CN104021445A - Information platform system construction method based on data analysis decision making - Google Patents

Information platform system construction method based on data analysis decision making Download PDF

Info

Publication number
CN104021445A
CN104021445A CN201410268657.6A CN201410268657A CN104021445A CN 104021445 A CN104021445 A CN 104021445A CN 201410268657 A CN201410268657 A CN 201410268657A CN 104021445 A CN104021445 A CN 104021445A
Authority
CN
China
Prior art keywords
assets
user
information
switching centre
assets information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410268657.6A
Other languages
Chinese (zh)
Other versions
CN104021445B (en
Inventor
童振新
丛丽娜
杨玉巧
邱良能
徐斌
符策雄
尚明征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yousheng Network Polytron Technologies Inc
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410268657.6A priority Critical patent/CN104021445B/en
Publication of CN104021445A publication Critical patent/CN104021445A/en
Application granted granted Critical
Publication of CN104021445B publication Critical patent/CN104021445B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an information platform system construction method based on data analysis decision making. An information platform system comprises a main system exchanging center and a plurality of auxiliary system exchanging centers, the main system exchanging center and the auxiliary system exchanging centers are provided with portals for users to log in corresponding systems, and the auxiliary system exchanging centers are connected with the main system exchanging center in a communication mode. Different authorities are distributed according to roles of the users, it is ensured that all the users check asset information related to themselves or change the corresponding asset information within own authority ranges, and influence on the information in the system exchanging centers by the operation, beyond the limit of authority, of the users is prevented.

