational method to realize the analysis to power distribution network present situation weak link for this reason.The present invention proposes a kind of power distribution network present situation method for analyzing weak link, can thoroughly evaluating power distribution network present situation situation, improve power supply capacity and the adaptability of power distribution network.

Claims (2)

1. a power distribution network present situation method for analyzing weak link, is characterized in that: described power distribution network present situation method for analyzing weak link comprises the following step of carrying out in order:
Step 1) analyze the feature of local distribution network:
The related economic data that distribution network planning personnel announce by searching government's yearbook and government, analyze regional geographic position, economic society historical development and planning, grasp city developing stage of living in; Utilize the existing dispatch automated system of grid company, PMS system, generalized information system to search electrical network present situation, analyze power construction, power grid construction, network load situation, grasp power network development nargin; Analyzed area is built the matching degree with distribution network construction, thereby determines distribution network construction principle and construction object;
Step 2) set up power distribution network present situation weak link analysis indexes system:
On the basis of above-mentioned definite distribution network construction principle and construction object, utilize area of computer aided to set up a set of analysis indexes system that can thoroughly evaluating power distribution network present situation weak link; Analysis indexes system is divided into four major parts: security, economy, adaptability, harmony;
Step 3) power distribution network as-is data corresponding to each index in collection analysis index system:
Distribution network planning personnel collect power distribution network as-is data corresponding to each index in above-mentioned analysis indexes system by Utilities Electric Co. in the infosystem of building, the infosystem relating to comprises GIS, PMS, dispatching automation, power consumer power information acquisition system, thereby grasps power distribution network ruuning situation comprehensively;
Step 4) the power distribution network as-is data in check analysis index system to be to find out power distribution network present situation weak link item by item:
Distribution network planning personnel are entered into the above-mentioned power distribution network as-is data of collecting in the analysis indexes system of utilizing computing machine foundation, and the power distribution network as-is data in analysis indexes system is compared with distribution network construction target item by item, to find out power distribution network present situation weak link; The weak link that can analyze by this system is as follows: N-1 percent of pass is on the low side, capacity-load ratio is not in rational scope, the equipment operation time limit is long, operating cost and construction cost are bigger than normal, electrical network utilization ratio is on the low side, power grid construction passage deficiency, for the investment of next step power distribution network and construction have indicated direction.
2. power distribution network present situation method for analyzing weak link according to claim 1, is characterized in that: in step 2) in, described security comprises: power distribution network N-1 percent of pass, capacity-load ratio, equipment; Economy comprises performance driving economy, builds economy; Adaptability comprises that electrical network utilization ratio, electrical network can extend ability, power supply and demand adaptability; Harmony comprises power network development speed coordination, power network development scale harmony, Connection Mode harmony, power grid construction passage harmony.
CN201410295711.6A 2014-06-26 2014-06-26 Method for analyzing weak links of power distribution network status Pending CN104050606A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410295711.6A CN104050606A (en) 2014-06-26 2014-06-26 Method for analyzing weak links of power distribution network status

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410295711.6A CN104050606A (en) 2014-06-26 2014-06-26 Method for analyzing weak links of power distribution network status

Publications (1)

Publication Number Publication Date
CN104050606A true CN104050606A (en) 2014-09-17

Family

ID=51503402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410295711.6A Pending CN104050606A (en) 2014-06-26 2014-06-26 Method for analyzing weak links of power distribution network status

Country Status (1)

Country Link
CN (1) CN104050606A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107464062A (en) * 2017-08-09 2017-12-12 国网山东省电力公司经济技术研究院 A kind of power network development Evaluation of Diagnosis system
CN110728457A (en) * 2019-10-17 2020-01-24 广西电网有限责任公司电力科学研究院 Operation risk situation perception method considering multi-level weak links of power distribution network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009176205A (en) * 2008-01-28 2009-08-06 Gyoseiin Genshino Iinkai Kakuno Kenkyusho Primary risk factor analysis device by sequence tree
CN103646352A (en) * 2013-11-14 2014-03-19 国网上海市电力公司 Electric-power emergency system evaluation model construction method based on frangibility
CN103679544A (en) * 2012-11-27 2014-03-26 江苏省电力公司南京供电公司 Comprehensive assessment method for running of intelligent power distribution network
US20140156094A1 (en) * 2012-11-13 2014-06-05 Gridqunat, Inc. Sigma algebraic approximants as a diagnostic tool in power networks

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009176205A (en) * 2008-01-28 2009-08-06 Gyoseiin Genshino Iinkai Kakuno Kenkyusho Primary risk factor analysis device by sequence tree
US20140156094A1 (en) * 2012-11-13 2014-06-05 Gridqunat, Inc. Sigma algebraic approximants as a diagnostic tool in power networks
CN103679544A (en) * 2012-11-27 2014-03-26 江苏省电力公司南京供电公司 Comprehensive assessment method for running of intelligent power distribution network
CN103646352A (en) * 2013-11-14 2014-03-19 国网上海市电力公司 Electric-power emergency system evaluation model construction method based on frangibility

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崔艳妍: "电网规划综合评价方法研究与应用", 《中国优秀硕士学位论文全文数据库(工程科技Ⅱ辑)》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107464062A (en) * 2017-08-09 2017-12-12 国网山东省电力公司经济技术研究院 A kind of power network development Evaluation of Diagnosis system
CN110728457A (en) * 2019-10-17 2020-01-24 广西电网有限责任公司电力科学研究院 Operation risk situation perception method considering multi-level weak links of power distribution network
CN110728457B (en) * 2019-10-17 2022-11-22 广西电网有限责任公司电力科学研究院 Operation risk situation perception method considering multi-level weak links of power distribution network

Similar Documents

Publication Publication Date Title
Yuan et al. Smart grids in China
Yu et al. Big data analytics in power distribution systems
Herrmann et al. Energy oriented simulation of manufacturing systems–Concept and application
CN105303259A (en) Gridding concept based power distribution network planning management method
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN102521604B (en) Device and method for estimating performance degradation of equipment based on inspection system
Qi et al. A fuzzy comprehensive evaluation and entropy weight decision-making based method for power network structure assessment
CN105469194A (en) Power distribution network main equipment operation efficiency evaluation method based on load duration curve
CN103150605B (en) Power grid planning auxiliary system
CN104050608A (en) Power distribution network investment method based on reliability planning
CN104123588A (en) Comprehensive evaluation system and method of smart distribution grid
CN107423901A (en) Electricity power engineering overall process data intelligence evaluation system
CN103020290B (en) Electric network information method of calibration and system
CN102663566A (en) Asset management decision analysis information processing method suitable for power system
CN104050606A (en) Method for analyzing weak links of power distribution network status
CN105631552A (en) Power distribution automation engineering economic benefit assessment method based on whole life cycle
CN104063757B (en) Transformer substation main electrical connection assessment method suitable for different development stages of power grids
Yuan et al. Systematic thinking and evaluation of construction quality management standardization of power engineering in China
Ye et al. Research on intelligent operation and maintenance technology of pumped storage power plant based on 5G
CN201417948Y (en) Distribution network status and operating mode optimizing system based on DSCADA system
CN104143159A (en) Power distribution network health degree self-diagnosis method with consideration of regional difference
Wang Design of power line safety operation and maintenance monitoring system based on cloud computing
Liu et al. Design and implementation of large-scale public building energy consumption monitoring platform based on BP neural network
Jing et al. Dynamic simulation of the economic impact of financial development based on wireless sensor networks and artificial intelligence
Santos et al. Efficiency of European metros: the Portuguese case

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140917

WD01 Invention patent application deemed withdrawn after publication