Description

A kind of construction method of the information platform system based on data analysis decision-making
Technical field
The present invention relates to a kind of construction method of the information platform system based on data analysis decision-making, be mainly used in the assets information management of large-scale enterprises and institutions.
Background technology
Along with the universal and scientific and technical develop rapidly of computing machine, people start to utilize more and more computing machine to solve practical problems.Fixed capital management is that the pith of enterprise information management is faced a large amount of Item Information, adopt manpower to process and will waste a large amount of time, man power and material, and the accuracy of data is low.
And existing Properties MIS is merely able to manage for the assets in warehouse, for following the tracks of in the situation of the assets of using, for large-scale enterprises and institutions, its assets are often distributed in different location, therefore need many cover Properties MISs respectively the assets of different location to be managed, and information can not intercommunication between many cover Properties MISs, and can not manage as a whole all assets.
Summary of the invention
The problem existing in order to solve prior art, the invention provides a kind of construction method of the information platform system based on data analysis decision-making, the assets information of various places can be integrated together, be convenient to managerial personnel's overall management, can follow the tracks of in addition the convenient management of detailed situation of each assets.
The technical solution adopted in the present invention:
A kind of construction method of the information platform system based on data analysis decision-making, comprise main system switching centre and some backup systems switching centre, described main system center and some described backup systems switching centre all provide the entrance that user logins correspondence system, some backup systems switching centre all with the communication connection of described main system switching centre, the method comprises:
1) set up the main system asset database corresponding with described main system switching centre;
2) described main system switching centre and some described backup systems switching centre distribute authority according to user's different role, and each equal correspondence in systems exchange center is provided with a keeper;
3) at main system switching centre and all assets informations of some backup system switching centre's typings, described assets information is included in assets information, inventory assets information and the dead assets information used, describedly using assets information to comprise assets title, assets value, use mechanism, use department and end user, described inventory assets information comprises that Asset Name claims, assets value and deposit position, described dead assets information comprises that Asset Name claims and deposit position, and described all assets informations are deposited in described database.
Preferably, in step 2, according to the residing department of user, distribute authority, the different user basis of same department separately position is distributed authority, and described in each, keeper has the right to distribute all users' of correspondence system switching centre authority separately.
Further, described keeper can increase user at its corresponding systems exchange center.
Each user can be to described main system switching centre's download and/or upload file, and this document can be stored in described database.
Preferably, in step 3, during typing assets information, automatically generate unique bar code or Quick Response Code, and this bar code or Quick Response Code are attached in corresponding assets.
Step 3 can also comprise: when the part assets of correspondence are defective in quality in inventory assets information, these part assets are carried out to handling return, corresponding user is labeled as the return of goods by this part assets information.
In step 3, can also comprise: when user applies for certain assets arbitrarily, subject to its higher level user, allow, assets information corresponding to these assets be from described inventory assets information transfer to during using assets information, and by actual end user, use department with use mechanism to replenish in this assets information.
On the other hand, while being consumptive material as the assets of user's application, when this asset consumption is complete, user is labeled as consumption from being about to assets information corresponding to these assets, when the assets of user application are only when using temporarily, after user finishes using and these assets are returned, assets information corresponding to these assets is transferred in described inventory assets information again.
When user applies for assets, and these assets are in other departments, this user allows subject to its higher level user, and the relative users through corresponding department allows, assets information corresponding to these assets is transferred under this user name, and the end user in assets information corresponding to these assets, use department and use mechanism are changed by actual conditions, after user finishes using, by in inventory assets information described in assets information transfer paper corresponding to these assets, or be transferred to former user, and assets information corresponding to adaptability revision.
When assets are damaged, user allows subject to its higher level user, or stock control user allows subject to its higher level user, and assets information corresponding to these assets is transferred to maintenance department;
When assets need be scrapped because exceeding tenure of use or damage, stock control user allows assets information corresponding to these assets to be labeled as and to scrap subject to its higher level user.
Beneficial effect of the present invention:
Adopt main system switching centre and some backup systems switching centre, all assets informations that some backup systems switching centre can record it are uploaded to main system switching centre, managerial personnel can pass through main system switching centre, check the assets information of all switching centres, all assets informations are planned as a whole together, facilitated managerial personnel to plan as a whole, be convenient to when a certain middle material is not enough, supplement in advance, increase work efficiency.
The present invention distributes different authorities according to user's role, guarantee that all use checks per family to own relevant assets information or corresponding assets information is changed in the extent of competence of oneself, prevent that user's super limiting operation from exerting an influence to information intracardiac in systems exchange.
The setting of bar code or Quick Response Code, and this bar code or Quick Response Code are attached in corresponding assets, be convenient to all assets to carry out digital management.
Return of goods method, assets application method, asset consumption method, assets returning method, assets secondment method, assets are damaged the setting of reporting method and asset retirement method for repairment, and assets its circulation process in its whole life cycle is all recorded.
Accompanying drawing explanation
The schematic diagram of Tu1Shi main system switching centre and backup system switching centre;
Fig. 2 is the process flow diagram of assets information management;
Fig. 3 is assets application method schematic diagram;
Fig. 4 is assets secondment method schematic diagram.
Embodiment
Referring to Fig. 1, the invention provides a kind of structure of the information platform system based on data analysis decision-making by method, comprise main system switching centre and some backup systems switching centre, described main system center and some described backup systems switching centre all provide the entrance that user logins correspondence system, some backup systems switching centre all with the communication connection of described main system switching centre, the method comprises:
1) set up the main system asset database corresponding with described main system switching centre;
At this, it is emphasized that described in each that backup system switching centre also all can set up its each self-corresponding database, database corresponding to each backup system only stored the data (assets information etc. of this backup system, lower with), and described main system asset database stores all systems exchange center data of (comprising main system switching centre and all backup systems switching centre).
2) described main system switching centre and some described backup systems switching centre distribute authority according to user's different role, and each equal correspondence in systems exchange center is provided with a keeper;
Here the different role that it should be explained that user refers to, the residing mechanism of user, department and position, and the authority of the high-ranking user in the same department of normal conditions is greater than junior user's authority; The authority here refers to the residing department according to user, as storehouse department, its internal user has the authority under one's name that the some assets informations in inventory assets information or several assets information is transferred to some users conventionally, and the user of common department can be transferred to its one or several assets information under one's name in inventory assets information, or be transferred to the authority under other user names, below can describe in detail.
Department head user You Qi department increases or deletes user's authority under one's name, and keeper has all authorities (increase of assets information, increases or delete user, increases or the department of deletion register, mechanism's register etc.).
In addition keeper's authority is only limited in its corresponding systems exchange intracardiac.
Each is used and has per family unique user name, and its corresponding password is set separately, in order to login corresponding system.
3) referring to Fig. 2, at main system switching centre and all assets informations of some backup system switching centre's typings, described assets information is included in assets information, inventory assets information and the dead assets information used, describedly using assets information to comprise assets title, assets value, use mechanism, use department and end user, described inventory assets information comprises that Asset Name claims, assets value and deposit position, described dead assets information comprises that Asset Name claims and deposit position, and described all assets informations are deposited in described database.
By assets information input system switching centre (main system switching centre or arbitrarily backup system switching centre, lower same) time, the bar code printer being connected with this systems exchange center prints bar code or Quick Response Code, and this bar code or Quick Response Code are attached in corresponding assets (corresponding with the assets information of typing).
The corresponding bar code of all assets or Quick Response Code are all not identical.
The use of bar code or Quick Response Code, facilitates all assets of personal management, can improve the utilization rate of capital assets, guarantees the safe and complete of capital assets, impels value preserving and the increment of capital assets.
Assets storage method:
The assets of newly buying, need put in storage it, storehouse office worker is by the assets information input system switching centre of these assets, and this assets information is stored under inventory assets information register, now this assets information comprise in have that Asset Name claims, assets value and deposit position (this deposit position can be accurate to the particular location in certain storehouse or certain storehouse, needs depending on actual conditions).
Return of goods method:
The assets of newly buying, when wherein part occurs that quality condition need to be returned goods, corresponding user's (being generally storehouse office worker) can be labeled as the return of goods by assets information corresponding to these part assets, and by this part assets information from inventory assets information transfer to return of goods assets information (return of goods assets information with using assets information, inventory assets information and dead assets information at same level).
Assets application method:
Referring to Fig. 3, when user applies for certain assets arbitrarily, need in systems exchange, subject to its higher level user, allow (with the common office worker in department, subject to department head, to allow in the heart, when department receives, must allow subject to higher level department), after allowing (if do not allowed, return), by this information delivery to storehouse, the user that storehouse is corresponding (being generally storehouse office worker) by the assets transfer of needs to needed user or department, and by the assets information corresponding with these assets from inventory assets information transfer of living in to (be transferred to concrete end user in using assets information or use department under one's name) during using assets information, and by actual end user, use department and use mechanism replenish (this partial information supplements as automatic generation conventionally) in this assets information.
For some public assets (the common assets of using of a plurality of departments), as printer, water dispenser etc., when these part assets of application, applicant (any users in a plurality of departments) allows (not allow through its higher level user, return), user corresponding to storehouse by needed assets transfer to public place, and by the corresponding assets information of these assets from described inventory assets information transfer to practical assets information, place to use is not replenished in this assets information.
Asset consumption method:
When the assets of user's application are consumptive material (as paper, pen etc.), when this asset consumption is complete, user is labeled as consumption from being about to assets information corresponding to these assets, this assets information is automatically from removing during using assets information, and this assets information is transferred in wasting assets information (wasting assets information with using assets information, inventory assets information and dead assets information at same level).
Assets returning method:
When the assets of user application are only when using temporarily, user, finish using and by after this assets return, assets information corresponding to these assets be transferred in described inventory assets information again, the user that storehouse is corresponding adds their confirmation.
Assets secondment method:
Referring to Fig. 4, when user applies for assets, and these assets are in other departments, this user allows subject to its higher level user, and the relative users through corresponding department allows (not allow, return), assets information corresponding to these assets is transferred under this user name, and the end user in assets information corresponding to these assets, use department and use mechanism are changed by actual conditions, after user finishes using, by in inventory assets information described in assets information transfer paper corresponding to these assets, or be transferred to former user, and assets information corresponding to adaptability revision.
Assets are damaged the method for reporting for repairment:
When assets are damaged, user allows subject to its higher level user, or stock control user allows (not allow subject to its higher level user, return), by this assets transfer, to maintenance department, assets information corresponding to these assets is transferred to maintenance department simultaneously, after maintenance department's maintenance, these assets are returned to storehouse or user, and this assets information is transferred to former storehouse or original subscriber again.
Certainly, for user, apply for maintenance, can be first by assets transfer to storehouse, and this assets information is transferred in described inventory assets information, then is keeped in repair by storehouse application.
Asset retirement method:
When assets need be scrapped because exceeding tenure of use or damage, stock control user allows (do not allow, return) that assets information corresponding to these assets is labeled as and scrapped subject to its higher level user, and this assets information is transferred in described dead assets information.
And for what in use scrap, by end user, subject to its higher level user, allow (do not allow, return), assets information corresponding to these assets is labeled as and scraps, and this assets information is transferred in described dead assets information.
For public assets, by any applicant, adopted to use the same method and scrap, do not repeat them here.
Dead assets method for cleaning:
For the assets of having scrapped, scrap processing, treatment people (being generally the office worker of Finance Department) allows (do not allow, return) subject to its higher level user, dead assets is processed, and be processed by dead assets information flag.
Native system, based on the up-to-date .net platform construction of Microsoft, provides across the high scalability access of INTERNET/INTRANET and supports.On fabric, based on .NET Framework build can hosted-type code components in order to basic service logical process to be provided, utilize ASP.NET technology to generate the foreground WEB page, adopt the IIS of NT to support operation platform as rear end, by the powerful distributed treatment ability of NT, enterprise level service support and security feature, for whole system provides the operation platform of stable, efficient, safety and tool extendability.
Concrete architecture is divided into following three logical layers:
(1) user service layer (USL)
User service layer provides the access ability of application programs for client.Web project in system realizes the function of this layer, and this layer is comprised of ASP.NET Web forms and code hidden file.Web forms provide user to operate with HTML (the support characteristic based on IE5.0), and code hidden file is realized the event handling of various controls, and provide with Dll.
(2) Business Logic (BLL)
The realization that Business Logic comprises miscellaneous service rule and logic.Operation_set project in system realizes the function of this layer.Its processing service flow process control, the inter-related tasks such as rule and logic analysis, institute's data have requirements for access to send by this layer.This layer is Managed Code assembly, with Dll form, provides.
(3) data access layer (DAL)
Data access layer provides data, services for BLL.Data_link project in system realizes the function of this layer.This layer is separated service logic and data structure and distribution mode thereof.This layer is Managed Code assembly, with Dll form, provides.
Except three logical layers described above, system also comprises Sharing Function packaged in Soft_Common project and the expansion base class definition in Soft_control, in order to provide object standardization, system initialization, data to connect the inter-related tasks such as sensing.
In addition native system also has following functions:
For single purchase, overlap single class assets more, when these assets are carried out to in-stockroom operation, storehouse office worker only need be by the assets information input system switching centre of these assets and its quantity of mark, and this system can generate a plurality of assets informations automatically also generate corresponding bar code or Quick Response Code.Thereby reduce staff's labour intensity.
In addition operating personnel's (mainly referring to storehouse office worker user), when admission data are made mistakes, can modify or delete this assets information.
In addition during large batch of typing assets information, can import by Microsoft Excel.
For financial staff, can derive underlying assets information by this system, be convenient to asset count and reconciliation.

Claims (10)

1. the construction method of the information platform system based on data analysis decision-making, it is characterized in that: comprise main system switching centre and some backup systems switching centre, described main system center and some described backup systems switching centre all provide the entrance that user logins correspondence system, some described backup systems switching centre all with the communication connection of described main system switching centre, the method comprises:
1) set up the main system asset database corresponding with described main system switching centre;
2) described main system switching centre and some described backup systems switching centre distribute authority according to user's different role, and each equal correspondence in systems exchange center is provided with a keeper;
3) at main system switching centre and all assets informations of some backup system switching centre's typings, described assets information is included in assets information, inventory assets information and the dead assets information used, describedly using assets information to comprise assets title, assets value, use mechanism, use department and end user, described inventory assets information comprises that Asset Name claims, assets value and deposit position, described dead assets information comprises that Asset Name claims and deposit position, and described all assets informations are deposited in described database.
2. the construction method of a kind of information platform system based on data analysis decision-making according to claim 1, it is characterized in that: in step 2, according to the residing department of user, distribute authority, the different user basis of same department separately position is distributed authority, and described in each, keeper has the right to distribute all users' of correspondence system switching centre authority separately.
3. the construction method of a kind of information platform system based on data analysis decision-making according to claim 2, is characterized in that: described keeper has the right to increase at its corresponding systems exchange center user.
4. the construction method of a kind of information platform system based on data analysis decision-making according to claim 3, is characterized in that: each user has the right to described main system switching centre's download and/or upload file, and this document is stored in described database.
5. according to the construction method of a kind of information platform system based on data analysis decision-making described in claim 1-4 any one, it is characterized in that: in step 3 during typing assets information, automatically generate unique bar code or Quick Response Code, and this bar code or Quick Response Code are attached in corresponding assets.
6. the construction method of a kind of information platform system based on data analysis decision-making according to claim 5, it is characterized in that: step 3 also comprises: when in inventory assets information, the part assets of correspondence are defective in quality, these part assets are carried out to handling return, and corresponding user is labeled as the return of goods by this part assets information.
7. the construction method of a kind of information platform system based on data analysis decision-making according to claim 5, it is characterized in that: in step 3, also comprise: when user applies for certain assets arbitrarily, subject to its higher level user, allow, assets information corresponding to these assets be from described inventory assets information transfer to during using assets information, and by actual end user, use department with use mechanism to replenish in this assets information.
8. the construction method of a kind of information platform system based on data analysis decision-making according to claim 7, it is characterized in that: when the assets of user's application are consumptive material, when this asset consumption is complete, user is labeled as consumption from being about to assets information corresponding to these assets, when the assets of user application are only when using temporarily, after user finishes using and these assets are returned, assets information corresponding to these assets is transferred in described inventory assets information again.
9. the construction method of a kind of information platform system based on data analysis decision-making according to claim 5, it is characterized in that: when user applies for assets, and these assets are in other departments, this user allows subject to its higher level user, and the relative users through corresponding department allows, assets information corresponding to these assets is transferred under this user name, and by the end user in assets information corresponding to these assets, use department and use mechanism change by actual conditions, after user finishes using, by in inventory assets information described in assets information transfer paper corresponding to these assets, or be transferred to former user, and assets information corresponding to adaptability revision.
10. the construction method of a kind of information platform system based on data analysis decision-making according to claim 5, it is characterized in that: when assets are damaged, user allows subject to its higher level user, or stock control user allows subject to its higher level user, and assets information corresponding to these assets is transferred to maintenance department;
When assets need be scrapped because exceeding tenure of use or damage, stock control user allows assets information corresponding to these assets to be labeled as and to scrap subject to its higher level user.
CN201410268657.6A 2014-06-17 2014-06-17 Information platform system construction method based on data analysis decision making Expired - Fee Related CN104021445B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410268657.6A CN104021445B (en) 2014-06-17 2014-06-17 Information platform system construction method based on data analysis decision making

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410268657.6A CN104021445B (en) 2014-06-17 2014-06-17 Information platform system construction method based on data analysis decision making

Publications (2)

Publication Number Publication Date
CN104021445A true CN104021445A (en) 2014-09-03
CN104021445B CN104021445B (en) 2017-05-24

Family

ID=51438185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410268657.6A Expired - Fee Related CN104021445B (en) 2014-06-17 2014-06-17 Information platform system construction method based on data analysis decision making

Country Status (1)

Country Link
CN (1) CN104021445B (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1691027A (en) * 2004-04-23 2005-11-02 千乡万才科技(中国)有限公司 Asset management system and method
CN1751278A (en) * 2003-02-19 2006-03-22 费舍-柔斯芒特系统股份有限公司 Open network-based data acquisition, aggregation and optimization for use with process control systems
CN101588242A (en) * 2008-05-19 2009-11-25 北京亿企通信息技术有限公司 Method and system for realizing authority management
CN101833740A (en) * 2010-04-30 2010-09-15 深圳市科陆电子科技股份有限公司 Electric power asset life cycle data management method based on RFID technology
CN101951377A (en) * 2010-09-21 2011-01-19 用友软件股份有限公司 Hierarchical authorization management method and device
CN101976396A (en) * 2010-11-05 2011-02-16 河南省烟草公司鹤壁市公司 Asset barcode management method
CN102034146A (en) * 2010-11-29 2011-04-27 中国联合网络通信集团有限公司 Method, equipment and system for confirmation of assets
CN102034163A (en) * 2010-12-22 2011-04-27 中兴通讯股份有限公司 Method and system for managing asset information of telecommunication equipment
CN202177927U (en) * 2011-07-29 2012-03-28 罗勇 Material uniformly-coding checking management system
CN202333858U (en) * 2011-11-11 2012-07-11 山东电力研究院 Electric automobile charge-conversion monitoring system based on two-dimension code technology
CN102843261A (en) * 2012-09-18 2012-12-26 平顶山中选自控系统有限公司 Role-based distributed authority management method for manufacturing execution system (MES) for coal preparation plant
CN102968678A (en) * 2011-09-01 2013-03-13 大连恒基电子技术有限公司 Fixed asset project management system based on geographic information system
CN202904655U (en) * 2012-11-14 2013-04-24 高辉 Fixed assets management system based on internet of things
CN103218907A (en) * 2013-04-26 2013-07-24 深圳供电局有限公司 Mobile terminal and system for electricity field operation
CN103440569A (en) * 2013-09-05 2013-12-11 天津津创晨光科技有限公司 Power plant electric meter storehouse intelligent comprehensive control management system
CN103473654A (en) * 2013-09-23 2013-12-25 国家电网公司 Asset data cleaning auxiliary method and system for electric ERP system
CN103489078A (en) * 2013-10-09 2014-01-01 国网上海市电力公司 Intelligent charging and battery-swapping service network asset life-cycle management method based on RFID

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1751278A (en) * 2003-02-19 2006-03-22 费舍-柔斯芒特系统股份有限公司 Open network-based data acquisition, aggregation and optimization for use with process control systems
CN1691027A (en) * 2004-04-23 2005-11-02 千乡万才科技(中国)有限公司 Asset management system and method
CN101588242A (en) * 2008-05-19 2009-11-25 北京亿企通信息技术有限公司 Method and system for realizing authority management
CN101833740A (en) * 2010-04-30 2010-09-15 深圳市科陆电子科技股份有限公司 Electric power asset life cycle data management method based on RFID technology
CN101951377A (en) * 2010-09-21 2011-01-19 用友软件股份有限公司 Hierarchical authorization management method and device
CN101976396A (en) * 2010-11-05 2011-02-16 河南省烟草公司鹤壁市公司 Asset barcode management method
CN102034146A (en) * 2010-11-29 2011-04-27 中国联合网络通信集团有限公司 Method, equipment and system for confirmation of assets
CN102034163A (en) * 2010-12-22 2011-04-27 中兴通讯股份有限公司 Method and system for managing asset information of telecommunication equipment
CN202177927U (en) * 2011-07-29 2012-03-28 罗勇 Material uniformly-coding checking management system
CN102968678A (en) * 2011-09-01 2013-03-13 大连恒基电子技术有限公司 Fixed asset project management system based on geographic information system
CN202333858U (en) * 2011-11-11 2012-07-11 山东电力研究院 Electric automobile charge-conversion monitoring system based on two-dimension code technology
CN102843261A (en) * 2012-09-18 2012-12-26 平顶山中选自控系统有限公司 Role-based distributed authority management method for manufacturing execution system (MES) for coal preparation plant
CN202904655U (en) * 2012-11-14 2013-04-24 高辉 Fixed assets management system based on internet of things
CN103218907A (en) * 2013-04-26 2013-07-24 深圳供电局有限公司 Mobile terminal and system for electricity field operation
CN103440569A (en) * 2013-09-05 2013-12-11 天津津创晨光科技有限公司 Power plant electric meter storehouse intelligent comprehensive control management system
CN103473654A (en) * 2013-09-23 2013-12-25 国家电网公司 Asset data cleaning auxiliary method and system for electric ERP system
CN103489078A (en) * 2013-10-09 2014-01-01 国网上海市电力公司 Intelligent charging and battery-swapping service network asset life-cycle management method based on RFID

Also Published As

Publication number Publication date
CN104021445B (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN102024211A (en) Enterprise office automation system and method
CN102663582A (en) Electronic government document handling system
CN102332115A (en) Electronic government office cooperation system based on cloud computing
CN106227838A (en) A kind of electric power enterprise eletronic data management system
CN105373896A (en) Project management system
CN104363255A (en) Distributive patent service system
CN102855546A (en) Integrated project management system
CN104700177A (en) Collaborative work platform
CN102332117A (en) Comprehensive cost analysis method and system
Gulla et al. Implementing SAP R/3 in a multi-cultural organization
CN107274135A (en) The raw tobacco material overall planning method and system shared based on cooperative information
CN104021445A (en) Information platform system construction method based on data analysis decision making
EP2413272A1 (en) Capturing and processing data generatid in an erp interim phase
CN102542428A (en) Managing system for kitchen spare parts
CN104539658A (en) Big data processing system and method based on enterprise private cloud
Słoniec Use of cloud computing in project management
Wulandari Optimizing Public Service Through E-Gov Services (The Case Of Public Service in South Jakarta Municipality)
CN110309928A (en) A kind of working method of the repairing storage platform based on modern technology of Internet of things
Pyda et al. Development assumptions of a data and service management centre at KGHM SA
CN110517006A (en) A kind of service monitoring system and method integrating purchase of goods and materials and transaction
CN108846627A (en) A kind of enterprise management system and its implementation based on sales management
Elmoniem et al. Implementing an ERP System in an Egyptian Research Center: Lessons from Practice
Liang et al. The Study on Engineering Construction Material Information Management System Based on. NET
Dong The Research of the Design for Storage System on Supply Chain Logistics Park
Smetanková et al. Construction proceedings in the Slovak Republic: An overview of tools for efficient exchange and management of information in the BIM environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Tan Kegang

Inventor before: Tong Zhenxin

Inventor before: Cong Lina

Inventor before: Yang Yuqiao

Inventor before: Qiu Liangneng

Inventor before: Xu Bin

Inventor before: Fu Cexiong

Inventor before: Shang Mingzheng

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170328

Address after: Haizhuqu District Guangzhou City, Guangdong province Chigang West 510310 No. 286 A115

Applicant after: Guangzhou Yousheng network Polytron Technologies Inc

Address before: 68 No. 571126 Hainan province Haikou City Meilan District Baiju Avenue

Applicant before: Tong Zhenxin

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20210617

CF01 Termination of patent right due to non-payment of annual fee